NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 3/28/2003

Size: px
Start display at page:

Download "NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 3/28/2003"

Transcription

1 TIFICATION OF ADDENDUM ADDENDUM. 2 DATED 3/28/2003 Control Project NH 2003(385) Highway US 59 County FORT BEND Ladies/Gentlemen: Attached please find an addendum on the above captioned project. Included in the attachment is an adendum notification which details the changes the respective proposal pages which were added / or changed. Except for new bid insert pages, it is unnecessary to return any of the pages attached. Bid insert pages must be returned with the bid proposal submitted to the Department, unless your firm is submitting a bid using a computer print out. The computer print out must be changed to reflect the new bid item information. Contractors material suppliers, etc. who have previously been furnished informational proposals are not being furnished a copy of the addendum. If you have a subcontractor on the above project, please advise them of this addendum. Acknowledgment of this addendum is not requested if your company has been issued a proposal stamped This Proposal Issued for Informational Purposes. You are required to acknowledge receipt of this addendum by entering the date, which appears at the top of this letter on the Addendum Acknowledgement Form, contained in your bid proposal. Failure to Acknowledge receipt of this addendum in your bid proposal will result in your bid not being read. 04/99

2 SUBJECT: PLANS AND PROPOSAL ADDENDUMS PROJECT: NH 2003(385) CONTROL: COUNTY: FORT BEND LETTING: 04/01/2003 REFERENCE : 0328 PROPOSAL ADDENDUMS _ PROPOSAL COVER X BID INSERTS (SH..: 4 OF 14 ) _ GENERAL TES (SH..: ) _ SPEC LIST (SH..: ) _ SPECIAL PROVISIONS: ADDED: DELETED: _ SPECIAL SPECIFICATIONS: ADDED: DELETED: X OTHER: SEE CHANGES BELOW RIPTION OF ABOVE CHANGES (INCLUDING PLANS SHEET CHANGES) PROPOSAL: BID INSERTS - REVISED QUANTITY FOR BID "MOBILIZATION". PLANS: PLAN SHEET 10 (E & Q) - REVISED QUANTITY FOR BID "MOBILIZATION". 1-1

3 REMOV CONC (RIPRAP) REMOV CONC (CTB) EXCAVATION (RDWY) SY 1, LF CY 3, EMBANK (DENS CONT)(TY C)(CL 3) CY 7, BLADING STA FURN AND PLACE TPSL (CL 2)(3") SY 17, STRAW OR HAY MULCH SY 35, DRILL SEED (PERM)(WARM OR COOL) DRILL SEED (TEMP)(WARM OR COOL) SY 17, SY 17, FERTILIZER (N-CHEMICAL) VEGETATIVE WATERING AC MG 1,

4 FL BS (COMPL IN PLAC)(TY D GR6 CL 2) TON LIME TREAT SUBGR (DC)(6 ") SY 11, LIME (TY A(SLRY)TY B, TY(C)DRY OR(SLRY) CEM TRT BS (STR-O)(TY D1 OR D2)(GR6) 6" SALV, HAUL & STKPL RCL APH PV (8"-11") ASPH STAB BS (GR 4A)(VAR H) TON SY 11, SY 3, TON 3, ASPH STAB BS (GR 4A)(8") ASPH STAB BS (GR 4A)(6") TON 2, TON REPAIR EXIST FLEX PAV STRUCT (12") PLANE ASPH CONC PAV (0" TO 2") SY 1, SY CEM STABIL BKFL CY

5 PRESTR CONC PIL (16" SQ) DRILL SHAFT (54 IN) CL C CONC (BENT) CL C CONC (FOOTING) PRESTR CONC BEAM (TY IV) CONC SURF TREAT LF 1, LF CY CY LF 1, SY CL C CONC FOR EXT STR (ABUT) CL S CONC FOR EXT STR (SLAB) CY SF 6, RIPRAP (CONC)(CL B) SIGN & BRACKET RAIL (TY T501) CY EA LF

6 SEALED EXPANSION JOINTS (4 IN) LF RC PIPE (CL III)(18 ") LF SAFE END TRT (TY II)(18")(RCP)(6:1)(C) EA MOBILIZATION LS BARRICADES, SIGNS AND TRAF HANDLE PORT CONC TRAF BAR(STKPL,INSTL & RETRN) PERM CONC TRAF BARRIER (P&P) MO LF 1, LF 1, STRUCT APPROACH SLABS CY MTL BM GD FEN TRANS (THRIE BEAM) REMOV METAL BEAM GUARD FENCE EA LF

7 REMOV TERMINAL-ANCHOR SECTION EA PLYWOOD SIGNS (TY A) ALUM SIGNS (TY A) ALUM SIGNS (TY O) SF SF SF SM RD SGN ASSM TY 10BWG(1)SA(P) SM RD SGN ASSM TY 10BWG(1)SA(T) SM RD SGN ASSM TY 10BWG(1)SA(U) SM RD SGN ASSM TY S80(1)SA(P) SM RD SGN ASSM TY S80(1)SA(T) SM RD SGN ASSM TY S80(1)SA(U) SM RD SGN ASSM TY S80(1)SA(U-1EXT) EA EA EA EA EA EA EA

8 SM RD SGN ASSM TY S80(2)SA(P) LG RDSD SGN SUPT (STRUCT STL) EA LB 2, REPLAC SMALL RDSD SIGNS EA REMOV LARGE RDSD SGN ASSMS REMOV SMALL RDSD SGN ASSMS OVHD SGN SUPT (40 FT BAL TEE)(21.0 HT) FND LG RDSD SGN SUPT (12 IN DRIL SHFT) FND LG RDSD SGN SUPT (24 IN DRIL SHFT) DEL ASM TY A (D-SW) FLEX (6.5 ) DEL ASM TY A (D-SY) FLEX (6.5 ) DEL ASM TY A (D-SW) FLEX (6.5 ) BI-DIR EA EA EA LF LF EA EA EA

9 DEL ASM TY A (D-SW) POST MNT EA DEL ASM TY C (CL A) (D-SW) EA DEL ASM TY C (CL A) (D-SW) BI-DIR EA OBJ MRK ASM TY 1 (OM-1R) EA OBJ MRK ASM TY 2 (OM-2VP)(A) OBJ MRK ASM TY 2 (OM-2VP)(A) BI-DIR WRK ZN PAV MRK REMOV (W) (4") (SLD) WRK ZN PAV MRK REMOV (W) (4") (BRK) WRK ZN PAV MRK REMOV (W) (8") (SLD) WRK ZN PAV MRK REMOV (W) (ARROW) WRK ZN PAV MRK REMOV (W) (DBL ARROW) EA EA LF 7, LF 1, LF EA EA

10 WRK ZN PAV MRK REMOV (W) (WORD) WRK ZN PAV MRK REMOV (W) (EXIT GORE) WRK ZN PAV MRK REMOV (Y) (4") (SLD) WRK ZN PAV MRK REMOV (Y) (8") (SLD) WRK ZN PAV MRK REMOV (CL B) TY I-A WRK ZN PAV MRK REMOV (CL B) TY II-A-A WRK ZN PAV MRK REMOV (CL B) TY II-C-R REFL PAV MRK TY I (W) (4") (SLD) REFL PAV MRK TY I (W) (4") (BRK) REFL PAV MRK TY I (W) (4") (DOT) REFL PAV MRK TY I (W) (8") (SLD) EA EA LF 1, LF EA EA EA LF 14, LF 2, LF LF

11 REFL PAV MRK TY I (W) (12") (SLD) REFL PAV MRK TY I (W) (12") (LNDP) REFL PAV MRK TY I (W) (24") (SLD) REFL PAV MRK TY I (W) (ARROW) REFL PAV MRK TY I (W) (DBL ARROW) REFL PAV MRK TY I (W) (WORD) REFL PAV MRK TY I (W) (ENTR GORE) REFL PAV MRK TY I (W) (EXIT GORE) REFL PAV MRK TY I (Y) (4") (SLD) REFL PAV MRK TY I (Y) (8") (SLD) REFL PAV MRK TY I (Y) (12") (SLD) LF 1, LF LF EA EA EA EA EA LF 12, LF LF

12 REFL PAV MRK TY II (W) (4") (SLD) REFL PAV MRK TY II (W) (4") (BRK) REFL PAV MRK TY II (W) (4") (DOT) REFL PAV MRK TY II (W) (8") (SLD) REFL PAV MRK TY II (W) (12") (SLD) REFL PAV MRK TY II (W) (12") (LNDP) REFL PAV MRK TY II (W) (24") (SLD) REFL PAV MRK TY II (W) (ARROW) REFL PAV MRK TY II (W) (DBL ARROW) REFL PAV MRK TY II (W) (WORD) REFL PAV MRK TY II (W) (ENTR GORE) LF 1, LF 1, LF LF LF 1, LF LF EA EA EA EA

13 REFL PAV MRK TY II (W) (EXIT GORE) REFL PAV MRK TY II (Y) (4") (SLD) REFL PAV MRK TY II (Y) (8") (SLD) RAIS PAV MRKR CL B (REFL) TY I-A(HV) RAIS PAV MRKR CL B (REFL) TY I-C(HV) RAIS PAV MRKR CL B (REFL) TY II-A-A(HV) RAIS PAV MRKR CL B (REFL) TY II-C-R(HV) ELIM EXT PAV MRK & MRKR (4") ELIM EXT PAV MRK & MRKR (8") ELIM EXT PAV MRK & MRKR (ARROW) ELIM EXT PAV MRK & MRKR (WORD) EA LF 1, LF EA EA EA EA LF 8, LF EA EA

14 PAV SURF PREP FOR MRKS (4") PAV SURF PREP FOR MRKS (8") LF 22, LF 1, PAV SURF PREP FOR MRKS (12") PAV SURF PREP FOR MRKS (24") PAV SURF PREP FOR MRKS (ARROW) PAV SURF PREP FOR MRKS (WORD) PAV SURF PREP FOR MRKS (ENTR GORE) PAV SURF PREP FOR MRKS (EXIT GORE) PAV SURF PREP FOR MRKS (BLAST CLN)(4") PAV SURF PREP FOR MRKS (BLAST CLN)(12") LF 1, LF EA EA EA EA LF 18, LF

15 PAV SURF PREP FOR MRKS (BLAST CLN)(ARW) PAV SURF PREP FOR MRKS (BLAST CLN)(WRD) PAV SURF PREP FOR MKS(BLST CLN)EXT GORE HOT MIX (TY C)(SURF)(PG 76-22)(L OR S) EA EA EA TON 3, ROCK FILTER DAMS (TY 1) LF ROCK FILTER DAMS (REMOV)(TY 1) TEMP SDMT CONT FEN (INLET PROTECT) TEMP SDMT CONT FEN (REMOV)(INLET PRCT) SINGLE GUARDRAIL TERM (TY III) LF LF LF EA

16 REACT 350 (REMOVE) REACT 350 (55 MPH) (21 8") EA EA

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 7/02/2004

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 7/02/2004 TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 7/02/2004 Control 0009-02-049, ETC. Project CM 97(89) Highway SH 78, ETC. County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018 TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 1/02/2018 Control 0483-02-021 Project STP 2018(077) Highway SH 72 County MCMULLEN Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

CIS 26.txt MIS.CIS.26 MATL VERIF & MISSING SOURCES CONTRACT MGR.NO. 055 PAGE 001

CIS 26.txt MIS.CIS.26 MATL VERIF & MISSING SOURCES CONTRACT MGR.NO. 055 PAGE 001 MIS.CIS.26 MATL VERIF & MISSING SOURCES CONTRACT 323216 MGR.NO. 55 PAGE 1 CONT 1 SEC 13 JOB 76 RES ENGR ICENHOWER, KENNETH PROJ MG 22(313) HWY US 67 BOX 538 TEXARKANA CNTY BOWIE DIST 19 CONTRACT PRICE

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 9/13/2006

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 9/13/2006 TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 9/13/2006 Control 0196-07-026 Project STP 2006(438)MM Highway SP 366 County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 7/09/2013

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 7/09/2013 TIFICATION OF ADDENDUM ADDENDUM. 2 DATED 7/09/2013 Control 0200-11-100, ETC. Project NH 2013(224) Highway US 69 County JEFFERSON Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 6/04/2014

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 6/04/2014 TIFICATION OF ADDENDUM ADDENDUM 1 DATED 6/04/2014 Control 1378-02-040 Project STP 2013(297) Highway RM 1431 County WILLIAMSON Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

$6, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 -30, PROJECT: STP 2013(839) GRAYSON

$6, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 -30, PROJECT: STP 2013(839) GRAYSON -30,219.83 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 291 CONTRACT ID: 051002028 PROJECT: STP 2013(839) CONTRACT: 07133220 AWARD : $4,317,753.44 PROJECTED : $4,394,254.44 ADJ. PROJECTED : $4,364,034.61

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 131 CONTRACT ID: 187503022 PROJECT: C 1875-3-22 CONTRACT: 12153043 AWARD : $3,146,993.47 PROJECTED : $3,149,993.47 ADJ. PROJECTED : $3,149,993.47 CONTRACT:

More information

AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements

AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements The above titled solicitation is amended. All amendments must be acknowledged on the PROPOSAL ; failure to do so may be cause for rejection of

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 4/28/2015

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 4/28/2015 TIFICATION OF ADDENDUM ADDENDUM 1 DATED 4/28/2015 Control 0535-01-072 Project C 535-1-72 Highway IH 10 County GUADALUPE Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 75 CONTRACT ID: 349701008 PROJECT: STP 2012(033)HES CONTRACT: 09113205 AWARD : $1,297,485.60 PROJECTED : $1,307,485.60 ADJ. PROJECTED : $1,307,485.60

More information

APPROACH SLAB (HPC) CY RETAINING WALL (MSE) SF 52, RETAINING WALL (CONC BLOCK) SF 493.

APPROACH SLAB (HPC) CY RETAINING WALL (MSE) SF 52, RETAINING WALL (CONC BLOCK) SF 493. COUNTY: COLLIN HIGHWAY: US 75 LENGTH: 1.3910 MI CONTROL NUMBER: 0047-06-133 DBE GOAL: 11.0 % PROJECT NUMBER: STP 1502(083)MM TYPE: STR, PVMT, SIGNS, PVMT MKGS TIME FOR COMPLETION: 750 WORKING DAYS GUARANTY:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 47,635.79 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 161 3 CONTRACT ID: 092106270 PROJECT: STP 2014(101)TE CONTRACT: 02163244 AWARD : $899,908.10 PROJECTED : $905,908.10 ADJ. PROJECTED : $953,543.89

More information

ADDENDUM 3 - JULY 24, 2015

ADDENDUM 3 - JULY 24, 2015 FORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY ("CRRMA") The undersigned having familiarized themselves with the local conditions affecting the cost of work and with the Request for Proposals

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: US 287 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: US 287 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD: 287,585.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 184 38.00 CONTRACT ID: 004301079 PROJECT: NH 2016(310) CONTRACT: 11153208 AWARD : $1,893,993.41 PROJECTED : $1,893,993.41 ADJ. PROJECTED :

More information

AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE 3 MONTH MOVING AVERAGE

AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE 3 MONTH MOVING AVERAGE AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE 3 MONTH MOVING AVERAGE Item 01002001 PREPARING ROW AC 12.91 $4,956.38000 22.28 $10,327.06000 7 01002002 PREPARING ROW STA 2,415.92 $3,604.56000 8,220.73

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013 NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013 Control 6237-93-001 Project RMC - 623793001 Highway US0075 County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/08/15 HIGHWAY: LP 289 COUNTY: 06/09/2009 ESTIMATE PAID: AWARD DATE: 06/25/2009 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/08/15 HIGHWAY: LP 289 COUNTY: 06/09/2009 ESTIMATE PAID: AWARD DATE: 06/25/2009 ESTIMATE PERIOD: 1,297,105.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/08/15 466 186.00 CONTRACT ID: 078302064 PROJECT: STP 2009(104)ES CONTRACT: 06093001 AWARD : 25,867,573.35 PROJECTED : 25,867,573.35 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 423 COUNTY: 05/06/2014 ESTIMATE PAID: AWARD DATE: 05/29/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 423 COUNTY: 05/06/2014 ESTIMATE PAID: AWARD DATE: 05/29/2014 ESTIMATE PERIOD: 4,177,077.12 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 810 54.00 CONTRACT ID: 156702032 PROJECT: C 1567-2-32 CONTRACT: 05143001 AWARD : 57,943,494.30 PROJECTED : 59,102,084.30 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/16

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/16 17,810.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/16-65.00 125 CONTRACT ID: 118802088 PROJECT: STP 2014(614)G CONTRACT: 05143227 AWARD AMOUNT: $600,782.63 PROJECTED AMOUNT: $632,782.63 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/16 07/07/2011 ESTIMATE PAID: AWARD DATE: 07/28/2011 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/16 07/07/2011 ESTIMATE PAID: AWARD DATE: 07/28/2011 ESTIMATE PERIOD: 00/00/0000 % TIME USED: 1,322,035.19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/16 1,103 CONTRACT ID: 001507065 PROJECT: C 15-7-65 CONTRACT: 07113001 AWARD : $70,449,357.13 PROJECTED : $72,387,266.12 ADJ. PROJECTED : $73,709,301.31

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

Macomb County Department of Roads Bid Comparison

Macomb County Department of Roads Bid Comparison Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 08/12/2015 ESTIMATE PAID: AWARD DATE: 08/14/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 08/12/2015 ESTIMATE PAID: AWARD DATE: 08/14/2015 ESTIMATE PERIOD: 209,750.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 650 365.00 CONTRACT ID: 628798001 PROJECT: RMC - 628798001 CONTRACT: 08151502 AWARD : $276,487.00 PROJECTED : $276,487.00 ADJ. PROJECTED :

More information

Federal Project No.: NHFP-081-1(346)

Federal Project No.: NHFP-081-1(346) Order : N27 Schedule of Items Page: 2 Oversight/State Project : (NFO)0081-098-778,B650-51,C501 Federal Project : NHFP-081-1(346) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc. BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

Whitley & Siddons Bid Tabulations

Whitley & Siddons Bid Tabulations Whitley & Siddons Bid Tabulations LOCAL LET TABULATIONS FOR OCTOBER, 2011 1402 BASTROP SH0021 6231-41-001 $235,694.01 1901 BOWIE US0059 6230-06-001 $251,000.00 1905 BOWIE US0059 6232-99-001 $31,000.00

More information

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15 COST FORM (1 of 5) Packet #15-15, Okemos Road & Sandhill Road Widening Project (Please Type or Print Clearly in Ink) Pay Description Unit Quantity Unit Price Total 1500001 Mobilization, Max. LS 1 2020002

More information

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal VENDOR BID TALLY AND ATTENDANCE SHEET BID #B15-21 BID TITLE: Replacement of Bridge LR50-0.2-17 over the Larimer and Weld Canal Addendum #1 Acknowled ged DATE: October 22, 2015 TIME: 2:00 p.m. DEPARTMENT:

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,

More information

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES 9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED Rev 2: Call No. 320, File No. 0247541 - Added Rev 1: Call No. 010, File No. 0425551

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

OTTAWA COUNTY ROAD COMMISSION Bid Comparison

OTTAWA COUNTY ROAD COMMISSION Bid Comparison OTTAWA COUNTY ROAD COMMISSION Bid Comparison Contract ID: Description: Location: Projects(s): 28th & Mason Reconstruct with pavement 28th Ave. and Mason St between Adams St. and 32nd Ave. Jamestown Township

More information

Federal Project No.: STP-5A27(380), STP-5A27(381)

Federal Project No.: STP-5A27(380), STP-5A27(381) Order : M42 Schedule of Items Page: 2 Oversight/State Project : (NFO)0649-020-136,C502, C503 Federal Project : STP-5A27(380), STP-5A27(381) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE

More information

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 Letting Location: SCDOT Headquarters Building Conference Room 331 955 Park Street Columbia,

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

STATEWIDE AVERAGES 31, 2014 THROUGH 1, 2016 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE

STATEWIDE AVERAGES 31, 2014 THROUGH 1, 2016 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE 100 MOBILIZATION LS 6779 693000 101486.5179 100 101 CONSTRUCTION SURVEYING (CONSTR.) LS 2500 250000 28927.32021 101 102 CONSTRUCTION SURVEYING(MIN. PLAN) LS 6000 30200 14340 102 104 DESIGN BUILD EA 1 83499998

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 HIGHWAY: COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 HIGHWAY: COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD: 60,795.01 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 58 CONTRACT ID: 092406377 PROJECT: NH 2013(045) CONTRACT: 09123218 AWARD : $340,789.00 PROJECTED : $362,789.00 ADJ. PROJECTED : $423,584.01

More information

Licensed Class C Virginia Contractor No.

Licensed Class C Virginia Contractor No. month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

Maine Turnpike Authority

Maine Turnpike Authority York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00

More information

DELETE first sentence of first paragraph that reads: REPLACE with the following:

DELETE first sentence of first paragraph that reads: REPLACE with the following: To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation

More information

APPENDIX H COST ESTIMATES

APPENDIX H COST ESTIMATES APPENDIX H COST ESTIMATES H-1 HDR ENGINEERING, INC. TBPE FIRM NO. F-754 COST ESTIMATING TEMPLATE PRELIMINARY NOT TO BE USED FOR PERMITTING, BIDDING, OR CONSTRUCTION PREPARED BY: PHILIP A. FULTON, PE PE

More information

ADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal.

ADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal. ADDENDUM NO. 1 DATE: August 7, 2014 PROJECT: FROM: TO: 2014 MFT Section 14-00000-00-GM, SUPP1 United City of Yorkville Kendall County, IL Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

Maine Turnpike Authority

Maine Turnpike Authority Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

Artist Rendering. Design-Build Project for. Route 29 Solutions. Albemarle County, Virginia Contract ID No. C DB80

Artist Rendering. Design-Build Project for. Route 29 Solutions. Albemarle County, Virginia Contract ID No. C DB80 Artist Rendering Design-Build Project for Route 29 Solutions Albemarle County, Virginia Contract ID No. C00077383DB80 Price Proposal January 20, 2015 ATTACHMENT 4.0.1.2 DESIGN-BUILD PRICE PROPOSAL CHECKLIST

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

PAGE 1 of 18 WEIGHTED AVERAGE

PAGE 1 of 18 WEIGHTED AVERAGE UNIT PRICES PAGE 1 of 18 201 BRIDGE SITE PREPARATION L.S. 1.00 15,000.00 15,000.00 15,000.00 * 201 CLEARING ACRE 4.10 40,470.00 4,500.00 13,010.78 201 CLEARING STA 6,089.00 11,000.00 1.00 1,162.09 201

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

2150 F&I 4 PVC pipe LF 100 $ F&I 6 PVC pipe LF 100 $ F&I 8 PVC pipe LF 100 $ 90.00 1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation 7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,

More information

The Tulalip Tribes of Washington

The Tulalip Tribes of Washington The Tulalip Tribes of Washington I-5/116th Street NE Interchange Improvements Phase 4 Ramps Bid Solicitation No. 17-007 ADDENDUM NO. 3 November 7, 2017 to Request for Bid Proposals The Tulalip Tribes of

More information

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

Information Technology Solutions

Information Technology Solutions Information Technology Solutions TEXAS CONSTRUCTION BULLETIN Section 1 Monday, August 31, 2015 Section 2 Section 3 Section 4 Since 1946 the Austin Chapter AGC has served as Austin s leading commercial

More information

CITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT

CITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT CITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT ADDENDUM NO. 2 DATE: March 30, 2017 REVISIONS TO: Request for Bids Specification No. ES17-0020F METAL SOLID WASTE AND RECYCLING CONTAINERS NOTICE TO ALL

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

Schedule of Pay Items

Schedule of Pay Items Schedule of Pay Items 4/27/2018 9:33 AM AASHTOWare Project Version 4.0 Revision 189 Report v1 Letting Call: 180601 001 Letting Date: June 1, 2018 Contract ID: 392144-202845 Description: Runway 17/35 rehabilitation

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013 Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D4-1102 November 21, 2013 Doughtie Construction Co., Elliott Construction Dudley Construction Ltd. SUBTOTAL GENERAL ITEMS : $191,713.00

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

Federal Project No.: STP-5A03 (950); STP-5A03 (956)

Federal Project No.: STP-5A03 (950); STP-5A03 (956) Order : A61 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0058-134-862, C501 Federal Project : STP-5A03 (950); STP-5A03 (956) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

Units Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price

Units Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 1500001 Mobilization, Max. $25,000.00 LSUM 1.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 4,400.00 4,400.00 2 2020040 Tree, Rem, 6 inch to 18 inch Ea 2.00 600.00

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00

More information

Federal Project No.: HSIP-5A27(567)

Federal Project No.: HSIP-5A27(567) Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M. PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

ROAD COMMISSION FOR IONIA COUNTY

ROAD COMMISSION FOR IONIA COUNTY ROAD COMMISSION FOR IONIA COUNTY 170 E. Riverside Drive P.O. Box 76 Ionia, Michigan 48846 Phone (616) 527-1700 Fax (616) 527-8848 CHARLES G. MINKLEY WILLIAM E. WEISGERBER KENNETH L. GASPER ALBERT A. ALMY

More information

County of Santa Cruz 0579

County of Santa Cruz 0579 County of Santa Cruz 0579 701 OCEAN STREET, ROOM 410, SANTA CRUZ, CA 95060-4070 (831) 454-2160 FAX (831) 454-2385 TOO (831) 454-2123 DIRECTOR OF PUBLIC WORKS SANTA CRUZ COUNTY BOARD OF SUPERVISORS 701

More information

MO 370 Interchange Ramp at Salt River Road - Phase 1

MO 370 Interchange Ramp at Salt River Road - Phase 1 MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

CANTON COMMUNITY REQUEST FOR BOARD ACTION

CANTON COMMUNITY REQUEST FOR BOARD ACTION CANTON COMMUNITY REQUEST FOR BOARD ACTION MEETING DATE: April 11, 2017 AGENDA ITEM #G-6 ITEM: Consider Approval of a Budget Amendment & Award of a Contract to J. Ranck Electric Inc. for the Pedestrian

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME CENTRAL AVENUE, ET AL. PROJECT ID RDC0013675 Engineer's Estimate (1) All American Asphalt (2) Sequel Contractors, Inc. (3) Sully-Miller Contracting Company (4) Palp, Inc. 5,177,177.00 5,292,979.00

More information

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications: DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project

More information

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10) 106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33

More information

2, total unit $ total unit $ total unit $ total $

2, total unit $ total unit $ total unit $ total $ BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;