1 Original Issue Date: Date of Revision : Page 1 follwed by Purpose: To provide guidelines for safe handling of materials manually or by using moving machinery like Fork Lifts Trucks, Trailer EOT, Jib Cranes and Hoists, Passenger Lifts. Transfer Trolly, Hand Trolly etc. 2.0 Reference: 3.0 Associated Hazards : Poor site layout; falls from vehicles; height restrictions; over turning; collision; striking people and equipment. falling, tripping etc. 4.0 Applicability: TRF WORKS 5.0 Responsibility :Contractors, Drivers of the equipment, shift Supervisor/Officers. 6.0 Procedure: S.No Requirements 7.1 Manual Lifting No employee shall be asked to carry loads above his capacity. In any case no load shall exceed 50 kg per man and 20 kg per woman. Where possible, mechanical lifting equipment shall be used. For lifting of materials manually, the safe lifting postures, as shown in the Figure: 1 must be followed

2 OCP Original Issue Date: Date of Revision : Page 2 follwed by Mechanical Lifting General Every driver / Operator of material moving machinery shall possess adequate skill and documented training in the operation of the particular lifting appliance. Suitable sticker is to be pasted on the helmet of successful employees, as an easy way for supervisors to know if the person operating the equipment has been formally trained. No person under 18 years of age shall be employed for operations of these machines or for giving signals to operator. All lifting machines and lifting tackles shall bear : Identification Mark Number (as mentioned in the Test Certificate) Safe Working Load Date of Last Test, and Next due date of test. Operator shall leave no machinery unattended, while power is on or load is suspended to above machinery. No person shall ride on suspended load or any lifting machine All lifting machinery shall be tested by competent person yearly and the test record shall be maintained by the owner department. While material handling, following precautions to be taken : The load is safe and secured while lifting Slinging method is proper for the load Lifted load shall not exceed the safe working load of the slinging gear The load is so slung that it will not collapse and does not damage the sling in gear. All persons at the site shall strictly use helmet with chin belt and shoes. Two-crane lift is always considered to be critical and hence care should be taken to ensure a) proper planning for the lift, b) no lateral load on the boom and c) to use lifting tackles as far as possible Fork Lift Trucks The forklift truck shall

3 OCP Original Issue Date: Date of Revision : Page 3 follwed by 19 Be provided with overhead protection for the driver. Be provided with an automatic reverse activated horn or buzzer and light. No person other than the trained operator shall operate forklift trucks. No attachment shall be incorporated on the forklift unless the necessary precautions are taken against the possible changes in the design specifications such as load centre, maximum safe capacity, etc. All persons, drivers and banks men shall be thoroughly conversant with the factors which affect the stability of the forklift in operation. Before driving fill out a daily forklift safety inspection checklist, including conditions and operability of seat belt. When driving without load, fork must be kept cm above floor. Drive at a safe speed as per the work area. Wheel, tyres must always be adequately inflated.(wherever REQD.) Switch off engine when machine is unattended. Keep hand dry and clean when driving. Avoid driving over any object lying on the path. This may topple the load and the vehicle. Avoid sudden stops and sudden turns. If load is obstructing a clear view, operate in reverse gear. Use pallets for carrying small / or loose materials. Pick up the load at its proper centre. Tilt the load against back-rest, before moving on. Return the tilt to vertical before lowering or picking up load. When stocking / unloading materials, ensure employees / personnel stand clear of the load and machine.

4 OCP Original Issue Date: Date of Revision : Page 4 follwed by Cranes & Dericks General requirements. a) The employer shall comply with the manufacturer's specifications and limitations applicable to the operation of any and all cranes and derricks. Where manufacturer's specifications are not available the limitations assigned to the equipment shall be based on the determinations of a qualified engineer, competent in this field and such determinations will be appropriately documented and recorded. Attachments used with cranes shall not exceed the capacity, rating, or scope recommended by the manufacturer. b) Rated load capacities, and recommended operating speeds, and special hazard warnings, or Instruction shall be conspicuously posted on all equipment. Instructions or warnings shall be visible to the operator while at the control station. A chart indicating safe working load (SWL) at various inclinations or radii of jib shall be displayed in the driver s cabin. This is needed only in cases where automatic SWL indicator is not provided on the crane. c) Standard Hand signals, as given in Fig.-2, 3a and 3b, shall be used to crane and derrick operators

5 Original Issue Date: Date of Revision : Page 5 follwed by 19 d) Every lifting appliance or machine and every part thereof including all working gear and all other plant or equipment used for anchoring or fixing such appliances or machines shall be of good mechanical construction, sound material, adequate strength and free from defect. The employer shall designate a competent person who shall inspect all machinery and equipment prior to each use, and periodically during use to make sure it is in safe operating condition. Any deficiencies shall be repaired, or defective parts replaced, before further use. e) A thorough, annual inspection of the hoisting machinery shall be made by a competent person or competent private agency recognized by the department. The employer shall maintain a permanent record of the dates and results of all inspections for each hoisting machine and piece of equipment. f) A tag line or guide rope shall be used on all loads that swing freely. Guide ropes or tag lines shall be held by experienced persons. g) Care shall be taken to guard against injury to workers, or damage to scaffolds or buildings, from swinging loads. h) The operator shall avoid carrying loads over people. No one must walk below a suspended load or the boom. i) When work is stopped or when the derrick is not in operation, the boom shall be lowered to a horizontal position or tied in place to prevent it whipping with the wind or other external force. j) Only authorized personnel shall make sling hitches on loads. k) Workers shall not be allowed to ride on loads handled by derricks. l) Operators shall observe signals only from duly authorized persons. Under no circumstances shall a load be moved until the signal is received from authorized personnel. The Crane operator shall respond to signals only from appointed signaler but shall obey stop signal given by anyone at anytime. m) Belts, gears, shafts, pulleys, sprockets, spindles, drums, fly wheels, chains, or other reciprocating, rotating, or other moving parts or equipment shall be guarded if such parts are exposed to contact by employees, or otherwise create a hazard. Any anchoring or fixing arrangement provided in connection with the lifting appliances or machines shall be adequate and secured. Do not operate a crane, which does not have the facility of automatic braking (in case of power failure).

6 Original Issue Date: Date of Revision : Page 6 follwed by 19 n) A minimum distance of one meter clearance shall be maintained between the swing radius of the greatest extension of the crane superstructure or counterweights and a stationary object, including the crane itself, while the crane is in operation. When this clearance cannot be maintained, suitable barricades or safeguards shall be used to isolate the pinch point hazard area. No person should approach nearer than six meter of the crane truck, when crane is in motion or loaded. o) All exhaust pipes shall be guarded or insulated where contact by employees, in the performance of normal duties, is possible. p) Crane shall be stationed: on a firm ground when operating. q) When leaving crane, operator must : Lower any suspended load to the ground. Disengage the clutch. Engage all safety locks. Secure boom against high winds. r) When parking overnight, in addition to the above: Release the load Lower the boom to ground Provide wheel locks and wheel blocks s) Cranes must not be operated between sunset and sunrise without adequate lighting provision. t) When traveling up a gradient, the load shall be derricked out and when traveling down a gradient, the load shall be derricked into the minimum radius, and this position shall be corrected on reaching level ground. Otherwise, constant watch on the radius should maintained while traveling on uneven surfaces. u) The mobile crane shall be fitted with suitable horn, head lights, side lamps, and flashing reverse direction indicator. v) Cranes with cantilever type jib, when traveling without load, the jib should be lowered to a horizontal position. w) The pneumatic tyres shall be maintained at the correct pressure at all times. x) Do not block emergency egresses, electrical panel or fire equipment with a truck or load. y) Lock out the malfunctioning equipment and schedule for repair by maintenance

7 Original Issue Date: Date of Revision : Page 7 follwed by Additional requirements. a) Whenever internal combustion engine powered equipment exhausts in enclosed spaces, tests shall be made and recorded to see that employees are not exposed to unsafe concentrations of toxic gases or oxygen deficient atmospheres. b) All cab glazing shall be safety glazing material. Windows shall be provided in the front and on both sides of the cab or operator's compartment with visibility forward and to either side. Visibility forward shall include a vertical range adequate to cover the boom point at all times. c) Where necessary for rigging or service requirements, a ladder or steps shall be provided to give access to a cab roof. d) On cranes, guardrails, handholds and steps shall be provided for easy access to the car. e) Cab Platforms and walkways shall have anti-skid surfaces. f) Fuel tank filler pipe shall be located in such a position, or protected in such manner, as to not allow spill or overflow to run onto the engine, exhaust, or electrical equipment of any machine being fueled. An accessible fire extinguisher shall be available at all operator stations or cabs of equipment. g) Except where electrical distribution and transmission lines have been de-energized and visibly grounded at point of work or where insulating barriers, not a part of or an attachment to the equipment or machinery, have been erected to prevent physical contact with the lines, equipment or machines shall be operated proximate to power lines only in accordance with the following: h) For lines rated 50 kv or below, minimum clearance between the lines and any part of the crane or load shall be the meters. i) For lines rated over 50 kv, minimum clearance between the lines and any part of the crane or load shall be three meters plus one centimeter for each 1 kv over 50 kv., or twice the length of the line insulator, but never less than three meters. j) In transit with no load and boom lowered, the equipment clearance shall be a minimum of 1.2 m for voltages less than 50 kv., and 3 m for voltages over 50 kv. up to and including 345 kv., and 4.8 m for voltages up to and including 750 kv;

8 Original Issue Date: Date of Revision : Page 8 follwed by 19 k) A person shall be designated to observe clearance of the equipment and give timely warning to insure that the required separation is maintained for all operations where it is difficult for the operator to maintain the desired clearance by visual means; While working under HT cables. Electrical department Representative and the job Supervisor must be present throughout the entire duration of the jib. A written clearance MUST be signed by the Electrical Department, the Mechanical Department and Safety Officer, when Cranes operate near or below H.T. electrical cables. l) Any overhead wire shall be considered to be an energized line unless and until the person owning such line or the electrical utility authorities indicate that it is not an energized line and it has been visibly grounded; m) Combustible and flammable materials shall be removed from the immediate area prior to operations. n) No modifications or additions which affect the capacity or safe operation of the equipment shall be made by the employer without the manufacturer's or a qualified engineer's written approval. If such modifications or changes are made, the capacity, operation, and maintenance instruction plates,,tags, shall be changed or decals accordingly. In no case shall the original safety factor of the equipment be reduced.

9 Original Issue Date: Date of Revision : Page 9 follwed by Overhead and gantry cranes. a) The rated load of the crane shall be plainly marked on each side of the crane. If the crane has more than one hoisting unit, each hoist shall have its rated load marked on it or its load block, and this marking shall be clearly legible from the ground or floor.. b) Except for floor-operated cranes, a gong or other effective audible warning signal shall be provided for each crane equipped with a power traveling mechanism. d) All overhead and gantry cranes in use, shall meet the applicable requirements for design, construction, installation, testing, maintenance, inspection, and operation. e) On every stage gantry or other place where a lifting appliance having a traveling or stewing motion is in use, an unobstructed passageway not less than 600 mm wide shall be maintained between any part of the appliance liable so to move and any guard-rails, fencing or other nearby fixture.

10 Original Issue Date: Date of Revision : Page 10 follwed by Mobile cranes. a) In all power driven shovel operations the person in charge shall issue instructions necessary to prevent accidents, to detect and correct unsafe acts and dangerous conditions, and to enforce all safety rules and regulations. The person in charge shall also issue instructions on the proper method of using tools and handling material. b) Where the ground is soft or uneven, timbering and planking shall be used to provide firm foundation and distribute the load. c) In case of a breakdown, the shovel shall be moved away from the foot of the slope before repairs are made. d) All persons shall keep away from the range of the shovel's swing and shall not be permitted to stand back of the shovel or in line with the swing of the dipper during operation or moving of shovel. e) Unauthorized persons shall not be allowed on the shovel during operations, and the operator shall not converse with other persons while operating machine

11 Original Issue Date: Date of Revision : Page 11 follwed by 19 f) The shovel dipper shall rest on the ground or on blocking during shut down periods. g) Shovels shall be inspected daily and all defects promptly repaired. h) All rubber tired mobile cranes shall be equipped with outriggers and sufficient blocking to properly stabilize crane while operating. i) Rubber tired mobile cranes shall be equipped with rear view mirrors. j) Positive boom stops shall be provided on all mobile cranes of the wheel and crawler type. k) Length of a crane boom and amount of counterweight shall not exceed manufacturer's rated capacity for equipment involved; except on isolated cases where permission is granted by the department. l) On all cranes where wedge brackets are used as terminal connections, the proper size wedge shall be used. m) On all mobile cranes, the hoist and boom drums shall be provided with a positive operated pawl or dog which shall be used in addition to the brake to hold the load and boom when they are suspended. Counterweight operated dogs are prohibited. n) Oiling and greasing shall be done under safe conditions with machine at rest, except when motion of machine is necessary. o) All steps, running boards, and boom ladder shall be of substantial construction and in good repair at all times. p) Operators shall not leave the cab while master clutch is engaged. q) Fire extinguishers shall be readily accessible and within reach of operator at all times. r) All shovel and crane cabs shall be kept clean and free of excess oil and grease on floor and machinery. Oily and greasy rags shall be disposed of immediately after use and not allowed to accumulate. s) Tools shall not be left on the cab floor. Spare cans of oil or fuel, and spare parts, shall not be stored in cabs, except in approved racks provided for that purpose. t) Mats or planking shall be used in moving shovels or cranes over soft or uneven ground

12 Original Issue Date: Date of Revision : Page 12 follwed by 19 u) Cranes or shovels setting on steep grades shall be securely blocked or secured with a tail hold. v) Smoking shall be prohibited while fueling or oiling machines.. w) Where cables cross roads they shall be elevated or placed in a trench. x) On all power shovels and on all drag-line cranes or all-purpose cranes of the crawler or wheel type, two persons shall constitute the minimum working crew. It is mandatory that one be a qualified operator of the equipment in use. The job title of the other crewmember may be oiler, rigger, signal person, or a laborer. The primary purpose of the second crewmember is to signal the operator when the operator's vision is impaired or obscured and to be on-hand in case of emergency. Second-crew persons shall be properly trained in second-person required skills. The second crewmember shall be close enough to the machine in operation to be aware of any emergency, if one arises, and to assure the machine is operated with necessary and appropriate signals to the operator Cabins for Drivers The driver of every power driven lifting appliance shall be provided with a suitable cabin and the cabin shall provide an unrestricted view for proper operation

13 Original Issue Date: Date of Revision : Page 13 follwed by Drums and Pulleys Every drum or pulley round which the chain or wire rope of any lifting appliance is carried shall be of suitable diameter and construction for the chain or rope used. Every chain or rope shall be properly anchored and secured to the drum of a lifting appliance and at least two turns shall remain on the drum in every operation position of the appliance. All cranes, crabs and winches shall be fitted with brakes capable of holding and controlling their maximum loads. Control handles, levers, switches shall be designed so that they cannot be operated accidentally and shall be marked to show what they are for and how they should be operated Safe means of Access Where any person engaged on the examination, repair or lubrication of any lifting appliance! Machine is liable to fall a distance of more than 2 m. there shall be provided and maintained safe means of access to and egress from the place at which the person has to work with adequate hand holds and foot holds Stability of Lifting Appliance a) Appropriate precautions shall be taken to ensure the stability of lifting appliances used on a soft or uneven surface or on a slope. b) Cranes shall be Anchored to the ground or other foundations. Rail tracks shall not be used as anchorage. Securely counter weighted or ballasted to prevent overturning when working.

14 Original Issue Date: Date of Revision : Page 14 follwed by 19. c) Whenever a crane is erected before the crane is put to work, by applying a load 25% higher than the maximum rated load. A report of these tests shall be maintained at the construction site by the contractor. Some important points for loading on trailors. Examine the trailor for tyre condition, general health, road worthiness and conformance to all safety requirements. Examine the underframe of the trailor to ensure that it can take the load at the edges. For transporting the loading will be mostly on the edges of the trailor. Width of the trailor bed should be such that when the center line of the track chain is parallel to the length of the trailor, most of the track chain will be within the width of the trailor. The trailor should be parked on the level ground at the time of the loading. Necessary wedges should be put on the wheel to prevent movement during loading. No one should be on the trailor bed while loading the crane on the trailor. The loading and lifting arrangement should be checked as per safety standards. All fastening between the trailor and the crane like D shackles, chains, hooks etc. should be checked before hand.. Necessary lashing, chain etc. shall be used to hold the load in desired condition. These should be of adequate strength to prevent toppling on transit. All other jobs related to this shall be done as per the requirement of relevant safety standards

15 Original Issue Date: Date of Revision : Page 15 follwed by Passenger Lifts a) Trained and designated operated shall operate passenger lift. b) The lift shall indicate the safe carrying capacity. For hoist, load carrying capacity shall be displayed at conspicuous locations. c) No over loading must be allowed. d) Routine checks should be carried out Quarterly. The records of such checking must be maintained in standard formats provided by the manufacturers. e) Drop test and other load / Empty test should be carried out as prescribed. f) Authorized personnel must do all repairs. g) A limit switch should be provided at the extreme operating points. h) All hoists and lifts must have proper and adequate enclosure on the ground. i) Entrance / Exit and loading access must be free from obstructions. j) All landings must have : Proper closing and operating gates Gates must remain automatically closed when not in use All gates / doors must have interlock switch.

16 Original Issue Date: Date of Revision : Page 16 follwed by Monitoring & Reviewing Frequency Mechanism Record Responsibility Quartely Inspection / Maintenance Once in ayear Annual Test by competent person for Cranes and Hoists, Passenger Lifts. Inspection / Maintenance Record Annual Test Record Contractors, Contractors,

17 Fig. 3b : Hand Signals for Mobile Crane

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks Mobile Crane - Onshore MOBILE CRANES Cranes and derricks. - 1926.550 Cranes, like all pieces of heavy equipment, if not properly operated, inspected and maintained have a potential for causing major bodily

More information

Cranes and Derricks. Objectives. Construction Safety Lecture 18

Cranes and Derricks. Objectives. Construction Safety Lecture 18 North Carolina State University Department of Civil, Construction, and Environmental Engineering Construction Safety Lecture 18 North Carolina State University Cranes and Derricks Subpart N Cranes and

More information

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and Crane Safety Fact Sheet In This Document MODULE DESCRIPTION This module provides information on the safety concerns and Introduction necessary precautions you will need to be aware of when working Crane

More information

OVERHEAD & GANTRY CRANE / RIGGING

OVERHEAD & GANTRY CRANE / RIGGING Overhead & Gantry Crane / Rigging OVERHEAD & GANTRY CRANE / RIGGING Overhead and gantry cranes - 1910.179 Crawler locomotive and truck cranes. - 1910.180 Slings. 1910.184 Cranes, like all pieces of heavy

More information

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 10. Lifting Operation

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 10. Lifting Operation OSH5063EP(PRS3607) Workplace and Work Equipment Hazard Session 10 Lifting Operation 1 Lifting equipment Lifting equipment covers any equipment used in the process of lifting loads or people and includes

More information

Cranes. OSHA Office of Training & Education 1

Cranes. OSHA Office of Training & Education 1 Cranes OSHA Office of Training & Education 1 Major Causes of Crane Accidents Contact with power lines Overturns Falls Mechanical failures OSHA Office of Training & Education 2 How Do Accidents Occur? Instability

More information

And the Labour Law for the Private Sector promulgated by And Legislative Decree No.(36) of 2012, particularly Article (166) thereof,

And the Labour Law for the Private Sector promulgated by And Legislative Decree No.(36) of 2012, particularly Article (166) thereof, MINISTRY OF LABOUR MINISTERIAL ORDER NO.(5) OF 2014 WITH RESPECT TO DETERMINING THE REQUIRED CONDITIONS AND PRECAUTIONARY MEASURES FOR THE PROTECTION OF WORKERS FROM THE HAZARDS OF WORK ON LIFTING EQUIPMENT

More information

While handling materials, employees must abide by the following requirements:

While handling materials, employees must abide by the following requirements: Material Handling and Equipment 12.1 Material Handling by Individuals While handling materials, employees must abide by the following requirements: a) Know the safe way to lift: i. A secure footing, feet

More information

Note: under no circumstances will a carbon tetrachloride extinguisher be used.

Note: under no circumstances will a carbon tetrachloride extinguisher be used. Clearheart Construction Co., Inc. Mobile Crane / Overhead & Gantry Crane / Rigging CRANES & RIGGING Overhead and gantry cranes - 1910.179 Crawler locomotive and truck cranes 1910.180 Cranes and derricks.

More information

SAFETY GUIDANCE MATERIAL

SAFETY GUIDANCE MATERIAL SAFETY GUIDANCE MATERIAL SAFETY OPERATIONS GUIDANCE MONDAY MARCH 23, 2015 This safety resource was written for the scrap industry by the scrap industry and was developed to assist you in making your scrap

More information

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS 1. Scope: This policy and procedure applies to the design, construction testing, use, and maintenance or personnel platforms and hosting of personnel platforms

More information

STANDARDS PRESENTATION Attachment No. 1 TO Page 1 of 6 CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH STANDARDS BOARD

STANDARDS PRESENTATION Attachment No. 1 TO Page 1 of 6 CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH STANDARDS BOARD TO Page 1 of 6 TITLE 8: Division 1, Chapter 4, Subchapter 4. Construction Safety Orders Article 12. Pile Driving and Pile Extraction [Notes in italics are editorial notes and generally refer to A10.19

More information

DGMS (Tech.) Circular No. 10 Dated Dhanbad the 19 th July, Safe use of mobile Cranes Code of practice

DGMS (Tech.) Circular No. 10 Dated Dhanbad the 19 th July, Safe use of mobile Cranes Code of practice DGMS (Tech.) Circular No. 10 Dated Dhanbad the 19 th July, 2002. To Owner, Agent and Manager of all Mines. Safe use of mobile Cranes Code of practice A large numbers of mobile cranes are being used for

More information

RELIANT HOLDINGS LTD AND ITS AFFILIATES Safety Management System. Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 5

RELIANT HOLDINGS LTD AND ITS AFFILIATES Safety Management System. Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 5 Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 5 Purpose This program is written to be in compliance with local regulatory requirements and provide directives to managers,

More information

Operators manual Bumpa 8 metre 110v Bumpa 10 metre 110v

Operators manual Bumpa 8 metre 110v Bumpa 10 metre 110v Operators manual Bumpa 8 metre 110v Bumpa 10 metre 110v SAFETY RULES Mk3 Bumpa Conveyor Danger Failure to obey the instructions and safety rules in this manual will result in death or serious injury. Do

More information

Operators manual Hoddi 6 metre 110v Bumpa 8 metre 110v Bumpa 10 metre 110v

Operators manual Hoddi 6 metre 110v Bumpa 8 metre 110v Bumpa 10 metre 110v Operators manual Hoddi 6 metre 110v Bumpa 8 metre 110v Bumpa 10 metre 110v SAFETY RULES Mk3 Bumpa Conveyor Danger Failure to obey the instructions and safety rules in this manual will result in death or

More information

SECTION 14: AERIAL LIFT PROGRAM

SECTION 14: AERIAL LIFT PROGRAM SECTION 14: AERIAL LIFT PROGRAM Fisher Auto Parts is committed to promoting a safe and healthy environment for all employees and customers. Protection from accidental loss of any resources, especially

More information

LIFTING/MOBILE EQUIPMENT CRANES AND DERRICKS. Steingass Mechanical Contracting, Inc. 754 Progress Drive Medina, Ohio (330)

LIFTING/MOBILE EQUIPMENT CRANES AND DERRICKS. Steingass Mechanical Contracting, Inc. 754 Progress Drive Medina, Ohio (330) LIFTING/MOBILE EQUIPMENT CRANES AND DERRICKS Steingass Mechanical Contracting, Inc. 754 Progress Drive Medina, Ohio 44256 (330) 725-6090 CRANES AND DERRICKS INTRODUCTION The Occupational Safety and Health

More information

Operation of Fork Lift Trucks

Operation of Fork Lift Trucks Operation of Fork Lift Trucks 1. PURPOSE The purpose of this Procedure is to define the rules for the safe operation of Forklift trucks within the University. 2. SCOPE These rules apply to all rider-type

More information

Powered Industrial Vehicle Policy

Powered Industrial Vehicle Policy Powered Industrial Vehicle Policy Policy The Flight Department is committed to protecting employees from the hazards involved in the operation of powered industrial vehicles. This Policy is established

More information

Industrial Truck (Forklift) Safety Program

Industrial Truck (Forklift) Safety Program University of North Carolina Wilmington Environmental Health & Safety Workplace Safety Industrial Truck (Forklift) Safety Program GENERAL The UNCW Environmental Health & Safety Department (EH&S) is authorized

More information

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012 PAGE 1 OF 5 PURPOSE: OVERHEAD CRANES AND LIFTS PROCEDURE The purpose of this procedure is to define the safety and training requirements for use of overhead cranes and lifts. Procedure: Definitions Designated

More information

Wind and Temperature Tip Over Hazard Do not add notice boards or similar

Wind and Temperature Tip Over Hazard Do not add notice boards or similar Lift & Work Platform Safety Information Safety Information: Boom Lifts Safety Information: Scissor Lifts Safety Information: Boom Lifts Power Lines Electrocution Hazard Maintain safe clearance from Electrical

More information

ROUGH TERRAIN VEHICLES

ROUGH TERRAIN VEHICLES ROUGH TERRAIN VEHICLES OPERATING SAFETY RULES AND PRACTICES Operator Responsibility Safe operation is the responsibility of the operator. The equipment can be dangerous if not used properly. The operator

More information

LIFT TRUCK SAFETY OPERATOR TRAINING

LIFT TRUCK SAFETY OPERATOR TRAINING LIFT TRUCK SAFETY OPERATOR TRAINING Avoiding Injury One person and a lift truck can move large amounts of material with ease and efficiency. Employers are responsible for training operators in the safe

More information

PLATFORM WHEEL WELL ACCESS STAND

PLATFORM WHEEL WELL ACCESS STAND PLATFORM WHEEL WELL ACCESS STAND Page 1 Standards WARNING Safety First Tested in general accordance with the applicable requirements of DIN EN 131 2 : 2012 BS EN 131 7 : 2013 ANSI ASC A14.7 20 2011 The

More information

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS Title: Cranes - Inspection and Maintenance PROCEDURE Procedure No: P314.422 Issue: 1 Revision: 0 Operative Date: 22/12/2016 Department: HSEC Sect./Classification: Safety / Gear & Equipment Author: D Steel

More information

Crane & Derrick Operation Procedures for Construction

Crane & Derrick Operation Procedures for Construction Safety & Health Program Crane & Derrick Operation Procedures for Construction 10627 Midwest Industrial Boulevard, St. Louis, MO Phone: 314-785-6425 Fax: 314-785-6426 The written Crane & Derrick Operation

More information

CRANE & HOIST SAFETY PROGRAM

CRANE & HOIST SAFETY PROGRAM CRANE & HOIST SAFETY PROGRAM 1.0 PURPOSE The purpose of the Crane and Hoist Safety Program is to: 1.1 Ensure a safe work environment for employees who operate, maintain, or work around cranes and hoists

More information

UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program

UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program INITIATOR: Desirée Villarreal REVISION DATE: 10/17/2014 1. Program Description 2. Scope 3. Definitions

More information

Element 3: Musculoskeletal Hazards and Risk Control

Element 3: Musculoskeletal Hazards and Risk Control Manually and Mechanically Operated Load Handling Equipment There are many different types of lifting and moving equipment such as manually operated trucks and hoists and mechanically operated forklift

More information

Document Number: HSE May 1, 2014 LADDERS. Author: A Holland. Rev Date Rev # Description Revised By 05/01/14 1 Reformat A.

Document Number: HSE May 1, 2014 LADDERS. Author: A Holland. Rev Date Rev # Description Revised By 05/01/14 1 Reformat A. Document Number: May 1, 2014 LADDERS Author: A Holland Rev Date Rev # Description Revised By 05/01/14 1 Reformat A. Holland A. The purpose of this standard is to ensure the safe use and proper construction,

More information

Powered Industrial Trucks

Powered Industrial Trucks INDIANA UNIVERSITY-PURDUE UNIVERSITY at INDIANAPOLIS IUPUI Department of Environmental Health and Safety 620 Union Drive, Room 043, Indianapolis, Indiana 46202 Powered Industrial Trucks Purpose and Background

More information

British Columbia - Colombie-Britannique. Aerial Lift - Appareil de Levage

British Columbia - Colombie-Britannique. Aerial Lift - Appareil de Levage British Columbia - Colombie-Britannique Aerial Lift - Appareil de Levage This material has been extracted from the Acts and Regulations of the Province to help students understand the subject. It is not

More information

Grease Stand MODEL# DF MAINTENANCE AND OPERATION MANUAL. Page 1

Grease Stand MODEL# DF MAINTENANCE AND OPERATION MANUAL. Page 1 Grease Stand Page 1 WARNING Safety First Standards Tested in general accordance with the applicable requirements of DIN EN 131 2 : 2012 BS EN 131 7 : 2013 ANSI ASC A147 20 2011 The best insurance against

More information

36CSR27 TITLE 36 LEGISLATIVE RULE BOARD OF COAL MINE HEALTH AND SAFETY SERIES 27 RULES AND REGULATIONS GOVERNING SURFACE AREAS

36CSR27 TITLE 36 LEGISLATIVE RULE BOARD OF COAL MINE HEALTH AND SAFETY SERIES 27 RULES AND REGULATIONS GOVERNING SURFACE AREAS TITLE 36 LEGISLATIVE RULE BOARD OF COAL MINE HEALTH AND SAFETY SERIES 27 RULES AND REGULATIONS GOVERNING SURFACE AREAS 36-27-1. General. 1.1. Scope. -- Rules and Regulations Governing Surface Areas. 1.2.

More information

SECTION 11 POWERED INDUSTRIAL TRUCKS

SECTION 11 POWERED INDUSTRIAL TRUCKS SECTION 11 POWERED INDUSTRIAL TRUCKS 11.1 Powered Industrial Truck Procedure 11.2 Forklift Inspection 11.3 Operator Performance Evaluation Checklist Revised: May 2009 Updated: November 2017 Reviewed: October

More information

WOC LP. Manual. Standards WOC HSE. WO Executive. Section L003 - Lifting Operations DOCUMENT NO: WOC-HSE-ST & EP Department

WOC LP. Manual. Standards WOC HSE. WO Executive. Section L003 - Lifting Operations DOCUMENT NO: WOC-HSE-ST & EP Department /31... ' \.4., _ 4. if IL C WOC LP & EP Department WOC HSE Standards Manual DOCUMENT NO: WOC-HSE-ST-0001 Section L003 - Lifting Operations REV ISSUE PREPARED BY REVIEWED BY APPROVED BY ISSUE DATE * NaviA,&...)

More information

Important. Contents. Contact us:

Important. Contents. Contact us: Operator's Manual First Edition Ninth Printing Important Read, understand and obey these safety rules and operating instructions before operating this machine. Only trained and authorized personnel shall

More information

The following material is Government of Prince Edward Island. Cap. O-1.01 Occupational Health and Safety Act PART 33

The following material is Government of Prince Edward Island. Cap. O-1.01 Occupational Health and Safety Act PART 33 Prince Edward Island - Île-du-Prince-Édouard Lift Truck / Forklift This material has been extracted from the Acts and Regulations of the Province of Prince Edward Island to aid students in understanding

More information

Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE

Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE Crane Operator - Offshore CRANE OPERATOR - OFFSHORE Cranes, like all pieces of heavy equipment, if not properly operated, inspected and maintained have a potential for causing major bodily injury or property

More information

MOBILE CRANES AND HOIST

MOBILE CRANES AND HOIST MOBILE CRANES AND HOIST Applicable OSHA Standards: 29 CFR 1926.251, 1926.1400 PURPOSE SCOPE To provide a guideline for the safe operation, use and inspection of mobile cranes and hoist. This program applies

More information

Series 1400A Hydraulic Crane 33 Ton

Series 1400A Hydraulic Crane 33 Ton Series 1A Hydraulic Crane 33 Ton Load Ratings DANGER AN UNTRAINED OPERATOR SUBJECTS HIMSELF AND OTHERS TO DEATH OR SERIOUS INJURY YOU MUST NOT OPERATE THIS CRANE UNLESS You have been trained in the safe

More information

Series 1400 Hydraulic Crane 33 Ton Load Ratings

Series 1400 Hydraulic Crane 33 Ton Load Ratings Series 1 Hydraulic Crane 33 Ton Load Ratings! DANGER AN UNTRAINED OPERATOR SUBJECTS HIMSELF AND OTHERS TO DEATH OR SERIOUS INJURY YOU MUST NOT OPERATE THIS CRANE UNLESS You have been trained in the safe

More information

1415 W. Bonanza Rd. Las Vegas, NV

1415 W. Bonanza Rd. Las Vegas, NV XR842/1045/1245/1254/1534 Operation & Safety Manual Supplement Suspended Loads & Personnel Platforms (702) 636-2969 (800) 497-1704 1415 W. Bonanza Rd. Las Vegas, NV 89106 www.xtrememanufacturing.com XR842/1045/1245/1254/1534

More information

BUCKET TRUCK SAFETY EQUIPMENT

BUCKET TRUCK SAFETY EQUIPMENT BUCKET TRUCK SAFETY EQUIPMENT Phone Number 800.222.4664 General Safety Guidelines - Safe Use of Bucket Trucks, Aerial Lifts) (Per OSHA Standard 1910.67, 1926.453) Definitions: An aerial device, by definition,

More information

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS (By authority conferred on the general industry safety standards commission by sections 16 and 21 of Act

More information

PURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES...

PURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES... Reed College 3203 Southeast Woodstock Blvd. Portland Oregon 97202-8199 Crane Safety Policy Effective Date: Revision Dates: February 9, 2011, June 25, 2012, July 2016 Review Dates: I. PURPOSE... 1 II. SCOPE...

More information

RUTGERS UNIVERSITY POWERED INDUSTRIAL TRUCK PROGRAM

RUTGERS UNIVERSITY POWERED INDUSTRIAL TRUCK PROGRAM RUTGERS UNIVERSITY POWERED INDUSTRIAL TRUCK PROGRAM 9/01 1 TABLE OF CONTENTS POWERED INDUSTRIAL TRUCK PROGRAM A. PURPOSE AND SCOPE...1 B. LIFE TRUCK REQUIREMENTS...1 C. AREA REQUIREMENTS...2 D. RESPONSIBILITIES...2

More information

Powered Industrial Truck Operator. Kelley Edmier Safety Check, Inc. Jim Martinek, Josh Moore & Jacob Scott OSHA

Powered Industrial Truck Operator. Kelley Edmier Safety Check, Inc. Jim Martinek, Josh Moore & Jacob Scott OSHA Powered Industrial Truck Operator Training Kelley Edmier Safety Check, Inc. Jim Martinek, Josh Moore & Jacob Scott OSHA Powered Industrial Truck Operator Training Forklift Safety: An Operator Training

More information

Powered Industrial Truck Safety Program

Powered Industrial Truck Safety Program Powered Industrial Truck Safety Program 0 TABLE OF CONTENTS Forklift Safety Program 1.0 Overview.. 2 2.0 Purpose....2 3.0 Procedures..2 4.0 Responsibilities. 4 5.0 Training Requirements......5 Appendix

More information

Star Swivel-Arm Hoist Installation and Operating Instructions

Star Swivel-Arm Hoist Installation and Operating Instructions Star Swivel-Arm Hoist Installation and Operating Instructions Conveying & Hoisting Solutions P/L ABN 78 6 7. Purpose of Equipment Star Swivel-Arm Hoists are intended for the transport of materials. Star

More information

Forklift Safety Plan Contents: Forklift Safety Plan

Forklift Safety Plan Contents: Forklift Safety Plan Forklift Safety Plan Contents: Forklift Safety Plan Introduction... ii Plan Cover Sheet... 1 Purpose... 2 Supervisory Responsibilities... 2 Maintenance, Fueling, and Repair... 3 General Rules for Operator

More information

Important. Contents. Contact us:

Important. Contents. Contact us: Operator's Manual Third Edition Third Printing Important Read, understand and obey these safety rules and operating instructions before operating this machine. Only trained and authorized personnel shall

More information

Series 1300 Hydraulic Crane 30 Ton Load Ratings

Series 1300 Hydraulic Crane 30 Ton Load Ratings Series 13 Hydraulic Crane Ton Load Ratings! DANGER AN UNTRAINED OPERATOR SUBJECTS HIMSELF AND OTHERS TO DEATH OR SERIOUS INJURY YOU MUST NOT OPERATE THIS CRANE UNLESS You have been trained in the safe

More information

Maintenance and Operation Manual for Landing Gear Access Stand

Maintenance and Operation Manual for Landing Gear Access Stand Maintenance and Operation Manual for Landing Gear Access Stand DF071592 03 Liftsafe Fall Protection Inc. Landing Gear Access Stand Manual Page 1 Table of Contents Section Page Number 1.0 Standards 3 2.0

More information

A POCKET BOOK on DOs and DON Ts for Operation and Maintenance of Jamalpur/Gottwald 140T DH Crane (Old Design)

A POCKET BOOK on DOs and DON Ts for Operation and Maintenance of Jamalpur/Gottwald 140T DH Crane (Old Design) For official use only ISO 9001-2000 Certified Organisation A POCKET BOOK on and for Operation and Maintenance of Jamalpur/Gottwald 140T DH Crane (Old Design) CRANE ORGANISATION EASTERN RAILWAY, LOCOMOTIVE

More information

MOBILE CRANES ONSHORE PROGRAM

MOBILE CRANES ONSHORE PROGRAM Page: Page 1 of 10 Purpose Overhead cranes, hoists, and rigging equipment are used by SHECO Services employees for lifting and moving materials. In order to maintain a safe workplace for its employees,

More information

Element C7.2 Lifting Work Equipment

Element C7.2 Lifting Work Equipment .2 Lifting Work Equipment Lifting Equipment LOLER Work equipment for lifting or lowering loads and includes its attachments used for anchoring, fixing or supporting it Cranes Mobile cranes Combined off

More information

Safe Operating Procedure ELECTRIC FORKLIFT

Safe Operating Procedure ELECTRIC FORKLIFT Safe Operating Procedure ELECTRIC FORKLIFT DO NOT use this equipment unless you have been instructed in its safe use and operation and given prior permission. PERSONAL PROTECTIVE EQUIPMENT `` PRE-OPERATIONAL

More information

Series 1300A Hydraulic Crane 30 Ton Load Ratings

Series 1300A Hydraulic Crane 30 Ton Load Ratings Series 13A Hydraulic Crane 3 Ton Load Ratings DANGER AN UNTRAINED OPERATOR SUBJECTS HIMSELF AND OTHERS TO DEATH OR SERIOUS INJURY YOU MUST NOT OPERATE THIS CRANE UNLESS You have been trained in the safe

More information

Mine Hoist Hazards. The incidents over the past 10 years have been associated with causal factors such as, but not limited to:

Mine Hoist Hazards. The incidents over the past 10 years have been associated with causal factors such as, but not limited to: Mine Hoist Hazards WSN Disclaimer The information contained in this material is provided as a guide only. WSN recognizes that individual companies must develop health and safety policies and programs which

More information

UNIVERSITY. MANITOBA PHYSICAL PLANT Aerial Work. Safe Work. Practice # Platform Operations

UNIVERSITY. MANITOBA PHYSICAL PLANT Aerial Work. Safe Work. Practice # Platform Operations UNIVERSITY OF MANITOBA PHYSICAL PLANT Aerial Work Safe Work Practice # Platform Operations 1.15.4 Edited by: pproved by: Created by: Created: Sept 2014 John Evinger M- Lloyd Peacock M - NIA W. Cory Sliworski

More information

Safelift Overhead Runway Beams & Rolling Beam Cranes

Safelift Overhead Runway Beams & Rolling Beam Cranes Operation & Maintenance Instructions Instructions for Safe Use Safelift Overhead Runway Beams & Rolling Beam Cranes Certification Safelift overhead runway beams and rolling beam cranes are lifting appliances

More information

LOLER REGULATIONS INTRODUCTION

LOLER REGULATIONS INTRODUCTION LOLER REGULATIONS INTRODUCTION The key piece of legislation concerning the inspection of lifting equipment is Regulation 9 of LOLER - The Lifting Operations and Lifting Equipment Regulations 1998. LOLER

More information

Humma UV35-25 LOAD CHARTS. Revision 9. A division of Westfield Nominees. Contains the following load charts: Main winch (Standard & Stationary)

Humma UV35-25 LOAD CHARTS. Revision 9. A division of Westfield Nominees. Contains the following load charts: Main winch (Standard & Stationary) A division of Westfield Nominees Humma UV35-25 Revision 9 Contains the following load charts: Main winch (Standard & Stationary) Sliding hook 1 & 2 Rhino hook Fly-jib www.dragroup.com.au Construct Engineering

More information

Wallace Tri-Adjustable Gantry Cranes Square Tube Assembly Instructions

Wallace Tri-Adjustable Gantry Cranes Square Tube Assembly Instructions Wallace Tri-Adjustable Gantry Cranes Square Tube Assembly Instructions For any additional information, Please call 1- S 1. Read and understand instructions before using this gantry. 2. Inspect gantry thoroughly

More information

TABLE OF CONTENTS PART 7 - MACHINERY AND MACHINERY GUARDING

TABLE OF CONTENTS PART 7 - MACHINERY AND MACHINERY GUARDING TABLE OF CONTENTS PART 7 - MACHINERY AND MACHINERY GUARDING Page DEFINITIONS...7-1 SAFEGUARDS...7-1 GUARDING...7-2 PULLEYS, BELTS AND BELT-SHIFTERS...7-3 CONTROLS...7-3 FLYWHEELS...7-3 GRINDING WHEELS...7-3

More information

PORTABLE LADDER SAFETY PROGRAM

PORTABLE LADDER SAFETY PROGRAM PORTABLE LADDER SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.25 Portable Wood Ladders* - 29 CFR 1910.26 Portable Metal Ladders* - 29 CFR 1926.1050-1060* *The above standards are intended to prescribe

More information

CRANE, HOIST AND SLING SAFETY PROGRAM

CRANE, HOIST AND SLING SAFETY PROGRAM CRANE, HOIST AND SLING SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.179 and 184 ANSI - B30.2 and 30.9 Crane Manufacturers Association of America 61 BASIS: The Occupational Safety and Health Administration

More information

OSHA PART 1: PREPARING FOR THE SESSION. 1. Training Booklet. 2. Why This Session Is Important. 3. Purpose and Objectives of the Session

OSHA PART 1: PREPARING FOR THE SESSION. 1. Training Booklet. 2. Why This Session Is Important. 3. Purpose and Objectives of the Session Crane, Derrick, and ling afety 5145A OHA A R N I G N I PAR 1: PRPARING FOR H ION 1. raining Booklet here is no training booklet that goes along with this ession. rainers should review other written material

More information

GENERAL HOUSEKEEPING. 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash?

GENERAL HOUSEKEEPING. 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash? Inspection Checklist GENERAL HOUSEKEEPING 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash? 2. Is oil, grease, or other liquids, when spilled on the floor

More information

Section 14 TABLE OF CONTENTS Material Handling, Storage and Disposal. 14.A Material Handling B Material Hoists

Section 14 TABLE OF CONTENTS Material Handling, Storage and Disposal. 14.A Material Handling B Material Hoists Section 14 TABLE OF CONTENTS Material Handling, Storage and Disposal Section: Page 14.A Material Handling... 14-1 14.B Material Hoists... 14-2 14.C Material Storage... 14-4 14.D Housekeeping... 14-7 14.E

More information

PAGE 1 OF 6 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S450 Motor Vehicle Safety REV /01/09

PAGE 1 OF 6 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S450 Motor Vehicle Safety REV /01/09 PAGE 1 OF 6 PURPOSE: MOTOR VEHICLE SAFETY To define the Company s requirement that drivers must possess the appropriate license for the type of vehicle to be operated and must comply at all times with

More information

Work Platforms. Operators Manual Warning Stickers ANSI Standards. ( Model # MWP 4x4 ) ( Model # MWP 4x6 ) ( Model # MWP 4X8 ) ( Model # MWP 4x116 )

Work Platforms. Operators Manual Warning Stickers ANSI Standards. ( Model # MWP 4x4 ) ( Model # MWP 4x6 ) ( Model # MWP 4X8 ) ( Model # MWP 4x116 ) Work Platforms ( Model # MWP 4x4 ) ( Model # MWP 4x6 ) ( Model # MWP 4X8 ) ( Model # MWP 4x116 ) Operators Manual Warning Stickers ANSI Standards Marv Haugen Enterprises 1851 Heartland Ave. 1851 Heartland

More information

ESSENTIAL SAFETY RESOURCES

ESSENTIAL SAFETY RESOURCES ESSENTIAL SAFETY RESOURCES GS-3027 MOBILE CRANE / OVERHEAD AND GANTRY CRANE / RIGGING Originator: Safety Advisor s Signature: Type Name Approval: HSE Manager s Signature: Type Name Approval: Operations

More information

Safe Operating Practices & Maintenance Manual

Safe Operating Practices & Maintenance Manual tcamerican.com sales@tcamerican.com 763-479-7000 11110 Industrial Circle NW, Suite A, Elk River, MN 55330 Safe Operating Practices & Maintenance Manual Section Subject Page A. General 2 B. Operator Qualifications

More information

ESSENTIAL SAFETY RESOURCES

ESSENTIAL SAFETY RESOURCES ESSENTIAL SAFETY RESOURCES GS-3009 DRIVING SAFETY Originator: Safety Advisor s Signature: Type Name Approval: HSE Manager s Signature: Type Name Approval: Operations Manager s Signature: Type Name Table

More information

Health, Safety, Security and Environment

Health, Safety, Security and Environment Document owner and change code Document Owner Aaron Perronne Title HSSE Manager Mark X Change Code Description X N/A First Issue A Typographical/Grammatical correction; formatting change; text clarification-no

More information

CAL/OSHA ELECTRICAL LOW VOLTAGE

CAL/OSHA ELECTRICAL LOW VOLTAGE Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to electrical exposure to low voltage (less than or equal to

More information

MOBILE CRANE/OVERHEAD & GANTRY CRANE/RIGGING

MOBILE CRANE/OVERHEAD & GANTRY CRANE/RIGGING Doc : SOP-44 Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 12 Purpose Overhead cranes, hoists, and rigging equipment are used by RELIANT HOLDINGS LTD AND ITS AFFILIATES employees

More information

Introduction. Motor Vehicles, Machinery and Mechanized Equipment

Introduction. Motor Vehicles, Machinery and Mechanized Equipment Introduction Motor Vehicles, Machinery and Mechanized Equipment ALL TERRAIN VEHICLES, UTILITY VEHICLES, AND SPECIALTY VEHICLES Section 18 of the USACE Safety and Health Requirements Manual EM 385-1-1 Introduction

More information

Moving materials: Crane and hoist safety

Moving materials: Crane and hoist safety Introduction... 1 Overhead and gantry cranes... 1 Introduction... 1 Crane components... 2 Markings and warnings 3 Loading components... 3 Load handling... 4 Crane inspections... 5 Frequent inspections...

More information

Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes

Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes Clearheart Construction Co., Inc. Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes Cranes, like all pieces of heavy equipment, if not properly operated, inspected

More information

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY AND HEALTH STANDARD STANDARDS

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY AND HEALTH STANDARD STANDARDS DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY AND HEALTH STANDARD STANDARDS Filed with the Secretary of State on These rules become effective immediately upon

More information

UNIVERSITY OF TOLEDO

UNIVERSITY OF TOLEDO UNIVERSITY OF TOLEDO SUBJECT: CRANE AND HOIST SAFETY PROGRAM Procedure No: S-08-024 PROCEDURE STATEMENT All crane and hoists operated on UT campuses must be adequately maintained and inspected as prescribed

More information

AERIAL LIFTS/MAN-LIFTS

AERIAL LIFTS/MAN-LIFTS AERIAL LIFTS/MAN-LIFTS Aerial lifts are pieces of equipment that many workers can't imagine working without. This equipment, if used correctly, provides quick and safe access to work areas that at one

More information

E-Z LIFT 2000 BMC/TMC OPERATORS MANUAL EZ90018-EZ90538 EZ90549-EZ90689

E-Z LIFT 2000 BMC/TMC OPERATORS MANUAL EZ90018-EZ90538 EZ90549-EZ90689 E-Z LIFT 2000 BMC/TMC OPERATORS MANUAL EZ90018-EZ90538 EZ90549-EZ90689 80464_E 2001 This page left intentionally blank. 80464_E 2001 President s Message The E-Z LIFT 2000 was designed and invented with

More information

Ensure staff are trained in use of equipment

Ensure staff are trained in use of equipment Work at height Can you avoid working at height in the first place? No Yes Plan the task required Risk assess the task required Ensure staff are trained in use of equipment Ensure equipment has been correctly

More information

SUNY GENESEO ENVIRONMENTAL HEALTH & SAFETY

SUNY GENESEO ENVIRONMENTAL HEALTH & SAFETY Prepared by: Darlene Necaster Page 1 I. OVERVIEW Material handling is a significant safety concern. During the movement of products and materials, there are a number of opportunities for injuries and property

More information

National N-55. LOAD CHARTS for Use With WRITTEN EXAMINATIONS

National N-55. LOAD CHARTS for Use With WRITTEN EXAMINATIONS LOAD CHARTS for Use With WRITTEN EXAMINATIONS National N-55 Manitowoc Crane Group, by providing pages of one of its manuals, is not providing a substitute for training on a Manitowoc crane. These pages

More information

OPERATOR S MANUAL 7(5 & ( 8&. $5.00 P/N REV.B

OPERATOR S MANUAL 7(5 & ( 8&. $5.00 P/N REV.B OPERATOR S MANUAL &281 2817( 7(5 %$/$1&( /,)7 7758& 8&. $5.00 P/N 901345 REV.B As a lift truck operator, you are responsible for a machine that is useful, powerful, and can be hazardous if not operated

More information

OPERATORS MANUAL AND SAFETY INSTRUCTIONS FOR STAR SAFETY WORK PLATFORMS

OPERATORS MANUAL AND SAFETY INSTRUCTIONS FOR STAR SAFETY WORK PLATFORMS 4101 Garland Dr, Fort Worth, Texas Phone: 817-485-6073 MODEL 1208B SHOWN SAFETY WORK PLATFORM INDUSTRIAL PLATFORM OPERATORS MANUAL AND SAFETY INSTRUCTIONS FOR STAR SAFETY WORK PLATFORMS INCLUDES MODELS

More information

Crane & Hoist Safety Guidelines

Crane & Hoist Safety Guidelines Purpose Crane & Hoist Safety Guidelines Many types of cranes, hoists, and rigging devices are used at [COMPANY] for lifting and moving materials. [COMPANY]'s policy is to maintain a safe workplace for

More information

29 CFR Ch. XVII ( Edition)

29 CFR Ch. XVII ( Edition) 1910.180 in paragraphs (c)(1) (ii) and (iii) of this section. Type of crane mounting Maximum load ratings (percent of tipping loads) Locomotive, without outriggers: Booms 60 feet or less... 1 85 Booms

More information

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

GUIDANCE IN-SERVICE INSPECTION PROCEDURES GUIDANCE IN-SERVICE INSPECTION PROCEDURES Number: MLCC 03 Prepared by: MACHINERY LIFTS AND CRANE COMMITTEE Status: Issue 07 Date: 23/06/15 Reference: Health, Safety and Welfare at Work (General Application)

More information

DEPARTMENT OF PUBLIC SAFETY

DEPARTMENT OF PUBLIC SAFETY Page 1 17 pages Section 1. The Regulations Connecticut State Agencies are amended by adding section 29-223-12a as follows: Sec. 29-223-12a. Special Provisions for Derricks. (a) Bracing foot blocks. The

More information

Liftcrane Boom Capacities 2250 SERIES 3

Liftcrane Boom Capacities 2250 SERIES 3 Liftcrane Capacities 2250 SERIES 3 No. 44 With Long Reach Top LIFTING CAPACITIES: Lifting capacities for various boom lengths and operating radii are for freely suspended loads and do not exceed 75% of

More information

Responsible Unit: Facilities Management

Responsible Unit: Facilities Management Policy Sponsor: Assistant Vice President Approval Date: January 2010 Mobile Overhead Cranes Safe Work Instructions Responsible Unit: Revisions: Service: Trade Services Shop: Mechanical & Welding Hazards

More information

STANDARD PRACTICE INSTRUCTION

STANDARD PRACTICE INSTRUCTION STANDARD PRACTICE INSTRUCTION DATE: March 1, 2010 SUBJECT: Ladder Safety Program. REGULATORY STANDARD: 29 CFR 1910.25 Portable Wood Ladders. 29 CFR 1910.26 Portable Metal Ladders. 29 CFR 1926.1052-1060