Flowline Fuse Mounting and Service Termination

Size: px
Start display at page:

Download "Flowline Fuse Mounting and Service Termination"

Transcription

1 Part 2 Reference Drawing Register Number R1 Description Pole Bolt Details R2-1 Bonding, Intermediate R2-2 Running disc angle 11, 22 and 33 kv 3 Phase Superposition R3-1 Insulators R3-2 Insulator Ties R3-3 Armour Rods R4 Insulator Pin and Bolt Details R5-1 Eyebolt Details R5-2 Eyebolt, Conductor Terminations R6 Earthing R7-1 Cable cleat Guard and Pole Top Switch Anti Climbing Guard Detail R7-2 Service Cable Cleat, Guard Fixing Details R8-1 ABC Taps for Transformer, and Cable Termination R8-2 Lugs and Connectors, Transformer and Cable R8-3 PG Clamps Installation Instruction R8-4 Lugs and Connectors, Insulation Piercing Clamps R10-1 Dropout Fuse Mounting, Details R10-2 Dropout Fuse Mounting, Boric Acid and Fault Tamer Details R11 Flowline Fuse Mounting and Service Termination R11-1 LV Supply to Pole-Mounted Equipment R12-1 Transformer LV, Isolation Details R12-2 Transformer LV, Isolation Details R12-3 Transformer LV, Isolation Details Horizon Power Corporation

2 Number Description R13-1 Pole Embedment Depth, Danger Plate R13-2 Steel Distribution Pole Belling of Base C and D Areas R14-1 Ground Stay R14-2 Outrigger Stay, HV and LV Tee Off R14-3 Outrigger Stay, HV or LV Termination only, HV and LV Intermediate only R14-4 Outrigger Stay, Running Disc Angle, 12.5 m Pole R14-5 Aerial Stay R14-6 Outrigger Stay Pole R14-7 R16 R17 R18 Double Ground Stay for Running Disc Angle with Underslung or Overhead Earth Wire Screw In Anchor, Flow Chart Transformer Kiosk (Non MPS), kva Installation Guide Transformer Kiosk (MPS), kva Installation Guide R19-1 Kiosk, kva Spud Transformer Installation Guide R19-2 Transformer Kiosk (MPS) 63 kva (HUB2 on a culvert) Installation Guide R20-1 Schneider RM6 Outdoor Switchgear 4 Way Installation Guide R20-2 Schneider RM6 Outdoor Switchgear 4 Way Installation Guide R20-3 Schneider RM6 Extensible Switchgear Installation Guide R21 R22 R24 Transformer Kiosk (Non MPS), kva, Cable Arrangements MPS Substation, Up to 630 kva LV Switchgear Kiosk, General Arrangement R26-1 Street Light Cutout, Single Phase Supply R26-2 Street Light Cutout, Single Phase Supply for Class II Luminaries Horizon Power Corporation

3 Number Description R26-3 Street Light Cutout Connection Arrangement for Electrical Attachment R27 R29 R30 R31 R32 R33 R35 R36 R37 R38 R39 R40 R42 R50 R51 R52 R53 R54 R55 Fusing Arrangement for Street Light Columns 25kVA Padmount Trfr 240V Street Feeder/Consumer Mains Terminal Block 25kVA Padmount Trfr 480V Street Feeder/Consumer Mains Terminal Block Mini Pillar Additional Neutral Mini Pillar Terminal Block Mini Pillar XLPE Working End Mini Pillar SPUDS 240V Nulec PMB Control Box Connection Detail Nulec PMB Solar Connection Detail (WITHDRAWN) Overhead Fault Indicator Solar Connection Detail Installer Identification Tag Installation of Above Ground Cable Marker Earth Bonding of Meter Guard Sample Operational Label Placement of Duct Beneath Road Crossings Cable and Duct Placement on Truncations Cross Section Details of Cable Easement Placement of Duct Beneath Open Drain Cable Trench Layout (Green Field Site) Two Layers (1 Tx and 5 LV Cables) Horizon Power Corporation

4 ROUND WASHER 76 x 76 x 5 SQUARE WASHER POLE SIDE 200 'A' COIL SPRING M14 TO M24 51 x 51 x 3 SQUARE WASHER CUT EXCESS THREAD TO WITHIN 10mm OF NUT BOLT DIMENSIONS DIMENSION A DIAMETER OF POLE BOLTS PB1 = 300mm 12mm 16mm 20mm PB2 = 400mm 12mm 16mm 20mm PB3 = 550mm 12mm 16mm 20mm POLE BOLT DETAILS B JUNE 2011 R1

5 50mm OF M12 THREADED HOLE FOR EARTHING PURPOSES mm OF M12 THREADED HOLE FOR EARTHING PURPOSES BONDING INTERMEDIATE B JUNE 2011 R2-1

6 WHITE PHASE ON TOP RIGHT-HAND ANGLE WHEN VIEWED FROM THIS END LEFT-HAND ANGLE WHEN VIEWED FROM THIS END NOTES: 1. IN ALL CASES MARK THE PHASE COLOURS ON THE VERTICAL/ANGLE STRAIN POLES. RUNNING DISC ANGLE 11kV, 22kV & 33kV (3 PHASE) PHASE SUPERPOSITION C MARCH 14 R2-2

7 HIGH VOLTAGE (33,22,11,6.6kV) STRAIN INSULATOR HIGH POLLUTION POST INSULATOR RUNNING DISC ANGLE LOW VOLTAGE INTERMEDIATE ANGLE UP TO 20 DEG INLINE STRAIN OR ANGLE DEG TERMINATION SWITCH WIRE AND RUNNING EARTH TERMINATION INTERMEDIATE 20mm BAND-IT STRAP TYPE INSULATORS B JUNE 2011 R3-1

8 SEQUENCE OF FOR HV & LV HALVE TIE. START WITH MIDDLE OF TIE AT BACK OF INSULATOR. A) TAKE HALF TURN AROUND INSULATOR, UNDER AND AROUND CONDUCTOR FOR ONE TURN. B) CROSS TIE AT THE FRONT OF INSULATOR AND CONTINUE UNDER AND AROUND CONDUCTOR FOR ONE TURN. C) CROSS TIE AT THE BACK OF INSULATOR AND CONTINUE UNDER AND AROUND CONDUCTOR FOR SIX TURNS. D) ONE OPEN TURN. E) FIVE TURNS. F) ONE OPEN TURN. G) THREE TURNS. H) TURN ENDS OF TIE DOWN AGAINST THE CONDUCTOR. HIGH VOLTAGE TOP TIE LOW VOLTAGE TOP TIE HIGH VOLTAGE SIDE TIE BARE ABC 300mm OVER CENTRE OF INSULATOR HIGH VOLTASGE SIDE TIE 300 SEQUENCE OF HALVE TIE. START WITH MIDDLE OF TIE AT BACK OF INSULATOR. A) TAKE HALF TURN AROUND INSULATOR AND UNDER CONDUCTOR ON EACH SIDE. B) TAKE ONE AND HALF TURNS AROUND CONDUCTOR ON EACH SIDE OF INSULATOR. C) CROSS ENDS AROUND BACK OF INSULATOR AND RETURN TO BOTTOM OF CONDUCTOR ON EACH SIDE. D) TAKE ONE TURN AROUND CONDUCTOR ON EACH SIDE OF INSULATOR E) PASS ENDS OVER AND ACROSS IN FRONT OF INSULATOR CARRYING EACH END TO BOTTOM OF CONDUCTOR. F) TAKE FIVE TURNS AROUND CONDUCTOR. G) ONE OPEN TURN. H) FIVE TURNS. J) ONE OPEN TURN. K) THREE TURNS. L) TURN ENDS OF TIE DOWN AGAINST CONDUCTOR. 95 & 150 mm2 ABC TOP TIE INSULATOR TIES C JUNE 2011 R3-2

9 ARMOUR ROD ARMOUR RODS ARE TO BE USED ON ALL BAYS OVER 80m (WAS 100 m.) ARMOUR RODS B JUNE 2011 R3-3

10 HV INSULATOR BOLT (STEEL CROSSARM) mm THREAD SPRING WASHER 75 x 75 x 5 WASHER LV INSULATOR PIN (WOOD CROSSARM) COIL SPRING 40 mm SQUARE WASHER WELDED TO SPINDLE 75 mm SQUARE WASHER 50mm SQUARE WASHER 'B' HEAD, LEAD M16 HEX. NUT M16 THREAD REVISION DATE B JUNE 2011 INSULATOR PIN AND BOLT DETAILS R4

11 POLE 16mm EYEBOLT FOR CENTRE PHASE AND RUNNING DISC ANGLE EYE RETURN TO BE HARD AGAINST POLE OR WASHER 76 x 76 x 5 SQUARE WASHER (N/A FOR STEEL POLES) POLE ROPE THIMBLE 20mm EYEBOLT FOR STAY HELICAL TERMINATION CROSSARM 16mm EYEBOLT FOR CROSSARM EYEBOLT DETAILS B JUNE 2011 R5-1

12 ALUMINIUM CLEVIS THIMBLE HELICAL TERMINATION ALUMINIUM CONDUCTOR (AAC & AAAC) OR STEEL CONDUCTOR (SCAC) MALLEABLE CAST IRON CLEVIS THIMBLE HELICAL TERMINATION STEEL CONDUCTOR (SCGZ) OR COPPER CONDUCTOR (CU) STRAP AND CLAMPS SUPPLIED WITH PTS HELICAL TERMINATION FOR PTS ARRANGEMENT CONDUCTOR TERMINATIONS C MARCH 14 R5-2

13 R6 600 SQ. EARTH MAT ROADSIDE 450 EARTH SPEAR BAND-IT STRAPS FOR EARTHING SEE NOTE 3 3 EXTRA ROD GUIDES REQUIRED (POSITION TO SUIT) SECURED WITH BAND-IT STRAPS NOTES: BAND-IT STRAPS TO SUIT EQUIPMENT SEE NOTE mm WIDE BAND-IT STRAPS ON RAYCHEM BRACKET, POLE ROD GUIDES AND LV ANGLE INSULATOR BRACKET. 12mm WIDE BAND-IT STRAPS ON CABLE GUARDS. 2. AN APPROVED EARTHING BRAID MUST BE FITTED TO BOND THE OPERATING HANDLE TO THE HANDLE FRAME 3. 12mm WIDE BAND-IT STRAPS FITTED WITH SADDLES TO FIX EQUIPMENT DOWN EARTHS TO POLE. TO BE SPACE APPROXIMATELY 500mm APART R7 - STANDARD CABLE GUARD EARTHWIRE EARTH ROD ROD GUIDE 150 CLAMP TO POLE 20 MINIMUM R = LESS THAN 30 OHMS SEE NOTE MINIMUM HEIGHT 720 FIRST 12mm BANDIT STRAP 150 ABOVE G.L. REFER EARTHING RESISTANCE TABLE EARTH PIT EARTH ROD EARTH POINT 100 ABOVE G.L. STEEL POLE 450 EARTH MAT INSTALLED EARTHING RESISTANCE REQUIREMENTS ISOLATED H.V. ISOLATED H.V. M.E.N. WITH OVERHEAD WITH NO EARTH OVERHEAD EARTH COMBINED <1 ohm <10 ohm <30 ohm INDIVIDUAL <30 ohm <30 ohm <30 ohm EARTHING C JUNE 2011 R6

14 SURGE ARRESTOR TO POLE TOP SWITCH BI-LUG PLATE EARTH SCREEN XLPE TYPE EARTH POINT 12mm BAND-IT STRAP SEE NOTE 2 CABLE CLEAT SPACING SEE NOTE ROD GUIDE NOTE 4 NOTES: 1. FOR NTEC'S BAND STRAP OVER ONLY 1 CHANNEL. 2. CABLE CLEATS SECURED WITH 12mm BANDIT STRAPS MINIMUM OF 2 REQUIRED. 3. CABLE GUARD SECURED WITH 12mm BANDIT STRAPS MINIMUM OF 2 REQUIRED. MINIMUM GAP POSSIBLE BETWEEN F.G.L. AND GUARD SHALL BE MAINTAINED. 4. ANTICLIMBING GUARD SECURED WITH 12mm BANDIT STRAPS MIN 2 REQUIRED. 5. IN ALL SECTIONS WHERE POLES ARE DRAWN WITH URD CABLES ON THEM THE FOLLOWING WILL APPLY FOR THE CABLE INSTALLATION. - ALL CABLES SHALL BE INSTALLED ON THE OPPOSITE SIDE OF THE POLE TO ONCOMING TRAFFIC. - SHOULD POINT ABOVE BE IMPRACTICAL, THE CABLES MAY BE INSTALLED ON THE FOOTPATH SIDE. (BETWEEN POLE AND PROPERTY BOUNDARY) - IF THE CONNECTION POINT AT THE POLE TOP IS ON THE OPPOSITE SIDE OF THE INSTALLED CABLE, THEN THE CABLE MUST BE ROLLED AROUND THE POLE ON THE FOOTPATH SIDE (BETWEEN POLE AND PROPERTY BOUNDARY) UP TO THE CONNECTION. - FOR POLE TOP SWITCH POLES THE CABLE MUST BE INSTALLED ON THE FOOTPATH SIDE (BETWEEN POLE AND PROPERTY BOUNDARY) THEN ROLLED AS HIGH UP AS POSSIBLE TO THE SIDE OF THE CONNECTION. CABLE CLEAT / GUARD AND POLE TOP SWITCH ANTI CLIMBING GUARD DETAIL C MARCH 14 R7-1

15 SHRINK GLOVE SHRINK GLOVE TOP BAND-IT STRAP FIRST BAND-IT STRAP 150 4m CONDUIT SEE NOTE MINIMUM OF 3 BAND-IT STRAPS EQUI-SPACED BETWEEN 1000mm MAX SPACING 3 BAND-IT STRAPS EQUI-SPACED NOTE: 1. CABLE GUARD SECURED WITH 12mm BANDIT STRAPS MINIMUM OF 2 REQUIRED. MINIMUM GAP POSSIBLE BETWEEN F.G.L. AND GUARD SHALL BE MAINTAINED. 2. IN ALL SECTIONS WHERE POLES ARE DRAWN WITH URD CABLES ON THEM THE FOLLOWING WILL APPLY FOR THE CABLE INSTALLATION. - ALL CABLES SHALL BE INSTALLED ON THE OPPOSITE SIDE OF THE POLE TO ONCOMING TRAFFIC. - SHOULD POINT ABOVE BE IMPRACTICAL, THE CABLES MAY BE INSTALLED ON THE FOOTPATH SIDE. (BETWEEN POLE AND PROPERTY BOUNDARY) - IF THE CONNECTION POINT AT THE POLE TOP IS ON THE OPPOSITE SIDE OF THE INSTALLED CABLE, THEN THE CABLE MUST BE ROLLED AROUND THE POLE ON THE FOOTPATH SIDE (BETWEEN POLE AND PROPERTY BOUNDARY) UP TO THE CONNECTION. - FOR POLE TOP SWITCH POLES THE CABLE MUST BE INSTALLED ON THE FOOTPATH SIDE (BETWEEN POLE AND PROPERTY BOUNDARY) THEN ROLLED AS HIGH UP AS POSSIBLE TO THE SIDE OF THE CONNECTION. REVISION DATE B JUNE 2011 SERVICE CABLE CLEAT / GUARD FIXING DETAILS R7-2

16 A. LINE TAPS TO DROPOUT FUSE or CABLE SURGE ARRESTOR P.G CLAMP INSULATED CRIMP 95 ABC SEE NOTE 1 CONNECT COPPER OR ALUMINIUM SPLICE TO SUIT MAINS USING PG CLAMPS INSULATED LUG WITH 12mm HOLE 95 ABC B. DROPOUT FUSE TO TRANSFORMER WITH SURGE ARRESTER TO D.O.F. TINNED BRASS HALF CLAMP TO INSULATOR INSULATED LUG WITH 12mm HOLE SURGE ARRESTOR END SEE NOTE 2 INSULATED LUG WITH 12mm HOLE D.O.F. END PAINT CLEANED OFF TO ENSURE GOOD ELECTRICAL CONTACT AFTER APPLY CONDUCTIVE GREASE C. DROPOUT FUSE TO CABLE SURGE ARRESTORS INSULATED LUG WITH 12mm HOLE SURGE ARRESTOR END SEE NOTE 2 INSULATED LUG WITH 12mm HOLE D.O.F. END NOTE: 1. WHERE THE INSULATED SPLICE CRIMP IS NOT USED FOR TRANSFORMER OR LINE TAPS A 20mm LENGTH OF INSULATION MUST BE REMOVED BEHIND THE INSULATED LUG TO ALLOW MOISTURE TO DRAIN. SEE R8/2 FOR PG CLAMP APPLICATION 2. REMOVE INSULATION FOR BRASS HALF CLAMP AND MOISTURE DRAIN (20mm) 3. ALTERNATIVELY USE "C" FROM D.O.F. TO TRANSFORMER OR TRANSFORMER TO SURGE ARRESTOR REVISION DATE B JUNE 2011 ABC TAPS FOR TRANSFORMER AND CABLE TERMINATION R8-1

17 12 DIAMETER S/S BOLT & NUT EARTH PHASE TRANSFORMER & EARTH LUGS ABC TO AERIAL UTILUX Australia FT94A AAC, AAAC mm dia. O.D mma. HEX DIE AL ABC LUG BRAID S/S FLAT WASHER S/S SPRING WASHER CRIMP MARK LUG BI-METAL Q TYPE LUG (CABLE CONNECTIONS) CABLE CRIMP LUGS AND CONNECTORS TRANSFORMER AND CABLE D JUNE 2011 R8-2

18 SMALL COPPER PG CLAMP FOR UP TO 70mm sq COPPER CONDUCTOR INCLUDING Cu DOWN EARTH JOINS ALUMINIUM ALUMINIUM OR COPPER PARALLEL GROOVE CLAMPS STEP 1 WIRE BRUSH SURFACE OF CONDUCTOR AND JAWS OF CLAMP. THEN IMMEDIATELY APPLY ALUMINIUM JOINTING COMPOUND. STOCK No. PG 0002 STEP 2 FIT CLAMP AND TIGHTEN BOLTS SECURELY. IF COPPER TO ALUMINIUM THEN ALUMINIUM CONDUCTOR TO BE ABOVE THE COPPER STEP 3 IN AREAS OF HIGH POLLUTION (TYPICALLY WITHIN 5 Kms OF COAST) APPLY GREASE TO COVER ALL PARTS OF JOINT. USE SHELL MP2 - STOCK No PG0125. IN EXTREMELY CORROSIVE ENVIRONMENTS WHERE THIS HAS PROVEN INADEQUATE, THEN APPLY 510 DENSO TAPE OVER GREASE AND JOINT TO EXCLUDE ALL MOISTURE - STOCK No K10020 REUSE OF PG CLAMPS DO NOT REUSE PG CLAMPS WHICH HAVE BEEN SUBJECTED TO HEAVY FAULT CONDITIONS AND EXCESSIVE CORROSION CONTACT GROOVES OF THE PG CONDUCTOR INTERFACE MUST BE THOROUGHLY CLEANED TO BRING THE SURFACE BACK TO "AS NEW" CONDITION APPLY CONTACT PROTECTION GREASE TO REINSTATE ENVIRONMENTAL PROTECTION AT THE INTERFACE PG CLAMPS INSTALLATION INSTRUCTION D JUNE 2011 R8-3

19 ABC TO SERVICE 95/35 & 150/35 LV MAINS IPC - ABC TO ABC REVISION DATE B JUNE 2011 LUGS AND CONNECTORS INSULATION PIERCING CLAMPS R8-4

20 BRACKET FOR ANGLE M12 BOLTS THROUGH PREDRILLED HOLES IN OFFSET CROSSARM 11kV METRO ONLY,NOMINATED LOCATIONS M12 BOLTS THROUGH PREDRILLED HOLES IN OFFSET CROSSARM NORMAL POLLUTION INCLUDING 11kV AREAS 2 M12 BOLTS THROUGH INSULATOR STANDOFF INSULATOR M12 BOLTS THROUGH PREDRILLED HOLES IN OFFSET CROSSARM ANGLE BRACKET M16 BOLTS THROUGH ANGLE HIGH POLUTION ALL AREAS EXCEPT METRO 11kV M12 BOLTS THROUGH PREDRILLED HOLES IN OFFSET CROSSARM FAULT TAMER 22kV ONLY NOMINATED HIGH FAULT CURRENT AREAS STRAIN EYE OF PTS M12 BOLT M16 BOLT ANGLE BRACKET M16 BOLT M16 BOLT M12 BOLT ANGLE BRACKET STRAIN EYE OF PTS NORMAL POLLUTION HIGH POLLUTION DROPOUT FUSE FITTED TO TERMINATION POLE TOP SWITCH WITH CABLE DROPOUT FUSE MOUNTING DETAILS B JUNE 2011 R10-1

21 XARM TYPES XARM MOUNTED POLE MOUNTED STANDARD DOF's UP TO 33kV 260 XARM TYPES 1146 BORIC ACID FUSES FOR FIRE RISK AREAS AND HIGHER FAULT RATINGS RADII STANDARD MOUNTING POSSIBLE MOUNTING VARIATIONS ON EXISTING STRUCTURES FOR FITTING & BARREL SWING CLEARANCE REVISION DATE B JUNE 2011 DROPOUT FUSE MOUNTING BORIC ACID AND FAULT TAMER DETAILS R10-2

22 /05/2017 1:26:11 PM H:\00 - Temp - 00\HP\AB\R11\R11.dgn GIS mleroux

23 R-11 R8-4 MUST BE DOUBLED OVER BEFORE PUTTING INTO CLAMP ABC IPC CB (5 AMP) CB (5 AMP) LV AERIAL CONNECTION SIDE VIEW LV ABC CONNECTION SIDE VIEW R12-2 CB (5 AMP) CB (5 AMP) U23-1 LV TRANSFORMER CONNECTION SIDE VIEW LV UNDERGROUND CONNECTION SIDE VIEW LV SUPPLY TO POLE MOUNTED EQUIPMENT A R11-1

24 ABC LUGS ABC HARNESS 95sqmm 70sqmm PVC COVERED COPPER DOWN EARTH QUICK LUGS TO DOWN EARTH ABC SUSPENSION CLAMPS BOLTED TO HARNESS BRACKET NEUTRAL 100 AMP FUSE HOLDER ABC SPLICE CRIMPED TO ABC AND PUT INTO PG CLAMP ABC SPLICE CUT TO LENGTH AND CRIMPED TO ABC 25 AND 63kVA TO BARE CONDUCTOR ABC LUGS ABC HARNESS 95sqmm FOR 100kVA ABC HARNESS 150sqmm FOR 200kVA 70sqmm PVC COVERED COPPER DOWN EARTH QUICK LUGS TO DOWN EARTH ABC SUSPENSION CLAMPS BOLTED TO HARNESS BRACKET NEUTRAL ABC SPLICE CRIMPED TO ABC AND PUT INTO PG CLAMP 400AMP LV ISOLATOR BOLTED TO INSULATOR PIN ABC LUG CRIMPED TO ABC 100 AND 200kVA TO BARE CONDUCTOR TRANSFORMER LV ISOLATION DETAILS D MARCH 14 R12-1

25 1000 SEE NOTE 1 TOP OF BRACKET 95sqmm ABC FOR PFISTERE FUSE UNIT 150sqmm ABC FOR 200kVA 315kVA TO ABC REFER TO R12 SHEET 3 FOR OPTIONS BOTTOM OF FUSE SWITCH PFISTERE - FOR 100kVA AND BELOW KRONE - FOR 200kVA 5000 NOTES: 1. ALTERNATIVE POSITION FOR BRACKET IF CABLE CLEARANCE CANNOT BE OBTAINED 100 and 200kVA TO ABC QUICK LUGS TO 25sqmm DOWN EARTH a3 a2 a1 a4 16sqmm TAP SERVICE NEUTRAL TERMINAL BLOCK ER 100 AMP FUSE HOLDER TO RUNNING EARTH 25sqmm PVC COVERED COPPER DOWN EARTH TO EARTH POINT SINGLE PHASE 10 AND 25kVA TRANSFORMER LV ISOLATION DETAILS D MARCH 14 R12-2

26 OPTION 1 1 PHASE ONLY SHOWN FOR CLARITY SINGLE LINE REPRESENTATION GS0062 LV AERIAL PG OPTION 2 FROM TX SUPPLY GS0062 LV AERIAL PG PG OPTION 3 FROM TX SUPPLY N GS0062 KRONE FUSES KRONE FUSES LV AERIAL PG OPTION 4 FROM TX SUPPLY N KRONE FUSES KRONE FUSES LV AERIAL PG TRANSFORMER LV ISOLATION DETAILS B JUNE 2011 R12-3

27 PL DANGER PLATE LOCATION WHEN SUPPLIED FOR FITTING 1400 POLE BURIAL DEPTHS POLE LENGTH EMBEDMENT DEPTH 9.5m 1.55m 11.0m 1.70m 12.5m 1.85m 14.0m 2.00m EXAMPLE 9.5m POLE G.L. E = (PL + 6.0) / 10 = ( ) / 10 = (15.5) / 10 = 1.55m E NOTE: E = EMBEDMENT DEPTH FOR CYCLONIC AREAS BURIAL DEPTH TO BE DETERMINED BY DESIGNER PL = POLE LENGTH POLE EMBEDMENT DEPTH AND DANGER PLATE B JUNE 2011 R13-1

28 NOTE: FOR CYCLONIC AREAS (AS CAT2-REGION "D") 6.5M COLUMNS SHALL BE SUPPORTED WITH A N20 CONCRETE SLEEVE AROUND THE COLUMN FOR THE FULL BURIAL DEPTH. CONCRETE DIA. FOR SANDY SOILS 600mm UP TO MASS FOR EACH BASE PLATE WILL BE APPROXIMATELY 60Kg CONCRETE MIXED ON SITE WILL HAVE 20mm AGGREGATE, SLUMP OF 80mm, CONCRETE GRADE OF N20 WITH NO ADDITIVES REQUIRED THE REQUIRED MEASURE IS: 1 PART OF CEMENT 2 PART OF CLEAN SAND 3 PARTS OF 20mm AGGREGATE 1 PART OF WATER APPROPRIATELY PRODDED TO REMOVE TRAPPED AIR POCKETS 600 TO 900 IMPACT ABSORBENT FEATURE GROUND LINE INDICATOR (MARK ON FACE) G.L. BURIAL DEPTH TO BE DETERMINED BY ENGINEER CONCRETE BASE SANDY SOILS 9.5M, 11M & 12.5M POLES 219, 1 x 48 CHS GRADE 350 STEEL DISTRIBUTION POLE BELLING OF BASE C AND D AREAS B JUNE 2011 R13-2

29 ROPE THIMBLE R5 HELICAL TERMINATION / /2.00 HELICAL TERMINATION INSULATOR ROPE GRIP GROUND LEVEL 25mm UV STABILISED PVC CONDUIT ROPE THIMBLE HELICAL TERMINATION GROUNDSCREW (SEE FLOW CHART - R16) INSTALLATION ANGLES AND TENSIONS OF STAYS ANGLE a ANGLE b ANGLE c A= C= C (DEGREES) (DEGREES) (DEGREES)(LENGTH)(LENGTH) (TENSION) Bx1.73 Bx2 SUM OF LINE LOAD x B Bx0.57 Bx1.41 Bx1.15 SUM OF LINE LOAD x 1.41 SUM OF LINE LOAD x 2 A = POSITION OF STAY ROD FROM BASE OF POLE B = HEIGHT OF STAY ATTACHMENT ABOVE GROUND C = LENGTH OF STAY WIRE B b a A C c NOTE: 1. IF THE STAY WIRE PASSES THROUGH L.V. MAINS THEN THE L.V. MAINS MUST BE CONSTRUCTED ON A 2100mm CROSSARM AND COVERED IN INSULATING MATERIAL GROUND STAY A JUNE 2011 R14-1

30 3600 ROPE THIMBLE HELICAL TERMINATION R /2.00 HELICAL TERMINATION ROPE THIMBLE 19/2.00 BANDIT STRAPS TO SUIT EQUIPMENT (NOTE 2) HELICAL TERMINATION INSULATOR mm UV STABILISED PVC CONDUIT ROPE GRIP 2700 (MINIMUM) ROPE THIMBLE HELICAL TERMINATION GROUND LEVEL 2700 GROUNDSCREW (SEE FLOW CHART - R16) NOTES: 1. IF THE STAY WIRE PASSES THROUGH L.V. MAINS THEN THE L.V. MAINS MUST BE CONSTRUCTED ON A 2100mm CROSSARM AND COVERED IN INSULATING MATERIAL 2. 32mm WIDE BANDIT STRAP ON OUTRIGGER. OUTRIGGER STAY HV AND LV TEE-OFF B MARCH 14 R14-2

31 3600 ROPE THIMBLE HELICAL TERMINATION R5 19/2.00 HELICAL TERMINATION ROPE THIMBLE BANDIT STRAP TO SUIT EQUIPMENT. (NOTE 2) 19/2.00 HELICAL INSULATOR TERMINATION 4400 HV 3000 LV 25mm UV STABILISED PVC CONDUIT ROPE GRIP 2700 (MINIMUM) ROPE THIMBLE HELICAL TERMINATION GROUND LEVEL 2700 GROUNDSCREW (SEE FLOW CHART - R16) NOTES: 1. IF THE STAY WIRE PASSES THROUGH L.V. MAINS THEN THE L.V. MAINS MUST BE CONSTRUCTED ON A 2100mm CROSSARM AND COVERED IN INSULATING MATERIAL 2. 32mm WIDE BANDIT STRAPS ON OUTRIGGER. REVISION DATE B MARCH 14 OUTRIGGER STAY HV OR LV TERMINATION ONLY HV AND LV INTERMEDIATE ONLY R14-3

32 ROPE THIMBLE HELICAL TERMINATION R5 (NOTE 2) 4100 HELICAL TERMINATION 19/2.00 ROPE THIMBLE NOTES: 1. IF THE STAY WIRE PASSES THROUGH L.V. MAINS THEN THE L.V. MAINS MUST BE CONSTRUCTED ON A 2100mm CROSSARM AND COVERED IN INSULATING MATERIAL. 2. REFER TO RDA CONSTRUCTION STANDARD H6 FOR STAY EYEBOLT LOCATIONS mm WIRE BANDIT STRAPS ON OUT RIGGER. 19/2.00 BANDIT STRAPS TO SUIT EQUIPMENT (NOTE 3) HELICAL TERMINATION INSULATOR mm UV STABILISED PVC CONDUIT ROPE GRIP 2700 (MINIMUM) ROPE THIMBLE HELICAL TERMINATION GROUND LEVEL 2700 GROUNDSCREW (SEE FLOW CHART - R16) OUTRIGGER STAY RUNNING DISC ANGLE 12.5m POLE B MARCH 14 R14-4

33 3000 HELICAL TERMINATION INSULATOR ROPE THIMBLE 19/ /2.00 R5 ROPE THIMBLE HELICAL TERMINATION HELICAL TERMINATION NOTES: 1. STAY INSULATOR/S MUST BE FITTED 3.0m FROM POLE. STAY MAY REQUIRE TWO INSULATORS IF OVER CONDUCTOR AT BOTH ENDS. AERIAL STAY A JUNE 2011 R14-5

34 /2.00 INSULATOR xx ROPE THIMBLE HELICAL TERMINATION R5 ROPE THIMBLE HELICAL TERMINATION 19/2.00 HELICAL TERMINATION ROPE THIMBLE 19/2.00 HELICAL TERMINATION INSULATOR 25mm UV STABILISED PVC CONDUIT ROPE GRIP 2700 xx (MINIMUM) ROPE THIMBLE HELICAL TERMINATION GROUND LEVEL 2700 GROUNDSCREW (SEE FLOW CHART - R16) OUTRIGGER STAY POLE A JUNE 2011 R14-6

35 NOTE: 1. IF THE STAY WIRE PASSES THROUGH L.V. MAINS THEN THE L.V. MAINS MUST BE CONSTRUCTED ON A 2100mm CROSSARM AND COVERED IN INSULATING MATERIAL 2. REFER TO RDA CONSTRUCTION STANDARD H7 FOR STAYS EYEBOLT LOCATIONS. ROPE THIMBLE HELICAL TERMINATION /2.00 R5 (NOTE 2) HELICAL TERMINATION INSULATOR HELICAL TERMINATION 19/ / /2.00 ROPE GRIP 25mm UV STABILISED PVC CONDUIT ROPE THIMBLE GROUND LEVEL GROUNDSCREW (SEE FLOW CHART - R16) INSTALLATION ANGLES AND TENSIONS OF STAYS ANGLE a ANGLE b ANGLE c A= C= C (DEGREES) (DEGREES) (DEGREES)(LENGTH)(LENGTH) (TENSION) Bx1.73 Bx2 SUM OF LINE LOAD x B Bx0.57 Bx1.41 Bx1.15 SUM OF LINE LOAD x 1.41 SUM OF LINE LOAD x 2 A = POSITION OF STAY ROD FROM BASE OF POLE B = HEIGHT OF STAY ATTACHMENT ABOVE GROUND C = LENGTH OF STAY WIRE C c A b a B REVISION DATE A JUNE 2011 DOUBLE GROUND STAY FOR RUNNING DISC ANGLE WITH UNDERSLUNG OR OVERHEAD EARTH WIRE R14-7

36 START USE 200mm SCREW ANCHOR FIT EXTENSION ROD ATTEMPT TO DRIVE ANCHOR UNTIL 300mm OF ROD LOAD WITH 4 PINS ATTEMPT TO DRIVE ANCHOR UNTIL 300mm OF ROD REMAINS EXPOSED REMAINS EXPOSED PINS SHEAR YES PINS SHEAR BEFORE REACHING WITH MORE THAN 300mm OF ROD EXPOSED NO NO SOIL YES LOAD WITH 10 PINS ATTEMPT TO DRIVE ANCHOR UNTIL 300mm OF ROD REMAINS EXPOSED CONDITIONS TOO SOFT FOR 200mm SCREW ANCHOR START AGAIN TRY 300mm SCREW ANCHOR YES HAS AN PINS SHEAR OR AUGER MOTOR STALLS NO NO EXTENSION ROD ALREADY BEEN FITTED YES REMOVE 6 PINS ATTEMPT TO DRIVE ANCHOR UNTIL 100mm OF ROD REMAINS EXPOSED IS LENGTH OF ROD EXPOSED LESS THAN 300mm PINS SHEAR NO FINISH SATISFACTORY YES YES ANCHOR INSTALLATION ACHIEVED SCREW IN ANCHOR FLOW CHART B JUNE 2011 R16

37 23/08/2016 9:08:55 AM pw:\\oca-pw-701.ghdnet.internal:pwv8iss4prodhp\documents\projects\61\31539 NIS Business Urgent Works\08_0 DRAFTING\8_3 DRAWINGS\R17.dgn GIS mleroux

38 23/08/2016 9:13:39 AM pw:\\oca-pw-701.ghdnet.internal:pwv8iss4prodhp\documents\projects\61\31539 NIS Business Urgent Works\08_0 DRAFTING\8_3 DRAWINGS\R18.dgn GIS mleroux

39 23/08/2016 9:15:26 AM pw:\\oca-pw-701.ghdnet.internal:pwv8iss4prodhp\documents\projects\61\31539 NIS Business Urgent Works\08_0 DRAFTING\8_3 DRAWINGS\R19-1.dgn GIS mleroux

40 LIFTING POINTS OVERHANG LIMITED TO CABLE ENTRY A8 B8 C8 NOT TO SCALE A8 B8 C8 NOT TO SCALE LV MV FGL FGL LV CABLE ACCESS CULVERT MV CABLE ACCESS COMPACTED BACKFILL VOID FILL BASE» LIMIT OF EXCAVATION SIDE VIEW COMPACTED & LEVELLED SUBGRADE FRONT VIEW NOTES: FOR OTHER INFORMATION ON SITE DESIGN & INSTALLATION DETAILS ETC. REFER TO DSM SHEETS 1&2 DSM DSM TYPICAL REFER TO FI4.4 LV FUTURE MPS CONNECTIONS LV MV 63kVA CONNECTIONS MV EQUIPMENT WEIGHT BOX CULVERT: CROWN = 948kg BASE = 384kg TRANSFORMERS:63kVA = 720kg LV MV NOTE: CABLE LENGTH AND ALIGNMENT TO ALLOW FOR FUTURE MPS INSTALLATION WHEN CONNECTION IS MADE TO 63kVA TRANSFORMER THIS DRAWING TO BE READ IN CONJUNCTION WITH THE SUBSTATION INSTALLATION REQUIREMENTS - HPC-9DJ TRANSFORMER KIOSK (MPS) 63kVA (HUB2 ON A CULVERT) INSTALLATION GUIDE C MARCH 14 R19-2

41 23/08/2016 9:38:47 AM pw:\\oca-pw-701.ghdnet.internal:pwv8iss4prodhp\documents\projects\61\31539 NIS Business Urgent Works\08_0 DRAFTING\8_3 DRAWINGS\R20-1.dgn GIS mleroux

42 23/08/2016 9:39:54 AM pw:\\oca-pw-701.ghdnet.internal:pwv8iss4prodhp\documents\projects\61\31539 NIS Business Urgent Works\08_0 DRAFTING\8_3 DRAWINGS\R20-2.dgn GIS mleroux

43 23/08/2016 9:41:19 AM pw:\\oca-pw-701.ghdnet.internal:pwv8iss4prodhp\documents\projects\61\31539 NIS Business Urgent Works\08_0 DRAFTING\8_3 DRAWINGS\R20-3.dgn GIS mleroux

44 N R W B EXTENSION PALM FITTED TO BUSHING BY MANUFACTURER 315, 630kVA 33kV TRANSFORMER LV N R W B AND 630kVA 6.6/11kV & 22kV TRANSFORMER LV DIAMETER HOLE 1000kVA 6.6/11kV, 22 & 33kV TRANSFORMER LV LV MV LV MV AND 630kVA 6.6/11kV AND 22kV TRANSFORMER 1000kVA 6.6/11kV AND 22kV TRANSFORMER 1200 LV MV LV MV AND 630kVA 33kV TRANSFORMER 1000kVA 33kV TRANSFORMER NOTES: 1. MV AND LV CABLES INSTALLED FOR 315 AND 630kVA NON MPS TRANSFORMERS MUST ALLOW 500 mm SLACK FOR POSSIBLE 1000kVA TRANSFORMER UPGRADE SEE ABOVE FOR HEIGHTS OF LV AND MV BUSHINGS. 2. ALL LV CABLES INSTALLED FOR NON MPS DISTRICT SUBSTATION ARRANGEMENTS TO BE 630mm Al, 2 PER PHASE AND 1 PER NEUTRAL. 3. CUSTOMER LV CABLES CONNECTED TO A SOLE USE 1000kVA TRANSFORMER CAN BE A MAXIMUM SIZE AND NUMBER OF 3 X 630 sq mm PER PHASE. 4. CUSTOMER LV CABLES CONNECTED TO A SOLE USE 315 AND 630kVA TRANSFORMER CAN BE A MAXIMUM SIZE AND NUMBER OF 2 X 630mm PER PHASE. 5. CUSTOMER LV CABLES CONNECTED TO A SOLE USE 160 kva TRANSFORMER CAN BE A MAXIMUM SIZE AND NUMBER OF 1 X 630mm PER PHASE. TRANSFORMER KIOSK (NON MPS) 160/315/630/1000 kva CABLE ARRANGEMENTS C 02/04/14 R21

45 R 5 x 400 AMP COVERS SUPPLIED WITH MPS W B HEATSHRINK N 600 B W R 630 AMP COVER WITH 600 AMP LINKS - OPTIONAL STRIP CABLE TO FUSE SWITCH (REF R25) 2 X 630 COVERS FIXED TOGETHER WITH 600 AMP LINKS 1200 AMP ARRANGEMENT - OPTIONAL NOTES: 1. MPS COMES COMPLETE WITH TRANSFORMER AND 5 x LV SWITCHES INCLUDING 630 AMP BASES. 2. CABLE SUPPLIED WITH MPS TRANSFORMER RANGE - 160, 315 AND 630 kva MPS SUBSTATION UP TO 630 kva B JUNE 2011 R22

46 1000 LV KIOSK TYPE 1 - FEEDER PILLAR 400 DEEP 400 DEEP 900 RECESS BUILT TO DIMENSIONS SHOWN FGL FGL THIS AREA TO BE FREE OF FOOTINGS CONCRETE SLABS (500 x 200 x 25 THICK) RECESSED IN WALL FREESTANDING NOTES: 1. THE CUSTOMER IS RESPONSIBLE FOR THE INSTALLATION OF THE HP SUPPLIED FEEDER PILLAR, TO BE RECESSED IN THE WALL. 2. APPROXIMATE MAXIMUM WEIGHT WITH 6 FUSEWAYS = 160kg DRILL 4-HOLES 12 DIAMETER THRU REINFORCED SECTIONS LV KIOSK TYPE 2 - DISTRICT SUBSTATION 400 DEEP 1300 FLOOR OF SUBSTATION FGL 1m DEEP TRENCH CONCRETE SLABS IN 2HR FIRE RATED SUBSTATION (500 x 200 x 25 THICK) NOTES: FREESTANDING 1. KIOSK BOLTED TO SUBSTATION WALL ABOVE THE TRENCH WITH 4 x 10mm RAWLNUTS AND 4 x 10mm BOLTS x 75 LONG. 2. APPROXIMATE MAXIMUM WEIGHT WITH 5 FUSEWAYS AND 2 DISCONNECTORS = 240kg DRILL 6-HOLES 12 DIAMETER THRU REINFORCED SECTIONS LV KIOSK TYPE 3 - DISTRICT SUBSTATION 400 DEEP 2200 FLOOR OF SUBSTATION FGL 1m DEEP TRENCH CONCRETE SLABS IN 2HR FIRE RATED SUBSTATION (500 x 200 x 25 THICK) NOTES: FREESTANDING 1. KIOSK BOLTED TO SUBSTATION WALL ABOVE THE TRENCH WITH 6 x 10mm RAWLNUTS AND 6 x 10mm BOLTS x 75 LONG. 2. APPROXIMATE MAXIMUM WEIGHT WITH 5 FUSEWAYS AND 2 DISCONNECTORS = 350kg LV SWITCHGEAR KIOSK GENERAL ARRANGEMENT C MARCH 14 R24

47 N E SUPERSEDED TYPE 1 REQUIREMENTS NOTE: THIS CUTOUT, WITH SEPARATE EARTH/NEUTRAL TERMINALS, WAS SUPERSEDED BY THE TYPE 2 CUTOUT WITH A COMMON EARTH/NEUTRAL TERMINAL HOWEVER, DUE TO THE NUMBER OF THIS TYPE STILL IN USE TYPE 1 MUST BE CONNECTED AS SHOWN 'WITH THE MEN LOOP INSTALLED' & 'EARTH LEAD TO MOUNTING BRACKET' CONNECT 6mm EARTH WIRE (EE1364) TO MOUNTING BRACKET FROM EARTH BLOCKS THESE LINKS MUST BE INSTALLED. LOOP BETWEEN NEUTRAL AND EARTH BLOCKS TO BE 6mm Cu PVC INSULATED. LINK OR FUSE A N E A DOUBLE INSULATED CABLE TO EACH LUMINAIRE VIEW ON INSIDE OF FRONT COVER TYPE 2 CONNECT EARTH WIRE TO MOUNTING BRACKET USING TERMINAL LUG AND M6 SCREW. A DOUBLE INSULATED CABLE TO EACH LUMINAIRE A N E DOUBLE INSULATION (SHEATHING) TO ENTER UNIT DOUBLE INSULATION (SHEATHING) E TO ENTER UNIT FIX TO MOUNTING BRACKET A N A N USING M4 SCREW EARTH/NEUTRAL BLOCK(MEN) EARTH/NEUTRAL PLUG TO BE INSULATED WITH HEAT SHRINK OR TAPE E CONNECT EARTH WIRE TO MOUNTING BRACKET USING TERMINAL LUG AND M6 SCREW. EARTH/NEUTRAL TO BE INSULATED WITH HEAT SHRINK OR TAPE 10mm (EE1420) OR 16mm (EE1421) XLPE INSULATED, RED CORE INSULATION, HELICAL WOUND NEUTRAL SCREEN CABLE SINGLE SERVICE SUPPLY LOOPED SERVICE SUPPLY SUPERSEDED TYPE 2 UNIT SEE R26/2 FOR REPLACEMENT GEC HENLEY STREET LIGHTING SERVICE CUTOUT CAT No. 8DE TYPE 2 STREET LIGHT CUTOUT SINGLE PHASE SUPPLY C MARCH 14 R26-1

48 NOTE: 1. LST 10A FUSE (STOCK CODE: GF1300) MUST BE INSTALLED FOR LED INSTALLATIONS. VIEW ON INSIDE OF FRONT COVER A N E A N E A N E FIX TO MOUNTING BRACKET USING PLATE AND SCREWS A DOUBLE INSULATED CABLE TO EACH LUMINAIRE A A A A N FIX TO MOUNTING BRACKET USING PLATE AND SCREWS A N E A N WITHDRAWN 10mm (EE1420) OR 16mm (EE1421) XLPE INSULATED, RED CORE INSULATION, HELICAL WOUND NEUTRAL SCREEN CABLE SINGLE PHASE SINGLE PHASE LOOPED SERVICE N LST 10A FUSE REFER TO R26-3 E STOCK No: HZ0128 STREET LIGHT CUTOUT SINGLE PHASE SUPPLY FOR CLASS II LUMINIARES C MARCH 14 R26-2

49 NOTE: 1. LST 10A FUSE (STOCK CODE: GF1300) MUST BE INSTALLED FOR ALL INSTALLATIONS. 2. CONNECT EARTH WIRE TO MOUNTING BRACKET USING TERMINAL LUG (FL0163) AND M6 SCREW (AB2820). 3. CONNECT 6mm EARTH WIRE (EE1364) TO MOUNTING BRACKET FROM EARTH TERMINAL. 4. MEN BRIDGE OR 6mm EARTH WIRE (EE1364) LOOP. LST 10A FUSE VIEW ON INSIDE OF FRONT COVER A DOUBLE INSULATED CABLE TO EACH LUMINAIRE A N E A N E A N E A A A A NOTE 2 N N FIX TO MOUNTING BRACKET USING PLATE AND SCREWS FIX TO MOUNTING BRACKET USING PLATE AND SCREWS A N E A N E NOTE 2 NOTE 4 NOTE 3 NOTE 4 NOTE 3 10mm (EE1420) OR 16mm (EE1421) XLPE INSULATED, RED CORE INSULATION, HELICAL WOUND NEUTRAL SCREEN CABLE SINGLE PHASE SUPPLY FUSE 32A SINGLE PHASE LOOPED SERVICE SUPPLY FUSE 32A STOCK No: HZ0128 STREET LIGHT CUTOUT SINGLE PHASE SUPPLY FOR LUMINIARES A APRIL 14 R26-3

50 TO OTHER STREET LIGHTS G.L. R26 (W/FUSE) SUPPLY FROM PREVIOUS STREET LIGHT OR PILLAR. G.L. FROM A LOOPED SERVICE CUTOFF ANY PORTION OF SCREW THREAD PROTRUDING BEYOND SECOND NUT. TERMINATING BLOCKS R26 (W/LINK) STREET LIGHT FUSE HOLDER (SEE NOTE 2) FITTED ON OPPOSITE SIDE OF TERMINALS BY FITTING TERMINAL FIXING SCREW AS SHOWN. TOP VIEW G.L. MINI PILLAR MOUNTING BOARD G.L. 2 C0RE 10sqmm CABLE (EE1420) FROM A MINI PILLAR NOTES FOR PILLAR CONNECTIONS. 1. DISTRIBUTE LIGHTING LOAD ACROSS THE PHASES WITHIN THE DEVELOPMENT. 2. GEC REDSPOT TYPE RS20H FUSE HOLDER (GF0121), USE WITH 10A NIT TYPE FUSE (GF0915) ALSO REFER TO DETAILS IN DRG R26 SERIES FUSING ARRANGEMENTS FOR STREET LIGHT COLUMNS B JUNE 2011 R27

51 FROM FUSE HOLDER RED PERSPEX COVER FROM TRANSFORMER BUSHING (a2) RED RED BLACK WHITE WHITE NEUTRAL M.E.N. LUG SEPERATE USE COMMON BOLT EARTH 70 mm sq GREEN/ YELLOW TO TRANSFORMER HV EARTH BAR BLUE SCREEN BLACK HEAT SHRINK OR TAPE OVER SCREEN AND BLUE PHASE MAXIMUM 5 CABLES MAXIMUM 35mm Cu XLPE 3C LV NOTES: 1. SEE R35 FOR MINI PILLAR ARRANGEMENT. 2. SETUP FOR A 12.7kV OR 19.1kV 25kVA 240/480V TRANSFORMER 240V CONFIGURATION SHOWN, SEE R30 FOR 480V CONFIGURATION. 25kVA PADMOUNT Tx LV DISTR. BOARD 240V STREET FEEDER/CONSUMER MAINS TERMINAL BLOCK C FEB 2013 R29

52 FROM FUSE HOLDER RED PERSPEX COVER WHITE RED RED FROM TRANSFORMER BUSHING (a2) WHITE BLACK WHITE NEUTRAL M.E.N. LUG SEPERATE USE COMMON BOLT EARTH 70 mm sq GREEN/ YELLOW TO TRANSFORMER HV EARTH BAR BLUE SCREEN BLACK HEAT SHRINK OR TAPE OVER SCREEN AND BLUE PHASE MAXIMUM 5 CABLES MAXIMUM 35mm Cu XLPE 3C LV NOTES: 1. SEE R35A FOR MINI PILLAR ARRANGEMENT. 2. SETUP FOR A 12.7kV OR 19.1kV 25kVA 240/480V TRANSFORMER 480V CONFIGURATION SHOWN. SEE R29 FOR 240V CONFIGURATION. 25kVA PADMOUNT Tx LV DISTR. BOARD 480V STREET FEEDER/CONSUMER MAINS TERMINAL BLOCK B FEB 2013 R30

53 NEUTRAL CONNECTION LINK EXISTING M.E.N LINK COVER R W B N MOUNTING BOARD ADDITIONAL 25/35mm BLACK CONDUCTOR TO LOOP TO M.E.N. ON BACK INSTALLATION PROCEDURE: 1. FIX EXTRA NEUTRAL LINK TO BACK OF PANEL BEHIND EXISTING M.E.N LINK. ADDITIONAL M.E.N LINK STOCK No HC USING INSULATED GLOVES AND TOOLS REMOVE EARTH STAKE CONDUCTOR FROM M.E.N LINK AND TEST BETWEEN M.E.N LINK AND REMOVED CABLE END TO CONFIRM NO POTENTIAL DIFFERENCE. 3. CONNECT REMOVED EARTH CABLE END TO BOTTOM R/HAND TERMINAL OF THE ADDITIONAL LINK. 4. CONNECT A 25/35MM NEUTRAL CONDUCTOR (BLACK) BETWEEN OLD EARTH TERMINAL IN EXISTING LINK AND BOTTOM CENTRE TERMINAL IN THE ADDITIONAL M.E.N LINK. 5. THEN CONNECT EXTRA NEUTRALS TO THE ADDITIONAL LINK. N TO OLD EARTH WIRE TERMINAL EARTH WIRE TO EXISTING EARTH ROD VIEW FROM BACK OF BOARD NOTES: 1. IF POTENTIAL EXISTS BETWEEN CUT ENDS NOTIFY HORIZON POWER. STOCK No. HC1299 MINI PILLAR ADDITIONAL NEUTRAL FITTING REQUIREMENTS B JUNE 2011 R31

54 TO STREET LIGHT/S STREET LIGHT NEUTRAL R W B N M.E.N. LINK TERMINAL BLOCKS COVER MOUNTING BOARD TO ROAD CROSSING EARTH (TO EARTH ROD) 25mm SERVICE FROM TEE JOINT TO ROAD CROSSING VIEW FROM STREET SUPPLY TO STREET LIGHT FUSE STREET LIGHT FUSE WHERE REQUIRED CONNECTION LINKS RED SPOT FUSE TO STREET LIGHT VIEW FROM SIDE MINI / UNIVERSAL PILLAR TERMINATION BLOCK B JUNE 2011 R32

55 NEUTRAL BLOCK SPLIT SCREEN HEATSHRINK G.L. CABLE TO BE STRIPPED BACK 300mm PVC POULTICE AREA (GLOVE) XLPE NOTES: 1. MINI PILLAR ENCLOSED WORKING END, LID OF PILLAR TO BE PAINTED WHITE MINI PILLAR XLPE WORKING END B JUNE 2011 R33

56 ACTIVE NEUTRAL R W B N HEATSHRINK GL TAPE SEE R29 1 PHASE CUSTOMER N ACTIVE 240V OUT 1 PHASE CUSTOMER ACTIVE N PROPERTY BLACK HEATSHRINK OVER BLUE PHASE ROAD EARTH ROD R W B N 240V IN 240V 1 PHASE SUPPLY ARRANGEMENT NOTES: 1. MAXIMUM CABLE SIZE 35mm SPUDS MINI PILLAR 240V SUPPLY FROM R29 ARRANGEMENT B JUNE 2011 R35

57 REMOVE MCB AND FIT LINK BETWEEN TERMINALS 6 & 7 NOTE 2 SURGE BATTERY ARRESTOR MCB LIVE NEUTRAL FIXING POINTS TO BE LOOSENED TO ALLOW SUPPLY CABLE TO BE RUN BEHIND THE EQUIPMENT PANEL SURGE ARRESTOR 240V AC SUPPLY L N A E E N E A N A E E EARTH N E EARTH STUD MODULAR DIN RAIL MOUNT SURGE ARRESTOR RADIO MODEM 2C+E 2.5sqmm PVC 240V LV MAINS SUPPLY CABLE PATCH LEAD RADIO MODEM TO BE FITTED USING NAMEPLATE FIXING PATCH LEAD P1 P2 EQUIPMENT ANTENNA EARTH CONTROL CABLE "O" RING CORRUGATED CONDUIT RETAINING NUT GLAND 240V SUPPLY LV MAINS SUPPLY CABLE COAXIAL CABLE 20mm LV MAINS ENTRY M10 EARTH STUD CONDUIT 16mm SPARE E REAR 20mm LV MAINS ENTRY ANTENNA SURGE ARRESTOR INSTALLATION DETAIL CONTROL CABLE ENTRY (TO SWITCHGEAR) NOTES: 1. FOR DOUBLE SKIN OR PAINTED ENCLOSURES AN EARTH LEAD IS REQUIRED FOR THE SURGE ARRESTOR. DRILL OUT CORNER 2. REFER TO DISTRIBUTION COMMISSIONING TEST SHEETOF VERMIN PROOFING - POLE MOUNTED RECLOSER/ISOLATOR FOR ARRESTOR TOP VIEW FRONT REVISION DATE D MARCH 14 NULEC N-SERIES RECLOSER CONTROL BOX CONNECTION DETAIL R36

58 2/09/ :30:38 AM H:\00 - Temp - 00\HP\AB\R37_B.dgn GIS mleroux

59 20W SOLAR PANEL BATTERY SOLAR CONTROLLER - + NOTE 4 & 5 MODEM NOTE 1 NOTE TRANSFORMER BATTERY SPACE NOTE 2 TX up CONTROLLED CHARGER RADIO MODEM (IC) SOLAR CONTROLLER SUNSAVER-6 12 VOLTS 6.5A SOLAR 6.0A LOAD LOAD CHARGING DISCONNECT PHOTOVOLTAIC CONTROLLER TEMP. SENSE 4 SOLAR BATTERY LOAD REMOVE 3 SEALED JUMPER OR WIRE FOR FLOODED FLOODED SELECT BATTERY ENCLOSURE (TOP VIEW) MORNINGSTAR RADIO MODEM RTU NOTE 7 NOTE 6 BATTERY NOTES: 1. REMOVE BATTERY AND TAILS. (ALLOW FOR RETERMINATING) 2. REMOVE TRANSFORMER CONNECTION. 3. PROVIDE LOOP AT BATTERY AND SOLAR TERMINALS. 4. SOLAR PANEL MAY BE PROVIDED WITH FLEXIBLE CABLE TAIL. 5. FOR 2 x 10W SOLAR PANELS REQUIRED AT SOLAR PANEL OR REGULATOR. 6. DO NOT USE LOAD TERMINALS FOR CONTROLLERS WITH LOAD DISCONNECT. 7. LINK REQUIRED FOR SEALED LEAD ACID BATTERY. 8. CONSTRUCTION USING 2 x 7Ah BATTERIES REQUIRES LARGER VERSION OF ENCLOSURE REVISION DATE B JUNE 2011 OVERHEAD FAULT INDICATOR SOLAR CONNECTION R38

60 STAINLESS STEEL TAG 80 x 20 x 0.5 USE SCREEN WIRE TO FIX TAG TO CABLE ADJACENT THE JOINT/TERMINATION X X X X X X M M Y Y PAY OR CONTRACTOR NUMBER DATE OF INSTALLATION (MONTH, YEAR) eg NOTES: 1. INSTALLER TO MARK TAG AS DETAILED WITH SUITABLE PUNCH SET 2. ONE TAG IS REQUIRED WHERE A 3 PHASE SET IS INSTALLED INSTALLER IDENTIFICATION TAG B JUNE 2011 R39

61 REMOVAL TOOL FRONT VIEW BACK VIEW STOCK CODE CR0327 DANGER LABEL DANGER DANGER UNDERGROUND UNDERGROUND ELECTRICAL ELECTRICAL CABLES IN CABLES IN THE VICINITY THE VICINITY DIAL 1100 BEFORE YOU DIG DIAL 1100 BEFORE YOU DIG 1000 CABLES IN VICINITY 1200 EQUIPMENT PROTECTION 1600 INSTALLATION TOOL STOCK CODE CR 0328 NOTES: 1. REMOVAL TOOL TO BE ORDERED FROM SUPPLIER AS NEEDED REVISION DATE B JUNE 2011 INSTALLATION OF ABOVE GROUND CABLE MARKER R40

62 170 METER BOARD NUT BOLT FLAT WASHER 212 PAINT TO BE REMOVED AROUND FIXING POINT STAR WASHER BOLT 2 FLAT WASHERS 2 NUTS SEE NOTES 1, 2, 3 & 4 97 SPLAYED CRIMP LUG SEE NOTE 4 METER COVER ELECTROCARD METER EMERGENCY SETTINGS CREDIT DISPLAY INSERT CARD STRIPE ON TOP SERIAL NUMBER METER NOTES: 1. BOND EARTH WIRE TO BE SAME AS INCOMING SUPPLY NEUTRAL. 2. ALL METER GUARDS ARE TO BE BONDED TO CONSUMERS METAL ENCLOSURE EARTHING POINT OR M.E.N. 3. EARTH WIRE TO BE FITTED BY LICENSED ELECTRICIAN 4. SPLAYED LUG TO BE SECURED TO EARTH COVER ON REAR OF METER BOARD WITH 6 DIAMETER x 20 LG GHH BOLT, 1 STAR WASHER, 2 FLAT WASHERS & 2 NUTS AS SHOWN. REMAINING FIXINGS TO BE DONE WITH 6 DIAMETER x 20 LG GHH BOLT, FLAT WASHER AND NUT AS SHOWN. STOCK No. JW0152 (COVER) REVISION DATE C MARCH 14 EARTH BONDING OF METER GUARD R42

63 DANGER!! EQUIPMENT IS OPERATIONAL TREAT AS ENERGISED LABEL SPECIFICATIONS ALUMINIUM, SELF ADHESIVE, WEATHERPROOF. DIMENSIONS : 100mm (WIDTH) x 80mm (DEPTH). "DANGER" TO APPEAR IN RED, OTHER TEXT IN BLACK. MOUNTED IN PROMINENT POSITION ON EQUIPMENT E.G. SIDE OF MINI AND UNIVERSAL PILLAR OR FRONT DOOR OF SUBSTATION. OTHER TAGS AVAILABLE: - DANGER : OTHER END NOT TERMINATED - DO NOT ENERGISE SAMPLE OPERATIONAL LABEL A 21/08/15 R50

64 CABLE ROADW AY ROADW AY 1.0m MIN PAST KERB 1.0m MIN PAST KERB PROPERTY BOUNDARY LINE KERB LINE CABLE UNDERGROUND POWER ALIGNMENT UNDERGROUND POWER ALIGNMENT CONDUIT INSTALLATION REQUIREMENTS FOR HV & LV CABLES PROTECT CABLES BETWEEN EDGE OF ALIGNMENT AND END OF CONDUIT WITH PROTECTION SLABS CABLE ROADW AY ROADW AY PROPERTY BOUNDARY LINE KERB LINE CABLE UNDERGROUND POWER ALIGNMENT UNDERGROUND POWER ALIGNMENT CONDUIT INSTALLATION REQUIREMENTS FOR SERVICE & STREET LIGHT CABLES CONDUIT SHALL BE INSTALLED TO EDGE OF CABLE ALIGNMENT NOTES: 1. REFER TO HORIZON POWER UNDERGROUND CABLE INSTALLATION MANUAL FOR SPECIFIC REQUIREMENTS. PLACEMENT OF DUCT BENEATH ROAD CROSSINGS A 21/08/15 R51

65 500 HORIZON POWER 0-500mm ALIGNMENT ROADWAY PROPERTY BOUNDARY DUCT ROADWAY ROADWAY EDGE OF CARRIAGEWAY PROPERTY BOUNDARY ROADWAY HORIZON POWER 0-500mm ALIGNMENT NOTE: 500 THE DUCT SHALL BE INSTALLED FROM EDGE TO EDGE OF THE CABLE ALIGNMENT. REVISION DATE A 21/08/15 CABLE AND DUCT PLACEMENTS ON TRUNCATIONS R52

66 EASEMENT 500 MARKER TAPE 1000 T (NOTES 3 & 4) (NOTES 3 & 4) T 2 x 100 DUCTS (INDICATIVE) NOTES: WHERE DUCT IS HEAVY DUTY AND MEETS THE RQUIREMENT OF CATEGORY A (AS DEFINED BY AS/NZS 3000 WIRING RULES), CONCRETE ENCASEMENT IS NOT REQUIRED. CONDUITS SHALL BE CENTRED IN EASEMENT. ENCASEMENT THICKNESS "T" SHALL BE AT LEAST 75mm OR 75% OF THE LARGEST CONDUIT NOMINAL DIAMETER, WHICHEVER IS GREATER. ENCASEMENT THICKNESS "T" SHALL BE AT MOST 150mm OR 200% OF THE LARGEST CONDUIT NOMINAL DIAMETER, WHICHEVER IS SMALLER. REVISION DATE A 21/08/15 CROSS SECTION DETAILS OF CABLE EASEMENT R53

67 ROADWAY LOT CABLE PUBLIC OPEN SPACE DUCT WHERE CABLE CROSSES OPEN DRAINS OPEN DRAIN PUBLIC OPEN SPACE ROADWAY LOT UNDERGROUND POWER ALIGNMENT (NOTES 4 & 5) T (NOTES 4 & 5) T DUCT CONCRETE ENCASEMENT DETAIL NOTES: DUCTS SHALL BE CONCRETE ENCASED AND HAVE A MINIMUM COVER OF 850mm BELOW THE BOTTOM OF WATER COURSE OR OPEN DRAIN. DUCTS SHALL EXTEND TO THE PROPERTY BOUNDARY EITHER SIDE OF THE WATER COURSE OR OPEN DRAIN. WHERE DIRECTIONAL DRILLING IS USED, CONCRETE ENCASEMENT IS NOT REQUIRED, DEPTH SHALL BE BETWEEN 900mm AND 1500mm AND DUCTS SHALL EXTEND 1500mm BEYOND EXTENT OF WATER COURSE EACH SIDE. ENCASEMENT THICKNESS "T" SHALL BE AT LEAST 75mm OR 75% OF THE LARGEST CONDUIT NOMINAL DIAMETER, WHICHEVER IS GREATER. ENCASEMENT THICKNESS "T" SHALL BE AT MOST 150mm OR 200% OF THE LARGEST CONDUIT NOMINAL DIAMETER, WHICHEVER IS SMALLER. REVISION DATE A 21/08/15 PLACEMENT OF DUCT BENEATH OPEN DRAIN R54

68 500 PROPERTY BOUNDARY ROAD RESERVE 425 CABLE TRENCH 850 MARKER TAPE LEVEL HV CABLE (TRANSFORMER) 150 BEDDING LV CABLE 35mm OR 50mm HV CABLE (TRANSFORMER) NOTES: LV CABLES SHALL BE ON THE TOP LAYER WITH THIS LAYER CONSISTING OF A MAXIMUM OF 5 LV CABLES. LV CABLE JOINTS ARE APPROXIMATELY 170mm. LV CABLE JOINTS SHALL BE INSTALLED ABOVE OTHER LV CABLES. LV CABLE JOINTS SHALL BE INSTALLED AT STAGGERED LOCATIONS. LAYOUT OF HV CABLES SHALL START FROM THE ROAD SIDE OF THE TRENCH. THE MINIMUM DEPTH OF COVER OF CABLES SHALL BE 850mm. THE DEPTH OF COVER OF CABLES IN A NOMINAL CABLE ALIGNMENT SHALL BE INCREASED AS REQUIRED SO THAT THE CABLE JOINTS ALSO HAVE THE NECESSAR DEPTH OF COVER. REVISION DATE A 24/08/15 CABLE TRENCH LAYOUT GREEN FIELD SITE TWO LAYERS (1 Tx AND 5 LV CABLES) R55

69 500 PROPERTY BOUNDARY ROAD RESERVE 425 CABLE TRENCH 850 MARKER TAPE LEVEL 25 TRANSFORMER AND LV CABLES INCLUDING STREET LIGHT AND SERVICE CABLES HV CABLE (FEEDER) 150 BEDDING LV CABLE 35mm OR 50mm HV CABLE (TRANSFORMER) HV CABLE (FEEDER) NOTES: LV CABLES SHALL BE ON THE TOP LAYER WITH THIS LAYER CONSISTING OF NO MORE THAN 2 LV CABLES AND 1 X 35mm HV CABLE. LV CABLE JOINTS ARE APPROXIMATELY 170mm. LV CABLE JOINTS SHALL BE INSTALLED ABOVE OTHER LV CABLES. LV CABLE JOINTS SHALL BE INSTALLED AT STAGGERED LOCATIONS. LAYOUT OF HV CABLES SHALL START FROM THE ROAD SIDE OF THE TRENCH. THE MINIMUM DEPTH OF COVER OF CABLES SHALL BE 850mm. THE DEPTH OF COVER OF CABLES IN A NOMINAL CABLE ALIGNMENT SHALL BE INCREASED AS REQUIRED SO THAT THE CABLE JOINTS ALSO HAVE THE NECESSAR DEPTH OF COVER. REVISION DATE A 24/08/15 CABLE TRENCH LAYOUT GREEN FIELD SITE TWO LAYERS (1 HV FEEDER, 1 Tx & LV CABLES) R56

70 500 PROPERTY BOUNDARY ROAD RESERVE 425 CABLE TRENCH 850 MARKER TAPE LEVEL 25 LV CABLES INCLUDING STREET LIGHT AND SERVICE CABLES HV FEEDER CABLE AND TRANSFORMER CABLE BEDDING LV CABLE 35mm OR 50mm HV CABLE (TRANSFORMER) HV CABLE (FEEDER) NOTES: LV CABLES SHALL BE ON THE TOP LAYER WITH THIS LAYER CONSISTING OF NO MORE THAN 2 LV CABLES. LV CABLE JOINTS ARE APPROXIMATELY 170mm. LAYOUT OF THE HV CABLES SHALL START FROM THE ROAD SIDE OF THE TRENCH. IF THE 35mm HV CABLE IS NOT ON THE BOTTOM LAYER IT SHALL BE NEAREST TO THE ROADSIDE. THE MINIMUM DEPTH OF COVER OF CABLES SHALL BE 850mm. THE DEPTH OF COVER OF CABLES IN A NOMINAL CABLE ALIGNMENT SHALL BE INCREASED AS REQUIRED SO THAT THE CABLE JOINTS ALSO HAVE THE NECESSAR DEPTH OF COVER. REVISION DATE A 24/08/15 CABLE TRENCH LAYOUT GREEN FIELD SITE TWO LAYERS (1 HV FEEDER, 1 Tx & 2 LV CABLES) R57

71 500 PROPERTY BOUNDARY ROAD RESERVE 425 CABLE TRENCH 850 MARKER TAPE LEVEL 25 TRANSFORMER AND LV CABLES INCLUDING STREET LIGHT AND SERVICE CABLES BEDDING LV CABLE 35mm OR 50mm HV CABLE (TRANSFORMER) NOTES: FOR A ONE LAYER CABLE TRENCH NO MORE THAN 4 X 185mm OR 3 X 240mm LV CABLES AND 1 X 35mm HV CABLE CAN BE INSTALLED. LV CABLE JOINTS ARE APPROXIMATELY 170mm. LV CABLE JOINTS SHALL BE INSTALLED ABOVE OTHER LV CABLES. LV CABLE JOINTS SHALL BE INSTALLED AT STAGGERED LOCATIONS. LAYOUT OF HV CABLES SHALL START FROM THE ROAD SIDE OF THE TRENCH. THE MINIMUM DEPTH OF COVER OF CABLES SHALL BE 850mm. THE DEPTH OF COVER OF CABLES IN A NOMINAL CABLE ALIGNMENT SHALL BE INCREASED AS REQUIRED SO THAT THE CABLE JOINTS ALSO HAVE THE NECESSAR DEPTH OF COVER. CABLE TRENCH LAYOUT GREEN FIELD SITE ONE LAYER (1 Tx AND 3 LV CABLES) A 24/08/15 R58

72 500 PROPERTY BOUNDARY ROAD RESERVE 425 CABLE TRENCH 850 MARKER TAPE LEVEL HV FEEDER AND LV CABLES INCLUDING STREET LIGHT AND SERVICE CABLES BEDDING LV CABLE HV CABLE (FEEDER) NOTES: LV CABLE JOINTS ARE APPROXIMATELY 170mm. LV CABLE JOINTS SHALL BE INSTALLED ABOVE OTHER LV CABLES. LV CABLE JOINTS SHALL BE INSTALLED AT STAGGERED LOCATIONS. LAYOUT OF HV CABLES SHALL START FROM THE ROAD SIDE OF THE TRENCH. THE MINIMUM DEPTH OF COVER OF CABLES SHALL BE 850mm. THE DEPTH OF COVER OF CABLES IN A NOMINAL CABLE ALIGNMENT SHALL BE INCREASED AS REQUIRED SO THAT THE CABLE JOINTS ALSO HAVE THE NECESSAR DEPTH OF COVER. REVISION DATE A 24/08/15 CABLE TRENCH LAYOUT GREEN FIELD SITE ONE LAYER (1 HV FEEDER AND LV CABLES) R59

URD Mini Pillar Installation Guide. UDS Universal Pillar Installation Guide. Cable to LV Isolators, Crossarm and Cable Detail

URD Mini Pillar Installation Guide. UDS Universal Pillar Installation Guide. Cable to LV Isolators, Crossarm and Cable Detail Part 5 LV Underground Drawing Register Number U8 U9 Description URD Mini Pillar Installation Guide UDS Universal Pillar Installation Guide U10-1 UDS Universal Pillar Double Link Unit Drilling Detail U10-2

More information

Item Code Description Unit Qty Total

Item Code Description Unit Qty Total UNDP ELECTRICITY SECTOR NORTHERN GOVERNORATES Phase XI Item Code Description Unit Qty Total 04-02-00001 Service Pole - 6m, 75mm dia GS Pipe 11250 04-02-00002 9m Tubular Steel Poles complete with all Accessories

More information

LIST OF EDD DESCRIPTION/ SPECIFICATION AS 19 TH OCTOBER 2016

LIST OF EDD DESCRIPTION/ SPECIFICATION AS 19 TH OCTOBER 2016 No Description/ Specification Amendment 1 EDD 1 :2008 11/0.415 kv Distribution Transformer, Oil Filled - 2 ED 2 :1987 The Galvanization of Iron and Steel, Articles Other Than Steel Wire - 3 ED 3 :1979

More information

Max value Max life Range from. ($000) (Years) Pole Type

Max value Max life Range from. ($000) (Years) Pole Type Draft Handbook Vector Asset Description 1 Unit Maximum Maximum Life Max value Max life Max Asset Life Max Asset Life Range from Submitters Max Asset Life ($000) SUBTRANSMISSION Concrete Wood Concrete Wood

More information

PROPOSED COST SCHEDULE OF MATERIALS FOR CONSUMER JOB AND OTHER JOBS

PROPOSED COST SCHEDULE OF MATERIALS FOR CONSUMER JOB AND OTHER JOBS PROPOSED COST SCHEDULE OF MATERIALS FOR CONSUMER JOB AND OTHER JOBS Sl. 1 260200003A STEEL TUBULAR POLE SWAGED 11 MTR. LONG WITH BASE 7651.62 8034.20 8435.91 PLATE & CAP (IS2713/1980) BTM: 165.1X4.5MM-5.6MTR,

More information

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes Engineering Service Specifications Commercial Single-Phase Current Transformer Metering Schemes Specifications for Commercial Underground Current Transformer Metering Requirements for a Single-Phase Customer

More information

List of materials for 1Km. Of L.T line 1-Ph., 2-Wire AB cable (1 X 25+1X16) sq.mm using 8M X 200 KG. PSC Pole

List of materials for 1Km. Of L.T line 1-Ph., 2-Wire AB cable (1 X 25+1X16) sq.mm using 8M X 200 KG. PSC Pole List of materials for 1Km. Of L.T line 1-Ph., 2-Wire AB cable (1 X 25+1X16) sq.mm using 8M X 200 KG. PSC Pole 1 L.T Stay set Complete Set 5 2 7/12 GI stay wire kg 50 3 Concreting of stay NO 5 4 Stay clamp

More information

3.1 Overview of ATCO Electric s URD System Design

3.1 Overview of ATCO Electric s URD System Design Page: 3-1 3.0 URD DESIGN GUIDELINES 3.1 Overview of ATCO Electric s URD System Design The power supply to all single lot underground residential services is through front lot service. Single phase transformers

More information

AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED PART B-07 TITLE: SERVICE CONNECTIONS SPECIFICTION NO: B-07 INCEPTION DATE: AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) AMENDMENTS / REVISIONS DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

More information

INDIAN INSTITUTE OF TECHNOLOGY KANPUR

INDIAN INSTITUTE OF TECHNOLOGY KANPUR INDIAN INSTITUTE OF TECHNOLOGY KANPUR Tender Notice No. 40/Elect./2018 SCHEDULE OF QUANTITY Name of Work: Electrical work for the Clean Room at NCFlexE IIT Kanpur. Name of the Contractor S. No Description

More information

Urgent Support to the Agriculture and Electricity Sector in the Gaza Strip

Urgent Support to the Agriculture and Electricity Sector in the Gaza Strip Project Number: PAL -10-00063805 Project Name: Urgent Support to the Agriculture and Electricity Sector in the Gaza Strip Bill of Quantities Package # 2 LOT 2: Supply of Electrical Materials The contract

More information

ABC Earthing Kits. ABC Earthing Kit. ABC/Bare Wire LV Earthing System H01

ABC Earthing Kits. ABC Earthing Kit. ABC/Bare Wire LV Earthing System H01 SECTION H EARTHING ABC Earthing Kits H01 ABC Earthing Kit 4 legged ABC earth kit. Each leg of the earth truss terminates with a female bayonet type pipe connector with a protective rubber hand guard. These

More information

UNDERGROUND SERVICES - SECONDARY

UNDERGROUND SERVICES - SECONDARY UNDERGROUND SERVICES - SECONDARY Contents - Underground Services... U-1 General Requirements for Underground Service...U-2 Names of Parts for Underground Service... U-3 Service Termination in a Service

More information

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE 4. METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE 4.-4 4. SELF-CONTAINED METERING, SINGE-PHASE INSTALLATION DETAILS /4 VOLT SINGLE-PHASE UNDERGROUND RESIDENTIAL SERVICE AND METER

More information

SCHEDULE OF QUANTITY

SCHEDULE OF QUANTITY SCHEDULE OF QUANTITY ELECTRICAL WORKS PM PALEM BRANCH, VISAKHAPATNAM SL NO. DESCRIPTION OF ITEM / WORK UNIT Qty RATE AMOUNT PART - A : ELECTRICAL WORKS 1 Energy Meter Cubicle : 2 Emergency Off Box (Red

More information

PART NUMBER POLE DIAMETER RANGE CARTON QTY " to 5" " to 6 3 4" " to 7 3 4" " to 8 3 4" 10

PART NUMBER POLE DIAMETER RANGE CARTON QTY  to 5  to 6 3 4  to 7 3 4  to 8 3 4 10 PH1 Offset Pole Band Bands Single Double Offset Pole Bands are used for dead-ending, guying, and mounting secondary racks on metal poles, pipe masts, or conduit. Each Pole Band Assembly contains two 1

More information

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS November 17, 2016 Engineering Service Specifications Table of Contents Commercial Service Requirements SLEMCO Commercial

More information

Total Cost Abstract. Project Name : - RDPL, Jaipur. Grand Total

Total Cost Abstract. Project Name : - RDPL, Jaipur. Grand Total Project Name : - RDPL, Jaipur Total Cost Abstract S. No. Description Amount 1 Metering & Distribution Boxes 2 Earthing 3 Point Wiring & Fixtures 4 Data & Voice Grand Total Project Name : - RDPL, Jaipur

More information

INDIAN INSTITUTE OF TECHNOLOGY KANPUR

INDIAN INSTITUTE OF TECHNOLOGY KANPUR INDIAN INSTITUTE OF TECHNOLOGY KANPUR Tender tice. 21/Elect./2018 SCHEDULE OF QUANTITY Name of Work: Construction of second floor above central block at ACES building (SH: Electrical works). Name of the

More information

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES INFORMATION BULLETIN / PUBLIC - ELECTRICAL CODE REFERENCE NO.: LAMC 93.0230 Effective: 3-24-69 DOCUMENT NO. P/EC 2002-006 Revised: 11-17-00 Previously Issued As: RGA #7-69 TEMPORARY ELECTRIC WIRING FOR

More information

For Conduit Inspections

For Conduit Inspections Underground Conduit Standards - Table of Content 5/8/2017 Section S22 Underground Conduit Standard Index: Description: 00 Table of Content 01 General Notes 02 Definition of Terms 03 Primary Riser Conduit

More information

Tender Schedule for Electrical Works at Varagani Branch. Sl. No. Particulars Quantity Unit Rate Amount

Tender Schedule for Electrical Works at Varagani Branch. Sl. No. Particulars Quantity Unit Rate Amount Tender Schedule for Electrical Works at Varagani Branch Sl. No. 1 Particulars Quantity Unit Rate Amount SITC of following rated Indoor operated wall/floor mounted, cubicle type MV cum APFC Panel suitable

More information

DISTRIBUTION DESIGN CATALOGUE

DISTRIBUTION DESIGN CATALOGUE DISTRIBUTION DESIGN CATALOGUE Section 16 UM Unmetered Supply HPC-1DC-07-0016-2014 For application to Horizon Power Electricity Distribution Networks Document Control Author Name: Paul Savig Position: Senior

More information

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE SOURCE 20V 240V STUD (PER NEC) A customer supplied and installed teaser wire is required from the neutral lug to a 5th terminal mounted on the left side of the meter block between the line and load terminals.

More information

DISTRIBUTION DESIGN CATALOGUE

DISTRIBUTION DESIGN CATALOGUE DISTRIBUTION DESIGN CATALOGUE Section 06 ST Stays HPC-1DC-07-0006-2014 For application to Horizon Power Electricity Distribution Networks Document Control Author Name: Paul Savig Position: Senior Standards

More information

ELECTRICIANS REGULATIONS EXAMINATION 23 November 2013 QUESTION AND ANSWER BOOKLET

ELECTRICIANS REGULATIONS EXAMINATION 23 November 2013 QUESTION AND ANSWER BOOKLET ER54 Candidate Code No. For Board Use Only Result Date Result Date Int ELECTRICIANS REGULATIONS EXAMINATION 23 November 2013 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours INSTRUCTIONS READ CAREFULLY

More information

and Original Series Pickup Lift Mounting Instructions Fullsize Nissan Titan Trucks present T-420 BOLT-ON GUSSET PART#5257

and Original Series Pickup Lift Mounting Instructions Fullsize Nissan Titan Trucks present T-420 BOLT-ON GUSSET PART#5257 and Original Series Pickup Lift Mounting Instructions Fullsize Nissan Titan Trucks- 2004-present Preparing the Gate 1. Remove the mounting hardware which is banded to the liftgate. 2. Verify mounting bracket

More information

and Original Series Pickup Lift Mounting Instructions Fleetside Chevy & GMC Trucks Fleetside 4-door Chevy & GMC Trucks T-100

and Original Series Pickup Lift Mounting Instructions Fleetside Chevy & GMC Trucks Fleetside 4-door Chevy & GMC Trucks T-100 r ve and Original Series Pickup Lift Mounting Instructions Fleetside Chevy & GMC Trucks - 1960-1987 Fleetside 4-door Chevy & GMC Trucks - 1988-1991 Preparing the Gate 1. Remove the mounting hardware which

More information

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP)

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title High Voltage and 1500 System Earthing References and Definitions Reference Number PDS 02 (RIC Standard: EP 12 00 00 01 SP) Document Control

More information

Name of work : Electrification of PG Block Second Floor in V.P.S.V Ayurveda college Kottakkal.

Name of work : Electrification of PG Block Second Floor in V.P.S.V Ayurveda college Kottakkal. Name of work : Electrification of PG Block Second Floor in V.P.S.V Ayurveda college Kottakkal. TENDER SCHEDULE -1-1 2 3 4 5 6 7 1 208 Point Wiring for light point/ fan point/ exhaust fan point/ call bell

More information

AMENDMENT ELECTRIC SERVICE MANUAL 2014

AMENDMENT ELECTRIC SERVICE MANUAL 2014 AMENDMENT (Pages 20,43,50,72,74,,76,78,83,86,99) ELECTRIC SERVICE MANUAL 2014 Effective April 1, 2015 18-7 6.0 SERVICE AND SERVICE ENTRANCES (General), Continued Conductor Sizing It is recommended that

More information

NPS/003/010 - Technical Specification for 400V Assemblies (LVAC Boards) utilised in Major Substations

NPS/003/010 - Technical Specification for 400V Assemblies (LVAC Boards) utilised in Major Substations Version:- 3.0 Date of Issue:- Dec 2013 Page 1 of 13 NPS/003/010 - Technical Specification for 400V Assemblies (LVAC Boards) utilised in Major Substations 1. Purpose This document is the technical specification

More information

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS Originated 1/85 Revised 6/95 Revised 6/02 Revised 11/05 Revised 4/08 Revised 11/09 Revised 1/12 Revised 11/12 Revised

More information

TGK Prefabricated Substation Technical Data

TGK Prefabricated Substation Technical Data TGK Prefabricated Substation Technical Data Ref Item Data 1 General Technical 1.1 Frequency (Hz) 50 1.2 Transformer Rating (kva) 315/750 1.3 Transformer Primary Voltage (kv) 11 1.4 Transformer Secondary

More information

MATERIAL FOR FIBRE OPTIC LINES. General C-bracket HSU trunnion type, forged, for aluminium based OPGW conductors...

MATERIAL FOR FIBRE OPTIC LINES. General C-bracket HSU trunnion type, forged, for aluminium based OPGW conductors... 153 Contents General.................................................................................................. 154 C-bracket.................................................................................................

More information

AUXILIARY BATTERY BOX INSTALLATION INSTRUCTIONS

AUXILIARY BATTERY BOX INSTALLATION INSTRUCTIONS AUXILIARY BATTERY BOX INSTALLATION INSTRUCTIONS The original TOMMY GATE hydraulic lift Assembling the Auxiliary Battery Box 1. Remove the cover from the auxiliary battery box by removing the two nuts and

More information

COMMERCIAL QUICK REFERENCE

COMMERCIAL QUICK REFERENCE COMMERCIAL QUICK REFERENCE PROVO CITY POWER STANDARDS ELECTRICAL ENGINEERING UPDATED: 2016 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTIFICATION. 18" MIN. OF TAIL. (NEUTRAL CONDUCTOR MUST BE WHITE OR

More information

Approved Meter Sockets and Cabinets

Approved Meter Sockets and Cabinets Single Unit Residential Guide 1 PHASE, 120/240 VOLT SERVICES SERVICE CAPACITY OWNED METERING (Metering sockets and cabinets are supplied by Customer). Outdoor meter mounting height is 1730 mm ( 5 8 ) to

More information

DISTRIBUTION DESIGN CATALOGUE

DISTRIBUTION DESIGN CATALOGUE DISTRIBUTION DESIGN CATALOGUE Section 12 SL Street Lighting HPC-1DC-07-0012-2014 For application to Horizon Power Electricity Distribution Networks Document Control Author Name: Paul Savig Position: Senior

More information

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

9. Non-Residential Services (Commercial, Industrial, and Agricultural) Section 9 2016 Electric Service Requirements, 3rd Edition Section 9 Non-Residential Services Directory Page 9.1 General Requirements 68 9.2 Direct-Connect Metering, Single Installations 69 9.3 Direct-Connect

More information

Construction and Wiring Guidelines for Ergon Energy Substation Panels

Construction and Wiring Guidelines for Ergon Energy Substation Panels Construction and Wiring Guidelines for Ergon Energy Substation Panels Table of Contents Purpose and Scope... 1 Responsibilities... 1 Definitions, Abbreviations and Acronyms... 1 References... 1 Panel Wiring...

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) (Corr.1 June 2018) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements

More information

Volume-III : Section-I 370 Technical Specifications

Volume-III : Section-I 370 Technical Specifications Volume-III : Section-I 370 TECHNICAL SPECIFICATION-PIERCING INSULATOR 5.1 Insulation Piercing Connectors (IPC) 5.1.1 Insulation Piercing Connectors (IPC) are used for making Tee/Tap-off/Service connectors

More information

NEC 2011 Code Changes

NEC 2011 Code Changes NEC 2011 Code Changes Articles 280.21-300.50 CHANGES FROM 2008 TO 2011 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 280 Surge Arresters, Over 1kV III. Connecting Surge Arresters 280.21 Connection

More information

(K),(M)430TB/G Up to 36 kv

(K),(M)430TB/G Up to 36 kv IS90722-ENG - 430TB/G-45 25 June 2009 - Revision 8A - Supersedes edition of 25 November 2008 Page 1 of 10 CAUTION : Read instructions thoroughly and completely prior to beginning installation. Installation

More information

SPECIFICATIONS FOR COMMERCIAL CONSTRUCTION

SPECIFICATIONS FOR COMMERCIAL CONSTRUCTION Roseville Electric SPECIFICATIONS FOR COMMERCIAL CONSTRUCTION REVISED 06/28/18 Commercial Construction Specifications Revision List REVISION Date Page No. Description 03/01/00 4.2-4.3 Changed leveling

More information

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS Network(s): Summary: ENGINEERING CONSTRUCTION STANDARD ECS 03-0054 CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS EPN, LPN, SPN This standard details the procedures to be undertaken

More information

Raychem CSJA Safety Instructions. Safety Instructions. Customer Service. Kit Contents. Installation Instructions

Raychem CSJA Safety Instructions. Safety Instructions. Customer Service. Kit Contents. Installation Instructions Raychem CSJA 1521 Cold-Shrinkable Splice for single core polymeric insulated (XLPE-EPR) cables up to 15kV for tape, wire, Unishield, LC shield, JCN, and flat strap neutral cable UniShield is a trademark

More information

ELECTRICIANS REGULATIONS EXAMINATION 25 June 2011

ELECTRICIANS REGULATIONS EXAMINATION 25 June 2011 ER42 Candidate Code No. For Board Use Only Result Date Result Date Int ELECTRICIANS REGULATIONS EXAMINATION 25 June 2011 Int QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three

More information

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service. UNDERGROUND SERVCE tems to consider f your trenching route has to be dug by hand, or if a cable must be installed under a paved surface, additional charges apply. f your service cable has to be moved later

More information

ELECTRICAL ITEMS Cables : Specification: XLPE Insulated Power Cable All Cables Cables PVC Insulated Cables Fire Resistant Cables Aluminium Cables

ELECTRICAL ITEMS Cables : Specification: XLPE Insulated Power Cable All Cables Cables PVC Insulated Cables Fire Resistant Cables Aluminium Cables ELECTRICAL ITEMS Cables : Specification: XLPE Insulated Power Cable 0.6 / 1kV XLPE Insulated Unarmoured Cables 0.6 / 1kV XLPE Insulated Armoured Cables 1.8 / 3kV XLPE Insulated Armoured Cables 3.6 / 6kV

More information

Commercial & Industrial Substation Construction Handover Checklist

Commercial & Industrial Substation Construction Handover Checklist UNCONTROLLED 2310 COPY 11.11.2008 Page 1 of 2 Commercial & Industrial Substation Construction Handover Checklist Project Location Date Planner Substation Contact Underground Contact Site Contact Phone

More information

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated

More information

Tender Schedule. Sl. No. Particulars Quantity Unit Rate `

Tender Schedule. Sl. No. Particulars Quantity Unit Rate ` Tender Schedule Estimate for Electrical Works at Savalyapuram Branch(18901) Guntur(District). Sl. No. Particulars Quantity Unit Rate ` 1 Wiring for light point/ fan point/ exhaust fan point/ call bell

More information

Pretest Module 29 High Voltage Unit 1

Pretest Module 29 High Voltage Unit 1 Pretest Module 29 High Voltage Unit 1 1. Is a person qualified to work on high-voltage installations when this module is completed? 2. What is the code definition of high-voltage? 3. What is the IEEE definition

More information

ELECTRICAL INSPECTOR EXAMINATION 14 November 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours

ELECTRICAL INSPECTOR EXAMINATION 14 November 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours Candidate Code No. IT 32 For Board Use Only Result Date Int Result Date Int ELECTRICAL INSPECTOR EXAMINATION 14 November 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours INSTRUCTIONS READ CAREFULLY

More information

EARTH WIRE FITTINGS 08

EARTH WIRE FITTINGS 08 EARTH WIRE FITTINGS 08 8 EARTH WIRE FITTINGS 119 Contents General... 120 C-bracket... 123 Suspension clamp with bolt, with straps, for steel and copper conductors... 123 Suspension clamp with bolt, with

More information

BILL OF QUANTITY (BOQ) FOR ELECTRICAL WORKS BOGAPURAM BRANCH

BILL OF QUANTITY (BOQ) FOR ELECTRICAL WORKS BOGAPURAM BRANCH BILL OF QUANTITY (BOQ) FOR ELECTRICAL WORKS BOGAPURAM BRANCH SL NO. DESCRIPTION OF ITEM / WORK UNIT QTY PART - A : ELECTRICAL WORKS 1 1 Energy Meter Cubicle : a Fabrication, Supply, Installation, testing

More information

Electrical. Earthing & Bonding. Installation Techniques. Learning Notes MODULE 2.2 UNIT PHASE:2

Electrical. Earthing & Bonding. Installation Techniques. Learning Notes MODULE 2.2 UNIT PHASE:2 Electrical Learning Notes MODULE 2.2 UNIT 2.2.6 Installation Techniques Earthing & Bonding PHASE:2 Table of Contents INTRODUCTION... 3 DEFINITIONS... 4 EARTHING... 5 TYPES OF SYSTEM EARTHING... 10 EQUIPOTENTIAL

More information

S. K. Industrial Corporation

S. K. Industrial Corporation +91-8048763042 S. K. Industrial Corporation https://www.indiamart.com/skindlcorpn/ We are an ISO 9001 : 2008 certified company. We are manufacturing, exporting and supplying HT and LT transmission line,

More information

A. Three-phase, oil filled self-cooled, padmounted transformers are installed outdoors on pads in the EWEB distribution system.

A. Three-phase, oil filled self-cooled, padmounted transformers are installed outdoors on pads in the EWEB distribution system. 1. APPLICATION A. Three-phase, oil filled self-cooled, padmounted transformers are installed outdoors on pads in the EWEB distribution system. 2. REFERENCE STANDARDS A. The transformers supplied shall

More information

Energy Australia Chamber Substation indoor switchgear. installation,operation and maintenance instructions version 1.

Energy Australia Chamber Substation indoor switchgear. installation,operation and maintenance instructions version 1. Energy Australia Chamber Substation indoor switchgear installation,operation and maintenance instructions version 1.6 / February 2009 1 Details of revision Version Comment Date 1.0 First Draft Issue May

More information

Earthing UNIT. Learning Objectives. Introduction. To understand purpose of Earthing. To learn system of earthing.

Earthing UNIT. Learning Objectives. Introduction. To understand purpose of Earthing. To learn system of earthing. 274 Electrical Technician UNIT 10 Earthing Learning Objectives To understand purpose of Earthing. To learn system of earthing. Introduction The very purpose of earthing is to safe against dangers of shock

More information

KRONE KGH Series Fuse-Switch-Disconnectors. For Low Voltage ABC Systems or Open-wire Overhead Networks

KRONE KGH Series Fuse-Switch-Disconnectors. For Low Voltage ABC Systems or Open-wire Overhead Networks KRONE KGH Series Fuse-Switch-Disconnectors For Low Voltage ABC Systems or Open-wire Overhead Networks Putting the Power in Your Hands... The KRONE KGH Range The KRONE type KGH Fuse-Switch- Disconnectors

More information

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers Supersedes IL 33-858-4 Dated 05/02 Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers Digitrip Retrofit System for ITE K-3000, Digitrip Retrofit System for ITE K-3000, K-3000

More information

STANDARD SPECIFICATION FOR. LIGHTING AND DC DISTRIBUTION PANELS WITH MCBs DOCUMENT NO: 44LK-5100/E.02/011

STANDARD SPECIFICATION FOR. LIGHTING AND DC DISTRIBUTION PANELS WITH MCBs DOCUMENT NO: 44LK-5100/E.02/011 Page 1 of 6 STANDARD SPECIFICATION FOR LIGHTING AND DC DISTRIBUTION PANELS WITH MCBs Rev No. Issue Date Pages Rev Description Prepared By Checked By Approved By 0 15.07.2008 6 Issued for FEED MSJ VDV VDV

More information

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions WARNING HIGH VOLTAGE 115V 4 M AP Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions Important: For your protection and the safety of the

More information

P Original Series Cargo Van Lift Mounting Instructions Fullsize Ford Van present. Preparing the Gate

P Original Series Cargo Van Lift Mounting Instructions Fullsize Ford Van present. Preparing the Gate Fullsize Ford Van- 1992-present Preparing the Gate 1. Remove the mounting hardware which is banded to the liftgate. 2. Verify mounting kit (Figure 1 and Table 1). S-400-40 STRAP VAN MOUNTING EAR BENT BRACKET

More information

56-SDMS-07 REV. 01 SPECIFICATIONS FOR

56-SDMS-07 REV. 01 SPECIFICATIONS FOR 56-SDMS-07 REV. 01 SPECIFICATIONS FOR UNIT SUBSTATIONS UP TO 36 kv ALUMINUM TRANSFORMER ALUMINUM BUS BARS LVDP This specification is property of SEC and subject to change or modification without any notice

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA TENDER FOR

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA TENDER FOR GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA - 390 007 TENDER FOR Design,Engineering, manufacturing, supply, erection, testing & commissioning of 66

More information

and Original Series Pickup Lift Mounting Instructions T-150-T T-150 PART#5177 T-150-T

and Original Series Pickup Lift Mounting Instructions T-150-T T-150 PART#5177 T-150-T Fullsize Chevy & GMC Trucks- 988-999 Toyota Tundra- 2000-2006 Toyota T-00-993-999 Preparing the Gate r ve and Original Series Pickup Lift Mounting Instructions. Remove the mounting hardware which is banded

More information

Electrical Awareness and Considerations

Electrical Awareness and Considerations Electrical Awareness and Considerations By David Taylor FIHE MIET IEng Objectives Awareness of specifications. Awareness of Distribution Network Operators (DNO) earthing arrangements. Awareness of basic

More information

Approved Contractor Construction e-guide Residential Commercial

Approved Contractor Construction e-guide Residential Commercial Approved Contractor Construction e-guide Residential Commercial Clark Public Utilities PO Box 8900 Vancouver, WA 98668 (PAGE 2) TABLE OF CONTENTS PAGE Trenching 3 Wire 8 Single-Phase Transformer Set 13

More information

Item L.1 Voltages 1. The consumer voltage must be between +10% and -10% of the nominal national voltage (nnv.)

Item L.1 Voltages 1. The consumer voltage must be between +10% and -10% of the nominal national voltage (nnv.) Village Hydro Specifications Line Distribution Description of Requirement Item L.1 Voltages 1. The consumer voltage must be between +10% and -10% of the nominal national voltage (nnv.) Recommendation 2.

More information

INTRODUCTION. The plug-in connection on the cables and lightning arrestors, allows for easy installation and replacement.

INTRODUCTION. The plug-in connection on the cables and lightning arrestors, allows for easy installation and replacement. INTRODUCTION The Power Systems 44 kv MiniSub TM is the most compact system at this voltage available. Utilizing a deadfront termination and lightning arrestor setup, it eliminates the line top or side

More information

ISSUE DATE JANUARY 1st, 2008 SECTION 5C 240V 1PHASE W/TCU AND VFD

ISSUE DATE JANUARY 1st, 2008 SECTION 5C 240V 1PHASE W/TCU AND VFD ISSUE DATE JANUARY 1st, 2008 SECTION 5C 240V 1PHASE W/TCU AND VFD CONTROL PANEL MOUNTING PAGE No. 74 NUMBER: LS-240V1PH-TCU-VFD 35 38 47 U A 9 33 V 26 24 25 41 43 7 7 44 ALUMINUM BACKPLATE 41 42 50 46

More information

LV MV HV SPECIALISTS. Cable Installation, Jointing, Substation & Electrical Equipment TOTAL SUPPLY ELECTRICAL POWER PRODUCTS

LV MV HV SPECIALISTS. Cable Installation, Jointing, Substation & Electrical Equipment TOTAL SUPPLY ELECTRICAL POWER PRODUCTS LV MV HV SPECIALISTS Cable Installation, Jointing, Substation & Electrical Equipment TOTAL SUPPLY ELECTRICAL POWER PRODUCTS 100,000+ PRODUCTS 100+ BRANDS International were established in 1985 and are

More information

ELECTRICIAN S REGULATIONS EXAMINATION 26 June 2010

ELECTRICIAN S REGULATIONS EXAMINATION 26 June 2010 Candidate Code No. Result Date Int For Board Use Only ER38 Version of AS/NZS 3000 used (tick ONE Box) 2000 2007 & Amend 1 ELECTRICIAN S REGULATIONS EXAMINATION 26 June 2010 QUESTION AND ANSWER BOOKLET

More information

CONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION

CONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION Page 1 of 11 R1 ****This Standard Supercedes CE Macros MPR1S, MUR1S, MPR3S & MUR3S and portions of BECo Standards CS2.7-1.1, CS2.7-1.5 & CS2.7-1.7**** PRIMARY URD RISER CONSTRUCTION TABLE OF CONTENTS Page

More information

SECTION 8 - SWITCHES AND PROTECTIVE DEVICES TABLE OF CONTENTS

SECTION 8 - SWITCHES AND PROTECTIVE DEVICES TABLE OF CONTENTS 08.00 GENERAL DISTRIBUTION SURGE ARRESTERS 08.00-0 CUTOUTS AND ARRESTERS GENERAL 08.00-03 08.0 CUTOUTS AND ARRESTERS METAL OXIDE ARRESTERS WITH POLYMER HOUSINGS 08.0-0 APPLICATION OF DIRECT CONNECTED ARRESTERS

More information

and Original Series Pickup Lift Mounting Instructions Fullsize Chevy & GMC Trucks: 1500 & 2500 LD HD & 3500HD BOLT-ON GUSSET

and Original Series Pickup Lift Mounting Instructions Fullsize Chevy & GMC Trucks: 1500 & 2500 LD HD & 3500HD BOLT-ON GUSSET r ve and Original Series Pickup Lift Mounting Instructions Fullsize Chevy & GMC Trucks: 1500 & 2500 LD 1999-2007 2500HD & 3500HD 2000-2007 Preparing the Gate 1. Remove the mounting hardware which is banded

More information

320A Single Phase URD Meter Loop Installations

320A Single Phase URD Meter Loop Installations 320A Single Phase URD Meter Loop Installations Location: The meter loop shall be mounted on the side of the pedestal facing the consumer's lot. (The side being one of the four flat surfaces of the pedestal

More information

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. UNDERGROUND SERVICE No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. Entrance cabinet must be directly through wall or directly under meter in basement.

More information

650 Series Cargo Van Lift Mounting Instructions Fullsize Ford 1992-Present

650 Series Cargo Van Lift Mounting Instructions Fullsize Ford 1992-Present TOMMY GATE OWNER'S / OPERATOR'S MANUAL 650 Series 650 LB Capacity 650 Series Cargo Van Lift Mounting Instructions Fullsize Ford 1992-Present Installing the Base Plate 1. Examine the interior and exterior

More information

Outdoor Power Transmission & Distribution

Outdoor Power Transmission & Distribution Description: The purpose of the section is to highlight the current applicable UMCP Design Standards and requirements for Outdoor Power Transmission and Distribution, including but not limited to the following:

More information

The Sika Solution x 600 x 700H / 900H. Class D. Roadway Installation Guidelines p 9-11

The Sika Solution x 600 x 700H / 900H. Class D. Roadway Installation Guidelines p 9-11 The Sika Solution Aluminium Jointing Chamber and Security Access Cover Set Package 1200 x 600 x 700H / 900H Class D Contents: Assembly Instructions p 2-8 Roadway Installation Guidelines p 9-11 Sika Technology

More information

Total Ex. Tax/VAT. (Rs.) (if any) in Rs. (Bought out/direct) length 587M 226M

Total Ex. Tax/VAT. (Rs.) (if any) in Rs. (Bought out/direct) length 587M 226M ORISSA POWER TRANSMISSION CORPORATION LIMITED Supply & Laying of 132 KV XLPE Double Circuit (4 cable per Circuit including one spare) underground 1000 Sq. mm annealed Copper XLPE EHV Cable with Associated

More information

Distribution Design Catalogue

Distribution Design Catalogue Distribution Design Catalogue Running Earth and Street Light Feed Section 03 (RE) Copyright of Western Power ABN 18540492861 RE Drawings Revision List CU DATE REVISION OF REVISION Sept 2002 Dec 2005 May

More information

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS Originated 1/85 Revised 6/95 Revised 6/02 Revised 11/05 Revised 4/08 Revised 11/09 Revised 1/12 Revised 11/12 Revised

More information

Connector Installation Guide Compression and Mechanical Connectors

Connector Installation Guide Compression and Mechanical Connectors Connector Installation Guide Compression and Mechanical Connectors Typical Cross Section of a Compression Connector Before Installation Before compression, a typical cross section of cable consists of

More information

NATIONAL POWER INDUSTRIES

NATIONAL POWER INDUSTRIES NSIC - CRISIL RATTING : SE 3 B NSIC - ICRA RATTING : SE 3 B C E MARKED PRODUCT Regd. Office : Administration Office Factory (1) Factory (2) Tele/Fax Mobile E-mail Website (Vyas Group Of Companies) Load

More information

SUSPENSION 04 CLAMPS

SUSPENSION 04 CLAMPS SUSPENSION CLAMPS 04 4 SUSPENSION CLAMPS 57 Contents General... 58 Suspension clamp trunnion type, forged,... 63 Suspension clamp trunnion type, forged, with bigger angle of deflection, for aluminium based

More information

GENERAL INFORMATION POLE MOUNT TRANSFORMER SINGLE PHASE PAD MOUNT TRANSFORMER SINGLE PHASE POLE MOUNT TRANSFORMER THREE PHASE 17

GENERAL INFORMATION POLE MOUNT TRANSFORMER SINGLE PHASE PAD MOUNT TRANSFORMER SINGLE PHASE POLE MOUNT TRANSFORMER THREE PHASE 17 GENERAL INFORMATION SECTION GUIDE SECTION 10 PAGE 1 DESCRIPTION SECTION NUMBER GENERAL INFORMATION... 10 POLE MOUNT TRANSFORMER SINGLE PHASE... 15 PAD MOUNT TRANSFORMER SINGLE PHASE..... 16 POLE MOUNT

More information

(K),(M),(P)489TB/G Up to 42 kv

(K),(M),(P)489TB/G Up to 42 kv IS91374-ENG - 489TB/G-45/S 22 October 2012 - Revision 1 - Supersedes edition of 4 May 2012 Page 1 of 9 CAUTION : Read instructions thoroughly and completely prior to beginning installation. Installation

More information

SYSTEM PROTECTION - PLATING

SYSTEM PROTECTION - PLATING INTRODUCTION 1. Plates F1 thru F10 supply only the material required for one-phase. Therefore, for threephase construction, you will be required to call for the specified plate three times at that station.

More information

PRODUCT/SERVICE CLASSIFICATION CLASS 285 ELECTRICAL EQUIPMENT AND SUPPLIES (EXCEPT CABLE AND WIRE)

PRODUCT/SERVICE CLASSIFICATION CLASS 285 ELECTRICAL EQUIPMENT AND SUPPLIES (EXCEPT CABLE AND WIRE) Please indicate which products and services your company can supply by checking the appropriate box(es). Check only the first box if your company can supply all of the products and services shown for this

More information

Distribution Design Catalogue

Distribution Design Catalogue Distribution Design Catalogue Running Earth and Street Light Feed Section 03 (RE) Copyright of Western Power ABN 18540492861 RE Drawings Revision List CU DATE REVISION OF REVISION Sept 2002 Original Issue

More information

SECTION 27 - PAD-MOUNTED TRANSFORMERS TABLE OF CONTENTS

SECTION 27 - PAD-MOUNTED TRANSFORMERS TABLE OF CONTENTS CABLE AND CONDUIT ENTRANCE SINGLE-PHASE PAD-MOUNTED TRANSFORMER INSTALLATION 100 KVA AND LARGER (CONCRETE PADS ONLY) 27.05-01 CABLE AND CONDUIT ENTRANCE SINGLE-PHASE PAD-MOUNTED TRANSFORMER INSTALLATION

More information

Schedules 1 to 4, Lot B: Extension of the Lessos Substation

Schedules 1 to 4, Lot B: Extension of the Lessos Substation 1.0 LIGHTNING ARRESTORS 1.1 ZNO lightning arrester, 192 kv rated voltage, 10 ka nominal discharge current 2.0 CAPACITIVE VOLTAGE TRANSFORMER ea. 45 2.1 220 kv capacitive voltage transformer 220/ 3 / 0.11/

More information

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION PULL BOX F SECONDARY SYSTEM Typical grade Pentahead bolts See note 2 Conduit run as specified Plastic or fiberglass for grass areas or Polymer concrete for light duty areas (see notes 2, 3, & 4) Company

More information