ROAD SAFETY AUDIT. Main St. (U.S. Route 7, Routes 23 & 41) at South Main St. (U.S. Route 7) and Maple Ave. (Routes 23 & 41) MassDOT Project #607756

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "ROAD SAFETY AUDIT. Main St. (U.S. Route 7, Routes 23 & 41) at South Main St. (U.S. Route 7) and Maple Ave. (Routes 23 & 41) MassDOT Project #607756"

Transcription

1 ROAD SAFETY AUDIT Main St. (U.S. Route 7, Routes 23 & 41) at South Main St. (U.S. Route 7) and Maple Ave. (Routes 23 & 41) MassDOT Project # Town of Great Barrington August 13, 2015 Prepared For: MassDOT Highway Division Prepared By: Nitsch Engineering 2 Center Plaza, Suite 430 Boston, MA 02108

2

3 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering Table of Contents Project Data... 1 Background... 1 Project Location and Description... 2 Audit Observations... 5 Potential Safety Enhancements Summary of Road Safety Audit List of Tables Table 1. Participating Audit Team Members... 1 Table 2. Time Frame and Costs Breakdown Table 3. Potential Safety Enhancement Summary List of Figures Figure 1: Locus Map... 3 Figure 2: Study Location... 4 List of Appendices Appendix A: RSA Meeting Agenda Appendix B: RSA Audit Team Contact List Appendix C: Detailed Crash Data Appendix D: Traffic Counts Appendix E: Road Safety Audit References

4

5 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering Project Data A Road Safety Audit for the intersection of Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) in Great Barrington occurred on Tuesday, July 21, 2015 in Great Barrington, MA. As indicated in Table 1, the audit team consisted of representatives from the Town of Great Barrington, MassDOT Traffic Engineering & Safety, MassDOT District 1, and Berkshire Regional Planning Commission (BRPC). The group observed operations with respect to safety at the study intersections and this report documents the audit team s findings. The RSA agenda can be found in Appendix A. Contact information for the team members can be found in Appendix B. Table 1. Participating Audit Team Members Name Agency/Affiliation Jane Davis Nitsch Engineering Jeff Bandini Nitsch Engineering Kevin Chiang MassDOT Boston Traffic Operations Joe Sokul Great Barrington DPW Superintendent Clete Kus Berkshire Regional Planning Commission William Walsh Great Barrington Chief of Police Sonja Gray MassDOT District 1 Peter Frieri MassDOT District 1 Background The Road Safety Audit (RSA) is one of the first steps in the design process as well as a necessary step for the project to be eligible to receive Highway Safety Improvement Program (HSIP) federal funds for construction. The goal of this RSA is to identify potential safety issues that can be addressed with shortterm improvements prior to construction and long-term improvements that can be incorporated into the design. All improvements should adhere to the MassDOT guidelines for intersection design. The RSA is a collaborative process by state, municipal, law enforcement, public works, and design consultants. The process involves conducting a meeting to discuss current crash data and safety issues at the site, visiting the site to discuss possible solutions that would improve safety, and preparing a written report that outlines the safety issues discussed along with the costs, timeline, and agency responsibility for implementing improvements. Page 1

6 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering Project Location and Description The Locus Map of the study area is shown in Figure 1. An aerial map of the study location of Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) is shown in Figure 2. Main Street/South Main Street (U.S. Route 7) in Great Barrington is classified as a principal arterial that runs in a north-south direction through the project area. Main Street is present from the project intersection northward until its terminus at State Road in Great Barrington, approximately 1 mile to the north. South Main Street is present from the project intersection southward until the Town of Sheffield line, approximately 2 miles to the south, where the roadway continues as North Main Street. U.S. Route 7 is designated as north-south and is present from its northern terminus at Interstate 89 in Highgate, Vermont to its southern terminus at Interstate 95 in Norwalk, Connecticut. Within Massachusetts, U.S. Route 7 is present from the northern border in the Town of Williamstown to the southern border in the town of Sheffield. Main Street/South Main Street (U.S. Route 7) is maintained by the Town of Great Barrington and serves approximately 14,500 vehicles per day north of Maple Avenue and approximately 11,000 vehicles per day south of Maple Avenue. The speed limit along Main Street/South Main Street is 30 miles per hour (mph) in the vicinity of the intersection. Maple Avenue (Routes 23 & 41) in Great Barrington is classified as a rural minor arterial that runs in an east-west direction through the project area. Maple Avenue is present from the project intersection westward until it crosses the Green River in Great Barrington, approximately 1 mile to the west, where the roadway continues as Egremont Road. Within Massachusetts, Route 23 is designated as east-west and is present from its eastern terminus at U.S. Route 20 in Russell to the western border in the Town of Egremont, where it continues into New York as New York State Route 23. Within Massachusetts, Route 41 is designated as north-south and is present from its northern terminus at U.S. Route 20 in Pittsfield to the southern border in the Town of Sheffield, where it continues into Connecticut as Connecticut Route 41. Maple Avenue (Routes 23 & 41) is maintained by the Massachusetts Department of Transportation (MassDOT) and serves approximately 5,500 vehicles per day west Main Street. The speed limit along Maple Avenue is 35 miles per hour (mph) in the vicinity of the intersection. Nitsch Engineering evaluated the last three years of available crash data ( ) from the Town of Great Barrington to establish a crash rate at the intersection to compare to the MassDOT signalized intersection average of 0.80 per Million Entering Vehicles (MEV) Statewide 1. For the three-year period , a total of 16 crashes were documented, yielding a crash rate of 0.93 per MEV, which is above the Statewide average. 1 The 2010 Average Crash Rates, per Million Entering Vehicles, by Intersection Type, MassDOT, Highway Division, for District 1 indicate a low sample total and recommend the use of Statewide Rates only. Page 2

7 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering Figure 1: Locus Map Road Safety Audit Main St. (U.S. Route 7, Routes 23 & 41) at South Main St. (U.S. Route 7) and Maple Ave. (Routes 23 & 41) Great Barrington, MA Data Source: MassGIS Nitsch Project # Page 3

8 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering Figure 2: Study Location Road Safety Audit Main St. (U.S. Route 7, Routes 23 & 41) at South Main St. (U.S. Route 7) and Maple Ave. (Routes 23 & 41) Great Barrington, MA Data Source: MassGIS Nitsch Project # Page 4

9 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering Audit Observations Based on a summary of the existing crash information and site visit, audit participants identified the following safety issues that are summarized below: Intersection Geometry, Visibility, and Traffic Operations: o Due to the angle of the Maple Avenue approach, the high amount of heavy vehicles turning right from Main Street onto Maple Avenue requires a large radius at the northwest corner of the intersection; this large radius also provides the width necessary for left-turning heavy vehicles from South Main Street onto Maple Avenue. This geometric design, however, results in the following safety and operational issues: Right and left-turning heavy vehicles often mount the traffic island on Maple Avenue due to both the geometry of the intersection and the presence of sloped granite curbing around the island, causing damage to existing signage and the pedestrian signal post. Motorists executing the Main Street right-turn movement at a relatively high rate of speed do so as a result of both the large radius and the presence of a right-turn signal arrow during all phases except for the exclusive pedestrian phase. The large radius at the northwest corner, combined with both the sloped area behind the curb and the location of the pedestrian crosswalk, contribute to poor visibility of pedestrians for right-turning vehicles from Main Street onto Maple Avenue. Due to these characteristics, the pedestrian crossing sign located approximately five feet in advance of the crosswalk provides little advanced warning for motorists prior to executing the turn. Looking northbound, the large radius and the sloped area behind the curb contribute to poor visibility of pedestrians crossing Maple Avenue from Main Street right-turning vehicles Looking westbound, the pedestrian crossing sign provides little advanced warning. Sloped granite curbing provides little protection to the signal post and signage within the traffic island Page 5

10 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering o o Backplates, which aid in visibility against the adjacent background, are not mounted on any of the traffic signals. Due to the roadway geometry, angle of the traffic signals, and presence of cut-away visors, the signals for South Main Street and Maple Avenue are visible from both approaches, which can create driver confusion. View from Maple Avenue shows the red signals intended for South Main Street can be easily seen from this approach. No back plates on signals. o o There are two (2) signals mounted on the span wire for each of the approaches, however, there are no supplemental post-mounted signals for any of the approaches. MassDOT is currently rehabilitating a portion of Main Street north of the intersection under Project #602182, estimated for completion in July The proximity of this reconstruction project results in traffic queues in the northbound direction through the intersection. Access Management: o Great Barrington Police Station, located on the east side of the project intersection, is not accessible directly from Maple Avenue. To access the Police Station driveway requires a right turn from the de-facto left-turn lane, or a left turn from the channelized right-turn lane, which may confuse nearby drivers. Page 6

11 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering o The curb cut on South Main Street for the commercial driveway of the plaza located on the southwest corner of the intersection presents issues with the following: Vehicles exit the site onto South Main Street at roughly the same location where the Main Street southbound lane and the Maple Avenue channelized right-turn lane merge. The excessive driveway width presents no clear path for entering and exiting vehicles. Turning vehicles must execute maneuvers proximate to the intersection. Lane Designation and Pavement Markings: o Due to the excessive width of the single de-facto left-turn approach lane on Maple Avenue and the two (2) northbound receiving lanes on Main Street, left-turning vehicles frequently form two lanes prior to executing the turn. Maple Ave approach is wide enough for vehicles to form two lanes to turn left o o There is no advanced warning for the lane configuration on any of the approaches. This is particularly problematic on the Maple Avenue approach, where the channelized rightturn lane cannot be seen in advance of the intersection. Audit participants observed vehicles executing illegal turns from both approach lanes on Maple Avenue as a result of the separation of the de-facto left-turn lane and channelized right-turn lane. Page 7

12 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering o The pavement markings in the vicinity of the traffic islands are faded and the delineation for the gore areas is unclear. The presence of faded markings coupled with the lack of hatching within the gore area, is problematic for Main Street/South Main Street southbound vehicles traveling through the intersection, where it appears two (2) receiving lanes are present. Looking southbound along Main Street, pavement striping can be confused for two receiving lanes Pedestrian Accessibility: o o o o There is no pedestrian signal head on the post located in the traffic island that separates the eastbound and westbound lanes of Maple Avenue. The pedestrian push button at the traffic island that separates the approach lanes for rightand left-turning vehicles on Maple Avenue is not compliant with current standards. The pedestrian signal indications do not contain countdown displays. According to the Signal and Timing Plan, the pedestrian walk interval is seven seconds with a 13 second flashing don t walk clearance, however, based on field observations, the pedestrian walk, flashing don t walk, and clearance timing seem inadequate. Pedestrian ramps are not present at any of the crosswalk termini or within the traffic islands. Page 8

13 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering o Some of the sidewalks at the intersection and the pedestrian paths through the traffic islands are difficult to traverse and do not meet current standards. Pedestrian path in traffic island is difficult to traverse; no pedestrian ramp at crosswalk terminus Bicycle Accessibility: o Bicycle accommodation is not present at the intersection. Emergency Vehicle Pre-emption: o Emergency vehicle pre-emption is not present at the intersection. Page 9

14 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering Potential Safety Enhancements Following review of crash data and traffic counts and a discussion of potential safety issues, audit participants recommend the following. Redesign the geometry of the intersection taking the following options into consideration: o Realign the intersection such that Maple Avenue intersects Main Street at as close to a 90 degree angle as possible to form a more typical T -type intersection. o Asses the feasibility of re-designing the intersection with a roundabout. Both options would alleviate the operational issues for heavy vehicles turning onto Maple Avenue from Main Street, increase visibility for pedestrians crossing Maple Avenue, reduce travel speed, and would provide accessibility to and from the Great Barrington Police Station. Reconstruct the traffic islands with vertical curb to prevent heavy vehicles from easily mounting the islands. Install a Turning Vehicles Yield to Pedestrians sign on Main Street southbound to give motorists advanced warning for pedestrians crossing Maple Avenue. Realign the crosswalk across Maple Avenue such that the terminus on the north side is closer to the corner to improve visibility for both motorists on Main Street and pedestrians waiting to cross Maple Avenue. Reconstruct the traffic signal system to provide improved visibility of the signals, including backplates for each signal indication and supplemental pole-mounted signals where appropriate. Reduce the width of the curb cut for the commercial plaza driveway on South Main Street, while providing access and egress as far from the intersection as possible to reduce conflicts with vehicles merging from Maple Street eastbound and Main Street southbound. Install a No Left Turn sign at the driveway egress on South Main Street, as vehicles can access the intersection by using the existing curb cut on Maple Avenue. Construct a median island on South Main Street to prevent left-turns from the plaza onto South Main Street. Determine if a second left-turn approach lane on Maple Avenue is warranted, or restripe the gore area at this location to reduce the width of the approach lane. Install advanced warning signage showing lane designations well in advance of the intersection to limit vehicle lane changes close to the intersection. Restripe the intersection to improve visibility of faded pavement markings, including hatching to more clearly define the gore areas around the traffic islands. Page 10

15 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering Install a new pedestrian signal system that meets current standards, including a longer walk and clearance time, pedestrian countdown display, push buttons, and signage. Construct new sidewalks at the intersection including the addition of pedestrian ramps at the crosswalk termini and the traffic islands. Reconfigure and/or restripe the intersection and adjacent roadways to accommodate bicycle travel. Install an emergency vehicle pre-emption system. Summary of Road Safety Audit MassDOT has retained Nitsch Engineering to prepare this Road Safety Audit (RSA) for the intersection of Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41). As part of the RSA process going forward, each of the potential safety enhancements is classified by time frame and cost, as shown in Table 2. Table 2. Time Frame and Costs Breakdown Time Frame Costs Short-term < 1 year Low < $10,000 Mid-term 1-3 years Medium $10,000-$50,000 Long-term > 3 years High > $50,000 The safety issues, potential improvements, estimated safety payoff, time frame, and cost for the intersection of Main Street at South Main Street and Maple Avenue are summarized in Table 3. Page 11

16 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering Table 3. Potential Safety Enhancement Summary Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Safety Issue Intersection Geometry, Visibility, and Traffic Operations Access Management Lane Designation and Pavement Markings Safety Enhancement Redesign the geometry of the intersection to alleviate the operational issues for heavy vehicles turning onto Maple Avenue from Main Street, increase visibility for pedestrians crossing Maple Avenue, reduce travel speed, and would provide accessibility to and from the Great Barrington Police Station. Reconstruct the traffic islands with vertical curb to prevent heavy vehicles from easily mounting the islands Install a Turning Vehicles Yield to Pedestrians sign on Main Street southbound to give motorists advanced warning for pedestrians crossing Maple Avenue. Realign the crosswalk across Maple Avenue such that the terminus on the north side is closer to the corner to improve visibility for both motorists on Main Street and pedestrians waiting to cross Maple Avenue. Reconstruct the traffic signal system to provide improved visibility of the signals, including backplates for each signal indication and supplemental pole-mounted signals where appropriate. Reduce the width of the curb cut for the commercial plaza driveway on South Main Street, while providing access and egress as far from the intersection as possible to reduce conflicts with vehicles merging from Maple Street eastbound and Main Street southbound. Install a No Left Turn sign at the driveway egress on South Main Street, as vehicles can access the intersection by using the existing curb cut on Maple Avenue. Construct a median island on South Main Street to prevent leftturns from the plaza onto South Main Street. Determine if a second left-turn approach lane on Maple Avenue is warranted or restripe the gore area at this location to reduce the width of the approach lane. Safety Payoff Time Frame Cost Responsible Agency High Long-term High MassDOT Low Mid-term Medium MassDOT Medium Short-term Low Town of Great Barrington High Mid-Term Medium MassDOT High Long-Term High MassDOT Medium Mid-term Medium Town of Great Barrington Medium Short-term Low MassDOT Page 12

17 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering Table 3. Potential Safety Enhancement Summary Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) (continued) Safety Issue Lane Designation and Pavement Markings (continued) Pedestrian Accessibility Bicycle Accessibility Safety Enhancement Install advanced warning signage showing lane designations well in advance of the intersection to limit vehicle lane changes close to the intersection. Restripe the intersection to improve visibility of faded pavement markings, including hatching to more clearly define the gore areas around the traffic islands. Install a new pedestrian signal system that meets current standards, including a longer walk and clearance time, pedestrian countdown display, push buttons, and signage. Construct new sidewalks at the intersection including the addition of pedestrian ramps at the crosswalk termini and the traffic islands. Reconfigure and/or re-stripe the intersection and adjacent roadways to accommodate bicycle travel. Safety Payoff Time Frame Cost Medium Short-term Low Medium Short-term Low Responsible Agency MassDOT/Town of Great Barrington MassDOT/Town of Great Barrington Medium Mid-Term High MassDOT Low Mid-term Medium MassDOT Medium Mid-term Medium MassDOT/Town of Great Barrington Emergency Install emergency vehicle pre-emption system High Mid-term High MassDOT Page 13

18

19 ROAD SAFETY AUDIT APPENDIX Main St. (U.S. Route 7, Routes 23 & 41) at South Main St. (U.S. Route 7) and Maple Ave. (Routes 23 & 41) MassDOT Project # Town of Great Barrington August 13, 2015 Prepared For: MassDOT Highway Division Prepared By: Nitsch Engineering 2 Center Plaza, Suite 430 Boston, MA 02108

20

21 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering Appendix A: RSA Meeting Agenda

22

23 Road Safety Audit Great Barrington, MA Main Street (Routes 7, 23 & 41) at Maple Avenue (Routes 23 & 41) Meeting Location: Great Barrington Police Department, 465 Main Street, Great Barrington, MA Tuesday, July 21, :30 AM 12:30 PM Type of meeting: Attendees: Please bring: High Crash Location Road Safety Audit Invited Participants to Comprise a Multidisciplinary Team Thoughts and Enthusiasm!! 10:30 AM Welcome and Introductions 10:45 AM Discussion of Safety Issues 11:00 AM Site Visit Crash history, Speed Regulations provided in advance Existing Geometries and Conditions Travel to the intersection of Main Street (Route 7) at Maple Avenue (Routes 23 & 41) As a group, identify areas for improvements 11:45 AM Discussion of Potential Improvements Return to original meeting location Discuss observations and finalize safety issue areas Discuss potential improvements and finalize recommendations 12:30 PM Adjourn for the Day but the RSA has not ended Instructions for Participants: Before attending the RSA on July 21 st, participants are encouraged to drive/walk through the intersection and complete/consider elements on the RSA Prompt List with a focus on safety. All participants will be actively involved in the process throughout. Participants are encouraged to come with thoughts and ideas, but are reminded that the synergy that develops and respect for others opinions are key elements to the success of the overall RSA process. After the RSA meeting, participants will be asked to comment and respond to the document materials to assure it is reflective of the RSA completed by the multidisciplinary team.

24

25 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering Appendix B: RSA Audit Team Contact List

26

27 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering RSA Sign In Sheet Main Street (Routes 7, 23 & 41) at South Main Street (Route 7) and Maple Avenue (Routes 23 & 41) Great Barrington, MA Tuesday, July 21, :30 a.m. Name Agency/Affiliation Phone Jane Davis Nitsch Engineering Jeff Bandini Nitsch Engineering Kevin Chiang MassDOT Boston Traffic Ops Great Barrington. DPW Joe Sokul Superintendent Clete Kus Berkshire Regional Planning Commission ext. 20 William Walsh Great Barrington Chief of Police Sonja Gray MassDOT District Peter Frieri MassDOT District

28

29 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering Appendix C: Detailed Crash Data

30

31 (ROUTES 7, 23 & 41) 2 7 MAIN STREET 10 1 MAPLE AVENUE (ROUTES 23 & 41) 8 11, 15 GREAT BARRINGTON POLICE STATION DRIVEWAY (ROUTE 7) SOUTH MAIN STREET 14 COMMERCIAL DRIVEWAY PEDSTRIAN INJURY ACCIDENT FIXED OBJECT SYMBOLS & TYPES OF COLLISIONS: CHANGING LANE MOVING VEHICLE OUT OF CONTROL REAR END BACKING VEHICLE BICYCLE NOT TO SCALE SIDE SWIPE ANGLE PARKED VEHICLE PREPARED FOR: MASSDOT

32 Intersection of Main Street (Routes 7, 23 & 41) at South Main Street (Route 7) and Maple Ave (Routes 23 & 41); Great Barrington, MA -- Information Not Available # Crash Month # Date Crash Day Time of Day Manner of Collision (11) Light Condition (1) Weather Condition (2,3) Road Surface (6) Driver Contributing Code (24) Ages Comments m/d/y # Type # Type # Type # Type # Type D1 D2 D3 D /1/10 Friday 1:00 AM 1 Single Vehicle Crash 4 Dark - lighted roadway 2 Cloudy 1 Dry 7 Driving too fast for conditions 24 Failure to negotiate turn 2 2 2/23/10 Tuesday 1:36 PM 4 Sideswipe, same direction 1 Daylight 4 Snow 4 Ice Failure to keep in proper lane or 9 running off road Poor roadway conditions due to weather 3 8 8/6/10 Friday 2:06 PM 6 Head on 1 Daylight 1 Clear 1 Dry 19 Inattention Driving on wrong side of road 4 9 9/18/10 Saturday 11:48 AM 3 Angle 1 Daylight 1 Clear 1 Dry 19 Inattention Failure to yeild making left turn /22/10 Monday 10:21 AM 5 Sideswipe, opposite direction 1 Daylight 3 Rain 2 Wet Disregarded traffic signs, signals, road 3 markings Failure to stop at a red light /2/10 Thursday 11:38 AM 3 Angle 1 Daylight 1 Clear 1 Dry 4 Failed to yield to right of way Failure to yeild making left turn 7 5 5/10/11 Tuesday 2:04 PM 3 Angle 1 Daylight 1 Clear 1 Dry 99 Unknown /19/11 Thursday 9:28 AM 1 Single Vehicle Crash 1 Daylight 2 Cloudy 1 Dry 19 Inattention 64 Distracted by infant in rear seat 9 5 5/29/11 Sunday 8:16 AM 3 Angle 1 Daylight 1 Clear 1 Dry 99 Unknown Failure to stop at a red light /7/11 Tuesday 4:10 PM 2 Rear-end 1 Daylight 1 Clear 1 Dry 99 Unknown /11/11 Saturday 12:12 PM 2 Rear-end 1 Daylight 2 Cloudy 1 Dry 19 Inattention Rear-ended at red light /31/11 Sunday 4:45 PM 4 Sideswipe, same direction 1 Daylight 1 Clear 1 Dry Failure to keep in proper lane or 9 running off road Improper lane change /18/11 Sunday 4:22 PM 2 Rear-end 1 Daylight 1 Clear 1 Dry 19 Inattention Rear-ended at red light /26/11 Saturday 10:52 AM 2 Rear-end 1 Daylight 1 Clear 1 Dry 99 Unknown /21/11 Wednesday 12:34 PM 2 Rear-end 1 Daylight 3 Rain 2 Wet 99 Unknown /23/12 Wednesday 9:45 AM 3 Angle 1 Daylight 1 Clear 1 Dry 1 No Improper Driving Summary based on Crash Reports obtained from Town of Great Barrington Police Department Crash Data Summary Table

33

34

35

36

37 Road Safety Audit Main Street (U.S. Route 7, Routes 23 & 41) at South Main Street (U.S. Route 7) and Maple Avenue (Routes 23 & 41) Nitsch Engineering Appendix D: Traffic Counts

38

39 MAIN STREET (ROUTES 7, 23 & 41) 21 (23) 402 (476) 188 (184) 336 (497) S 203 (188) 22 (14) MAPLE AVENUE (ROUTES 23 & 41) SOUTH MAIN STREET (ROUTE 7) LEGEND: S SIGNALIZED INTERSECTION XXX (XXX) TRAFFIC DIRECTION TRAFFIC VOLUME - AM (PM) NOT TO SCALE PREPARED FOR: MASSDOT HIGHWAY DIVISION

40 Location: South Main (Route 7) PO Box 468 Location: South of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Start 12-Nov-14 Northbound Southbound Combined 13-Nov Northbound Southbound Combined Time Wed A.M. P.M. A.M. P.M. A.M. P.M. Thu A.M. P.M. A.M. P.M. A.M. P.M. 12: : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : Total Day Total % Total 18.9% 30.3% 20.2% 30.6% 18.3% 30.6% 19.7% 31.4% Peak - 07:45 03:15 11:00 03:45 07:45 03:15-07:45 03:45 11:00 03:45 11:00 03:45 Vol P.H.F ADT ADT 11,364 AADT 11,364 Page 1

41 Location: South Main (Route 7) PO Box 468 Location: South of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Northbound Start th 95th Time Total Percent Percent 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 12.7% 6.0% 15.2% 30.7% 27.0% 7.6% 0.6% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 08:00 11:00 11:00 11:00 08:00 08:00 07:00 06:00 00:00 08:00 Vol PM Peak 12:00 12:00 17:00 15:00 14:00 14:00 19:00 14:00 15:00 Vol Page 1

42 Location: South Main (Route 7) PO Box 468 Location: South of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Northbound Start th 95th Time Total Percent Percent 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 9.4% 4.0% 12.8% 35.4% 30.4% 7.3% 0.6% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 07:00 08:00 08:00 11:00 10:00 06:00 06:00 07:00 04:00 08:00 Vol PM Peak 15:00 15:00 17:00 16:00 16:00 13:00 14:00 16:00 Vol Total Percent 11.0% 5.0% 14.0% 33.1% 28.7% 7.4% 0.6% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15th Percentile : 18 MPH 50th Percentile : 28 MPH 85th Percentile : 33 MPH 95th Percentile : 37 MPH Stats 10 MPH Pace Speed : MPH Number in Pace : 6886 Percent in Pace : 61.8% Number of Vehicles > 40 MPH : 80 Percent of Vehicles > 40 MPH : 0.7% Mean Speed(Average) : 27 MPH Page 2

43 Location: South Main (Route 7) PO Box 468 Location: South of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Southbound Start th 95th Time Total Percent Percent 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 10.1% 2.1% 5.1% 16.5% 33.6% 22.9% 8.3% 1.2% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 07:00 07:00 10:00 11:00 10:00 07:00 07:00 07:00 06:00 05:00 00:00 11:00 Vol PM Peak 12:00 13:00 15:00 17:00 14:00 14:00 18:00 15:00 14:00 15:00 Vol Page 3

44 Location: South Main (Route 7) PO Box 468 Location: South of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Southbound Start th 95th Time Total Percent Percent 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 9.0% 2.1% 4.5% 16.3% 33.3% 26.3% 7.1% 1.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 08:00 10:00 11:00 11:00 11:00 07:00 07:00 05:00 05:00 03:00 11:00 Vol PM Peak 15:00 12:00 15:00 15:00 13:00 16:00 16:00 23:00 14:00 18:00 16:00 Vol Total Percent 9.5% 2.1% 4.8% 16.4% 33.4% 24.6% 7.7% 1.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 15th Percentile : 23 MPH 50th Percentile : 32 MPH 85th Percentile : 38 MPH 95th Percentile : 42 MPH Stats 10 MPH Pace Speed : MPH Number in Pace : 6732 Percent in Pace : 58.1% Number of Vehicles > 40 MPH : 1052 Percent of Vehicles > 40 MPH : 9.1% Mean Speed(Average) : 31 MPH Page 4

45 Location: South Main (Route 7) PO Box 468 Location: South of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Northbound, Southbound Start th 95th Time Total Percent Percent 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 11.4% 4.0% 10.1% 23.5% 30.4% 15.4% 4.5% 0.7% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 07:00 11:00 11:00 11:00 09:00 07:00 07:00 06:00 00:00 05:00 00:00 11:00 Vol PM Peak 12:00 12:00 17:00 17:00 14:00 14:00 19:00 15:00 14:00 15:00 Vol Page 5

46 Location: South Main (Route 7) PO Box 468 Location: South of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Northbound, Southbound Start th 95th Time Total Percent Percent 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 9.2% 3.1% 8.5% 25.7% 31.9% 17.0% 3.9% 0.7% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 07:00 08:00 08:00 11:00 10:00 07:00 07:00 05:00 04:00 03:00 11:00 Vol PM Peak 15:00 15:00 15:00 15:00 16:00 16:00 16:00 23:00 14:00 18:00 16:00 Vol Total Percent 10.3% 3.5% 9.3% 24.6% 31.1% 16.2% 4.2% 0.7% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 15th Percentile : 20 MPH 50th Percentile : 30 MPH 85th Percentile : 36 MPH 95th Percentile : 39 MPH Stats 10 MPH Pace Speed : MPH Number in Pace : Percent in Pace : 55.7% Number of Vehicles > 40 MPH : 1132 Percent of Vehicles > 40 MPH : 5.0% Mean Speed(Average) : 29 MPH Page 6

47 Location: South Main (Route 7) PO Box 468 Location: South of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Northbound Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Classed Total 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 2.3% 67.8% 14.9% 0.7% 2.3% 1.3% 0.4% 0.7% 1.2% 0.1% 0.0% 0.0% 0.0% 8.2% AM Peak 07:00 11:00 08:00 07:00 07:00 11:00 07:00 11:00 09:00 07:00 10:00 08:00 08:00 Vol PM Peak 16:00 15:00 15:00 14:00 14:00 16:00 14:00 15:00 12:00 17:00 15:00 12:00 Vol Page 1

48 Location: South Main (Route 7) PO Box 468 Location: South of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Northbound Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Classed Total 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 2.0% 67.8% 15.0% 0.7% 2.7% 1.5% 0.4% 0.8% 1.2% 0.1% 0.0% 0.0% 0.1% 7.8% AM Peak 08:00 11:00 08:00 07:00 08:00 09:00 08:00 07:00 09:00 08:00 09:00 07:00 Vol PM Peak 16:00 16:00 16:00 13:00 12:00 14:00 12:00 12:00 15:00 12:00 12:00 15:00 Vol Grand Total Percent 2.1% 67.8% 15.0% 0.7% 2.5% 1.4% 0.4% 0.7% 1.2% 0.1% 0.0% 0.0% 0.1% 8.0% Page 2

49 Location: South Main (Route 7) PO Box 468 Location: South of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Southbound Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Classed Total 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 1.9% 60.7% 16.4% 0.9% 7.6% 1.3% 0.1% 0.8% 1.0% 0.2% 0.0% 0.0% 0.0% 9.0% AM Peak 10:00 11:00 10:00 08:00 06:00 09:00 08:00 08:00 09:00 08:00 09:00 07:00 Vol PM Peak 15:00 17:00 16:00 15:00 14:00 15:00 14:00 13:00 15:00 14:00 12:00 Vol Page 3

50 Location: South Main (Route 7) PO Box 468 Location: South of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Southbound Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Classed Total 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 1.6% 61.6% 16.7% 0.9% 7.1% 1.0% 0.3% 0.9% 1.4% 0.2% 0.0% 0.0% 0.0% 8.3% AM Peak 11:00 11:00 09:00 11:00 10:00 11:00 08:00 11:00 07:00 01:00 08:00 10:00 Vol PM Peak 12:00 16:00 16:00 15:00 14:00 14:00 15:00 12:00 12:00 13:00 16:00 14:00 15:00 Vol Grand Total Percent 1.7% 61.2% 16.6% 0.9% 7.3% 1.1% 0.2% 0.8% 1.2% 0.2% 0.0% 0.0% 0.0% 8.7% Page 4

51 Location: South Main (Route 7) PO Box 468 Location: South of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Northbound, Southbound Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Classed Total 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 2.1% 64.2% 15.7% 0.8% 5.0% 1.3% 0.3% 0.8% 1.1% 0.1% 0.0% 0.0% 0.0% 8.6% AM Peak 07:00 11:00 08:00 08:00 06:00 09:00 07:00 11:00 09:00 07:00 10:00 08:00 09:00 07:00 Vol PM Peak 15:00 17:00 15:00 15:00 14:00 16:00 14:00 15:00 15:00 14:00 15:00 12:00 Vol Page 5

52 Location: South Main (Route 7) PO Box 468 Location: South of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Northbound, Southbound Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Classed Total 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 1.8% 64.6% 15.9% 0.8% 4.9% 1.2% 0.3% 0.8% 1.3% 0.1% 0.0% 0.0% 0.1% 8.1% AM Peak 08:00 11:00 08:00 07:00 10:00 09:00 08:00 07:00 09:00 08:00 08:00 07:00 Vol PM Peak 16:00 16:00 16:00 12:00 14:00 14:00 12:00 12:00 12:00 12:00 16:00 12:00 15:00 Vol Grand Total Percent 1.9% 64.4% 15.8% 0.8% 5.0% 1.3% 0.3% 0.8% 1.2% 0.1% 0.0% 0.0% 0.0% 8.3% Page 6

53 Location: South Main (Route 7) PO Box 468 Location: North of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Start 12-Nov-14 Southbound Northbound Combined 13-Nov Southbound Northbound Combined Time Wed A.M. P.M. A.M. P.M. A.M. P.M. Thu A.M. P.M. A.M. P.M. A.M. P.M. 12: : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : Total Day Total % Total 20.3% 30.8% 20.1% 28.8% 19.4% 31.1% 19.2% 30.3% Peak - 07:15 02:30 08:15 02:45 07:45 02:30-07:15 04:15 08:00 03:45 07:30 03:45 Vol P.H.F ADT ADT 14,510 AADT 14,510 Page 1

54 Location: South Main (Route 7) PO Box 468 Location: North of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Southbound Start th 95th Time Total Percent Percent 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 10.8% 2.7% 10.1% 29.9% 34.3% 10.4% 1.6% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 08:00 11:00 10:00 10:00 07:00 07:00 06:00 05:00 06:00 11:00 11:00 Vol PM Peak 17:00 17:00 12:00 13:00 14:00 14:00 14:00 21:00 13:00 14:00 Vol Page 1

55 Location: South Main (Route 7) PO Box 468 Location: North of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Southbound Start th 95th Time Total Percent Percent 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 7.5% 1.2% 7.0% 29.7% 39.9% 13.0% 1.4% 0.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 10:00 07:00 07:00 09:00 08:00 07:00 06:00 07:00 10:00 03:00 11:00 Vol PM Peak 15:00 17:00 16:00 16:00 12:00 12:00 13:00 13:00 15:00 16:00 16:00 Vol Total Percent 9.1% 2.0% 8.5% 29.8% 37.2% 11.8% 1.5% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15th Percentile : 22 MPH 50th Percentile : 30 MPH 85th Percentile : 34 MPH 95th Percentile : 38 MPH Stats 10 MPH Pace Speed : MPH Number in Pace : 9879 Percent in Pace : 67.0% Number of Vehicles > 40 MPH : 252 Percent of Vehicles > 40 MPH : 1.7% Mean Speed(Average) : 29 MPH Page 2

56 Location: South Main (Route 7) PO Box 468 Location: North of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Northbound Start th 95th Time Total Percent Percent 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 27.3% 3.1% 6.1% 16.0% 31.7% 13.6% 2.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 09:00 10:00 10:00 10:00 08:00 07:00 07:00 05:00 08:00 Vol PM Peak 12:00 17:00 17:00 14:00 14:00 14:00 14:00 20:00 18:00 14:00 Vol Page 3

57 Location: South Main (Route 7) PO Box 468 Location: North of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Northbound Start th 95th Time Total Percent Percent 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 13.9% 0.8% 2.2% 18.3% 44.1% 17.9% 2.5% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 08:00 07:00 11:00 09:00 08:00 10:00 07:00 06:00 11:00 08:00 Vol PM Peak 15:00 14:00 14:00 17:00 16:00 16:00 16:00 12:00 16:00 Vol Total Percent 20.4% 1.9% 4.0% 17.2% 38.2% 15.8% 2.3% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15th Percentile : 11 MPH 50th Percentile : 30 MPH 85th Percentile : 36 MPH 95th Percentile : 39 MPH Stats 10 MPH Pace Speed : MPH Number in Pace : 7899 Percent in Pace : 55.3% Number of Vehicles > 40 MPH : 360 Percent of Vehicles > 40 MPH : 2.5% Mean Speed(Average) : 27 MPH Page 4

58 Location: South Main (Route 7) PO Box 468 Location: North of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Southbound, Northbound Start th 95th Time Total Percent Percent 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 18.8% 2.9% 8.1% 23.1% 33.0% 12.0% 1.8% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 09:00 10:00 10:00 10:00 08:00 07:00 07:00 05:00 06:00 11:00 08:00 Vol PM Peak 16:00 17:00 17:00 14:00 14:00 14:00 14:00 20:00 18:00 13:00 14:00 Vol Page 5

59 Location: South Main (Route 7) PO Box 468 Location: North of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Southbound, Northbound Start th 95th Time Total Percent Percent 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 10.7% 1.0% 4.6% 24.0% 42.0% 15.4% 2.0% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 10:00 07:00 07:00 09:00 08:00 07:00 07:00 06:00 10:00 03:00 11:00 Vol PM Peak 15:00 14:00 14:00 17:00 16:00 16:00 16:00 13:00 15:00 16:00 16:00 Vol Total Percent 14.6% 1.9% 6.3% 23.6% 37.7% 13.8% 1.9% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15th Percentile : 15 MPH 50th Percentile : 30 MPH 85th Percentile : 35 MPH 95th Percentile : 38 MPH Stats 10 MPH Pace Speed : MPH Number in Pace : Percent in Pace : 61.2% Number of Vehicles > 40 MPH : 612 Percent of Vehicles > 40 MPH : 2.1% Mean Speed(Average) : 28 MPH Page 6

60 Location: South Main (Route 7) PO Box 468 Location: North of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Southbound Start Cars 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Motor Trailer Long Buses 6 Tire Single Single Doubl Doubl Doubl Multi Multi Multi Bicycl Class Total 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 0.4% 69.3% 14.9% 0.8% 2.8% 0.9% 0.1% 0.9% 0.6% 0.1% 0.0% 0.0% 0.1% 0.5% 8.4% Page 1

61 Location: South Main (Route 7) PO Box 468 Location: North of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Southbound Start Cars 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Motor Trailer Long Buses 6 Tire Single Single Doubl Doubl Doubl Multi Multi Multi Bicycl Class Total 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 0.6% 69.7% 15.8% 0.8% 3.0% 0.9% 0.1% 0.9% 0.8% 0.1% 0.0% 0.0% 0.0% 0.3% 7.0% Total Percent 0.5% 69.5% 15.4% 0.8% 2.9% 0.9% 0.1% 0.9% 0.7% 0.1% 0.0% 0.0% 0.1% 0.4% 7.7% Page 2

62 Location: South Main (Route 7) PO Box 468 Location: North of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Northbound Start Cars 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Motor Trailer Long Buses 6 Tire Single Single Doubl Doubl Doubl Multi Multi Multi Bicycl Class Total 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 0.5% 60.1% 14.2% 0.7% 2.5% 0.6% 0.1% 0.6% 0.5% 0.1% 0.0% 0.0% 0.0% 0.9% 19.2% Page 3

63 Location: South Main (Route 7) PO Box 468 Location: North of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Northbound Start Cars 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Motor Trailer Long Buses 6 Tire Single Single Doubl Doubl Doubl Multi Multi Multi Bicycl Class Total 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 0.4% 65.6% 15.7% 0.7% 3.2% 0.6% 0.2% 1.0% 0.7% 0.1% 0.0% 0.0% 0.0% 0.5% 11.3% Total Percent 0.4% 63.0% 15.0% 0.7% 2.9% 0.6% 0.1% 0.8% 0.6% 0.1% 0.0% 0.0% 0.0% 0.7% 15.1% Page 4

64 Location: South Main (Route 7) PO Box 468 Location: North of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Southbound, Northbound Start Cars 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Motor Trailer Long Buses 6 Tire Single Single Doubl Doubl Doubl Multi Multi Multi Bicycl Class Total 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 0.4% 64.8% 14.6% 0.8% 2.7% 0.7% 0.1% 0.7% 0.5% 0.1% 0.0% 0.0% 0.0% 0.7% 13.7% Page 5

65 Location: South Main (Route 7) PO Box 468 Location: North of Route 41 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Southbound, Northbound Start Cars 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Motor Trailer Long Buses 6 Tire Single Single Doubl Doubl Doubl Multi Multi Multi Bicycl Class Total 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 0.5% 67.7% 15.7% 0.7% 3.1% 0.8% 0.1% 0.9% 0.7% 0.1% 0.0% 0.0% 0.0% 0.4% 9.1% Total Percent 0.5% 66.3% 15.2% 0.8% 2.9% 0.8% 0.1% 0.9% 0.6% 0.1% 0.0% 0.0% 0.0% 0.5% 11.3% Page 6

66 Location: Maple Ave (Route 41) PO Box 468 Location: West of Route 7 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Start 12-Nov-14 Westbound Eastbound Combined 13-Nov Westbound Eastbound Combined Time Wed A.M. P.M. A.M. P.M. A.M. P.M. Thu A.M. P.M. A.M. P.M. A.M. P.M. 12: : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : Total Day Total % Total 18.5% 32.8% 20.2% 28.6% 18.1% 32.6% 20.6% 28.7% Peak - 07:30 04:00 08:00 03:45 08:00 03:45-07:45 02:45 08:15 03:00 08:00 03:00 Vol P.H.F ADT ADT 5,585 AADT 5,585 Page 1

67 Location: Maple Ave (Route 41) PO Box 468 Location: West of Route 7 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Westbound Start th 95th Time Total Percent Percent 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 6.0% 6.3% 14.0% 28.2% 32.5% 11.5% 1.3% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 09:00 10:00 09:00 11:00 09:00 08:00 06:00 06:00 08:00 Vol PM Peak 13:00 12:00 12:00 16:00 17:00 14:00 16:00 13:00 16:00 Vol Page 1

68 Location: Maple Ave (Route 41) PO Box 468 Location: West of Route 7 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Westbound Start th 95th Time Total Percent Percent 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 13.2% 5.0% 12.0% 23.1% 32.8% 12.7% 1.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 11:00 11:00 08:00 11:00 09:00 08:00 10:00 09:00 08:00 Vol PM Peak 21:00 12:00 15:00 15:00 16:00 16:00 18:00 12:00 15:00 Vol Total Percent 9.6% 5.6% 13.0% 25.6% 32.6% 12.1% 1.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15th Percentile : 19 MPH 50th Percentile : 29 MPH 85th Percentile : 34 MPH 95th Percentile : 38 MPH Stats 10 MPH Pace Speed : MPH Number in Pace : 3320 Percent in Pace : 58.3% Number of Vehicles > 40 MPH : 79 Percent of Vehicles > 40 MPH : 1.4% Mean Speed(Average) : 28 MPH Page 2

69 Location: Maple Ave (Route 41) PO Box 468 Location: West of Route 7 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Eastbound Start th 95th Time Total Percent Percent 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 11.7% 13.4% 24.4% 33.7% 14.9% 1.7% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 08:00 09:00 08:00 08:00 08:00 10:00 08:00 08:00 Vol PM Peak 12:00 12:00 15:00 14:00 18:00 15:00 16:00 15:00 Vol Page 3

70 Location: Maple Ave (Route 41) PO Box 468 Location: West of Route 7 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Eastbound Start th 95th Time Total Percent Percent 11/13/ : : * * 03: : : : : : : : : PM : : : : : : : : : * * 22: * * 23: * * Total Percent 9.1% 13.3% 24.5% 34.7% 16.0% 2.3% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 11:00 08:00 11:00 08:00 07:00 08:00 00:00 08:00 Vol PM Peak 15:00 15:00 15:00 13:00 16:00 17:00 16:00 15:00 Vol Total Percent 10.3% 13.3% 24.4% 34.2% 15.5% 2.0% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15th Percentile : 16 MPH 50th Percentile : 25 MPH 85th Percentile : 30 MPH 95th Percentile : 34 MPH Stats 10 MPH Pace Speed : MPH Number in Pace : 3211 Percent in Pace : 58.7% Number of Vehicles > 40 MPH : 12 Percent of Vehicles > 40 MPH : 0.2% Mean Speed(Average) : 24 MPH Page 4

71 Location: Maple Ave (Route 41) PO Box 468 Location: West of Route 7 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Westbound, Eastbound Start th 95th Time Total Percent Percent 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 8.8% 9.8% 19.0% 30.9% 23.9% 6.8% 0.8% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 08:00 10:00 09:00 08:00 08:00 08:00 08:00 06:00 08:00 Vol PM Peak 12:00 12:00 12:00 16:00 18:00 14:00 16:00 13:00 16:00 Vol Page 5

72 Location: Maple Ave (Route 41) PO Box 468 Location: West of Route 7 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Westbound, Eastbound Start th 95th Time Total Percent Percent 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 11.1% 9.1% 18.1% 28.8% 24.5% 7.6% 0.7% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 11:00 08:00 08:00 08:00 09:00 08:00 10:00 09:00 08:00 Vol PM Peak 21:00 15:00 15:00 13:00 16:00 16:00 16:00 12:00 15:00 Vol Total Percent 10.0% 9.4% 18.6% 29.8% 24.2% 7.2% 0.7% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15th Percentile : 17 MPH 50th Percentile : 27 MPH 85th Percentile : 33 MPH 95th Percentile : 37 MPH Stats 10 MPH Pace Speed : MPH Number in Pace : 6040 Percent in Pace : 54.1% Number of Vehicles > 40 MPH : 91 Percent of Vehicles > 40 MPH : 0.8% Mean Speed(Average) : 26 MPH Page 6

73 Location: Maple Ave (Route 41) PO Box 468 Location: West of Route 7 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Westbound Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Classed Total 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 1.0% 66.8% 19.5% 1.3% 4.0% 1.0% 0.6% 0.5% 0.8% 0.0% 0.0% 0.0% 0.0% 4.4% AM Peak 07:00 11:00 08:00 11:00 11:00 09:00 07:00 07:00 09:00 07:00 08:00 Vol PM Peak 12:00 16:00 16:00 12:00 16:00 12:00 13:00 16:00 16:00 13:00 Vol Page 1

74 Location: Maple Ave (Route 41) PO Box 468 Location: West of Route 7 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Westbound Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Classed Total 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 0.7% 62.1% 17.7% 0.9% 3.8% 1.1% 0.2% 0.6% 1.3% 0.1% 0.0% 0.0% 0.0% 11.5% AM Peak 08:00 08:00 08:00 07:00 11:00 10:00 07:00 06:00 09:00 08:00 10:00 Vol PM Peak 12:00 15:00 12:00 12:00 15:00 12:00 12:00 12:00 15:00 13:00 21:00 Vol Grand Total Percent 0.8% 64.5% 18.6% 1.1% 3.9% 1.1% 0.4% 0.6% 1.1% 0.1% 0.0% 0.0% 0.0% 7.9% Page 2

75 Location: Maple Ave (Route 41) PO Box 468 Location: West of Route 7 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Eastbound Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Classed Total 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 1.6% 68.8% 16.3% 0.9% 3.2% 1.2% 0.1% 0.4% 0.9% 0.1% 0.0% 0.0% 0.0% 6.5% AM Peak 10:00 08:00 08:00 07:00 08:00 10:00 10:00 09:00 04:00 08:00 Vol PM Peak 12:00 15:00 15:00 15:00 12:00 12:00 12:00 17:00 13:00 13:00 13:00 Vol Page 3

76 Location: Maple Ave (Route 41) PO Box 468 Location: West of Route 7 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Eastbound Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Classed Total 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 1.2% 70.0% 16.2% 0.9% 3.2% 1.7% 0.1% 0.5% 1.2% 0.2% 0.0% 0.0% 0.0% 4.7% AM Peak 08:00 11:00 08:00 09:00 10:00 08:00 08:00 08:00 08:00 08:00 09:00 Vol PM Peak 15:00 15:00 13:00 12:00 12:00 13:00 12:00 14:00 13:00 13:00 15:00 Vol Grand Total Percent 1.4% 69.4% 16.2% 0.9% 3.2% 1.5% 0.1% 0.5% 1.1% 0.1% 0.0% 0.0% 0.0% 5.6% Page 4

77 Location: Maple Ave (Route 41) PO Box 468 Location: West of Route 7 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Westbound, Eastbound Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Classed Total 11/12/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 1.3% 67.8% 17.9% 1.1% 3.6% 1.1% 0.3% 0.5% 0.9% 0.1% 0.0% 0.0% 0.0% 5.4% AM Peak 10:00 08:00 08:00 11:00 11:00 09:00 10:00 09:00 08:00 07:00 08:00 Vol PM Peak 12:00 16:00 16:00 14:00 16:00 12:00 13:00 17:00 13:00 13:00 13:00 Vol Page 5

78 Location: Maple Ave (Route 41) PO Box 468 Location: West of Route 7 Belchertown, Massachusetts Location: Great Barrington, Massachusetts innovativedatallc.com or Client: Nitsch Enginering / S. Farr Westbound, Eastbound Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Classed Total 11/13/ : : : : : : : : : : : PM : : : : : : : : : : : Total Percent 0.9% 66.0% 17.0% 0.9% 3.5% 1.4% 0.1% 0.6% 1.3% 0.1% 0.0% 0.0% 0.0% 8.1% AM Peak 08:00 11:00 08:00 07:00 10:00 08:00 07:00 08:00 08:00 08:00 10:00 Vol PM Peak 12:00 15:00 13:00 12:00 15:00 13:00 12:00 16:00 15:00 13:00 21:00 Vol Grand Total Percent 1.1% 66.9% 17.4% 1.0% 3.6% 1.3% 0.2% 0.5% 1.1% 0.1% 0.0% 0.0% 0.0% 6.8% Page 6

79 PO Box 468 Belchertown, Massachusetts innovativedatall.com or N / S: South Main (Route 7) File Name : AM Peak - South Maple E / W: Maple Ave (Route 41) Site Code : 1 City, State: Great Barrington, MA Start Date : 11/12/2014 Client: Nitsch Engineering / S. Farr Page No : 1 Groups Printed- PCs and Peds - Heavy Vehicles - Bicycles Route 7 Route 7 Route 41 From North From East From South From West Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total Grand Total Apprch % Total % PCs and Peds % PCs and Peds Heavy Vehicles % Heavy Vehicles Bicycles % Bicycles Route 7 Route 7 Route 41 From North From East From South From West Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total Peak Hour Analysis From 07:00 AM to 10:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM :00 AM :15 AM :30 AM Total Volume % App. Total PHF

80 PO Box 468 Belchertown, Massachusetts innovativedatall.com or N / S: South Main (Route 7) File Name : AM Peak - South Maple E / W: Maple Ave (Route 41) Site Code : 1 City, State: Great Barrington, MA Start Date : 11/12/2014 Client: Nitsch Engineering / S. Farr Page No : 1 Groups Printed- Heavy Vehicles Route 7 Route 7 Route 41 From North From East From South From West Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total 07:00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total Grand Total Apprch % Total % Route 7 Route 7 Route 41 From North From East From South From West Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total Peak Hour Analysis From 07:00 AM to 10:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM :30 AM :45 AM :00 AM Total Volume % App. Total PHF

81 PO Box 468 Belchertown, Massachusetts innovativedatall.com or N / S: South Main (Route 7) File Name : PM Peak - South Maple E / W: Maple Ave (Route 41) Site Code : 2 City, State: Great Barrington, MA Start Date : 11/12/2014 Client: Nitsch Engineering / S. Farr Page No : 1 Groups Printed- PCs and Peds - Heavy Vehicles - Bicycles Route 7 Route 7 Route 41 From North From East From South From West Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total 03:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % PCs and Peds % PCs and Peds Heavy Vehicles % Heavy Vehicles Bicycles % Bicycles Route 7 Route 7 Route 41 From North From East From South From West Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM :00 PM :15 PM :30 PM Total Volume % App. Total PHF

82 PO Box 468 Belchertown, Massachusetts innovativedatall.com or N / S: South Main (Route 7) File Name : PM Peak - South Maple E / W: Maple Ave (Route 41) Site Code : 2 City, State: Great Barrington, MA Start Date : 11/12/2014 Client: Nitsch Engineering / S. Farr Page No : 1 Groups Printed- Heavy Vehicles Route 7 Route 7 Route 41 From North From East From South From West Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total 03:00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total Grand Total Apprch % Total % Route 7 Route 7 Route 41 From North From East From South From West Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Int. Total Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 03:00 PM 03:00 PM :15 PM :30 PM :45 PM Total Volume % App. Total PHF

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Suitland Parkway at Stanton Road SE Study Area and Location District PSA Ward ANC Phase Description

More information

ROAD SAFETY AUDIT. Dascomb Road (Frontage Road to I-93 NB Ramps) Town of Andover. March 29, 2017

ROAD SAFETY AUDIT. Dascomb Road (Frontage Road to I-93 NB Ramps) Town of Andover. March 29, 2017 ROAD SAFETY AUDIT Dascomb Road (Frontage Road to I-93 NB Ramps) Town of Andover March 29, 2017 Prepared For: Massachusetts Department of Transportation Town of Andover, Massachusetts Prepared By: TEC,

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Yarmouth Port Road Safety Audit Route 6A Willow Street to Union Street

Yarmouth Port Road Safety Audit Route 6A Willow Street to Union Street Yarmouth Port Road Safety Audit Route 6A Willow Street to Union Street Final Report, August 9, 2013 Prepared by the Cape Cod Commission In cooperation with The Town of Yarmouth And MassDOT Highway Division

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

CITY OF POWAY MEMORANDUM

CITY OF POWAY MEMORANDUM CITY OF POWAY MEMORANDUM TO: FROM: Traffic Safety Committee Steve Crosby P.E., City Engineer DATE: February 14, 2018 SUBJECT: Espola Road speeding concerns BACKGROUND In 2017, staff received a request

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

APPENDIX A. OC Transpo Maps & Route Information

APPENDIX A. OC Transpo Maps & Route Information APPENDIX A OC Transpo Maps & Route Information OC Transpo Route 99 APPENDIX B Traffic Count Information & Collision Data VEHICULAR TURNING MOVEMENTS (15 Min. Volumes) Limebank Road & Spratt Road

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation

More information

Buffalo Drive Road Safety Audit

Buffalo Drive Road Safety Audit UPWP Task 6410-11 Contract No: 11-050 Buffalo Drive Road Safety Audit CC 215 to Blue Diamond Road (SR 160) PRE CONSTRUCTION PHASE AUDIT Prepared for: Regional Transportation Commission of Southern Nevada

More information

ROAD SAFETY AUDIT. Route 16 (Webster Street) Corridor From Webster Town Line to Main Street Intersection. Town of Douglas.

ROAD SAFETY AUDIT. Route 16 (Webster Street) Corridor From Webster Town Line to Main Street Intersection. Town of Douglas. ROAD SAFETY AUDIT Route 16 (Webster Street) Corridor From Webster Town Line to Main Street Intersection Town of Douglas June 2015 Prepared For: MassDOT Prepared By: Hoyle, Tanner & Associates, Inc. 150

More information

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE TRAFFIC IMPACT ANALYSIS for MILTON SQUARE US Route 7 Milton, Vermont March 5, 2008 LAMOUREUX & DICKINSON 14 Morse Drive Essex Junction, Vermont 05452 (802) 878-4450 Traffic Impact Assessment EXECUTIVE

More information

Purpose of Tonight s Meeting

Purpose of Tonight s Meeting Purpose of Tonight s Meeting Point Dume Neighborhood Traffic Calming Project background, goals Resident Safety Concerns Existing Conditions Fact Sheets Map of Proposed Improvements Discussion Next Steps

More information

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois

Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois N 83 rd Street Janes Avenue Soccer Fields Janes Avenue Shopping Plaza Cypress Cove Family

More information

CITY CLERK. Warrants for All-Way Stop Sign Control and 40 km/h Maximum Speed Limits

CITY CLERK. Warrants for All-Way Stop Sign Control and 40 km/h Maximum Speed Limits CITY CLERK Clause embodied in Report No. 9 of the, as adopted by the Council of the City of Toronto at its Special Meeting held on July 30, 31 and August 1, 2002. 10 Warrants for All-Way Stop Sign Control

More information

Essex Junction Train Station Access and Scoping Study Discussion of Transportation Alternatives

Essex Junction Train Station Access and Scoping Study Discussion of Transportation Alternatives Essex Junction Train Station Access and Scoping Study Discussion of Transportation Alternatives Village of Essex Junction Chittenden County Regional Planning Commission, Inc. Scott & Partners Architectural

More information

The remainder of this memorandum contains the details of our peer review findings.

The remainder of this memorandum contains the details of our peer review findings. REF: MAX-2014067.00 DATE: June 20, 2014 TO: FROM: RE: Mr. Leo Bartolini, Jr. Chairman, Zoning Board of Appeals 17 Common Street Southborough, MA 01772 Mr. Jason DeGray, P.E., PTOE Proposed Residence at

More information

Speed measurements were taken at the following three locations on October 13 and 14, 2016 (See Location Map in Exhibit 1):

Speed measurements were taken at the following three locations on October 13 and 14, 2016 (See Location Map in Exhibit 1): 2709 McGraw Drive Bloomington, Illinois 61704 p 309.663.8435 f 309.663.1571 www.f-w.com www.greennavigation.com November 4, 2016 Mr. Kevin Kothe, PE City Engineer City of Bloomington Public Works Department

More information

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B... Speed Hump Program CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 1. GENERAL... 3 2. ELIGIBILITY REQUIREMENTS... 3 A. PETITION... 3 B. OPERATIONAL AND GEOMETRIC CHARACTERISTICS OF

More information

FINAL ROAD SAFETY AUDIT REPORT SR 592 (FLAMINGO ROAD) IN CLARK COUNTY FROM MP CL TO MP CL POST CONSTRUCTION PHASE RSA

FINAL ROAD SAFETY AUDIT REPORT SR 592 (FLAMINGO ROAD) IN CLARK COUNTY FROM MP CL TO MP CL POST CONSTRUCTION PHASE RSA FINAL ROAD SAFETY AUDIT REPORT SR 592 (FLAMINGO ROAD) IN CLARK COUNTY FROM MP CL 21.46 TO MP CL 31.378 POST CONSTRUCTION PHASE RSA 3R PRESERVATION PROJECT STAGE Prepared for: Nevada Department of Transportation

More information

2015 Community Report Doña Ana County

2015 Community Report Doña Ana County 25 Doña Ana County Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population

More information

2014 Community Report Portales

2014 Community Report Portales 4 Portales Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,

More information

State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by:

State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report. City of Morro Bay. Prepared for: Prepared by: State Route 1/State Route 41/ Main Street Intersection Control Evaluation (Step 2) Report Prepared for: City of Morro Bay Prepared by: (Caltrans Project No. 0515000104, EA 0F670) State Route 1/State Route

More information

2014 Community Report Luna County

2014 Community Report Luna County 4 Luna County Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

2014 Community Report Tularosa

2014 Community Report Tularosa 4 Tularosa Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 8 by the University of New Mexico, Geospatial and Population Studies,

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay TO: FROM: Chair and Members Engineering and Public Works Committee Mark Misko, C.E.T. Manager, Roads Maintenance and Construction DATE: March 23, 2016 SUBJECT: REPORT NO: Designation of a Community Safety

More information

2015 Community Report Tularosa

2015 Community Report Tularosa 5 Tularosa Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

2016 Community Report San Juan County

2016 Community Report San Juan County 26 San Juan County Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population

More information

2015 Community Report San Juan County

2015 Community Report San Juan County 25 San Juan County Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population

More information

Reduced Speed Limits or Curve Warning Signs? Northeast Traffic Safety Conference Cromwell, Connecticut October 24-25, 2017

Reduced Speed Limits or Curve Warning Signs? Northeast Traffic Safety Conference Cromwell, Connecticut October 24-25, 2017 Reduced Speed Limits or Curve Warning Signs? Northeast Traffic Safety Conference Cromwell, Connecticut October 24-25, 2017 Overview/Objectives Curve signing overview State signing history for curved alignments

More information

2015 Community Report Los Lunas

2015 Community Report Los Lunas 25 Los Lunas Produced for the New Mexico Department of Transportation, Traffic Safety Division, Traffic Records Bureau, Under Contract 58 by the University of New Mexico, Geospatial and Population Studies,

More information

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 15001714A Table of Contents Table of Contents I. INTRODUCTION... 1 II. EXISTING CONDITIONS... 4 III. 2015 EXISTING TRAFFIC CONDITIONS...

More information

WELLS COUNTY TRANSPORTATION PLAN

WELLS COUNTY TRANSPORTATION PLAN WELLS COUNTY TRANSPORTATION PLAN 2010 NORTHEASTERN INDIANA REGIONAL COORDINATION COUNCIL INTRODUCTION The Northeastern Indiana Regional Coordinating Council has conducted the transportation planning activities

More information

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee Why We Are Here: GDOT s Transportation Improvement Act (TIA) Office, the City of Columbus, and the project delivery team are here this evening to display and answer questions concerning the proposed roadway

More information

COUNTY ROAD SPEED LIMITS. Policy 817 i

COUNTY ROAD SPEED LIMITS. Policy 817 i Table of Contents COUNTY ROAD SPEED LIMITS Policy 817.1 PURPOSE... 2.2 APPLICABILITY... 2.3 DEFINITIONS... 2.4 STATE ENABLING LEGISLATION... 3.5 SPEED LIMITS ON COUNTY ROADS (CCC 11.04)... 3.6 ESTABLISHING

More information

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives 3.0 What preliminary alternatives are being evaluated? The alternatives for the East San Fernando Valley Transit Corridor project that were considered for screening include the No Build Alternative, Transportation

More information

BY-ELECTION SIGN GUIDELINES

BY-ELECTION SIGN GUIDELINES BY-ELECTION SIGN GUIDELINES GUIDELINES FOR THE PLACEMENT OF FREE STANDING BY-ELECTION SIGNS ON CITY OF LETHBRIDGE ROAD RIGHT OF WAY Election Sign Definition: An election sign is a temporary sign announcing

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

NAU DESIGN GUIDELINES FOR DISABLED ACCESS PARKING AND ACCESSIBLE ROUTE AT VEHICULAR TRAFFIC AREAS

NAU DESIGN GUIDELINES FOR DISABLED ACCESS PARKING AND ACCESSIBLE ROUTE AT VEHICULAR TRAFFIC AREAS NAU DESIGN GUIDELINES FOR DISABLED ACCESS PARKING AND ACCESSIBLE ROUTE AT Intent, Purpose And Goals: The intent and purpose of these NAU technical requirements is to establish minimum requirements to safeguard

More information

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI

LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES. Genoa Township, Livingston County, MI LATSON INTERCHANGE DEVELOPMENT TRAFFIC STUDIES Genoa Township, Livingston County, MI DRAFT TRAFFIC STUDY FOR I-96 AT LATSON RD INTERCHANGE Livingston County CS 47065 JN 101622C Submitted to: Michigan Department

More information

Roadway Safety Audit Packet

Roadway Safety Audit Packet HILLSBOROUGH COUNTY SCHOOLS Roadway Safety Audit Packet Location: 25, 20 14 Tuesday, February 14 Road Safety Audit 1 of 25 HILLSBOROUGH COUNTY SCHOOLS RSA Tuesday, February 14, 2017, Prompt List Motorist

More information

CAR 10-1 TRAFFIC CALMING CAR 10-1 OPR: Engineering 06/06

CAR 10-1 TRAFFIC CALMING CAR 10-1 OPR: Engineering 06/06 CAR 10-1 TRAFFIC CALMING CAR 10-1 OPR: Engineering 06/06 Purpose Section I Policy II I. Purpose The purpose of this Ordinance is to outline the City s response to the traffic complaints arising as a result

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

CHAPTER 69 PARKING REGULATIONS

CHAPTER 69 PARKING REGULATIONS CHAPTER 69 PARKING REGULATIONS 69.01 Parking Limited or Controlled 69.07 Persons With Disabilities Parking 69.02 Park Adjacent to Curb 69.08 Truck Parking Limited 69.03 Park Adjacent to Curb One-way Street

More information

Ramsey, Minnesota, Code of Ordinances >> PART II - CODE OF ORDINANCES >> Chapter 54 - TRAFFIC AND VEHICLES >> ARTICLE IV. - RECREATIONAL VEHICLES >>

Ramsey, Minnesota, Code of Ordinances >> PART II - CODE OF ORDINANCES >> Chapter 54 - TRAFFIC AND VEHICLES >> ARTICLE IV. - RECREATIONAL VEHICLES >> Ramsey, Minnesota, Code of Ordinances >> PART II - CODE OF ORDINANCES >> Chapter 54 - TRAFFIC AND VEHICLES >> ARTICLE IV. - RECREATIONAL VEHICLES >> ARTICLE IV. - RECREATIONAL VEHICLES [36] Sec. 54-96.

More information

MBTA Key Bus Route Improvement Program. Community Meeting Route 66 Allston/Brighton

MBTA Key Bus Route Improvement Program. Community Meeting Route 66 Allston/Brighton MBTA Key Bus Route Improvement Program Community Meeting Route 66 Allston/Brighton January 19, 2011 Honan-Allston Library 300 North Harvard Street Agenda Welcome and introductions Safety briefing/accommodations

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

Massachusetts Private Passenger Automobile Statistical Plan Appendix C Traffic Law Violations

Massachusetts Private Passenger Automobile Statistical Plan Appendix C Traffic Law Violations The following abbreviations are used in Appendix C: M.G.L. c., Chapter and Section of the Massachusetts General Laws CMR " Code of Massachusetts Regulations The following out-of-state incidents are to

More information

LARGE TRUCKS May 2010

LARGE TRUCKS May 2010 May 2010 A collision produces three levels of data: collision, unit (vehicles), and individual. For this reason, readers should pay particular attention to the wording of statements about the data to avoid

More information

Mannheim/Higgins. Lee/Touhy. Municipal. Alternate 1), Village of Rosemont (Eastbound. Major Considerations:

Mannheim/Higgins. Lee/Touhy. Municipal. Alternate 1), Village of Rosemont (Eastbound. Major Considerations: Mannheim/Higgins Municipality: Municipality: City of Village Des Plaines of Skokie (Eastbound Alternate 1), Village of Rosemont (Eastbound Alternate Major 2 and Considerations: Westbound Alternate 1),

More information

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange

INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange INTERCHANGE OPERTIONS STUDY Interstate 77 / Wallings Road Interchange City of Broadview Heights, Cuyahoga County, Ohio Prepared For: City of Broadview Heights Department of Engineering 9543 Broadview Road

More information

Sherman Oaks Community Traffic Plan

Sherman Oaks Community Traffic Plan Sherman Oaks is a community that is geographically bound by the Santa Monica mountains on its southern boundary, and the ever-expanding San Fernando Valley on its western, northern, and eastern boundaries.

More information

NORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue

NORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue NORTHWEST HIGHWAY SCURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY Northwest Highway (US 14) From Seegers Road to Western Avenue Northwest Highway SCurve Pedestrian/Bicycle Access Feasibility Study City

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

1.0 Detailed Definition of Alternatives

1.0 Detailed Definition of Alternatives 1.0 Detailed Definition of Alternatives 1.1 Introduction This chapter provides supplemental information on the four alternatives, including both physical and operational characteristics (e.g. service plans)

More information

CORE AREA SPECIFIC PLAN

CORE AREA SPECIFIC PLAN only four (A, B, D, and F) extend past Eighth Street to the north, and only Richards Boulevard leaves the Core Area to the south. This street pattern, compounded by the fact that Richards Boulevard is

More information

Section 6H.01 Typical Applications

Section 6H.01 Typical Applications December 27, 2010 Draft Page 6H-1 Section 6H.01 Typical Applications Support: 01 Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. 02 The needs and control of all

More information

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing.

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing. TECHNICAL COMMITTEE: Railroad and Light Rail Transit Technical Committee DATE OF ACTION: June 25, 2004 TOPIC: Crossbuck with Yield or Stop Signs and Advance Signs. STATUS: Accepted by the National Committee

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

Background Information about the Metrobus 29 Lines Study

Background Information about the Metrobus 29 Lines Study Background Information about the Metrobus 29 Lines Study Questions Overview of Existing Service Q. Why is the study being conducted? A. The 29 Lines provide an important connection between Annandale and

More information

ESTABLISH PERPENDICULAR PARKING Alabama Street, east side, from 75 feet to 96 feet south of Mullen Avenue (extends existing zone by 21 feet)

ESTABLISH PERPENDICULAR PARKING Alabama Street, east side, from 75 feet to 96 feet south of Mullen Avenue (extends existing zone by 21 feet) ESTABLISH STOP SIGNS Irving Street, eastbound and westbound, at 45 th Avenue, making this intersection an all-way STOP ESTABLISH BUS ZONE Market Street, north side, from Steuart Street to 110 feet westerly

More information

US 211/US 17/29 Bus (Broadview Avenue) Access Management Improvements

US 211/US 17/29 Bus (Broadview Avenue) Access Management Improvements September 2015 Intersection Traffic Analysis Broadview Ave @ rost Ave / Waterloo St US 211/US 17/29 Bus (Broadview Avenue) Access Management Improvements rom South of rost Avenue to South of Winchester

More information

1701 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES)

1701 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES) 0 N. BEAUREGARD STREET NEW WEST END ELEMENTARY SCHOOL (NWEES) C O TRANSPORTATION ANALYSIS STUDY March th, 0 APPLICANT: Alexandria City Public Schools Educational Facilities Department Operational & Maintenance

More information

Corridor Sketch Summary

Corridor Sketch Summary Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins

More information

CTA Blue Line Study Area

CTA Blue Line Study Area CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING

More information

830 Main Street Halifax Regional Municipality

830 Main Street Halifax Regional Municipality 830 Main Street Halifax Regional Municipality Traffic Impact Statement Final Report Prepared by: GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 www.griffininc.ca Prepared

More information

Start Time. LOCATION: Scotts Valley Dr QC JOB #: SPECIFIC LOCATION: 0 ft from Tabor St. DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA

Start Time. LOCATION: Scotts Valley Dr QC JOB #: SPECIFIC LOCATION: 0 ft from Tabor St. DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA Tube Counts Type of report: Tube Count - Volume Data LOCATION: Scotts Valley Dr QC JOB #: 245667 SPECIFIC LOCATION: ft from Tabor St DIRECTION: EB/WB CITY/STATE: Scotts Valley, CA DATE: Mar 2 24 - Mar

More information

Report Title Report Date: Adaptir

Report Title Report Date: Adaptir Report Title Report Date: 2000 Adaptir Principle Investigator Vendor Name and Address Name McCoy, Pat Scientex Corp. Affiliation Univ of Nebraska, Lincoln Eddie Neal, President Address (deceased) 2000

More information

Diablo Vista Pumping Plant Replacement

Diablo Vista Pumping Plant Replacement Diablo Vista Pumping Plant Replacement Traffic Study PHA Transportation Consultants 12-05-359 October 2012 Diablo Vista Pumping Plant Replacement Traffic Study For EBMUD October 2012 PHA Transportation

More information

TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT

TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT AGENDA ITEM #3 T/T MTG: 072815 DATE: JULY 28, 2015 TO: TRAFFIC & TRANSPORTATION COMMISSION FROM: BENJAMIN CHAN, P.E, T.E., DEPUTY PUBLIC WORKS DIRECTOR

More information

1 of 8 6/20/12 12:10 PM

1 of 8 6/20/12 12:10 PM HOME PROPERTY PARKING & VEHICLES Camera Violations Commercial Programs Diplomats/Consular Manhattan Residents Parking Tickets Refunds Towed Vehicles BUSINESS/EXCISE TAXES OTHER SERVICES FORMS & PUBLICATIONS

More information

Low Speed Design Criteria for Residential Streets Andrew J. Ballard, P.E. and David M. Haldeman, E.I.T.

Low Speed Design Criteria for Residential Streets Andrew J. Ballard, P.E. and David M. Haldeman, E.I.T. Low Speed Design Criteria for Residential Streets Andrew J. Ballard, P.E. and David M. Haldeman, E.I.T. Background The City of San Antonio receives many complaints regarding speeding in residential areas.

More information

Traffic Study for Highway 107 Phase 1 Burnside to Sackville

Traffic Study for Highway 107 Phase 1 Burnside to Sackville FINAL REPORT Traffic Study for Highway 107 Phase 1 Burnside to Sackville Presented To: Nova Scotia Department of Transportation and Infrastructure Renewal February 2011 Project No. DA10095 www.genivar.com

More information

Department of Highway Safety and Motor Vehicles

Department of Highway Safety and Motor Vehicles Department of Highway Safety and Motor Vehicles Traffic Report 2005 A Compilation of Motor Vehicle Crash Data from the Florida Crash Records Database Fred O. Dickinson Executive Director Our Mission: Making

More information

Capital Metro Downtown Multimodal Station

Capital Metro Downtown Multimodal Station Capital Metro Downtown Multimodal Station Stakeholder Briefing December 11, 2015 Agenda 1 2 3 4 5 Project Summary Downtown Station Concept Evaluation 4 th Street Traffic Analysis 5 th Street Traffic Analysis

More information

Defensive Driving Policy

Defensive Driving Policy Date: 01 January 2015 To: All Chieftain Contract Services LLC Employees From: Scott Wiegers, Director of Safety, Chieftain Contract Services LLC Re: Defensive Driving Policy Defensive Driving Policy Chieftain

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

STATE LOOP 195 PUBLIC MEETING. Footer Text

STATE LOOP 195 PUBLIC MEETING. Footer Text STATE LOOP 195 PUBLIC MEETING STATE LOOP 195 From FM 755 to 1 mile west of Loma Blanca Rd Public Meeting Agenda Welcome & Introductions Octavio Saenz TxDOT Public Information Officer Technical Overview

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS RESOLUTION No. 16-036 WHEREAS, The San Francisco Municipal Transportation Agency has received a request, or identified a need for traffic

More information

TORONTO MUNICIPAL CODE CHAPTER 903, PARKING FOR PERSONS WITH DISABILITIES. Chapter 903 PARKING FOR PERSONS WITH DISABILITIES

TORONTO MUNICIPAL CODE CHAPTER 903, PARKING FOR PERSONS WITH DISABILITIES. Chapter 903 PARKING FOR PERSONS WITH DISABILITIES 903-1. General definitions. 903-2. Specific definitions 903-3. Interpretation. 903-4. Use and display of permit. Chapter 903 PARKING FOR PERSONS WITH DISABILITIES ARTICLE I On-Street and Off-Street Parking

More information

Speed Zoning. District Traffic Engineer ISHC, Seymour, Indiana

Speed Zoning. District Traffic Engineer ISHC, Seymour, Indiana Speed Zoning D e l m a r L. K lo eker District Traffic Engineer ISHC, Seymour, Indiana IN T R O D U C T IO N One of the concerns of the Indiana State Highway Commission and citizens throughout the state

More information

II. PROJECT DESCRIPTION

II. PROJECT DESCRIPTION II. PROJECT DESCRIPTION A. PROJECT APPLICANT The project applicants for the proposed Sepulveda/Rosecrans Site Rezoning are: Mar Ventures, Inc., 2050 West 190 th Street, Suite 108, Torrance, California,

More information

Section 5.8 Transportation and Traffic

Section 5.8 Transportation and Traffic Section 5.8 Transportation and Traffic 5.8 TRANSPORTATION AND TRAFFIC Generous This Section is based on the Topgolf Specific Plan Traffic Impact Analysis (RK Engineering Group, Inc., October 31, 2016);

More information

Lighting Justification Report

Lighting Justification Report Lighting Justification Report SR 847 / NW 47th Avenue Project Development & Environment Study From SR 860/NW 183rd Street to Premier Parkway County: Miami-Dade and Broward Efficient Transportation Decision

More information

2040 Metropolitan Transportation Plan -- Table XVII-1

2040 Metropolitan Transportation Plan -- Table XVII-1 C:\7. \Projects\ 2040MTP Project List_Nov16-16.xlsx ID # NAME LIMITS DESCRIPTION COST () AGENCY PROJECT TYPE* 2017 1 B Dr S and Capital Ave SW B Dr S from 3.5 Mile Rd eastward to M-66 (1.7 mi); Capital

More information

November 4, 2016 PUBLIC HEARING RESULTS

November 4, 2016 PUBLIC HEARING RESULTS The Sustainable Streets Division of the San Francisco Municipal Transportation Agency held a public hearing on Friday,, at 10:00 AM, in Room 416 (Hearing Room 4), City Hall, 1 Dr. Carlton B. Goodlett Place,

More information

Agenda. Puerto Rico s Highway System. An Overview of Puerto Rico

Agenda. Puerto Rico s Highway System. An Overview of Puerto Rico Motorcycle Crashes and its Implications to Local Roads Dr. Alberto Figueroa Dr. Benjamin Colucci University of Puerto Rico at Mayagüez Puerto Rico LTAP Southeast Local Roads Conference (SELRC) Orange Beach,

More information

US Rt. 12/20/45 at US Rt. 20 <Westbound and Southbound>

US Rt. 12/20/45 at US Rt. 20 <Westbound and Southbound> US Rt. 12/20/45 at US Rt. 20 Village of Stone Park, Illinois R L R F o l l o w - U p E v a l u a t i o n R e p o r t Reference No: 016-43280 December 2010 Table of Contents

More information

ODOT Transportation Safety. It All Starts With Crash Data

ODOT Transportation Safety. It All Starts With Crash Data ODOT Transportation Safety Programs It All Starts With Crash Data Robin Ness, Mgr. Crash Analysis & Reporting Unit Oregon Department of Transportation (ODOT) 17 th Annual Northwest Tribal Symposium Red

More information

Section 3.12 Traffic and Transportation

Section 3.12 Traffic and Transportation Section. Traffic and Transportation SECTION SUMMARY This section describes existing ground transportation within the Port and surrounding area associated with implementation of the proposed Project. An

More information

I-95 Corridor-wide safety data analysis and identification of existing successful safety programs. Traffic Injury Research Foundation April 22, 2010

I-95 Corridor-wide safety data analysis and identification of existing successful safety programs. Traffic Injury Research Foundation April 22, 2010 I-95 Corridor-wide safety data analysis and identification of existing successful safety programs Traffic Injury Research Foundation April 22, 2010 Overview Background Methodology Purpose Crash analysis

More information