BUILDING ELECTRICAL SERVICES DESIGN FOR A PROPOSED COLLEGE ADMINISTRATION BLOCK

Size: px
Start display at page:

Download "BUILDING ELECTRICAL SERVICES DESIGN FOR A PROPOSED COLLEGE ADMINISTRATION BLOCK"

Transcription

1 BUILDING ELECTRICAL SERVICES DESIGN FOR A PROPOSED COLLEGE ADMINISTRATION BLOCK PROJECT INDEX: PRJ 107 BY ONSONGO KEVIN NYAKUNDI F17/1770/2006 SUPERVISOR: DR. N. O. ABUNGU EXAMINER: DR. WEKESA DATE: 27 TH MAY 2011.

2 OBJECTIVES Design of a Lighting System Design of power points layout Load assessment Load Balance realization Design of Electrical Power Distribution System Design of back-up power system Power Factor correction Protection

3 INTRODUCTION The College is located in an area where solar and wind are the main sources of energy Total load = = 1000 Number of floors =4 266kVA The design of the distribution system was in compliance with the IEE regulations for electrical installations.

4 A section of the college map.

5 LIGHTING DESIGN Two methods commonly used for design: 1. Lumen method (Zonal cavity method). 2. Point by point method. Lumen method: Uses horizontal illuminance criteria to establish a uniform luminaire layout in a space. Considered for uniform lighting. Point by Point method: Suitable for outdoor schemes and indoor schemes where reflectances are negligible. Lumen method was used in this project.

6 SAMPLE CALCACULATION:REGISTRAR S OFFICE Recommended illuminance = 500lux Floor dimension : L = 4.8m, W = 3.5m Ceiling height = 3m Mounting height, H m = = 2.15m K = = ( ) UF = Lighting design lumens(ldl) = 3600lumens Required Flux = = 8400lumens 8400 Flux to be installed = = 29577lumens Number of Luminaires =

7 Registrar s office on ground floor Luminaire Quattro lamps

8 Fittings arrangement on first floor

9 LIGHTING CIRCUITS Radial circuits are used. Worst case of 100W per lamp. 10 lighting points assigned to each lighting circuit. MCB rating of 6A is used to protect each lighting circuit.

10 DESIGN OF THE POWERING POINTS Sockets (BS 1363) Radial circuit Ring circuit Ring circuits were used each protected by a 32A MCB. Maximum of 4 twin sockets per ring circuit. Kitchen Units: Used to connect power to the cooker. They also have an attached socket. Single Phase Isolators: Used to power the hand driers and single phase air conditioners.

11 Power and data points on Mezzanine Floor.

12 LOAD ASSESSMENT This was to facilitate the determination of the design current I b. The main loads in the installation were: Lighting circuits. Ring circuits. Single phase isolators. Design current I b = V P η Cos φ I b for a single lighting point = = 0.538Amps Each lighting circuit had 10 lighting points, thus 5.38A. Total load for light circuit = = Watts

13 MAXIMUM DEMAND ASSESSMENT Evaluated for each of the final circuit. This was done to facilitate load balancing. Maximum demand was calculated as follow; Maximum demand (A) = Connected load diversity Maximum demand : the highest rate at which power is consumed. Connected load : the sum of all loads in the installation. Diversity : accounts for the fact that some of the connected loads will not be running at the same time instant as other loads. Example: Each lighting circuit: Total load = Watts Diversity factor = 0.9 Maximum demand= = Watts

14 LOAD BALANCING Equally distributing the single-phase loads across the three-phase supply is known as balancing the load. Was achieved by distributing the various loads on the different phases. Load balancing in the building Floor Red phase Yellow Phase Blue Phase Ground Mezzanine First Second Total Load(W) Current(A)

15 POWER DISTRIBUTION Desirable principles in distribution schemes in buildings are: The circuit should be reliable. The circuit should be economical. It should be able to meet future expansions without large financial costs. Distribution system can be: The vertical supply system (rising mains). The horizontal supply (distribution at each floor level). The vertical supply system was used.

16 BACK-UP GENERATOR Used to provide critical loads with power in the case of mains failure. All the loads were to be backed up i.e. 266kVA A 340kVA Manlift hooded generator was used. The MFP intended for automatic operation of the generator was incorporated at the switch board.

17 SIZING OF CABLES The size of a cable to be used for an installation depends upon: the current rating of the cable under defined installation conditions. the maximum permitted drop in voltage as defined by Regulation 525. Was done with an allowance of 20% to cater for future growth. Conductor cross section area got from IEE standard Table 4D2A. Voltage drop per ampere per metre obtained from Table 4D1B. Volt drop = Where: V I b = = V Ib L 1000 voltage drop per ampere per metre in mv/a/m Total load CU load

18 Cable sizing for consumer units on ground floor

19 DISTRIBUTION SYSTEM RETICULATION Fig.7: Distribution system layout Fig 6: Distribution system reticulation layout

20 POWER FACTOR CORRECTION Is the relationship between active power and total power. Power factor correction helps in: Reducing copper losses. Enables economic use of conductors and switchgear Power factor before correction =0.7 Required power factor =0.9 Power factor triangle N/B: 150kVAr capacitor bank chosen

21 PROTECTION SYSTEM DESIGN Protection of cables (BS 7671). Protection against overcurrent; overload and short circuit achieved by use of MCBs and MCCBs. Discrimination: IEE Wiring Regulations

22 Summary of discrimination for the protective devices and protection of cables Consumer Unit(CU) GF.1 GF.2 GF.3 GF.4 GF.5 GF.6 CU Cable size (mm 2 ) Cable Rating (A) Cable current (Amps) Rating of largest MCB in CU(A) Fault current (Amps) Rating of MCCB upstream

23 CONCLUSIONS The design of lighting and distribution system was achieved under the IEE standards and regulations. The total load was assessed to be 266kVA. The distribution system was realized by use of one DB and 24 Cus. Back-up system designed with a 340kVA generator in place. Reactive power improved by a 150kVAr capacitor bank. Protection system was designed.

24 RECOMMENDATIONS FOR FUTURE WORK There is need for; Automation of the lighting system. Development of a program code to do calculation of earth faults and cable sizes.

25 THANK YOU

UNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING

UNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING UNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING BUILDING ELECTRICAL SERVICES DESIGN FOR THE BANK OF FAHARI CITY PROJECT INDEX: PRJ 099 BY ODHIAMBO GIFT

More information

UNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING BUILDING ELECTRICAL SERVICES DESIGN FOR HOSTEL

UNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING BUILDING ELECTRICAL SERVICES DESIGN FOR HOSTEL UNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING BUILDING ELECTRICAL SERVICES DESIGN FOR HOSTEL ALONG NYERERE ROAD PROJECT NUMBER: PRJ 095 BY OELE O. COLLINS

More information

UNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING

UNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING UNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING LIGHTING AND DISTRIBUTION SYSTEM DESIGN FOR A PROPOSED RESIDENTIAL ESTATE IN FAHARI CITY PROJECT INDEX:

More information

ELECTRICIANS REGULATIONS EXAMINATION 29 June 2013 QUESTION AND ANSWER BOOKLET

ELECTRICIANS REGULATIONS EXAMINATION 29 June 2013 QUESTION AND ANSWER BOOKLET ER52 Candidate Code No. For Board Use Only Result Date Result Date Int ELECTRICIANS REGULATIONS EXAMINATION 29 June 2013 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours INSTRUCTIONS READ CAREFULLY

More information

Calculation of the Cross-sectional Areas of Circuit Live Conductors

Calculation of the Cross-sectional Areas of Circuit Live Conductors Calculation of the Cross-sectional Areas of Circuit Live Conductors MOTOR CIRCUITS SUBJECT TO FREQUENT STOPPING AND STARTING Regulations requires that where a motor is intended for intermittent duty and

More information

Central Battery Systems

Central Battery Systems Central battery system based emergency lighting is ideal for medium to large installations. For projects where central control and testing is desirable, a central battery system is a viable and cost effective

More information

Central Battery Systems

Central Battery Systems Central battery system based emergency lighting is ideal for medium to large installations. For projects where central control and testing is desirable, a central battery system is a viable and cost effective

More information

ELECTRICAL INSPECTOR EXAMINATION 18 November 2017 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours

ELECTRICAL INSPECTOR EXAMINATION 18 November 2017 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours Candidate Code No. IT 36 For Board Use Only Result Date Int Result Date Int ELECTRICAL INSPECTOR EXAMINATION 18 November 2017 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours INSTRUCTIONS READ CAREFULLY

More information

ELECTRICAL INSPECTOR EXAMINATION 14 November 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours

ELECTRICAL INSPECTOR EXAMINATION 14 November 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours Candidate Code No. IT 32 For Board Use Only Result Date Int Result Date Int ELECTRICAL INSPECTOR EXAMINATION 14 November 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours INSTRUCTIONS READ CAREFULLY

More information

Recommended Procedures

Recommended Procedures Selective Coordination Study Recommended Procedures The following steps are recommended when conducting a selective coordination study.. One-Line Diagram Obtain the electrical system one-line diagram that

More information

MYRON ZUCKER CALMANUAL POWER FACTOR CORRECTION APPLICATION GUIDE INC.

MYRON ZUCKER CALMANUAL POWER FACTOR CORRECTION APPLICATION GUIDE INC. MYRON ZUCKER CALMANUAL POWER FACTOR CORRECTION APPLICATION GUIDE INC. CALMANUAL HOW TO APPLY CAPACITORS TO LOW VOLTAGE POWER SYSTEMS. SECTION INDEX SECTION I POWER FACTOR UNDERSTANDING POWER FACTOR...

More information

Power Factor Correction

Power Factor Correction AE9-1249 R10 August 2008 Power Factor Correction Index Page 1. Introduction... 1 2. Electrical Fundamentals... 1 3. Electrical Formulas... 2 4. Apparent Power and Actual Power... 2 5. Effects of Poor Power

More information

On-Site Guide (BS 7671:2008 Wiring Regulations, incorporating Amendment No 1:2011)

On-Site Guide (BS 7671:2008 Wiring Regulations, incorporating Amendment No 1:2011) (BS 7671:2008 Wiring Regulations, incorporating Amendment No 1:2011) Author: IET Publications (edited by Mark Coles) Book details Author: IET Publications (edited by Mark Coles) Year: 2011 Format: Paperback,

More information

Effective discrimination of protective devices

Effective discrimination of protective devices Effective discrimination of protective devices In the event of a fault occurring on an electrical installation only the protective device nearest to the fault should operate,leaving other healthy circuits

More information

On_Disc. 2 o/c1 BS 7671 applies to a lift installations b highway equipment c equipment on board ships d electrical equipment of machines.

On_Disc. 2 o/c1 BS 7671 applies to a lift installations b highway equipment c equipment on board ships d electrical equipment of machines. 1 PAPER 4 Sample Questions - C&G 2382 17th Edition full paper D 1 o/c 1 - A recommendation for the interval to the first periodic inspection shall be made by: a the installation electrician. b the main

More information

ELECTRICIANS REGULATIONS EXAMINATION 25 June 2011

ELECTRICIANS REGULATIONS EXAMINATION 25 June 2011 ER42 Candidate Code No. For Board Use Only Result Date Result Date Int ELECTRICIANS REGULATIONS EXAMINATION 25 June 2011 Int QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three

More information

Lisun Electronics Inc. Tel:+86(21)

Lisun Electronics Inc.   Tel:+86(21) Report No.: Test Time: 2013-11-28 15:27 Luminaire Property Page 1 of 17 Pages Luminaire Manufacturer: One Electrical Co.,ltd Luminaire Category: OE-LED-PANEL22 Luminaire Description: 22W Round LED Panel

More information

Investigation into UK socket-outlets incorporating USB charging points

Investigation into UK socket-outlets incorporating USB charging points Investigation into UK socket-outlets incorporating USB charging points Electrical Safety First investigated a number of commercially available UK socket-outlets incorporating USB ports, as a repeat of

More information

Electrical Design/Build Guide

Electrical Design/Build Guide 2017 Electrical Design/Build Guide Based on the 2017 National Electrical Code Copyright Durand & Associates 1986-2016 60 C Copper Ampacity 4 - Wire Fill - (Non-Current Carrying Neutral) 4 or 5 - Parallel

More information

White Paper. Application of Resistive/Reactive Load Banks for kva Testing

White Paper. Application of Resistive/Reactive Load Banks for kva Testing White Paper Application of Resistive/Reactive Load Banks for kva Testing Application of Resistive/Reactive Load Banks for kva Testing Resistive load banks are the most commonly used load banks for the

More information

Lisun Electronics Inc. Tel:+86(21)

Lisun Electronics Inc.  Tel:+86(21) Report No.: Test Time: 2013-11-28 14:48 Luminaire Property Page 1 of 17 Pages Luminaire Manufacturer: One Electrical Co.,ltd Luminaire Category: OE-LED-COB-30 Luminaire Description: 30W COB LED Downlight

More information

THE PROTECTION OF INDUSTRIAL CAPACITOR BANKS BY CURRENT LIMITING FUSES. By M.J. Smart and B. Wadcock

THE PROTECTION OF INDUSTRIAL CAPACITOR BANKS BY CURRENT LIMITING FUSES. By M.J. Smart and B. Wadcock 203 THE PROTECTION OF INDUSTRIAL CAPACITOR BANKS BY CURRENT LIMITING FUSES By M.J. Smart and B. Wadcock 1.0 INTRODUCTION Capacitors are widely used for industrial power factor correction throughout the

More information

AUTOMATIC CAPACITOR BANK WITH CONTACTOR OPERATIONS

AUTOMATIC CAPACITOR BANK WITH CONTACTOR OPERATIONS AUTOMATIC CAPACITOR BANK WITH CONTACTOR OPERATIONS INSTRUCTION MANUAL (M98125401-03 / 03A) (c) CIRCUTOR S.A. ------Automatic capacitor bank with contactor operations ----- Page 2 TABLE OF CONTENTS 1. Introduction.

More information

Test Sample Description Catalog Number: Description:

Test Sample Description Catalog Number: Description: Project Number Date 15.00487 3/26/2015 LAB 6 Test Sample Description Catalog Number: Description: P3408-0930K9 Close to Ceiling fixture Test Method: Preburn Time: Time To Stabilize: Total Operating Time:

More information

Candidate Handbook answers

Candidate Handbook answers Candidate Handbook answers Progress check 7.1, p. 341 1. What must the electrical system installed in premises be suitable for? The purpose of the system; the building and environment. What is the role

More information

HOTLINE ELECTRICAL TRADING

HOTLINE ELECTRICAL TRADING HOTLINE ELECTRICAL TRADING (L.L.C) P.O.Box: 235152 Dubai, UAE. Tel ; +971-4-3455173 Email:-manuel@hletllc.com I www.hletllc.com Company Profile Hotline Electrical Trading L.L.C is a trading company dealing

More information

ELECTRICIANS REGULATIONS EXAMINATION 23 November 2013 QUESTION AND ANSWER BOOKLET

ELECTRICIANS REGULATIONS EXAMINATION 23 November 2013 QUESTION AND ANSWER BOOKLET ER54 Candidate Code No. For Board Use Only Result Date Result Date Int ELECTRICIANS REGULATIONS EXAMINATION 23 November 2013 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours INSTRUCTIONS READ CAREFULLY

More information

KENYA POWER-MOMBASA BRANCH REPLACEMENT OF AIR-CONDITIONING AND ASSOCIATED WORKS BILLS OF QUANTITIES FOR ELECTRICAL INSTALLATIONS BILL NO

KENYA POWER-MOMBASA BRANCH REPLACEMENT OF AIR-CONDITIONING AND ASSOCIATED WORKS BILLS OF QUANTITIES FOR ELECTRICAL INSTALLATIONS BILL NO BILL 1 MAINS POWER DISTRIBUTION 2-1 ITEM DESCRIPTION QTY UNIT RATE AMOUNT Supply, install, test, commission and set to work the following:- 1.01 Free-standing purpose made front access sub main switchboard

More information

DESCRIPTION & APPLICATION

DESCRIPTION & APPLICATION T5 FME T5 4L - Full Body High Bay DESCRIPTION & APPLICATION The Envirobrite FME T5 fixture is a full body fluorescent high bay ideal for replacing energy devouring HID fixtures. This all aluminum enclosed

More information

S BERGIN R BEATTIE Lighting Engineer. Checked Approved

S BERGIN R BEATTIE Lighting Engineer. Checked Approved REPORT NUMBER: ITL73351 PAGE: 1 OF 10 CATALOG NUMBER: MARRAKESH SCONCE I (LED) LUMINAIRE: FABRICATED BRONZE COLORED METAL UPPER HOUSING AND OPTICAL COMPARTMENT, 1 LED MODULE, FABRICATED BRONZE COLORED

More information

lectronic starter for single phase duction motor

lectronic starter for single phase duction motor lectronic starter for single phase duction motor PROJECT NO: 104 SUPERVISOR: DR. WEKESA EXAMINER: PROF MANG OLI Prepared by: GITONGA HILDA WANJIKU- F17/39921/2011 PROJECT OUTLINE 1. Project Objective 2.

More information

About us. Switchgear Factory, Mumbai

About us. Switchgear Factory, Mumbai Wires & Cables About us Larsen & Toubro is a technologydriven USD 9.8 billion company that infuses engineering with imagination. The Company offers a wide range of advanced solutions in the field of Engineering,

More information

18 th Edition. Overload Protection of RCCBs and Switches within Consumer Units

18 th Edition. Overload Protection of RCCBs and Switches within Consumer Units 18 th Edition Overload Protection of RCCBs and Switches within Consumer Units Contents Executive Summary 3 Introduction 4 Where the changes to the regulations originate 4 Pre 18 th Edition approach to

More information

MAINTAINED LED DOUBLE SIDED SUSPENDED CEILING MOUNTED EMERGENCY LIGHT

MAINTAINED LED DOUBLE SIDED SUSPENDED CEILING MOUNTED EMERGENCY LIGHT Model No. PEL00580 MAINTAINED LED DOUBLE SIDED SUSPENDED CEILING MOUNTED EMERGENCY LIGHT 1 Please read these instructions carefully before starting installation and retain for future reference. The centre

More information

FUSES. Safety through quality

FUSES. Safety through quality Safety through quality HH HIGH VOLTAGE Over many decades SIBA has developed a global product line of High Voltage Fuses that are comprehensive for any and all applications. Superior engineering, advanced

More information

Miniature & Moulded Case

Miniature & Moulded Case Miniature & Moulded Case MCB OPERATION MAGNETIC OPERATION The short time protection (typically less than 1 second after energising) of the MCB is defined as the magnetic operation. 1 2 3 THERMAL OPERATION

More information

INTERACTIVE SCIENCE 2A

INTERACTIVE SCIENCE 2A INTERACTIVE SCIENCE 2A Workbook Solutions (Enrichment Edition) Chapter 8 MAKING USE OF ELECTRICITY Part A Sectional Exercise 8.1 & 8.2 Concept checking p.35 1. False 2. True 3. False 4. True 5. True Questions

More information

5. High voltage warning labels should be placed on all cabinet doors and terminal covers enclosing equipment operating at above 50 volts.

5. High voltage warning labels should be placed on all cabinet doors and terminal covers enclosing equipment operating at above 50 volts. Village hydro specifications Electrical components E1. Labels and notices Requirement 1. All electrical components must carry labels describing their function. This applies particularly to switches and

More information

Don t Discriminate: The importance of selective coordination in electrical installations

Don t Discriminate: The importance of selective coordination in electrical installations Don t Discriminate: The importance of selective coordination in electrical installations Prepared by: Design Engineer: Anthony Unsworth anthonyunsworth@sudlows.com What is Discrimination? Discrimination,

More information

NON MAINTAINED TWIN SPOTLIGHT WALL MOUNT LED EMERGENCY LIGHT

NON MAINTAINED TWIN SPOTLIGHT WALL MOUNT LED EMERGENCY LIGHT Model No. PEL00581 NON MAINTAINED TWIN SPOTLIGHT WALL MOUNT LED EMERGENCY LIGHT 1 Please read these instructions carefully before starting installation and retain for future reference. The centre page

More information

LEN Series 2x2 / 2x4 LED

LEN Series 2x2 / 2x4 LED FEATURES & SPECIFICATIONS Intended Use The LEN offers the look and feel of a fluorescent luminaire - subtle soft direct elements, interest and depth across the ceiling plane - with a contemporary look

More information

Chapter P Residential and other special locations

Chapter P Residential and other special locations Chapter P Residential and other special locations 1 2 3 Contents Residential and similar premises 1.1 General P1 1.2 Distribution boards components P1 1.3 Protection of people P4 1.4 Circuits P6 1.5 Protection

More information

Applications. Standard Materials

Applications. Standard Materials Code Master Jr. HID Factory Sealed Luminaires Integrally Ballasted. 50 W, 70 W, 00 W, 50 W HPS; 50 W, 70 W, 00 W, 75 W PSMH. 75 W MH V. Medium Base. For Use with Threaded Metal Conduit. Class I, Division

More information

Tender Schedule for Electrical Works at Varagani Branch. Sl. No. Particulars Quantity Unit Rate Amount

Tender Schedule for Electrical Works at Varagani Branch. Sl. No. Particulars Quantity Unit Rate Amount Tender Schedule for Electrical Works at Varagani Branch Sl. No. 1 Particulars Quantity Unit Rate Amount SITC of following rated Indoor operated wall/floor mounted, cubicle type MV cum APFC Panel suitable

More information

IT 28 ELECTRICAL INSPECTOR EXAMINATION ANSWER SCHEDULE. Question 1 Marks Reference Marking notes. (1 mark) ESR 57(3)(e)(ii)

IT 28 ELECTRICAL INSPECTOR EXAMINATION ANSWER SCHEDULE. Question 1 Marks Reference Marking notes. (1 mark) ESR 57(3)(e)(ii) IT 28 ELECTRICAL INSPECTOR EXAMINATION ANSWER SCHEDULE Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination questions. The

More information

UNIT 1 ELECTRICIAN S MATH AND BASIC ELECTRICAL FORMULAS...1 Introduction...1. UNIT 2 ELECTRICAL CIRCUITS...49 Introduction...49

UNIT 1 ELECTRICIAN S MATH AND BASIC ELECTRICAL FORMULAS...1 Introduction...1. UNIT 2 ELECTRICAL CIRCUITS...49 Introduction...49 UNIT 1 ELECTRICIAN S MATH AND BASIC ELECTRICAL FORMULAS...1 Introduction...1 PART A ELECTRICIAN S MATH...1 Introduction...1 1.1 Whole Numbers...1 1.2 Decimal...1 1.3 Fractions...1 1.4 Percentages...2 1.5

More information

Current Ratings. Standards & codes note 1. Introduction. interest. By Steve Hansen Sr. Field Engineer

Current Ratings. Standards & codes note 1. Introduction. interest. By Steve Hansen Sr. Field Engineer Achieving Higher Short Circuit Current Ratings for Industrial Control Panels Standards & codes note 1 By Steve Hansen Sr. Field Engineer Introduction Articles 9.1 and. in the National Electrical Code require

More information

Test Sample Description Catalog Number: Description:

Test Sample Description Catalog Number: Description: Project Number Date 17.00221 1/24/2017 LAB 6 Test Sample Description Catalog Number: Description: P350055-00930 1-Lt. DCLED Flush Mount Test Method: Preburn Time: Time To Stabilize: Total Operating Time:

More information

EKT112 Principles of Measurement and Instrumentation. Power Measurement

EKT112 Principles of Measurement and Instrumentation. Power Measurement EKT112 Principles of Measurement and Instrumentation Power Measurement 1 Outline Power? Power in DC and AC Circuits Power Measurements Power Instrumentation (Wattmeter) 2 Concept of Electric POWER Power

More information

INDEPENDENT TEST LABORATORY REPORT No

INDEPENDENT TEST LABORATORY REPORT No Lighting Sciences, Inc. UL Verification Services 7826 E. Evans Rd. Scottsdale, Arizona 85260 USA P: 480-991-9260 F: 480-991-0375 lsi@ul.com www.lightingsciences.com Description: The sample(s) was(were)

More information

Electrak power track underfloor power distribution systems

Electrak power track underfloor power distribution systems 4 www.electrak.co.uk Electrak power track underfloor power distribution systems Tel: 01207 503400 Fax: 01207 501799 Email: sales@electrak.co.uk Because of our policy of continuous improvement, Electrak

More information

Chapter 3.1: Electrical System

Chapter 3.1: Electrical System Part-I: Objective type Questions and Answers Chapter 3.1: Electrical System 1. The heat input required for generating one kilo watt-hour of electrical output is called as. a) Efficiency b) Heat Rate c)

More information

TECHNICAL TERMS AND ABBREVIATIONS

TECHNICAL TERMS AND ABBREVIATIONS THIRD REVISED SHEET NO. 3.1 CANCELS SECOND REVISED SHEET NO. 3.1 TECHNICAL TERMS AND ABBREVIATIONS ALTERNATING CURRENT (A-C): AMPERE: BASE RATES: BRITISH THERMAL UNIT (BTU): CAPACITOR or CAPACITANCE: CAPACITY

More information

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK 91 CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK CHAPTER CONTENTS: 5.1 INTRODUCTION 5.2 CONDUCTION OF VARIOUS POWER FLOW STUDIES ON THE MODEL 5.3 EXPERIMENTS CONDUCTED FOR VARIOUS POWER FLOW

More information

www. ElectricalPartManuals. com Section 13 Switchgear Low Voltage

www. ElectricalPartManuals. com Section 13 Switchgear Low Voltage Switchgear Low Voltage Introduction...13-1 AKD-10 Low-Voltage Switchgear...13-3 AKD-20 Low-Voltage Switchgear...13-3 Low Voltage Switchgear GE low-voltage switchgear is heavy-duty equipment built to ANSI

More information

CHAPTER 3. Basic Considerations and Distribution System Layout

CHAPTER 3. Basic Considerations and Distribution System Layout CHAPTER 3 Basic Considerations and Distribution System Layout Utility Load Classifications The electrical power distribution system is that portion of the electrical system that connects the individual

More information

University of California, San Diego Cal (IT) 2 Technical Assignment #2. Brian Smith

University of California, San Diego Cal (IT) 2 Technical Assignment #2. Brian Smith University of California, San Diego Cal (IT) 2 Technical Assignment #2 Brian Smith Advisor: Dr. Moeck 31 October 2005 Brian Smith Lighting/Electrical Option University of California, San Diego Cal (IT)

More information

LED Black Housing High Output Remote Capable

LED Black Housing High Output Remote Capable Catalog Number 73426 UPC Number 60198673426 Description Emergency Light LED Black Housing High Output Remote Capable Features u Long Life Energy Saving LED Lamps u Completely Self-Contained u Fully Automatic

More information

General Purpose Buck - Boost Wiring Diagrams... 86

General Purpose Buck - Boost Wiring Diagrams... 86 SECTION LOW VOLTAGE/ LIGHTING TRANSFORMERS General Purpose... 84 Buck - Boost... 85 Wiring Diagrams... 8 LOW VOLTAGE LIGHTING TRANSFORMERS & POWER SUPPLIES Low Voltage Lighting A greater selection for

More information

Interruption Technology of Breakers for High-voltage Direct Current

Interruption Technology of Breakers for High-voltage Direct Current Interruption Technology of Breakers for High-voltage Direct MORIAI Hiroshi ABSTRT Applications for direct current () electric distribution have been spreading along with the increase of data centers and

More information

Paramount HRC Cartridge

Paramount HRC Cartridge Paramount HRC Cartridge Eaton MEM HRC fuselinks are manufactured to exacting standards using precision assembly methods and undergo rigorous quality checking before dispatch including resistance testing

More information

Medium-voltage fuses 3 kv 40.5 kv, 0.4 A 315 A

Medium-voltage fuses 3 kv 40.5 kv, 0.4 A 315 A DISTRIBUTION SOLUTIONS Medium-voltage fuses 3 kv 40.5 kv, 0.4 A 315 A Continuous protection and reliable operation Proven design and compliance with newest fuses standards Compatibility with other ABB

More information

Review paper on Fault analysis and its Limiting Techniques.

Review paper on Fault analysis and its Limiting Techniques. Review paper on Fault analysis and its Limiting Techniques. Milap Akbari 1, Hemal Chavda 2, Jay Chitroda 3, Neha Kothadiya 4 Guided by: - Mr.Gaurang Patel 5 ( 1234 Parul Institute of Engineering &Technology,

More information

CUSTOMER / ACCOUNT INFORMATION Electric Utility Customer Information (As shown on utility bill)

CUSTOMER / ACCOUNT INFORMATION Electric Utility Customer Information (As shown on utility bill) GENERATOR INTERCONNECTION APPLICATION Category 2 (Combined) For All Projects with Aggregate Generator Output of More Than 20 kw but Less Than or Equal to 150 kw Also Serves as Application for Category

More information

EH2741 Communication and Control in Electric Power Systems Lecture 3. Lars Nordström Course map

EH2741 Communication and Control in Electric Power Systems Lecture 3. Lars Nordström Course map EH2741 Communication and Control in Electric Power Systems Lecture 3 Lars Nordström larsn@ics.kth.se 1 Course map 2 1 Outline 1. Repeating Power System Control 2. Power System Topologies Transmission Grids

More information

Alternator as a voltage Generating source and its response to the leading power factor loads

Alternator as a voltage Generating source and its response to the leading power factor loads Alternator as a voltage Generating source and its response to the leading power factor loads Presentation by: Jay Deshpande (Engineered Solutions- Mission Critical) Kohler Power Systems Washington, DC

More information

LED E-Series. we know light. LED Cents LED E-Series troffers gives you the appearance of fluorescent technology with a tube-like glow.

LED E-Series. we know light. LED Cents LED E-Series troffers gives you the appearance of fluorescent technology with a tube-like glow. LED E-Series LED E-Series troffers gives you the appearance of fluorescent technology with a tube-like glow. Limitless options for the following applications: Offices Restaurants Retail Stores Lobbies

More information

A Transient Free Novel Control Technique for Reactive Power Compensation using Thyristor Switched Capacitor

A Transient Free Novel Control Technique for Reactive Power Compensation using Thyristor Switched Capacitor A Transient Free Novel Control Technique for Reactive Power Compensation using Thyristor Switched Capacitor 1 Chaudhari Krunal R, 2 Prof. Rajesh Prasad 1 PG Student, 2 Assistant Professor, Electrical Engineering

More information

Element C8.3 Installation, Use and Inspection of Electrical Systems

Element C8.3 Installation, Use and Inspection of Electrical Systems .3 Installation, Use and Inspection of Electrical Systems Duty Holders Electricity at Work Regs 1989 EWR Employers and Self Employed Comply with regs as far as they are under their control Managers of

More information

ELECTRICAL POWER DISTRIBUTION FOR INFORMATION TRANSPORT SYSTEMS

ELECTRICAL POWER DISTRIBUTION FOR INFORMATION TRANSPORT SYSTEMS ELECTRICAL POWER DISTRIBUTION FOR INFORMATION TRANSPORT SYSTEMS Bob Hertling Senior Communications Engineer / RCDD, OSP PARSONS Your ITS equipment requires AC power Do you know what is on the other side

More information

EARTHING YOUR QUESTIONS ANSWERED

EARTHING YOUR QUESTIONS ANSWERED 18 EARTHING YOUR QUESTIONS ANSWERED By Geoff Cronshaw What are earthed and unearthed systems? What are the requirements of BS 7671? What are the advantages and disadvantages of the various types of earthing

More information

EMERGENCY ONE-LED TM SOLO TM NON MAINTAINED LED LAMP AND DRIVER KIT

EMERGENCY ONE-LED TM SOLO TM NON MAINTAINED LED LAMP AND DRIVER KIT Product description One-LED Solo TM is a non-maintained, self-contained LED emergency luminaire comprising an Omni-LED emergency LED driver, hinged rechargable battery and a flush-mount SELV lamp head.

More information

Secondaries. arc flash note Introduction. By Mike Lang, engineer and. Services Supervisor

Secondaries. arc flash note Introduction. By Mike Lang, engineer and. Services Supervisor Reducing Arc Flash Energies on Transformer Secondaries arc flash note 6 By Mike Lang, principal field engineer and Dave Komm, Technical Services Supervisor 1. Introduction Arc flash incident energy calculations

More information

ELECTRICIAN S THEORY EXAMINATION 20 June 2015 QUESTION AND ANSWER BOOKLET

ELECTRICIAN S THEORY EXAMINATION 20 June 2015 QUESTION AND ANSWER BOOKLET Candidate Code No. ET54 For Board Use Only Result Date Int Result Date Int ELECTRICIAN S THEORY EXAMINATION 20 June 2015 QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three hours

More information

PHONE: (303) FAX: (970) WEBSITE:

PHONE: (303) FAX: (970) WEBSITE: REPORT NUMBER: ITL77175 PAGE: 1 OF 5 CATALOG NUMBER: 2-5105-24 LUMINAIRE: FABRICATED SPECULAR METAL HOUSING, FORMED WHITE PAINTED METAL REFLECTOR, TRANSLUCENT WHITE ACRYLIC DIFFUSER. BALLAST IS EXPOSED

More information

2 LED Designer Series

2 LED Designer Series LED Designer Series When appearance is most important, TCP s LED Designer Series turns any location into something truly exceptional. Limitless options for the following applications: Offices Restaurants

More information

ELECTRICIAN S REGULATIONS EXAMINATION 26 June 2010

ELECTRICIAN S REGULATIONS EXAMINATION 26 June 2010 Candidate Code No. Result Date Int For Board Use Only ER38 Version of AS/NZS 3000 used (tick ONE Box) 2000 2007 & Amend 1 ELECTRICIAN S REGULATIONS EXAMINATION 26 June 2010 QUESTION AND ANSWER BOOKLET

More information

Chapter 6 Generator-Voltage System

Chapter 6 Generator-Voltage System Chapter 6 Generator-Voltage System 6-1. General The generator-voltage system described in this chapter includes the leads and associated equipment between the generator terminals and the low-voltage terminals

More information

825-P Modular Protection System for motors Specification Guide

825-P Modular Protection System for motors Specification Guide Specification Guide 1.0 General 1.01 The motor protection relay shall have a current operating range of 0.5 and 5000 amperes. 1.02 The motor protection relay shall provide current measurement-based protection

More information

Visual comparison of Plain & Hazy PP Film

Visual comparison of Plain & Hazy PP Film ECOVAR High Voltage Power Capacitors are manufactured at our Sinnar Plant in India which is an ISO 9001 accredited facility & houses a computer aided design manufacturing processing and testing infrastructure

More information

ELECTRIC POWER AND HOUSEHOLD CIRCUITS

ELECTRIC POWER AND HOUSEHOLD CIRCUITS ELECTRIC POWER AND HOUSEHOLD CIRCUITS HEATING EFFECT OF CURRENT Heating effect of electricity is one of the widely-used effects in the world. When electric current is passed through a conductor, it generates

More information

PHONE: (303) FAX: (970) WEBSITE:

PHONE: (303) FAX: (970) WEBSITE: INDEPENDENT LABORATORIES, INC. REPORT NUMBER: ITL90473-GONIOPHOTOMETRY PAGE: 1 OF 7 ADDRESS: 2476 EDISON BLVD TWINSBURG, OH 44087 LUMINAIRE: FABRICATED WHITE PAINTED METAL DRIVER HOUSING, EXTRUDED BLACK

More information

Major changes within the New 18 th Edition Wiring Regulations announced by The IET

Major changes within the New 18 th Edition Wiring Regulations announced by The IET Major changes within the New 18 th Edition Wiring Regulations announced by The IET BS 7671:2018 Requirements for Electrical Installations will be issued on 2 nd July 2018 and is intended to come into effect

More information

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 2

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 2 The University of New South Wales School of Electrical Engineering and Telecommunications Industrial and Commercial Power Systems Topic 2 SWITCHBOARDS Overview Also called Switchgear and Controlgear Assembly

More information

Protection for 2500KVA High Tension Transformer Ankita S.Kulkarni 1, Priyanka S.Dhayarkar 2, Harsha H.Ambure 3, Ashwini S.Shinde 4

Protection for 2500KVA High Tension Transformer Ankita S.Kulkarni 1, Priyanka S.Dhayarkar 2, Harsha H.Ambure 3, Ashwini S.Shinde 4 Protection for 2500KVA High Tension Transformer Ankita S.Kulkarni 1, Priyanka S.Dhayarkar 2, Harsha H.Ambure 3, Ashwini S.Shinde 4 Graduate Student, Dept. of E&TC, Pimpri Chinchwad College of Engineering,

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Level 3 Award in the Requirements for Electrical Installations BS 7671:2018 ( )

Level 3 Award in the Requirements for Electrical Installations BS 7671:2018 ( ) Level 3 Award in the Requirements for Electrical Installations BS 7671:2018 (2382-18) March 2018 Version 1.0 FAQs 1 18 th Edition IET Wiring Regulations 2018 FAQs When will the 18 th Edition of BS 7671

More information

ELECTRICIAN S THEORY EXAMINATION 19 June 2010 QUESTION AND ANSWER BOOKLET

ELECTRICIAN S THEORY EXAMINATION 19 June 2010 QUESTION AND ANSWER BOOKLET Candidate Code No. ET34 For Board Use Only Result Date Int Result Date Int ELECTRICIAN S THEORY EXAMINATION 19 June 2010 QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three hours

More information

Photovoltaic Solar Plan Review

Photovoltaic Solar Plan Review PAIGE B. VAUGHAN, CBO Director of Building and Safety Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail:lbutler@comptoncity.org Building & Safety Department Photovoltaic Solar Plan Review Plan Check

More information

INDEPENDENT TEST LABORATORY REPORT No

INDEPENDENT TEST LABORATORY REPORT No Lighting Sciences, Inc. UL Verification Services 7826 E. Evans Rd. Scottsdale, Arizona 85260 USA P: 480-991-9260 F: 480-991-0375 lsi@ul.com www.lightingsciences.com Description: The sample(s) was(were)

More information

PHOTOMETRIC TESTING & EVALUATION. Sample Tested Man-D-Tec UNILED-12-4K. Prepared for: Man-D-Tec 8175 E. Paradise Lane Scottsdale, AZ 85260

PHOTOMETRIC TESTING & EVALUATION. Sample Tested Man-D-Tec UNILED-12-4K. Prepared for: Man-D-Tec 8175 E. Paradise Lane Scottsdale, AZ 85260 PHOTOMETRIC TESTING & EVALUATION Sample Tested Man-D-Tec UNILED-12-4K Prepared for: Man-D-Tec 8175 E. Paradise Lane Scottsdale, AZ 85260 Phone: 480-998-0325 Technical Report Number 70150753 August 8, 2017

More information

A comparison of metal-enclosed load interrupter (ME) switchgear and metal-clad (MC) switchgear

A comparison of metal-enclosed load interrupter (ME) switchgear and metal-clad (MC) switchgear Robert J. Gustin Eaton Fellow Application Engineer, P. E. Southfield, Michigan Definitions Metal-enclosed load interrupter switchgear type ME Metal-enclosed switchgear is defined in ANSI C37.20.3-1987,

More information

Electrical Tech Note 106

Electrical Tech Note 106 Electrical Tech Note 106 Biosystems & Agricultural Engineering Department Michigan State University Master Exam Study Guide and Sample Questions 1 Based on the 2014 NEC, Part 8 of PA 230, PA 407, and the

More information

Medium Voltage. Power Factor Correction Reactive Compensation Harmonic Filters. Electrical Power Quality Management at its best.

Medium Voltage. Power Factor Correction Reactive Compensation Harmonic Filters. Electrical Power Quality Management at its best. Medium Voltage Power Factor Correction Reactive Compensation Harmonic Filters POWER QUALITY Electrical Power Quality Management at its best. From electricity generation, transmission, thru its distribution

More information

INDEPENDENT TEST LABORATORY REPORT No A

INDEPENDENT TEST LABORATORY REPORT No A Lighting Sciences, Inc. UL Verification Services 7826 E. Evans Rd. Scottsdale, Arizona 85260 USA P: 480-991-9260 F: 480-991-0375 lsi@ul.com www.lightingsciences.com Description: The sample(s) was(were)

More information

Distribution transformers Efficiency over life-cycle

Distribution transformers Efficiency over life-cycle Distribution transformers Efficiency over life-cycle ABB a global leader ABB is a global leader in Power and Automation technologies that enable utility and industry customers to improve performance while

More information

Utilization of Electric Power Laboratory 3 rd Year G2: Testing & Characteristic of MCCB Used in Commercial and Industrial Applications

Utilization of Electric Power Laboratory 3 rd Year G2: Testing & Characteristic of MCCB Used in Commercial and Industrial Applications G2: Testing & Characteristic of MCCB Used in Commercial and Industrial Applications Contents 1. Laboratory Objective... 4 2. MECHANICAL OPERATION TESTS... 4 2.1 Purpose... 4 2.2 Procedure... 4 2.3 Results...

More information

NOTES ON ELEVATOR SYSTEMS

NOTES ON ELEVATOR SYSTEMS 1. Electrohydraulic Lifts 2. Escalators 3. Electrical Requirements 4. Ventilation in Lift Machine Room 5. Lifts for Persons with Limited Mobility Disclaimer 1 Electrohydraulic Lifts Pascal's law of fluid

More information

Medium voltage products. Fuses

Medium voltage products. Fuses Medium voltage products Fuses Index Introduction... 3 Main definitions... 4 ABB HV Fuses with Temperature Control Unit... 5 General principles for fuse link selection... 6 CEF... 8 CEF-S... 16 CEF-VT...

More information

2000 Cooper Bussmann, Inc. Page 1 of 9 10/04/00

2000 Cooper Bussmann, Inc. Page 1 of 9 10/04/00 DO YOU KNOW THE FACTS ABOUT SINGLE-POLE INTERRUPTING RATINGS? YOU MAY BE IN TROUBLE! Typical plant electrical systems use three-phase distribution schemes. As an industry practice, short-circuit calculations

More information