1 Mitsubishi F6 Gas Circuit Breaker ype 100 FM-40E Breaker Failure Report Prepared by: Jeffery M. Wright Manager ransmission Field ervices Vermont Electric Power Company, Inc.

2 April 6, :08 VELCO experienced a breaker failure in the Essex FAC switchyard. he 115 kv F6 gas circuit breaker is a Mitsubishi 100MF-40E. Although there were no visible external damages, relay and protection engineers analyzed the relay information and all indications led to an internal failure of the K98 circuit breaker. EXAMPLE ONLY Mitsubishi 100MF- 40E Circuit Breaker Location: Georgia C80 Cap Bank Breaker

3 DFR analysis indicates the fault lasted nearly 4 cycles with phase 3 volts dropping to.02 p.u.

4 IBM, the largest manufacturer in Vermont is electrically connected to redundant VELCO 115 kv sources. hey are located.7 miles from the Essex substation. IBM 115 kv phase 3 bus voltage dropped to approximately the same as what VELCO recorded at Essex. Approximately.02 p.u. for nearly 4 cycles. he power quality interruption cost IBM in excess of $1.5M in lost tooling hours and production.

5 F6 arc byproducts An internal inspection directed by Mitsubishi technical engineers verified that an internal fault had indeed occurred. he breaker was shipped back two days following the failure to Mitsubishi (Pittsburgh, PA) for a thorough failure analysis.

6 Formal Mitsubishi Response Friday, April 16, 2004 Conference Call Failure Analysis Report 1) Repair Efforts & Flashover Location he tanks from Breaker G were dis-assembled and inspected. he flashover was noted to have occurred at Bushing Assembly #4, center phase, at the moving end. he evidence indicates that the arc struck from the Bushing #4 conductor to the bushing adapter plate. Fotos are attached. he quantity of arc byproduct powder in the center phase tank was moderate, indicating the flashover was not severe. Arc byproduct powder was collected and the F6 which came inside the breaker was also collected, for possible future analysis. Breaker components which were damaged or suspected of being damaged were replaced; major replaced components included center phase interrupter, Bushing Assembly #4 (conductor & insulator), all 6 bushing adapter plates, the F6 gas system, desiccant, and associated hardware, O-rings, etc. he other 2 phases were also disassembled; all major components from these 2 phases were re-used. All 3 tanks were thoroughly cleaned; all re-used components were thoroughly cleaned. Breaker G was re-assembled and re-tested following written instructions. Breaker G was shipped on 4/15/04. 2) Investigation into Cause of Flashover Our investigation indicated that randomly-occurring water was the likely cause of the flashover. Water was detected using our ultrasonic (U) inspection technique, which can detect water in boltholes without dis-assembling the breaker. Boltholes in every nozzle were evaluated for presence of water by the ultrasonic method, and every bolt was removed for visual examination. his gave us an opportunity to visually confirm the ultrasonic indications. his investigation indicated that water was present randomly, at different levels, in 3 of the 6 bushing nozzles, in boltholes Bushing Nozzle # 2 (2 of 12 boltholes, very minor <0.5 mm) Bushing Nozzle # 3 (2 of 12 boltholes, very minor < 0.5 mm) Bushing Nozzle # 4 (6 of 12 boltholes, minor & moderate levels) mall traces of a water-and-oil liquid were noted on the undersides of 4 of 6 bushing adapter plates, where they mate with the tank nozzles. Foto attached. Visual observations of removed bolts & boltholes also indicate that some of the water in the boltholes does evaporate, and is likely absorbed by the desiccant in each tank

7 he internal inspection conducted by Mitsubishi uncovered evidence of the internal fault between the bushing conductor and bushing adapter plate inside the bushing throat.

8 Further investigation uncovered water droplets in the breaker bolt holes of four out of six bushing adapter plates. Water Droplets Present Following the failure analysis, the major components damaged were replaced, the breaker was rebuilt, shipped back to the Essex substation and commissioned by VELCO technicians on April 21 st at 13:24.

9 Formal Mitsubishi Response Friday April 16, 2004 Conference Call Mitsubishi admits knowledge of three other similar failures of the same type of breaker one in Illinois and two in Nebraska. Mitsubishi admits to a known process control problem which was identified and corrected in June 2001, affecting breakers manufactured between he manufacturing process began with pressure washing the cast breaker tanks with water. he tanks were set outside to dry and the failures are attributed to trapped water in internal bolt holes that eventually migrates into the tank providing a point of discharge, ultimately faulting the breaker internally at the point of the water droplets on the tank wall. Mitsubishi did not issue a service advisory to all of their customers notifying them of this problem. Mitsubishi has since developed a method for detecting the water in the bolt holes using an ultra-sonic method. hey agreed to send a crew to Vermont on Monday April 19 th to begin testing other subject breakers yet to be identified.

10 Mitsubishi Response Mitsubishi identifies the subject breakers that VELCO owns. Out of the thirty (30) 100FM- 40E type breakers VELCO owns, seventeen (17) are potentially subject to the same problem FM-40HE G C82 ANDBAR G K23 WILLION K43 WILLION G01316 K34-40 WE RULAND G01312 K37-40 WE RULAND G01313 K39-37 WE RULAND G01315 K34 WE RULAND G01314 K30-39 WE RULAND C71 NORH RULAND C72 MIDDLEBURY G C80 GEORGIA G C36 G C35 G K98 G K97 G C39 G C38 G C37 G C34 G K25 G K25-22 G K22-23 G K23 G K24 G K20-24 G K21-20 G K21 G01311 C92 COOLIDGE G01318 C91 COOLIDGE G01319 K32 COOLIDGE YEAR YPE ERIAL NUMBER MANUFACURER POIN AION

11 he esting Process he breaker is removed from service and C shrouds are removed, exposing the bushing throats. he bushing throat is filed clean, providing a clean surface to apply the ultra-sonic device to. By aligning the test probe directly with the bolt hole behind the test area, the test device indicates a waveform. A non-distorted waveform indicates a dry bolt hole, whereas a distorted waveform can be an indication of a contaminated bolt hole. Interpretation of test results is done on site by the technician. An inspection can be completed within four hours.

12 he bushing throat is filed clean, providing a clean surface to apply the ultra-sonic device to.

13 By aligning the test probe directly with the bolt hole behind the test area, the test device indicates a waveform. A non-distorted waveform indicates a dry bolt hole, whereas a distorted waveform can be an indication of a contaminated bolt hole. Interpretation of test results is done on site by the technician.

14 he Internal Inspection / Rebuild Process If water is suspected in the bushing adapter plate bolt holes, the breaker is drained of gas, bushings are removed and all mounting hardware is removed, cleaned and reassembled. he rebuild process typically consumes a twelve to fourteen hour day. Four breakers were rebuilt.

15 Once the bushing adapter plate is removed, the holes are inspected for water, blown dry and prepped for reassembly.

16

17 Mitsubishi Response Mitsubishi s response was timely. M APRIL W F he failed breaker was repaired and returned to VELCO in seven (7) days BREAKER FAIL BREAKER HIPPED O MEPPI 3 10 Inspections followed immediately afterward INPECION AR BREAKER HIPPED O VELCO FAILURE ANALYI CONF CALL

18 Mitsubishi Response All work was wrapped up by the end of June. M APRIL W F M MAY W F MEPPI was very cooperative and worked weekends to accommodate outage requirements Of the seventeen (17) breakers that were ultrasonically inspected, four (4) required internal inspection and cleaning M JUNE W F M JULY W FINIHED F

19 VELCO Response VELCO has kept all of its owners and IBM informed of the results of the failure analysis report and the progress and results of the testing. VELCO has gone forth and publicized the failure on the Doble Engineering upport Group forum to inform other utilities of the facts related to the VELCO failure. VELCO is satisfied with the Mitsubishi inspection process and rebuilds. VELCO intends to hold MEPPI accountable for remedying any further problems identified and is currently negotiating the compensation for VELCO labor and materials. VELCO s labor and material costs exceed $33,000.

ELECTRICAL HAZARD EXAMPLES

ELECTRICAL HAZARD EXAMPLES ELECTRICAL HAZARD EXAMPLES UNFORTUNATELY, THE EVENTS LISTED BELOW ARE MORE COMMON THAN YOU WOULD EXPECT Circuit breaker does not open the circuit when operated manually or remotely. The contacts within

More information

COPPERBELT ENERGY CORPORATION EXPERIENCES ON TWO FAILURES OF MERLIN GERIN TYPE SB6 72 CIRCUIT BREAKERS

COPPERBELT ENERGY CORPORATION EXPERIENCES ON TWO FAILURES OF MERLIN GERIN TYPE SB6 72 CIRCUIT BREAKERS COPPERBELT ENERGY CORPORATION EXPERIENCES ON TWO FAILURES OF MERLIN GERIN TYPE SB6 72 CIRCUIT BREAKERS Author & Presenter: John O Silweya BEng Elect Senior Maintenance Engineer at Copperbelt Energy Corporation

More information

COOPER POWER SERIES. 600 A 15, 25, and 35 kv Class Cleer Loadbreak Bushing Insert Installation Instructions. Loadbreak/Deadbreak Connectors MN650016EN

COOPER POWER SERIES. 600 A 15, 25, and 35 kv Class Cleer Loadbreak Bushing Insert Installation Instructions. Loadbreak/Deadbreak Connectors MN650016EN Loadbreak/Deadbreak Connectors MN650016EN Effective July 2018 Supersedes January 2018 COOPER POWER SERIES 600 A 15, 25, and 35 kv Class Cleer Loadbreak Bushing Insert Installation Instructions DISCLAIMER

More information

2015 WDC Disturbance and Protection Standards Overview

2015 WDC Disturbance and Protection Standards Overview NERC Update 2015 WDC Disturbance and Protection Standards Overview Rich Bauer Senior Manager Reliability Risk Management / Event Analysis IEEE PSRC meeting Denver, Co May 12, 2016 2 System Protection and

More information

PUB NLH 174 Island Interconnected System Supply Issues and Power Outages Page 1 of 4

PUB NLH 174 Island Interconnected System Supply Issues and Power Outages Page 1 of 4 PUB NLH 174 Island Interconnected System Supply Issues and Power Outages Page 1 of 4 1 2 3 4 5 6 7 8 9 Q. Please describe Hydro s terminal station and substation inspections policies and practices. In

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner

More information

B-03 ELECTRICIAN TRAINING SKILL DEVELOPMENT GUIDE

B-03 ELECTRICIAN TRAINING SKILL DEVELOPMENT GUIDE B-03 ELECTRICIAN TRAINING SKILL DEVELOPMENT GUIDE Duty B: Power Distribution (600V and below) B-03: Troubleshoot 480V System Issued 06/01/98 Task Preview Troubleshoot 480V System The 480V distribution

More information

BP OIL -- TOLEDO REFINERY

BP OIL -- TOLEDO REFINERY BP OIL -- TOLEDO REFINERY Document Type: Procedure Effective Date: August 31, 2017 Owner: Dane P. Clark Refinery Wide Electrical Distribution System Switching and Isolation Auth. By: Rick J. Chmelovski

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

COOPER POWER SERIES. 200 A Fused Loadbreak Elbow Connector Replacement Fuse Installation Instructions. Fusing Equipment MN132021EN

COOPER POWER SERIES. 200 A Fused Loadbreak Elbow Connector Replacement Fuse Installation Instructions. Fusing Equipment MN132021EN Fusing Equipment MN132021EN Effective November 2016 Supersedes June 2011 (S240-97-1) COOPER POWER SERIES Installation Instructions DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY The information,

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic July 26, 2016 Reliability Analysis Update MetEd Transmission Zone N-1 First Energy Planning Criteria (FERC Form 715): The North Boyertown West Boyertown 69 kv is

More information

Outdoor Distribution (15 kv through 25 kv) S&C Fault Tamer Fuse Limiter

Outdoor Distribution (15 kv through 25 kv) S&C Fault Tamer Fuse Limiter Outdoor Distribution (5 kv through 25 kv) S&C Fault Tamer Fuse Limiter Introducing S&C s new generation of pole-top transformer protection... Application Although the S&C Fault Tamer Fuse Limiter handles

More information

Installation, Operation, and Maintenance

Installation, Operation, and Maintenance S&C Regulator Bypass Switches Outdoor Distribution (14.4 kv through 25 kv) Type XL (Sequenced) and Type NL (Non-sequenced) Installation, Operation, and Maintenance Table of Contents Section Page Section

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

Targeted Application of STATCOM Technology in the Distribution Zone

Targeted Application of STATCOM Technology in the Distribution Zone Targeted Application of STATCOM Technology in the Distribution Zone Christopher J. Lee Senior Power Controls Design Engineer Electrical Distribution Division Mitsubishi Electric Power Products Electric

More information

PAD-MOUNTED SWITCHGEAR INSPECTION & MAINTENANCE RECOMMENDATIONS TYPE PSI/II. 15kV 25kV. Qualified Persons

PAD-MOUNTED SWITCHGEAR INSPECTION & MAINTENANCE RECOMMENDATIONS TYPE PSI/II. 15kV 25kV. Qualified Persons Page 1 Qualified Persons... 1 Safety Information... 2 Procedures... 3 Maintenance... 3 Security Inspection (Exterior)... 3 Verify Securing Devices... 3 Maintaining the Exterior... 3 Replacing Labels...

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

DO COMMERCIAL BUILDINGS HAVE POWER PROBLEMS? THE ANSWER IS - THEY CERTAINLY DO.

DO COMMERCIAL BUILDINGS HAVE POWER PROBLEMS? THE ANSWER IS - THEY CERTAINLY DO. DO COMMERCIAL BUILDINGS HAVE POWER PROBLEMS? THE ANSWER IS - THEY CERTAINLY DO. By Patrick J. Lynch, P.Eng. PROBLEMS CAN BE GENERATED BY THE ACTUAL BUILDING LOCATION, OTHERS BY EQUIPMENT WITHIN THE BUILDING

More information

Refurbishment and Life Extension of Existing Facilities in Vermont

Refurbishment and Life Extension of Existing Facilities in Vermont Refurbishment and Life Extension of Existing Facilities in Vermont Prepared by Joshua Burroughs, Joanne Hu & Jeff Carrara 2015 Grid of Future Symposium Life Extension Projects in Vermont Highgate Converter

More information

ARC-ALERT CIRCUIT INTERRUPTER TECHNOLOGY NEXT GENERATION OF CIRCUIT PROTECTION

ARC-ALERT CIRCUIT INTERRUPTER TECHNOLOGY NEXT GENERATION OF CIRCUIT PROTECTION ARC-ALERT CIRCUIT INTERRUPTER TECHNOLOGY NEXT GENERATION OF CIRCUIT PROTECTION ARC-ALERT CIRCUIT INTERRUPTER ARC-ALERT CIRCUIT INTERRUPTER HOW AN AEROSPACE BREAKER OPERATES HOW AN AEROSPACE BREAKER OPERATES

More information

Brochure. Modular Systems wind portfolio Power Collection and Grid Connection products

Brochure. Modular Systems wind portfolio Power Collection and Grid Connection products Brochure Modular Systems wind portfolio Power Collection and Grid Connection products Wind portfolio Background ABB is one of the few suppliers that has been deeply involved in wind power segment development,

More information

3.0 Radial Distribution Systems

3.0 Radial Distribution Systems 3.0 Radial Distribution Systems Radial distribution systems (RDS) are the most common design used by electric utilities, and are the least expensive to plan, construct, and maintain. They generally consist

More information

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS El Paso Electric Company System Operations Department System Planning Section May 2004

More information

3 Reliability Issues and Solutions

3 Reliability Issues and Solutions 3 Reliability Issues and Solutions 3.1 Reliability issues identified Figure 3 1 summarizes the transmission reliability issues identified as part of the 2009 planning process. These areas represent locations

More information

Type NR oil switch installation and operation instructions

Type NR oil switch installation and operation instructions Oil Switches Effective October 2013 Supersedes S260-20-1, March 2002 S230-60-1 Type NR oil switch installation and operation instructions DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY The information,

More information

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017 MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017 REVIEWABLE OPERATING INCIDENT REPORT UNDER THE NATIONAL ELECTRICITY RULES Published: 3 August 2017 INCIDENT CLASSIFICATIONS

More information

SF6 GAS INSULATED METAL ENCLOSED SWITCHGEAR (GIS)

SF6 GAS INSULATED METAL ENCLOSED SWITCHGEAR (GIS) SF6 GAS INSULATED METAL ENCLOSED SWITCHGEAR (GIS) About company The «Elektroapparat» plant starts its operation in 1922 as a plant manufacturing high-voltage electrical equipment. During the first two

More information

S&C Fault Tamer Fuse Limiter. Outdoor Distribution (15 kv through 25 kv)

S&C Fault Tamer Fuse Limiter. Outdoor Distribution (15 kv through 25 kv) S&C Fault Tamer Fuse Limiter Outdoor Distribution (5 kv through 25 kv) Introducing S&C s new generation of pole-top transformer protection... Application Although the S&C Fault Tamer Fuse Limiter handles

More information

Substation Maintenance Training

Substation Maintenance Training Substation Maintenance Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq Electrical Substation maintenance

More information

Cleaning Flooded Gear

Cleaning Flooded Gear S&C Manual PMX Modular Metal-Enclosed Switchgear Outdoor Distribution (13.8 kv and 25 kv) Cleaning Flooded Gear Table of Contents Section Page Section Page Introduction.... 2 Safety Information Understanding

More information

Full View Flow Indicator

Full View Flow Indicator Full View Flow Indicator Threaded and Flanged Process Connection Installation / Operation / Maintenance Manual P.O. Box 1116 Twinsburg, OH 44087 Phone: 330/405-3040 Fax: 330/405-3070 E-mail: view@ljstar.com

More information

THE PUBLIC SERVICE COMMISSION OF WYOMING

THE PUBLIC SERVICE COMMISSION OF WYOMING NAME: Powder River Energy Corporation WY PSC Tariff No. 7 ADDRESS:, Sundance, WY 82729 THE PUBLIC SERVICE COMMISSION OF WYOMING TARIFF RATE RIDER 5th Revised Sheet No. 1 Cancels 4th Revised Sheet No. 1

More information

BOILER PM & INSPECTION

BOILER PM & INSPECTION BOILER PM & INSPECTION Record inspection log for Gaming Commission and Safety Department. The following listed maintenance items are not intended to be a complete list. Follow any additional maintenance

More information

ECO Pump successfully prevents slow release of oil from Substation Secondary Containment System

ECO Pump successfully prevents slow release of oil from Substation Secondary Containment System Substation Secondary Containment System In January, 2013 a C.I.Agent Storm Water Solutions ECO Pump was installed at a Cleveland area substation for a major utility as part of the secondary containment

More information

Annex A-4 DIESEL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BALANCE OF PLANT GENERATOR DIESEL ENGINE

Annex A-4 DIESEL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BALANCE OF PLANT GENERATOR DIESEL ENGINE Annex A-4 DIESEL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES Electrical 3600-3690 Power Station Switchyard 3700-3730 Generator 4500-4580 Exciter 4600-4609 Cooling System 4610-4650 Controls 4700-4750 Miscellaneous

More information

Double earth fault in a PSP during back to back launching sequence

Double earth fault in a PSP during back to back launching sequence Double earth fault in a PSP during back to back launching sequence Jean-Louis DROMMI EDF Hydro Engineering Center, France Pump Storage Scheme, back to back launching Electricité de France Hydro Department

More information

COOPER POWER. SERIES ELF Current-Limiting Dropout Fuse Installation Instructions. Fusing Equipment MN132028EN. Pull ring. Housing

COOPER POWER. SERIES ELF Current-Limiting Dropout Fuse Installation Instructions. Fusing Equipment MN132028EN. Pull ring. Housing Fusing Equipment MN132028EN Effective November 2016 Supersedes June 2012 (S240-66-1) COOPER POWER SERIES ELF Current-Limiting Dropout Fuse Installation Instructions Pull ring Housing Lifting eye Identification

More information

Senior Substation Project Lead Engineer

Senior Substation Project Lead Engineer Senior Substation Project Lead Engineer Are you ready to be a technology pioneer? Oil and gas factories 3000 meters underwater, heavy locomotive traction motors, electric vehicle chargers that deliver

More information

Cleaning Flooded Gear

Cleaning Flooded Gear S&C Manual Metal-Enclosed Switchgear Indoor and Outdoor Distribution (4.16 kv through 34.5 kv) Cleaning Flooded Gear Table of Contents Section Page Section Page Introduction.... 2 Safety Information Understanding

More information

Effective November 2016 Supersedes February 2012 (S )

Effective November 2016 Supersedes February 2012 (S ) Fusing Equipment MN132033EN Effective November 2016 Supersedes February 2012 (S240-97-2) 200 A Fused Loadbreak Elbow Connector Shorting Bar (solid link) Installation Instructions COOPER POWER SERIES Pulling

More information

Battery Control Center - Diesel

Battery Control Center - Diesel Service Manual CAUTION: All servicing of the Battery Control Center should be done only by a qualified Service Technician. Inadvertent shorts inside the Battery Control Center could result in severe damage

More information

Case Study on On EHV Circuit Breaker Flashover NTPC-SINGRAULI

Case Study on On EHV Circuit Breaker Flashover NTPC-SINGRAULI Case Study on On EHV Circuit Breaker Flashover AUTHORS: B. K. SINGH (AGM-ELECT) S.C.SINGH (SUPDT-ELECT) MANOJ SHARMA (Dy SUPDT-ELECT) ANAND PANDEY (ENGR-ELECT) BREAKER-FLASHOVER There has been a rising

More information

Specification for Remanufacture Alstom Model 5 Switch Machine

Specification for Remanufacture Alstom Model 5 Switch Machine Alstom Model 5 Switch Machine This page is intentionally left blank for the purpose of double sided printing Alstom Model 5 Switch Machine - Page 2 of 9 - (262) 658-3590 TABLE OF CONTENTS 1 SCOPE AND INTENT.5

More information

Altivar 61/71 Adjustable Speed Drives Plastic Kits and Power Terminal Kit

Altivar 61/71 Adjustable Speed Drives Plastic Kits and Power Terminal Kit Altivar 61/71 Adjustable Speed Drives Plastic Kits and Power Terminal Kit Instruction Bulletin 30072-453-27 Retain for future use. For Frame Sizes 2 5: ATV61H075M3, -HU15M3, -HU22M3, -HU30M3, -HU40M3,

More information

COOPER POWER SERIES. 200 A loadbreak junction 15 and 25 kv class installation instructions. Loadbreak Connectors MN650015EN

COOPER POWER SERIES. 200 A loadbreak junction 15 and 25 kv class installation instructions. Loadbreak Connectors MN650015EN Loadbreak Connectors MN650015EN Effective December 2015 Supersedes S500-15-1 October 2013 COOPER POWER SERIES 200 A loadbreak junction 15 and 25 kv class installation instructions DISCLAIMER OF WARRANTIES

More information

Evaluating Water-Damaged Electrical Equipment

Evaluating Water-Damaged Electrical Equipment Evaluating Water-Damaged Electrical Equipment 1 USE OF THIS PUBLICATION This publication serves as a guide that represents the consensus of NEMA member companies and is not intended to override the recommendations

More information

COOPER POWER SERIES. Current-Limiting Type NXC (C-Rated) Fuse Installation Instructions. Fusing Equipment MN132014EN

COOPER POWER SERIES. Current-Limiting Type NXC (C-Rated) Fuse Installation Instructions. Fusing Equipment MN132014EN Fusing Equipment MN132014EN Effective November 2016 Supersedes July 2005 (S240-61-1) Current-Limiting Type NXC (C-Rated) Fuse Installation Instructions COOPER POWER SERIES DISCLAIMER OF WARRANTIES AND

More information

ELECTRIC SYSTEM RELIABILITY ANNUAL REPORT

ELECTRIC SYSTEM RELIABILITY ANNUAL REPORT ELECTRIC SYSTEM RELIABILITY ANNUAL REPORT 2016 LIBERTY UTILITIES (CALPECO ELECTRIC) LLC (U 933 E) Prepared for California Public Utilities Commission July 15, 2017 EXECUTIVE SUMMARY The Electric System

More information

STATISTICS ELECTRICAL INCIDENTS IN ALBERTA. January 1 to December 31, 2013

STATISTICS ELECTRICAL INCIDENTS IN ALBERTA. January 1 to December 31, 2013 Safety Services 16 th floor, Commerce Place Tel: 1-866-421-6929 10155 102 nd Street Fax: 780-427-8686 Edmonton, Alberta Canada T5J 4L4 STATISTICS ELECTRICAL INCIDENTS IN ALBERTA January 1 to December 31,

More information

AVIATION INVESTIGATION REPORT A01Q0009 LOSS OF CONTROL ON TAKE-OFF

AVIATION INVESTIGATION REPORT A01Q0009 LOSS OF CONTROL ON TAKE-OFF AVIATION INVESTIGATION REPORT A01Q0009 LOSS OF CONTROL ON TAKE-OFF PA-28-140 C-FXAY MASCOUCHE, QUEBEC 13 JANUARY 2001 The Transportation Safety Board of Canada (TSB) investigated this occurrence for the

More information

L007 LIQUID LEVEL FLOAT SWITCH. Side-Mounted Liquid Level Float Switch INSTALLATION AND OPERATIONS MANUAL

L007 LIQUID LEVEL FLOAT SWITCH. Side-Mounted Liquid Level Float Switch INSTALLATION AND OPERATIONS MANUAL L007 LIQUID LEVEL FLOAT SWITCH INSTALLATION AND OPERATIONS MANUAL Side-Mounted Liquid Level Float Switch READ THIS MANUAL PRIOR TO INSTALLATION This manual provides information on the L007 Side- Mounted

More information

II DISTRIBUTION & SUBSTATION TYPE C

II DISTRIBUTION & SUBSTATION TYPE C CapCheckIII DISTRIBUTION & SUBSTATION TYPE Ca p a c i t o r C h e c ke r Operating & Instruction Manual 1475 Lakeside Drive Waukegan, Illinois 60085 U.S.A. 847.473.4980 f a x 8 4 7. 4 7 3. 4 9 8 1 w e

More information

BMRX Series Rotary Level Indicator

BMRX Series Rotary Level Indicator BMRX Series Rotary Level Indicator BinMaster: Division of Garner Industries 7201 N. 98th St., Lincoln, NE 68507 402-434-9102 email: info@binmaster.com www.binmaster.com OPERATING INSTRUCTIONS PLEASE READ

More information

Module 22 Ignition Systems - Outputs

Module 22 Ignition Systems - Outputs Module 22 Ignition Systems - Outputs Author: Grant Swaim E-mail: sureseal@nr.infi.net URL: www.tech2tech.net Phone: (336) 632-9882 Fax: (336) 632-9688 Postal Address: Tech-2-Tech Website PO Box 18443 Greensboro,

More information

U00X ULTRASONIC LEVEL SWITCH. Ultrasonic Liquid Level Switches INSTALLATION AND OPERATIONS MANUAL. For Models: U002, U003 & U004

U00X ULTRASONIC LEVEL SWITCH. Ultrasonic Liquid Level Switches INSTALLATION AND OPERATIONS MANUAL. For Models: U002, U003 & U004 U00X ULTRASONIC LEVEL SWITCH INSTALLATION AND OPERATIONS MANUAL Ultrasonic Liquid Level Switches For Non-Hazardous Locations For Models: U002, U003 & U004 READ THIS MANUAL PRIOR TO INSTALLATION This manual

More information

Service Bulletin Published by Sudden Service, Inc.

Service Bulletin Published by Sudden Service, Inc. Service Bulletin Published by Sudden Service, Inc. Volume 09 / Number 3 / May 15, 2009 Louisville, Mississippi Pre-operational checks of the MM80 Pack-Rat should be performed before each use in order to

More information

Local, Series-Connected Interrupters Enhance System Reliability

Local, Series-Connected Interrupters Enhance System Reliability As Presented at Finepoint s 15 th Annual Circuit Breaker Test & Maintenance 2008 Training Conference in Pittsburgh, PA Local, Series-Connected Interrupters Enhance System Reliability Larry Taylor, P.E.,

More information

Designated Entity Pre-Qualification Materials. Exelon Corporation

Designated Entity Pre-Qualification Materials. Exelon Corporation Designated Entity Pre-Qualification Materials By Exelon Corporation On behalf of its affiliates Baltimore Gas and Electric Company, Commonwealth Edison Company, PECO Energy Company and Exelon Transmission

More information

Service Bulletin Published by Sudden Service, Inc.

Service Bulletin Published by Sudden Service, Inc. Service Bulletin Published by Sudden Service, Inc. Volume 07 / Number 3 / June 13, 2007 Louisville, Mississippi Electrical System Maintenance Requirements Taylor Machine Works, Inc. has developed electrical

More information

User s Manual. Automatic Switch-Mode Battery Charger

User s Manual. Automatic Switch-Mode Battery Charger User s Manual Automatic Switch-Mode Battery Charger IMPORTANT Read, understand, and follow these safety rules and operating instructions before using this battery charger. Only authorized and trained service

More information

Mechanical Filter Box Kit

Mechanical Filter Box Kit Mechanical Filter Box Kit REMINDER CALL 1-888-755-4497 BEFORE RETURNING TO STORE. MODEL #MFBX500P Questions, problems, missing parts? Before returning to your retailer, call our customer service department

More information

25kV 200A Loadbreak Bushing Insert and Elbow Design Test Report. Report Number:

25kV 200A Loadbreak Bushing Insert and Elbow Design Test Report. Report Number: 25kV 200A Loadbreak Bushing Insert and Elbow Design Test Report Report Number: Date: RN-R7604 9/16/2013 Table of Contents I. OBJECTIVE... 2 II. SUMMARY... 2 III. CONCLUSION... 2 IV. CABLE DATA... 2 V.

More information

WaltZilla TM Installation and Operation Guide

WaltZilla TM Installation and Operation Guide The Boldest, Baddest Charging Station on the Planet! WaltZilla TM Installation and Operation Guide Software Version 2.0.1 or higher UL File # E473741 LiquidSky Technologies, Inc. 716 Beacon Street Newton

More information

COOPER POWER SERIES. Expulsion fuse installation instructions. Capacitors MN230005EN. Effective November 2016 Supersedes November 2001 (S )

COOPER POWER SERIES. Expulsion fuse installation instructions. Capacitors MN230005EN. Effective November 2016 Supersedes November 2001 (S ) Capacitors MN230005EN Effective November 2016 Supersedes November 2001 (S230-30-3) Expulsion fuse installation instructions COOPER POWER SERIES DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY The

More information

COOPER POWER. SERIES CMU Medium voltage power fuse installation instructions. Fusing Equipment MN132032EN

COOPER POWER. SERIES CMU Medium voltage power fuse installation instructions. Fusing Equipment MN132032EN Fusing Equipment MN132032EN Effective September 2018 Supersedes November 2016 COOPER POWER SERIES CMU Medium voltage power fuse installation instructions DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY

More information

EE 456 Design Project

EE 456 Design Project F-2014 EE 456 Design Project PROJECT REPORT MALUWELMENG, CONNIE SHARP, MEGAN Table of Contents Introduction... 2 Assignment I... 2 Setup... 2 Simulation... 2 Assignment II... 3 Problems... 3 Solution...

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

In the first part of this series on

In the first part of this series on by Mike Van Dyke In the first part of this series on diagnosing ECUs, we went over some basic visual diagnosis of common failures. In this, the second part of the series, we re going to go over some basic

More information

Robotic Inspection of Unpiggable Piping at Pump Station

Robotic Inspection of Unpiggable Piping at Pump Station Robotic Inspection of Unpiggable Piping at Pump Station by Steve Lacatena 1 and Jonathan Minder 2 1 Alyeska Pipeline Service Co, Anchorage, AK, USA 2 Diakont, San Diego, CA USA Unpiggable Pipeline Solutions

More information

Study of Fault Clearing by A Circuit Breaker In Presence of A Shunt Capacitor Bank

Study of Fault Clearing by A Circuit Breaker In Presence of A Shunt Capacitor Bank Day 2 - Session V-B 299 Study of Fault Clearing by A Circuit Breaker In Presence of A Shunt Capacitor Bank Murali Kandakatla, B. Kondala Rao, Gopal Gajjar ABB Ltd., Maneja, Vadodara, India Thane Introduction

More information

The 1,400-MW Kii-Channel HVDC System

The 1,400-MW Kii-Channel HVDC System The 1,4-MW Kii-Channel HVDC System The 1,4-MW Kii-Channel HVDC System 114 Hiroyuki Nakao Masahiro Hirose Takehisa Sakai Naoki Kawamura Hiroaki Miyata Makoto Kadowaki Takahiro Oomori Akihiko Watanabe OVERVIEW:

More information

April 23, U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC

April 23, U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC Cwnsunme, EIneIUY A CMS Energy Compan}y Daniel J. Malone foireotor, Ffgineeung April 23, 2001 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 DOCKET 50-255 - LICENSE

More information

S&C Vista Underground Distribution Switchgear

S&C Vista Underground Distribution Switchgear S&C Vista Underground Distribution Switchgear Pad-Mounted, Vault-Mounted, and UnderCover Styles Instructions For Installation and Operation of Portable Motor Operator TABLE OF CONTENTS Section Page Section

More information

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES 10-100 KILOWATTS IN THE STATE OF NEW JERSEY January 1, 2005 Rockland Electric Company 390 West Route 59 Spring Valley,

More information

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation Feasibility Study Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection J.E.D. Solid Waste Management Facility Holopaw Substation September 2013 1 of 12 Table of Contents GENERAL... 3 SHORT

More information

Seabrook Substation Reliability Improvement Project

Seabrook Substation Reliability Improvement Project New England Division Seabrook Substation Reliability Improvement Project 1. Project Summary Description Seabrook Substation is critical to ISO-New England as a Pool Transmission Facility, to grid availability

More information

Mechanical Filter Pump Kit Up to 500 gallons

Mechanical Filter Pump Kit Up to 500 gallons Mechanical Filter Pump Kit Up to 500 gallons REMINDER CALL 1-888-755-6750 BEFORE RETURNING TO STORE. ITEM #FM002P Questions, problems, missing parts? Before returning to your retailer, call our customer

More information

PJM SRTEP Meeting Questions Pertaining to Proposed Projects & Scopes AEP: Ambler Ridge:

PJM SRTEP Meeting Questions Pertaining to Proposed Projects & Scopes AEP: Ambler Ridge: PJM SRTEP Meeting 2-13-2018 Questions Pertaining to Proposed Projects & Scopes AEP: Ambler Ridge: The problem statement states two 138kV CB s will be installed at Ambler Ridge, however the potential solution

More information

Could also be a Near Hit

Could also be a Near Hit A near miss is an unplanned event that did not result in a fatal injury but had the potential to do so. Only a fortunate break in the chain of events prevented an injury, fatality or damage; in other words,

More information

TABLE OF CONTENTS GENERAL SPECIFICATIONS... 3 SAFETY SUMMARY INTRODUCTION INSTALLATION Location and Mounting Input

TABLE OF CONTENTS GENERAL SPECIFICATIONS... 3 SAFETY SUMMARY INTRODUCTION INSTALLATION Location and Mounting Input BMRX Series ROTARY LEVEL CONTROL OPERATING INSTRUCTIONS PLEASE READ CAREFULLY TABLE OF CONTENTS GENERAL SPECIFICATIONS... 3 SAFETY SUMMARY... 4 1.0 INTRODUCTION... 5 2.0 INSTALLATION...5 2.1 Location and

More information

SERVICE BULLETIN NUMBER: R DATE: 10/26/15 REVISED: 11/19/15. APPLICABILITY: MY Legacy and Outback Models SUBJECT:

SERVICE BULLETIN NUMBER: R DATE: 10/26/15 REVISED: 11/19/15. APPLICABILITY: MY Legacy and Outback Models SUBJECT: ATTENTION: GENERAL MANAGER q PARTS MANAGER q CLAIMS PERSONNEL q SERVICE MANAGER q IMPORTANT - All Service Personnel Should Read and Initial in the boxes provided, right. 2015 Subaru of America, Inc. All

More information

www. ElectricalPartManuals. com lncoming-6900 through 69,000 volts Outgoing-2400 through 13,800 volts Ratings:

www. ElectricalPartManuals. com lncoming-6900 through 69,000 volts Outgoing-2400 through 13,800 volts Ratings: PRIMARY UNIT SUBSTATIONS SECTION 2701 PRIMARY UNIT SUBSTATIONS Ratings: lncoming-6900 through 69,000 volts Outgoing-2400 through 13,800 volts PAGE 1 ---JUNE 1, 1959 DESIGNED AND BUILT TO MEET YOUR OWN

More information

DRIVER QUALIFICATION FILE CHECKLIST

DRIVER QUALIFICATION FILE CHECKLIST DRIVER QUALIFICATION FILE CHECKLIST 1. DRIVER APPLICATION FOR EMPLOYMENT 391.21 2. INQUIRY TO PREVIOUS EMPLOYERS (3 YEARS) 391.23(a)(2) & (c) 3. INQUIRY TO STATE AGENCIES 391.23(a)(1) & (b) 4. MEDICAL

More information

Installation Notes for Ford Excursion 7.3L

Installation Notes for Ford Excursion 7.3L The following document is used in conjunction with the puradyn Bypass Oil Filtration System Installation Manual (PFT 8) that is included in the unit box, and as such, should be considered a supplemental

More information

All you need to know: New automatic meter

All you need to know: New automatic meter All you need to know: New automatic meter July 2018 Why new electricity meters? The Norwegian Water Resources and Energy Directorate (NVE) has decided that all current electricity meters are to be replaced

More information

Model Description Vac. Max rating Pedestal Only: 36 Utility Pedestal W/O Disconnect General Duty Series:

Model Description Vac. Max rating Pedestal Only: 36 Utility Pedestal W/O Disconnect General Duty Series: MAPA Products MPD-XX / Pedestal Disconnect 30, 60, 100 amp February 2014 Pedestal Disconnect Installation Instructions Parts List MAPA Products Fusible Rainproof Pedestal Mounted Safety Switch provides

More information

27.6 Vdc 1 Amp Switch Mode Power Supply for Fire EN54-4:1997 +A1 +A2

27.6 Vdc 1 Amp Switch Mode Power Supply for Fire EN54-4:1997 +A1 +A2 1 27.6 Vdc 1 Amp Switch Mode Power Supply for Fire EN54-4:1997 +A1 +A2 STX2401-C STX2401-T FEATURES 0843-CPR-0213 14 Elmdene International Ltd Tel: +44(0)23 9269 6638 3 Keel Close, Interchange Park, Fax:

More information

HVDC. TMT&D provides the best and most economical HVDC system.

HVDC. TMT&D provides the best and most economical HVDC system. HVDC TMT&D HVDC TMT&D provides the best and most economical HVDC system. In 1955, TMT&D started the development of HVDC and is the leading HVDC supplier in Japan. TMT&D has continued to develop HVDC technology

More information

GUADALUPE POWER PARTNERS, LP Section MAINTENANCE GT1 CI WORK SCOPE

GUADALUPE POWER PARTNERS, LP Section MAINTENANCE GT1 CI WORK SCOPE Outage; Combustion Inspection on Gas Turbine #1 serial number 297365 Start Date; March 15, 2009 Completion Date; March 21, 2009 Test Fire and Tune Date; March 20, 2009 Work Scope Summary o Combustion Inspection

More information

"Top Ten" reasons to measure: 10. To Provide Proper Sheet Metal Fit

Top Ten reasons to measure: 10. To Provide Proper Sheet Metal Fit Important Reasons why your collision shop needs to Measure. This is one of the most important functions of collision repair and it is a Must Do Process for the success of your business. by Tom Brandt Whether

More information

L-Series: LIQUID LEVEL FLOAT SWITCH. Single-Point, Vertically-Mounted Liquid Level Float Switch INSTALLATION AND OPERATIONS MANUAL

L-Series: LIQUID LEVEL FLOAT SWITCH. Single-Point, Vertically-Mounted Liquid Level Float Switch INSTALLATION AND OPERATIONS MANUAL L-Series: L001, L002, L003, L170, L175, L176, L177, L178, L180, L190 AND L195 LIQUID LEVEL FLOAT SWITCH INSTALLATION AND OPERATIONS MANUAL Single-Point, Vertically-Mounted Liquid Level Float Switch L001

More information

Container Fountain Kit with LED Light

Container Fountain Kit with LED Light Container Fountain Kit with LED Light REMINDER CALL 1-888-755-6750 BEFORE RETURNING TO STORE. PACKAGE CONTENTS Questions, problems, missing parts? Before returning to your retailer, call our customer service

More information

Lecomble & Schmitt S.A.S.

Lecomble & Schmitt S.A.S. 2 0 1 9 Lecomble & Schmitt S.A.S. BP N 2 64240 URT France Sales Department: 33 (0) 559 56 24 11 - commercial@ls-france.com Technical Department: 33 (0) 559 56 26 46 - commercial2@ls-france.com Fax : 33

More information

Atlas ESR. User Guide. Capacitance and Equivalent Series Resistance Meter. Model ESR60 (Enhanced)

Atlas ESR. User Guide. Capacitance and Equivalent Series Resistance Meter. Model ESR60 (Enhanced) Atlas ESR Capacitance and Equivalent Series Resistance Meter Model ESR60 (Enhanced) User Guide Peak Electronic Design Limited 2004/2008 In the interests of development, information in this guide is subject

More information

PPL Gas Insulated Substations: Design Considerations and Lessons Learned. Nicholas Matone Support Engineer, T&S Standards

PPL Gas Insulated Substations: Design Considerations and Lessons Learned. Nicholas Matone Support Engineer, T&S Standards PPL Gas Insulated Substations: Design Considerations and Lessons Learned Nicholas Matone Support Engineer, T&S Standards Agenda PPL Overview Previous GIS Experience Present GIS Installations Mobile GIS

More information

SM-1700 Secondary Shunt Trip Coil Assembly. Powered by Safety

SM-1700 Secondary Shunt Trip Coil Assembly. Powered by Safety SM-1700 Secondary Shunt Trip Coil Assembly Powered by Safety SM-1700 Secondary Shunt Trip Coil Assembly SM-1700 Contact Information Powell Electrical Systems, Inc. www.powellind.com info@powellind.com

More information

Product Recall TRACY SAUERBREY WARRANTY/RECALL DEPARTMENT. RECALL 11V-503/ TC Battery Cable Pass-Thru Corrosion

Product Recall TRACY SAUERBREY WARRANTY/RECALL DEPARTMENT. RECALL 11V-503/ TC Battery Cable Pass-Thru Corrosion Product Recall To: From: Subject: ALL DEALERS TRACY SAUERBREY WARRANTY/RECALL DEPARTMENT RECALL 11V-503/ TC2011-369 Battery Cable Pass-Thru Corrosion Date: December 9, 2011 Enclosed are copies of the customer

More information

Georgia Transmission Corporation Georgia Systems Operations Corporation

Georgia Transmission Corporation Georgia Systems Operations Corporation Georgia Transmission Corporation Georgia Systems Operations Corporation Reactive Power Requirements for Generating Facilities Interconnecting to the Georgia Integrated Transmission System with Georgia

More information

S Fault Indicators. S.T.A.R. Type TPR Faulted Circuit Indicator Installation Instructions. Contents INSTALLATION PROCEDURES

S Fault Indicators. S.T.A.R. Type TPR Faulted Circuit Indicator Installation Instructions. Contents INSTALLATION PROCEDURES Fault Indicators S.T.A.R. Type TPR Faulted Circuit Indicator Installation Instructions Service Information S320-40-1 Contents Product Information...........................1 Safety Information............................2

More information

www. ElectricalPartManuals. com CPL Station Arrester Controlled Protective Level Page 1 Indoor-Outdoor Altitude 0-10,000 feet KV

www. ElectricalPartManuals. com CPL Station Arrester Controlled Protective Level Page 1 Indoor-Outdoor Altitude 0-10,000 feet KV December, 1975 New nformation and Supersedes DB 38-131 Pages 1-4, dated May 1972, and 38-121 D WE A, Pages 1-4, dated April1974 E, D, C/1981/ DB Westinghouse Electric Corporation Distribution Apparatus

More information