Engineering Design of On-Track Machines in Running Mode

Size: px
Start display at page:

Download "Engineering Design of On-Track Machines in Running Mode"

Transcription

1 Engineering Design of On-Track Machines in Running Synopsis This document mandates requirements for the design of on-track machines in running mode. Copyright in the s is owned by Rail Safety and Standards Board Limited. All rights are hereby reserved. No (in whole or in part) may be reproduced, stored in a retrieval system, or transmitted, in any form or means, without the prior written permission of Rail Safety and Standards Board Limited, or as expressly permitted by law. Members are granted copyright licence in accordance with the Constitution Agreement relating to Rail Safety and Standards Board Limited. In circumstances where Rail Safety and Standards Board Limited has granted a particular person or organisation permission to copy extracts from Railway Group Standards, Rail Safety and Standards Board Limited accepts no responsibility for, nor any liability in connection with, the use of such extracts, or any claims arising therefrom. This disclaimer applies to all forms of media in which extracts from s may be reproduced. Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2013 Rail Safety and Standards Board Limited

2 record Date Comments One January 1996 Original document Two December 2002 Replaces issue one Three December 2010 Replaces issue two Includes requirements for on-track machines previously contained in GM/RT2100 issue three Four September 2011 Replaces issue three Small scale change amendment revision of 3.6 to align with the requirements in BS EN September 2013 Replaces, issue four, GM/RT2476, issue one GM/GN2575 issue two and GM/GN2576 issue one Document aligned with Conventional Rail Locomotives and Passenger Technical Specification for Interoperability (CR LOC & PAS TSI) and BS EN series. All requirements for on-track machines in running mode are now contained within this document or with specific references to other documents. Revisions have not been marked by a vertical black line in this issue because the document has been revised throughout. Superseded documents The following Railway Group documents are superseded, either in whole or in part as indicated: Superseded documents issue four, September 2011 Track Machines GM/RT2476 issue one, August 2003 On-Track Machine Requirements for Demonstrating the Reliable Operation of Track Circuits GM/GN2575 issue two, June 2004 Guidance on the Engineering Acceptance of On-Track Machines GM/GN2576 issue one, August 2003 Guidance on Vehicle Requirements for Reliable Track Circuit Operation Sections superseded Date when sections are superseded All December 2013 All December 2013 All December 2013 All December 2013 Supply issue four, GM/RT2476 issue one GM/GN2575 issue two and GM/GN2576 issue one cease to be in force and are withdrawn as of 07 December The authoritative version of this document is available at Uncontrolled copies of this document can be obtained from Communications,, Block 2, Angel Square, 1 Torrens Street, London EC1V 1NY, telephone or enquirydesk@rssb.co.uk. Other Standards and associated documents can also be viewed at Page 2 of 25

3 Contents Section Description Page Part 1 Purpose and Introduction Purpose Introduction Approval and authorisation of this document 5 Part 2 Design Requirements for On-track Machines Structure and mechanical parts Track interaction and gauging Braking Environmental conditions and aerodynamic effects External lights and visible and audible warning devices Traction and electrical equipment Driver's cab and driver-machine interface Fire safety and evacuation Design for rescue purposes Marking and registration Demountable modules 15 Part 3 Documentation Maintenance Operating instructions 16 Part 4 Application of this document Application - infrastructure managers Application - railway undertakings Health and safety responsibilities 17 Appendices Appendix A Track Twist Geometry 18 Appendix B Obstacle Deflectors 19 Appendix C List of s for which On-Track Machines are removed from scope 21 Definitions 22 References 23 Figures Figure 1 Exhaust outlet 12 Figure 2 Track twist geometry 18 Page 3 of 25

4 Part 1 Purpose and Introduction 1.1 Purpose This document mandates requirements for the design of on-track machines when they are in running mode This document is the national technical rule (NTR), which is able to be used as an alternative standard instead of the CR LOC & PAS TSI as permitted by the CR LOC & PAS TSI clause Introduction Background Principles The production of issue five takes into account the Technical Specifications for Interoperability (TSI) and Euronorms (ENs). has been rewritten using the headings set out in the CR LOC & PAS TSI and mandates the requirements of BS EN :2011, BS EN :2008+A1:2011 and BS EN :2009+A1:2011 and a number of other ENs Where ENs are considered complete and a suitable substitute for Railway Group Standards, reference to the EN is made The requirements of this document are based on one of the following principles: a) All new on-track machines are manufactured in compliance with the CR LOC & PAS TSI for running mode. Or b) The new on-track machine is designed to this standard as permitted by CR LOC & PAS TSI clause Notwithstanding the stated scope of other s (see Appendix C), this document provides all the necessary technical requirements for the design of on-track machines Related requirements in other documents On-track machines are out of scope of all RGSs except for RGSs explicitly mandated in this document. For information, Appendix C sets out a list of the RGSs for which on-track machines are removed from scope following the compliance date of this standard The following RGS, which describe processes, remain applicable to on-track machines as the situation arises: GE/RT8106 GE/RT8250 GE/RT8270 GM/RT2273 Management of Safety Related Control, Command and Signalling (CCS) System Failures Reporting High Risk Defects Assessment of Compatibility of Rolling Stock and Infrastructure Post Incident and Post Accident Testing of Rail Vehicles Supporting documents Page 4 of 25

5 The following Rail Industry Standard complements this : RIS-1702-PLT Rail Industry Standard for the Design of On-track Machines in Working and Travelling s 1.3 Approval and authorisation of this document The content of this document was approved by Plant Standards Committee on 12 June 2013 and Rolling Stock Standards Committee on 28 June This document was authorised by on 23 July Page 5 of 25

6 Part 2 Design Requirements for On-track Machines 2.1 Structure and mechanical parts Mechanical interfaces The intention of section of this document is that the end coupling system of on-track machines, where fitted, is designed to transmit, safely and without suffering significant permanent deformation all sustained and shock loads that arise between it and other rail vehicles, including on-track machines associated with: a) Coupling and uncoupling. b) Traction and braking. c) Traversing curved track. d) Vertical changes in alignment. e) Shock loads caused by play and flexibility in the train coupling, drawgear and buffers, if fitted The coupling system, with the exception of buffers, shall engage positively with the coupling system of any rail vehicle to which it is intended to couple The design of the system shall ensure that it is possible to determine that the coupling systems are positively engaged, either directly or by a suitable system of indication Except as set out in of this document, the coupling systems, with the exception of buffers, shall be designed to remain positively engaged over the limiting values for track features set out below, for each feature separately: a) Minimum horizontal track radius of 80 m. b) Minimum horizontal track reverse radii each of 80 m with a 3 m intermediate straight. c) Minimum vertical track radius, concave and convex of 500 m. d) Maximum installed cant of 200 mm. e) Maximum cant gradient of 1 in 400. f) Maximum track twist as set out in Appendix A Where an on-track machine is unable to meet the limiting values set out in of this document, the limitation(s) shall be stated in the operating instructions, as set out in Part The limiting value of track features that coupling and uncoupling is possible for the particular on-track machine shall be stated in the operating instructions Systems that control the operation of the coupling or uncoupling system shall be protected from reasonably foreseeable interference that could result in the system's inadvertent or malicious operation The design of the coupling system shall allow manual uncoupling of the coupling system when the systems normally required for uncoupling are unavailable. Page 6 of 25

7 Drawgear and its attachments to an on-track machine body shall be designed to fail at a lower tensile load than that for the primary structure of the machine Drawgear designed to be capable of transferring shear forces between adjacent vehicles shall withstand, without significant permanent deformation, the transfer of 100 kn in both the vertical and transverse directions simultaneously Inner couplings between different on-track machines of a fixed formation train shall be designed to withstand the forces due to the intended operating conditions, as stated in the operating instructions, see Part 3 of this document If vehicles of an on-track machine are permanently coupled together, the coupling systems between the vehicles shall be designed to withstand forces greater than the couplings and buffers at the ends of the on-track machine For articulated on-track machines, the joint between two parts of a machine which share the same running gear shall comply with the requirements of BS EN :2010 clause and clause On-track machines not equipped with any end coupling feature shall be capable of being attached to a rescue railway vehicle in the event of failure or breakdown. The design shall include an operable failsafe through brake system between the on-track machine and the rescuing rail vehicle that automatically applies the brakes in the event of a breakaway The coupling system shall, as a minimum, be designed such that it does not require any human presence between them whilst either the on-track machine or vehicle is moving. Note: The Supply of Machinery (Safety) Regulations 2008 sets out the requirement that the coupling system is designed such that employees are not exposed to undue risk during coupling and uncoupling, or rescue operations If an on-track machine is fitted with buffers, then under all load conditions, the buffer height shall be within the range of 940 mm and 1065 mm Strength of vehicle structure The static frame strength of on-track machines shall comply with BS EN :2011, clause 6.2. In addition on-track machines with a driving cab shall meet the requirements of BS EN 12663:2010 clause and for Table 6 and Table 7 only shall be considered as category L The dynamic frame strength of on-track machines shall comply with BS EN :2010, clause Attachments to the on-track machine frame, including bogie attachments, shall comply with BS EN :2010 clause and clause Bogies and axlebox equipment shall comply with BS EN 13749:2011 clause 4. Axleboxes and equipment fitted to non-bogied on-track machines shall also comply with BS EN 13749:2011 clause 4. The validation of these requirements shall comply with BS EN 13749:2011 clause For on-track machines that include a bogie frame, the integrity of the structure of the bogie frame, all attached equipment and body to bogie connections shall be demonstrated using one of the methods set out in BS EN 13749:2011 clause In the application of the load cases referred to in BS EN 13749:2011, the exceptional payload shall be taken as the fully laden condition. Page 7 of 25

8 The hypothesis taken to evaluate the loads due to bogie running (formulas and coefficients), set out in BS EN 13749:2011 Annex C, shall be stated in the technical file All roofs over areas designed to be occupied by people shall resist the penetration into the on-track machine of a concrete cube weighing 100 kg dropped from a height of 3.0 m above the roof. The cube shall be dropped so that a flat surface hits the roof Lifting and jacking Lifting and jacking points on on-track machines shall comply with BS EN :2011 clause 6.3. Brackets used for re-railing shall either conform to the options given in pren 16404:2012 or if different to those choices the, brackets shall be carried on the on-track machine Access doors External on-track machine doors and their mountings shall withstand the following separate proof load cases without significant permanent deformation or loss of normal function: a) A concentrated perpendicular load of 2.5 kn applied over an area of 0.1 m x 0.1 m, acting from within the vehicle. The door structure shall be capable of withstanding this load at any position on the surface of the door. b) An external surface pressure load of 2.5 kpa. c) The inner surface pressure load of 2.5 kpa, applied over the internal surface of the door plus a concentrated perpendicular load, acting from within the vehicle, of 0.8 kn applied over an area of 0.1 m x 0.1 m. The structure shall be capable of withstanding the concentrated load at any position on the surface of the door External doors for use by personnel for access and egress directly from and to the track shall withstand as an ultimate load case a sustained pressure of 3 kpa over its internal surface. It is permissible for the door and associated components not to remain operational after the application of this load In addition, on-track machine personnel access doors shall comply with BS EN :2011 clause and clause 15.2 (second paragraph) Mechanical characteristics of glass (other than windscreens) All side windows shall comply with BS EN :2011 clause In this case 'safety' glass shall either be laminated or toughened glass Glass used in roofs shall comply with of this document Obstacle deflectors If a self-propelled on-track machine is designed with a maximum speed in excess of 145 km/h, it shall be fitted with obstacle deflectors that comply with Appendix B. 2.2 Track interaction and gauging Gauging The swept envelope of on-track machines in running mode shall be determined by the process set out in GM/RT2149. Page 8 of 25

9 When the on-track machine is in running mode, any equipment capable of moving outside its normal swept envelope shall comply with BS EN :2011 clause 5.2 and clause 15.2, fourth sentence. When in use, all retention devices of the equipment being retained shall withstand the foreseeable forces encountered during normal operation or accidental operation Pantographs shall not be deployable in running mode Axle load and wheel load Axle loads and track loading forces in running mode shall comply with BS EN :2011 clause 7.6 and GM/TT0088. Note: GE/RT8006 (which is referred to in BS EN 15528:2008 which itself is referred to in BS EN :2011 clause 7.6) sets out specific requirements for the assessment of compatibility between the static load characteristics of the on-track machine and the capacity of underline bridges to carry the vertical static and dynamic loads imposed by the on-track machine Parameters which influence ground based systems For the ability to actuate track circuits, axle-counters and treadles, on-track machines intended to self-propel outside possessions shall comply with BS EN :2011 clause 7.6 and clause 11. In addition the following standards shall apply to on-track machines where applicable: a) GE/RT8018. b) GE/RT8026. c) GE/RT8075. d) GE/RT8080. e) GK/RT0028. f) GK/RT0036. g) GK/RT0054. h) GM/RT There are special national conditions contained within BS EN :2011, Annex B. Two of the conditions mandate the use of GM/RT2185 and GM/RT2476, on-track machines are not required to comply with these special national conditions Dynamic behaviour Note: The on-track machine should be compatible with the signalling system for which it is intended to be operated. Consideration should be given to the need to fit ERTMS / ETCS, and where fitted it should comply with the requirements in RIS-0340-CCS On-track machines shall comply with BS EN :2011, clause 8. The acceptance criteria when carrying out simulation is also permitted to be as detailed in GM/RT2141 Appendix D Running gear Wheelsets fitted to on-track machines for use in running mode shall comply with GM/RT2466. Page 9 of 25

10 2.2.6 Minimum curve radius On-track machines, in running mode, shall be designed to negotiate a 500 m radius vertical curve Life guards On-track machines shall comply with BS EN :2011 clause Electro-magnetic compatibility On-track machines shall comply with BS EN :2011 clause Protection measures from electrical traction equipment 2.3 Braking General On-track machines shall comply with BS EN :2008+A1:2011 clause The brakes on on-track machines, in running mode and when working outside of a possession if designed for working at speeds greater than 30 km/h, shall comply with BS EN :2011 clause 9. The performance parameters shall be as set out in GM/RT2042 or GM/RT2043 as applicable Parking brake Note: BS EN :2011 clause and clause provides two special national conditions for the United Kingdom to comply with GM/RT Each on-track machine shall be fitted with a parking brake Any vehicle within an on-track machine, which is permitted to be coupled or uncoupled during normal operation, shall be fitted with a parking brake The parking brake shall comply with BS EN :2011 clause Brake data Brake force data shall be calculated in accordance with the requirements of GM/RT2040. Note: The brake force data is supplied to the Rolling Stock Library as set out in GM/RT Environmental conditions and aerodynamic effects Environmental conditions On-track machines shall comply with BS EN :2011 clause 16.1, clause 16.2 and clause Fuel tanks shall not be located ahead of a leading axle Aerodynamic effects On-track machines shall comply with the requirements of GM/RT On-track machines, with a maximum speed greater than 130 km/h, shall not generate a peak to peak pressure pulse from any part of the machine (including nose to nose connections) greater than 1.44 kpa. The peak to peak pressure pulse shall be measured in the open air on a calm day at height of maximum body width on the side of a stationary train on a straight stretch of adjacent track. Page 10 of 25

11 For on-track machines with a maximum speed greater than 130 km/h, the most likely maximum pressure loadings, including the transient pressure loadings caused by an on-track machine entering and passing through tunnels, shall be determined. These transient pressure loadings are affected by speed, length and aerodynamic characteristics of the on-track machine and by the tunnel geometry. An on-track machine shall sustain such loadings without damage or significant permanent deformation. 2.5 External lights and visible and audible warning devices External lights External lighting on on-track machines shall comply with BS EN :2011 clause 13.2 and BS EN :2009+A1:2011 clause Visible warning On-track machines shall comply with BS EN : Horn (audible warning device) Where intended for use in Great Britain (GB) only, on-track machines shall comply with GM/RT2484. On-track machines intended for international use shall comply with the horn sound pressure levels as set out in in BS EN : Traction and electrical equipment Traction drive systems Where provided, the traction drive system shall be capable of moving the on-track machine in both tare and fully laden conditions, independently of any external source of power, in a smooth and progressive manner between 'creep' and 'full' speed, without wheel spin, in normal adhesion conditions ( = 0.1) on level track Traction drive systems shall be arranged such that identical performance is obtainable in each direction No single point failure shall result in the unintentional movement of the on-track machine Traction drive systems designed for multiple working, where the leading on-track machine operates the system in a connected trailing on-track machine, shall be matched to comply with of this document Diesel engines used for traction On-track machines shall comply with BS EN :2011 clause Except where otherwise permitted by BS EN :2011 clause 16.4, the exhaust outlets shall be as shown in Figure 1. Page 11 of 25

12 Figure 1 Exhaust outlet Equipotential bonding On-track machines shall comply with BS EN :2011 clause Driver's cab and driver-machine interface Driver s cab The driver's cab shall be designed to accommodate, as a minimum, the driver and a second person Except as set out in , the second person's position shall comply with BS EN :2011 clause It is permissible for the second person's position not to have the capability to activate safety system controls. Page 12 of 25

13 For access to and egress from the driving cab(s), on-track machines shall comply with BS EN :2011 clause It is permissible to: a) Consider BS EN :2011 Annex E as an informative annex with regard to the dimensions given. b) Have a walkway headroom of less than 2000 mm as set out in RIS-1702-PLT clause The forward visibility shall comply with BS EN :2011 clause Where an on-track machine is not fitted with buffers, the distance in front of the on-track machine shall be taken from a plane 300 mm in front of the front of the on-track machine The interior layout of the driving cab shall comply with BS EN :2011 clause , clause 14.7 and clause 14.8, except that the direction of the power brake controls is permitted to be varied for compatibility with existing machines The driver's and second person's seats shall comply with BS EN :2009+A1:2011 clause The driver's cab heating, cooling and ventilation shall comply with BS EN :2011 clause The driver's cab internal lighting shall comply with BS EN :2011 clause All forward facing surfaces, except as set out in of this document, of on-track machines occupied by people shall have sufficient impact strength to resist penetration of a sharp cornered hollow steel cube having sides of 70 mm to 75 mm and a mass of 0.9 kg and travelling at twice the maximum operating speed of the on-track machine Windscreen The windscreen and forward facing windows in the driving cab and any compartment occupied when in running mode shall comply with BS EN :2011 clause Driver machine interface The controls in the driving cab shall comply with of this document and BS EN :2011 clause On-track machine drivers' cabs shall be designed to permit operation by a single driver The maximum noise level permitted in the cab is set out in the Conventional Rail Noise TSI (CR NOI TSI) The acoustic characteristics of the driving cabs shall be such that exploding detonators, as specified in BR 0640A, are heard inside the cab at any vehicle speed and readily distinguished from background noise Onboard tools and portable equipment Each driving cab shall be provided with the equipment set out in BS EN :2011 Annex J. Page 13 of 25

14 2.7.5 Recording device On-track machines with a driving cab shall be fitted with an on-train monitoring recorder (OTMR). The OTMR shall comply with GM/RT Fire safety and evacuation Fire safety and evacuation protection on on-track machines shall comply with BS EN :2008+A1:2011 clause 5.9. Note: BS EN :2008+A1:2011 clause 5.9 refers to the term 'operator', this means the driver when the on-track machine is in running mode The selection of materials used to construct machines shall comply with EN :2013. On-track machines shall correspond to operational category Design for rescue purposes To enable the safe removal of the machine clear of the line, failed on-track machines shall be capable of being coupled to a locomotive fitted with a drawhook that complies with BS EN 15566:2009+A1:2010 clause It shall be possible (where not prevented by damage to the brake system) to release and apply the brakes of the combined train when the assisted on-track machine is coupled to the assisting train or locomotive. The brake system shall be designed to apply the brakes in the event of the combined train parting Where the on-track machine is designed to be recovered by use of an emergency tow bar, then the emergency tow bar shall: a) Be carried on the on-track machine. b) Be designed to be fitted by one person. c) Accept the forces and movements involved in the recovery of the on-track machine, without significant permanent deformation or damage Where the on-track machine is designed to be recovered involving the use of special brake hoses, then the special brake hoses shall: a) Be carried on the on-track machine. b) Be designed to be fitted by one person It shall be possible to return the on-track machine to running mode in the event of failure of the primary power source. All equipment required for emergency stowage shall be supplied as part of the on-track machines tool kit, together with suitable provision for it to be carried on the machine Marking and registration On-track machines shall comply with the requirements for markings set out in BS EN :2011 clause 17 and BS EN :2009+A1:2011 clause On-track machines shall comply with the requirements for an overhead line equipment warning line set out in GM/RT On-track machines shall comply with GM/RT2453. Page 14 of 25

15 2.11 Demountable modules A demountable module shall be assessed as part of the on-track machine to all relevant parts of when any of the following apply: a) It has been manufactured or modified to suit the particular on-track machine or type of on-track machine. b) It is used to carry personnel during running or travelling. c) It is positioned on the on-track machine by other than gravity or twist locks. d) It has electrical, pneumatic or hydraulic connections to the on-track machine. e) It is connected to the on-track machine by twist locks and is used for lifting any load. f) It is connected to the on-track machine by twist locks and has moveable components which are able to exceed the gauge profile of the on-track machine. Page 15 of 25

16 Part 3 Documentation 3.1 Maintenance Maintenance documentation for on-track machines shall be provided and comply with GM/RT Operating instructions Operating instructions shall comply with BS EN :2011 Annex G, BS EN :2008+A1:2011 clause 7 and BS EN :2009+A1:2011 clause The operating instructions shall also include the following: a) The limiting value of track features for the coupling system, as set out in of this document. b) The limiting value of track features for the coupling and uncoupling action, as set out in of this document. c) Design operating conditions, as set out in of this document. d) The swept envelope of the on-track machine in running mode, as set out in of this document. e) The fitting instructions and any limitations on movement of the on-track machine and operation arising from the use of the emergency tow bar, as set out in of this document. f) The fitting instructions and any limitations on movement and operation of the on-track machine arising from the use of the special brake hoses or other connections, as set out in of this document. Page 16 of 25

17 Part 4 Application of this document 4.1 Application - infrastructure managers There are no requirements applicable to infrastructure managers. 4.2 Application - railway undertakings Scope The requirements of this document apply to all new on-track machines The requirements of this document apply to all modifications of on-track machines Where an on-track machine is subject to modification or upgrade and the nature of the modification or upgrade provides a reasonable opportunity to bring the on-track machine into conformity, then the requirements of this document applicable to the alteration apply Exclusions from scope There are no exclusions from the scope specified in for railway undertakings General compliance date for railway undertakings This comes into force and is to be complied with from 07 December 2013, except as specified in Where the dates specified in are later than the above date, this is to allow railway undertakings sufficient time to achieve compliance with the specified exceptions After the compliance dates, or the date by which compliance is achieved if earlier, railway undertakings are to maintain compliance with the requirements set out in this. Where it is considered not reasonably practicable to comply with the requirements, permission to comply with a specified alternative should be sought in accordance with the s Code Exceptions to general compliance date It is permissible for on-track machines to continue to be built to the standard in force at the time of signing a contract, where that contract has already been signed by the date of implementation of this standard. 4.3 Health and safety responsibilities Users of documents published by are reminded of the need to consider their own responsibilities to ensure health and safety at work and their own duties under health and safety legislation. does not warrant that compliance with all or any documents published by is sufficient in itself to ensure safe systems of work or operation or to satisfy such responsibilities or duties. Page 17 of 25

18 Appendix A Track Twist Geometry The content of this appendix is mandatory. Figure 2 Track twist geometry 1º = Long wave length track twist angle between running rails = 1:300 2º = Short wavelength track twist angle between running rails = 1:150 T = Semi-span of short wavelength discontinuity 6 m Note: The short wavelength discontinuity can occur at any position relative to the on-track machine as the on-track machine moves over it. Page 18 of 25

19 Appendix B Obstacle Deflectors The content of this appendix is mandatory. B.1 Technical requirements for obstacle deflectors B.1.1 Obstacle deflectors are fitted with the aim of minimising the risk of derailment in the event of a collision between the train and a large obstacle such as an animal or car on the track. B.1.2 B.1.3 B.1.4 B.1.5 Obstacle deflectors shall be fitted to all leading on-track machines with a maximum operational speed of 145 km/h or above, unless the axleload of the leading bogie is 170 kn or more, or if operation is exclusively on third-rail d.c. lines. For on-track machines with axleloads less than 170 kn, which operate only on third-rail d.c. lines, obstacle deflectors shall be fitted if the maximum operating speed is greater than 160 km/h. Obstacle deflectors shall be mounted on the on-track machine body structure and not on bogies. Where the maximum operational speed is greater than 160 km/h, the axleloads of the leading bogie of the leading on-track machine shall be at least 120 kn. An obstacle deflector shall: a) Be as wide as practicable within the on-track machine profile, extend as low as safely possible within the infrastructure clearances (GM/RT2149 sets out the clearances) and be angled symmetrically in plan view about the on-track machine centreline to produce an included angle of 160. b) Be vertical in elevation. A concave forward face, symmetrical about a horizontal axis, is permissible. c) Be able to resist as a proof load a static longitudinal force applied uniformly over the complete leading surface of the deflector of: i) 300 kn for a maximum operating speed of 145 km/h. ii) iii) iv) 375 kn for a maximum operating speed of 160 km/h. 450 kn for a maximum operating speed of 175 km/h. 600 kn for a maximum operating speed of 200 km/h and over. d) Be able to resist as a proof load a static longitudinal force, applied at any position along its bottom edge (distributed over a distance of 500 mm) of: i) 300 kn for a maximum operating speed of 145 km/h. ii) iii) iv) 375 kn for a maximum operating speed of 160 km/h. 450 kn for a maximum operating speed of 175 km/h. 600 kn for a maximum operating speed of 200 km/h and over. Page 19 of 25

20 e) For on-track machines with a maximum operating speed of 200 km/h or less, be designed so that progressive collapse starts at a static longitudinal force applied at any position along its bottom edge (distributed over a distance of 500 mm) of at least the appropriate value in B.1.4 d) and continues with a force of 80 % or more of this value over a longitudinal deflection of at least 150 mm. f) For on-track machines with a maximum operating speed of greater than 200 km/h up to and including 225 km/h, be designed so that progressive collapse starts at a static longitudinal force, applied at any position along its bottom edge (distributed over a distance of 500 mm) of at least the appropriate value in B.1.4 d) and continues so as to absorb at least: i) 100 kj over a longitudinal deflection of at least 150 mm. g) Be designed so that, if it is permanently deformed by an impact, no part of it shall foul the infrastructure or running gear or interfere with the operational performance of the bogie. B.1.6 The underneath of the on-track machine body, forward of the deflector, shall be designed so as not to impede the flow or ejection of debris from the deflector. Page 20 of 25

21 Appendix C List of s for which On-Track Machines are removed from scope The content of this appendix is for information purposes. C.1.1 From the publication of this standard, the following s do not apply to on-track machines: a) GE/RT8014. b) GE/RT8015. c) GM/RT2000. d) GM/RT2001. e) GM/RT2100. f) GM/RT2130. g) GM/RT2141. h) GM/RT2160. i) GM/RT2161. j) GM/RT2162. k) GM/RT2176. l) GM/RT2185. m) GM/RT2190. n) GM/RT2304. o) GM/RT2483. Page 21 of 25

22 Definitions Coupling system The mechanical system, including buffers where fitted, drawgear and gangway where fitted, that connects two rail vehicles together, and the electrical and pneumatic connections where fitted between vehicles. Drawgear A set of fittings used to connect railway vehicles for the purpose of transmitting longitudinal forces between adjacent vehicles, connection can be made manually or automatically. Driving Moving the on-track machine self-propelled in running mode. Driving cab The place from where the on-track machine is controlled for movement in running mode when self-propelled. Fixed formation Two or more on-track machines semi-permanently coupled and that can only be worked together. On-track machine Any rail-mounted machine, whose primary function is for the renewal, maintenance, inspection or measurement of the infrastructure. Operating instructions The instruction handbook provided by the manufacturer detailing the on-track machine design options and working instructions, including details of any operating restrictions. Running An on-track machine is considered to be in running mode when its suspension allows movement along the track, all moveable parts stowed within the applicable gauge and the on-track machine interacting with the signalling and control systems. Travelling An on-track machine is considered to be in travelling mode when its suspension allows movement along the working track, all moveable parts stowed within the applicable gauge, the machine does not require to interact with the signalling and control systems (in this condition there is no need to ensure operation of signalling systems or for cab based signalling equipment). An on-track machine in travelling mode does not need to meet the operational requirements for the movement of trains on the railway network Technical Specification for Interoperability (TSI) A TSI is a specification adopted in accordance with the European Interoperability Directive by which each subsystem or part subsystem is covered in order to meet the essential requirements and ensure the interoperability of the rail system. Working The use of an on-track machine to perform any of its permitted design tasks outside and inside of a possession. As soon as a machine is unpacked it is in working mode. Page 22 of 25

23 References The Catalogue of s gives the current issue number and status of documents published by. This information is also available from RGSC 01 RGSC 02 s Code The Standards Manual Documents referenced in the text s GE/RT8006 GE/RT8014 GE/RT8015 GE/RT8018 GE/RT8026 GE/RT8075 GE/RT8080 GE/RT8106 GE/RT8250 GE/RT8270 GK/RT0028 GK/RT0036 GK/RT0054 GM/RT2000 GM/RT2001 GM/RT2004 GM/RT2040 GM/RT2042 GM/RT2043 GM/RT2045 GM/RT2100 GM/RT2130 GM/RT2141 GM/RT2142 GM/RT2149 GM/RT2160 GM/RT2161 Assessment of Compatibility of Rail Vehicle Weights and Underline Bridges Axlebox Condition Monitoring - Hot Axlebox Detection Electromagnetic Compatibility between Railway Infrastructure and Trains Mechanical Trainstop Systems Safety Requirements for Cab Signalling Systems AWS and TPWS Interface Requirements Train Radio Systems for Voice and Related Messaging Communications Management of Safety Related Control, Command and Signalling (CCS) System Failures Reporting High Risk Defects Assessment of Compatibility of Rolling Stock and Infrastructure Infrastructure Based Train Detection Interface Requirements Transitions Between Signalling Systems Radio Electronic Token Block Engineering Acceptance of Rail Vehicles Design Scrutiny for the Engineering Acceptance of Rail Vehicles Rail Vehicle Maintenance Calculation of Brake Force Data for Rolling Stock Library Braking System Requirements and Performance for Traction Units Braking System and Performance for Freight Trains Braking Principles for Rail Vehicles Requirements for Rail Vehicle Structures Vehicle Fire, Safety and Evacuation Resistance of Railway Vehicles to Derailment and Roll- Over Resistance of Railway Vehicles to Roll-Over in Gales Requirements for Defining and Maintaining the Size of Railway Vehicles Environment Inside Railway Vehicles (Audibility of detonators) Requirements for Driving Cabs of Railway Vehicles Page 23 of 25

24 GM/RT2162 GM/RT2176 GM/RT2181 GM/RT2185 GM/RT2190 GM/RT2273 GM/RT2304 GM/RT2453 GM/RT2461 GM/RT2466 GM/RT2472 GM/RT2476 GM/RT2483 GM/RT2484 GM/TT0088 documents GM/GN2575 GM/GN2576 RIS-0340-CCS RIS-1702-PLT Traincrew Access to and Egress from Railway Vehicles Air Quality and Lighting Environment for Traincrew Inside Railway Vehicles Overhead Line Equipment (O.L.E.) Warning Line on Traction and Rolling Stock Train Safety Systems Compatibility Requirements for Rail Vehicle Couplings and Interconnectors Post Incident and Post Accident Testing of Rail Vehicles Equipotential Bonding of Rail Vehicles to Running Rail Potential Registration, Identification and Data to be Displayed on Rail Vehicles Sanding Equipment Fitted to Multiple Units and On-Track Machines Railway Wheelsets Data Recorders on Trains - Design Requirements On-Track Machine Requirements for Demonstrating the Reliable Operation of Track Circuits Visibility Requirements for Trains Audibility Requirements for Trains Permissible Track Forces for Railway Vehicles Guidance on the Engineering Acceptance of On-Track Machines Guidance on Vehicle Requirements for Reliable Track Circuit Operation Rail Industry Standard for Onboard ETCS Rail Industry Standard for the Design of On-Track Machines in Working and Travelling s Other references BR 0640A BS EN :2010 BS EN 13749:2011 Specification for Railway Detonators, Single Chamber Type for Hand or Machine Placing (1964) Railway applications Structural requirements of railway vehicle bodies, Part 1: Locomotives and passenger rolling stock (and alternative method for freight wagons) Railway applications - Wheelsets and bogies - Method of specifying the structural requirements of bogie frames BS EN :2011 Railway applications - Track - Railbound construction and maintenance machines - Part 1: Technical requirements for running BS EN :2008+A1:2011 Railway applications - Track Railbound construction and maintenance machines, Part 2: Technical requirements for working BS EN :2009+A1:2011 Railway applications - Track Railbound construction and maintenance machines, Part 3: General safety requirements Page 24 of 25

25 BS EN :2013 BS EN :2013 BS EN 15528:2008 BS EN 15566:2009+A1:2010 CR LOC & PAS TSI CR NOI TSI EN :2013 Railway applications - External visible and audible warning devices for high speed trains - Part 1: Head, marker and tail lamps Railway applications - External visible and audible warning devices for high speed trains - Part 2: Warning horns Railway applications Line categories for managing the interface between load limits of vehicles and infrastructure Railway applications - Railway rolling stock - Draw gear and screw coupling Conventional Rail Locomotives and Passenger Rolling Stock TSI Decision 2011/291/EU, (OJ L139/1, , p1) Conventional Rail Noise Aspects of Conventional Rolling Stock TSI, Decision 2006/66/EC, (OJ L37, , p1) Railway applications - Fire protection on railway vehicles Part 2: Requirements for fire behavior of materials and components pren 16404:2012 Railway Applications - Re-railing and recovery requirements for railway vehicles S.I.2008/1597 The Supply of Machinery (Safety) Regulations 2008 Page 25 of 25

Track Circuit Assister Configuration for Rail Vehicles

Track Circuit Assister Configuration for Rail Vehicles Track Circuit Assister Configuration for Rail Synopsis This Standard mandates where TCAs shall be fitted onto a vehicle and how they shall be set up. It also contains the requirements for testing a TCA.

More information

National technical rules for vehicles Related Control Command and Signalling Requirements

National technical rules for vehicles Related Control Command and Signalling Requirements National technical rules for vehicles Related Control Command and Signalling Requirements Note: Relevant TSI is Control, Command and Signalling (Commission Regulation (EU) 2016/919 of 27 May 2016 - which

More information

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001 Train Safety Systems Synopsis This document defines the requirements for train safety systems to enable safe operation of trains on Railtrack controlled infrastructure. Signatures removed from electronic

More information

Rail Industry Standard for the Design of On- Track Machines in Travelling and Working Modes

Rail Industry Standard for the Design of On- Track Machines in Travelling and Working Modes Supersedes Iss 1 with effect from 01/09/2018 for the Design of On- Track Machines in Travelling and Working Modes Synopsis This document sets out requirements and guidance for the application of the BS

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 26.5.2011 Official Journal of the European Union L 139/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 26 April 2011 concerning a technical specification for interoperability relating to the

More information

Requirements for the Application of Standard Vehicle Gauges

Requirements for the Application of Standard Vehicle Gauges Synopsis This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure. [This document contains one or more pages which contain colour] Copyright

More information

Structural Requirements For Drawgear And Buffers On Railway Vehicles

Structural Requirements For Drawgear And Buffers On Railway Vehicles Structural Requirements For Drawgear And Buffers On Railway Vehicles Submitted by D. Boocock Nominated Responsible Manager Synopsis This standard prescribes the strength requirements for drawgear and buffers

More information

GM/RC2532. Recommendations for Rail Vehicle Emergency and Safety Equipment. Uncontrolled When Printed. Railway Group Recommendations for GM/RT2130

GM/RC2532. Recommendations for Rail Vehicle Emergency and Safety Equipment. Uncontrolled When Printed. Railway Group Recommendations for GM/RT2130 RC Published by Rail Safety and Standards Board Evergreen House 160 Euston Road London NW1 2DX Copyright 2008 Rail Safety and Standards Board Limited GM/RC2532 Issue One: June 2008 Railway Group Recommendations

More information

Standards Manager Web Standards List RSSB-Rail Safety and Standards Board

Standards Manager Web Standards List RSSB-Rail Safety and Standards Board Standards Manager Web Standards List RSSB-Rail Safety and Standards Board Id Number Title Year Organization Page GERT80 Iss ERTMS/ETCS DMI National Requirements 06 RSSB 0 GIGN7608 Iss Guidance on the Infrastructure

More information

Requirements for the Application of Standard Vehicle Gauges

Requirements for the Application of Standard Vehicle Gauges Requirements for the Application of Standard Vehicle Gauges Synopsis This defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure. This document contains

More information

Requirements for the Application of Standard Vehicle Gauges

Requirements for the Application of Standard Vehicle Gauges Requirements for the Application of Standard Vehicle Gauges Synopsis This Railway Group Standard defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure.

More information

Mechanical Trainstop Systems

Mechanical Trainstop Systems Mechanical Trainstop Systems Synopsis This document defines the functional requirements for mechanical trainstop systems and the requirements relating to their use on both track and trains. Signatures

More information

Equipotential Bonding of Rail Vehicles to Running Rail Potential

Equipotential Bonding of Rail Vehicles to Running Rail Potential Railway Group Standard Equipotential Bonding of Rail Vehicles to Running Rail Potential Synopsis This standard mandates the requirements for equipotenial bonding of rail vehicles to comply with the Electricity

More information

Permissible Track Forces for Railway Vehicles

Permissible Track Forces for Railway Vehicles British Railways Board Page 1 of 11 Part A Synopsis This document prescribes design and maintenance requirements for traction and rolling stock and for on track plant to ensure that interactive forces

More information

Lineside Signal Spacing and Speed Signage

Lineside Signal Spacing and Speed Signage Document comes into force and supersedes GKRT0075 Iss 3 on 05/12/15 With effect from 03/03/18 parts of this document have been superseded by Date September 15 Lineside Signal Spacing and Speed Synopsis

More information

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0

EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 006REC1025 V 1.0 Annex 1: Amendments to the technical specification for interoperability relating to the rolling stock locomotives and passenger rolling stock subsystem of the rail system in the European Union (Annex to

More information

English version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface

English version of. Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr af 30. november 2012) Preface English version of Executive Order on vehicles' technical compatibility with the rail network (Bekendtgørelse nr. 1127 af 30. november 2012) Preface Please note that the English version is for informational

More information

Compatibility Requirements for Braking Systems of Rail Vehicles

Compatibility Requirements for Braking Systems of Rail Vehicles GMRT2043 Iss 2, GMRT2044 Iss 4, Iss 3, GMRT2046 Iss 1, GMGN2615 Iss 1 (G 2.1.83 to G 2.1.132 inclusive) Compatibility Requirements for Braking Systems of Rail Synopsis This document defines the compatibility

More information

Controlling the Speed of Tilting Trains Through Curves

Controlling the Speed of Tilting Trains Through Curves Controlling the Speed of Tilting Trains Through Curves Synopsis This document mandates the means by which Tilting Trains may be operated at higher speeds than nontilting trains around curves. Signatures

More information

Risk Management of Rail Vehicle Axle Bearings

Risk Management of Rail Vehicle Axle Bearings Railway Group Standard Risk Management of Rail Vehicle Axle Bearings Synopsis This Railway Group Standard mandates that there shall be riskbased processes to minimise and detect failures of rail vehicle

More information

Interface between Rail Vehicle Weights and Underline Bridges

Interface between Rail Vehicle Weights and Underline Bridges Interface between Rail Vehicle Weights and Synopsis This document sets out the requirements for managing the risk of overloading of underline bridges by rail vehicles Submitted by Signatures removed from

More information

Official Journal L 104. of the European Union. Legislation. Non-legislative acts. Volume April English edition. Contents REGULATIONS

Official Journal L 104. of the European Union. Legislation. Non-legislative acts. Volume April English edition. Contents REGULATIONS Official Journal of the European Union ISSN 1977-0677 L 104 English edition Legislation Volume 56 12 April 2013 Contents II Non-legislative acts REGULATIONS Commission Regulation (EU) No 321/2013 of 13

More information

Rolling Stock Subsystem and Interfaces to AC Energy Subsystem

Rolling Stock Subsystem and Interfaces to AC Energy Subsystem Rolling Stock and Interfaces to AC Energy Synopsis This document defines the interface requirements to the AC energy system for all rolling stock operating over the AC electrified railway. Copyright in

More information

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998 Rapid Response Railway Group Standard Lineside Signal Spacing Synopsis This Standard specifies the minimum distance that must be provided between the first signal displaying a cautionary aspect and the

More information

Railway Wheelsets. Railway Group Standard GMRT2466 Issue: Four Date: December 2017

Railway Wheelsets. Railway Group Standard GMRT2466 Issue: Four Date: December 2017 Supersedes Iss 3 (in part) with effect from 03/03/2018 Synopsis This document sets out requirements for the design, manufacture and maintenance of wheelsets and their components. Copyright in the Railway

More information

Compatibility Between Electric Trains and Electrification Systems

Compatibility Between Electric Trains and Electrification Systems Compatibility Between Electric Trains and Electrification Systems Synopsis Process for managing change that affects the compatibility between electric trains and electrification systems Submitted by Signatures

More information

INTEROPERABILITY UNIT UNION RAIL SYSTEM SUBSYSTEM ROLLING STOCK TSI LOCOMOTIVES AND PASSENGER RST

INTEROPERABILITY UNIT UNION RAIL SYSTEM SUBSYSTEM ROLLING STOCK TSI LOCOMOTIVES AND PASSENGER RST INTEROPERABILITY UNIT UNION RAIL SYSTEM SUBSYSTEM ROLLING STOCK TSI LOCOMOTIVES AND PASSENGER RST Reference IU-LOC_ PAS_TSI Document type Technical Specification for Interoperability Version 1.0 Status

More information

POSITION PAPER Version 3.0

POSITION PAPER Version 3.0 POSITION PAPER Version 3.0 Revision of the Technical Specification for Interoperability / Energy (ENE) Brussels, September 26 th, 2012 1. REFERENCE DOCUMENT UNION RAIL SYSTEM - SUBSYSTEM Energy - TSI Energy

More information

Resistance of Railway Vehicles to Derailment and Roll-Over

Resistance of Railway Vehicles to Derailment and Roll-Over Resistance of Railway Vehicles to Derailment and Roll-Over Synopsis This document mandates requirements for rolling stock to ensure acceptable resistance against flange climbing derailment and against

More information

(Text with EEA relevance)

(Text with EEA relevance) L 150/10 COMMISSION REGULATION (EU) 2015/924 of 8 June 2015 amending Regulation (EU) No 321/2013 concerning the technical specification for interoperability relating to the rolling stock freight wagons

More information

Acceptance of Trams and Light Rail or Metro Vehicles for Shared Running on Railtrack Controlled Infrastructure

Acceptance of Trams and Light Rail or Metro Vehicles for Shared Running on Railtrack Controlled Infrastructure Acceptance of Trams and Light Rail or Metro Vehicles for Shared Running on Railtrack Controlled Infrastructure Synopsis This Standard defines the mandatory requirements for trams, light rail or metro vehicles

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 14.5.2011 Official Journal of the European Union L 126/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 26 April 2011 concerning a technical specification for interoperability relating to the

More information

(Text with EEA relevance)

(Text with EEA relevance) L 356/228 12.12.2014 COMMISSION REGULATION (EU) No 1302/2014 of 18 November 2014 concerning a technical specification for interoperability relating to the rolling stock locomotives and passenger rolling

More information

Low Voltage Power Supplies in Electrified Areas

Low Voltage Power Supplies in Electrified Areas Low Voltage Power Supplies in Electrified Areas Synopsis This document mandates requirements for control of return and stray currents and the management of earthing for low voltage power supplies in electrified

More information

Guidance on the Energy TSI

Guidance on the Energy TSI Rail Industry Guidance on the Energy TSI Synopsis This document gives guidance on interpreting the requirements of the Energy Technical Specification for Interoperability 2014 (), Commission Regulation

More information

European Railway Agency

European Railway Agency European Railway Agency INTEROPERABILITY UNIT REVISION OF THE WAGON TSI TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM SUBSYSTEM ROLLING STOCK TSI WAGON Reference: Document type: Technical specifications for

More information

Applicable standards in HS Infrastructure subsystem TSI (2008/217/EC)

Applicable standards in HS Infrastructure subsystem TSI (2008/217/EC) Applicable standards in HS Infrastructure subsystem TSI (2008/217/EC) ERA 1.0 Page 1/8 Standards or other documents referred to in the HS infrastructure TSI (and therefore mandatory) TSI Sections Characteristics

More information

Council of the European Union Brussels, 18 July 2014 (OR. en)

Council of the European Union Brussels, 18 July 2014 (OR. en) Council of the European Union Brussels, 18 July 2014 (OR. en) 11932/14 ADD 1 TRANS 367 COVER NOTE From: European Commission date of receipt: 9 July 2014 To: General Secretariat of the Council No. Cion

More information

Branding of Wheels,Tyres and Axles

Branding of Wheels,Tyres and Axles Branding of Wheels,Tyres and Axles Signatures removed from electronic version Submitted by G A Clayton Nominated Responsible Manager Synopsis This standard details the branding requirements for all wheels,

More information

APTU Uniform Rules (Appendix F to COTIF 1999) Uniform Technical Prescriptions (UTP) applicable to the Rolling Stock subsystem:

APTU Uniform Rules (Appendix F to COTIF 1999) Uniform Technical Prescriptions (UTP) applicable to the Rolling Stock subsystem: LOCOMOTIVES AND PASSENGER Page 1 of 224 APTU Uniform Rules (Appendix F to COTIF 1999) Uniform Technical Prescriptions () applicable to the Rolling Stock subsystem: LOCOMOTIVES AND PASSENGER - ( LOC&PAS)

More information

Railway Wheelsets. Railway Group Standard. GM/RT2466 Issue Three Date February 2010

Railway Wheelsets. Railway Group Standard. GM/RT2466 Issue Three Date February 2010 Superseded in part by GMRT2466 Iss 4 and RIS-2766-RST Iss 1 Railway Group Standard Synopsis This document mandates requirements for the design, manufacture and maintenance of wheelsets and their components.

More information

Interoperability TSIs applicable to Railway vehicles. Innotrans, September, 2010

Interoperability TSIs applicable to Railway vehicles. Innotrans, September, 2010 Interoperability TSIs applicable to Railway vehicles Innotrans, 21-24 September, 2010 1. Purpose of the presentation 2. Geographical scope (Directives and TSIs) 3. Technical scope of TSIs 4. TSIs applicable

More information

GO/GN3637. Guidance on Defective On-Train Equipment. Rail Industry Guidance Note for GO/RT3437. Published by: RSSB

GO/GN3637. Guidance on Defective On-Train Equipment. Rail Industry Guidance Note for GO/RT3437. Published by: RSSB GN Published by: Copyright 2015 Rail Safety and Standards Board Limited GO/GN3637 Guidance on Defective On-Train Equipment Issue Two September 2015 Rail Industry Guidance Note for GO/RT3437 Issue record

More information

GM/GN2687. Guidance on Rail Vehicle Interior Structure and Secondary Structural. Elements

GM/GN2687. Guidance on Rail Vehicle Interior Structure and Secondary Structural. Elements GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2010 Rail Safety and Standards Board Limited GM/GN2687 Structural Elements Issue One: December 2010 Rail Industry Guidance

More information

Council of the European Union Brussels, 18 July 2014 (OR. en)

Council of the European Union Brussels, 18 July 2014 (OR. en) Council of the European Union Brussels, 18 July 2014 (OR. en) 11933/14 ADD 1 TRANS 368 COVER NOTE From: European Commission date of receipt: 9 July 2014 To: General Secretariat of the Council No. Cion

More information

Control, Safe Use and Operation of Road-Rail Plant

Control, Safe Use and Operation of Road-Rail Plant Control, Safe Use and Operation of Page 1 of 13 Part A Synopsis A Standard detailing the requirements for the control, safe use and operation of road-rail plant in the railway environment. Approval and

More information

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Page 1 of 14 Part A Synopsis A standard detailing the requirements for the control, safe use and operation of excavators,

More information

GM/RC2641. Recommendations for Vehicle Static Testing. Railway Group Recommendations for GM/RT2141. Uncontrolled When Printed.

GM/RC2641. Recommendations for Vehicle Static Testing. Railway Group Recommendations for GM/RT2141. Uncontrolled When Printed. RC Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2009 Rail Safety and Standards Board Limited GM/RC2641 Issue Two: June 2009 Railway Group Recommendations for GM/RT2141 Issue

More information

ZWISCHENSTAATLICHE ORGANISATION FÜR DEN INTERNATIONALEN EISENBAHNVERKEHR INTERGOVERNMENTAL ORGANISATION FOR INTERNATIONAL CARRIAGE BY RAIL

ZWISCHENSTAATLICHE ORGANISATION FÜR DEN INTERNATIONALEN EISENBAHNVERKEHR INTERGOVERNMENTAL ORGANISATION FOR INTERNATIONAL CARRIAGE BY RAIL ORGANISATION INTERGOUVERNEMENTALE POUR LES TRANSPORTS INTERNATIONAUX FERROVIAIRES ZWISCHENSTAATLICHE ORGANISATION FÜR DEN INTERNATIONALEN EISENBAHNVERKEHR OTIF INTERGOVERNMENTAL ORGANISATION FOR INTERNATIONAL

More information

EXTRACT of chapter XXXIV coupling devices (version of ) ANNEX XXXIV Requirements on mechanical couplings

EXTRACT of chapter XXXIV coupling devices (version of ) ANNEX XXXIV Requirements on mechanical couplings EXTRACT of chapter XXXIV coupling devices (version of 18.09.2013) ANNEX XXXIV Requirements on mechanical couplings Definitions specific to this Annex Mechanical coupling between tractor and towed vehicle

More information

Common position by FR and CEMA on mechanical couplings for towed vehicles 28/9/2015

Common position by FR and CEMA on mechanical couplings for towed vehicles 28/9/2015 Common position by FR and CEMA on mechanical couplings for towed vehicles 28/9/2015 ANNEX XXXIV Requirements on mechanical couplings 1. Definitions For the purposes of this Annex: 1.1. Mechanical coupling

More information

Resistance of Railway Vehicles to Overturning in Gales

Resistance of Railway Vehicles to Overturning in Gales Resistance of Railway Vehicles to Overturning in Gales Signatures removed from electronic version Submitted by D. Boocock Nominated Responsible Manager Approved by J. R. Mitchell Chairman, Traction and

More information

OTIF. Uniform Technical Prescription UTP LOC&PAS Applicable to the Rolling Stock subsystem: LOCOMOTIVES AND PASSENGER ROLLING STOCK

OTIF. Uniform Technical Prescription UTP LOC&PAS Applicable to the Rolling Stock subsystem: LOCOMOTIVES AND PASSENGER ROLLING STOCK ORGANISATION INTERGOUVERNEMENTALE POUR LES TRANSPORTS INTERNATIONAUX FERROVIAIRES ZWISCHENSTAATLICHE ORGANISATION FÜR DEN INTERNATIONALEN EISENBAHNVERKEHR OTIF INTERGOVERNMENTAL ORGANISATION FOR INTERNATIONAL

More information

INTEROPERABILITY UNIT TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM SUBSYSTEM ENERGY

INTEROPERABILITY UNIT TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM SUBSYSTEM ENERGY INTEROPERABILITY UNIT TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM SUBSYSTEM ENERGY Reference: IU-ENE-071221-TSI 2.1 Document Type: Version: Title: 2.1 - Draft Technical Specification of Interoperability Preliminary

More information

Preparation and movement of trains Defective or isolated vehicles and on-train equipment Issue 7

Preparation and movement of trains Defective or isolated vehicles and on-train equipment Issue 7 GERT8000-TW5 Rule Book Module TW5 Preparation and movement of trains Defective or isolated vehicles and on-train equipment Issue 7 September 2016 Comes into force 03 December 2016 Published by: RSSB The

More information

Discipline: Engineering (Track & Civil) Category: Code of Practice. Clearances. Section 7. Applicability. ARTC Network wide.

Discipline: Engineering (Track & Civil) Category: Code of Practice. Clearances. Section 7. Applicability. ARTC Network wide. Discipline: Engineering (Track & Civil) Category: Code Practice Clearances Section 7 Applicability ARTC Network wide Primary Source Document Status Version Date Reviewed Prepared by Reviewed by Endorsed

More information

TOPAS 2130A (Draft v3)

TOPAS 2130A (Draft v3) TOPAS 2130A (Draft v3) Revision Date Scope Authorised by A (v1) 10/10/17 Draft A (v2) 11/11/17 Draft A (v3) 15/12/17 Draft Traffic Open Products And Specifications Limited 2017. This document is the property

More information

SECTION 11 INTERMODAL EQUIPMENT

SECTION 11 INTERMODAL EQUIPMENT SECTION 11 INTERMODAL EQUIPMENT ROA MANUAL SCHEDULE OF AMENDMENTS SECTION 11 AMENDMENT NUMBER PAGES AMENDED AMENDMENT SUMMARY DATE ISSUED TABLE OF CONTENTS Section Description Page No. 11.1 SCOPE... 11-1

More information

DRAFT RECOMMENDATION N. 006REC1072

DRAFT RECOMMENDATION N. 006REC1072 Making the railway system work better for society. DRAFT RECOMMENDATION N. 006REC1072 OF THE EUROPEAN UNION AGENCY FOR RAILWAYS ON The amendment of Commission Regulation (EU) No 1304/2014 concerning the

More information

SECTION 8 RAIL FREIGHT VEHICLE UNDERFRAME AND BODY STRUCTURES

SECTION 8 RAIL FREIGHT VEHICLE UNDERFRAME AND BODY STRUCTURES SECTION 8 RAIL FREIGHT VEHICLE UNDERFRAME AND BODY STRUCTURES ROA MANUAL SCHEDULE OF AMENDMENTS SECTION 8 AMENDMENT NUMBER PAGES AMENDED AMENDMENT SUMMARY DATE ISSUED Portions of this Section of the ROA

More information

Terminology. Glossary of Railway. Glossary of Railway Terminology

Terminology. Glossary of Railway. Glossary of Railway Terminology Glossary of Railway Terminology Glossary of Railway Terminology Glossary of Railway Terminology Issue 1 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents approved

More information

INFORMATIVE TRANSLATION OF EXECUTIVE ORDER no 1465, DATED 5 DECEMBER 2016

INFORMATIVE TRANSLATION OF EXECUTIVE ORDER no 1465, DATED 5 DECEMBER 2016 INFORMATIVE TRANSLATION OF EXECUTIVE ORDER no 1465, DATED 5 DECEMBER 2016 Please note that this English version is for informational purposes only. Where the wording in the Danish and English versions

More information

OTIF OTIF. Guide for the application of the UTP LOC&PAS ORGANISATION INTERGOUVERNEMENTALE POUR LES TRANSPORTS INTERNATIONAUX FERROVIAIRES

OTIF OTIF. Guide for the application of the UTP LOC&PAS ORGANISATION INTERGOUVERNEMENTALE POUR LES TRANSPORTS INTERNATIONAUX FERROVIAIRES OTIF ORGANISATION INTERGOUVERNEMENTALE POUR LES TRANSPORTS INTERNATIONAUX FERROVIAIRES ZWISCHENSTAATLICHE ORGANISATION FÜR DEN INTERNATIONALEN EISENBAHNVERKEHR INTERGOVERNMENTAL ORGANISATION FOR INTERNATIONAL

More information

Freight Gauge Nuances. Presented by Martin Osman 4 th November 2015

Freight Gauge Nuances. Presented by Martin Osman 4 th November 2015 Freight Gauge Nuances Presented by Martin Osman 4 th November 2015 Introduction What s new in the field of freight gauging? Established or Benchmark suspension Standard Vehicle Gauge Data sheets (SVGD)

More information

Issue 8. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book

Issue 8. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book GERT8000-TW5 Rule Book Preparation and movement of trains: Defective or isolated vehicles and on-train equipment Issue 8 Module TW5 September 2017 Comes into force 02 December 2017 Conventions used in

More information

Official Journal of the European Union

Official Journal of the European Union L 140/8 COMMISSION DELEGATED REGULATION (EU) 2018/829 of 15 February 2018 amending and correcting Delegated Regulation (EU) 2015/208 supplementing Regulation (EU) No 167/2013 of the European Parliament

More information

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2 3 ELECTRIC TRACTION SYSTEMS 2 3.1. SAFE FOR PEOPLE 2 3.1.1. Electric Traction System 2 3.1.2. Protection against unwanted access 2 3.1.3. Fencing 2 3.1.4. On bridges and other structures 2 3.1.5. At level

More information

Issue 9. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book

Issue 9. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book GERT8000-TW5 Rule Book Preparation and movement of trains: Defective or isolated vehicles and on-train equipment Issue 9 Module TW5 September 2018 Comes into force 01 December 2018 Conventions used in

More information

Handbook 11. Issue 6. Duties of the person in charge of the possession (PICOP) GERT8000-HB11 Rule Book

Handbook 11. Issue 6. Duties of the person in charge of the possession (PICOP) GERT8000-HB11 Rule Book GERT8000-HB11 Rule Book Duties of the person in charge of the possession (PICOP) Issue 6 September 2017 Comes into force 02 December 2017 Handbook 11 Uncontrolled when printed Published by: RSSB The authoritative

More information

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015 GE/RT8000/SP Rule Book Module SP Speeds Issue 5 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk/rgsonline Contents

More information

Application Guide for the European Register of Authorised Types of Railway Vehicles (ERATV)

Application Guide for the European Register of Authorised Types of Railway Vehicles (ERATV) European Railway Agency Application Guide for the European Register of Authorised Types of Railway Vehicles () According to Article 5(1) of Commission Implementing Decision 2011/665/EU Reference in ERA:

More information

GK/GN0644. Guidance on Permissive Working. Rail Industry Guidance Note for GK/RT0044

GK/GN0644. Guidance on Permissive Working. Rail Industry Guidance Note for GK/RT0044 GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GK/GN0644 Issue Two December 2014 Rail Industry Guidance Note for GK/RT0044

More information

E/ECE/324/Rev.1/Add.57/Rev.3 E/ECE/TRANS/505/Rev.1/Add.57/Rev.3

E/ECE/324/Rev.1/Add.57/Rev.3 E/ECE/TRANS/505/Rev.1/Add.57/Rev.3 30 November 2017 Agreement Concerning the Adoption of Harmonized Technical United Nations Regulations for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and

More information

2. Test Centre VUZ Velim Cerhenice

2. Test Centre VUZ Velim Cerhenice Testing laboratory locations: 1. Testing Laboratory (Not carrying out the tests) Novodvorská 1698, 142 01 Praha 4 - Braník 2. Test Centre VUZ Velim 281 02 Cerhenice The Laboratory is qualified to update

More information

SOUTH AFRICAN NATIONAL STANDARD. Plug and socket-outlet systems for household and similar purposes for use in South Africa

SOUTH AFRICAN NATIONAL STANDARD. Plug and socket-outlet systems for household and similar purposes for use in South Africa ISBN 978-0-626-27016-2 SANS 164-1:2012 SOUTH AFRICAN NATIONAL STANDARD Plug and socket-outlet systems for household and similar purposes for use in South Africa Part 1: Conventional system, 16 A 250 V

More information

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB15 Iss 2 published on 01/09/2012

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB15 Iss 2 published on 01/09/2012 GE/RT8000/HB15 Rule Book Handbook 15 Duties of the machine controller (MC) and on-track plant operator Handbook 15 Issue 1 Valid from June 2011 Published by: RSSB Block 2 Angel Square 1 Torrens Street

More information

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book GERT8000-HB15 Rule Book Duties of the machine controller (MC) and ontrack plant operator Handbook 15 Issue 5 September 2017 Comes into force 02 December 2017 Published by: RSSB The authoritative version

More information

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Official Journal of the European Union. (Non-legislative acts) REGULATIONS 10.1.2019 L 8 I/1 II (Non-legislative acts) REGULATIONS REGULATION (EU) 2019/26 OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 8 January 2019 complementing Union type-approval legislation with regard to

More information

Signing of Permissible Speeds and Speed Restrictions

Signing of Permissible Speeds and Speed Restrictions Document to be withdrawn as of 04/06/11 Railway Group Standard published on 05/03/11 Date December 00 Signing of Permissible Speeds and Speed Restrictions Synopsis This document defines the principles

More information

RIS RIS-1701-PLT. Rail Industry Standard for Portable and Transportable Plant Used for. Infrastructure Work Issue 1 October 2008

RIS RIS-1701-PLT. Rail Industry Standard for Portable and Transportable Plant Used for. Infrastructure Work Issue 1 October 2008 RIS This document is a voluntary standard, produced by RSSB at the request of the industry. Duty holders may choose to mandate it through internal instructions/procedures or contract conditions. Published

More information

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3.

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3. GE/RT8000/DC Rule Book Module DC DC electrified lines Issue 3 March 2014 Comes into force 07 June 2014 Conventions used in the Rule Book Example A black line in the margin indicates a change to that rule

More information

Control, Safe Use and Operation of Forklift Trucks and Sideloaders

Control, Safe Use and Operation of Forklift Trucks and Sideloaders Control, Safe Use and Operation of Forklift Trucks and Sideloaders British Railways Board Page 1 of 12 Part A Synopsis A standard detailing the requirements for control, safe use and operation of forklift

More information

QUESTION / CLARIFICATION

QUESTION / CLARIFICATION QUESTION / CLARIFICATION CO-ORDINATION BETWEEN NOTIFIED BODIES INTEROPERABILITY DIRECTIVE AND SUBSEQUENT AMENDMENTS ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE UNION QC-RST-020 Issue 02 Date:

More information

Preparation and movement of trains

Preparation and movement of trains GERT8000-TW1 Rule Book Uncontrolled When Printed Preparation and movement of trains Issue 11 Module TW1 September 2016 Comes into force 03 December 2016 Published by: RSSB The authoritative version of

More information

Draft for comments only Not to be cited as East African Standard

Draft for comments only Not to be cited as East African Standard EAST AFRICAN STANDARD CD/K/021:2008 ICS 43.040.50 Motor vehicle safety Steering mechanism of motor vehicles (Category M 1 only) Behaviour on impact EAST AFRICAN COMMUNITY EAC 2010 First Edition 2010 CD/K/021:2008

More information

Module T11. Movement of engineering trains and on-track plant under T3 arrangements. GE/RT8000/T11 Rule Book. Issue 2.

Module T11. Movement of engineering trains and on-track plant under T3 arrangements. GE/RT8000/T11 Rule Book. Issue 2. GE/RT8000/T11 Rule Book Module T11 Movement of engineering trains and on-track plant under T3 arrangements Issue 2 January 2007 Comes into force 02 June 2007 Issue Date Comments Comes into force 1 June

More information

ECOMP.3.A EUROPEAN UNION. Brussels, 12 December 2018 (OR. en) 2018/0220 (COD) PE-CONS 67/18 ENT 229 MI 914 ENV 837 AGRI 596 PREP-BXT 58 CODEC 2164

ECOMP.3.A EUROPEAN UNION. Brussels, 12 December 2018 (OR. en) 2018/0220 (COD) PE-CONS 67/18 ENT 229 MI 914 ENV 837 AGRI 596 PREP-BXT 58 CODEC 2164 EUROPEAN UNION THE EUROPEAN PARLIAMT THE COUNCIL Brussels, 12 December 2018 (OR. en) 2018/0220 (COD) PE-CONS 67/18 T 229 MI 914 V 837 AGRI 596 PREP-BXT 58 CODEC 2164 LEGISLATIVE ACTS AND OTHER INSTRUMTS

More information

Minimum Operating Standards for. Rolling Stock WOS 01

Minimum Operating Standards for. Rolling Stock WOS 01 Discipline Engineering Standard Category Rolling Stock Minimum Operating Standards for Rolling Stock WOS 01 Applicability ARTC Network wide New South Wales Western Jurisdiction Victoria Primary Source

More information

Rail Safety and Standards Board

Rail Safety and Standards Board Rail Safety and Standards Board Certificate of Derogation from a Railway Group Standard (under 8.3 of the Railway Group Standards Code) Derogation Number: Applicant: Subject Matter of Derogation: RGS Number:

More information

Certificate of Acceptance

Certificate of Acceptance HILTI TE6, TE7 and TE30 36 volt hand drills Product Description Product Image TE6, TE7 and TE30 36 volt hand drills TE6 and TE7 are existing Hilti drilling units to be replaced, through continued renewals

More information

Issue 4. Glossary of Railway Terminology. Glossary of Railway. Terminology

Issue 4. Glossary of Railway Terminology. Glossary of Railway. Terminology Glossary of Railway Terminology Issue 4 Glossary of Railway Terminology December 2017 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved by Traffic

More information

GM/RC2495. Recommendations for Railway Wheelset Manufacture and Assembly. Railway Group Recommendations for GM/RT2466.

GM/RC2495. Recommendations for Railway Wheelset Manufacture and Assembly. Railway Group Recommendations for GM/RT2466. RC Published by Rail Safety and Standards Board Evergreen House 160 Euston Road London NW1 2DX Copyright 2008 Rail Safety and Standards Board Limited GM/RC2495 Issue One: August 2008 Railway Group Recommendations

More information

The Voice of European Railways POSITION PAPER. Revision of Appendix T of TSI OPE (decision /EU) January 2013

The Voice of European Railways POSITION PAPER. Revision of Appendix T of TSI OPE (decision /EU) January 2013 POSITION PAPER Revision of Appendix T of TSI OPE (decision 2012-757/EU) January 2013 1. REFERENCE DOCUMENTS Commission Decision 2012-757/EU concerning the technical specification for interoperabilityrelating

More information

E/ECE/324/Rev.1/Add.78/Rev.2/Amend.3 E/ECE/TRANS/505/Rev.1/Add.78/Rev.2/Amend.3

E/ECE/324/Rev.1/Add.78/Rev.2/Amend.3 E/ECE/TRANS/505/Rev.1/Add.78/Rev.2/Amend.3 7 December 2017 Agreement Concerning the Adoption of Harmonized Technical United Nations Regulations for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and

More information

ISO 5700 INTERNATIONAL STANDARD

ISO 5700 INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 5700 Fourth edition 2006-11-15 Tractors for agriculture and forestry Roll-over protective structures (ROPS) Static test method and acceptance conditions Tracteurs agricoles et

More information

CODE 10 OECD STANDARD CODE FOR THE OFFICIAL TESTING OF FALLING OBJECT PROTECTIVE STRUCTURES ON AGRICULTURAL AND FORESTRY TRACTORS

CODE 10 OECD STANDARD CODE FOR THE OFFICIAL TESTING OF FALLING OBJECT PROTECTIVE STRUCTURES ON AGRICULTURAL AND FORESTRY TRACTORS CODE 10 OECD STANDARD CODE FOR THE OFFICIAL TESTING OF FALLING OBJECT PROTECTIVE STRUCTURES ON AGRICULTURAL AND FORESTRY TRACTORS 1 TABLE OF CONTENTS INTRODUCTION... 3 1. DEFINITIONS... 3 1.1 Agricultural

More information

ANNEX. to the. Commission Delegated Regulation (EU).../...

ANNEX. to the. Commission Delegated Regulation (EU).../... EUROPEAN COMMISSION Brussels, XXX [ ](2016) XXX draft ANNEX 1 ANNEX to the Commission Delegated Regulation (EU).../... amending Regulation (EU) No 540/2014 of the European Parliament and of the Council

More information

Guide for the application of the CR ENE TSI

Guide for the application of the CR ENE TSI European Railway Agency According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 1.00 Date: 26 August 2011 Document prepared by Document type:

More information

Guidance for Low Voltage Electrical Installations

Guidance for Low Voltage Electrical Installations Guidance for Low Voltage Electrical Synopsis This document provides information in support of GI/RT7007 Low Voltage Electrical. Signatures removed from electronic version Submitted by Anne E Blakeney Standards

More information

DRAFT SOUTH AFRICAN STANDARD (DSS): PUBLIC ENQUIRY STAGE

DRAFT SOUTH AFRICAN STANDARD (DSS): PUBLIC ENQUIRY STAGE Document number 022/SANS 1496 Reference SANS 1496 DRAFT SOUTH AFRICAN STANDARD (DSS): PUBLIC ENQUIRY STAGE Date of circulation 2017-09-14 Closing date 2017-11-15 Number and title: SANS 1496:XXXX Wheel

More information