AGRALITE ELECTRIC COOPERATIVE 320 EAST HIGHWAY 12 P.O. BOX 228 BENSON, MN PHONE: (320) FAX: (320)

Size: px
Start display at page:

Download "AGRALITE ELECTRIC COOPERATIVE 320 EAST HIGHWAY 12 P.O. BOX 228 BENSON, MN PHONE: (320) FAX: (320)"

Transcription

1 AGRALITE ELECTRIC COOPERATIVE 320 EAST HIGHWAY 12 P.O. BOX 228 BENSON, MN PHONE: (320) FAX: (320) Thank you for your interest to interconnect Distributed Generation Rated Less Than 40 kw with Agralite s electrical system. This packet includes information and forms that are required by Agralite to complete the connection. Included in this packet are the following documents: Agralite Board Policy o The policy outlines Agralite s position for interconnecting to our system. Agralite s Interconnection Requirements o Outlines the technical requirements for interconnection. Agralite s Interconnection Procedure o Explains the process and steps needed to complete the interconnection. Application Form: DG Systems Rated Less than 40 kw o This application must be completed and returned to Agralite to begin processing the DG request. Schedule D: DG Interconnection Agreement for Systems Rated Less than 40 kw o Statewide Contract for Cogeneration o To be completed after Agralite confirms approval of the interconnection project. Schedule C: Average Retail Cooperative Energy Rate o Annually calculated revenue rates for General Single Phase and General Multiphase. *All documents must be filled out and signed by a member of Agralite Electric Cooperative These forms and information can also be obtained from our website: Jonathan Messner Manager of Member Services jmessner@agralite.com

2 Page left Intentionally Blank for 2-sided printing.

3 AGRALITE ELECTRIC COOPERATIVE 320 EAST HIGHWAY 12 P.O. BOX 228 BENSON, MN PHONE: (320) FAX: (320) July 1 st, 2015 Notice to Distributed Generation Facilities Interconnected after July 1 st, 2015: The Uniform Statewide Contract required to interconnect a distributed generation qualifying facility provides notice to the member owner that rates may change over the time of the contract due to action of the cooperative or the Minnesota Public Utilities Commission. Rates as defined by Minnesota Statute 216B.02 include every charge, fare, fee and classification collected by the utility in providing the service. As of July 1st, 2015, Minnesota Statute 216B.164 allows electric cooperatives and municipal utilities to charge a fee to recover the fixed costs to serve a distributed generation qualifying facility. The recovery of fixed costs through a fee or other charges to recover the cooperative s cost of providing service is part of the rate structure of the cooperative that may change over time. Please contact Agralite Electric Cooperative offices for additional information or details concerning potential changes in Agralite s Distributed Generation program. Please call Contact: Jonathan Messner Manager of Member Services jmessner@agralite.com

4 Page left Intentionally Blank for 2-sided printing.

5 POLICY NO SUBJECT: Distributed Generation Policy I. INTRODUCTION A. This policy shall apply to the interconnection and extended parallel operation of all qualifying distributed generation installations having a design capacity of 10 megawatts or less as well as the electric service to such generating installations. B. Any individual, corporation, or partnership wishing to interconnect with Agraite s Distribution System shall become a member of Agralite in accordance with the Bylaws of the Cooperative. C. The member shall be responsible for all costs involved with application submittal, engineering studies, and incremental costs resulting from interconnecting the Distributed Generation (DG) System with Agralite. Incremental interconnection costs shall include all reasonable and applicable costs of connection, switching, metering, transmission, distribution, safety provisions and administrative costs incurred by the Cooperative directly related to the installation and maintenance of the physical facilities necessary to permit interconnected operations with the member s DG System, to the extent such costs are in excess of the corresponding costs which the Cooperative would have incurred had it not interconnected with the DG System. D. Stand-alone DG Systems shall not be considered a qualifying facility as their primary purpose is for energy sales and not offsetting existing energy use. At the discretion of Agralite, stand-alone DG Systems may be approved for interconnection and parallel operation with Agralite s Distribution System, but shall not be eligible for net energy billing status or retail rate compensation by the Cooperative. These systems may receive compensation under prevailing avoided cost based rates from Agralite s power supplier. E. Agralite and members with proposed DG systems which have a total nameplate capacity less than 40 kw, utilize a Grid Tie Inverter or an Interconnection Relay, and qualify under PURPA rules and regulations will follow and make use of the standards, procedures, requirements, forms, and agreements contained in the following Agralite documents: 1. Distributed Generation Policy 2. Application Form: DG Systems Rated Less Than 40 kw 3. Procedure: DG Systems Rated Less Than 40 kw 4. Requirements: DG Systems Rated Less Than 40 kw 5. Schedule D: DG Interconnection Agreement for Systems Rated Less Than 40 kw F. Agralite and members with proposed DG Systems which have a total nameplate capacity of 40 kw to 10MW or DG Systems that are less than 40 kw but do not meet the criteria set forth in Section I.E will follow and utilize the standards, Policy Distributed Generation Policy Page 1 of 6

6 procedures, requirements, forms, and agreements contained in the following Agralite documents. If the DG System will be selling energy on the wholesale market or the DG System s total nameplate capacity is greater than the expected distribution substation minimum load, then the member shall contact MISO (Midwest Independent System Operator) and follow their procedures. 1. Distributed Generation Policy 2. Application Form: DG Systems 3. Engineering Data Submittal Form 4. Procedure: DG Systems 5. Requirements: DG Systems 6. Schedule D: DG Interconnection Agreement G. Definitions 1. Cooperative Agralite Electric Cooperative (Agralite) 2. Distributed Generation (DG) in connection with this Policy and its corresponding documents is defined as generation built within close proximity to the generating member s load where the primary purpose of the generation is to offset energy use. DG includes, but may not be limited to the following: a. small scale generators such as photovoltaics (PV), fuel cells, small wind turbines; b. micro-turbines or reciprocating engines fueled by renewable fuels such as landfill gas or methane gas from digesters; c. any qualifying facility (QF) under the Public Utility Regulatory Policies Act of 1978 (PURPA) 3. DG Coordinator The Cooperative shall designate a single point of contract for the procedures involved with interconnecting a generation system. This person may not be able to directly answer of resolve all of the issues involved in the review and implementation of the interconnection, standards, and requirements, but shall be available to provide coordination assistance with the member. 4. Generation System (DG System) is the interconnected generator(s), controls, relays, switches, breakers, transformers, inverters, and associated wiring and cables up to the Point of Common Coupling. 5. Grid Tie Inverter is a device that converts DC electricity to AC electricity and has been specially designed and constructed to safely interconnect with an Area Electric Power System (Agralite s Distribution System). For this Policy and its corresponding documents, a Grid Tie Inverter is also designed and tested to meet the requirements of IEEE 1547 and ANSI 929 standards and has been certified with a UL 1741 label. 6. Interconnection Relay is a protection device that detects Area Electric Power Systems (Area EPS- Agralie s Distribution System) supply problems and automatically disconnects the DG System from the Area Policy Distributed Generation Policy Page 2 of 6

7 EPS. For this policy and its corresponding documents, an Interconnection Relay is also designed and tested to meet the requirements of ieee 1547 and has been certified with a UL 1741 and/or a UL 508 and 508A label. 7. Nameplate Capacity is the total nameplate capacity rating of all the Generation included in the Generation System. For this definition the maximum rated kw capacity on the nameplate shall be used. 8. Point of Common Coupling (PCC) is the point where the member s DG System is connected to Agralite s Distribution System. 9. Public Utilities Regulatory Policies Act 1978 (PURPA) is a US federal law enacted in 1978 which was intended to encourage more energyefficient and environmentally friendly commercial energy productions. PURPA defined a new class of energy producer called a Qualifying Facility. 10. Qualifying Facilities (QFs) are either small-scale producers of commercial energy who normally self-generate energy for their own needs but may have occasional or frequent surplus energy, or incidental producers who happen to generate usable electric energy as a byproduct of other activities. II. INTERCONNECTION PROCESS A. DG Systems (Rated Less than 40 kw) 1. This section is applicable to the interconnection of a DG System with Agralite s Distribution System which meets all of the following criteria: a. Total nameplate capacity is less than 40 kw b. Utilizes a Grid Tie Inverter or an Interconnection Relay c. Qualifies under PURPA rules and regulations 2. Members seeking to interconnect a DG System with Agralite s Distribution System meeting the above criteria shall follow the procedures outlined in the document Procedures: DG Systems Rated Less than 40 kw. The following gives an overview of the steps involved in the process. Refer to the aforementioned document for the complete process. a. The member submits a complete application form ( Application Form: DG Systems Rated Less than 40 kw ) with supporting documentation and includes the $100 non-refundable application fee. b. Agralite reviews the application and responds to the member with whether or not the project is approved. If the project is approved, the Cooperative will also supply the member with an Interconnection Agreement, cost estimates and a payment schedule. c. If the member decides to proceed then they must supply additional items to the Cooperative. Policy Distributed Generation Policy Page 3 of 6

8 d. The member and Agralite will order and install applicable equipment and conduct required testing and inspection, including an inspection by the State Electrical Inspector. e. Final testing is completed by both the member and Agralite. B. DG Systems (Rated 40 kw and above) 1. This section is applicable to the interconnection of a DG System with Agralite s Distribution System having a total nameplate capacity of 40 kw to 10 MW or a DG System that is less than 40 kw, but does not meet the criteria set forth in section III.A.1. In addition, if the member will be selling energy on the wholesale market or he DG System s total Nameplate Capacity is greater than the expected distribution substation minimum load, then the member shall contact MISO (Midwest Independent System Operator) and follow their procedures. 2. Members seeking to interconnect a DG System with Agralite s Distribution System meeting the above criteria shall follow the procedures outlined in the document Procedures: DG Systems. The following gives an overview of the steps involved in the process. Refer to the aforementioned document for the complete process. a. The member submits a complete application form ( Application Form: DG Systems ) with supporting documentation and includes the non-refundable application fee. Refer to the document Procedures: DG Systems or to the Cooperative s DG Coordinator for application fee cost. b. Agralite completes a preliminary review of the interconnection request and responds to the member with whether or not the project is approved. If the project is approved, the Cooperative will communicate, among other things, the need, scope and cost of engineering studies. c. If the member decides to proceed then they must provide upfront payment for the engineering study and any other requested information to the Cooperative. d. Agralite Electric Cooperative completes engineering study. e. Agralite provides the member with the results of the engineering study, special requirements, cost estimates and payment schedule. f. The member supplies upfront payment as identified in the payment schedule, a signed Interconnection Agreement, a final timeline, and detailed information on the proposed equipment. g. Agralite completes the review of the final DG System design. h. The member provides copies of signed Power Purchase Agreements to Agralite. i. The member installs DG System, submits required documentation and completes equipment inspections and testing. Agralite orders Policy Distributed Generation Policy Page 4 of 6

9 and installs their equipment, assists member, and provides input and review for inspections and testing. j. Final testing is completed by both the member and Agralite. k. Agralite provides written approval for normal operation of the DG System. l. The member provides Agralite with updates (as tested) documentation and drawings. III. PURCHASE OF ELECTRICITY BY THE COOPERATIVE A. The Cooperative shall pay or credit the member monthly for all energy furnished during the month in accordance with the applicable rate schedule and the appropriate rate. All rates may be adjusted by the Power Cost Adjustment (PCA) when applicable. 1. Due to actions of the Cooperative or the Minnesota Public Utilities Commission, purchase of electricity may change over the time that a particular Interconnection Agreement is in place. Purchases will be made under the rates in effect each month during the time the Interconnection Agreement is in force. 2. Copies of presently filed rate schedules are available from the Cooperative s DG Coordinator. The applicable rate schedule shall be made part of the Interconnection Agreement. 3. Members shall be paid in accordance with the rat schedule in force for the class of service to which the member s account belongs. 4. Payment to the member shall coincide with normal billing dates for the service. 5. The Cooperative will compute the charges and payments for purchases and sales for each billing period. Any credit to the member will be made under one of the following options: a. Credit to the member s account with the Cooperative b. Paid by check to the member within 15 days of the billing date B. Member Owned DG System with Total Nameplate Capacity less than 40 kw 1. Members shall have the option of the following rate schedules as defined in the Minnesota PUC Rules, Chapter a. Net Energy Billing Rate ( ) 1) Net energy input to the Cooperative s Distribution System will be compensated at the average retail energy rate (Schedule C). b. Simultaneous Purchase and Sale Billing Rate ( ) 1) This option is only available if mutually agreed upon between the member and the Cooperative. 2) Energy and Capacity input to the Cooperative s Distribution System will be compensated under prevailing Policy Distributed Generation Policy Page 5 of 6

10 avoided cost based rates from Agralite s power supplier (Schedule A, PG1). C. Member owned DG System with Total Nameplate Capacity between 40 kw and not greater than 10 MW. a. Energy and capacity input to the Cooperative s Distribution System will be compensated under prevailing avoided cost based rates from Agralite s power supplier (Schedule A, B, PG1). IV. PURCHASE OF ELECTRICIY BY THE MEMBER A. The member shall pay the present rate for the class of service to which the member s account belongs. B. The payment from the member to the Cooperative shall coincide with normal billing dates for the service. V. RESPONSIBILITY The General Manager shall be responsible for the administration of this policy. Effective Date: 12/30/10 Adopted with New Subdivisions: 1/27/11 Review Date: 8/27/15 Secretary Policy Distributed Generation Policy Page 6 of 6

11 Page left Intentionally Blank for 2-sided printing.

12 Agralite Electric Cooperative Requirements: Eligible DG Systems Rated Less Than 40 kw TABLE OF CONTENTS I. Introduction 2 II. General Information 3 III. Interconnection Issues and Technical Requirements 7 IV. Generation Metering, Monitoring and Control 9 V. Contracts / Agreements / Insurance 10 VI. Testing Requirements 10 VII. Attachments: System Diagram [AEC] DG Metering One-Line 13 System Diagram Interconnection Relay 14 System Diagram Grid Tie Inverter 15

13 I. Introduction Electric distributed generation systems span a wide range of sizes and electrical characteristics. Electrical distribution system design varies widely from what is required to serve the rural Member to what is required to serve the large commercial Member. With so many variations possible, it becomes complex and difficult to create one interconnection standard that fits all generation interconnection situations. This streamlined version of the Technical Requirements document has been written to only cover the technical interconnection requirements for generation systems which meet all of the criteria outlined in the definition of an Eligible DG System Rated Less Than 40 kw. If your system 1) is rated at 40 kw or more; 2) does not qualify under PURPA rules and regulations; or 3) does not use a Grid Tie Inverter or an Interconnection Relay, then this document does not fully cover the Technical Requirements for interconnecting your system. If that is the case please refer to the Agralite document titled Requirements: DG Systems. Agralite Electric Cooperative has the right to limit the maximum size of a Distributed Generation (DG) System or the number of DG Systems that are allowed to interconnect if the DG System would reduce reliability to other Members connected to Agralite s Distribution System. In creating this document many assumptions have been made about what is a typical, less than 40kW DG System. Due to these assumptions and the fact that presently there is not a standard for generation system design, there may be areas not covered within this document. In those cases the Agralite document titled Requirements: DG Systems shall apply. This standard only covers the Technical Requirements and does not cover the interconnection process from the planning of a project through approval and construction. Please refer to the companion document Procedure: Eligible DG Systems Rated Less than 40 kw for the process to follow. It is also important to get copies of Agralite s tariffs concerning generation interconnection, which will include rates and costs. The earlier the Member contacts Agralite s DG Coordinator and involves him or her in the planning and design the smoother the process will go. This Agralite document ( Requirements: Eligible DG Systems Rated Less Than 40 kw ) and Agralite s full version of this document ( Requirements: DG Systems ) are based on and incorporate all the requirements found in the state document titled State of Minnesota Distributed Generation Interconnection Requirements. Items in this document preceded by [AEC] indicate that the requirement or standard is specific to Agralite Electric Cooperative and is supplemental to the requirements or standards found in the state document ( State of Minnesota Distributed Generation Interconnection Requirements ). AEC Requirements: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 2 of 15

14 II. General Information A. Definitions The definitions defined in the IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems (IEEE 1547) apply to this document as well. The following definitions are in addition to the ones defined in IEEE 1547, or are repeated from the IEEE 1547 standard. 1. [AEC] Applicant (or Member) is defined as the person or entity, whom is requesting the interconnection of the Generation System with Agralite and has overall responsibility for ensuring that the Generation System is designed, operated and maintained in compliance with the Technical Requirements Area EPS is an electric power system (EPS) that serves Local EPS s. Note- Typically, an Area EPS has primary access to public rights-of-way, priority crossing of property boundaries, etc. Agralite is an Area EPS. [AEC] Cooperative Agralite Electric Cooperative (Agralite) [AEC] Distributed Generation (DG) for this document is defined as generation typically built within close proximity to the generating Member s load where the primary purpose of the generation is to offset energy use. DG includes, but may not be limited to the following: a. small scale generators such as photovoltaic (PV), fuel cells, small wind turbines; b. micro-turbines or reciprocating engines fueled by renewable fuels such as landfill gas or methane gas from digesters; c. any qualifying facility (QF) under the Public Utility Regulatory Policies Act of 1978 (PURPA) 5. [AEC] DG Coordinator the person or persons designated by Agralite to provide a single point of coordination with the Member for the generation interconnection process [AEC] Distribution System is the Agralite facilities which are not part of the Area EPS Transmission System or any Generation System. Eligible DG System Rated Less Than 40 kw For this document a DG System shall meet all of the following criteria and requirements in order to be considered an Eligible DG System Rated Less Than 40 kw. a. Qualifies under PURPA rules and regulations as a Qualifying Facility b. Total Nameplate Capacity is less than 40 kw a. Protection scheme utilizes a Grid Tie Inverter or an Interconnection Relay 7. Generation is any device producing electrical energy, i.e., rotating generators driven by wind, steam turbines, internal combustion engines, hydraulic turbines, solar, fuel cells, etc.; or any other electric producing device, including energy storage technologies Generation System is the interconnected generator(s), controls, relays, switches, breakers, transformers, inverters and associated wiring and cables, up to the Point of Common Coupling. Grid Tie Inverter is a device that converts DC electricity to AC electricity and has been specially designed and constructed to safely interconnect with an Area EPS. For this document, a Grid Tie Inverter is also designed and tested to meet the requirements of IEEE 1547 and ANSI 929 standards and has been certified with a UL 1741 label. AEC Requirements: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 3 of 15

15 10. Interconnection Customer is the party or parties who will own/operate the Generation System and are responsible for meeting the requirements of the Agreements and Technical Requirements. This could be the Generation System applicant, installer, owner, designer, or operator. 11. [AEC] Interconnection Relay is a protection device that detects Area EPS supply problems and automatically disconnects the DG System from the Area EPS. For this document, an Interconnection Relay is also designed and tested to meet the requirements of IEEE Local EPS is an electric power system (EPS) contained entirely within a single premises or group of premises. Point of Common Coupling is the point where the Local EPS is connected to an Area EPS. 14. [AEC] Public Utilities Regulatory Policies Act 1978 (PURPA) is a US federal law enacted in 1978 which was intended to encourage more energy-efficient and environmentally friendly commercial energy production. PURPA defined a new class of energy producer called a Qualifying Facility. 15. [AEC] Qualifying Facilities (QFs) are either small-scale producers of commercial energy who normally self-generate energy for their own needs but may have occasional or frequent surplus energy, or incidental producers who happen to generate usable electric energy as a byproduct of other activities. A Qualifying Facility satisfies the conditions established in Code of Federal Regulations, title 18, section (b)(1), (1981), as applied when interpreted in accordance with the amendments to Code of Federal Regulations, title 18, sections to adopted through Federal Register, volume 46, pages , (1981). 16. [AEC] Technical Requirements refers to the set of requirements outlined in the Agralite document titled Requirements: DG Systems. This Requirements document is a more concise subset of the Technical Requirements. Both of the documents are based on and incorporate all the requirements found in the state document titled State of Minnesota Distributed Generation Interconnection Requirements Transmission System are those facilities as defined by using the guidelines established by the Minnesota State Public Utilities Commission; In the Matter of Developing Statewide Jurisdictional Boundary Guidelines for Functionally Separating Interstate Transmission from Generation and Local Distribution Functions Docket No. E-015/M Type-Certified is generation paralleling equipment that is listed by an OSHA listed national testing laboratory as having met the applicable type testing requirement of UL 1741 or UL Subject At the time this document was prepared these were the only national standards available for certification of generation transfer switch equipment. This definition does not preclude other forms of type-certification if agreeable to Agralite. B. Interconnection Requirements Goals This standard defines the minimum technical requirements for the implementation of the electrical interconnection between the DG System and Agralite s Distribution System. It does not define the AEC Requirements: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 4 of 15

16 overall requirements for the DG System. The requirements in this standard are intended to achieve the following: 1. Ensure the safety of Agralite personnel and contractors working on the electrical power system. 2. Ensure the safety of Agralite Members and the general public. 3. Protect and minimize the possible damage to the electrical power system and Member s property. 4. Ensure proper operation to minimize adverse operating conditions on the electrical power system. C. Area EPS Modifications Depending on the size of the DG System, the location on Agralite s Distribution System and how the DG System is operated, certain modifications and/or additions may be required to Agralite s existing Distribution System. To the extent possible, this standard describes the modifications, which could be necessary to Agralite s Distribution System for different types of DG Systems. If any special requirements are necessary they will be identified by Agralite during the application review process. D. Generation System Protection The Interconnection Customer is solely responsible for providing protection for the DG System. Protection systems required in this standard are structured to protect Agralite s Distribution System and the public. The DG System protection is not provided for in this standard. Additional protection equipment may be required to ensure proper operation for the DG System. This is especially true while operating disconnected from Agralite s Distribution System. Agralite s Distribution System does not assume responsibility for protection of the DG System equipment or any portion of the Local EPS. E. Electrical Code Compliance 1. The Interconnection Customer shall be responsible for complying with all applicable local, independent, state and federal codes such as building codes, National Electric Code (NEC), National Electrical Safety Code (NESC) and noise and emissions standards. As required by Minnesota State law, Agralite s Distribution System will require proof of complying with the National Electrical Code before the interconnection is made. This will be accomplished through final inspection and approval by a Minnesota State Electrical Inspector. 2. The Interconnection Customer s DG System and installation shall comply with latest revisions of the ANSI/IEEE standards applicable to the installation. One such standard is IEEE 1547; Standard for Interconnecting Distributed Resources with Electric Power Systems. See the reference section in this document for a partial list of the standards, which apply to the generation installations covered by this standard. F. References AEC Requirements: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 5 of 15

17 The following standards shall be used in conjunction with this standard. When the stated version of the following standards is superseded by an approved revision then that revision shall apply. 1. IEEE Std , IEEE Standard Dictionary of Electrical and Electronic Terms 2. IEEE Std , IEEE Recommended Practices and Requirements for Harmonic Control in Electric Power Systems 3. IEEE Std , IEEE Recommended Practice for Utility Interface of Photovoltaic (PV) Systems. 4. IEEE Std 1547, IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems 5. IEEE Std C (1995), IEEE Standard Surge Withstand Capability (SEC) Tests for Protective Relays and Relay Systems. 6. IEEE Std C (1995), IEEE Standard Withstand Capability of Relay Systems to Radiated 7. Electromagnetic Interference from Transceivers. 8. IEEE Std C , IEEE Recommended Practice on Characterization of Surges in Low Voltage (1000V and Less) AC Power Circuits 9. IEEE Std C (2002), IEEE Recommended Practice on Surge Testing for Equipment Connected to Low Voltage (1000V and less) AC Power Circuits 10. ANSI C , Electric Power Systems and Equipment Voltage Ratings (60 Hertz) 11. ANSI/IEEE , Recommended Practice for Emergency and Standby Power Systems for Industrial and Commercial Applications. 12. ANSI/IEEE Standard , IEEE Recommended Practice for Grounding of Industrial an 13. Commercial Power Systems Green Book, UL Std Standard for Safety for Inverters, Converters, Controllers and Interconnection System Equipment for Use with Distributed Energy Resources 14. NEC National Electrical Code, National Fire Protection Association (NFPA), NFPA NESC National Electrical Safety Code. ANSI C2-2000, Published by the Institute of Electrical and Electronics Engineers, Inc. III. Interconnection Issues and Technical Requirements A. General Requirements AEC Requirements: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 6 of 15

18 The following requirements apply to the interconnected generating equipment. Agralite s Distribution System shall be considered the source side and the Member s Generation System shall be considered the load side in the following interconnection requirements. 1. For three-phase operation, the inverter or relay control must be able to detect and separate for the loss of one or more phases. 2. If banks of inverter or relay systems are installed at one location, a design review by Agralite must be performed to determine if there are any additional protection systems, metering or other needs that are required. The issues will be identified by Agralite once the interconnection application is received. 3. Visible Disconnect- a. A visible disconnect is required for safely isolating the Distributed Generation. The inverter or relay shall not be used as a safety isolation device. The visible disconnect shall be installed to electrically isolate and provide a visible air gap between the Interconnection Customer s Generation and Agralite s Distribution System in order to establish the safety isolation required for work on Agralite s Distribution System. This disconnecting device shall be readily accessible 24 hours per day by Agralite field personnel and shall be capable of padlocking by Agralite field personnel. The disconnecting device shall be lockable in the open position. b. The visible disconnect shall be a UL approved or National Electrical Manufacture s Association approved manual safety disconnect switch of adequate ampere capacity. The visible disconnect shall not open the neutral when the switch is open. c. The visible disconnect shall be labeled, as required by Agralite, to inform the Agralite field personnel. d. [AEC] The visible disconnect shall be located within eight feet of the main meter. 4. [AEC] Distribution System Open Point - If not already in place, Agralite may install a cabinet or cutout(s) up-line (source side) of the service transformer(s) in order to provide a visual open/isolation point on the Distribution System. The cabinet or cutout(s) will be installed at a location on the Distribution System such that the Member s DG System and the transformer(s) feeding the DG System can be manually isolated from the rest of the Distribution System and not affect service to other Cooperative Members. This is in addition to the Visible Disconnect requirement as explained above Energization of Equipment by the Generation System - The DG System shall not energize any de-energized portion of Agralite s Distribution System. Power Factor - The power factor of the DG System and connected load shall be no less than 90% at the PCC. a. [AEC] If power factor levels are outside the limits identified above, Agralite reserves the right to require the Member to install power factor correction equipment or reimburse the Cooperative for its cost of installing power factor correction equipment. AEC Requirements: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 7 of 15

19 7. [AEC] Single Phase Limitations - The total Nameplate Capacity shall be limited to 10 kw and below for single-phase DG Systems operating in parallel with the Agralite s Distribution System unless authorized by the Cooperative. Single-phase installations greater than 10 kw may be permitted if engineering calculations determine that the installation will not adversely affect adjacent Agralite Members Fault and Line Clearing - The DG System shall be removed from Agralite s Distribution System for any faults or outages occurring on the electrical circuit serving the DG System. Interference - The Interconnection Customer shall disconnect the DG System from Agralite s Distribution System if the DG System causes radio, television or electrical service interference to other Members via the EPS or interference with the operation of the Area EPS. The Interconnection Customer shall either effect repairs to the DG System or reimburse Agralite for the cost of any required modifications to Agralite s Distribution System due to the interference. 10. Unintended Islanding - Under certain conditions with extended parallel operation, it would be possible for a part of Agralite s Distribution System to be disconnected from the rest of Agralite s Distribution System and have the DG System continue to operate and provide power to a portion of the isolated circuit. This condition is called islanding. It is not possible to successfully reconnect the energized isolated circuit to the rest of Agralite s Distribution System since there are no synchronizing controls associated with all of the possible locations of disconnection. Therefore, it is a requirement that the DG System be automatically disconnected from Agralite s Distribution System immediately by protective relays for any condition that would cause Agralite s Distribution System to be de-energized. The DG System must either isolate with the Member s load or trip. The Generation System must also be blocked from closing back into Agralite s Distribution System until Agralite s Distribution System is reenergized and Agralite s Distribution System voltage is within Range B of ANSI C84.1 Table 1 for a minimum of 5 minutes. Depending upon the size of the DG System it may be necessary to install direct transfer trip equipment from Agralite s Distribution System source(s) to remotely trip the generation interconnection to prevent islanding for certain conditions. 11. Protective Systems a. A Grid Tie Inverter is designed, constructed and tested so that the necessary protective functions are built in to the inverter to ensure isolation of the DG System from the Distribution System as required. In general, the functions required by IEEE 1547 and IEEE 929 standards include: Over/Under Voltage, Over/Under Frequency, and phase and ground over-current. No further protective equipment is typically necessary. Please note that the NEC or other state or local codes may require you to install additional protective equipment such as fuses. b. An Interconnection Relay is constructed and tested to ensure isolation of the DG System from the Distribution System as required. In general, the functions required by IEEE 1547 include: Over/Under Voltage, Over/Under Frequency, and phase and ground overcurrent. No further protective equipment is typically necessary. Please note that the NEC or other state or local codes may require you to install additional protective equipment such as fuses. AEC Requirements: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 8 of 15

20 12. [AEC] Interconnection - Interconnection of a DG System with Agralite s Distribution System shall only be permitted after all requirements are met and written authorization to interconnect is issued by the Cooperative. 13. Disconnection- Agralite may refuse to connect or may disconnect without prior notice, a DG System from Agralite s Distribution System under the following conditions: a. There is not an approved Application Form and/or the Interconnection Agreement is not in place. b. [AEC] There is no proof of insurance or the level and/or type of insurance is not consistent with that described in Section V. c. Termination of interconnection by mutual agreement. d. Non-Compliance with any of the technical or contractual requirements. e. [AEC] DG System output exceeds 40 kw. f. System Emergency or for imminent danger to the public or Agralite personnel (Safety). g. Routine maintenance, testing, repairs and modifications to Agralite s Distribution System. Agralite shall coordinate planned outages with the Interconnection Customer to the extent possible. IV. Generation Metering, Monitoring and Control A. Metering, Monitoring and Control For Distributed Generation Systems less than 40kW the following are the Metering, Monitoring and Control requirements. This document assumes that the DG System qualifies under the PURPA requirements (Public Utilities Regulatory Policies Act Federal Gov. 1978) and the power is not being sold to a third party. 1. Metering Requirements* - For DG Systems that qualify under the PURPA requirements, the service will be metered following the State of Minnesota net metering standards. a. For single-phase DG Systems the Member is required to provide and install an Agralite approved single phase meter socket. Agralite will supply a single-phase meter that will record power flow in both directions. The Member shall be responsible for the cost of the meter and the meter socket. b. For three-phase Generation Systems the Member is required to provide an Agralite approved commercial three phase meter socket. Agralite will supply the three-phase meter to record power flow in both directions. The Member shall be responsible for the cost of the meter and the meter socket. 2. Monitoring and Control Requirements* - For qualified DG Systems 40 kw and less there are no requirements for monitoring and remote control of the DG System by Agralite. 3. [AEC] Agralite shall retain the right to install additional metering equipment for data collection and research purposes. Agralite will furnish such metering equipment and pay all associated operation and maintenance costs. AEC Requirements: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 9 of 15

21 4. [AEC] Load management sub-meters are not compatible with typical DG Systems. Agralite may remove existing sub-meters when DG Systems are installed and interconnected. Agralite may allow, at the Member s expense, load management meters which are connected on the utility side of the main meter. * The above Metering, Monitoring and Control Requirements assume a typical installation. There could be other requirements for metering, monitoring or control that are required for non-typical installations. V. Contracts / Agreements / Insurance A. Contracts / Agreements 1. Statewide Contract for Cogeneration and Small Power Production Facilities Having Less Than 40 Kilowatts of Capacity- This agreement is a standard contract between the Member and Agralite. 2. [AEC] The State of Minnesota mandated standard agreement ( Uniform Statewide Contract for Cogeneration and Small Power Production Facilities Having Less Than 40 Kilowatts of Capacity ) may also be referenced as the Agralite document titled Schedule D: DG Interconnection Agreement for Systems Rated Less than 40 kw. This Agreement is available from Agralite s DG Coordinator. 3. [AEC] Any individual, corporation, or partnership wishing to interconnect with Agralite s Distribution System shall become a Member of Agralite Electric Cooperative. Correspondence and actions pertaining to application submittal and signing, agreement signing, payments and billing and all other required dealings will be done between the Member and Agralite only. B. Insurance 1. [AEC] In connection with the performance of their duties and obligations, the Interconnection Customer shall maintain, during the term of the Interconnection Agreement, general liability insurance, from a qualified insurance agency with a B+ or better rating by Best and with a combined single limit of not less than three hundred thousand ($300,000) for each occurrence if the Nameplate Capacity of the Generation System is less than 40 kw. VI. Testing Requirements A. Certification of Equipment The most important part of the process to interconnect generation with Local and Area EPS s is safety. One of the key components of ensuring the safety of the public and employees is to ensure that the design and implementation of the elements connected to the electrical power system operate as required. To meet this goal, all of the electrical wiring in a business or residence, is required by the State of Minnesota to be listed by a recognized testing and certification laboratory, for its intended purpose. Typically this is seen as UL listed. To be in compliance with this version of the Technical Requirements a Grid Tie Inverter shall be listed by a nationally recognized testing laboratory as having met the applicable type-testing requirements of UL 1741 and IEEE 929. [AEC] If an Interconnection Relay is used it shall be listed by a nationally recognized testing laboratory and meet the applicable type-testing requirements of IEEE AEC Requirements: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 10 of 15

22 B. Commissioning Testing The following tests shall be completed by the Interconnection Customer. Agralite has the right to witness all field testing and to review all records prior to allowing the system to be made ready for normal operation. 1. Before testing- The DG System shall be inspected and approved by a State of Minnesota Electrical Inspector prior to interconnecting the DG System with Agralite s Distribution System. 2. Any pre-testing recommended by the equipment manufacturer and/or installer shall be completed prior to the On-line Commissioning test. 3. On-Line Commissioning Test Agralite and the Interconnection Customer shall complete an on-line commissioning test (anti-island test) in order to verify functionality once the DG System has completed pre-testing and the results have been reviewed and approved by Agralite. Agralite s Distribution System shall be considered the source side and the Member s Generation System shall be considered the load side in the following steps. a. [AEC] Anti-Island Test Steps 1) The DG System shall be started and operated in parallel with Agralite s Distribution System source. 2) Agralite s Distribution System source shall be removed by opening a switch, fuse or breaker or by other means deemed acceptable by Agralite on the source side of the Grid Tie Inverter or Interconnection Relay. 3) Under the condition established in Step 2, the DG System shall immediately stop generating. Voltage measurements shall be taken on either the load side or the source side of the transformer(s) to ensure generation has ceased. a) Applicable voltage(s) measured on the load side or the source side of the transformer(s) shall be zero when simulating a single-phase or a three-phase outage. The accuracy of the meter and special characteristics of the service shall be taken into account when determining whether or not the measured voltage is considered zero. 4) Under the condition established in Step 2, the DG System shall not reenergize any part of Agralite s Distribution System. 5) The device that was opened to disconnect Agralite s Distribution System source shall be closed and the DG System shall not automatically reparallel / reconnect with Agralite s Distribution System for at least 5 minutes. 6) For three-phase systems this test will be repeated for each phase of the system and also for a complete three phase loss of Agralite s Distribution System source. C. Periodic Testing and Record Keeping AEC Requirements: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 11 of 15

23 1. Anytime the Grid Tie Inverter or Interconnection Relay hardware or software is replaced and/or modified, Agralite s DG Coordinator shall be notified. This notification shall be as soon as reasonably possible and be with sufficient warning so that Agralite personnel can be involved and/or witness the verification testing. Verification testing shall be completed on the replaced and/or modified equipment and systems. The involvement of Agralite personnel will depend upon the complexity of the DG System and the component being replaced and/or modified. Since the Interconnection Customer and Agralite are now operating an interconnected system it is important for each to communicate changes in operation, procedures and equipment to ensure the safety and reliability of the Local and Area EPS. 2. All interconnection related protection systems shall be periodically tested and maintained by the Interconnection Customer at intervals specified by the manufacture or system integrator. These intervals shall not exceed 5 years. Periodic test reports and a log of inspections shall be maintained by the Interconnection Customer and made available to Agralite upon request. 3. [AEC] All interconnection related protection systems may be periodically tested by Agralite personnel in order to verify correct operation. The testing will be performed according to the steps outlined previously for conducting an anti-island test. Agralite shall coordinate such testing with the Interconnection Customer. AEC Requirements: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 12 of 15

24 AEC Requirements: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 13 of 15

25 Page left Intentionally Blank for 2-sided printing.

26 AEC Requirements: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 14 of 15

27 Page left Intentionally Blank for 2-sided printing.

28 AEC Requirements: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 15 of 15

29 Page left Intentionally Blank for 2-sided printing.

30 Agralite Electric Cooperative Procedure: Eligible DG Systems Rated Less Than 40 kw I. Introduction To interconnect a Generation System with Agralite Electric Cooperative (Agralite or AEC), there are several steps that must be followed. This document outlines those steps for eligible systems rated less than 40 kw. At any point in the process, if there are questions, please contact Agralite s DG Coordinator. This document has been prepared to explain the process to interconnect a specific type and size of generation system with Agralite. The criterion used to determine whether or not your Generation System is covered by this document is outlined in the definition of an Eligible DG System Rated Less Than 40 kw. If your system 1) is rated at 40 kw or more; 2) does not qualify under PURPA rules and regulations; or 3) does not use a Grid Tie Inverter or an Interconnection Relay, then this document does not fully cover the procedure for interconnecting your system. If that is the case please refer to the Agralite document titled Procedure: DG Systems. This Procedure does not discuss the associated interconnection Technical Requirements, which are covered in Agralite s document titled Requirements: Eligible DG Systems Rated Less Than 40 kw. Please refer to that document for Technical Requirements and additional explanation of the terms utilized in this document. This Agralite document ( Procedure: Eligible DG Systems Rated Less Than 40 kw ) and Agralite s full version of this document ( Procedure: DG Systems ) are based on and closely follows the process outlined in the state document titled State of Minnesota Interconnection Process for Distributed Generation Systems.

31 II. General Information A. Definitions 1. Applicant (or Member) is defined as the person or entity, whom is requesting the interconnection of the Generation System with Agralite and has overall responsibility for ensuring that the Generation System is designed, operated and maintained in compliance with the Technical Requirements Area EPS is an electric power system (EPS) that serves Local EPS s. Note- Typically an Area EPS has primary access to public rights-of-way, priority crossing of property boundaries, etc. Agralite is an Area EPS. Cooperative Agralite Electric Cooperative (Agralite or AEC) Dedicated Facilities is the equipment that is installed due to the interconnection of the Generation System and not required to serve other Agralite Members. Distributed Generation (DG) for this document is defined as generation typically built within close proximity to the generating Member s load where the primary purpose of the generation is to offset energy use. DG includes, but may not be limited to the following: a. small scale generators such as photovoltaic (PV), fuel cells, small wind turbines; b. micro-turbines or reciprocating engines fueled by renewable fuels such as landfill gas or methane gas from digesters; c. any qualifying facility (QF) under the Public Utility Regulatory Policies Act of 1978 (PURPA) 6. DG Coordinator the person or persons designated by Agralite to provide a single point of coordination with the Member for the generation interconnection process Distribution System is the Agralite facilities which are not part of the Area EPS Transmission System or any Generation System. Eligible DG System Rated Less Than 40 kw For this document a DG System shall meet all of the following criteria and requirements in order to be considered an Eligible DG System Rated Less Than 40 kw. a. Qualifies under PURPA rules and regulations as a Qualifying Facility b. Total Nameplate Capacity is less than 40 kw a. Protection scheme utilizes a Grid Tie Inverter or an Interconnection Relay 9. Extended Parallel means the Generation System is designed to remain connected with Agralite s Distribution System for an extended period of time. 10. Generation is any device producing electrical energy, i.e.: rotating generators driven by wind, steam turbines, internal combustion engines, hydraulic turbines, solar, fuel cells, etc.; or any other electric producing device, including energy storage technologies. 11. Generation System is the interconnected generator(s), controls, relays, switches, breakers, transformers, inverters and associated wiring and cables, up to the Point of Common Coupling. 12. Grid Tie Inverter is a device that converts DC electricity to AC electricity and has been specially designed and constructed to safely interconnect with an Area EPS. For this document, a Grid Tie Inverter is also designed and tested to meet the requirements of IEEE AEC Procedure: Eligible DG Systems Rated Less Than 40 kw (7/5/11) Page 2 of 7

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Table of Contents Chapter 1. Purpose and scope. Pg 3 Chapter 2. Application

More information

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities New Ulm Public Utilities Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities INDEX Document Review and History... 2 Definitions... 3 Overview... 3 Application

More information

STATE OF NORTH DAKOTA DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS TABLE OF CONTENTS

STATE OF NORTH DAKOTA DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS TABLE OF CONTENTS STATE OF NORTH DAKOTA DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS TABLE OF CONTENTS Foreword 2 1. Introduction 3 2. References 6 3. Types of Interconnections 7 4. Interconnection Issues and Technical

More information

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Consumer Guidelines for Electric Power Generator Installation and Interconnection Consumer Guidelines for Electric Power Generator Installation and Interconnection Habersham EMC seeks to provide its members and patrons with the best electric service possible, and at the lowest cost

More information

DAKOTA ELECTRIC ASSOCIATION DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS

DAKOTA ELECTRIC ASSOCIATION DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS DAKOTA ELECTRIC ASSOCIATION DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS TABLE OF CONTENTS Foreword 2 1. Introduction 3 2. References 6 3. Types of Interconnections 7 4. Interconnection Issues and

More information

Interconnection Requirements for Generation Systems

Interconnection Requirements for Generation Systems Interconnection Requirements for Generation Systems I. Foreword...1 II. Introduction...2 III. Definitions...2 IV. Interconnection Requirements Goals...4 V. Protection...4 VI. Nodak System Modifications...4

More information

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program As part of our commitment to support renewable energy, Kissimmee Utility Authority

More information

White River Electric Association, Inc. Net Metering Information & Service Requirements

White River Electric Association, Inc. Net Metering Information & Service Requirements White River Electric Association, Inc. Net Metering Information & Service Requirements What is Net Metering? Net Metering is an electric policy and service for consumers who own and utilize renewable energy

More information

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1. Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.3, 5/16/18 1.0 Scope This document is currently limited in scope to inverter interfaced PV installations

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

Interconnection Process for Generation Systems

Interconnection Process for Generation Systems Interconnection Process for Generation Systems I. INTRODUCTION...1 II. GENERAL INFORMATION...2 A. Definitions...2 B. Nodak Electric Cooperative, Inc. Generation Interconnection Contacts...3 C. Engineering

More information

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility Processed Date Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility Customer s Printed Name Installation Street Address Account Number Please note: Columbia Water & Light

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

ENGINEERING SPECIFICATION

ENGINEERING SPECIFICATION December 206 ENGINEERING SPECIFICATION No. of 6 DATE: 2-9-6 CATEGORY SUBJECT TABLE OF CONTENTS. Overview... 2 2. General Requirements for Service... 3 3. Definitions... 3 4. Abbreviations... 5 5. References

More information

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power 40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power WHO SHOULD FILE THIS APPLICATION: Anyone expressing interest to install generation which will interconnect

More information

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _ Application for Operation of & Net Metering for Member-Owned Generation -------------- OWNER/APPLICANT INFORMATION Name: Mailing Address: City: County: State: Zip Code: _ Phone Number: Email Address:.Representative:

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

Net Metering Program

Net Metering Program Net Metering Program Chapter 1 Purpose and Scope. The purpose of this chapter is to establish rules for determining the terms and conditions governing the interconnection of electric generation facilities

More information

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655) - (SMUD FORM 2655) A. Applicability: This Generating Facility Interconnection Application (Application) shall be used to request the interconnection of a Generating Facility to Sacramento Municipal Utility

More information

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501 Original Sheet No. 72 Page 1 of 7 AVAILABILITY: Available to any customer that owns and operates a solar, wind or hydroelectric generating facility with a capacity of not more than 25 Kw that is located

More information

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES 10-100 KILOWATTS IN THE STATE OF NEW JERSEY January 1, 2005 Rockland Electric Company 390 West Route 59 Spring Valley,

More information

JEA Distributed Generation Policy Effective April 1, 2018

JEA Distributed Generation Policy Effective April 1, 2018 Summary This JEA Distributed Generation Policy is intended to facilitate generation from customer-owned renewable and non-renewable energy generation systems interconnecting to the JEA electric grid. The

More information

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A SUBJECT: Interconnection of and Service to Qualifying Facilities under Public Utility Regulatory Policies Act (PURPA) OBJECTIVE: To provide, through

More information

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board Policy Description: In an effort to ensure fair treatment of all of its customers,

More information

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT INTERCONNECTION AGREEMENT FOR SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION THIS AGREEMENT MUST ACCOMPANY

More information

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION SAMPLE ORDINANCE 3/5/2012 Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION Section 1: Applicable Service Territory Net metering and electrical system interconnection is available on a first-come,

More information

Louisville Gas and Electric Company

Louisville Gas and Electric Company P.S.C. Electric No. 11, Original Sheet No. 57 APPLICABLE In all territory served. AVAILABILITY OF SERVICE Available to any customer-generator who owns and operates a generating facility located on Customer

More information

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT This Net Metering and Interconnection Agreement ( Agreement ) is made and entered into as of this day of, 2018, by the City of Santa

More information

Adopted: September 24, 2015 Version: Version 1.0

Adopted: September 24, 2015 Version: Version 1.0 Interconnection Standards for Parallel Installation and Operation of Customer Owned Renewable Electric Generating Facilities for Coon Rapids Municipal Utilities Adopted: September 24, 2015 Version: Version

More information

MEMBER RELATIONS POLICY NO SUBJECT: INTERCONNECTION OF CUSTOMER GENERATION RESOURCES

MEMBER RELATIONS POLICY NO SUBJECT: INTERCONNECTION OF CUSTOMER GENERATION RESOURCES Beartooth Electric Cooperative, Inc. MEMBER RELATIONS POLICY NO. 416 1. SUBJECT: INTERCONNECTION OF CUSTOMER GENERATION RESOURCES 2. OBJECTIVE: Beartooth Electric Cooperative, Inc. (BEC) recognizes that

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Rocky Mountain Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system

More information

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER Page 1 of 5 ACCEPTED FOR RUHR RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER APPLICABILITY Unless specifically excluded within this Schedule, all of the Cooperative's Terms

More information

REVISION NO.: 7 EFFECTIVE: 07/07/16

REVISION NO.: 7 EFFECTIVE: 07/07/16 SOLAR PROGRAM INTERCONNECTION PROCESS OVERVIEW FOR RESIDENTIAL AND SMALL GENERAL SERVICE REVISION NO.: 7 EFFECTIVE: 07/07/16 Required Steps for ED3 s Solar Program Interconnection Process for Residential

More information

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase PAGE 1 OF 7 USE: Requirements and guidelines for interconnection of single phase customer owned, (DR) Distributed Resource generation source, to NIPSCO s electric system, configured for. LATEST REVISION:

More information

TILLAMOOK PEOPLE S UTILITY DISTRICT

TILLAMOOK PEOPLE S UTILITY DISTRICT TILLAMOOK PEOPLE S UTILITY DISTRICT DISTRIBUTION INTERCONNECTION PROCEDURE Inverter Based Generators 25 kw and Smaller This document contains the interconnection requirements for inverter based generators,

More information

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING Third Revised Sheet 55a Cancels Second Revised Sheet 55a A. ELIGIBLE CUSTOMER-GENERATOR RULE NO. 17 NET ENERGY METERING Net energy metering is available to eligible customer-generators, defined as, permanent

More information

INTERCONNECTION for GENERATING FACILITIES Up to 20 MW

INTERCONNECTION for GENERATING FACILITIES Up to 20 MW PROGRAM REQUIREMENTS Important Information from Your Local Non-Profit Utility INTERCONNECTION for GENERATING FACILITIES Up to 20 MW Interconnecting to the Electrical Distribution System of Public Utility

More information

Interconnection of Distributed Generation Net Metering (Excluding Solar*Rewards) DATE: August 17, 2015

Interconnection of Distributed Generation Net Metering (Excluding Solar*Rewards) DATE: August 17, 2015 Interconnection of Distributed Generation Net Metering (Excluding Solar*Rewards) DATE: August 17, 2015 Enclosed is a copy of Xcel Energy s APPLICATION FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED

More information

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System This document is intended to be a general overview of PG&E s current technical

More information

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS TABLE OF CONTENTS Purpose and Scope...2 Authority...2 Applicability... 2 Intent.. 2 Maximum Connected Generation Allowed. 2 Definitions.

More information

Definitions. Scope. Customer Generation Interconnection Requirements

Definitions. Scope. Customer Generation Interconnection Requirements Updated 02/1 Page 1 Scope The purpose of this document is to describe Idaho Power s requirements for the installation and testing of Customer Generation acilities that are interconnected with Idaho Power

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS XXV. NET METERING A. Applicability and Availability 1. The terms Net Metering Service, Demand Charge-based Time-of- Use Tariff, Net Metering Customer, Customer, Time-of-Use Customer, Time-of-Use Tier,

More information

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER RS-N SECOND REVISED SHEET NO. 8.2.1 CANCELLING FIRST SHEET NO. 8.2.1 NAME OF UTILITY CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER DEFINITION Net Metering means calculating

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to

More information

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements. A. General This Customer-Owned Generation Standards for Customer-Owned Grid Connected Electric Generating Systems sets forth the requirements and conditions for interconnected non-utility-owned electric

More information

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM Page 1 of 19 Table of Contents 1.0 SCOPE...4 2.0 PURPOSE...4 3.0 LIMITATIONS...5 4.0 GENERAL INTERCONNECTION

More information

INTERCONNECTION REQUIREMENTS POLICY

INTERCONNECTION REQUIREMENTS POLICY Issue Date: January 8, 2018 Resolution No. 2097-18 INTERCONNECTION REQUIREMENTS POLICY 1. Purpose and Scope A. The purpose of these Interconnection Requirements is to establish rules for determining the

More information

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff.

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff. JERSEY CENTRAL POWER & LIGHT UNIFORM TECHNICAL AND PROCEDURAL INTERCONNECTION REQUIREMENTS FOR NET METERING FACILITIES FOR INVERTER BASED WIND AND PHOTOVOLTAIC SYSTEMS OF 100 kw OR SMALLER for Atlantic

More information

RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES

RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES Last Revised Date: October 15, 2015 Contents Chapter 1 - Purpose and Scope 2 Chapter 2 - Application of Rules 2 Chapter 3 - Definitions

More information

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering Credits 18.06:

More information

SCHEDULE NO. ACG33 NET METERING SERVICE

SCHEDULE NO. ACG33 NET METERING SERVICE Approved by Decision No.: 75408 Effective: January 19, 2016 Applicability Applicable to "Net Metering Facility" as defined below, or applicable Arizona Corporation Commission ("Cmnn1ission") Decision,

More information

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members 49.1 INTERCONNECTION OF AND SERVICE TO QUALIFYING FACILITIES UNDER Objective To provide for the interconnection of and service to a Qualifying Facility in keeping with the provisions of the Public Utility

More information

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System Adopted Based on State and Tariff Interconnection Rules Applicable to Northern States Power,

More information

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System Adopted Based on State and Tariff Interconnection Rules Applicable to Northern States Power,

More information

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW) City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems

More information

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018 William F. Stephens Director (804) 371-9611 FAX (804)371-9350 PO Box 1197 Richmond, Virginia 23218-1197 DIVISION OF May 22, 2018 Mr. Eric M. Page Ecker Seamans Cherin & Mellott, LLC 919 East Main Street

More information

M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65

M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65 M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65 CLASS OF SERVICE: CUSTOMER GENERATING SYSTEMS OVER 20 KW RATE CGS 1 AVAILABILITY To customers owning generating

More information

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620 Policy Bulletin No. 25 Net Metering Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620 Interconnection Standards For Residential Net Energy Metering With Electric

More information

Northeastern Rural Electric Membership Corporation Columbia City, Indiana

Northeastern Rural Electric Membership Corporation Columbia City, Indiana Page 1 of 5 SCHEDULE ADG - 1 AGGREGATED DISTRIBUTED GENERATION SERVICE I. AVAILABILITY This Aggregated Distributed Generation Schedule is available to any member in good standing of Northeastern REMC (Northeastern),

More information

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT INTRODUCTION Lathrop Irrigation District has created a policy to allow safe connection

More information

Noble County Rural Electric Membership Corporation

Noble County Rural Electric Membership Corporation Albion, Indiana Page 1 of 7 SCHEDULE LPDG-1 LARGE POWER AND COMMERCIAL MEMBER-OWNED GENERATION I. AVAILABILITY This Generation rate is available to any member in good standing of Noble REMC (Noble) who

More information

Duke Energy Carolinas North Carolina Interconnection Request Checklist

Duke Energy Carolinas North Carolina Interconnection Request Checklist Duke Energy Carolinas North Carolina Interconnection Request Checklist The North Carolina Utilities Commission issued North Carolina Interconnection Procedures, Forms, And Agreements For State-Jurisdictional

More information

Noble County Rural Electric Membership Corporation

Noble County Rural Electric Membership Corporation Albion, Indiana Page 1 of 5 SCHEDULE NB-1 RESIDENTIAL NET BILLING I. AVAILABILITY This Net Billing Rate is available to any residential member in good standing of Noble REMC (Noble) who owns and operates

More information

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS For residential and commercial systems, the combined generation

More information

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDG 50 kw FOREWARD Requirements for Parallel Operations for Customers with Generation Not Exceeding 50 kw is intended to be used

More information

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018 Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018 Outlined below are the engineering documents and their associated minimum detail requirements for a Distributed Energy Resource (DER)

More information

WOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM. Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less)

WOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM. Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less) WOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less) Issued and Effective: April 3, 2008 Agreement Between And

More information

Heber Light & Power Electric Service Rule No. 14 NET METERING SERVICE

Heber Light & Power Electric Service Rule No. 14 NET METERING SERVICE Heber Light & Power Electric Service Rule No. 14 NET METERING SERVICE 1. Overview The Company offers Residential and Small General Service Customers net metering service that allows the Customer to use

More information

Senate Substitute for HOUSE BILL No. 2101

Senate Substitute for HOUSE BILL No. 2101 Senate Substitute for HOUSE BILL No. 2101 AN ACT concerning utilities; relating to renewable energy resources; amending K.S.A. 2013 Supp. 66-1,184, 66-1265, 66-1266, 66-1267 and 66-1271 and repealing the

More information

SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY

SERVICE CLASSIFICATION CEF COMMUNITY ENERGY FACILITY P.S.C. Del. No. 8 - Electric Original Leaf No. 95a SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY A Community Energy Facility (CEF) consists of one or more generators located in Company s service

More information

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM A. Application. The following tariff shall apply to members who: (1) take service under a rate within this electric service

More information

Net +Plus Connection Code

Net +Plus Connection Code Net +Plus Connection Code LANKA ELECTRICITY COMPANY (PRIVATE) LIMITED 1.0 BACKGROUND The existing Net Metering Concept launched in the year 2010 noticed an exponential growth in the recent year and at

More information

JACKSON ELECTRIC COOPERATIVE POLICY NO. 305

JACKSON ELECTRIC COOPERATIVE POLICY NO. 305 JACKSON ELECTRIC COOPERATIVE POLICY NO. 305 I. SUBJECT: Interconnected Distributed Generation (DG) II. OBJECTIVE: To provide guidelines and procedures for members/applicants and JEC personnel in DG systems.

More information

FRENCH BROAD ELECTRIC MEMBERSHIP CORPORATION RATE SCHEDULES

FRENCH BROAD ELECTRIC MEMBERSHIP CORPORATION RATE SCHEDULES FRENCH BROAD ELECTRIC MEMBERSHIP CORPORATION RATE SCHEDULES Effective for Bills Rendered on or after April 1, 2017 Table of Contents Title Page Primary Residential (Rate Schedule A-17) 3 Secondary Residential

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to

More information

Distributed Generation Interconnection Policy

Distributed Generation Interconnection Policy Distributed Generation Interconnection Policy 1 Introduction Carroll Electric Membership Corporation Distributed Generation Interconnection Policy Carroll Electric Membership Corporation (herein after

More information

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5 Columbia City, Indiana Page 1 of 5 SCHEDULE DG-2 LARGE POWER DISTRIBUTED GENERATION I. AVAILABILITY This Distributed Generation Rate is available to any member in good standing of Northeastern REMC (Northeastern)

More information

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering NHEC supports the development of member-sited renewable energy generation and storage facilities (referred to herein as an interconnection

More information

PUD ELECTRIC SYSTEM INTERCONNECTION

PUD ELECTRIC SYSTEM INTERCONNECTION APPENDIX A PROCEDURES & REQUIREMENTS for OKANOGAN PUD ELECTRIC SYSTEM INTERCONNECTION Version 4.0 December 2011 Version 4.0 12/28/2011 Page 1 of 15 TABLE OF CONTENTS DEFINITIONS 1.0 Introduction 2.0 Procedures

More information

SCHEDULE 62 COGENERATION AND SMALL POWER PRODUCTION SCHEDULE - IDAHO

SCHEDULE 62 COGENERATION AND SMALL POWER PRODUCTION SCHEDULE - IDAHO First Revision Sheet 62 62 I.P.U.C. No. 28 Original Sheet 62 SCHEDULE 62 COGENERATION AND SMALL POWER PRODUCTION SCHEDULE - IDAHO AVAILABLE: In all the electric territory served by the Company in the State

More information

MISSOURI SERVICE AREA

MISSOURI SERVICE AREA MO.P.S.C. SCHEDULE NO. 6 1st Revised SHEET NO. 171.5 CANCELLING MO.P.S.C. SCHEDULE NO. 6 Original SHEET NO. 171.5 INTERCONNECTION APPLICATION/AGREEMENT FOR NET METERING SYSTEMS WITH CAPACITY OF 100 kw

More information

NET METER REQUEST FORM

NET METER REQUEST FORM Form No. 3651 02/17 NET METER REQUEST FORM In order to receive a Net Meter, please provide the information requested below, sign and return only this coversheet by mail to the address below. NorthWestern

More information

Louisiana Net Metering Service. Customer Information Package

Louisiana Net Metering Service. Customer Information Package Louisiana Net Metering Service Customer Information Package August 1, 2013 Net Metering - The means of measuring the difference between the electricity supplied by an electric utility and the electricity

More information

Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1)

Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1) Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1) 4-2-2 NET METERING. The objective of this net metering policy is to establish Springfield Utility Board (SUB)

More information

Rider 11 Partial Requirements Service (PRS)

Rider 11 Partial Requirements Service (PRS) Original Sheet No.: 711-1 Rider 11 Partial Requirements Service (PRS) AVAILABILITY For all Qualifying Facilities ("QF") that have entered into a Service Agreement with the Company in all territories served

More information

Copyright 2003 Advanced Power Technologies, Inc.

Copyright 2003 Advanced Power Technologies, Inc. Overview of the Standard for Interconnecting Distributed Resources with Electric Power Systems, IEEE 1547 and it s potential impact on operation of the Distributed Generation (DG) systems and on the design

More information

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services

More information

S T A F F R E P O R T

S T A F F R E P O R T S T A F F R E P O R T DATE: December 11, 2012 TO: FROM: Honorable Mayor and City Council Superintendent, Brandon Graham SUBJECT: Net Metering Policy Section A 2. b. (Change the maximum installation capacity

More information

NET ENERGY METERING RIDER Rider NEM. Certain words, when used in this Rider NEM shall be understood to have the following meanings:

NET ENERGY METERING RIDER Rider NEM. Certain words, when used in this Rider NEM shall be understood to have the following meanings: Original Sheet No.34 Rider NEM 1) Definitions Certain words, when used in this Rider NEM shall be understood to have the following meanings: a) Baseline Annual Usage : i) The total of an Eligible Customer-Generator

More information

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department. D.P.U. 11-10-A 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering

More information

MCCOOK PUBLIC POWER DISTRICT McCook, Nebraska BOARD POLICY NUMBER 488

MCCOOK PUBLIC POWER DISTRICT McCook, Nebraska BOARD POLICY NUMBER 488 MCCOOK PUBLIC POWER DISTRICT McCook, Nebraska BOARD POLICY NUMBER 488 SUBJECT Renewable Generator Net Metering Interconnect Policy OBJECTIVE To set forth a policy for the interconnection and net metering

More information

COMMUNITY SOLAR PROGRAM

COMMUNITY SOLAR PROGRAM Original Sheet No. D-22.00 COMMUNITY SOLAR PROGRAM The Cooperative's generation and transmission Cooperative ("G&T") has created a standing offer for 10 MW ofrenewable energy, produced by solar and wind

More information

Schedule No. NMR-405 NET METERING RIDER-405 APPLICABLE

Schedule No. NMR-405 NET METERING RIDER-405 APPLICABLE 6100 Neil Road, Reno, Nevada Original PUCN Sheet No.81D(3)(ab) APPLICABLE This Rider is applicable to purchases of excess energy from any Customer-generator taking service under any Rate Schedule 1) whose

More information

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Table of Contents 1. Introduction... 1 2. Purpose... 1 3. Customer Eligibility...

More information

Net Metering Interconnection Requirements

Net Metering Interconnection Requirements Net Metering Interconnection Requirements Customer Generation Capacity Not Exceeding 100 kw Date: 2017-07-01 Version: 1 Revision History Date Rev. Description July 1, 2017 1 Initial Release Newfoundland

More information

Your Friendly and Caring Member Cooperative. Consumer Guidelines for Electric Power Generator Installation and Interconnection

Your Friendly and Caring Member Cooperative. Consumer Guidelines for Electric Power Generator Installation and Interconnection Your Friendly and Caring Member Cooperative Consumer Guidelines for Electric Power Generator Installation and Interconnection Your electric cooperative seeks to provide its members and patrons with the

More information

2lr1344 CF 2lr1396. Drafted by: Heide Typed by: Rita Stored 02/02/12 Proofread by Checked by By: Senator Pinsky A BILL ENTITLED

2lr1344 CF 2lr1396. Drafted by: Heide Typed by: Rita Stored 02/02/12 Proofread by Checked by By: Senator Pinsky A BILL ENTITLED C Bill No.: Requested: Committee: CF lr Drafted by: Heide Typed by: Rita Stored 0/0/ Proofread by Checked by By: Senator Pinsky A BILL ENTITLED AN ACT concerning Electricity Community Energy Generating

More information

P.S.C.U. No. 50 Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 136 STATE OF UTAH

P.S.C.U. No. 50 Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 136 STATE OF UTAH P.S.C.U. No. 50 Original Sheet No. 136.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 136 STATE OF UTAH Transition Program for Customer Generators AVAILABILITY: At any point on the Company's interconnected

More information

MICHIGAN ELECTRIC UTILITY

MICHIGAN ELECTRIC UTILITY MICHIGAN ELECTRIC UTILITY Generator Interconnection Requirements Category 1 Projects with Aggregate Generator Output 20 kw or Less August 3, 2009 Page 1 Introduction Category 1 This Generator Interconnection

More information

TERMS AND CONDITIONS XXV. NET METERING CUSTOMERS AND SMALL AGRICULTURAL GENERATORS

TERMS AND CONDITIONS XXV. NET METERING CUSTOMERS AND SMALL AGRICULTURAL GENERATORS A. Applicability and Availability 1. The terms Net Metering Service, Net Metering Customer, Agricultural Net Metering Customer, Small Agricultural Generator, Agricultural Business, Customer, Person(s),

More information