1 MV / LV cabins maintenance The operation and maintenance of the cabins are meant to ensure high reliability (i.e. the early detection of anomalies, the failure prevention and monitoring functional) and to ensure safety. Personnel training is given responsibility for the proper application periodic checks. The following description defines the basic operations for the maintenance of MV / LV bearing in mind that the booths presenting a great diversity in their composition the procedure goes applied from time to time according to the equipment present. Obviously, if there are any equipment not mentioned in the cards following, the same will be built or upgraded. The scheduled maintenance must be carried out always circuit is not energized by performing the procedures for commissioning safety of the system and the display of related warning signs. Regular checks are: Cabin N Daily Weekly Monthly Every 3 1 Remove any materials not related plants and perform the cleaning of the premises. 2 Integrity Control ventilation grille cleaning of the same. 3 Check for devices protection equipment and fire suppression. 4 Upload etinguishers 5 Check for warning signs and documentation system 6 Run the control of the state of preservation of the protection structures against direct contact nets, gates, pleiglas, etc. 7 Painting outside cabin and reconstruction waterproof cover MV Isolators Perform cleaning and visual inspection integrity of the insulators. Verify the effectiveness of interlocks mechanical and / or electrical disconnect between line and earthing. Run the tightening control of electrical connections to the insulators. Verify the efficiency of locking devices that prevent access to live parts. Check the efficiency of mechanical signaling position Check the efficiency of the ground

2 connections of the ground Check the continuity of conductors made grounded metal structures and installed equipment. Fuses 1 Visual check to be carried 2 Check of the project electrical characteristics SF6 Switches Visual inspection equipment integrity and cleaning Check the pressure on the pressure switch (if present) for any gas leaks. Perform five mechanical closing and opening Visual inspection of the poly (resin parts). Visual inspection of the command and transmission Check the tightness of the ground Check the tightness, contacts isolated (only for withdrawable circuit-breaker). Verify the supply voltage of the electrical accessories of the command. Measure the insulation resistance every 5 years For auiliary circuits control the operation of the reports and motor control (if equipped). Checking the functionality of the interlocks Check the springs and replace if damaged Grease with suitable points loading of the springs of the command, the points of loading of the opening spring and latches and opening. Protection power relay Visual inspection equipment integrity and cleaning Visually check the calibration values of electrical parameters with those design. Simulate the operation of the protection act mechanically on the release device switch

3 For overcurrent protection (50-51), of ground (50N-51N) and minimum voltage, type indirect: Visually check the calibration values of electrical parameters with those design. Check the correct operation of the protections overcurrent and ground with the appropriate instrument. Before commissioning, check that the voltage current circuits are not left open. Resin transformer room temperature sensors feature PT 100 / PTC Control unit Cleaning from dust, dirt deposits, any foreign bodies on the windings Hardware link to star / delta and terminals MV / LV Control winding insulation between them and to earth Centering control wraps. MV / LV core- Magnetic meter Control plates registry blocks suspension with a torque wrench Oil transformer room Perform eternal visual inspection for eternal verify the integrity of the equipment. Where available to perform a visual inspection of the supply pipes. Check the condition of the painting conservator, radiators and boes cable entry, and if there are signs evidence of corrosion, program a etraordinary intervention for painting partial or total. Perform cleaning of insulators passers, check the integrity, the absence of

4 breakage, cracks and signs of shock surface that may cause undesired efficiency. Check the tightness of power cables on for loops with torque wrench as to the manufacturer's instructions and check the tightening the bolts, cleaning connections and the continuity of the conductor grounding and replace any terminals conductors and deteriorate. Remove any oidation from the terminals power and protect the same product with specific. Perform a sample of oil tested strength. Check that the oil level is below the minimum, if any replenishments have to be made with dielectric oil of the same type and try it and see that there is no loss of oil. Check the Bucholz relay make cleaning and visual inspection to check the status of conservation apparatus. After re-fed auiliary circuits cause the intervention of alarm and lock instrument, acting on the button proof. Verify that the intervention of the various levels cause the intervention of alarm and / or opening switches upstream and downstream in the transformer as provided by the manufacturer. For the thermostat to perform the cleaning and the visual inspection to check the status of conservation apparatus. After re-fed circuits MV METERS in the room Visually inspect the eternal verify the integrity of the cabinets. Where accessible perform visual inspection of the supply lines. Perform internal and eternal cleaning of paintings by compressed air and vacuum Check the condition of structures protection against direct contact (screens metal, etc..). Check the tightness of bolts, cleaning

5 the connections and the continuity of the conductor grounded and replace the any damaged terminals and conductors. Verify the efficiency of the devices block that prevent access to parts voltage. Check the efficiency of lighting internal framework if present. Check the efficiency of the resistors condensation and thermostats (if any). Check tightness of connections power Program maintenance 6/9 Check and replace the door seals. Visually check the good state of conservation of protections (fuses, relays, circuit breakers). To verify the characteristics of the fuses Electrical project For checking the settings of overload relays project. Per of circuit breakers checking the settings and features Electrical project. For the protection of indirect (where eist) to verify the correct operation of the overcurrent protection and earth fault using the tool. For the relays and circuit breakers verify proper operation using the tool. Visual verification of the information given on ' switch relay 'min. voltage Verify the integrity 'of the grounding equipment Terminal tightening electrical and strikethrough Check calibration of relays' maimum current For auiliary circuits: 1. Check the tightness of electrical connections of auiliary circuits. 2. Check the integrity of the switches checking with the tester and the actual opening closure. 3. Check the integrity, functionality and the efficiency of switches, buttons, lights, etc. occurring circuits that are enabled under the project. 4. Check the integrity and function of measuring instruments by acting on the voltage switch for voltmeters and

6 load variation for the ammeters. 5. Check the efficiency of the Auiliary equipment and feeding them where possible, or to perform the check with the tester. N Daily Weekly Monthly Every 3 Check the condition of structures protection against direct contact (screens metal, etc..). Check the equipment inside the program maintenance 7/9 framework rifas. and measure absorption. condensation. For capacitors perform the visual inspection to verify the integrity of the equipment, make the cleaning of the capacitors and check the state of the electrical wiring, isolators and terminal and the status of torque. Check the continuity of conductors ground structures. metal and equipment installed Verify the efficiency of the devices block Check tightening power terminals Continuity groups Visual inspection and cleaning and replacing batteries if necessary. Check autonomy uninterruptible for about one hour Make full charge of the battery rectifier and the group. quotas. Check the battery fluid level if necessary Make sure the plug holes are free from impurities' Check the good condition of the connections electrical Check the density 'of the electrolyte if necessary

7 F.M. SYSTEM OF LIGHT NORMAL, EMERGENCY AND SAFETY AIR ETRACTOR Checking the status of the lamps both internal and outside of the cab with possible replacement of components that have obvious signs of overheating and / or corrosion and defective lamps or aged. Confirm the lighting of lighting Safety causing a lack of voltage Program maintenance 8/9 normal supply perform a download of the lamps of emergency for a few minutes Driving force for the system test the integrity and with the appropriate tool presence of voltage. (CEE sockets 400 V- 230 V) For the system driving force control the Tightening of the electrical connections and commissioning to the ground. Check for proper operation ejector and make clean the fan Grounding system Every two years, measurements of the ground Verify the integrity 'of links to Earth plate Check tightness of connections in accessible points. Replace parts that show obvious signs of oidation or corrosion. TESTS AND MEASUREMENTS N Daily Weekly Monthly Every 3 1 Every three years, measurements of continuity of all protective conductors and equipotential 2 Every three years, measure insulation resistance 3 Every three years to measure the impedance

8 Zg of the fault loop at the bottom of circuit, ie at the point farthest from the relative the protective device and verify the relationship according to CEI

GUIDE TO MAINTENANCE PRACTICES FOR DISTRIBUTION NETWORKS IN THE DISTRIBUTION SECTOR OF THE NAMIBIAN ELECTRICITY SUPPLY INDUSTRY

GUIDE TO MAINTENANCE PRACTICES FOR DISTRIBUTION NETWORKS IN THE DISTRIBUTION SECTOR OF THE NAMIBIAN ELECTRICITY SUPPLY INDUSTRY PART B-04 TITLE: DISTRIBUTION SUBSTATIONS SPECIFICATION NO: B-04 INCEPTION DATE: AFTER GAZETTING (WORKING DOCUMENT FOR A 2 YEAR PERIOD) AMENDMENTS/REVISIONS DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

More information

INSTALLATION MANUAL. Instructions, precautions, suggestions for installing and servicing resin transformers in full compliance with safety rules

INSTALLATION MANUAL. Instructions, precautions, suggestions for installing and servicing resin transformers in full compliance with safety rules INSTALLATION MANUAL Instructions, precautions, suggestions for installing and servicing resin transformers in full compliance with safety rules ING TABLE OF CONTENTS 1. General information 2 1.1 Standards

More information

1. Inspection and Maintenance

1. Inspection and Maintenance 1. and Maintenance Mandatory Be sure to inspect the inverter regularly and periodically to prevent it from breaking down because of the environment of use, such as temperature, humidity, dust and vibration,

More information

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Building Operations Electrical Technical Support.2 UBC Energy & Water Services 2.0 REQUIREMENTS FOR COMMISSIONING AND TESTING 2.1 Testing.1 Unit

More information

AIR COOLED RECTIFIER SPECIFICATION S-50-A

AIR COOLED RECTIFIER SPECIFICATION S-50-A SPECIFICATIONS AIR COOLED RECTIFIER Spec50a1 5JAN1999 SPECIFICATION S-50-A HIGH VOLTAGE SINGLE TRANSFORMER AIR COOLED RECTIFIER Standard output power range: 250 to 600 volts at 100 to 1,200 amperes TECHNICAL

More information

CALTRAP INSTALLATION AND OPERATIONS MANUAL

CALTRAP INSTALLATION AND OPERATIONS MANUAL INSTALLATION AND OPERATIONS MANUAL NOTE Please read this entire installation and operations manual before energizing the. Safety Considerations: Installing and servicing capacitor equipment can be hazardous.

More information

Switchgear and Distribution Systems for Engineers and Technicians

Switchgear and Distribution Systems for Engineers and Technicians Switchgear and Distribution Systems for Engineers and Technicians WHAT YOU WILL LEARN: How to identify typical characteristics of an industrial distribution system Become familiar with the main components

More information

INTER PLANT STANDARD STEEL INDUSTRY SPECIFICATION FOR STATIC EXCITATION CONVERTORS FOR SYNCHRONOUS MOTORS (FIRST REVISION)

INTER PLANT STANDARD STEEL INDUSTRY SPECIFICATION FOR STATIC EXCITATION CONVERTORS FOR SYNCHRONOUS MOTORS (FIRST REVISION) INTER PLANT STANDARD STEEL INDUSTRY I P S S SPECIFICATION FOR STATIC EXCITATION CONVERTORS FOR SYNCHRONOUS MOTORS (FIRST REVISION) Corresponding IS does not exist IPSS: 1-10-036-12 0 FOREWORD 0.1 This

More information

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment.

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment. Film-Tech The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment. These manuals are designed to facilitate the exchange of information related to cinema

More information

PUB NLH 174 Island Interconnected System Supply Issues and Power Outages Page 1 of 4

PUB NLH 174 Island Interconnected System Supply Issues and Power Outages Page 1 of 4 PUB NLH 174 Island Interconnected System Supply Issues and Power Outages Page 1 of 4 1 2 3 4 5 6 7 8 9 Q. Please describe Hydro s terminal station and substation inspections policies and practices. In

More information

Matrix AP 400V 690V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 20 ❷ Startup/Troubleshooting Pages WARNING

Matrix AP 400V 690V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 20 ❷ Startup/Troubleshooting Pages WARNING Matrix AP 400V 690V INSTALLATION GUIDE FORM: MAP-IG-E REL. May 2017 REV. 002 2017 MTE Corporation WARNING High Voltage! Only a qualified electrician can carry out the electrical installation of this filter.

More information

AUE-AUD-AU2E AU2D-AUED

AUE-AUD-AU2E AU2D-AUED AUE-AUD-AU2E AU2D-AUED EN12845 Fire Pump Stations Designation of AUE 120 / 100 - N 80-250/75 + DJ MV 708 AUE: One electric main pump + jockey 120: Rated Flow (m 3 /h) 100: Rated Pressure (Hm) N 80-250/75:

More information

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment.

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment. Film-Tech The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment. These manuals are designed to facilitate the exchange of information related to cinema

More information

ST Charger. Industrial Battery Charger

ST Charger. Industrial Battery Charger ST Charger Industrial Battery Charger Installation and Operation Manual ST_13 Table of Contents Pg# 1.0 INSTALLATION 1 1.1 Receiving 1 1.2 Location 1 1.3 Line Voltage 1 1.4 A.C. Service Requirements 2

More information

AIR INSULATED EXTENDABLE SWITCHGEAR UP TO 12KV GUIDE

AIR INSULATED EXTENDABLE SWITCHGEAR UP TO 12KV GUIDE AIR INSULATED EXTENDABLE SWITCHGEAR UP TO 12KV GUIDE Certificate Number FM35831 APPLICATION Typical Uses and Classification The MSGair switchgear is used in transformer and switching substations mainly

More information

GE Consumer & Industrial Power Protection. New. SecoGear kV Metal-clad Switchgear. GE imagination at work

GE Consumer & Industrial Power Protection. New. SecoGear kV Metal-clad Switchgear. GE imagination at work GE Consumer & Industrial Power Protection New SecoGear 12-24kV GE imagination at work General SecoGear metal-clad switchgear is designed and manufactured with advance technology and has been comprehensively

More information

WARNING. Instructions for Combination Bypass Isolation and Transfer Switches Amps I.L A FILE APPLICATION SAFETY PRACTICES

WARNING. Instructions for Combination Bypass Isolation and Transfer Switches Amps I.L A FILE APPLICATION SAFETY PRACTICES FILE 29-900 Instructions for Combination Bypass Isolation and Transfer Switches 100-1000 Amps APPLICATION The Cutler-Hammer combination Bypass Isolation and Transfer Switches are listed under Underwriters

More information

B-03 ELECTRICIAN TRAINING SKILL DEVELOPMENT GUIDE

B-03 ELECTRICIAN TRAINING SKILL DEVELOPMENT GUIDE B-03 ELECTRICIAN TRAINING SKILL DEVELOPMENT GUIDE Duty B: Power Distribution (600V and below) B-03: Troubleshoot 480V System Issued 06/01/98 Task Preview Troubleshoot 480V System The 480V distribution

More information

ARTICLE BEGINNING SERVICE PRECAUTIONS

ARTICLE BEGINNING SERVICE PRECAUTIONS Page 1 of 96 ARTICLE BEGINNING SERVICE PRECAUTIONS WARNING: WARNING: CAUTION: When performing any inspection or service procedure on this vehicle, ensure following service precautions are followed to prevent

More information

Appendix C. Interval Every 2 Year. Functional Test Weekly Monthly Quarterly. Semi. Every 3. Engineering Studies

Appendix C. Interval Every 2 Year. Functional Test Weekly Monthly Quarterly. Semi. Every 3. Engineering Studies Engineering Studies Coordination Study Every 5 years and in conjunction with electrical system modifications. Short Circuit Study NETA MTS 6.2 Every 5 years and in conjunction with electrical system modifications.

More information

On_Disc. 2 o/c1 BS 7671 applies to a lift installations b highway equipment c equipment on board ships d electrical equipment of machines.

On_Disc. 2 o/c1 BS 7671 applies to a lift installations b highway equipment c equipment on board ships d electrical equipment of machines. 1 PAPER 4 Sample Questions - C&G 2382 17th Edition full paper D 1 o/c 1 - A recommendation for the interval to the first periodic inspection shall be made by: a the installation electrician. b the main

More information

Technical Service Bulletin IOX/DCX Transmitter Maintenance Schedule

Technical Service Bulletin IOX/DCX Transmitter Maintenance Schedule Technical Service Bulletin 140610 IOX/DCX Transmitter Maintenance Schedule Service Bulletin 140610 applies to Comark IOX, DCX and Paragon transmitters. This bulletin contains important maintenance schedule

More information

USER MANUAL. 10KV Digital High Voltage Insulation Tester. Model MG500. Additional User Manual Translations available at

USER MANUAL. 10KV Digital High Voltage Insulation Tester. Model MG500. Additional User Manual Translations available at USER MANUAL 10KV Digital High Voltage Insulation Tester Model MG500 Additional User Manual Translations available at www.extech.com Introduction Thank you for selecting the Extech Instruments Model MG500.

More information

SineWave Guardian TM 380V 600V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 17 ❷ Startup/Troubleshooting Pages WARNING

SineWave Guardian TM 380V 600V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 17 ❷ Startup/Troubleshooting Pages WARNING SineWave Guardian TM 380V 600V INSTALLATION GUIDE FORM: SWG-IG-E REL. October 2018 REV. 003 2018 MTE Corporation High Voltage! Only a qualified electrician can carry out the electrical installation of

More information

ACE Variable Frequency Drive System

ACE Variable Frequency Drive System ACE Variable Frequency Drive System Installation & Maintenance Information SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE IF 1690 BLOWER COOLING INTAKE SHROUDS BLOWER FUSE BLOCK TEMPERATURE CONTROLLER TRANSFORMER

More information

9.1.4 Troubleshooting of Faults in LCD Screen

9.1.4 Troubleshooting of Faults in LCD Screen User Manual 9 and Maintenance 9.1.2 Arc Detection Self-test An auto-test circuit is included in the module design of the inverter s AFDI function. If a DC arc fault is detected, the corresponding fault

More information

G600 Series Replacement Intermittent Pilot Ignition Controls

G600 Series Replacement Intermittent Pilot Ignition Controls Installation Instructions G600 Issue Date 0601 G600 Series ment Intermittent Pilot Ignition Controls Installation IMPORTANT: These instructions are intended as a guide for qualified personnel installing

More information

ES5 Security Theory/Regulations Answer Schedule

ES5 Security Theory/Regulations Answer Schedule ES5 Security Theory/Regulations Answer Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination questions. The marker

More information

C1000 Series Automatic Cap Bank

C1000 Series Automatic Cap Bank C1000 Series Automatic Cap Bank Metal Enclosed - Medium Voltage Capacitors Assemblies Fixed / Auto Medium Voltage 5, 15, 25 and 35 kv Class Customized to your specifications The Reactive Power Solution

More information

NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL SYSTEMS AND CONSTRUCTION NQF LEVEL 3 NOVEMBER 2009

NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL SYSTEMS AND CONSTRUCTION NQF LEVEL 3 NOVEMBER 2009 NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL SYSTEMS AND CONSTRUCTION NQF LEVEL 3 NOVEMBER 2009 (12041033) 24 November (X-Paper) 09:00 12:00 This question paper consists of 6 pages. (12041033) -2- NC720(E)(N24)V

More information

SDS Enclosed Star-Delta Starter User Guide

SDS Enclosed Star-Delta Starter User Guide SDS Enclosed Star-Delta Starter User Guide (7.5kW~90kW) V2.0.0 PLEASE NOTE: AS STANDARD AND UNLESS OTHERWISE SPECIFIED, THIS PRODUCT IS EQUIPPED WITH A BASIC LOW INTEGRITY EMERGENCY STOP CIRCUIT STOPPING

More information

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001 CLP POWER HONG KONG LIMITED SUPPLY March 2001 ADVISORY SERVICE Advice concerning matters relating to the supply of electricity may be obtained free of charge from the Company. OTHER COMPANY PUBLICATIONS

More information

MCset kv Medium voltage equipment

MCset kv Medium voltage equipment Maintenance Guide PE90014 PE90006 MCset 1-2 - 3 17.5 kv Medium voltage equipment Air-insulated switchboards Metal-enclosed switchgear with moving parts PE90007 PE90008 PE90009 PE90007 Maintenance Guide

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 26 13 13 MEDIUM VOLTAGE SWITCHGEAR PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical General

More information

SECTION DC POWER SUPPLY/BATTERY CHARGER

SECTION DC POWER SUPPLY/BATTERY CHARGER SECTION 26 33 05 PART 1 - GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide the single-phase heavy-duty industrial battery charger and all accessories required, complete and operable, in accordance

More information

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1. Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.3, 5/16/18 1.0 Scope This document is currently limited in scope to inverter interfaced PV installations

More information

Electric Motor Controls BOMA Pre-Quiz

Electric Motor Controls BOMA Pre-Quiz Electric Motor Controls BOMA Pre-Quiz Name: 1. How does a U.P.S. (uninterruptable power supply) work? A. AC rectified to DC batteries then inverted to AC B. Batteries generate DC power C. Generator, batteries,

More information

Heating and Gas Installations - December 2014

Heating and Gas Installations - December 2014 This is an example of good practice maintenance specifications. It is not exhaustive and should only be used to assist with facilities management or specification of a maintenance contract. Emergency Gas

More information

INSPECTION AND MAINTENANCE CHECKLIST

INSPECTION AND MAINTENANCE CHECKLIST INSPECTION AND MAINTENANCE CHECKLIST Lattice-Boom Crawler Cranes Models 111-21000 & MLC Series Does Not Apply to Small Crawler Models or Model 31000 This record applies to the following crane: Crane Model:

More information

V. Design, Application, Maintenance & Operation Technical Requirements

V. Design, Application, Maintenance & Operation Technical Requirements V. Design, Application, Maintenance & Operation Technical Requirements V.L Line & Substation Operation and Maintenance 1.0 General Requirements 1.1 Each facility owner shall have an established and documented

More information

1. INTRODUCTION SYSTEM DESCRIPTION Front Panel CONNECTION AND OPERATION TROUBLESHOOTING...8

1. INTRODUCTION SYSTEM DESCRIPTION Front Panel CONNECTION AND OPERATION TROUBLESHOOTING...8 Contents : 1. INTRODUCTION...1 2. IMPORTANT SAFETY INSTRUCTIONS...2 3. SYSTEM DESCRIPTION...4 3.1 Front Panel...4 4. CONNECTION AND OPERATION...6 5. TROUBLESHOOTING...8 6. MAINTENANCE...9 6.1 Operation...9

More information

Horizontal Circuit Switchers

Horizontal Circuit Switchers > Transformer Protection > CIRCUIT SWITCHERS C A T A L O G B U L L E T I N General Application Southern States Types CSH and CSH-B Horizontal Circuit Switchers provide an economical, versatile, space saving

More information

Horizontal Circuit Switchers

Horizontal Circuit Switchers > Transformer Protection > CIRCUIT SWITCHERS C A T A L O G B U L L E T I N General Application Southern States Types CSH and CSH-B Horizontal Circuit Switchers provide an economical, versatile, space saving

More information

APC Smart-UPS. GUIDE SPECIFICATIONS FOR 1000VA & 2000VA Smart-UPS 230VAC Uninterruptible Power Supply

APC Smart-UPS. GUIDE SPECIFICATIONS FOR 1000VA & 2000VA Smart-UPS 230VAC Uninterruptible Power Supply APC Smart-UPS GUIDE SPECIFICATIONS FOR 1000VA & 2000VA Smart-UPS 230VAC Uninterruptible Power Supply PART 1 - GENERAL 1.1 SUMMARY A. This specification describes the operation and functionality of a continuous

More information

DISTRIBUTION SOLUTIONS. GSec Gas-insulated switching and isolating apparatus

DISTRIBUTION SOLUTIONS. GSec Gas-insulated switching and isolating apparatus DISTRIBUTION SOLUTIONS GSec Gas-insulated switching and isolating apparatus GSec is a three-position SF6 gas-insulated switchdisconnector designed for use in medium voltage switchgear for secondary distribution

More information

Quick Start Guide TS 910 & TS 920

Quick Start Guide TS 910 & TS 920 Quick Start Guide TS 910 & TS 920 DANGER HAZARD OF ELECTRICAL SHOCK, EXPLOSION, OR ARC FLASH Read and understand this quick start guide before installing and operating the transfer switch The installer

More information

HIB Enclosed Inverter User Guide

HIB Enclosed Inverter User Guide HIB Enclosed Inverter User Guide (0.75kW~22kW) V1.2.0 Contents 1 Safety information...1 2 Technical Data...2 3 Motor Connection...4 4 Operation...5 5 Single phase circuit diagram...7 6 Three phase circuit

More information

UniSec Maintenance solutions

UniSec Maintenance solutions DISTRIBUTION SOLUTIONS UniSec Maintenance solutions ABB supports you to improve the reliability, safety and efficiency of your electrical equipment UniSec Maintenance solutions Table of contents 004 00

More information

SERIES Pulse and 12 Pulse DC Power Supplies for Electrocoating and Industrial DC Powered Systems MODELS 506 & 5012

SERIES Pulse and 12 Pulse DC Power Supplies for Electrocoating and Industrial DC Powered Systems MODELS 506 & 5012 100V to 1000V DC 100A to 5000A DC SERIES 50 MODELS 506 & 5012 6 Pulse and 12 Pulse DC Power Supplies for Electrocoating and Industrial DC Powered Systems Applications: Electrocoating Ion Nitriding Magnet

More information

Electrical Control System Components Basics of Magnetic Control :

Electrical Control System Components Basics of Magnetic Control : Electrical Control System Components Basics of Magnetic Control : Dr.M.S.Narkhede, LEE, GP Mumbai 1 Contact Types : Contacts are classified into different ways as follows. According to applications contacts

More information

Innovators in Protection Technology Moulded Case Circuit Breaker Instruction Manual

Innovators in Protection Technology Moulded Case Circuit Breaker Instruction Manual Innovators in Protection Technology Moulded Case Circuit Breaker Instruction Manual 11-M61E TABLE OF CONTENTS HANDLING & MAINTENANCE Storage 1 Transport 1 STANDARD ENVIRONMENT 1 INSTALLATION AND CONNECTION

More information

NXPLUS C Single busbar. Maintenance-free for lifetime

NXPLUS C Single busbar. Maintenance-free for lifetime NXPLUS C Single busbar Maintenance-free for lifetime Energy Distribution Welcome! Page 2 Content Overview Technical data Typicals Panel design Circuit-Breaker panel Busbar Operation Metering Low-voltage

More information

BASIC TROUBLESHOOTING START / STOP PUSHBUTTONS, PILOT LIGHTS, RELAYS, TIMER LIMIT SWITCHES, FLOW SWITCHES, THERMAL SWITCHES, AND OVERLOAD RELAYS.

BASIC TROUBLESHOOTING START / STOP PUSHBUTTONS, PILOT LIGHTS, RELAYS, TIMER LIMIT SWITCHES, FLOW SWITCHES, THERMAL SWITCHES, AND OVERLOAD RELAYS. BASIC TROUBLESHOOTING FOUR BASIC BUILDING BLOCKS OF A PLATING RECTIFIER: 1. ELECTRICAL CONTROLS 2. AC POWER CIRCUITS 3. DC POWER CIRCUITS 4. ELECTRONIC CONTROL 1. ELECTRICAL CONTROLS START / STOP PUSHBUTTONS,

More information

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis.

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis. CENTRIFUGAL CHILLER Annual Inspection Refrigerant Circuit Check and record refrigerant level Inspect for leak results Calculate refrigerant lass and report to the customer. Repair minor leaks as required

More information

High Frequency SineWave Guardian TM

High Frequency SineWave Guardian TM High Frequency SineWave Guardian TM 380V 480V INSTALLATION GUIDE FORM: SHF-IG-E REL. January 2018 REV. 002 2018 MTE Corporation High Voltage! Only a qualified electrician can carry out the electrical installation

More information

This tender addendum and clarification forms part of the Request for Proposal and Contract documents, and modifies them as follows:

This tender addendum and clarification forms part of the Request for Proposal and Contract documents, and modifies them as follows: This tender addendum and clarification forms part of the Request for Proposal and Contract documents, and modifies them as follows: I. ADDENDUM Isinya Mandatory Spares list Description Quantity A AIS 400kV

More information

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 2

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 2 The University of New South Wales School of Electrical Engineering and Telecommunications Industrial and Commercial Power Systems Topic 2 SWITCHBOARDS Overview Also called Switchgear and Controlgear Assembly

More information

INSTALLATION, OPERATION & MAINTENANCE SERIES ABC11B-120-XX BATTERY CHARGERS

INSTALLATION, OPERATION & MAINTENANCE SERIES ABC11B-120-XX BATTERY CHARGERS MANUAL NUMBER: 64073 REV: 2 DATE: October 3, 2006 INSTALLATION, OPERATION & MAINTENANCE SERIES ABC11B-120-XX BATTERY CHARGERS AMERICAN BATTERY CHARGING, INC. P.O. BOX 17040 28 MAPLE AVENUE SMITHFIELD,

More information

Table Summary of Sprinkler System Inspection, Testing, and Maintenance. Reference. Inspection , ,

Table Summary of Sprinkler System Inspection, Testing, and Maintenance. Reference. Inspection , , Table 5.1.1.2 Summary of Sprinkler System Inspection, Testing, and Maintenance Item Frequency Reference Inspection Gauges (dry, preaction, and deluge systems) Quarterly 5.2.4.2, 5.2.4.3, 5.2.4.4 Control

More information

Quick Start Guide TS 910

Quick Start Guide TS 910 Quick Start Guide TS 910 DANGER HAZARD OF ELECTRICAL SHOCK, EXPLOSION, OR ARC FLASH Read and understand this quick start guide before installing and operating the transfer switch The installer is responsible

More information

BellMega BM-510. Operation Manual Ver: 1.0 Rev: 1

BellMega BM-510. Operation Manual Ver: 1.0 Rev: 1 BellMega BM-510 Operation Manual Ver: 1.0 Rev: 1 CONTENTS Page Description 1 Operation 2 Safety 2 Charging 3 Service / Calibration 3 Specifications 4 Description The BellMega is a continuity tester for

More information

M T E C o r p o r a t i o n. MTE Series RL. Line/ load Reactors USER MANUAL PART NO. INSTR -011 REL MTE Corporation

M T E C o r p o r a t i o n. MTE Series RL. Line/ load Reactors USER MANUAL PART NO. INSTR -011 REL MTE Corporation M T E C o r p o r a t i o n MTE Series RL Line/ load Reactors USER MANUAL PART NO. INSTR -011 REL. 050516 2002 MTE Corporation IMPORTANT USER INFORMATION NOTICE MTE Series RL Line/Load Reactors are components

More information

Section S7 - DC and AC auxiliary services installations

Section S7 - DC and AC auxiliary services installations S7/2 Section S7 - DC and AC auxiliary services installations Contents S7. Generalities...3 S7. Generalities...4 S7..1 Scope of work...4 S7..2 Dimensioning the auxiliary services equipment...4 S7.1 General

More information

INSTRUCTION MANUAL (M A)

INSTRUCTION MANUAL (M A) LOW VOLTAGE CAPACITOR BANK SWITCHED BY CONTACTORS OPTIM SERIES (OPTIM 3, OPTIM 3A, OPTIM 4, OPTIM 6, OPTIM 8, OPTIM 12, OPTIM SC8, OPTIM SC12, OPTIM SC16) INSTRUCTION MANUAL (M98248601-20-12A) SYMBOLS

More information

Matrix APAX. 380V-415V 50Hz TECHNICAL REFERENCE MANUAL

Matrix APAX. 380V-415V 50Hz TECHNICAL REFERENCE MANUAL Matrix APAX 380V-415V 50Hz TECHNICAL REFERENCE MANUAL WARNING High Voltage! Only a qualified electrician can carry out the electrical installation of this filter. Quick Reference ❶ Performance Data Pages

More information

1-50 KVA SINGLE-PHASE SERVO REGULATOR INSTRUCTIONS FOR USE SERVO SINGLE-PHASE VOLTAGE REGULATOR

1-50 KVA SINGLE-PHASE SERVO REGULATOR INSTRUCTIONS FOR USE SERVO SINGLE-PHASE VOLTAGE REGULATOR 1-50 KVA SINGLE-PHASE SERVO REGULATOR INSTRUCTIONS FOR USE SERVO SINGLE-PHASE VOLTAGE REGULATOR I Important Notice! Thank you for preferring us. Your product has been designed to protect your sensitive

More information

Distribution transformers Efficiency over life-cycle

Distribution transformers Efficiency over life-cycle Distribution transformers Efficiency over life-cycle ABB a global leader ABB is a global leader in Power and Automation technologies that enable utility and industry customers to improve performance while

More information

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc. Chapter 3 TRANSMISSION SYSTEMS 1 Transmitting large amounts of electric energy over long distances is accomplished most efficiently by using high-voltages. Without transformers the widespread distribution

More information

RAPTOR DEFAULT TEST TEMPLATES

RAPTOR DEFAULT TEST TEMPLATES RAPTOR DEFAULT TEST TEMPLATES www.smcint.com PAGE 1 OF 12 The Raptor Default Test Templates in Raptor HH June 2015 General parts of main screen: TEST TEMPLATES: Default test templates are factory configured

More information

OutdoorXUPS-600AHV-8364

OutdoorXUPS-600AHV-8364 OutdoorXUPS-600AHV-8364 TSi Power s OutdoorXUPS-600AHV-8364 provides secure and uninterrupted 230 vac power to critical loads. 1) Weather-tight metal cabinet (IP44 or NEMA 3R rated) 2) 2A and 2B are wide

More information

Medium Voltage Metal-Enclosed Switches

Medium Voltage Metal-Enclosed Switches Medium Voltage Metal-Enclosed Switches Outdoor Medium Voltage Switch.1 Medium Voltage Switch MVS Product Description............................................. 2 Application Description..........................................

More information

SUBSTATION VACUUM CIRCUIT BREAKER (15.5KV)

SUBSTATION VACUUM CIRCUIT BREAKER (15.5KV) SUBSTATION VACUUM CIRCUIT BREAKER (15.5KV) For more than four decades, Myers Power Products has led the switchgear market in quality for the electric industry, delivering highly reliable products for utilities

More information

MODEL SCA Installation and Operation Manual Important:

MODEL SCA Installation and Operation Manual Important: MODEL SCA Installation and Operation Manual Important: This manual contains specific cautionary statements relative to worker safety. Read this manual thoroughly and follow as directed. It is impossible

More information

SUBSTATION VACUUM CIRCUIT BREAKER (38KV)

SUBSTATION VACUUM CIRCUIT BREAKER (38KV) SUBSTATION VACUUM CIRCUIT BREAKER (38KV) For more than four decades, Myers Power Products has led the switchgear market in quality for the electric industry, delivering highly reliable products for utilities

More information

SUBSTATION VACUUM CIRCUIT BREAKER (25.8 / 27KV)

SUBSTATION VACUUM CIRCUIT BREAKER (25.8 / 27KV) SUBSTATION VACUUM CIRCUIT BREAKER (25.8 / 27KV) For more than four decades, Myers Power Products has led the switchgear market in quality for the electric industry, delivering highly reliable products

More information

General. Main electric circuits Fuses compartment Operating mechanisms Cables connection compartment

General. Main electric circuits Fuses compartment Operating mechanisms Cables connection compartment General The switchgear must be suitable for 36 kv rated voltage and specifically conceived for the secondary distribution substations in M.V. with either ring or radial type networks. The switchgear must

More information

SYLLABUS FOR ELECTRICAL SUPERVISOR CERTIFICATE OF COMPETENCY (SCC MV) Electrical Engineering Paper (Written Test)

SYLLABUS FOR ELECTRICAL SUPERVISOR CERTIFICATE OF COMPETENCY (SCC MV) Electrical Engineering Paper (Written Test) ANNEXURE I SYLLABUS FOR ELECTRICAL SUPERVISOR CERTIFICATE OF COMPETENCY (SCC MV) Electrical Engineering Paper (Written Test) Paper I & Paper II for General Category of S.C.C. Examination Paper I & Paper

More information

Ensuring the Safety Of Medical Electronics

Ensuring the Safety Of Medical Electronics Chroma Systems Solutions, Inc. Ensuring the Safety Of Medical Electronics James Richards, Marketing Engineer Keywords: 19032 Safety Analyzer, Medical Products, Ground Bond/Continuity Testing, Hipot Testing,

More information

GAE MCC Modular-C. Catalogue Standardized Motor Control Centres. PT Guna Era Manufaktura

GAE MCC Modular-C. Catalogue Standardized Motor Control Centres. PT Guna Era Manufaktura Modular-C\Standardized Motor Control Centres\ M600204.15 PT Guna Era Manufaktura Catalogue 2015 GAE MCC Modular-C Standardized Motor Control Centres General Definition Type-tested low-voltage switchgear

More information

User Manual. T6 Tachometer. Online: Telephone: P.O. Box St. Petersburg, Florida 33736

User Manual. T6 Tachometer. Online:   Telephone: P.O. Box St. Petersburg, Florida 33736 User Manual T6 Tachometer Online: www.phareselectronics.com Telephone: 727-623-0894 P.O. Box 67251 St. Petersburg, Florida 33736 Table of Contents Overview... 1 Description... 1 Wiring... 1 T6 Tachometer

More information

LV CAPACITOR BANKS WITH STATIC SWITCHING EMK SERIES

LV CAPACITOR BANKS WITH STATIC SWITCHING EMK SERIES LV CAPACITOR BANKS WITH STATIC SWITCHING EMK SERIES INSTRUCTIONS MANUAL M98118701-20-12A-GB CIRCUTOR, SA SYMBOLS AND WARNINGS Pay attention to the warnings in this manual, which are shown with the following

More information

SFset with VIP 400/410 built-in control unit Medium Voltage Circuit Breaker

SFset with VIP 400/410 built-in control unit Medium Voltage Circuit Breaker SFset with VIP 400/410 built-in control unit Medium Voltage Circuit Breaker Instructions for use 11/2017 18 0 2 ing A r p s e l b a l i va SFset- Instructions for use Table of contents Presentation Presentation...

More information

TPM Fuse Panel Installation Guide. Document INS-727XXXXXXX This manual covers the following part numbers- Trimm 727XXXXXXX Family

TPM Fuse Panel Installation Guide. Document INS-727XXXXXXX This manual covers the following part numbers- Trimm 727XXXXXXX Family TPM Fuse Panel Installation Guide Document INS-727XXXXXXX This manual covers the following part numbers- Trimm 727XXXXXXX Family Table of Contents Section 1- General Information... 3 1.1 - Product Description...

More information

CAST RESIN TRANSFORMERS

CAST RESIN TRANSFORMERS MODEL TAM CAST RESIN - TAM TYPE Epoxy cast resin dry-type transformers are recommended to operate in places that require security, the materials used in its construction are hard to combust and are self-extinguishable

More information

That s how compact transformer protection is today. The customer newsletter of Kries-Energietechnik

That s how compact transformer protection is today. The customer newsletter of Kries-Energietechnik The customer newsletter of Kries-Energietechnik www.kries.com A change of paradigm in distribution network transformer protection: the self-powered and IEC 60255-compliant IKI-35 protection relay 05 17

More information

NEXT STEP B) SAFETY :

NEXT STEP B) SAFETY : SUMMARY : EVOLUTION OF MV/LV SUBSTATIONS COMPACT SUBSTATIONS J. M. Solans, C. Prevé, R. Farrán, R. Muñoz. SCHNEIDER ELECTRIC S.A. - SPAIN INTRODUCTION The recent liberalisation of the electricity supply

More information

Abbeon Cal, Inc. Model BD-50E HIGH FREQUENCY GENERATOR OPERATING MANUAL

Abbeon Cal, Inc. Model BD-50E HIGH FREQUENCY GENERATOR OPERATING MANUAL Abbeon Cal, Inc. Model BD-50E HIGH FREQUENCY GENERATOR OPERATING MANUAL DESCRIPTION. The Model BD-50E is a rugged tester designed for testing tank lining and other applications where extended use is necessary.

More information

Pioneer 321 MSR. 2/14 Antwerpsesteenweg Gent - Oostakker T +32 (0) F +32 (0)

Pioneer 321 MSR. 2/14 Antwerpsesteenweg Gent - Oostakker   T +32 (0) F +32 (0) GB Instruction manual 2/14 www.welda.be F +32 (0)9 355 92 01 0 1 INTRODUCTION... 4 2 FRONT PANEL... 4 3 REAR PANEL... 5 4 INSTALLATION... 6 4.1 UNIT ASSEMBLY... 6 4.2 CONNECTIONS TO THE ELECTRICAL MAINS

More information

TPM/GMT Panel Installation Guide

TPM/GMT Panel Installation Guide TPM/GMT Panel Installation Guide Document INS-837xxxxxxx This manual covers the following part numbers- Trimm 837xxxxxxx Family Table of Contents Table of Contents... 2 Section 1- General Information...

More information

General Description. Product Specification. Document Digital Temperature Interlock

General Description. Product Specification. Document Digital Temperature Interlock Document 474751 Installation, Operation and Maintenance Manual Please read and save these instructions for future reference. Read carefully before attempting to assemble, install, operate or maintain the

More information

Chapter 5 FOUNDATION. 2010, The McGraw-Hill Companies, Inc. 2010, The McGraw-Hill Companies, Inc.

Chapter 5 FOUNDATION. 2010, The McGraw-Hill Companies, Inc. 2010, The McGraw-Hill Companies, Inc. Chapter 5 FOUNDATION 1 FOUNDATION - A rigid foundation is essential for minimum vibration and proper alignment between motor and load. Concrete makes the best foundation, particularly for large motors

More information

ZIP Economizer Fault Detection and Diagnostics (FDD) Table

ZIP Economizer Fault Detection and Diagnostics (FDD) Table Fault Detection and Diagnostics (FDD) Table Fault Detection Problem Diagnostic ction (in addition to alarm stored / transmitted) Potential Cause C Fault Code OT sensor predetermined range O damper returns

More information

Electric Vehicle Charging Safety Guidelines Part 2: Selection and Installation

Electric Vehicle Charging Safety Guidelines Part 2: Selection and Installation 86 Customhouse Quay PO Box 165, Wellington 6140 New Zealand Date of publication: 1 November 2016 Issued by: Mark Wogan, Manager Energy Safety WorkSafe New Zealand Electric Vehicle Charging Safety Guidelines

More information

UniPack compact secondary substations (CSS) upto 36 kv For safe, reliable and space saving power distribution solutions

UniPack compact secondary substations (CSS) upto 36 kv For safe, reliable and space saving power distribution solutions UniPack compact secondary substations (CSS) upto 36 kv For safe, reliable and space saving power distribution solutions ABB a global leader ABB is a global leader in power and automation technologies that

More information

LCL FILTERS INSTRUCTIONS MANUAL (M A) (c) CIRCUTOR S.A.

LCL FILTERS INSTRUCTIONS MANUAL (M A) (c) CIRCUTOR S.A. LCL FILTERS INSTRUCTIONS MANUAL (M98121701-03-09A) (c) CIRCUTOR S.A. ------ LCL filters: Instructions Manual ----- Page 2 TABLE OF CONTENTS TABLE OF CONTENTS 2 1 CHECKS ON RECEIPT OF THE EQUIPMENT. 3 2

More information

Quick guide. Plug-in fans GPPM with FC101_106 August 2014

Quick guide. Plug-in fans GPPM with FC101_106 August 2014 Quick guide Plug-in fans GPPM with FC101_106 August 2014 Fläkt Woods permanent magnet motors and speed controllers for plug fans GPPM 1. General Fläkt Woods offers a wide range of permanent magnet motors

More information

Functions provided by measuring relays in railway equipment

Functions provided by measuring relays in railway equipment Functions provided by measuring relays in railway equipment 1-Current relays -Minimum current relays (During normal operation, if the current is present these relays are in operating position and switch

More information

Electrical operating instructions

Electrical operating instructions en Electrical operating instructions Reversing contactor universal 2 Contactor / 24V for three- and single- phase motor 51171134 - d 04.2009 OPERATING INSTRUCTIONS 52210115 consisting of: E : Electrical

More information

Step 1: Collection of required data

Step 1: Collection of required data Step 1: Collection of required data If the relevant parameters of the interfaces are known, it is possible to dimension ASSEMBLIES 3 Installation and environmental conditions 4 Operating and servicing

More information

100% OUTSIDE AIR MAKE-UP UNITS WITH DISCHARGE TEMPERATURE CONTROL & c.pco DIRECT DIGITAL CONTROL MODULE

100% OUTSIDE AIR MAKE-UP UNITS WITH DISCHARGE TEMPERATURE CONTROL & c.pco DIRECT DIGITAL CONTROL MODULE 100% OUTSIDE AIR MAKE-UP UNITS WITH DISCHARGE TEMPERATURE CONTROL & c.pco DIRECT DIGITAL CONTROL MODULE Start-up must be performed by a trained, experienced service person. The following general start-up

More information