BUILDING ELECTRICAL SERVICES DESIGN FOR A PROPOSED COLLEGE ADMINISTRATION BLOCK
|
|
- Jeffry Bradford
- 5 years ago
- Views:
Transcription
1 BUILDING ELECTRICAL SERVICES DESIGN FOR A PROPOSED COLLEGE ADMINISTRATION BLOCK PROJECT INDEX: PRJ 107 BY ONSONGO KEVIN NYAKUNDI F17/1770/2006 SUPERVISOR: DR. N. O. ABUNGU EXAMINER: DR. WEKESA DATE: 27 TH MAY 2011.
2 OBJECTIVES Design of a Lighting System Design of power points layout Load assessment Load Balance realization Design of Electrical Power Distribution System Design of back-up power system Power Factor correction Protection
3 INTRODUCTION The College is located in an area where solar and wind are the main sources of energy Total load = = 1000 Number of floors =4 266kVA The design of the distribution system was in compliance with the IEE regulations for electrical installations.
4 A section of the college map.
5 LIGHTING DESIGN Two methods commonly used for design: 1. Lumen method (Zonal cavity method). 2. Point by point method. Lumen method: Uses horizontal illuminance criteria to establish a uniform luminaire layout in a space. Considered for uniform lighting. Point by Point method: Suitable for outdoor schemes and indoor schemes where reflectances are negligible. Lumen method was used in this project.
6 SAMPLE CALCACULATION:REGISTRAR S OFFICE Recommended illuminance = 500lux Floor dimension : L = 4.8m, W = 3.5m Ceiling height = 3m Mounting height, H m = = 2.15m K = = ( ) UF = Lighting design lumens(ldl) = 3600lumens Required Flux = = 8400lumens 8400 Flux to be installed = = 29577lumens Number of Luminaires =
7 Registrar s office on ground floor Luminaire Quattro lamps
8 Fittings arrangement on first floor
9 LIGHTING CIRCUITS Radial circuits are used. Worst case of 100W per lamp. 10 lighting points assigned to each lighting circuit. MCB rating of 6A is used to protect each lighting circuit.
10 DESIGN OF THE POWERING POINTS Sockets (BS 1363) Radial circuit Ring circuit Ring circuits were used each protected by a 32A MCB. Maximum of 4 twin sockets per ring circuit. Kitchen Units: Used to connect power to the cooker. They also have an attached socket. Single Phase Isolators: Used to power the hand driers and single phase air conditioners.
11 Power and data points on Mezzanine Floor.
12 LOAD ASSESSMENT This was to facilitate the determination of the design current I b. The main loads in the installation were: Lighting circuits. Ring circuits. Single phase isolators. Design current I b = V P η Cos φ I b for a single lighting point = = 0.538Amps Each lighting circuit had 10 lighting points, thus 5.38A. Total load for light circuit = = Watts
13 MAXIMUM DEMAND ASSESSMENT Evaluated for each of the final circuit. This was done to facilitate load balancing. Maximum demand was calculated as follow; Maximum demand (A) = Connected load diversity Maximum demand : the highest rate at which power is consumed. Connected load : the sum of all loads in the installation. Diversity : accounts for the fact that some of the connected loads will not be running at the same time instant as other loads. Example: Each lighting circuit: Total load = Watts Diversity factor = 0.9 Maximum demand= = Watts
14 LOAD BALANCING Equally distributing the single-phase loads across the three-phase supply is known as balancing the load. Was achieved by distributing the various loads on the different phases. Load balancing in the building Floor Red phase Yellow Phase Blue Phase Ground Mezzanine First Second Total Load(W) Current(A)
15 POWER DISTRIBUTION Desirable principles in distribution schemes in buildings are: The circuit should be reliable. The circuit should be economical. It should be able to meet future expansions without large financial costs. Distribution system can be: The vertical supply system (rising mains). The horizontal supply (distribution at each floor level). The vertical supply system was used.
16 BACK-UP GENERATOR Used to provide critical loads with power in the case of mains failure. All the loads were to be backed up i.e. 266kVA A 340kVA Manlift hooded generator was used. The MFP intended for automatic operation of the generator was incorporated at the switch board.
17 SIZING OF CABLES The size of a cable to be used for an installation depends upon: the current rating of the cable under defined installation conditions. the maximum permitted drop in voltage as defined by Regulation 525. Was done with an allowance of 20% to cater for future growth. Conductor cross section area got from IEE standard Table 4D2A. Voltage drop per ampere per metre obtained from Table 4D1B. Volt drop = Where: V I b = = V Ib L 1000 voltage drop per ampere per metre in mv/a/m Total load CU load
18 Cable sizing for consumer units on ground floor
19 DISTRIBUTION SYSTEM RETICULATION Fig.7: Distribution system layout Fig 6: Distribution system reticulation layout
20 POWER FACTOR CORRECTION Is the relationship between active power and total power. Power factor correction helps in: Reducing copper losses. Enables economic use of conductors and switchgear Power factor before correction =0.7 Required power factor =0.9 Power factor triangle N/B: 150kVAr capacitor bank chosen
21 PROTECTION SYSTEM DESIGN Protection of cables (BS 7671). Protection against overcurrent; overload and short circuit achieved by use of MCBs and MCCBs. Discrimination: IEE Wiring Regulations
22 Summary of discrimination for the protective devices and protection of cables Consumer Unit(CU) GF.1 GF.2 GF.3 GF.4 GF.5 GF.6 CU Cable size (mm 2 ) Cable Rating (A) Cable current (Amps) Rating of largest MCB in CU(A) Fault current (Amps) Rating of MCCB upstream
23 CONCLUSIONS The design of lighting and distribution system was achieved under the IEE standards and regulations. The total load was assessed to be 266kVA. The distribution system was realized by use of one DB and 24 Cus. Back-up system designed with a 340kVA generator in place. Reactive power improved by a 150kVAr capacitor bank. Protection system was designed.
24 RECOMMENDATIONS FOR FUTURE WORK There is need for; Automation of the lighting system. Development of a program code to do calculation of earth faults and cable sizes.
25 THANK YOU
UNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING
UNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING BUILDING ELECTRICAL SERVICES DESIGN FOR THE BANK OF FAHARI CITY PROJECT INDEX: PRJ 099 BY ODHIAMBO GIFT
More informationUNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING BUILDING ELECTRICAL SERVICES DESIGN FOR HOSTEL
UNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING BUILDING ELECTRICAL SERVICES DESIGN FOR HOSTEL ALONG NYERERE ROAD PROJECT NUMBER: PRJ 095 BY OELE O. COLLINS
More informationUNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING
UNIVERSITY OF NAIROBI FACULTY OF ENGINEERING DEPARTMENT OF ELECTRICAL AND INFORMATION ENGINEERING LIGHTING AND DISTRIBUTION SYSTEM DESIGN FOR A PROPOSED RESIDENTIAL ESTATE IN FAHARI CITY PROJECT INDEX:
More informationELECTRICIANS REGULATIONS EXAMINATION 29 June 2013 QUESTION AND ANSWER BOOKLET
ER52 Candidate Code No. For Board Use Only Result Date Result Date Int ELECTRICIANS REGULATIONS EXAMINATION 29 June 2013 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours INSTRUCTIONS READ CAREFULLY
More informationCalculation of the Cross-sectional Areas of Circuit Live Conductors
Calculation of the Cross-sectional Areas of Circuit Live Conductors MOTOR CIRCUITS SUBJECT TO FREQUENT STOPPING AND STARTING Regulations requires that where a motor is intended for intermittent duty and
More informationCentral Battery Systems
Central battery system based emergency lighting is ideal for medium to large installations. For projects where central control and testing is desirable, a central battery system is a viable and cost effective
More informationCentral Battery Systems
Central battery system based emergency lighting is ideal for medium to large installations. For projects where central control and testing is desirable, a central battery system is a viable and cost effective
More informationELECTRICAL INSPECTOR EXAMINATION 18 November 2017 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours
Candidate Code No. IT 36 For Board Use Only Result Date Int Result Date Int ELECTRICAL INSPECTOR EXAMINATION 18 November 2017 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours INSTRUCTIONS READ CAREFULLY
More informationELECTRICAL INSPECTOR EXAMINATION 14 November 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours
Candidate Code No. IT 32 For Board Use Only Result Date Int Result Date Int ELECTRICAL INSPECTOR EXAMINATION 14 November 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours INSTRUCTIONS READ CAREFULLY
More informationRecommended Procedures
Selective Coordination Study Recommended Procedures The following steps are recommended when conducting a selective coordination study.. One-Line Diagram Obtain the electrical system one-line diagram that
More informationMYRON ZUCKER CALMANUAL POWER FACTOR CORRECTION APPLICATION GUIDE INC.
MYRON ZUCKER CALMANUAL POWER FACTOR CORRECTION APPLICATION GUIDE INC. CALMANUAL HOW TO APPLY CAPACITORS TO LOW VOLTAGE POWER SYSTEMS. SECTION INDEX SECTION I POWER FACTOR UNDERSTANDING POWER FACTOR...
More informationPower Factor Correction
AE9-1249 R10 August 2008 Power Factor Correction Index Page 1. Introduction... 1 2. Electrical Fundamentals... 1 3. Electrical Formulas... 2 4. Apparent Power and Actual Power... 2 5. Effects of Poor Power
More informationOn-Site Guide (BS 7671:2008 Wiring Regulations, incorporating Amendment No 1:2011)
(BS 7671:2008 Wiring Regulations, incorporating Amendment No 1:2011) Author: IET Publications (edited by Mark Coles) Book details Author: IET Publications (edited by Mark Coles) Year: 2011 Format: Paperback,
More informationEffective discrimination of protective devices
Effective discrimination of protective devices In the event of a fault occurring on an electrical installation only the protective device nearest to the fault should operate,leaving other healthy circuits
More informationOn_Disc. 2 o/c1 BS 7671 applies to a lift installations b highway equipment c equipment on board ships d electrical equipment of machines.
1 PAPER 4 Sample Questions - C&G 2382 17th Edition full paper D 1 o/c 1 - A recommendation for the interval to the first periodic inspection shall be made by: a the installation electrician. b the main
More informationELECTRICIANS REGULATIONS EXAMINATION 25 June 2011
ER42 Candidate Code No. For Board Use Only Result Date Result Date Int ELECTRICIANS REGULATIONS EXAMINATION 25 June 2011 Int QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three
More informationLisun Electronics Inc. Tel:+86(21)
Report No.: Test Time: 2013-11-28 15:27 Luminaire Property Page 1 of 17 Pages Luminaire Manufacturer: One Electrical Co.,ltd Luminaire Category: OE-LED-PANEL22 Luminaire Description: 22W Round LED Panel
More informationInvestigation into UK socket-outlets incorporating USB charging points
Investigation into UK socket-outlets incorporating USB charging points Electrical Safety First investigated a number of commercially available UK socket-outlets incorporating USB ports, as a repeat of
More informationElectrical Design/Build Guide
2017 Electrical Design/Build Guide Based on the 2017 National Electrical Code Copyright Durand & Associates 1986-2016 60 C Copper Ampacity 4 - Wire Fill - (Non-Current Carrying Neutral) 4 or 5 - Parallel
More informationWhite Paper. Application of Resistive/Reactive Load Banks for kva Testing
White Paper Application of Resistive/Reactive Load Banks for kva Testing Application of Resistive/Reactive Load Banks for kva Testing Resistive load banks are the most commonly used load banks for the
More informationLisun Electronics Inc. Tel:+86(21)
Report No.: Test Time: 2013-11-28 14:48 Luminaire Property Page 1 of 17 Pages Luminaire Manufacturer: One Electrical Co.,ltd Luminaire Category: OE-LED-COB-30 Luminaire Description: 30W COB LED Downlight
More informationTHE PROTECTION OF INDUSTRIAL CAPACITOR BANKS BY CURRENT LIMITING FUSES. By M.J. Smart and B. Wadcock
203 THE PROTECTION OF INDUSTRIAL CAPACITOR BANKS BY CURRENT LIMITING FUSES By M.J. Smart and B. Wadcock 1.0 INTRODUCTION Capacitors are widely used for industrial power factor correction throughout the
More informationAUTOMATIC CAPACITOR BANK WITH CONTACTOR OPERATIONS
AUTOMATIC CAPACITOR BANK WITH CONTACTOR OPERATIONS INSTRUCTION MANUAL (M98125401-03 / 03A) (c) CIRCUTOR S.A. ------Automatic capacitor bank with contactor operations ----- Page 2 TABLE OF CONTENTS 1. Introduction.
More informationTest Sample Description Catalog Number: Description:
Project Number Date 15.00487 3/26/2015 LAB 6 Test Sample Description Catalog Number: Description: P3408-0930K9 Close to Ceiling fixture Test Method: Preburn Time: Time To Stabilize: Total Operating Time:
More informationCandidate Handbook answers
Candidate Handbook answers Progress check 7.1, p. 341 1. What must the electrical system installed in premises be suitable for? The purpose of the system; the building and environment. What is the role
More informationHOTLINE ELECTRICAL TRADING
HOTLINE ELECTRICAL TRADING (L.L.C) P.O.Box: 235152 Dubai, UAE. Tel ; +971-4-3455173 Email:-manuel@hletllc.com I www.hletllc.com Company Profile Hotline Electrical Trading L.L.C is a trading company dealing
More informationELECTRICIANS REGULATIONS EXAMINATION 23 November 2013 QUESTION AND ANSWER BOOKLET
ER54 Candidate Code No. For Board Use Only Result Date Result Date Int ELECTRICIANS REGULATIONS EXAMINATION 23 November 2013 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours INSTRUCTIONS READ CAREFULLY
More informationKENYA POWER-MOMBASA BRANCH REPLACEMENT OF AIR-CONDITIONING AND ASSOCIATED WORKS BILLS OF QUANTITIES FOR ELECTRICAL INSTALLATIONS BILL NO
BILL 1 MAINS POWER DISTRIBUTION 2-1 ITEM DESCRIPTION QTY UNIT RATE AMOUNT Supply, install, test, commission and set to work the following:- 1.01 Free-standing purpose made front access sub main switchboard
More informationDESCRIPTION & APPLICATION
T5 FME T5 4L - Full Body High Bay DESCRIPTION & APPLICATION The Envirobrite FME T5 fixture is a full body fluorescent high bay ideal for replacing energy devouring HID fixtures. This all aluminum enclosed
More informationS BERGIN R BEATTIE Lighting Engineer. Checked Approved
REPORT NUMBER: ITL73351 PAGE: 1 OF 10 CATALOG NUMBER: MARRAKESH SCONCE I (LED) LUMINAIRE: FABRICATED BRONZE COLORED METAL UPPER HOUSING AND OPTICAL COMPARTMENT, 1 LED MODULE, FABRICATED BRONZE COLORED
More informationlectronic starter for single phase duction motor
lectronic starter for single phase duction motor PROJECT NO: 104 SUPERVISOR: DR. WEKESA EXAMINER: PROF MANG OLI Prepared by: GITONGA HILDA WANJIKU- F17/39921/2011 PROJECT OUTLINE 1. Project Objective 2.
More informationAbout us. Switchgear Factory, Mumbai
Wires & Cables About us Larsen & Toubro is a technologydriven USD 9.8 billion company that infuses engineering with imagination. The Company offers a wide range of advanced solutions in the field of Engineering,
More information18 th Edition. Overload Protection of RCCBs and Switches within Consumer Units
18 th Edition Overload Protection of RCCBs and Switches within Consumer Units Contents Executive Summary 3 Introduction 4 Where the changes to the regulations originate 4 Pre 18 th Edition approach to
More informationMAINTAINED LED DOUBLE SIDED SUSPENDED CEILING MOUNTED EMERGENCY LIGHT
Model No. PEL00580 MAINTAINED LED DOUBLE SIDED SUSPENDED CEILING MOUNTED EMERGENCY LIGHT 1 Please read these instructions carefully before starting installation and retain for future reference. The centre
More informationFUSES. Safety through quality
Safety through quality HH HIGH VOLTAGE Over many decades SIBA has developed a global product line of High Voltage Fuses that are comprehensive for any and all applications. Superior engineering, advanced
More informationMiniature & Moulded Case
Miniature & Moulded Case MCB OPERATION MAGNETIC OPERATION The short time protection (typically less than 1 second after energising) of the MCB is defined as the magnetic operation. 1 2 3 THERMAL OPERATION
More informationINTERACTIVE SCIENCE 2A
INTERACTIVE SCIENCE 2A Workbook Solutions (Enrichment Edition) Chapter 8 MAKING USE OF ELECTRICITY Part A Sectional Exercise 8.1 & 8.2 Concept checking p.35 1. False 2. True 3. False 4. True 5. True Questions
More information5. High voltage warning labels should be placed on all cabinet doors and terminal covers enclosing equipment operating at above 50 volts.
Village hydro specifications Electrical components E1. Labels and notices Requirement 1. All electrical components must carry labels describing their function. This applies particularly to switches and
More informationDon t Discriminate: The importance of selective coordination in electrical installations
Don t Discriminate: The importance of selective coordination in electrical installations Prepared by: Design Engineer: Anthony Unsworth anthonyunsworth@sudlows.com What is Discrimination? Discrimination,
More informationNON MAINTAINED TWIN SPOTLIGHT WALL MOUNT LED EMERGENCY LIGHT
Model No. PEL00581 NON MAINTAINED TWIN SPOTLIGHT WALL MOUNT LED EMERGENCY LIGHT 1 Please read these instructions carefully before starting installation and retain for future reference. The centre page
More informationLEN Series 2x2 / 2x4 LED
FEATURES & SPECIFICATIONS Intended Use The LEN offers the look and feel of a fluorescent luminaire - subtle soft direct elements, interest and depth across the ceiling plane - with a contemporary look
More informationChapter P Residential and other special locations
Chapter P Residential and other special locations 1 2 3 Contents Residential and similar premises 1.1 General P1 1.2 Distribution boards components P1 1.3 Protection of people P4 1.4 Circuits P6 1.5 Protection
More informationApplications. Standard Materials
Code Master Jr. HID Factory Sealed Luminaires Integrally Ballasted. 50 W, 70 W, 00 W, 50 W HPS; 50 W, 70 W, 00 W, 75 W PSMH. 75 W MH V. Medium Base. For Use with Threaded Metal Conduit. Class I, Division
More informationTender Schedule for Electrical Works at Varagani Branch. Sl. No. Particulars Quantity Unit Rate Amount
Tender Schedule for Electrical Works at Varagani Branch Sl. No. 1 Particulars Quantity Unit Rate Amount SITC of following rated Indoor operated wall/floor mounted, cubicle type MV cum APFC Panel suitable
More informationIT 28 ELECTRICAL INSPECTOR EXAMINATION ANSWER SCHEDULE. Question 1 Marks Reference Marking notes. (1 mark) ESR 57(3)(e)(ii)
IT 28 ELECTRICAL INSPECTOR EXAMINATION ANSWER SCHEDULE Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination questions. The
More informationUNIT 1 ELECTRICIAN S MATH AND BASIC ELECTRICAL FORMULAS...1 Introduction...1. UNIT 2 ELECTRICAL CIRCUITS...49 Introduction...49
UNIT 1 ELECTRICIAN S MATH AND BASIC ELECTRICAL FORMULAS...1 Introduction...1 PART A ELECTRICIAN S MATH...1 Introduction...1 1.1 Whole Numbers...1 1.2 Decimal...1 1.3 Fractions...1 1.4 Percentages...2 1.5
More informationCurrent Ratings. Standards & codes note 1. Introduction. interest. By Steve Hansen Sr. Field Engineer
Achieving Higher Short Circuit Current Ratings for Industrial Control Panels Standards & codes note 1 By Steve Hansen Sr. Field Engineer Introduction Articles 9.1 and. in the National Electrical Code require
More informationTest Sample Description Catalog Number: Description:
Project Number Date 17.00221 1/24/2017 LAB 6 Test Sample Description Catalog Number: Description: P350055-00930 1-Lt. DCLED Flush Mount Test Method: Preburn Time: Time To Stabilize: Total Operating Time:
More informationEKT112 Principles of Measurement and Instrumentation. Power Measurement
EKT112 Principles of Measurement and Instrumentation Power Measurement 1 Outline Power? Power in DC and AC Circuits Power Measurements Power Instrumentation (Wattmeter) 2 Concept of Electric POWER Power
More informationINDEPENDENT TEST LABORATORY REPORT No
Lighting Sciences, Inc. UL Verification Services 7826 E. Evans Rd. Scottsdale, Arizona 85260 USA P: 480-991-9260 F: 480-991-0375 lsi@ul.com www.lightingsciences.com Description: The sample(s) was(were)
More informationElectrak power track underfloor power distribution systems
4 www.electrak.co.uk Electrak power track underfloor power distribution systems Tel: 01207 503400 Fax: 01207 501799 Email: sales@electrak.co.uk Because of our policy of continuous improvement, Electrak
More informationChapter 3.1: Electrical System
Part-I: Objective type Questions and Answers Chapter 3.1: Electrical System 1. The heat input required for generating one kilo watt-hour of electrical output is called as. a) Efficiency b) Heat Rate c)
More informationTECHNICAL TERMS AND ABBREVIATIONS
THIRD REVISED SHEET NO. 3.1 CANCELS SECOND REVISED SHEET NO. 3.1 TECHNICAL TERMS AND ABBREVIATIONS ALTERNATING CURRENT (A-C): AMPERE: BASE RATES: BRITISH THERMAL UNIT (BTU): CAPACITOR or CAPACITANCE: CAPACITY
More informationCHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK
91 CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK CHAPTER CONTENTS: 5.1 INTRODUCTION 5.2 CONDUCTION OF VARIOUS POWER FLOW STUDIES ON THE MODEL 5.3 EXPERIMENTS CONDUCTED FOR VARIOUS POWER FLOW
More informationwww. ElectricalPartManuals. com Section 13 Switchgear Low Voltage
Switchgear Low Voltage Introduction...13-1 AKD-10 Low-Voltage Switchgear...13-3 AKD-20 Low-Voltage Switchgear...13-3 Low Voltage Switchgear GE low-voltage switchgear is heavy-duty equipment built to ANSI
More informationCHAPTER 3. Basic Considerations and Distribution System Layout
CHAPTER 3 Basic Considerations and Distribution System Layout Utility Load Classifications The electrical power distribution system is that portion of the electrical system that connects the individual
More informationUniversity of California, San Diego Cal (IT) 2 Technical Assignment #2. Brian Smith
University of California, San Diego Cal (IT) 2 Technical Assignment #2 Brian Smith Advisor: Dr. Moeck 31 October 2005 Brian Smith Lighting/Electrical Option University of California, San Diego Cal (IT)
More informationLED Black Housing High Output Remote Capable
Catalog Number 73426 UPC Number 60198673426 Description Emergency Light LED Black Housing High Output Remote Capable Features u Long Life Energy Saving LED Lamps u Completely Self-Contained u Fully Automatic
More informationGeneral Purpose Buck - Boost Wiring Diagrams... 86
SECTION LOW VOLTAGE/ LIGHTING TRANSFORMERS General Purpose... 84 Buck - Boost... 85 Wiring Diagrams... 8 LOW VOLTAGE LIGHTING TRANSFORMERS & POWER SUPPLIES Low Voltage Lighting A greater selection for
More informationInterruption Technology of Breakers for High-voltage Direct Current
Interruption Technology of Breakers for High-voltage Direct MORIAI Hiroshi ABSTRT Applications for direct current () electric distribution have been spreading along with the increase of data centers and
More informationParamount HRC Cartridge
Paramount HRC Cartridge Eaton MEM HRC fuselinks are manufactured to exacting standards using precision assembly methods and undergo rigorous quality checking before dispatch including resistance testing
More informationMedium-voltage fuses 3 kv 40.5 kv, 0.4 A 315 A
DISTRIBUTION SOLUTIONS Medium-voltage fuses 3 kv 40.5 kv, 0.4 A 315 A Continuous protection and reliable operation Proven design and compliance with newest fuses standards Compatibility with other ABB
More informationReview paper on Fault analysis and its Limiting Techniques.
Review paper on Fault analysis and its Limiting Techniques. Milap Akbari 1, Hemal Chavda 2, Jay Chitroda 3, Neha Kothadiya 4 Guided by: - Mr.Gaurang Patel 5 ( 1234 Parul Institute of Engineering &Technology,
More informationCUSTOMER / ACCOUNT INFORMATION Electric Utility Customer Information (As shown on utility bill)
GENERATOR INTERCONNECTION APPLICATION Category 2 (Combined) For All Projects with Aggregate Generator Output of More Than 20 kw but Less Than or Equal to 150 kw Also Serves as Application for Category
More informationEH2741 Communication and Control in Electric Power Systems Lecture 3. Lars Nordström Course map
EH2741 Communication and Control in Electric Power Systems Lecture 3 Lars Nordström larsn@ics.kth.se 1 Course map 2 1 Outline 1. Repeating Power System Control 2. Power System Topologies Transmission Grids
More informationAlternator as a voltage Generating source and its response to the leading power factor loads
Alternator as a voltage Generating source and its response to the leading power factor loads Presentation by: Jay Deshpande (Engineered Solutions- Mission Critical) Kohler Power Systems Washington, DC
More informationLED E-Series. we know light. LED Cents LED E-Series troffers gives you the appearance of fluorescent technology with a tube-like glow.
LED E-Series LED E-Series troffers gives you the appearance of fluorescent technology with a tube-like glow. Limitless options for the following applications: Offices Restaurants Retail Stores Lobbies
More informationA Transient Free Novel Control Technique for Reactive Power Compensation using Thyristor Switched Capacitor
A Transient Free Novel Control Technique for Reactive Power Compensation using Thyristor Switched Capacitor 1 Chaudhari Krunal R, 2 Prof. Rajesh Prasad 1 PG Student, 2 Assistant Professor, Electrical Engineering
More informationElement C8.3 Installation, Use and Inspection of Electrical Systems
.3 Installation, Use and Inspection of Electrical Systems Duty Holders Electricity at Work Regs 1989 EWR Employers and Self Employed Comply with regs as far as they are under their control Managers of
More informationELECTRICAL POWER DISTRIBUTION FOR INFORMATION TRANSPORT SYSTEMS
ELECTRICAL POWER DISTRIBUTION FOR INFORMATION TRANSPORT SYSTEMS Bob Hertling Senior Communications Engineer / RCDD, OSP PARSONS Your ITS equipment requires AC power Do you know what is on the other side
More informationEARTHING YOUR QUESTIONS ANSWERED
18 EARTHING YOUR QUESTIONS ANSWERED By Geoff Cronshaw What are earthed and unearthed systems? What are the requirements of BS 7671? What are the advantages and disadvantages of the various types of earthing
More informationEMERGENCY ONE-LED TM SOLO TM NON MAINTAINED LED LAMP AND DRIVER KIT
Product description One-LED Solo TM is a non-maintained, self-contained LED emergency luminaire comprising an Omni-LED emergency LED driver, hinged rechargable battery and a flush-mount SELV lamp head.
More informationSecondaries. arc flash note Introduction. By Mike Lang, engineer and. Services Supervisor
Reducing Arc Flash Energies on Transformer Secondaries arc flash note 6 By Mike Lang, principal field engineer and Dave Komm, Technical Services Supervisor 1. Introduction Arc flash incident energy calculations
More informationELECTRICIAN S THEORY EXAMINATION 20 June 2015 QUESTION AND ANSWER BOOKLET
Candidate Code No. ET54 For Board Use Only Result Date Int Result Date Int ELECTRICIAN S THEORY EXAMINATION 20 June 2015 QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three hours
More informationPHONE: (303) FAX: (970) WEBSITE:
REPORT NUMBER: ITL77175 PAGE: 1 OF 5 CATALOG NUMBER: 2-5105-24 LUMINAIRE: FABRICATED SPECULAR METAL HOUSING, FORMED WHITE PAINTED METAL REFLECTOR, TRANSLUCENT WHITE ACRYLIC DIFFUSER. BALLAST IS EXPOSED
More information2 LED Designer Series
LED Designer Series When appearance is most important, TCP s LED Designer Series turns any location into something truly exceptional. Limitless options for the following applications: Offices Restaurants
More informationELECTRICIAN S REGULATIONS EXAMINATION 26 June 2010
Candidate Code No. Result Date Int For Board Use Only ER38 Version of AS/NZS 3000 used (tick ONE Box) 2000 2007 & Amend 1 ELECTRICIAN S REGULATIONS EXAMINATION 26 June 2010 QUESTION AND ANSWER BOOKLET
More informationChapter 6 Generator-Voltage System
Chapter 6 Generator-Voltage System 6-1. General The generator-voltage system described in this chapter includes the leads and associated equipment between the generator terminals and the low-voltage terminals
More information825-P Modular Protection System for motors Specification Guide
Specification Guide 1.0 General 1.01 The motor protection relay shall have a current operating range of 0.5 and 5000 amperes. 1.02 The motor protection relay shall provide current measurement-based protection
More informationVisual comparison of Plain & Hazy PP Film
ECOVAR High Voltage Power Capacitors are manufactured at our Sinnar Plant in India which is an ISO 9001 accredited facility & houses a computer aided design manufacturing processing and testing infrastructure
More informationELECTRIC POWER AND HOUSEHOLD CIRCUITS
ELECTRIC POWER AND HOUSEHOLD CIRCUITS HEATING EFFECT OF CURRENT Heating effect of electricity is one of the widely-used effects in the world. When electric current is passed through a conductor, it generates
More informationPHONE: (303) FAX: (970) WEBSITE:
INDEPENDENT LABORATORIES, INC. REPORT NUMBER: ITL90473-GONIOPHOTOMETRY PAGE: 1 OF 7 ADDRESS: 2476 EDISON BLVD TWINSBURG, OH 44087 LUMINAIRE: FABRICATED WHITE PAINTED METAL DRIVER HOUSING, EXTRUDED BLACK
More informationMajor changes within the New 18 th Edition Wiring Regulations announced by The IET
Major changes within the New 18 th Edition Wiring Regulations announced by The IET BS 7671:2018 Requirements for Electrical Installations will be issued on 2 nd July 2018 and is intended to come into effect
More informationThe University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 2
The University of New South Wales School of Electrical Engineering and Telecommunications Industrial and Commercial Power Systems Topic 2 SWITCHBOARDS Overview Also called Switchgear and Controlgear Assembly
More informationProtection for 2500KVA High Tension Transformer Ankita S.Kulkarni 1, Priyanka S.Dhayarkar 2, Harsha H.Ambure 3, Ashwini S.Shinde 4
Protection for 2500KVA High Tension Transformer Ankita S.Kulkarni 1, Priyanka S.Dhayarkar 2, Harsha H.Ambure 3, Ashwini S.Shinde 4 Graduate Student, Dept. of E&TC, Pimpri Chinchwad College of Engineering,
More information15 Nelson-Marlborough Regional Plan
15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant
More informationLevel 3 Award in the Requirements for Electrical Installations BS 7671:2018 ( )
Level 3 Award in the Requirements for Electrical Installations BS 7671:2018 (2382-18) March 2018 Version 1.0 FAQs 1 18 th Edition IET Wiring Regulations 2018 FAQs When will the 18 th Edition of BS 7671
More informationELECTRICIAN S THEORY EXAMINATION 19 June 2010 QUESTION AND ANSWER BOOKLET
Candidate Code No. ET34 For Board Use Only Result Date Int Result Date Int ELECTRICIAN S THEORY EXAMINATION 19 June 2010 QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three hours
More informationPhotovoltaic Solar Plan Review
PAIGE B. VAUGHAN, CBO Director of Building and Safety Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail:lbutler@comptoncity.org Building & Safety Department Photovoltaic Solar Plan Review Plan Check
More informationINDEPENDENT TEST LABORATORY REPORT No
Lighting Sciences, Inc. UL Verification Services 7826 E. Evans Rd. Scottsdale, Arizona 85260 USA P: 480-991-9260 F: 480-991-0375 lsi@ul.com www.lightingsciences.com Description: The sample(s) was(were)
More informationPHOTOMETRIC TESTING & EVALUATION. Sample Tested Man-D-Tec UNILED-12-4K. Prepared for: Man-D-Tec 8175 E. Paradise Lane Scottsdale, AZ 85260
PHOTOMETRIC TESTING & EVALUATION Sample Tested Man-D-Tec UNILED-12-4K Prepared for: Man-D-Tec 8175 E. Paradise Lane Scottsdale, AZ 85260 Phone: 480-998-0325 Technical Report Number 70150753 August 8, 2017
More informationA comparison of metal-enclosed load interrupter (ME) switchgear and metal-clad (MC) switchgear
Robert J. Gustin Eaton Fellow Application Engineer, P. E. Southfield, Michigan Definitions Metal-enclosed load interrupter switchgear type ME Metal-enclosed switchgear is defined in ANSI C37.20.3-1987,
More informationElectrical Tech Note 106
Electrical Tech Note 106 Biosystems & Agricultural Engineering Department Michigan State University Master Exam Study Guide and Sample Questions 1 Based on the 2014 NEC, Part 8 of PA 230, PA 407, and the
More informationMedium Voltage. Power Factor Correction Reactive Compensation Harmonic Filters. Electrical Power Quality Management at its best.
Medium Voltage Power Factor Correction Reactive Compensation Harmonic Filters POWER QUALITY Electrical Power Quality Management at its best. From electricity generation, transmission, thru its distribution
More informationINDEPENDENT TEST LABORATORY REPORT No A
Lighting Sciences, Inc. UL Verification Services 7826 E. Evans Rd. Scottsdale, Arizona 85260 USA P: 480-991-9260 F: 480-991-0375 lsi@ul.com www.lightingsciences.com Description: The sample(s) was(were)
More informationDistribution transformers Efficiency over life-cycle
Distribution transformers Efficiency over life-cycle ABB a global leader ABB is a global leader in Power and Automation technologies that enable utility and industry customers to improve performance while
More informationUtilization of Electric Power Laboratory 3 rd Year G2: Testing & Characteristic of MCCB Used in Commercial and Industrial Applications
G2: Testing & Characteristic of MCCB Used in Commercial and Industrial Applications Contents 1. Laboratory Objective... 4 2. MECHANICAL OPERATION TESTS... 4 2.1 Purpose... 4 2.2 Procedure... 4 2.3 Results...
More informationNOTES ON ELEVATOR SYSTEMS
1. Electrohydraulic Lifts 2. Escalators 3. Electrical Requirements 4. Ventilation in Lift Machine Room 5. Lifts for Persons with Limited Mobility Disclaimer 1 Electrohydraulic Lifts Pascal's law of fluid
More informationMedium voltage products. Fuses
Medium voltage products Fuses Index Introduction... 3 Main definitions... 4 ABB HV Fuses with Temperature Control Unit... 5 General principles for fuse link selection... 6 CEF... 8 CEF-S... 16 CEF-VT...
More information2000 Cooper Bussmann, Inc. Page 1 of 9 10/04/00
DO YOU KNOW THE FACTS ABOUT SINGLE-POLE INTERRUPTING RATINGS? YOU MAY BE IN TROUBLE! Typical plant electrical systems use three-phase distribution schemes. As an industry practice, short-circuit calculations
More information