Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons TOTAL CAPACITY 1400 GALLONS

Size: px
Start display at page:

Download "Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons TOTAL CAPACITY 1400 GALLONS"

Transcription

1 CALIBRATION CHART FOR TANK NO. DOT 2266 TYPE OF TANK: Distributer OWNER: John C. Hipp Const. Equip. Co. P.P.Box 1000 Alachua, Fla MAKE OF TANK: Rosco SERIAL NO.: 6295 COMPARTMENTS: one OVERALL LENGTH: 7Ft. 6in. HEIGHT OF DOME ABOVE SHELL: 6in. OVERALL WIDTH OR DIA.: 7Ft. 6in. DEPTH FROM TOP OF DOME TO BOTTOM OF SHELL: 6in. COIL DATA: 4 ea., 8in. CALIBRATION DATE AND LOCATION: 26 January 82 Gainesville, Fla BY: Doug Cardin Note: MEASUREMENTS FROM TOP OF DOME TO SURFACE OF LIQUID REPRESENTS GALLONS REMAINING IN TANK. MEASUREMENTS ARE ININCHES AND SIXTEENTHS OF AN INCH. ALL MEASUREMENTS MUST BE MADE ONLY WHEN TANKS ARE LEVEL. DOT 2266 STAMPED ON LEFT REAR FRAME AND DOME OF TANK. ZERO GALLONS INDICATES TANK WAS TILTED AND DRAINED. TOTAL CAPACITY 1400 GALLONS ALL MEASUREMENTS MUST BE MADE FROM ONLY DOME TANK # DOT 2266 Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons 6 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /

2 17 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /

3 41 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 15

4 Correction Factors for Emulsified Asphalts (K= ) Temp. Corr. Temp. Corr. Temp. Corr. Temp. Corr. Temp. Corr

5 Correction Factors for Emulsified Asphalts (K= ) Temp. Corr. Temp. Corr. Temp. Corr. Temp. Corr. Temp. Corr

6 Correction Factors for AC/ARB (K= ) Temp. Corr. Temp. Corr. Temp. Corr. Temp. Corr. Temp. Corr

7 Correction Factors for AC/ARB (K= ) Temp. Corr. Temp. Corr. Temp. Corr. Temp. Corr. Temp. Corr

8 RANDOM NUMBERS FOR DENSITY TESTING (UNITS ARE IN FEET) Column 1 Column 2 Column 3 Column 4 Column 5 Column 6 Column 7 No. Loc. No. Loc. No. Loc. No. Loc. No. Loc. No. Loc. No. Loc. Group A Group B Group C Group D Group E Group F

9 Date: July 19, 1999 Copy of Memorandum To: From: Copies: Subject: Steve J. Benak, District Construction Engineer Frank M. Kreis, District Bituminous Engineer Philip Gainer, Aubrey Graves, A. M. Cook, Jim Musselman Asphalt Rubber Membrane Interlayer (ARMI) The purpose of the memorandum is to document those construction techniques that will improve the quality of the ARMI. ARMI has been used extensively in the district and has proven to be effective in controlling reflective cracking and serving as a moisture barrier. Pre-Paving Discuss the placement of ARMI at the Pre-Paving conference, specifically addressing material certifications and samples; spread rate of the asphalt rubber binder; distance between the distributor and ship spreader; rolling; correction of defective areas. Notify the District Bituminous Engineer (DBE) in advance to allow us ten working days to sample and complete testing of the No. 6 stone. Contractor provides certifications to DBE for the ground tire rubber (gts), AC-20 asphalt cement and the asphalt rubber binder (ARB-20) Construction Project Engineer establishes the application rate for the ARB-20 placed on: Concrete surface 0.70 gal/sy Milled surface 0.65 gal/sy Severely cracked oxidized, brittle surface gal/sy Newly placed leveling or overbuild gal/sy Adjust the application rate as necessary. Excessive Asphalt Rubber Binder or puddling will cause rutting and shoving. Maintain a minimum of 300 ft. between the application of the asphalt rubber binder and the application of the cover material. Lengthen this distance to eliminate pick-up. The hot mix asphalt will actually create the cohesion between the asphalt, crack relief stone and the asphalt rubber binder (ARB). Use paper or squeegee device where the contractor starts and stops the application of ARB. Puddling or excessive material will cause rutting. Require the contractor to have a spot crew to correct defective areas (fat spots, improperly covered spots with aggregate, excessive free aggregate).

10 Include a traffic roller with the steel wheel roller for the compaction effort of the asphaltic overlay. Project personnel should verify certifications and perform rotational viscosity test on each distributor load. Apply the asphalt rubber binder 3 to 6 wider than the width of hot mix overlay. Crack relief aggregate should be free on contamination and excessive moisture. The application rate of the crack relief aggregate should be set at the lower limit of the range established in Adjust the application rate upward as required. If the contractor attempts to place loads in transit, which are caught in the rain, stop paving operations until the rain has stopped. Standing water or puddled water will significantly impact the cohesion of the ARMI with the asphalt overlay. North Florida aggregates are highly absorptive and are significantly affected by rain. (A traffic roller can be used to help dry the crack relief layer). Post-Construction Contractor cores the asphalt overlay (nuclear density control strip) and project personnel measures core thickness and checks cohesion of the overlay and ARMI. Project personnel checks the spread rate of the asphalt overlay to ensure 1 ½ (150 lbs/yd 2 ) to 2 (200 lbs/yd 2 ), as required in the plans.

Long Life Asphalt Performance Testing January 17, 2018

Long Life Asphalt Performance Testing January 17, 2018 PennDOT District 11 Long Life Asphalt Performance Testing January 17, 2018 Jim Foringer, P.E. Assistant District Executive Construction Division Neal Fannin, P.E. Pavement Materials Engineer BOPD Construction

More information

Topics. Hauling, Laydown and Compaction. Optional Release Agent Hauling Vehicles. Delivery 7/6/2010

Topics. Hauling, Laydown and Compaction. Optional Release Agent Hauling Vehicles. Delivery 7/6/2010 Topics Hauling, Laydown and Compaction WisDOT/WAPA Asphalt Pavement Project Manager Training June 2010 Hauling Equipment pavers, MTDs, rollers Construction surface prep, placement and joints Compaction

More information

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road

More information

CHIP SEAL BEST PRACTICES

CHIP SEAL BEST PRACTICES CHIP SEAL BEST PRACTICES Marc Bertsch- APS Doug Olsen- Western Emulsions HOT APPLIED AND EMULSION CHIP SEALS EXPECTATIONS THE KEY TO ANY SUCCESSFUL CHIP SEAL GOOD WEATHER GOOD MATERIALS GOOD WORKMANSHIP

More information

Innovative Warm Mix Asphalt Projects: The Contractor s Perspective

Innovative Warm Mix Asphalt Projects: The Contractor s Perspective Innovative Warm Mix Asphalt Projects: The Contractor s Perspective NESMEA 2009 Portland, ME October 7 th 2009 ROD BIRDSALL, PE What is Warm-Mix Asphalt (WMA)? Asphalt Mix produced at 40-100ºF less than

More information

SULFUR EXTENDED ASPHALT INVESTIGATION - LABORATORY AND FIELD TRIAL

SULFUR EXTENDED ASPHALT INVESTIGATION - LABORATORY AND FIELD TRIAL A5EE-151 SULFUR EXTENDED ASPHALT INVESTIGATION - LABORATORY AND FIELD TRIAL Ali Ehsan Nazarbeygi 1, Ali Reza Moeini 2 1 Bitumen and Road Construction Department, Research Institute of Petroleum Industry

More information

Geoscience Testing laboratory (Al Ain)

Geoscience Testing laboratory (Al Ain) Soil 1 In-situ Density by Sand Replacement Method Using Large Pouring Cylinder & Small Pouring Cylinder In-place Density Test by Sand Cone Method BS 1 Part ASTM D 1556 Dry Density Moisture Content Relationship

More information

Chip Seal CAPA Presented by: Rick Peters, Manager Rocky Mountain Chipseal, LLC

Chip Seal CAPA Presented by: Rick Peters, Manager Rocky Mountain Chipseal, LLC Chip Seal CAPA 2011 Presented by: Rick Peters, Manager Rocky Mountain Chipseal, LLC Chip Seal Introduction Chip Seal Introduction What is a Chip Seal? Chip Seal Introduction What is a Chip Seal? Chip

More information

All Regional Engineers. Omer M. Osman, P.E. Special Provision for Hot-Mix Asphalt Mixture Design Composition and Volumetric Requirements July 25, 2014

All Regional Engineers. Omer M. Osman, P.E. Special Provision for Hot-Mix Asphalt Mixture Design Composition and Volumetric Requirements July 25, 2014 All Regional Engineers Omer M. Osman, P.E. Special Provision for Hot-Mix Asphalt Mixture Design Composition and Volumetric Requirements July 25, 2014 This special provision was developed by the Bureau

More information

Balancing Paving & Compaction Operations. Presented by Todd Mansell, CAT Paving

Balancing Paving & Compaction Operations. Presented by Todd Mansell, CAT Paving Balancing Paving & Compaction Operations Presented by Todd Mansell, CAT Paving What are we trying to achieve? 1. Tonnage 2. Density 3. Smoothness 4. Efficiency 5. Overall quality How do we achieve these

More information

District 5 Gering job openings 7/11/2018 Highway Maintenance Worker Senior EEO/Veteran s Preference Employer

District 5 Gering job openings 7/11/2018 Highway Maintenance Worker Senior EEO/Veteran s Preference Employer 1 District 5 Gering job openings 7/11/2018 SALARY: Highway Maintenance Worker Senior $15.18 Hourly OPENING DATE: 07/03/18 07/17/18 11:59 PM Bridgeport Successful applicant will be trained to operate various

More information

I.D.O.T. Update Version -

I.D.O.T. Update Version - I.D.O.T. Update - 2007 Version - RUBBLIZATION Rubblization with HMA Overlay Rehabilitation method for deteriorated concrete pavements Alternative to extensive patching or reconstruction Pavement in effect

More information

Louisiana s Experience

Louisiana s Experience ALF Crumb Rubber Modified Asphalt Louisiana s Experience Louisiana Transportation Conference Baton Rouge Louisiana February 9 th, 2009 Chris Abadie Summary of Louisiana ss Experience Eight CRM asphalt

More information

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT (Gravel, Crushed Rock, Sand, Road Oils, Recycled Aggregate, Bituminous Milling, Sealcoating,

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BITUMINOUS SURFACE TREATMENT

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BITUMINOUS SURFACE TREATMENT 402-1(a-e) 99 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BITUMINOUS SURFACE TREATMENT These Special Provisions revise, amend, and where in conflict, supersede applicable sections of the

More information

RE: S.P (T.H. 210) in Crow Wing County Located on T.H. 210 from Brainerd (R.P ) to Ironton (R.P )

RE: S.P (T.H. 210) in Crow Wing County Located on T.H. 210 from Brainerd (R.P ) to Ironton (R.P ) District 3 Administration 7964 Industrial Park Road Baxter, MN 56425 Memo To: Dan Anderson Transportation District Engineer From: Scott Zeidler Senior Engineering Specialist Date: December 11, 2017 RE:

More information

Pre-Installation. Surface Preparation TRAFFIC STRIPES, EPOXY RESIN

Pre-Installation. Surface Preparation TRAFFIC STRIPES, EPOXY RESIN 3-11-2013 Traffic Stripes TRAFFIC STRIPES, EPOXY RESIN Pre-Installation Striping Plan The contractor is required to submit the striping plan 20 days prior to beginning striping operations to the RE for

More information

District 5 Gering job openings 8/1/2018 Highway Maintenance Worker/Senior EEO/Veteran s Preference Employer

District 5 Gering job openings 8/1/2018 Highway Maintenance Worker/Senior EEO/Veteran s Preference Employer 1 District 5 Gering job openings 8/1/2018 SALARY: Highway Maintenance Worker/Senior $15.18 Hourly OPENING DATE: 07/27/18 08/13/18 11:59 PM Gering Successful applicant will be trained to operate various

More information

Performance Tests of Asphalt Mixtures

Performance Tests of Asphalt Mixtures Performance Tests of Asphalt Mixtures Louay N. Mohammad, Ph.D. Department of Civil and Environmental Engineering LA Transportation Research Center Louisiana State University 42 nd Annual Rocky Mountain

More information

If it ain t broke, don t t fix it. HMA Thin Lifts for Pavement Preservation in Tennessee 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA

If it ain t broke, don t t fix it. HMA Thin Lifts for Pavement Preservation in Tennessee 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA $9 $8 $7 $6 $5 $4 $3 $2 $1 Month-Year Ton Tonne 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA The Tennessee Program HMA Thin Lifts for Pavement Preservation in Tennessee Mark Woods TDOT 5,109 Interstate Lane

More information

Highway Maintenance Worker Senior EEO/Veteran s Preference Employer

Highway Maintenance Worker Senior EEO/Veteran s Preference Employer District 5 Gering job openings 10/10/2018 SALARY: 1 OPENING DATE: 10/09/18 10/23/18 11:59 PM Kimball Join our team of over 2000 professionals, currently offering expert training and career growth, paid

More information

The Honorable Connie Bernardy, DFL Lead House Transportation & Regional Governance Policy Committee 253 State Office Building Saint Paul, MN 55155

The Honorable Connie Bernardy, DFL Lead House Transportation & Regional Governance Policy Committee 253 State Office Building Saint Paul, MN 55155 This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 395 John Ireland Boulevard

More information

District 5 Gering job openings 7/6/2016

District 5 Gering job openings 7/6/2016 1 District 5 Gering job openings 7/6/2016 Engineer-Field Training Program $23.74 /Hour OPENING DATE: 07/01/16 See job description Come be a part of the Nebraska Department of Roads team and participate

More information

HMA Thin Lifts for Pavement Preservation in Tennessee

HMA Thin Lifts for Pavement Preservation in Tennessee HMA Thin Lifts for Pavement Preservation in Tennessee The Tennessee Program 5,109 Interstate Lane Miles 26,244 State Route LM 31,353 Total* MARK WOODS, P.E. TDOT DIV. OF MATERIALS AND TESTS * As of 2008

More information

Minnesota DOT -- RDM Experience. Dr. Kyle Hoegh, MnDOT Dr. Shongtao Dai, MnDOT Dr. Lev Khazanovich, U. of Pittsburgh

Minnesota DOT -- RDM Experience. Dr. Kyle Hoegh, MnDOT Dr. Shongtao Dai, MnDOT Dr. Lev Khazanovich, U. of Pittsburgh Minnesota DOT -- RDM Experience Dr. Kyle Hoegh, MnDOT Dr. Shongtao Dai, MnDOT Dr. Lev Khazanovich, U. of Pittsburgh Acknowledgements FHWA/AASHTO for providing RDM MnDOT district materials and constructions

More information

EXPERI MENTAL PROJECTS

EXPERI MENTAL PROJECTS EXPERI MENTAL PROJECTS PROVIDING SMOOTH RAILROAD GRADE CR"OSSINGS USING ASPHALT CONCRETE PAVEMENT Report Numbe r: DEPARTMENTAL I NFORMAT JON EXCHANGE STAT E AND D EPA RTM ENT P UB L IC OF HIGHWAYS T R

More information

SECTION 916 (Pages ) is deleted and the following substituted: SECTION 916 BITUMINOUS MATERIALS

SECTION 916 (Pages ) is deleted and the following substituted: SECTION 916 BITUMINOUS MATERIALS 916 BITUMINOUS MATERIALS. (REV 7-28-03) (FA 1-13-04) (7-04) SECTION 916 (Pages 785-797) is deleted and the following substituted: SECTION 916 BITUMINOUS MATERIALS 916-1 Superpave PG Asphalt Binder: 916-1.1

More information

District 5 Gering job openings 9/16/2016

District 5 Gering job openings 9/16/2016 1 District 5 Gering job openings 9/16/2016 SALARY: Temporary Highway Maintenance Worker - Winter Operations $13.07 /Hour OPENING DATE: 09/08/16 Winter positions, temporary, until March 31, 2017. Hours

More information

Asphalt Pavement Analyzer (APA)

Asphalt Pavement Analyzer (APA) Updated 01-01-15 Pavement Technology, Inc. 9308-A INDUSTRIAL DRIVE COVINGTON, GA 30014 TELEPHONE (770) 388-0909 - FAX (770) 388-0149 Asphalt Pavement Analyzer (APA) Rutted Superpave Cylindrical Asphalt

More information

DMS ASPHALTIC CONCRETE PATCHING MATERIAL (STOCKPILE STORAGE)

DMS ASPHALTIC CONCRETE PATCHING MATERIAL (STOCKPILE STORAGE) DMS - 9202 (STOCKPILE STORAGE) EFFECTIVE DATES: AUGUST 2004 APRIL 2010. 9202.1. Description. This Specification governs for an asphaltic concrete mixture intended primarily as a cool to cold weather stockpile

More information

The European Standards for Asphalt

The European Standards for Asphalt The European Standards for Asphalt August 007 Venue Briefing Speakers Company B510/ 1 / 1 QPA Representatives WELCOME Bob Allen John Bradshaw-Bullock John Harris John Lay Colin Loveday Malcolm Simms (Secretariat)

More information

DIVISION V SURFACINGS AND PAVEMENTS

DIVISION V SURFACINGS AND PAVEMENTS 36-3.01 GENERAL DIVISION V SURFACINGS AND PAVEMENTS 36 GENERAL 04-20-18 Replace section 36-3 with: 36-3 PAVEMENT SMOOTHNESS 36-3.01A Summary Section 36-3 includes specifications for measuring the smoothness

More information

Asphalt Pavement Construction Update

Asphalt Pavement Construction Update Asphalt Pavement Construction Update 2013 FTBA Construction Conference Richard Hewitt, PE State Construction Pavement Engineer Smoothness Developmental Specification Smoothness Developmental Specification

More information

Sealant Troubleshooting. CAPTG Workshop Toronto September 13 th Tim Morris Crafco Inc

Sealant Troubleshooting. CAPTG Workshop Toronto September 13 th Tim Morris Crafco Inc Sealant Troubleshooting CAPTG Workshop Toronto September 13 th 2009 Tim Morris Crafco Inc Why Crack Treatment? Cracks are inevitable, and neglect leads to accelerated cracking and potholing, further reducing

More information

DMS-9203, Asphaltic Concrete Patching Material (Containerized)

DMS-9203, Asphaltic Concrete Patching Material (Containerized) Overview Effective Date: July 1999 July 2004 This specification shall govern for containerized asphaltic concrete mixture intended primarily for cool to cold, wet weather repair of small pavement areas.

More information

Section 4 DMS-9203, Asphaltic Concrete Patching Material (Containerized)

Section 4 DMS-9203, Asphaltic Concrete Patching Material (Containerized) Section 4 DMS-9203, Asphaltic Concrete Patching Overview Effective Date: August 2004 - December 2005. This Specification governs for rapid curing containerized asphaltic concrete mixture intended primarily

More information

Pavement Preservation. Checklist Series. 1 Crack. Seal Application

Pavement Preservation. Checklist Series. 1 Crack. Seal Application Pavement Preservation Checklist Series 1 Crack Seal Application Crack Seal Application Checklist This checklist is one of a series created to guide State and local highway maintenance and inspection staff

More information

Implementation and Thickness Optimization of Perpetual Pavements in Ohio

Implementation and Thickness Optimization of Perpetual Pavements in Ohio Implementation and Thickness Optimization of Perpetual Pavements in Ohio OTEC 2015 Issam Khoury, PhD, PE Russ College of Engineering and Technology Ohio University, Athens, Ohio Outline Background prior

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) CFS:TEH 1 of 10 APPR:KPK:JFS:07-07-16 FHWA:APPR:07-15-16 a. Description. This

More information

2017 Local Roads Workshop Local Agency HMA Acceptance Specification

2017 Local Roads Workshop Local Agency HMA Acceptance Specification 2017 Local Roads Workshop Local Agency HMA Acceptance March 2017 Review of Existing Spec Next Steps Construction Local Agency HMA Acceptance 1. Mix Design a. Submit Mix design and JMF to Engineer for

More information

Oregon Department of Transportation Standard Specifications For Asphalt Materials 2004

Oregon Department of Transportation Standard Specifications For Asphalt Materials 2004 Oregon Department of Transportation Standard Specifications For Asphalt Materials 2004 Effective for contracts and purchase orders advertised after January 1, 2004 Revisions - Changes to the 2003 Asphalt

More information

Table Standardized Naming Convention for ERD Files

Table Standardized Naming Convention for ERD Files S-1 (2399) PAVEMENT SURFACE SMOOTHNESS (2013 version) DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. Always use with SP2005-111 (CONCRETE PAVING MIX SPECIFICATIONS PAVEMENT) and SP2005-140

More information

Who s doing the work? Who do I call with questions I may have after I read this FAQ? Why is my street being paved?

Who s doing the work? Who do I call with questions I may have after I read this FAQ? Why is my street being paved? Paving FAQs Who s doing the work? Who do I call with questions I may have after I read this FAQ? Why is my street being paved? What s involved in paving my street? Can I park on my street during construction?

More information

SEAUPG 2009 CONFERENCE-HILTON HEAD ISLAND, SOUTH CAROLINA

SEAUPG 2009 CONFERENCE-HILTON HEAD ISLAND, SOUTH CAROLINA SEAUPG 9 CONFERENCE-HILTON HEAD ISLAND, SOUTH CAROLINA Update on the Texas Overlay Tester Tom Scullion TTI Hamburg Wheel Tracking Device Overlay Tester Presentation Overview Background Initial Validation

More information

DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface.

DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface. 2399 PAVEMENT SURFACE SMOOTHNESS 2399.1 DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface. A Definitions The Department defines Smoothness as the Mean

More information

150 Equipment. 155 HMA Surfacing and HMA Pavement Recycling Equipment For compaction equipment see section 151 b-e

150 Equipment. 155 HMA Surfacing and HMA Pavement Recycling Equipment For compaction equipment see section 151 b-e 150 Equipment 2/22/2010 Plate 150 Equipment 151 Compaction Equipment a Sheepsfoot Roller Data 151. 01 b Self-Propelled Pneumatic Roller Data. 02 c Two Axle Tandom Steel Roller Data. 03 d Pull-Type Steel

More information

(2111) Digital Test Rolling REVISED 07/22/14 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. SP

(2111) Digital Test Rolling REVISED 07/22/14 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. SP S-xx (2111) Digital Test Rolling REVISED 07/22/14 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. SP2014-54.2 The Veda Software and Digital Test Rolling forms are available on the MnDOT Advanced

More information

SITE PLANS ASSISTED LIVING REDEVELOPMENT

SITE PLANS ASSISTED LIVING REDEVELOPMENT SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE

More information

Good crack bridging ability Mechanically resistant if broadcast Watertight Easy application Solvent free

Good crack bridging ability Mechanically resistant if broadcast Watertight Easy application Solvent free Product Data Sheet Edition 12 October 2011 Sikafloor -375 2-part PUR tough elastic, crack-bridging coating Construction Product Description Sikafloor -375 is a two part, solvent free, low viscosity, tough

More information

GRITTING FOR IMPROVED EARLY LIFE SKID RESISTANCE OF STONE MASTIC ASPHALT SURFACES

GRITTING FOR IMPROVED EARLY LIFE SKID RESISTANCE OF STONE MASTIC ASPHALT SURFACES GRITTING FOR IMPROVED EARLY LIFE SKID RESISTANCE OF STONE MASTIC ASPHALT SURFACES Ed Baran, Queensland Department of Transport and Main Roads, Australia Russell Lowe, Queensland Department of Transport

More information

ATTACHMENT A - STATEMENT OF WORK INVITATION TO BID FOR CHILLER INSPECTION SERVICES ITB NO.: DMS-13/14-035

ATTACHMENT A - STATEMENT OF WORK INVITATION TO BID FOR CHILLER INSPECTION SERVICES ITB NO.: DMS-13/14-035 4050 Esplanade Way Tallahassee, Florida 32399-0950 Tel: 850.488.2786 Fax: 850. 922.6149 Rick Scott, Governor Craig J. Nichols, Agency Secretary ATTACHMENT A - STATEMENT OF WORK INVITATION TO BID FOR CHILLER

More information

Darwin-ME Status and Implementation Efforts_IAC09

Darwin-ME Status and Implementation Efforts_IAC09 Darwin-ME Status and Implementation Efforts_IAC9 What s Being Used (7 survey) Asphalt Design: MEPDG Darwin-ME Status and Implementation Efforts Idaho Asphalt Conference October, 9 Does SHA Use or Plan

More information

Mattest (Ireland) Ltd

Mattest (Ireland) Ltd Unit 2, Northwest Business Park, Ballycoolin, Dublin 15 Testing Laboratory Registration number: 286T is accredited by the Irish National Board (INAB) to undertake testing as detailed in the Schedule bearing

More information

2018 NACE Conference Wisconsin Dells, WI. Joseph Cheung P.E. FHWA Office of Safety

2018 NACE Conference Wisconsin Dells, WI. Joseph Cheung P.E. FHWA Office of Safety 2018 NACE Conference Wisconsin Dells, WI Joseph Cheung P.E. FHWA Office of Safety Skid related crashes are determined by many factors: Tire issues Weather Conditions Friction Demand Road Geometry Vehicle

More information

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No

EXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No EXISTING PAVEMENT EVALUATION WILLMER ENGINEERING INC. Prepared For Clark Patterson Lee Suwanee, Georgia Prepared By WILLMER ENGINEERING INC. 3772 Pleasantdale Road Suite 165 Atlanta, Georgia 30340-4270

More information

2/5/2019. Definitions. Consolidation. Compaction 101: Doing the Right Things, the Right Way Session W14 Dale Starry, Volvo Construction Equipment

2/5/2019. Definitions. Consolidation. Compaction 101: Doing the Right Things, the Right Way Session W14 Dale Starry, Volvo Construction Equipment Compaction 101: Doing the Right Things, the Right Way Session W14 Dale Starry, Volvo Construction Equipment Definitions Consolidation Compression Compaction 2 Consolidation Material volume change achieved

More information

BUREAU OF STANDARDS. Effective Date: 8/19/2016 Section No. 4. Version: 1.2 Procedure No. 3

BUREAU OF STANDARDS. Effective Date: 8/19/2016 Section No. 4. Version: 1.2 Procedure No. 3 BUREAU OF STANDARDS Effective Date: 8/19/2016 Section No. 4 Version: 1.2 Procedure No. 3 TITLE: LP Gas Bulk Plant Final Inspection PURPOSE: This document details the procedures used to conduct a Final

More information

Ultra-thin Bonded Wearing Course Performance Update, Minnesota

Ultra-thin Bonded Wearing Course Performance Update, Minnesota 2009-30 Ultra-thin Bonded Wearing Course Performance Update, Minnesota Take the steps... Research...Knowledge...Innovative Solutions! Transportation Research Ultra-thin Bonded Wearing Course Performance

More information

DMS-9202, Asphaltic Concrete Patching Material (Stockpile Storage)

DMS-9202, Asphaltic Concrete Patching Material (Stockpile Storage) Overview Effective Date: July 1999 July 2004 This specification shall govern for an asphaltic concrete mixture intended primarily as a cool to cold weather stockpile patching mix for maintenance. It shall

More information

Thomas Bennert, Ph.D. Rutgers University Center for Advanced Infrastructure and Transportation (CAIT)

Thomas Bennert, Ph.D. Rutgers University Center for Advanced Infrastructure and Transportation (CAIT) Thomas Bennert, Ph.D. Rutgers University Center for Advanced Infrastructure and Transportation (CAIT) Rutgers University working on putting together a set of performance tests (rutting and cracking) that

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

Laboratory Certification For. Shakib Dastaggir Construction & Design Company (S-CAD) Laboratory

Laboratory Certification For. Shakib Dastaggir Construction & Design Company (S-CAD) Laboratory Laboratory Certification For Shakib Dastaggir Construction & Design Company (S-CAD) Laboratory Lab ID: LCP-006 Issue date: Sept 19, 2016 Expiry date: March 18, 2017 This letter confirms the completion

More information

ADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal.

ADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal. ADDENDUM NO. 1 DATE: August 7, 2014 PROJECT: FROM: TO: 2014 MFT Section 14-00000-00-GM, SUPP1 United City of Yorkville Kendall County, IL Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois

More information

A Crack is a Crack Mn/DOT s Perspective on Cracking in Asphalt Pavements

A Crack is a Crack Mn/DOT s Perspective on Cracking in Asphalt Pavements A Crack is a Crack s Perspective on Cracking in Asphalt Pavements Presented at the Pavement Performance Prediction Symposium 2007 Laramie, Wyoming Tim Clyne, Roger Olson Minnesota Department of Transportation

More information

Developing Affordable GTR Asphalt Mixes for Local Roadways

Developing Affordable GTR Asphalt Mixes for Local Roadways Developing Affordable GTR Asphalt Mixes for Local Roadways Munir D. Nazzal Sang Soo Kim 1 Ala Abbas Acknowledgement The researchers would like to thank: Ohio Department of Transportation (ODOT), Ohio s

More information

Pavement Performance Prediction Symposium July 17, 2008 University of Wyoming Laramie, Wyoming

Pavement Performance Prediction Symposium July 17, 2008 University of Wyoming Laramie, Wyoming Pavement Performance Prediction Symposium July 17, 2008 University of Wyoming Laramie, Wyoming Acknowledgements: John D Angelo - FHWA FHWA Mobile Asphalt Testing Laboratory Program Chuck Paugh Project

More information

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-B111 Sewer Main Repair

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-B111 Sewer Main Repair Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-B111 Sewer Main Repair 1. Objective: 1.1. To repair the sewer main in a timely and efficient manner, minimizing disruption

More information

BERKSHIRE REGIONAL GROUP PURCHASING PROGRAM Laura Wood, CPO Phone: (413) Main Street Fax: (413) North Adams, MA 01247

BERKSHIRE REGIONAL GROUP PURCHASING PROGRAM Laura Wood, CPO Phone: (413) Main Street Fax: (413) North Adams, MA 01247 BERKSHIRE REGIONAL GROUP PURCHASING PROGRAM 2014-2015 Laura Wood, CPO Phone: (413) 662-3038 10 Main Street Fax: (413) 662-3022 North Adams, MA 01247 Email: Lwood@northadams-ma.gov TO: Town Administrators

More information

3/27/2016. Crack filling/sealing PLANNING & SCHEDULING. Two types of crack treatment

3/27/2016. Crack filling/sealing PLANNING & SCHEDULING. Two types of crack treatment Crack filling/sealing Two types of crack treatment Crack Filling: Pavements that are in good condition Working cracks Crack Sealing: Filling non working cracks closely spaced Most cost effective treatment

More information

TECHNICAL MANUAL OPERATION INSTRUCTIONS CONCRETE - MOBILE MIXER BODY M919, MODEL 8CM-24/F NSN

TECHNICAL MANUAL OPERATION INSTRUCTIONS CONCRETE - MOBILE MIXER BODY M919, MODEL 8CM-24/F NSN TECHNICAL MANUAL OPERATION INSTRUCTIONS CONCRETE - MOBILE MIXER BODY M919, MODEL 8CM-24/F NSN 3895-01-028-4391 DAFFIN MOBILE PRODUCTS DIVISION OF BARBER-GREENE COMPANY (MANUAL PREPARED BY AM GENERAL CORPORATION)

More information

City of Vallejo Public Works Department

City of Vallejo Public Works Department Streets & Potholes Frequently Asked Questions A Guide to Potholes What is a pothole? How do we fix a pothole? Why do some potholes get fixed faster? I reported a pothole but it wasn't fixed - why not?

More information

Multiple Stress Creep Recovery (MSCR): New Binder Grade Testing and Terminology

Multiple Stress Creep Recovery (MSCR): New Binder Grade Testing and Terminology Multiple Stress Creep Recovery (MSCR): New Binder Grade Testing and Terminology 2016 AASHTO - Subcommittee On Materials Mick Syslo, P.E. Materials & Research Engineer Nebraska Department of Roads Current

More information

PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS

PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS To review the proposed amendments Approval of the amendments (5-3) Ogden City Planning is proposing several amendments and clarifications to the parking

More information

Developing Affordable GTR Asphalt Mixes for Local Roadways

Developing Affordable GTR Asphalt Mixes for Local Roadways Developing Affordable GTR Asphalt Mixes for Local Roadways Munir D. Nazzal, Ph.D., P.E. 1 Sang Soo Kim, Ph.D., P.E. Ala Abbas, Ph.D. Acknowledgement The researchers would like to thank: Ohio s Research

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Fundamentals of Paving Smoothness

Fundamentals of Paving Smoothness Paving Smoothness Overview Fundamentals of Paving Smoothness Ty Huls Smoothness Measurements Smoothness on the Job Site Smoothness at the Paver Smoothness at the Rollers Continuous Paving Job Site Example

More information

SKID RESISTANCE EVALUATION PROGRAM

SKID RESISTANCE EVALUATION PROGRAM SKID RESISTANCE EVALUATION PROGRAM P a u l O w e n s Director ISH C Research and Training Center West Lafayette, Indiana H IS T O R Y Indiana started skidding roads in 1968 with a towed-trailer type skid

More information

TRAILER MATE SPECIFICATIONS

TRAILER MATE SPECIFICATIONS TRAILER MATE SPECIFICATIONS TM50 2-Wheel Drive 3-Wheel Drive TABLE OF CONTENTS TM50 2-WD / 3-WD Specifications / Dimensions. 1 General Specifications.... 2 Weights / Travel Speed / Tilt Table Degrees /

More information

Developing Affordable GTR Asphalt Mixes for Local Roadways

Developing Affordable GTR Asphalt Mixes for Local Roadways Developing Affordable GTR Asphalt Mixes for Local Roadways Munir D. Nazzal, Ph.D., P.E. 1 Sang Soo Kim, Ph.D., P.E. Ala Abbas, Ph.D. Acknowledgement The researchers would like to thank: Ohio s Research

More information

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016)

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.34 NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) A. Purpose and Applicability The purpose of this rule is to reduce emissions of oxides

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

8 Crucial Tactics for Asphalt Pavement Protection. Since 1941 // WolfPaving.com

8 Crucial Tactics for Asphalt Pavement Protection. Since 1941 // WolfPaving.com 8 Crucial Tactics for Asphalt Pavement Protection Since 1941 // WolfPaving.com Your asphalt pavement protection plan: How, Why, and When of asphalt pavement care. You ve invested in a new asphalt parking

More information

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER DESIGN DESIGNATION A.A.D.T - XXXX = XXXX V = XX M.P.H PLANS FOR PROPOSED HIGHWAY INDEX OF SHEETS SHEET DESCRIPTION NUMBER TITLE SHEET ----------------------- 1 TYPICAL SECTIONS (TS) (1 SHEET)-- QUANTITIES

More information

DMS-9202 Asphaltic Concrete Patching Material (Stockpile Storage or Bagged)

DMS-9202 Asphaltic Concrete Patching Material (Stockpile Storage or Bagged) Asphaltic Concrete Patching Material (Stockpile Storage or Bagged) Effective Date: May 2017 1. DESCRIPTION This Specification governs for crushed stone asphaltic concrete intended primarily as a cool-

More information

Non-Destructive Pavement Testing at IDOT. LaDonna R. Rowden, P.E. Pavement Technology Engineer

Non-Destructive Pavement Testing at IDOT. LaDonna R. Rowden, P.E. Pavement Technology Engineer Non-Destructive Pavement Testing at IDOT LaDonna R. Rowden, P.E. Pavement Technology Engineer Bureau of Materials and Physical Research Physical Research Section Bridge Investigations Unit Pavement Technology

More information

GUIDE FOR CERTIFICATION AND INSPECTION OF WHEEL SHOPS. Routine Special Shop Certification Follow up Inspection

GUIDE FOR CERTIFICATION AND INSPECTION OF WHEEL SHOPS. Routine Special Shop Certification Follow up Inspection GUIDE FOR CERTIFICATION AND INSPECTION OF WHEEL SHOPS Routine Special Shop Certification Follow up Inspection M-1003 Approved ISO Approved SR = See Report Attachments Y/N N/A NI = Not Inspected # MOUNTED

More information

Patton Hill Road (Four Inch Main), Project No

Patton Hill Road (Four Inch Main), Project No Patton Hill Road (Four Inch Main), Project No. 2016100 MP-5.01 MOBILIZATION (3% MAX) 1 LS MP-5.02.8(d) 8" DIP (CLASS 350) ALL DEPTHS 600 LF MP-5.02.6(p) 6" PVC ALL DEPTHS, INCLUDING BEDDING 10 LF MP-5.02.4(p)

More information

APPENDIX G. Greenhouse Gas and Climate Change Analysis

APPENDIX G. Greenhouse Gas and Climate Change Analysis APPENDIX G Greenhouse Gas and Climate Change Analysis GHG Running Exhaust and Fuel Cycle Emissions (CO2e) Year Emission Factor (g/mi)* ADT (vehicles per day) Length (mi) g/day MT/day MT/year 2015 638.13

More information

Use of New High Performance Thin Overlays (HPTO)

Use of New High Performance Thin Overlays (HPTO) Northeast Asphalt User/Producer Group Wilmington/Christiana Delaware October 11-12, 2006 Use of New High Performance Thin Overlays (HPTO) Thomas Bennert Rutgers University NJ s s Thin-Lift Materials New

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

On-the-Job Training Program. Overview of Training Programs

On-the-Job Training Program. Overview of Training Programs On-the-Job Training Program Overview of Training Programs The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough 1040 902 Concrete Finisher (Paving) 1040 903 Concrete

More information

Fast Track Repair Materials and Methods. 9/22/2006 International Grooving &Grinding Association 1

Fast Track Repair Materials and Methods. 9/22/2006 International Grooving &Grinding Association 1 Fast Track Repair Materials and Methods 9/22/2006 International Grooving &Grinding Association 1 New Technology for mix designs Sequencing methodology Innovative Bidding Fast Track 9/22/2006 International

More information

Development of long life structural asphalt

Development of long life structural asphalt Build something great Development of long life structural asphalt Trevor Distin Sustainability opportunities for the asphalt industry Reusing RAP Preservation of raw materials bitumen & aggregates However

More information

Update NCHRP Project 9-61 Short- and Long-Term Binder Aging Methods to Accurately Reflect Aging in Asphalt Mixtures

Update NCHRP Project 9-61 Short- and Long-Term Binder Aging Methods to Accurately Reflect Aging in Asphalt Mixtures Update NCHRP Project 9-61 Short- and Long-Term Binder Aging Methods to Accurately Reflect Aging in Asphalt Mixtures Ramon Bonaquist, P.E. Research Team Ramon Bonaquist - PI Western Research Institute Jeramie

More information

Concrete Delivery Requirements

Concrete Delivery Requirements BORAL CONCRETE Build something great Customer Notification Concrete Delivery Requirements MARCH 2017 CONCRETE DELIVERY REQUIREMENTS - TRAFFIC MANAGEMENT, ENVIRONMENTAL At Boral we regard the safety and

More information

DRAG-A-BOX BRAND MATERIAL SPREADERS

DRAG-A-BOX BRAND MATERIAL SPREADERS DRAG-A-BOX BRAND MATERIAL SPREADERS MODEL CE 7-12 OPERATION INSTRUCTIONS & OWNERS MANUAL BY J. PYOTT & ASSOCIATES 1 OPERATORS INSTRUCTIONS & OWNERS MANUAL These instructions cover the assembly and operation

More information

Fuel Resistant. Punishing Conditions. Supreme Production.

Fuel Resistant.   Punishing Conditions. Supreme Production. Fuel Resistant www.axeonsp.com Punishing Conditions. Supreme Production. WELL-GROUNDED SOLUTIONS FOR HEAVY-DUTY TRAFFIC. StellarFlex FR Fuel Resistant Ever increasing traffic. New aircraft landing gear

More information

Pavement Management Program Report

Pavement Management Program Report Pavement Management Program Report for the City of Placentia 2018 Citywide Pavement Management Program Update June 19, 2018 June 19, 2018 Luis Estevez Director of Public Works City of Placentia 401 East

More information

Appendix D. Airside and Landside Pavement Inventories

Appendix D. Airside and Landside Pavement Inventories Appendix D Airside and Landside Pavement Inventories Runway 5-23 2010 2" Mill and 2" Bituminous Surface Course Overlay 2001 2" Bituminous Surface Overlay 1984 2" Bituminous Surface Course Partial Overlay

More information