1 Therm-L-Tec Building Systems LLC Therm-L-Tech Power Operated Retrofit Kit 230 VAC or 440/480 VAC 50/60 Hz Installation and Setup Manual Rev. A 01/2015

2 Index Index 1 Electrical Requirements for Therm-L-Tec Power Operated Doors 2 Mounting of Control Box and Motor 3 Further Requirements 4 Wiring the Motor 5 Wiring the Pull Cord Switches Wiring the Safety Reversing Edge 6 Installing the Photoeye s 7 Installing the Sensor Extension Cords 8 Installing and wiring the control cables 9 Installation of the Photoeye s: Open Position Sensor Installation of the Photoeye s: Close Position Sensor 11 Final Adjustment, fine tuning 12 M 1000 I/O Ports 13 Appendix A: Wiring Diagram 230 VAC 14 Wiring Diagram 440/480 VAC 15 Appendix B: Pull Cord Location Guide 16 Therm-L-Tec Building Systems, LLC Chestnut Street Basehor, KS U.S.A. Tel: (913) Web Site: scole@themltec.com 2014 Therm-L-Tec Building Systems, LLC Page 1 of 16

3 Electrical Requirements for Therm-L-Tec Power Operated Doors 1) Power to the operator must be preceded by a fused disconnect! Failure to install a properly fused disconnect will void manufacturer s liability in the event of equipment failure. The operating voltage of this unit cannot be altered in the field. Fuse requirements Operating Voltage Phases Fuse Rating 208 VAC 3 Phase FRN 5 AMP 240 VAC 3 Phases FRN 4 AMP 480 VAC 3 Phases FRN 2 AMP The incoming 3 phases from the fused disconnect to the operator are terminated on the 3 Terminal Blocks Label: L1, L2, L3 and GND Page 2 of 16

4 2) Freezer doors are equipped with a self-regulating heat cable. Fuse protection is supplied in the junction box. The heat cable requires 110 VAC 7 Amps. Because of the nature of the self regulating heat cable, if the temperature is below freezing when power is applied, the fuse may blow. This can be remedied by bypassing the fuse for one minute, then re-applying power to the feed side of the fuse. The wiring diagram is located inside the cover of the supplied junction box. Mounting of Control Box and Motor: The Motor should always be mounted on the side of the header in which the door opens, i.e. Right Hand open should mount on the right hand side of the Header and vice versa for left hand open. The Control Box should be mounted as close as possible to the motor, keeping the cable between Motor and Enclosure as short as possible to reduce EMI related issues. The Electrical Box can either be mounted above the header or to the side of the Motor. WARNING! MOUNT BOX OUT OF THE DOOR S TRAVEL PATH! Please refer to the Mechanical Drawing, if supplied for proper distances and spacing when building your own Header Board. All Therm-L-Tec supplied Header Boards are already pre-drilled for you specific application. Page 3 of 16

5 Further Requirements for Control Box: 1. Interim Board, M-1000 or M-1000s Controller VDC Power Supply 3. Omron MX2 Drive 230 VAC or 440/480 VAC 3 Phase 50/60 Hz Page 4 of 16

6 Wiring the Motor: 1. Connect the supplied yellow 16-4 SOOW type cable to the leads on the electrical box on the motor. Wire #1: T1 (U) black Wire #2: T2 (V) red Wire #3: T3 (W) white Green Wire: attach to stud which has two nuts 2. Drill a 7/8" Hole on the side of the Electrical Enclosure 3. Insert the Strain Relieve into the hole and secure with nut 4. Insert the SOOW Cord and strip insulation leaving enough length to reach the VFD Terminals U, V, W with some extra reserve. 5. Attach the 3 Wires: T1, T2, T3 to the VFD on the lower side Terminals labeled U/T1,V/T2,W/T3 and the Green Wire on the Ground bar (Green Screw). 6. Power Electrical control box and turn both Power Switches on. 7. Push the small Push button on the M-1000 Boards briefly. 8. The door should move in the Open direction. IF DOOR MOVES IN THE CLOSE DIRECTION STOP! REMOVE POWER TO DOOR THEN SWITCH WIRE U/T1 AND V/T2 ON THE VFD! REAPPLY POWER VERIFY THAT DOOR OPENS NOW, BY PRESSING THE SMALL PUSH BUTTON AGAIN BRIEFLY! 9. The Motor is now wired correctly Wiring the Pull Cord Switches: 1. Install the Pull Cord Switches at your desired location. Use Appendix B: Pull Cord Location Guide for reference. 2. Run a conduit to each Pull Cord with 2 14 or 16 ga wires. Connect Wires inside the Pull Cord according to Appendix A: Wiring Diagram DO NOT RUN THESE WIRE WITH ANY HIGH VOLTAGE [100 VAC and above] IN THE SAME CONDUIT! THIS MAY CAUSE INTERFERENCE PROBLEMS! 3. Connect the wires to the rolled up, above the 24 Volt Power Supply, Pruple and Orange 18ga wires as shown in Appendix A: Wiring Diagram Connect the Blue Wire if you have a Heated Pull Cord Switch only as shown in Appendix A: Wiring Diagram Page 5 of 16

7 Wiring the Safety Reversing Edge: 1. Drill a 5/8" Hole on the side or on the bottom of the Electrical Enclosure 2. Mount the 4 PIN Female Receptacle in the hole 3. Use the following two of the four wires and connect them as follows: White: Terminal 6 on the M-1000 Board Brown: Terminal 9 or 10 on the M-1000 Board Blue: Not used ( cut off or roll up and secure ) Black: Not used ( cut off or roll up and secure ) 4. Attach the grey 22-4 CMX cable with the male connector to the female receptacle. 5. Move the door to the Close position 6. Insert the 22-4 CMX Cable into the Cantilever by means of a strain relieve, leaving a slight sag in the cable. Drill a 7/8" Hole if the Cantilever Cover does not have a hole for the strain relieve. 7. Remove the insulation of the CMX Cable inside the Cantilever and connect each of the two wires White and Brown to the each of the 2 wires which are inside the cantilever so that the wire match up as follows: White Wire from Safety Edge: Orange Wire from Safety Edge: White Wire CMX Cable Brown Wire CMX Cable 8. Install the safety reversing edge on the other side of the door. 9. Connect the two wires on the safety reversing edge with the two wires which run inside the door to the cantilever. 10. If the two wires inside the door plug are missing, run the CMX Cable on top of the door connecting the two wires from the safety reversing edge as follows: White Wire from Safety Edge: White Wire CMX Cable Orange Wire from Safety Edge: Brown Wire CMX Cable Not used: Blue Wire CMX Cable ( Cut Off ) Not used: Black Wire CMX Cable ( Cut Off ) 11. Verify operation by testing Terminal 9 [10] and 6 for continuity with a continuity tester. The tester should respond for 1 to 3 seconds when the safety edge is depressed. 12. The safety reversing edge upon verification of continuity is now operational Page 6 of 16

8 Installing the Photoeye s: The Photoeye Sensors are installed on the Header. There is one Sensor for the Open Position and one for the Close Position. The sensor s can be installed in between the Drive belt, but care should be taken that the Belt does not touch the Photoeye Bracket or the Cable. Positioning of the Photoeye s: The Photoeye s need to be mounted that they sense the door before the door reaches it s full position. Recommendation: All adjustments should be made when the surrounding area of the door has reached it s desired Operating Temperature. This means that the cooler/freezer Temperature should be at the normal operating temperature on both sides of the door. This will prevent drifting of the door. Note: The adjustment will drift with temperature change. As an example: Door was set at 65 F and opens and closes to the desired End Points Ambient Temperature Increases Ambient Temperature Decreases Travel of door will increase by about 1" for every 40 F positive Temperature Change Travel of door will decrease by about 1" for every 40 F negative Temperature Change Page 7 of 16

9 Installing the Sensor Extension Cords: Your Photoeye Conversion Kit comes with two control cable s. A short control cable for the Open Position Sensor which is to be mounted close to the control cabinet and a long control cable for the Close Position Sensor which is going to be mounted farther away from the control cabinet. Each control cable has a connector attached on one side. This connector has to be in the proximity of where the Sensor is going to be mounted. If you have a TLT Logic Board, M-595 or M-596 Board then those will have to be replaced with a M Board or a M-1000s Unit. Please follow the particular Manual for installing those Units / Boards before installing the Sensors. M-1000 Board / Interim Board M-1000s Unit The new Power Supply will replace the existing control Transformer. Please follow the Manual for installing the Power Supply Unit. Page 8 of 16

10 Installing and wiring the control cables: 1. Drill a 7/8" Hole on the side of the Electrical Enclosure 2. Insert the Strain Relieve into the hole and secure with nut 3. Insert the two new control cables with the open wire ends through the strain relief in the Control Cabinet. 4. Run the control cables with their connector sides to the approximate Sensor location 5. Mount the control cable with Mounting ties to the top of the header Do not fully close the tie end of these ties yet Leave some slack so you have enough cable to move the Sensor around Secure all these cable ties after the sensors have been installed and adjusted 6. Cut the control cables inside the Control Cabinet, leaving app. 1' to 2' of slack. 7. Cut off the white wire from the control cables. This wire is not needed. 8. Twist the two brown wires from each control cable together and connect them to Terminal #9 or #10 (+24VDC) on the M-1000 Board or to Terminal #15 On the M-1000s Unit 9. Twist the two blue wire from each control cable together and connect them to the upper header Terminal #10 (0VDC) on the M-1000 Board or to Terminal #13 On the M-1000s Unit 10. Insert the black wire of the Open Limit Sensor into Terminal # 7 on the M-1000 Board or to Terminal #14 On the M-1000s Unit 11. Insert the black wire of the Close Limit Sensor into Terminal # 8 on the M-1000 Board or to Terminal #16 On the M-1000s Unit 12. Secure the control cables with cable ties after the sensors have been installed and adjusted This concludes the wiring Installation of the Photoeye s Please make sure that you have finished the Chapter Installing and wiring the control cables and Changing the VFD Parameters in this manual before proceeding. Open Position Sensor Note: The Open Position requires more breaking distance for the door to come to a complete stop! Make sure your belt tension is correct before proceeding! 1. Move the door to your desired Full Open Position 2. Mark the position in between the belt on the header, extending the end of the Leading Door Edge Trolley Angle with a marker. 3. Measure 6" with a tape into the door travel and make an other mark 4. Mount the Open Sensor on this second mark with the mark being in the center of the slots with the enclosed Mounting Position Adjuster, assembled with Keyence Parts OP-87404, PZ-S20A and Photoeye LR-ZB250CP as shown in the picture below. Adjust the Sensor so that the light beam hits the shroud as shown in the pictures below. Assemble the close position sensor in the same way. Page 9 of 16

11 Assembled Photo Eye with Mounting Bracket 5. Attach Sensor Cable to the extension cable previously installed. 6. Apply Power to the System so the LED Display of the sensor comes on 7. Push and hold UP Button for 3 seconds until the display will either display: Lon or don Select Lon by pushing the UP Button until Lon flashes. Lon will flash for a few seconds and then the display will go back to normal operations. Lon will turn the Output of the Sensor ON (Normally Open) and the Orange Indicator Light will also be ON when the target is sensed. Selecting don will invert the Output (Normally Closed) and the Orange Indicator Light. It is important to select Lon for the correct operation of this system! Location of the different Buttons and Light Indicators on the Laser Sensor Page 10 of 16

12 7. Move the door so the light beam meets the end of the Trolley Angle. If the light beam hits the leading edge trolley angle like this adjust the sensor by loosening the set screw on the Bracket and aligning the beam by moving the sensor in or out until the beam hits the trolley angle like in this picture. 8. Push the SET Button once. The Display will flash Set and a Number and the Green Spot Indicator Light should be ON and the ORANGE INDICATOR LIGHT should be ON. 9. Move the Door so the light beam is no longer on the Trolley Angle and the Green Spot Indicator Light should be OFF and the ORANGE INDICATOR LIGHT should be OFF. 10. Push the SET Button again once. The Display will now flash a few times and then display a number. 11. Verify correct operation of the sensor by moving the door several times in and out of the light beam. Every time the door is detected by the Sensor the Orange Indicator Light should come on and has to go Off when door is not detected. 12. Verify with a Voltmeter that the Terminal #8 is at +24VDC when the Orange Indicator Light comes on and is below 1 VDC when the Orange Light is Off Close Position Sensor The Close Position Sensor is essentially installed and setup in the same way as the Open Sensor. However, the distance is about 3" which the sensor has to be moved into the door travel and the Photo Eye should detect the Trailing Door Edge Trolley Angle. Check Terminal #7 for +24VDC when the door is detected for the closing Input. Page 11 of 16

13 Final Adjustment, fine tuning After finishing the preceding steps and having installed the Sensors, operate the door. 1. Pull the Pull Cord. Door should Open 2. Check the offset between your desired position and the actual position This door is not fully open. The desired Open Position is that the Safety Edge is flush with the Door Seal. The door opening is short by about 1" in this example. 3. Measure the distance on the door of how much the door has over/under traveled 4. Adjust the Sensor now as follows: Door does not open far enough: Move the Sensor in door open [close] direction by the measured inches. Door opens to far: Move the Sensor in the close [open] direction by the measured inches. 5. Repeat the same steps above for the Close Position [direction]. Your Door is now ready for operation. The Sensor will not need to be re calibrated unless the drive parameters have been changed or the door has been hit or damaged. We also recommend that you check your belt tension on a weekly or monthly basis. Page 12 of 16

14 M 1000 I/O Ports Upper Header Pos# Description I/O Type X1 24 VDC Supply Power 9 0 VDC Supply Power X2 On/Off Switch or Wire Bridge to X3 Input X3 On/Off Switch or Wire Bridge to X2 Input 10 0V - for Blue Wire from Photo Eye s Power G GND Protective Earth Ground PEG Float 11 Door Open Out 12 0V all Drives Out 13 0V all Drives Out 14 Door Close Out Lower Header 1 Door Open / Pull Cord s Input 2 Partial Door Open [ if installed ] Input 3 Loop Detector [ if installed ] Input 4 Not Used Input 5 Speed [ not used ] Input 6 Safety Edge Input 7 Open Limit Input 8 Close Limit Input VDC Supply Power VDC Supply Power Page 13 of 16

15 Appendix A: 230 VAC 3 Phase Wiring Diagram Page 14 of 16

16 440/480 VAC 3 Phase Wiring Diagram Page 15 of 16

17 Appendix B: Page 16 of 16

Power Operated Retrofit Kit for Manual Door 230 VAC or 440/480 VAC 50/60 Hz Installation and Setup Manual

Power Operated Retrofit Kit for Manual Door 230 VAC or 440/480 VAC 50/60 Hz Installation and Setup Manual Therm-L-Tec Building Systems LLC Therm-L-Tech Power Operated Retrofit Kit for Manual Door 230 VAC or 440/480 VAC 50/60 Hz Installation and Setup Manual Rev. A 10/2014 Index Index 1 Electrical Requirements

More information

INOVA HIGHTECH Ltd. MEP 002/003 Auto Starter Manual

INOVA HIGHTECH Ltd. MEP 002/003 Auto Starter Manual INOVA HIGHTECH Ltd. MEP 002/003 Auto Starter Manual Complete Installation and Operating Manual for the MEP 002/003 Auto / Remote Starter for the following MEP Power Generators: MEP 002A/003A/011A/802A/803A/811A

More information

METROLOGIC INSTRUMENTS, INC. MX001 Industrial Control Interface Installation and User s Guide

METROLOGIC INSTRUMENTS, INC. MX001 Industrial Control Interface Installation and User s Guide METROLOGIC INSTRUMENTS, INC. MX001 Industrial Control Interface Installation and User s Guide Copyright 2007 by Metrologic Instruments, Inc. All rights reserved. No part of this work may be reproduced,

More information

Battery Charger Retrofit Kit Q-DCCHG1 for DC Cabinet Retrofit Manual

Battery Charger Retrofit Kit Q-DCCHG1 for DC Cabinet Retrofit Manual Battery Charger Retrofit Kit Q-DCCHG1 for DC Cabinet Retrofit Manual 25500181 Rev. A0 415 Printed in U.S.A. Copyright 2015 Federal Signal Corporation Limited Warranty The Alerting and Notification Systems

More information

Product Manual MNX10015 / REV B MODEL SB142, SB242. Dual Output Series Switch Boxes

Product Manual MNX10015 / REV B MODEL SB142, SB242. Dual Output Series Switch Boxes Product Manual MNX10015 / REV B MODEL SB142, SB242 Dual Output Series Switch Boxes Contents Section I Overview Introduction.... 2 Description... 2 Section II Installation Mounting... 3 Electrical Connections...

More information

JARVIS. Model AST -101 STUNNER TESTER

JARVIS. Model AST -101 STUNNER TESTER Model AST -101 STUNNER TESTER EQUIPMENT SELECTION... Ordering No. TABLE OF CONTENTS... Page Stunner Tester, 115V... 4016004 Stunner Tester, 230V... 4016005 Notice to Employer and Safety Director... 2 Notice

More information

POWER PINNER RAPID FIRE 7005 RF OPERATOR S MANUAL

POWER PINNER RAPID FIRE 7005 RF OPERATOR S MANUAL POWER PINNER RAPID FIRE 7005 RF OPERATOR S MANUAL Copyright: February 20, 2007 Revised: 12-11-2015. Gripnail Corporation An Employee Owned Company 97 Dexter Road East Providence, Rhode Island 02914-2045

More information

Series BFM Bulk Flow Monitor 1A FUSE RED LED RELAY. Part Number BFM-1 BFM-2 BFM-3 BFS-1

Series BFM Bulk Flow Monitor 1A FUSE RED LED RELAY. Part Number BFM-1 BFM-2 BFM-3 BFS-1 Series Bulk Flow Monitor Specifications - Installation and Operating Instructions Bulletin FL-1-4x 3/4 CONDUIT KNOCKOUTS BFS 1A FUSE RED LED RELAY 5-9/64 [130.45] TRANSFORMER 3[76.20] GREEN LED 7 [177.80]

More information

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market 1 888-323-8755 www.nwlifts.com JEEVES Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market This manual will cover the installation procedure step-by-step. The installation of this dumbwaiter

More information

INSTALLATION MANUAL. Melink Corporation (513) Revision

INSTALLATION MANUAL. Melink Corporation (513) Revision INSTALLATION MANUAL Revision 130711 Table of Contents Step Installation Contractor Page 1 Install System Controller Electrical 4 2 Install Variable Frequency Drive Electrical 6 3 Install Touchpad Mechanical

More information

Installation Instructions

Installation Instructions Installation Instructions MX3635-01 Rev. E Models HydraSwing 40s HydraSwing 40F 4,000 lb (1,814 kg) 10-15 seconds HydraSwing 40 4,000 lb (1,814 kg) 15-20 seconds HydraSwing 40 Twin 4,000 lb (1,814 kg)/leaf

More information

MPA Chassis for Multi-Probe Magnetic Transducers

MPA Chassis for Multi-Probe Magnetic Transducers DESCRIPTION: TYPICAL APPLICATIONS: The MPA chassis is utilized for multi-probe SENIS Magnetic Field-to-Voltage Transducer system with any of SENIS Hall Probes. Characterization and quality control of permanent

More information

Sprayer Control. Manual for SprayLink Cable Installations. Tank. Jet Agitator. Agitator Valve. Diaphragm Pump. Pressure Transducer.

Sprayer Control. Manual for SprayLink Cable Installations. Tank. Jet Agitator. Agitator Valve. Diaphragm Pump. Pressure Transducer. Sprayer Control Plumbing & Installation Manual for SprayLink Cable Installations Tank Jet Tank Shut-Off Diaphragm Pump Electric Ball s Transducer Strainer Relief Regulating Copyrights 2012 TeeJet Technologies.

More information

LN3 Series Motor and Drives

LN3 Series Motor and Drives LN3 Series Motor and Drives Operator's Manual PN 04-01906 C PRECISION MOTION CONTROLS 2175 De La Cruz Blvd. #1 Santa Clara, CA 95050 LN3 Manual CONTENTS Introduction... 3 Description... 3 Features... 3

More information

RS4000 Setup. Before you install the RS4000 system, check to ensure that nothing was damaged or lost during shipping.

RS4000 Setup. Before you install the RS4000 system, check to ensure that nothing was damaged or lost during shipping. RS4000 Setup Before you install the RS4000 system, check to ensure that nothing was damaged or lost during shipping. If anything is damaged or missing, contact your salesman immediately. Mount Components

More information

Control Panel Interface Upgrade Installation Guide For Model 200i and 250i Motorcycle Dynamometers Serial Number 202xxxx.

Control Panel Interface Upgrade Installation Guide For Model 200i and 250i Motorcycle Dynamometers Serial Number 202xxxx. 2004 Dynojet Research, Inc. All Rights Reserved. Control Panel Interface Upgrade Installation Guide For Model 200i and 250i Motorcycle Dynamometers Serial Number 202xxxx. This manual is copyrighted by

More information

Gas Spreader PLUS Remote Kit With Built in Clutch Relay and On/Off Switch

Gas Spreader PLUS Remote Kit With Built in Clutch Relay and On/Off Switch Gas Spreader PLUS Remote Kit With Built in Clutch Relay and On/Off Switch NOTE: Read all directions first before continuing. This wireless controller kit has been programmed and tested before shipping.

More information

ELECTRICAL SYSTEM UPGRADE

ELECTRICAL SYSTEM UPGRADE NEW CONTROLLER & ELECTRICAL SYSTEM UPGRADE FOR DAIRY TECH, INCORPORATED 10, 30 & 60G PASTEURIZERS Parts to Include 2 Wire ties (Nuts) 2 sticky wire mount pads Large Rubber Grommet (for bottom of electric

More information

Woda-Sci System Installation Parts Set

Woda-Sci System Installation Parts Set Installation Manual Woda-Sci System Installation Parts Set 5/32 x 3 ½ Drill Bit - 5 Connector Body - 7 3/8 Locking Nut - 8 3/16 x 1 ¼ Concrete Anchors- 4 Mounting Screws - 3 Stainless Steel Hanger - 9

More information

PRODUCT INFORMATION BULLETIN

PRODUCT INFORMATION BULLETIN 724-283-4681 724-283-5939 (fax) PRODUCT INFORMATION BULLETIN DESCRIPTION The, Model 10-7100 is one in a series of critical speed switches that monitor speed and detect motion in all types of machinery

More information

Mizer Single Pump and Starter Box

Mizer Single Pump and Starter Box Mizer Single Pump and Starter Box Table of Contents Line Diagram... 2 Overview... 3 Booster Pump Specifications... 3 Water... 3 Electrical... 3 Models... 3 Mounting... 4 Electrical... 6 Motor Rotation...

More information

TRAIL CHARGER with EXTENDER and COMBO NOSE BOX

TRAIL CHARGER with EXTENDER and COMBO NOSE BOX TRAIL CHARGER with EXTENDER and COMBO NOSE BOX 284424 01 Version 1.02 03/14/2011 Owners Manual Operation Installation Wiring Diagram Troubleshooting Parts Breakdown 1 GENERAL OPERATION PROBLEM On applications

More information

Ebling Back Blade Snow Plow Wireless Controller Kit Only sold by SnowplowsPlus.com and ControlAllWireless.com

Ebling Back Blade Snow Plow Wireless Controller Kit Only sold by SnowplowsPlus.com and ControlAllWireless.com Ebling Back Blade Snow Plow Wireless Controller Kit Only sold by SnowplowsPlus.com and ControlAllWireless.com WARNING Always unplug the plow or shut off the battery breaker when in transport or not in

More information

EasyStart Installation Instructions for Dometic Family RV A/Cs

EasyStart Installation Instructions for Dometic Family RV A/Cs EasyStart Installation Instructions for Dometic Family RV A/Cs DuoTherm Brisk Brisk II Penguin Penguin II Contents Introduction... 4 Safety first... 4 Making a good crimp... 4 Identifying Dometic AC Units...

More information

Pay For Water System DU 1A046A

Pay For Water System DU 1A046A Pay For Water System DU 1A046A Serial Number: Owner s Manual #0822 012913 Installation Date: Please read and understand this manual. Store in safe location for future reference. Everyone who operates this

More information

RigMaster Power Service and Repair Manual Document # S901009

RigMaster Power Service and Repair Manual Document # S901009 Document # S901009 WARNING The following procedures present hazards which can result in injury or death. Only persons qualified to carry out electrical and mechanical servicing should undertake this work.

More information

HP COOL TECH, INC. COOLANT PUMP. PowerPump. INSTALLATION MANUAL HANWHA XD20 Series 10000/11000

HP COOL TECH, INC. COOLANT PUMP. PowerPump. INSTALLATION MANUAL HANWHA XD20 Series 10000/11000 HP COOL TECH, INC. COOLANT PUMP PowerPump INSTALLATION MANUAL HANWHA XD20 Series 10000/11000 1 TABLE OF CONTENTS Page Topic 3 Introduction 3 Specifications 3 Warning 4 Safety 5, 6, 7 Installation 8 Use

More information

F-4600 INLINE ULTRASONIC FLOW METER Installation and Operation Guide

F-4600 INLINE ULTRASONIC FLOW METER Installation and Operation Guide F-4600 INLINE ULTRASONIC FLOW METER Installation and Operation Guide 11451 Belcher Road South, Largo, FL 33773 USA Tel +1 (727) 447-6140 Fax +1 (727) 442-5699 1054-7 / 34405 www.onicon.com sales@onicon.com

More information

SERVICE MANUAL (DOMESTIC & INTERNATIONAL)

SERVICE MANUAL (DOMESTIC & INTERNATIONAL) SERVICE MANUAL (DOMESTIC & INTERNATIONAL) DUAL TECHNOLOGY FINISHER MODEL 1960 & 1980 SERIES Lincoln Foodservice Products, LLC 1111 North Hadley Road Fort Wayne, Indiana 46804 United States of America Telephone:

More information

INTELLIQUILTER INSTALLATION ON INNOVA VERSION

INTELLIQUILTER INSTALLATION ON INNOVA VERSION INTELLIQUILTER INSTALLATION ON INNOVA VERSION 04.25.16 1. EDGERIDER WHEELS ON THE CARRIAGE Slightly loosen the bolts ( A ) on the bracket that holds the front wheels, so it can allow for changes in the

More information

Pole Mount COD Installations (PMCOD)

Pole Mount COD Installations (PMCOD) FLASHRIGHT Display Installation Instructions Pole Mount COD Installations (PMCOD) Delphi (Key needed in some cases) FlashRight Displays 3482 Keith Bridge Rd. Suite # 260 Cumming, GA 30041 Tel. 678-455-9121

More information

650 Series Cargo Van Lift Mounting Instructions Ford Transit (Standard Roof) 2015-Present

650 Series Cargo Van Lift Mounting Instructions Ford Transit (Standard Roof) 2015-Present TOMMY GATE OWNER'S / OPERATOR'S MANUAL 650 Series 650 LB Capacity 650 Series Cargo Van Lift Mounting Instructions Ford Transit (Standard Roof) 2015-Present Installing the Base Plate 1. Examine the interior

More information

INSTALLATION AND OPERATING INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS INSTALLATION AND OPERATING INSTRUCTIONS MANUAL TRANSFER SWITCHES FROM 0 Residential Wattage Requirements Appliance Running Watts Add watts for starting Furnace blower, gas or fuel 1/8 hp 300 500 1/8 hp

More information

ATS-9600/9700 TABBER/LABELER

ATS-9600/9700 TABBER/LABELER ATS-9600/9700 TABBER/LABELER INSTALLATION AND OPERATING INSTRUCTIONS SAFETY PRECAUTIONS THIS EQUIPMENT PRESENTS NO PROBLEM WHEN USED PROPERLY. HOWEVER, CERTAIN SAFETY RULES SHOULD BE OBSERVED WHEN OPERATING

More information

CO 2 Room Sensor in the BAPI-Stat Quantum Prime Style Enclosure

CO 2 Room Sensor in the BAPI-Stat Quantum Prime Style Enclosure Identification and Overview The BAPI CO 2 Sensor is an accurate and reliable way of incorporating demand controlled ventilation into a building s HVAC strategy. It measures the CO 2 in a range of 0 to

More information

LNII Series Motor and Drives

LNII Series Motor and Drives LNII Series Motor and Drives Operator's Manual PN 04-01805 B PRECISION MOTION CONTROLS 2530 Berryessa Rd. #209 San Jose, CA 95132 10/04/05 2 2 LNII Manual Table of Contents Page Introduction 1. Description

More information

COMMERICAL SPLIT SYSTEM KITS AND ACCESSORIES /2014 Supersedes 8/2012

COMMERICAL SPLIT SYSTEM KITS AND ACCESSORIES /2014 Supersedes 8/2012 COMMERICAL SPLIT SYSTEM KITS AND ACCESSORIES 506953-01 3/2014 Supersedes 8/2012 Litho U.S.A. MSAV Supply Air Blower VFD Kit INSTALLATION INSTRUCTIONS FOR MSAV (MULTI-STAGE AIR VOLUME) SUPPLY AIR BLOWER

More information

FM200 FLOW/NO-FLOW MONITOR INSTALLATION AND TECHNICAL MANUAL 120 VAC MODEL 6/1/2017

FM200 FLOW/NO-FLOW MONITOR INSTALLATION AND TECHNICAL MANUAL 120 VAC MODEL 6/1/2017 FM200 FLOW/NO-FLOW MONITOR INSTALLATION AND TECHNICAL MANUAL 120 VAC MODEL 6/1/2017 Maxi-Tronic, Inc. 417 Wards Corner Road Loveland, OH 45140 513.398.2500 800.659.8250 FAX: 513.398.2536 info@maxitronic.com

More information

Stay-IN-Play with Panic Stop Braking

Stay-IN-Play with Panic Stop Braking INSTALLATION INSTRUCTIONS TOWED VEHICLE BRAKING SYSTEM Stay-IN-Play with Panic Stop Braking SMI Manufacturing, Inc. P.O. Box 14040 Evansville, IN 47728 1-800-893-3763 www.smibrake.com SIP0906 Model SIP0603

More information

McDonalds Installation Guide

McDonalds Installation Guide McDonalds Installation Guide Canopy COD Installation CCOD ------------------------------------------------------------------------------------------------------ Metal Pedestal COD Installation MCOD Everbrite

More information

MK7 Installation Instructions

MK7 Installation Instructions MK7 Installation Instructions Thank you for choosing the Double Apex Garage Control. If you have any questions about the installation please do not hesitate to email us at support@doubleapex.co. A PDF

More information

OPERATING & SERVICE PARTS MANUAL SM20ES ENERGY SMART WRAPPER

OPERATING & SERVICE PARTS MANUAL SM20ES ENERGY SMART WRAPPER OPERATING & SERVICE PARTS MANUAL SM20ES ENERGY SMART WRAPPER Series B Model SM20ESC6 Cradle Mount Model SM20ESC6 Cradle Mount Shown with Optional Left & Right Wings Model SM20ESC6 Cradle Mount Shown with

More information

INSTALLATION INSTRUCTIONS AND OPERATION MANUAL

INSTALLATION INSTRUCTIONS AND OPERATION MANUAL INSTALLATION INSTRUCTIONS AND OPERATION MANUAL Commercial and Industrial Fire Door Operator Logic Control Restricted Duty Fire Door Operators IMPORTANT INSTALLATION INSTRUCTIONS WARNING To reduce the risk

More information

INSTRUCTIONS FOR INSTALLING MIND/MOTION SENSOR/E-PORT ON USI ALPINE FOOD MACHINE

INSTRUCTIONS FOR INSTALLING MIND/MOTION SENSOR/E-PORT ON USI ALPINE FOOD MACHINE INSTRUCTIONS FOR INSTALLING MIND/MOTION SENSOR/E-PORT ON USI ALPINE FOOD MACHINE Read these instructions carefully before installing the kit. If you are having problems installing the kit, please call

More information

29048, 29049, 29050, 29051, 29052, 29053, 29054,

29048, 29049, 29050, 29051, 29052, 29053, 29054, April 15, 2014 Lit. No. 29225, Rev. 11 29048, 29049, 29050, 29051, 29052, 29053, 29054, 29400 5 HARNESS KIT 3 PORT ISOLATION MODULE LIGHT SYSTEM w/2 PLUG SYSTEM HARNESSES Installation Instructions Read

More information

PRO REMOTE 25 LV CAPACITANCE PROBE

PRO REMOTE 25 LV CAPACITANCE PROBE Price $5.00 PRO REMOTE 25 LV CAPACITANCE PROBE OPERATING INSTRUCTIONS READ THOROUGHLY BEFORE INSTALLING EQUIPMENT Distribué par : 2 rue René Laennec 51500 Taissy France Fax: 03 26 85 19 08, Tel : 03 26

More information

534HS Pressure Transmitter

534HS Pressure Transmitter These instructions provide information for installation, process connection, electrical connection and field calibration of SOR 534HS Pressure Transmitters. The 534HS Pressure Transmitter consists of a

More information

MPT-250B SPECIFICATIONS AND OPERATING INSTRUCTIONS

MPT-250B SPECIFICATIONS AND OPERATING INSTRUCTIONS 1. SAFETY The MPT-250B Wire Crimp Pull Tester is a force measurement device, and as such should be operated with due caution. Operators should wear safety glasses for eye protection because the crimp under

More information

Crestline Dampening System. Installation Instructions. A.B. Dick 350, 360, 375 Single & Dual Lever Machines. X /01 Rev-A

Crestline Dampening System. Installation Instructions. A.B. Dick 350, 360, 375 Single & Dual Lever Machines. X /01 Rev-A Crestline Dampening System Installation Instructions A.B. Dick 350, 360, 375 Single & Dual Lever Machines X88-20 01/01 Rev-A GENERAL INFORMATION ATTENTION CRESTLINE DAMPENER OWNER! Accel Graphic Systems

More information

ROSBACK PRINTERS AND BOOKBINDER S MACHINERY Quality Bindery Equipment Since 1881

ROSBACK PRINTERS AND BOOKBINDER S MACHINERY Quality Bindery Equipment Since 1881 PRINTERS AND BOOKBINDER S MACHINERY Quality Bindery Equipment Since 1881 FIELD CONVERSION VACUUM KIT Part No. 220-A-121 (60Hz) Part No. 220-A-121-1 (50Hz) For TRUE-LINE 20" & 26" PERFORATORS MODELS 220A

More information

TT /17 INSTALLATION INSTRUCTIONS. Introduction. Required Tools and Equipment

TT /17 INSTALLATION INSTRUCTIONS. Introduction. Required Tools and Equipment TT-1701 2/17 INSTALLATION INSTRUCTIONS Original Issue Date: 2/17 Model: 15-60REOZK with Decision-Makerr 3000 Controllers Only Market: Industrial Subject: Electronic Governor Kit GM90661-KP1 Introduction

More information

Installing the gate post bracket with the cardboard arm template

Installing the gate post bracket with the cardboard arm template ......... Installing the gate post bracket with the cardboard arm template... Installing gate posts brackets and arms for Push-to-Open or Pull-to-Open gates... Connection of Power Source 240Vac or Solar...

More information

PRO REMOTE Series CAPACITANCE PROBE

PRO REMOTE Series CAPACITANCE PROBE Price $5.00 PRO REMOTE Series CAPACITANCE PROBE OPERATING INSTRUCTIONS READ THOROUGHLY BEFORE INSTALLING EQUIPMENT TABLE OF CONTENTS GENERAL SPECIFICATIONS...3 1.0 INTRODUCTION...4 2.0 APPLICATIONS...4

More information

advanced FLOW engineering Instruction Manual P/N:

advanced FLOW engineering Instruction Manual P/N: advanced FLOW engineering Instruction Manual P/N: 77-84010 Make: Chevrolet Model: Silverado HD Year: 2017-2018 Engine: V8-6.6L (td) Duramax (L5P) Make: GMC Model: Sierra HD Year: 2017-2018 Engine: V8-6.6L

More information

3 in 1 TRAIL CHARGER with LOCKOUT

3 in 1 TRAIL CHARGER with LOCKOUT Owner s Manual P/N: 283821 500 3 in 1 TRAIL CHARGER with LOCKOUT 283821 01 Version 2.04 07/05/2011 Owners Manual Operation Installation Wiring Diagram Troubleshooting Parts Breakdown 1 GENERAL OPERATION

More information

ONBOARD AIR SYSTEM FOR ALL VEHICLES APPLICATIONS

ONBOARD AIR SYSTEM FOR ALL VEHICLES APPLICATIONS ONBOARD SYSTEM FOR ALL VEHICLES APPLICATIONS Thank you and congratulations on the purchase of a Pacbrake onboard air system. Please read the manual prior to starting to ensure you can complete the installation

More information

Ultrasonic Sensor U-B

Ultrasonic Sensor U-B MAINTAIN CONSTANT TENSION - The ultrasonic sensor is used to maintain constant tension when using a brake for producing unwind (payout) tension, or when using a clutch for rewind tension. The sensor measures

More information

ROUSH Active IO Exhaust. Installation Instructions P/N: (R LITE) Fastback GT Convertible GT V8

ROUSH Active IO Exhaust. Installation Instructions P/N: (R LITE) Fastback GT Convertible GT V8 Installation Instructions P/N: 422128 (R1318-5231LITE) Fastback GT Convertible GT V8 39555 Schoolcraft Rd, Plymouth MI, 48170 800.59.ROUSH ROUSH Active IO Exhaust Installation Instructions P/N: 422128

More information

Control Box Wiring For PRSstandard Tool

Control Box Wiring For PRSstandard Tool 888-680-4466 ShopBotTools.com Control Box Wiring For PRSstandard Tool Copyright 2018 ShopBot Tools, Inc. page 1 Table of Contents Introduction...5 Installation...5 Powering the PRSstandard Control Box...5

More information

29048, 29049, 29050, 29051, 29052, 20953, 29054,

29048, 29049, 29050, 29051, 29052, 20953, 29054, July 15, 2008 Lit. No. 29225, Rev. 06 29048, 29049, 29050, 29051, 29052, 20953, 29054, 29400-2 HARNESS KIT 3-PORT ISOLATION MODULE LIGHT SYSTEM w/2-plug SYSTEM HARNESSES Installation Instructions Read

More information

ASI Model 8374 Automatic Roll Towel Mechanism Owner s Manual

ASI Model 8374 Automatic Roll Towel Mechanism Owner s Manual ASI Model 8374 Automatic Roll Towel Mechanism Owner s Manual 1610131300 Rev B 17Jun2017 1 Fig. 1.1 DIM S INCH [MM] Fig. 1 Designed for maximum sanitary use, the 8374 Automatic Roll Towel Mechanism automatically

More information

Installation Instructions Table of Contents

Installation Instructions Table of Contents Installation Instructions Table of Contents Pre- Installation of Garage Storage Lift 2 Layout the Garage Storage Lift 3 Installing the strut Channels 3 Install the Drive Assembly 5 Install the Drive Shaft

More information

IMI vibration switch USER MANUAL INSTALLATION - OPERATION - MAINTENANCE

IMI vibration switch USER MANUAL INSTALLATION - OPERATION - MAINTENANCE USER MANUAL IMI vibration switch INSTALLATION - OPERATION - MAINTENANCE Z0929039_A ISSUED 03/2017 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. contents Overview General

More information

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited.

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited. SERVICE MANUAL ELECTRIC BRAISING PANS (30 & 40 GALLON) VE30 VE40 ML-126849 ML-126850 VE40 SHOWN - NOTICE - This Manual is prepared for the use of trained Vulcan Service Technicians and should not be used

More information

Instruction Manual for the. E-SL 450 Series

Instruction Manual for the. E-SL 450 Series Instruction Manual for the E-SL 450 Series Estate Slide Summary of Functions The Estate Slide is only to be used for vehicular Slide gates in a Class I setting. Class I: A vehicular gate opener (or system)

More information

OPERATION MANUAL MODELS TWE-250 TWE-321 TWE-375 TRU WELD EQUIPMENT COMPANY 6400 N. HONEYTOWN ROAD SMITHVILLE, OHIO (330)

OPERATION MANUAL MODELS TWE-250 TWE-321 TWE-375 TRU WELD EQUIPMENT COMPANY 6400 N. HONEYTOWN ROAD SMITHVILLE, OHIO (330) OPERATION MANUAL MODELS TWE-250 TWE-321 TWE-375 TRU WELD EQUIPMENT COMPANY 6400 N. HONEYTOWN ROAD SMITHVILLE, OHIO 44677 (330) 669 2773 CONTENTS Section Description Pages 1 Introduction 3 2 External Features

More information

CO 2 Room Sensor in the BAPI-Stat 3 Enclosure with Common Ground Configuration

CO 2 Room Sensor in the BAPI-Stat 3 Enclosure with Common Ground Configuration Identification and Overview The BAPI CO 2 Sensor is an accurate and reliable way of incorporating demand controlled ventilation into a building s HVAC strategy. It measures the CO 2 in a range of 0 to

More information

IMPORTANT SAFEGUARDS

IMPORTANT SAFEGUARDS INSTRUCTION MANUAL NON-INTERRUPTIBLE AC INVERTER SYSTEM MODEL EAC FTM 350 FOR EMERGENCY LIGHTING POWER IMPORTANT SAFEGUARDS When using electrical equipment, basic safety precautions should always be followed,

More information

Application Note. Monitoring Bearing Temperature with ProPAC

Application Note. Monitoring Bearing Temperature with ProPAC Monitoring Bearing Temperature with ProPAC Introduction A mechanical stamping press usually has two or more main bearings for supporting the crankshaft and for allowing smooth and accurate rotation. There

More information

Go Power! Manual. GP-1750HD Inverter GP-2500 Inverter

Go Power! Manual. GP-1750HD Inverter GP-2500 Inverter Go Power! Manual GP-1750HD Inverter GP-2500 Inverter Go Power! Electric Inc. PO Box 6033 Victoria, BC V8P 5L4 Tel: 866-247-6527 Fax: 866-607-6527 Email: info@gpelectric.com Table of Contents 1. INTRODUCTION...

More information

Users Manual. Defender 1 8.0KW to 14.0KW Online Emergency Lighting Inverter. Technical Manual # Revision B

Users Manual. Defender 1 8.0KW to 14.0KW Online Emergency Lighting Inverter. Technical Manual # Revision B Users Manual Defender 1 8.0KW to 14.0KW Online Lighting Inverter Technical Manual #018-0102-01 Revision B Phone: 1.877.DSPM.POWER 1.877.377.6769 Fax: 909.930.3335 Website: www.dspmanufacturing.com E-Mail:

More information

Sól Dual Voltage Buck Boost Solar Charge Controller Connection & Operation V1.00

Sól Dual Voltage Buck Boost Solar Charge Controller Connection & Operation V1.00 Sól Dual Voltage Buck Boost Solar Charge Controller Connection & Operation V1.00 Connection Instructions Remove Bottom 4 cover to attach wires to terminal blocks then attach cover and flip over for mounting

More information

Operations Manual. Zero Speed Switch Sensor Model ZS09P

Operations Manual. Zero Speed Switch Sensor Model ZS09P Zero Speed Switch Sensor Model ZS09P The must be referred to for correct installation. Failure to comply with the shall void all warranties and liabilities. Overview The Phares Electronics Model ZS09P

More information

K10 Intrinsically Safe Electro-Pneumatic Positioner Operating Manual

K10 Intrinsically Safe Electro-Pneumatic Positioner Operating Manual K0 Intrinsically Safe Electro-Pneumatic Positioner Operating Manual Pneumatic Connection Outlet Port Gauge Single Acting Actuator (Spring Return): For single acting actuators Outlet Port 2 is to be plugged.

More information

General Description. Product Specification. Document Digital Temperature Interlock

General Description. Product Specification. Document Digital Temperature Interlock Document 474751 Installation, Operation and Maintenance Manual Please read and save these instructions for future reference. Read carefully before attempting to assemble, install, operate or maintain the

More information

ACCESSORY KIT INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION INSTRUCTIONS ACCESSORY KIT INSTALLATION INSTRUCTIONS GAS HEAT KIT FOR -60 F OPERATION KIT MODELS 2BC04700106, 2BC04700151 and 2BC04700154 FOR SINGLE PACKAGE AIR CONDITIONERS 6.5 THRU 12.5 TONS MODELS DM, DL, J**DM,

More information

Instructions for Field Retrofit of a Model 98 Temperature Controller in place of a Model 85 Temperature Controller

Instructions for Field Retrofit of a Model 98 Temperature Controller in place of a Model 85 Temperature Controller Introduction: Instructions for Field Retrofit of a Model 98 Temperature Controller in place of a Model 85 Temperature Controller The following is a set of instructions for retrofitting a Model 98 Digital

More information

FARM MODEL INSTALLATION INSTRUCTIONS

FARM MODEL INSTALLATION INSTRUCTIONS REAR ATTACHMENT ELECTRIC CONVERSION FARM MODEL INSTALLATION INSTRUCTIONS This page intentionally left blank MICHEL S INDUSTRIES, LTD. p.o. Box 119 St. GREGOR,SK PH: 306.366.2184 em: SALES@MICHELS.CA 1

More information

INSTALLATION MANUAL. Thunderstone Manufacturing LLC 3400 West O Street Lincoln, NE (Fax)

INSTALLATION MANUAL. Thunderstone Manufacturing LLC 3400 West O Street Lincoln, NE (Fax) INSTALLATION MANUAL August 7 th 2018 43 /48 /50 2011 and Older Timpte STD/Split 36 Style Hopper Trailers with Roller Bearing Doors Kit #101533 for 96w & Kit #101534 for 102w Thunderstone Manufacturing

More information

SlimRack Bed Lift System OEM INSTALLATION MANUAL

SlimRack Bed Lift System OEM INSTALLATION MANUAL SlimRack Bed Lift System OEM INSTALLATION MANUAL Rev: 07.11.2018 TABLE OF CONTENTS System Information 2 Safety Information 3 Resources Required 3 General Requirements 3 Installation 4 SlimRack Bed Lift

More information

Table of Contents. General Operation. 3 How Slam-A-Winner plays How the Wheel Scores How the Ball Lift works Programming Options...

Table of Contents. General Operation. 3 How Slam-A-Winner plays How the Wheel Scores How the Ball Lift works Programming Options... 61-MAN-B Table of Contents General Operation. 3 How Slam-A-Winner plays How the Wheel Scores How the Ball Lift works Programming Options... 4-6 Troubleshooting Guide. 7-8 Parts Identification 9 Schematics

More information

Assembly Instructions MP-P2 Power Supply and Chassis Base Plate

Assembly Instructions MP-P2 Power Supply and Chassis Base Plate Assembly Instructions MP-P2 Power Supply and Chassis Base Plate The MP-P2 Power Supply is the supply designed to power the mother board and its complement of plug-on boards including the MP-09 Microprocessor

More information

CONTENTS TABLE OF CONTENTS... 1 INTRODUCTION... 2 SEC 1 - SPECIFICATIONS... 3 SEC 2 - DESCRIPTION... 5 SEC 3 - OPERATING INSTRUCTIONS...

CONTENTS TABLE OF CONTENTS... 1 INTRODUCTION... 2 SEC 1 - SPECIFICATIONS... 3 SEC 2 - DESCRIPTION... 5 SEC 3 - OPERATING INSTRUCTIONS... CONTENTS SUBJECT PAGE TABLE OF CONTENTS... 1 INTRODUCTION... 2 SEC 1 - SPECIFICATIONS... 3 SEC 2 - DESCRIPTION... 5 SEC 3 - OPERATING INSTRUCTIONS... 8 SEC 4 - BATTERY CHARGING NOTES... 9 SEC 5 - VERIFICATION

More information

PowerLogic High Density Metering System 4-Meter Enclosure Installation Guide

PowerLogic High Density Metering System 4-Meter Enclosure Installation Guide PowerLogic High Density Metering System 4-Meter Enclosure Installation Guide 7002-0289-00 Instruction Bulletin HAZARD CATEGORIES AND SPECIAL SYMBOLS Read these instructions carefully and look at the equipment

More information

Quick Start Guide Armstrong Ave. Irvine, CA / Rev B

Quick Start Guide Armstrong Ave. Irvine, CA / Rev B Quick Start Guide 16882 Armstrong Ave. Irvine, CA 92606 sales@mkprod.com 800-787-1234 091-0719/ Rev B Installation Process Step 1: Out of the box Tools needed: 1/2 wrench Phillips screw driver Uncrate

More information

SE-600-P Eco-Series. Operation & Parts Manual

SE-600-P Eco-Series. Operation & Parts Manual SE-600-P Eco-Series Operation & Parts Manual SE 600 PC & PS SERIES OWNERS MANUAL Table of Contents 1. Set-up instructions 2. Bridge-Tramming Procedure 3. Operation instructions 4. Cleaning 5. Troubleshooting

More information

Rated for use on 110/120VAC 60Hz and 220/240VAC 60Hz applications

Rated for use on 110/120VAC 60Hz and 220/240VAC 60Hz applications WPC-1 Rated for use on 110/120VAC 60Hz and 220/240VAC 60Hz applications Installation Instructions: Read these instructions in their entirety before performing any installation work. FOR USE WITH POOL AND

More information

TAKE-A-LABEL Power Dr. Nunica, MI Phone: (616) Fax: (616)

TAKE-A-LABEL Power Dr. Nunica, MI Phone: (616) Fax: (616) OPERATIONS MANUAL MODEL TAL-3100T TAMP APPLICATOR TAKE-A-LABEL 16900 Power Dr. Nunica, MI 49448 Phone: (616) 837-9300 Fax: (616) 937-9301 http://www.take-a-label.com E-Mail sales@take-a-label.com Page

More information

650 Series Cargo Van Lift Mounting Instructions Fullsize Ford 1992-Present

650 Series Cargo Van Lift Mounting Instructions Fullsize Ford 1992-Present TOMMY GATE OWNER'S / OPERATOR'S MANUAL 650 Series 650 LB Capacity 650 Series Cargo Van Lift Mounting Instructions Fullsize Ford 1992-Present Installing the Base Plate 1. Examine the interior and exterior

More information

USB Charge Port Installation Instructions

USB Charge Port Installation Instructions USB Charge Port Installation Instructions Lifetime Technical Support support@logolites.com 770-476-7322 www.logolites.com Manual 100-0014C Thank you for purchasing a Logo Lites USB Charge Port! USB Charge

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS www.burcam.com 2190 Dagenais Blvd.West TEL: 514.337.4415 LAVAL (QUEBEC) FAX: 514.337.4029 CANADA H7L 5X9 info@burcam.com Your pump has been carefully packaged at the factory to prevent damage during shipping.

More information

GE Sensing & Inspection Technologies

GE Sensing & Inspection Technologies GE Sensing & Inspection Technologies Modus Model RPM-1 Room Pressure Monitor Installation and Setup Guide 1. GENERAL The RPM-1 monitors either positive or negative room pressures (see the Datasheet for

More information

Control Box Wiring For PRSstandard Tool

Control Box Wiring For PRSstandard Tool 888-680-4466 ShopBotTools.com Control Box Wiring For PRSstandard Tool Copyright 2017 ShopBot Tools, Inc. page 1 Copyright 2017 ShopBot Tools, Inc. page 2 Table of Contents Introduction...5 Installation...5

More information

Safety Sensor CSS 180 Product Information

Safety Sensor CSS 180 Product Information Safety Sensor CSS 180 Product Information Safety Sensor CSS 180 CSS180CSS 180 PDF-M / EN 60947-5-3 EN 954-1 Control Category 4 IEC 61508, suitable for use in SIL 3 applications BG Type-Certification in

More information

Electronic Dynamo Regulator INSTRUCTION MANUAL. COPYRIGHT 2014 CLOVER SYSTEMS All Rights Reserved

Electronic Dynamo Regulator INSTRUCTION MANUAL. COPYRIGHT 2014 CLOVER SYSTEMS All Rights Reserved DRM TM DRM-HP TM Electronic Dynamo Regulator INSTRUCTION MANUAL COPYRIGHT 2014 CLOVER SYSTEMS All Rights Reserved INTRODUCTION The Clover Systems DRM is a state-of-the art all-electronic voltage and current

More information

PF3100 TROUBLESHOOTING SOLUTIONS TO COMMON PROBLEMS. v1.1 Revised Nov 29, 2016

PF3100 TROUBLESHOOTING SOLUTIONS TO COMMON PROBLEMS. v1.1 Revised Nov 29, 2016 PF3100 TROUBLESHOOTING SOLUTIONS TO COMMON PROBLEMS v1.1 Revised Table of Contents 1 Common Alarms and Warnings... 1 2 Common Issues... 6 2.1 Communication problems... 6 2.1.1 Controller communication

More information

Lankota, INC. LAN Installation Instructions

Lankota, INC. LAN Installation Instructions Lankota, INC. LAN - 84206 Converts 600 Series Platform Heads to 50 Series & Earlier Model Combines. Installation Instructions Kit LAN84206 Lankota is the trademark of Lankota, Inc. 1 LAN 84206 Parts break

More information

Part Name/Description Part Number Quantity Instruction Kit Metalfor Flow Sensor

Part Name/Description Part Number Quantity Instruction Kit Metalfor Flow Sensor NOTE: Indented items indicate parts included in an assembly listed above Part Name/Description Part Number Quantity Instruction Kit Metalfor 4101091 1 Flow Sensor 4001356 1 Deflector plate 2000612-1 1

More information

TRAC-3 TENSION READOUT AND CONTROL

TRAC-3 TENSION READOUT AND CONTROL Magnetic Power Systems, Inc. 1626 Manufacturers Drive. Fenton, MO 63026 Tel: 636.343.5550 Fax: 636.326.0608 magpowr@magpowr.com INSTRUCTION MANUAL TRAC-3 READOUT AND CONTROL For Control of Magnetic Particle

More information

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers Supersedes IL 33-858-4 Dated 05/02 Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers Digitrip Retrofit System for ITE K-3000, Digitrip Retrofit System for ITE K-3000, K-3000

More information