TRAINING AND EQUIPMENT MANUAL PUMP OPERATOR S GUIDE EFFECTIVE: MARCH 2009
|
|
- Roland Goodwin
- 6 years ago
- Views:
Transcription
1 TRAINING AND EQUIPMENT MANUAL 303 PUMPS PUMP OPERATOR S GUIDE EFFECTIVE: MARCH 2009 QUICK REFERENCE PAGE (MOST VALUES ARE ROUNDED) PRECONNECTS Pump Discharge Pressure () Hse Lay 3/4 Bster (SM-3) (NC rigs) Bster (SM-3) /2 Htline (SM-10) *1-3/4 Precnnect (SM-20 r TFT) 155 / / 150 APARTMENT LAY Per 2-1/2 Lengths Number f 1-3/4 Lines ff f the Wye 100 ft. 200 ft. 300 ft. *1 Bundle ( 1-3/4, Wye, SM-20) **2 Bundles (*) = Recmmend a minimum f tw firefighters n hseline. (**) = Cautin Firefighters! Recmmend a minimum f tw firefighters n hseline. Any time wyed lines are in play firefighters at the nzzles cannt be prtected frm significant nzzle reactins caused by pening and clsing nzzles. 2-1/2 HANDLINE Hse Lay 100 ft. 200 ft. 300 ft. 2-1/2 Handline (SM-30) PORTABLE MONITOR Hse Lay 100 ft. 200 ft. 300 ft. 400 ft. 500 ft. LDH With SM-1000 r SM / LADDER PIPE Surce Pump t LDH Supplying Quint Prvide 1250 at 50 psi t Pump Inlet STAND PIPE (SP) INCLUDING COMBO SYSTEMS LDH t FDC: SP Flrs up t 16th Mmentary Pressure Test at: Maintain 175 psi 190 psi SPRINKLER SYSTEM LDH t FDC Maintain 150 psi Page 1 f 12
2 PRECONNECTED HANDLINES 1-1/2 Pre-Cnnect SM-10, SM-10F Hse Lay NP /100 Feet Ttal f 1-1/ /4-Inch Pre-Cnnect SM-20 Hse Lay NP /100 Feet Ttal f 1-3/ * *141 * *153 * *190 (* ) = Recmmend tw firefighters n hseline and gate dwn lwer pressure lines. Page 2 f 12
3 APARTMENT LAY BUNDLES Apartment Lay: f 1-3/4, A Wye, 2-1/2 Supply SM-20F Nzzles # f 1-3/4 Lines Ttal Wye NP 1-3/4 2-1/2 * * ** ** (*) = Recmmend a minimum f tw firefighters n hseline. (**) = Cautin Firefighters! Recmmend a minimum f tw firefighters n hseline. Any time wyed lines are in play firefighters at the nzzles cannt be prtected frm significant nzzle reactins caused by pening and clsing nzzles. Incident Cmmander must be ntified if pump pressure exceeds 275 psi. 2-1/2-INCH HANDLINES NP / 2-1/2-Inch Handline Elkhart SM Page 3 f 12
4 PORTABLE MONITOR NP Appliance 5-Inch Supply Line (SM-1000) Per Inch Supply Line (SM-1250) NP Appliance Per Nte: FFD may have the fllwing alternate M/S tips in service. shuld be adjusted as fllws: SM 100 (pre 2007) 1000 at 100 PSI nzzle pressure Add 25 PSI t abve prescribed TFT 1250 at 100 PSI nzzle pressure (Reserve Apparatus). Add 25 PSI t abve prescribed Akrn 1250 at 80 PSI nzzle pressure (Nrth Central Apparatus) Add 5 PSI t abve prescribed 5-Inch Supply Line (Slid Stream) Nzzle Appliance / NP Tip /2- Inch /4- Inch Inch Page 4 f 12
5 LADDER PIPE AND / OR SOURCE PUMPING OPERATIONS The bjective f ladder pipe peratins is t flw 1,250. Flw meters frequently becme ut f calibratin r can fail cmpletely. Althugh increasing until flw meter(s) read 1,250 is generally acceptable, the fllwing charts shall give guidance if flw meter accuracy is in questin. The pump n quints shall be used whenever pssible. Nte: assumes full nzzle elevatin at. As necessary, subtract 5 psi per estimated 10 feet f nzzle elevatin belw when aerial is nt at the highest extensin and / r angle f elevatin. Ladder Pipe (Quint Pump ) Nzzle NP Ladder Pipe Elevatin Fg SM Slid Stream Nzzle Fg SM Surce Pumping LDH t Ladder Pipe Intake (Quint Pump Nt Used) NP App. Elevatin Per / / / LDH per Surce Pumping LDH t Supply a Pumper r Quint Maintain Residual PSI Pump Intake Page 5 f 12
6 STANDPIPE OPERATIONS FDC Supply Pumper Test Pressure: 190 PSI. Operating Pressure: Maintain 175 psi at all times. Exceptin: 2220 Tulare (Old Del Web): Maintain 210 PSI fr fires abve the 16 th flr. D nt exceed 200 psi in dry r cmbinatin standpipe systems. Exceptin: 2220 Tulare (Old Del Web) The Cmbinatin system n this building is tested at apprximately 225 psi. Standpipe Cntrl Valve Target pressure at the SP discharge while ne line is flwing: Begin with 95 PSI. Add 5 PSI per flr that hselines are deplyed t abve the discharge. Add 15 PSI per 50 sectin f 2-1/2 needed t place the wye at the base f a stairwell when SP discharges are nt in the stairwell. Page 6 f 12
7 SPRINKLER SYSTEMS Attempt t maintain 150 psi at all times. Exceptin: Super Blck: West side f Van Ness, between Fresn and Tulare. Super Blck FDC s must be pumped at a maximum f 75 PSI if the system s fire pump is perating. If the system s fire pump is nt perating and sprinklers are flwing, lck-ut / tag-ut the pump electric pwer surce and pump the FDC at 150 PSI. Five-inch hse is always preferable. FOAM OPERATIONS Fam Fuel Type Fam % Class A (Silvex Plus r Ordinary Cmbustibles.5 t 1 % Phs-Chek 881) Class B AFFF Hydrcarbns (Gasline, Oil) 3 % Class B AFFF Plar Slvents (Alchl, Acetne) 6 % Elkhart In-Line Eductr Objective is 200 psi at eductr inlet. May be used with 150 feet f 1-1/2-inch with SM-10 r up t 400 feet f 1-3/4- inch with SM-20. If using 2-1/2-inch t supply eductr, attach Camcne shutff. Pressure at Eductr Inlet Frictin Lss in 2-1/2-Inch Hse Elkhart In-Line Eductr Page 7 f 12
8 AMMONIA DIFFUSERS DISTRIBUTORS 2-1/2-Inch Inlet Cnnectin 500 gpm Pressure at Inlet = 9 psi Frictin Lss in 2-1/2-Inch Hse = 50 psi/100 Feet Hse Frictin Length f Lay Lss 100 Feet Feet Feet Feet Feet /2-Inch Inlet Cnnectin 500 gpm Pressure at Inlet = 56 psi Frictin Lss in 2-1/2-Inch Hse = 50 psi/100 Feet Length f Lay Hse Frictin Lss 100 Feet Feet Feet Feet Incident Cmmander must be ntified if pump pressure exceeds 275 psi. Page 8 f 12
9 BRESNAN DISTRIBUTORS 2-1/2 Elkhart (495 ) Length f Lay NP Hse /2 Elkhart / 1-1/2 Hse (140 ) Length f Lay NP Hse 1-1/2 Elkhart / 1-3/4 Hse (140 ) Length NP Hse OF Lay Incident Cmmander must be ntified if pump pressure exceeds 275 psi. Page 9 f 12
10 PIERCING NOZZLE fr 1-3/ INCIDENT COMMANDER MUST BE NOTIFIED IF PUMP PRESSURE EXCEEDS 275 PSI. RELAY PUMPING/FRICTION LOSS TABLES 1,000 gpm. One 4-inch r 5-inch line. Start frm surce. Space engines maximum 1,000 feet apart. 50 psi at inlet; minimum 20 psi. Adjust pressures accrding t need at fire pumper. Frictin Lss 5-Inch Hse /100 /100 /100 gpm Feet gpm Feet gpm Feet , , , , , , , , , Page 10 f 12
11 FORMULAS / FRICTION LOSSES Determining : = NP + + EP + APL NP = Nzzle Pressure = Frictin Lss in Hse EP = Elevatin Pressure Lss r Gain APL = Appliance Frictin Lss Frictin Lss Frmula fr Hse: = C x Q² x L C = Cefficient Q = Quantity f Flw fr every 100 gpm L = Length f Hse Lay fr every 100 feet Frictin Lss Cefficients: 1-1/ / / Frictin Lss fr Appliances: Wye, Siamese: Standpipe: 10 (Fr flws 350 ) 10 (Fr the FDC) Deck Pipes and Prtable Mnitrs: 25 Ladder Pipe Including M/S Appliance: 80 Page 11 f 12
12 WATER AVAILABILITY CHART (Fr calculating available water frm a hydrant fr Like Lines per IFSTA) Percent Methd: 0-10 Percent = Three times the amunt flwing Percent = Tw times the amunt flwing Percent = One time the amunt flwing. 26 Percent r mre = Mre water may be available but nt mre than the current amunt flwing. Static Reading 10 Percent DROP 15 Percent DROP 25 Percent DROP First Digit Methd Multiply the first digit f static hydrant pressure by 1, 2, and 3. Subtract values frm the hydrant pressure t determine water availability fr Like Lines. The fllwing chart lists sme examples f the prcess: Static Hyd. PSI 1 st Digit X 1 / 2 / 3 Drp in Residual Hydrant Pressure Residual Hydrant PSI / # f Like Lines 55 5 / 10 / psi = / psi = / psi = / / 12 / psi = / psi = / psi = / 1 Page 12 f 12
TWO FULLY EQUIPPED PUMPERS STATIC AND PRESSURIZED WATER SOURCES REFERENCES: ESSENTIALS OF FIRE FIGHTING, FOURTH EDITION, IFSTA, CHAPTERS 11 AND 12
INSTRUCTOR GUIDE TOPIC: BACK TO BASICS: ESTABLISHING SUPPLY LINES TIME REQUIRED: THREE HOURS MATERIALS: TWO FULLY EQUIPPED PUMPERS STATIC AND PRESSURIZED WATER SOURCES REFERENCES: ESSENTIALS OF FIRE FIGHTING,
More informationPSS INSTALLATION INSTRUCTIONS
PSS INSTALLATION INSTRUCTIONS Imprtant - Read Befre Starting! Befre starting yur installatin carefully read the fllwing warnings and instructins. Failure t prperly fllw the warnings and instructins culd
More informationEnergyBar 6. Setup Guide
EnergyBar 6 Setup Guide WELCOME Cngratulatins n yur purchase f the Apex EnergyBar 6! The EnergyBar 6 allws the Apex system t cntrl up t six 230 vlt items such as lights, pumps, fans, heaters, chillers
More informationINSTALLATION INSTRUCTIONS FOR PART #47002 WATER / METHANOL INJECTION SYSTEM UNIVERSAL TURBO DIESEL
Kit Cntents INSTALLATION INSTRUCTIONS FOR PART #47002 WATER / METHANOL INJECTION SYSTEM UNIVERSAL TURBO DIESEL Parts UHO Pump (Ultra High Output) 3 Qt Reservir 10 ft High Pressure Tubing 3 ft Black Wire
More informationE+ Battery Care Guide
Electric Mtin Systems, LLC 45150 Business Curt, Suite 300 Dulles, VA 20166 USA E+ Battery Care Guide Welcme! Yur E+ Hub Battery Pack is a pwerful, sphisticated, and imprtant part f yur E+ Electric Bicycle.
More informationSWP200 SERIES: PHOTOVOLTAIC KITS FOR WATER PUMPING
File ref.: KITswp0_ing Rev. 00-04.0 SWP0 SERIES: PHOTOVOLTAIC KITS FOR WATER PUMPING Water is ne f the few resurces, withut which mankind cannt d. Man has t supply with certain quantities f water in rder
More informationA L L Diagnostic Trouble Codes ( DTC ): P Code Charts P0302
2012 Chrysler Truck Twn & Cuntry V6-3.6L Cpyright 2013, ALLDATA 10.52 Page 1 A L L Diagnstic Truble Cdes ( DTC ): P Cde Charts P0302 P0302-CYLINDER 2 MISFIRE Special Tls: Fr a cmplete wiring diagram, refer
More informationINSTALLATION & USER S GUIDE
REKLUSE MOTOR SPORTS The Rekluse EXP Clutch OVERVIEW INSTALLATION & USER S GUIDE Dc ID: 191-6000 Manual Revisin: 050514 This kit will replace sme f the OEM frictins and drive plates with the EXP disk.
More informationINSTALLATION INSTRUCTIONS FOR PART #20001 FORCED INDUCTION BOOST COOLER WATER / METHANOL INJECTION SYSTEMS
INSTALLATION INSTRUCTIONS FOR PART #20001 FORCED INDUCTION BOOST COOLER WATER / METHANOL INJECTION SYSTEMS Parts UHO (Ultra High Output) Pump 3 Qt Reservir 10 ft High Pressure Tubing 3ft Wire Lm 18 1/8
More information{EMS Shock} Student Name: Period:
{EMS Shck} Student Name: Perid: 5 th Grade Engineering Pulleys Unit Rubric Lab #0016 Pulley Frame Pulley Frame: Student cnstructed the Pulley Frame t lab specificatins. Pulley Frame was nt apprved 0 pints
More informationFUELS SAFETY BRANCH INFORMATION BULLETIN July 1994
FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994 Guidelines fr Maintenance and Inspectin Prgrams fr Natural Gas and Prpane Appliances and their Fuel Features In Schls The Ontari Gas Utilizatin Cde states
More informationINSTALLATION INSTRUCTIONS FOR PART #20010 RT1/RT2/DOM WATER / METHANOL INJECTION SYSTEMS
Kit Cntents INSTALLATION INSTRUCTIONS FOR PART #20010 RT1/RT2/DOM WATER / METHANOL INJECTION SYSTEMS Parts UHO Pump (Special High Output) 3 Qt Reservir 10 Ft High Pressure Tubing 3 Ft Wire Lm 18 1/8 Silicne
More informationDTC P0401 Exhaust Gas Recirculation Flow Insufficient Detected
DTC P0401 Exhaust Gas Recirculatin Flw Insufficient Detected DESCRIPTION Based n the driving cnditins, the ECM regulates the vlume f exhaust gas that is recirculated t the engine's cmbustin chambers and
More informationDriveCam Unit Installation Instructions
DriveCam Unit Installatin Instructins Installatin f the DriveCam Unit is nt cmplicated, thugh care must be taken t avid specific prblems. Sme vehicles require additinal cnsideratin t determine the ptimum
More informationTemporary Use and Vendor Stand Online Permit Submittal
Temprary Use and Vendr Stand Online Permit Submittal A Temprary Use Permit is an pen-air small business that is there fr a limited time fr the uses listed belw. Temprary Use Duratin Extensin Agricultural
More informationINSTALLATION INSTRUCTIONS FOR PART #50015 DIESEL MPG-MAX WATER / METHANOL INJECTION SYSTEM 6.0L/6.4L/6.7L POWERSTROKE DIESEL
Kit Cntents INSTALLATION INSTRUCTIONS FOR PART #50015 DIESEL MPG-MAX WATER / METHANOL INJECTION SYSTEM 6.0L/6.4L/6.7L POWERSTROKE DIESEL Parts 7 Galln Reservir UHO Pump (Ultra High Output) 25 ft High Pressure
More informationGearbox Installation Manual
Gearbx Installatin Manual Rtrk Gears HOB/MPR & HOS/MPR ranges (Electrnic cpy available n www.rtrk.cm)! This manual cntains imprtant safety infrmatin. Please ensure it is thrughly read and understd befre
More information/2017. Flexline rapid clamping systems with drive chain clamping element, T-slot and adjustment track
Traveling unit chain (adjustment track) in 3 lengths s in varius designs Mtr Advantages 8 different clamping elements 4 different T-slts 3 different adjustment tracks drive mtr and die mnitr attachable
More informationINSTRUCTION FOR INSTALLATION AND INJECTION HEAD DN PN
INSTRUCTION FOR INSTALLATION AND INJECTION HEAD DN 15 - PN - VHF PM - 218/17/03/GB The instructins fr installatin and service f injectin head are binding fr users t ensure prper functin f injectin head.
More information2-CHANNEL WIRELESS REMOTE CONTROL SYSTEM EWC-2
2-CHANNEL WIRELESS REMOTE CONTROL SYSTEM EWC-2 "Fingertip cntrl withut hard-wiring" CONTROL TWO LOW VOLTAGE DEVICES OR OPERATIONS FROMA CONVENIENT POCKET SIZED REMOTE ~:::.~.~ I,- L. ~'~~~I..~ "J THANK
More informationFIRST: Top battery (closest to the arm) SECOND: Middle battery. LAST: Top battery (furthest from arm)
Hw t Install the Batteries Hw t Hld the Lamp: The InteliEnergy Lamp selectin switches utilize the same technlgy as cell phnes: Capacitive Tuch. This assures the ultimate in lngevity because there are n
More informationSolvent Filter. What is a Solvent Trap, Solvent Recycler or Solvent Filter? Why use a solvent filter? Why is the HIT Solvent Filter better?
Slvent Filter What is a Slvent Trap, Slvent Recycler r Slvent Filter? It is a device attached t the end f a threaded barrel that cllects all f the slvent and debris as it is cleaned frm the barrel and
More informationIntroduction Specifications Structure & Performance Assembly Folding Operation Care & Maintenance...
n Intrductin... 3 Specificatins... 4 Structure & Perfrmance... 5 Assembly... 6 Flding... 7 Operatin... 8-12 Care & Maintenance... 13-15 2 P a g e Read and fllw all instructins, warnings, and ntes in this
More informationSANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST UNDERGROUND STORAGE TANK INSTALLATION PLAN REVIEW CHECKLIST
July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST UNDERGROUND STORAGE TANK INSTALLATION PLAN REVIEW CHECKLIST Address: Permit #: Inspectr: Date: Status: Inspectr: Date:
More informationSEC NI-CAD BATTERIES
SEC NICKE CADMIUM SEC NI-CAD BATTERIES NICKE CADMIUM - POCKET PATE SEC Industrial Battery Cmpanies Nickel Cadmium Pcket Plate batteries are available fr a wide range f applicatins. APPICATIONS - Telecmmunicatins
More informationInstallation instructions: 13 Pin Electrical system for towing hitch
General data Part number Westfalia Vehicle Manufacturer Vehicle 321 538 300 153 ZGB 1T0 055 204 Vlkswagen Turan MY 2003> 321 538 391 105-005 - 33/07 Imprtant ntes Read the installatin manual prir t starting
More informationHIGH POWER RGB LED SERIES. The HB Series Advantage! Architectural Illumination Systems!
The HB Series Advantage SGS listed cnfirming t UL Standard 2108 & 8750 Certified t CSA Standard C22.2 N.9 LED Life f 50K+ hurs, under nrmal perating cnditins Lw wattage, lw heat, lw vltage (12DVC & 24VDC
More informationTrouble Shooting Guide for AFVK-SP Series Valve Kit (AF-4000 Series Gas Valves)
Truble Shting Guide fr AFVK-SP Series Valve Kit (AF-4000 Series Gas Valves) AFVK-SP, AFVK-SP-H/L, AFVK-SP-MH/L AFVK-SP Series Valve Kit Truble Shting Guide (AF-4000 Series) TABLE OF CONTENTS General Infrmatin
More informationMachine Safeguarding
Machine Safeguarding General This dcument will prvide yu a high-level verview n sme best practices pertaining t machine guarding and sample types f guards fund in manufacturing settings. The Main Causes
More informationPRE-PLANNING & DELIVERY GUIDE
TM PRE-PLANNING & DELIVERY GUIDE Need Assistance? Call 1-888-329-4847 PRE-DELIVERY Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time
More informationESCONDIDO FIRE DEPARTMENT TRAINING MANUAL ENGINE MODULE HOSE PAGE 1 OF 20 Supply Hose Lays Revised
HOSE 12-01-16 PAGE 1 OF 20 There are five base North Zone supply hose lays: Forward Lay Spotting a Hydrant Stationary Lay Reverse Lay Split Lay Escondido Fire Department Core Hose Lays The Escondido Fire
More informationADVISORY: General Motors Upfitter Integration Bulletin #108d P a g e 1 May 18, 2016
Subject: Aftermarket ALDL r DLC Interface Devices Causing Multiple Issues Mdels All Passenger Cars and Trucks Affected: Mdel Years: 2006 and beynd Date: February 4, 2013 Revisin Date: May 18, 2016 ADVISORY:
More informationUninterruptible Current Supply USV V / 1.2 Ah
Uninterruptible Current Supply USV 011 +24 V / 1.2 Ah The USV 011 Uninterruptible current supply is used t buffer the +24 V supply f an Industry PC (C-IPC, SIPC). The +24 V supply is nrmally cnnected t
More informationCS369-R51I Thank you very much for purchasing our air conditioner.
OWNER'S MANUAL CONDITIONER REMOTE CONTROLLER ILLUSTRATION The design and specificatins are subject t change withut prir ntice fr prduct imprvement. Cnsult with the sales agency r manufacturer fr details.
More informationSerial Number: Date of Purchase:
Cngratulatins n the purchase f yur Grund Lgic, Inc. machine. This prduct has been carefully designed and manufactured t be a dependable piece f equipment that will prvide years f trublefree peratin. BEFORE
More informationINSTALLATION INSTRUCTIONS FOR PART #20140 STAGE 3 N54 BMW BOOST COOLER WATER/METHANOL INJECTION SYSTEM
INSTALLATION INSTRUCTIONS FOR PART #20140 STAGE 3 N54 BMW BOOST COOLER WATER/METHANOL INJECTION SYSTEM Parts List UHO (Special High Output) Pump 2.5 gal Reservir 20 ft. 1/4 OD Tubing 3ft.Black Wire Lm
More informationVolume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools
Vlume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE by BLUEROCK Tls UNPACKING THE ITEM Cautin: This machine is packed tgether with items that may be sharp, ily and verly heavy bjects.
More informationVALVE-REGULATED SEALED LEAD ACID BATTERY. FMJ GEL Series. High Performance. Product Guide
VALVE-REGULATED SEALED LEAD ACID BATTERY FMJ GEL Series High Perfrmance Prduct Guide Cntents Intrductin...01 Technical Features...01 Applicatins...02 Certificatin...02 Standards...02 General Specificatins...02
More informationStreetblaster Pro-Stud Wet Nitrous System
Streetblaster Pr-Stud Wet Nitrus System www.nswizard.cm Table f Cntents List f Cmpnents 1 Nitrus Bttle Installatin 2 Nitrus Supply Pipe Ruting 3 Pulsid Installatin 4 Pipe Fitting Instructins 5 Plumbing
More informationADO-Pumping Apparatus Manipulative Skill Objectives PREVENTIVE MAINTENANCE
ADO-Pumping Apparatus Manipulative Skill Objectives PREVENTIVE MAINTENANCE 1. Perform and document routine tests, inspections, and servicing functions on specified systems and components. A. For a fire
More informationComplete Solutions for Industrial Valves
Butterfly Valves Cmplete Slutins fr Industrial Valves NEWAY VALVE Cat.n.:E-BFV-2006 T Series: Sft Seated Cncentric Butterfly Valve Figure Numbers 12 TC 1 W G WCB 338 Neway figure numbers are designed t
More informationOther significant updates include:
THE NEW N.F.P.A. 1962 The NFPA recently revised its standard on fire hose. The newest edition requires that hose manufactured before July 1987 be removed from service. This makes sense given all the changes
More informationEnergyCell PLC Series. Owner s Manual
EnergyCell PLC Series Owner s Manual Abut OutBack Pwer Technlgies OutBack Pwer Technlgies is a leader in advanced energy cnversin technlgy. OutBack prducts include true sine wave inverter/chargers, maximum
More informationTools Required. Installation. Step 1. Headlight lense removal (Driver's side shown, Passenger side similar)
Tls Required Phillips Screw Driver (crner lamps) Flat Head Screw Driver (ptinal fr headlight cver) Pliers (handy t have) Electrical Tape Sturdy Cpper Wire (t use as a wire fish) 10mm Scket r Wrench (grund
More informationStandalone Linear Li-Ion Charger with Thermal Regulation. Features. Applications
Standalne Linear Li-In Charger with Thermal Regulatin General Descriptin The is a cmplete linear charger fr single cell lithium-in batteries. With small TDFN-10 package and few external cmpnents, is well
More informationSOMSAS Student User Manual Overseas Short Term Programs
SOMSAS Student User Manual Overseas Shrt Term Prgrams Table f cntents WHAT IS SOMSAS? 2 CREATE A NEW APPLICATION 2 Shrt Term Prgram 3 ADD SUBJECTS TO YOUR APPLICATION 3 Hst Institutin Details 4 Partner
More informationPROJE CT-BASED LEARNING: ABS PLASTIC DERBY
PROJE CT-BASED LEARNING: ABS PLASTIC DERBY Descriptin D yu remember the pine wd derby cars yu designed and built when yu were a child? D yu remember hw difficult it was t get the shape yu wanted in the
More informationInstallation Guide Contigo 6100
Installatin Guide Cmmercial Vehicle Prductivity and Security The is a high-perfrmance beacn designed fr cmmercial prductivity and security. It is ideally suited t installatins in delivery and service fleets
More informationApplication of size, weight, and load limitations for vehicles -- Exceptions.
Utah Vehicle Cde 41-1a-102. Definitins. As used in this chapter: (10) "Cmmercial vehicle" means a mtr vehicle, trailer, r semitrailer used r maintained fr the transprtatin f persns r prperty that perates:
More informationGeneral Faucet Installation Instructions
General Faucet Installatin Instructins Step 1: Psitin the Faucet Begin installing yur faucet by placing the gasket and faucet in psitin n the sink. (Diagram A) Frm under the sink, thread the plastic munting
More informationYou have a Chiller, Now What?
Yu have a Chiller, Nw What? Raschell Hickmtt Reginal Sales Manger Dimplex Thermal Slutins Klant Klers Brand Chillers Agenda This presentatin is develped t be a very brief and generic intrductin t anyne
More informationVB 60/ Zero Flow sensitive unloader valve
Ultim aggirnament: 20/04/18 VB 60/600-400-250 Zer Flw sensitive unlader valve Manuale tecnic: E 272 Pressure regulating valve unlader type with zer setting n delivery line: at gun clsure the water flw
More informationTECHNICAL SPECIFICATION. SPC-4T Stirling Process Cryogenerator
TECHNICAL SPECIFICATION SPC-4T Stirling Prcess Crygeneratr Reference 80 8044_00 Issue Date April 20, 2016 Stirling Crygenics is a registered trade name f DH Industries BV Fr mre infrmatin n the Stirling
More informationAdjusting the Pekar K68 for your Dnepr or Ural Adjustment section translated from Pekar K68 manual
Adjusting the Pekar K68 fr yur Dnepr r Ural Adjustment sectin translated frm Pekar K68 manual Adjusting the Pekar K68 carburetrs n yur Dnepr r Ural. This dcument is intended t server as the primer fr prper
More informationPre-Planning Delivery Guide
Pre-Planning Delivery Guide Need Assistance? Call 1-888-768-6772 Pre-Delivery Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time f yur
More information2017 of. Battle thebots. Before the Event. By 1/11/17, send the following to Mary Beth Hausken, Event Director, at
2017 f Battle thebts Befre the Event By 1/11/17, send the fllwing t Mary Beth Hausken, Event Directr, at mbhausken@pef.rg: Cmplete the nline Team Infrmatin Frm. Email a pht f yur team (fr inclusin in ur
More informationMotor pumps and hydraulic units type R and RG
Mtr pumps hydraulic units type R RG Pump units with radial-pistn pumps ace. t D 6010 ready fr installatin peratin Operating pressure p max = 700 bar Delivery flw Q max = 91.2 lpm (at 1450 rpm) Gemetric
More informationUpdate on Emerging Technologies of the RfG
An Cimisiún um Rialáil Fóntas Cmmissin fr Regulatin f Utilities Update n Emerging Technlgies f the RfG Reprting Perid May July 2018 Infrmatin Paper Reference: CRU18223 Date Published: 1/10/2018 Clsing
More informationSelf Consumption in residential systems
Self Cnsumptin in residential systems Brad Bassett Sr. Applicatin Engineer Jan 27, 2017 San Dieg, CA What is Self Cnsumptin? A direct grid tie system is where slar energy prduced, pwers the huse lads as
More informationVYLEATER DAILY HOUSEKEEPING & PREVENTATIVE MAINTENANCE PROCEDURES. Follow these procedures to keep your Vyleater running smoothly.
VYLEATER DAILY HOUSEKEEPING & PREVENTATIVE MAINTENANCE PROCEDURES! WARNING! Failure t fllw these prcedures may cause an verlad cnditin that culd result in the Vyleater becming severely damaged. Fllw these
More informationRefer to the description for DTC P0C Refer to DESCRIPTION.
Print 203 Tyta Prius 8L Eng Plug-In P34A REQUESTED INFORMATION Dtc P34A-828: Inverter Clant Pump Speed Signal Descriptin Refer t the descriptin fr DTC P0C73-776 Refer t DESCRIPTION The inverter water pump
More informationUpdate on Emerging Technologies of the RfG
An Cimisiún um Rialáil Fóntas Cmmissin fr Regulatin f Utilities Update n Emerging Technlgies f the RfG Reprting Perid March May 2018 Infrmatin Paper Reference: CRU/18/121 Date Published: 26/07/2018 Clsing
More informationOpen Street Cam User Manual
Open Street Cam User Manual Table f cntent 1.Installing the app and setting it up fr the first time 1.1 Installing the app 1.2 Setting up the app fr the first time 2. Installing the smartphne in the car
More informationSTART-UP DRIP IRRIGATION SYSTEM
START-UP DRIP IRRIGATION SYSTEM CHECK LIST Erick Smith, Dari Chavez, Tim Clng, and Lenny Wells, UGA Department f Hrticulture Wesley Prter, UGA Department f Crp and Sil Sciences Specialty crps such as fruits,
More informationMini H1 Twin Kit - Installation Instructions
Intrductin: Thanks fr purchasing the Mini H twin kit! Yu are very clse t imprve yur lightning nw :) Please read this manual carefully. Feel free t cntact us r visit ur Facebk cmmunity; Eurpean Headlight
More informationFuel Meter Model FM 200
Fuel Meter Mdel FM 200 WILLIAM C. KIELING, Assistant Prfessr f Mechanical Engineering, Cllege f Engineering, University f Washingtn The mtr benefits fuel meter is an Accurate, _. wide flw range fuel-measuring
More informationMG1 TM MAGNETIC SUPER-COMPACT SYSTEM FILTER
MG1 TM MAGNETIC SUPER-COMPACT SYSTEM FILTER CT3070.0_01 EN June 2016 Patent applicatin n. 202015000064159 Super cmpact Retains all impurities Fights crrsin Increases the lifespan f the biler Maintains
More informationTechnical Manual. eluma. Aluminum Frame LED Panels. patents pending. Technical Specifications Subject to Change
Technical Manual eluma Aluminum Frame LED Panels patents pending TM Technical Specificatins Subject t Change TABLE OF CONTENTS General Specificatins.. Page 3 Prfile Specificatins EL001.. Page 4 Prfile
More informationModel: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS
120 Mdel: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS IF YOU CANNOT READ OR UNDERSTAND THESE INSTALLATION INSTRUCTIONS DO NOT ATTEMPT TO INSTALL OR OPERATE INTRODUCTION This Wired Wall Timer system was
More informationParts Checklist: XJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* *BOX 2* Jeep Cherokee XJ
XJ Frnt 3-Link Lng Arm Upgrade Installatin Instructins 84-01 Jeep Cherkee XJ Parts Checklist: *BOX 1* Instructins Invice Lg decal 10001 (1) Rck-Link decal 13287 (2) Irnrckffrad.cm decal (1) Subframe center
More informationParts Checklist: WJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* (1) *BOX 2* (1) Jeep Grand Cherokee WJ
Parts Checklist: *BOX 1* 13319 (1) Instructins Lg decal 10001 (Qty: 1) Rck-Link Decal 13287 (2) Irnrckffrad.cm decal (1) Subframe center 92270 (1) Subframe left uter 92256 (1) Subframe right uter 92275
More informationCar Refrigerator PFN-C-WEA-25/35/45/55
Car Refrigeratr PFN-C-WEA-25/35/45/55 Accessries available separately:- Prtective Transit Bag AC0V -240Vt DC 2 V Pwer Adaptr Please read this manual carefully befre using yur unit. Sectin Page Key Prduct
More informationInstallation Instructions AQ-5100, AQ-5200 & AQ-5300 Under Counter Water Filter Single Stage (5100), Two Stage (5200) and Three Stage (5300) systems
Live Healthy s ' p V iv Installatin Instructins AQ-5100, AQ-5200 & AQ-5300 Under Cunter Water Filter Single Stage (5100), Tw Stage (5200) and Three Stage (5300) systems Welcme t the Aquasana experience.
More information;THI~~Sf\-FEJY _.:.. ;'..»...
45 -CHAPTER......... j...,.. 8 ~\..- ;THI~~Sf\-FEJY _.:.. ;'..».......,. np;,llf I~~yeantlfreez~in ah'penc8ntaiil~rr spllledq.l,1thefi()r ~~erifit:p1ightbe acc;~ss:lblle.i t children r ariimals.antifreezeis'txic
More informationRelay Pumping Operations
Relay Pumping Operations OBJECTIVES Identify potential water sources Demonstrate acquiring water from various water sources Demonstrate proper relay pumping hydraulic calculations Demonstrate proper relay
More informationCHECK OUT OUR WEBSITE SOME TIME FOR PLENTY OF ARTICES ABOUT SELF DEFENSE, SURVIVAL, FIREARMS AND MILITARY MANUALS.
CHECK OUT OUR WEBSITE SOME TIME FOR PLENTY OF ARTICES ABOUT SELF DEFENSE, SURVIVAL, FIREARMS AND MILITARY MANUALS. http://www.survivalebks.cm/ Thank yu fr purchasing ur ebk package. SUBCOURSE QM3503 EDITION
More informationDiagram1- typical B-Triple. Diagram 2 typical AB-Triple. Diagram 3 typical Road Train
NSW ROAD TRAIN MODERNISATION PROGRAM B-TRIPLE & AB-TRIPLE OPERATING CONDITIONS Applicatin These perating cnditins apply t: B-Triples, which are a vehicle cmbinatin cnsisting f a prime mver twing three
More informationOperator s Manual. with Maintenance Information. Seventh Second Printing Part No
Operatr s Manual with Maintenance Infrmatin Secnd First Editin Editin Seventh Secnd Printing Part N. 43645 65176 Imprtant Read, understand and bey these safety rules and perating instructins befre perating
More informationTips & Technology For Bosch business partners
Tips & Technlgy Fr Bsch business partners Current tpics fr successful wrkshps N. 35/2011 Gasline injectin Invented fr life Lambda sensr Knw-hw frm the market leader Bsch, innvative cmpany and wrld's largest
More informationInstallation Guide Contigo 6150 & 6151
Installatin Guide Cntig 6150 & 6151 Cmmercial Vehicle Prductivity and Security The Cntig 6150 & 6151* (cllectively knwn as the Cntig 615X) are highperfrmance beacns designed fr cmmercial prductivity and
More informationCS ENERGY PROCEDURE FOR LADDERS CS-OHS-52. Key Changes Prepared By Checked By Approved By Date
CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52 Respnsible Officer: Respnsible Executive: Grup Manager Health and Safety Executive General Manager Crprate DOCUMENT HISTORY Key Changes Prepared By Checked By
More informationHow to Sweat (Solder) Copper Pipe By See Jane DrillTM Copyright 2013, All Rights Reserved
Hw t Sweat (Slder) Cpper Pipe By See Jane DrillTM Cpyright 2013, All Rights Reserved Objective T learn hw t attach pieces f cpper pipe by sweating r sldering the metal tgether. This is a helpful skill
More informationVolume 1.1 OPERATIONAL MANUAL MODEL: CG-211C PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools
Vlume 1.1 OPERATIONAL MANUAL MODEL: CG-211C PIPE TORCH/BURNER MACHINE by BLUEROCK Tls UNPACKING THE ITEM Cautin: This machine is packed tgether with items that may be sharp, ily and verly heavy bjects.
More informationTexas: Texas Transportation Code link: TRANSPORTATION CODE TITLE 7. VEHICLES AND TRAFFIC
Texas: Texas Transprtatin Cde link: http://www.statutes.legis.state.tx.us/?link=tn TRANSPORTATION CODE TITLE 7. VEHICLES AND TRAFFIC (17) "Semitrailer" means a vehicle with r withut mtive pwer, ther than
More informationParts Checklist: ZJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* *BOX 2* Jeep Grand Cherokee ZJ
ZJ Frnt 3-Link Lng Arm Upgrade Installatin Instructins 93-98 Jeep Grand Cherkee ZJ Parts Checklist: *BOX 1* Instructins Invice Lg decal 10001 (Qty: 1) Rck-Link decal 13287 (2) Irnrckffrad.cm decal (1)
More informationPRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D),
SERVICE REPLACES: Please discard ATV 07-02 dated 4/5/07 MODEL: PRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D), KFX700 (KSV700-A/B/C),
More informationJune Drill of the Month Instructor Guide. Topic: Review of Hydraulics and Pump Components
Course: Pumps Refresher Course Session Reference: 1 June Drill of the Month Instructor Guide Topic: Review of Hydraulics and Pump Components Level of Instruction: Time Required: 3 hours Materials: Chalkboard
More informationVEHICLE ACTIVATED SPEED LIMIT SIGNS
VEHICLE ACTIVATED SPEED LIMIT SIGNS TRS-VASL VEHICLE ACTIVATED SPEED LIMIT SIGNS Vehicle Activated Speed Limit (VASL) signs measure the speed f appraching vehicles. If the speed f the vehicle is higher
More informationJatro Renewables S U S T A I N A B L E C H E M I S T R Y F O R E A R T H
Jatr Renewables S U S T A I N A B L E C H E M I S T R Y F O R E A R T H 2004 2010 2004,Transesterificatin: Refine t 2% FFA 2009, Esterificatin: Refine t 15% FFA 2015, Supercritical: Refine t 100% FFA 2015
More informationInstallation, Operation and Maintenance Instructions
FJ-310A Installatin, Operatin and Maintenance Instructins Sump cleaner ERIEZ MAGNETICS HEADQUARTERS: 2200 ASBURY ROAD, ERIE, PA 16506 1402 U.S.A. WORLD AUTHORITY IN SEPARATION TECHNOLOGIES P.C# 762-766
More informationDesign Standard - Fume Hoods & Fume Hood Exhausts
1.0 Intrductin Design Standard - Fume Hds & Fume Hd Exhausts The fume hd is the primary cntrl device in mst labratries fr prtecting emplyees and students frm expsure t hazardus chemicals. It is als an
More informationC-BOA Tool Validation of Energy Savings Estimation Methods
C-BOA Tl Validatin f Energy Estimatin Methds February 21, 2012 1 f 7 Table f Cntents Summary... 3 Recmmendatin... 3 Evaluatin Apprach... 3 Technical Advisry Grup Oversight... 3 Prject Specificatins...
More informationBUTTON CELL CR2430 BSI M G T E D BRIEF SPECIFICATION
BUTTON ELL R2430 BSI RE M G IS T E D RE IR F BRIEF SPEIFIATION Mdel: R2430 Nminal Vltage: V Nminal apacity: 270mAh Standard Discharge urrent: 0.4mA Weight: 4.0g Stainless steel cntainer ISO9002 ertified
More informationTCS and TCS-200-1H Tension Controls
TCS-200-1 and TCS-200-1H Tensin Cntrls P-2003-2-WE 819-0420 Service & Installatin Instructins An Altra Industrial Mtin Cmpany Cntents Intrductin...2 Thery f Operatin...3 Technical Specificatins...3 Installatin
More informationREAD ALL INSTRUCTIONS THOROUGHLY FROM START TO FINISH BEFORE BEGINNING INSTALLATION!
www.fabtechmtrsprts.cm 4331 EUCALYPTUS AVE ~~ CHINO, CA 91710 PHONE 909-597-7800 ** FAX 909-597-7185 1994-2001 DODGE RAM 1500 & 2500 4 WHEEL DRIVE FTS3400-50 FRONT DUAL SHOCK SYSTEM PARTS LIST: 1 EA. FT3400-50-100P
More informationF-1000 INSTRUCTION MANUAL
F000 INSTRUCTION MANUAL BlueWhite R Industries, Ltd. 5300 Business Drive Huntingtn Beach, CA 9649 USA Phne: 74893859 FAX: 74894949 E mail: sales@bluewhite.cm r techsupprt@bluewhite.cm Website: www.bluewhite.cm
More informationJD F Conversion. Combine Manual a
JD 9000-600F Cnversin Cmbine Manual 09040114a Abut Headsight Headsight Cntact Inf Headsight, Inc Bremen, IN 46506 Phne:574-546-5022 Fax: 574-546-5760 Email: inf@headsight.cm Web: www.headsight.cm Technical
More informationCompact Safedrive with built-in Safety Brake. innovative drive systems for industrial doors. Variable Speed Safedrive with built-in Safety Brake
GfA-ELEKTROMATEN Chain Drive Operatr fr Rller Shutter Cmpact Safedrive with built-in Safety Brake Safedrive with built-in Safety Brake Chain Drive with separate Safety Brake Fire Shutter Operatr innvative
More informationDraft ADEM Guidance Proposed Additions to the Alabama UST Regulations
Draft ADEM Guidance Prpsed Additins t the Alabama UST Regulatins Yu may have heard abut upcming changes t the undergrund strage tank regulatins (UST regulatins). On Octber 13, 2015 EPA finalized the first
More informationP/N Water/Methanol Injection Kit V2 Standard Controller - Internal MAP 1-Gallon Tank STOP!
Instructin Manual P/N 30-3300 Water/Methanl Injectin Kit V2 Standard Cntrller - Internal MAP 1-Galln Tank STOP! THIS PRODUCT HAS LEGAL RESTRICTIONS. READ THIS BEFORE INSTALLING/USING! THIS PRODUCT MAY
More information