1 New Jersey Department of Transportation NATMEC 2014 Improving Traffic Data Collection, Analysis and Use New Jersey Pilot Study

2 What We ll Cover Today Project Approach Pilot Corridors Data Sources Performance Measure Calculations Annual Hours of Delay Reliability Indexes Variations Thresholds Measurement Unit Aggregation Results Wrap-up Issues & Challenges Other Considerations Possible Next Steps/Recommendations 2

3 Project Approach Test system-level performance measure methodologies For two NJ corridors (Interstate, arterial) Test AASHTO recommended measures for delay and reliability Propose/test alternate formulations Test alternate thresholds Evaluate aggregation methods Assess results what the values are telling us Note barriers, challenges, assumptions, workarounds Develop a Summary Report Outline step-by-step procedures Present results, lessons learned Provide recommendations 3

4 Pilot Corridors Chosen based on regional importance, unique features and familiarity 78-A 78-B 78-C 78-D Interstate; rural to urban; portion with local & express lanes; toll & free Entire length 67.8 miles Divided into 4 sub-corridors: - PA border to I-287 (30.8 miles) - I-287 to GSP (22.6 miles) - GSP to NJ Tpk (5.4 miles) - NJ Tpk to Holland Tunnel (9.0 miles) 18-D 18-C NHS freeway & arterial; limited access & traffic signals; urban, commercial, semi-rural 18 -B 18-A Entire length 45.3 miles Divided into 4 sub-corridors: - NJ 138 to GSP (14.3 miles) - GSP to US 9 (16.1 miles) - US 9 to NJTPK (9.5 miles) - NJTPK to Hoes Lane (5.4 miles) 4

5 Data Sources Travel Time (Speed) Data Vehicle Probe Project (VPP) Suite (Massive Raw Data Downloader) Five-minute average -- reliability Hourly average -- delay Vehicle Probe Project Suite Vehicle/Truck/Bus NJDOT Congestion Management System (NJCMS) NJ TRANSIT General Transit Feed Specifications (GTFS) NJDOT Weigh-in-motion (WIM) Vehicle Occupancy Plan4Safety (Crash database) NJ TRANSIT (Bus load factors) 5

6 Performance Measure Calculations Annual Hours of Delay (AHD) & Reliability 6

7 Annual Hours of Delay (AHD) Compare hourly travel times with threshold travel time Consider options for Agency-specified thresholds Delay Time = Travel Time in excess of threshold Delay = Delay Time x Volume (vehicles/persons/trucks/buses) AASHTO Method Hourly travel times for an Average Week Calculate delay for an average week, multiply by 52 TMC delays can be aggregated to sub-corridors and corridors by adding Alternate Method Concern: Average Week data underestimates annual delay If particular Avg TT < Threshold TT, Delay Time = 0 But individual day TT for that time of day, day of week Proposal: Use hourly data for each day of the year 7

8 Reliability NATMEC 2014 AASHTO Reliability Index (RI 80 ) RI 80 = Maximum TT 80 /Threshold TT In words: TT multiplier to ensure on-time arrival 80% of the time if you happen to be traveling in the most congested 5-minute period, compared to a threshold TT for that segment, regardless of time of day Alternate Method (TTR Max ) Concerns: RI 80 threshold TT does not reflect congested conditions; most unreliable time of day may not be most congested time of day; extreme values for RI 80 (>7, <1) Proposal: TTR Max = max (TT 80 /TT 50 ) In words: TT multiplier to ensure on-time arrival 80% of the time, if you happen to be traveling in the most unreliable 5-minute period of the day, compared to a median travel time for that segment for that five-minute period Denominator doesn t have to be median, but should vary with time (otherwise is the same as RI 80 ) This method give less extreme values 8

9 TTR = TT80/TT50 Travel Time, minutes NATMEC 2014 Comparative Example RI 80 vs. TTR Max TT80 TT50 TMC 120P04419 Max TT 80 = 4.19 min (7:50 AM) Free-flow TT = 0.56 min Annual Median TT = 0.59 min RI 80 = 7.1 or Max TT 50 = 1.73 min (7:55 AM) :00 AM 4:00 AM 6:00 AM 8:00 AM 10:00 AM 12:00 PM 2:00 PM 4:00 PM 6:00 PM 8:00 PM 10:00 PM 12:00 AM TTR Time of Day TTR Max = 4.8 (8:55 AM) TT 80 = 3.32 min TT 50 = 0.69 min Maximum unreliability is not at the same time as maximum 80 th percentile travel time :00 AM 2:00 AM 4:00 AM 6:00 AM 8:00 AM 10:00 AM 12:00 PM 2:00 PM 4:00 PM 6:00 PM 8:00 PM 10:00 PM 12:00 AM Time of Day 9

10 Variations Thresholds Measurement Unit Aggregation 10

11 Threshold Variations Free-flow travel time Use calculated 15 th percentile travel time (using 5-minute data) Same as travel time at 85 th percentile speed Implies that freely flowing roadways are goal Median travel time over all days Single value, but similar to free-flow travel time, unless always congested Median travel time by day of week and hour of day Reflective of expected conditions by time of day & day of week May be more appropriate for reliability threshold than delay threshold Maximum throughput travel time (at 85% of the posted speed) Based on Washington State DOT practice Acceptable travel time Percentage of free-flow travel time that varies based on area type and time of day Context-sensitive All thresholds capped at speed limit Percent of Free-flow Travel Time Area Type Peak Off-peak Urban 167% 133% Suburban 133% 118% Rural 111% 105% 11

12 Travel time, min NATMEC 2014 Threshold Comparison For Average Week Example Link A (TMC ) "Acceptable" TT Maximum Throughput TT Median TT, all days Freeflow TT Median TT, day/hr Average TT Sun 12 AM Mon 12 AM Tue 12 AM Wed 12 AM Thu 12 AM Fri 12 AM Sat 12 AM Sun 12 AM Day of week and hour of day 12

13 Measurement Unit Variations Vehicles (vehicle-hours, vehicle-miles) Measures only the number of vehicles moved Person (person-hours, person-miles) Measures the total people moved Buses Auto passengers Bus passengers Where PMs impact buses Trucks Where PMs impact trucks Sub corridor Vehicles Occupants AVO 78A 4,202 5, B 4,987 6, C 3,075 4, D 2,280 3, A B C 3,424 4, D 1,546 2,

14 Aggregation Variations Delay (Units of Hours) Simple addition Reliability (Indices) TMC Sub-Corridor Corridor Reliability measures are unit-less, cannot be added together Option 1: Weighted Averages Many possibilities for TMC weights: Link length Daily vehicle miles traveled (VMT) Median travel time Daily person miles traveled (PMT) Daily vehicle volume Daily vehicle hours traveled (VHT) Daily person volume Daily person hours traveled (PHT) Option 2: Calculate reliability directly at sub-corridor/corridor level (by direction) Add up travel times for entire sub-corridor/corridor Calculate statistics and index values similar to TMC level 14

15 Results Corridor/Sub-Corridor for AHD and Reliability 15

16 AHD Results Example: I78 (TMC-level) Shown in Person-Hours of Delay/mile Hourly Person Volume x Travel Time above threshold Person Volume = Vehicle Volume x AVO Subcorr + Bus Passengers Over all days Varying Threshold Travel Time Creates Different AHD Results Free-flow travel time Maximum thru-put travel time (85% of posted speed) Additional thresholds not shown Yearly median Day/Hour median Acceptable travel time Miles Free-flow Threshold 78-C Max. Thru-put Threshold 78-C Miles 78-D Legend APHD/mile (Freeflow Threshold) 47-25,000 25,000-50,000 50, , , , D N N Legend APHD/mile (Max Thruput) 0-25,000 25,000-50,000 50, , ,000-1,430,000 16

17 Annual Person-Hours of Delay per mile (thousands) NATMEC 2014 AHD Threshold Variation Results Varying threshold travel time results in different outcomes No consistent pattern Each threshold option has unique policy implications for delay Corridor 18A 18B 18C 18D 78 Corridor 78A 78B 78C 78D Free-flow Yearly Median Max Throughput Acceptable Speed Day/Hr Median 17

18 RI 80 Threshold Variation Results Varying Threshold Travel Time Creates Different RI 80 Results Free-flow travel time Yearly Median travel time Maximum Throughput travel time (85% of posted speed) Extreme values Values under 1.0 Worst 80 th percentile TT < threshold TT Not a logical multiplier Set to 1.0 Values above 7.0 Worst 80 th percentile TT > seven times threshold TT! Legend < 18

19 Alternate Formulation (RI 80 vs. TTR Max ) TTR Max gives more moderate (realistic?) values than RI 80 on a TMC basis AASHTO Formula Alternate Formula 19

20 Alternate Formulation (RI80 vs. TTR Max ) but differences are less pronounced on a corridor or subcorridor level Reliability Alternatives Median Threshold - Aggregated with PHT Weights RI80 TTRMax 20

21 Wrap-up Issues & Challenges Other Considerations Possible Next Steps/Recommendations 21

22 Issues & Challenges General MS Access has 2 GB file size limitation Use multiple databases with linked tables Alternatively, use an enterprise DBMS (e.g., SQL, Oracle) or statistics package (e.g., SPSS, SAS) Manual conflation of TMCs (for volumes) tedious and timeconsuming Hopefully a one-time process NJCMS missing hourly volumes by day of week, especially weekends Currently assuming average weekday hourly volumes apply to all 7 days Determining how to aggregate up TMCs for telling the story, particularly for reliability 22

23 Issues & Challenges NJ Specific Lacking traffic volume data in NJCMS for 128 miles of the enhanced NHS (need to find out coverage of INRIX and NPMRDS/here data) Accounting for transit ridership is problematic: Tedious process to use GTFS tables to get number of NJ TRANSIT buses on each TMC during each hour for weekday and weekends Applying typical peak/off-peak loading factors to get number of passengers Missing private and university bus data NJDOT Specific IT/OIT (Hardware/Software/Bandwidth) significant tech issues Staff Knowledge/Skill Sets rapidly evolving tech/data difficult to keep up with; using AOD creatively to tell the story challenging for most Time current workload/staffing makes taking on new, complex work difficult; department-wide attrition also a factor 23

24 Other Considerations Why PM changes occur (may be difficult to quantify and could affect target-setting) Project effectiveness? Change in background traffic growth? Economy boom or bust? Gas prices? Complex issues re signalized arterials Signal spacing/side friction Multiple speed curves Algorithms are evolving (makes trending tricky) Functional class More critical thinking needed re: agency-determined threshold travel times Across performance measures Across agencies Analytical tools HIGHLY DESIRABLE Automates the process Minimizes errors Speeds production Creates consistent summary output (tables, graphs, visualizations) 24

25 Possible Next Steps/Recommendations Look at multiple years to see what changes in PMs occur Temporally Spatially Test corridors/years where there have been recently completed projects Telling the story about project effectiveness Have other States and MPOs run through similar tests Varying levels of resources, tools, expertise, etc. Test the PM methodologies using NPMRDS datasets Data completeness, integrity, etc. 25

26 Thank you! NATMEC 2014 Questions Comments Discussion Keith Miller, Principal Planner Data Analysis & Forecasting John C. Allen, Section Chief Bureau of Commuter,/Mobility Strategies 26

Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections What s New for 2015

Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections What s New for 2015 Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections Prepared by Texas A&M Transportation Institute August 2015 This memo documents the analysis

More information

Performance Measure Summary - Boston MA-NH-RI. Performance Measures and Definition of Terms

Performance Measure Summary - Boston MA-NH-RI. Performance Measures and Definition of Terms Performance Measure Summary - Boston MA-NH-RI There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Allentown PA-NJ. Performance Measures and Definition of Terms

Performance Measure Summary - Allentown PA-NJ. Performance Measures and Definition of Terms Performance Measure Summary - Allentown PA-NJ There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Pittsburgh PA. Performance Measures and Definition of Terms

Performance Measure Summary - Pittsburgh PA. Performance Measures and Definition of Terms Performance Measure Summary - Pittsburgh PA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Washington DC-VA-MD. Performance Measures and Definition of Terms

Performance Measure Summary - Washington DC-VA-MD. Performance Measures and Definition of Terms Performance Measure Summary - Washington DC-VA-MD There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single

More information

Performance Measure Summary - New York-Newark NY-NJ-CT. Performance Measures and Definition of Terms

Performance Measure Summary - New York-Newark NY-NJ-CT. Performance Measures and Definition of Terms Performance Measure Summary - New York-Newark NY-NJ-CT There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single

More information

Performance Measure Summary - Large Area Sum. Performance Measures and Definition of Terms

Performance Measure Summary - Large Area Sum. Performance Measures and Definition of Terms Performance Measure Summary - Large Area Sum There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Medium Area Sum. Performance Measures and Definition of Terms

Performance Measure Summary - Medium Area Sum. Performance Measures and Definition of Terms Performance Measure Summary - Medium Area Sum There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measures and Definition of Terms

Performance Measures and Definition of Terms Performance Measure Summary - All 471 Areas Sum There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Austin TX. Performance Measures and Definition of Terms

Performance Measure Summary - Austin TX. Performance Measures and Definition of Terms Performance Measure Summary - Austin TX There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - New Orleans LA. Performance Measures and Definition of Terms

Performance Measure Summary - New Orleans LA. Performance Measures and Definition of Terms Performance Measure Summary - New Orleans LA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Portland OR-WA. Performance Measures and Definition of Terms

Performance Measure Summary - Portland OR-WA. Performance Measures and Definition of Terms Performance Measure Summary - Portland OR-WA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Oklahoma City OK. Performance Measures and Definition of Terms

Performance Measure Summary - Oklahoma City OK. Performance Measures and Definition of Terms Performance Measure Summary - Oklahoma City OK There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Seattle WA. Performance Measures and Definition of Terms

Performance Measure Summary - Seattle WA. Performance Measures and Definition of Terms Performance Measure Summary - Seattle WA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Buffalo NY. Performance Measures and Definition of Terms

Performance Measure Summary - Buffalo NY. Performance Measures and Definition of Terms Performance Measure Summary - Buffalo NY There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Fresno CA. Performance Measures and Definition of Terms

Performance Measure Summary - Fresno CA. Performance Measures and Definition of Terms Performance Measure Summary - Fresno CA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Hartford CT. Performance Measures and Definition of Terms

Performance Measure Summary - Hartford CT. Performance Measures and Definition of Terms Performance Measure Summary - Hartford CT There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Boise ID. Performance Measures and Definition of Terms

Performance Measure Summary - Boise ID. Performance Measures and Definition of Terms Performance Measure Summary - Boise ID There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Tucson AZ. Performance Measures and Definition of Terms

Performance Measure Summary - Tucson AZ. Performance Measures and Definition of Terms Performance Measure Summary - Tucson AZ There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Wichita KS. Performance Measures and Definition of Terms

Performance Measure Summary - Wichita KS. Performance Measures and Definition of Terms Performance Measure Summary - Wichita KS There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Spokane WA. Performance Measures and Definition of Terms

Performance Measure Summary - Spokane WA. Performance Measures and Definition of Terms Performance Measure Summary - Spokane WA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Grand Rapids MI. Performance Measures and Definition of Terms

Performance Measure Summary - Grand Rapids MI. Performance Measures and Definition of Terms Performance Measure Summary - Grand Rapids MI There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Charlotte NC-SC. Performance Measures and Definition of Terms

Performance Measure Summary - Charlotte NC-SC. Performance Measures and Definition of Terms Performance Measure Summary - Charlotte NC-SC There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Toledo OH-MI. Performance Measures and Definition of Terms

Performance Measure Summary - Toledo OH-MI. Performance Measures and Definition of Terms Performance Measure Summary - Toledo OH-MI There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Pensacola FL-AL. Performance Measures and Definition of Terms

Performance Measure Summary - Pensacola FL-AL. Performance Measures and Definition of Terms Performance Measure Summary - Pensacola FL-AL There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Omaha NE-IA. Performance Measures and Definition of Terms

Performance Measure Summary - Omaha NE-IA. Performance Measures and Definition of Terms Performance Measure Summary - Omaha NE-IA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Nashville-Davidson TN. Performance Measures and Definition of Terms

Performance Measure Summary - Nashville-Davidson TN. Performance Measures and Definition of Terms Performance Measure Summary - Nashville-Davidson TN There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single

More information

Performance Measure Summary - Corpus Christi TX. Performance Measures and Definition of Terms

Performance Measure Summary - Corpus Christi TX. Performance Measures and Definition of Terms Performance Measure Summary - Corpus Christi TX There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - El Paso TX-NM. Performance Measures and Definition of Terms

Performance Measure Summary - El Paso TX-NM. Performance Measures and Definition of Terms Performance Measure Summary - El Paso TX-NM There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS)

Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS) Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS) Chen-Fu Liao Department of Civil, Environmental, and Geo- Engineering University

More information

Performance Measure Summary - Minneapolis-St. Paul MN-WI. Performance Measures and Definition of Terms

Performance Measure Summary - Minneapolis-St. Paul MN-WI. Performance Measures and Definition of Terms Performance Measure Summary - Minneapolis-St. Paul MN-WI There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no

More information

Performance Measure Summary - Louisville-Jefferson County KY-IN. Performance Measures and Definition of Terms

Performance Measure Summary - Louisville-Jefferson County KY-IN. Performance Measures and Definition of Terms Performance Measure Summary - Louisville-Jefferson County KY-IN There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There

More information

Metropolitan Freeway System 2013 Congestion Report

Metropolitan Freeway System 2013 Congestion Report Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...

More information

2016 Congestion Report

2016 Congestion Report 2016 Congestion Report Metropolitan Freeway System May 2017 2016 Congestion Report 1 Table of Contents Purpose and Need...3 Introduction...3 Methodology...4 2016 Results...5 Explanation of Percentage Miles

More information

1 On Time Performance

1 On Time Performance MEMORANDUM: US 29 Travel Time & OTP To: From: Joana Conklin, Montgomery County DOT James A. Bunch, SWAI Subject: US 29 Travel Time and On Time Performance Analysis Date: This memorandum documents the US

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Traffic Data For Mechanistic Pavement Design

Traffic Data For Mechanistic Pavement Design NCHRP 1-391 Traffic Data For Mechanistic Pavement Design NCHRP 1-391 Required traffic loads are defined by the NCHRP 1-37A project software NCHRP 1-39 supplies a more robust mechanism to enter that data

More information

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013 Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013 TASK #3 PROCESS TRUCK GPS DATA AND DERIVE PERFORMANCE

More information

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS Michigan / Grand River Avenue TECHNICAL MEMORANDUM #18 From: URS Consultant Team To: CATA Project Staff and Technical Committee Topic:

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

Funding Scenario Descriptions & Performance

Funding Scenario Descriptions & Performance Funding Scenario Descriptions & Performance These scenarios were developed based on direction set by the Task Force at previous meetings. They represent approaches for funding to further Task Force discussion

More information

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA Project Development & Environment Study Broward County Intermodal Center And People Mover AASHTO Value Engineering Conference Presentation September 1, 2009 San Diego, CA Background P D & E Study Regional

More information

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming COORDINATION WITH VDOT DISTRICTS TO DELIVER IMPLEMENTABLE IMPROVEMENT PROJECTS March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming PRESENTATION OUTLINE What

More information

Travel Time Savings Memorandum

Travel Time Savings Memorandum 04-05-2018 TABLE OF CONTENTS 1 Background 3 Methodology 3 Inputs and Calculation 3 Assumptions 4 Light Rail Transit (LRT) Travel Times 5 Auto Travel Times 5 Bus Travel Times 6 Findings 7 Generalized Cost

More information

RTID Travel Demand Modeling: Assumptions and Method of Analysis

RTID Travel Demand Modeling: Assumptions and Method of Analysis RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel

More information

Railroad Impact Study

Railroad Impact Study Railroad Impact Study Ryan Huebschman, PE, PTOE Jason O Neill November 21, 2016 Study Impetus CSXT to lease and improve rail line between Louisville and Indianapolis Rail improvements will allow CSXT to

More information

Traffic and Toll Revenue Estimates

Traffic and Toll Revenue Estimates The results of WSA s assessment of traffic and toll revenue characteristics of the proposed LBJ (MLs) are presented in this chapter. As discussed in Chapter 1, Alternatives 2 and 6 were selected as the

More information

CHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA

CHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA CHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA LSU Research Team Sherif Ishak Hak-Chul Shin Bharath K Sridhar OUTLINE BACKGROUND AND

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

Site DNL Calculator. Guidelines:

Site DNL Calculator. Guidelines: http://portal.hud.gov/hudportal/hud?src=/program_offices/comm_planning/environment/... Page 1 of 3 1/9/214 HUD > Program Offices > Community Planning and Development > Environment > Site For more information

More information

Reliability Guide for the HCM Concepts & Content

Reliability Guide for the HCM Concepts & Content Reliability Guide for the HCM Concepts & Content SHRP 2 Project L08: Incorporation of Travel Time Reliability into the Highway Capacity Manual July 2012 1 Research Objectives The objectives of Project

More information

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013 MnDOT Contract No. 998 Work Order No.47 213 Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/3/213 TASK #4:

More information

I-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation

I-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation I-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation Report for Georgia (#03) I-75 Prepared by: Masoud Hamedi, Sanaz Aliari, Sara Zahedian University of Maryland, College

More information

Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability

Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability (http://mobility.tamu.edu/mmp) Office of Operations, Federal Highway Administration Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability This report is a supplement

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

I-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation. Report for North Carolina (#08) I-240, I-40 and I-26

I-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation. Report for North Carolina (#08) I-240, I-40 and I-26 I-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation Report for North Carolina (#08) I-240, I-40 and I-26 Prepared by: Masoud Hamedi, Sanaz Aliari University of Maryland,

More information

Driver Speed Compliance in Western Australia. Tony Radalj and Brian Kidd Main Roads Western Australia

Driver Speed Compliance in Western Australia. Tony Radalj and Brian Kidd Main Roads Western Australia Driver Speed Compliance in Western Australia Abstract Tony Radalj and Brian Kidd Main Roads Western Australia A state-wide speed survey was conducted over the period March to June 2 to measure driver speed

More information

Planning for Future Mobility In a Performance-Based World Steven Gayle, PTP

Planning for Future Mobility In a Performance-Based World Steven Gayle, PTP Planning for Future Mobility In a Performance-Based World Steven Gayle, PTP September 26, 2018 MPOs at the Intersection 2 Performance-Based Planning New planning paradigm introduced in MAP-21 MPOs and

More information

The Screening and Selection of Regionally Significant Projects

The Screening and Selection of Regionally Significant Projects The Screening and Selection of Regionally Significant Projects UTC 2018 Seminar Series March 15, 2018 Claire Bozic Martin Menninger ON TO 2050 CMAP is the Region s MPO, seven county region Land use and

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury Open House Presentation January 19, 2012 Study Objectives Quantify the need for transit service in BWG Determine transit service priorities based

More information

State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT

State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT April 2016 I. COST-EFFECTIVENESS ANALYSIS A Benefit-Cost Analysis (BCA) was conducted in conformance

More information

I-95 Corridor Coalition

I-95 Corridor Coalition I-95 Corridor Coalition I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Report for New Hampshire (#1) I-89 and I-93 October 2016 I-95 CORRIDOR COALITION VEHICLE PROBE PROJECT VALIDATION

More information

Dallas Integrated Corridor Management System Lessons Learned. June 2, 2014

Dallas Integrated Corridor Management System Lessons Learned. June 2, 2014 Dallas Integrated Corridor Management System Lessons Learned June 2, 2014 US 75 Corridor Networks Freeway with continous Frontage Roads Managed HOV lanes Dallas North Tollway 167 Miles of Arterials DART

More information

Green Line Long-Term Investments

Green Line Long-Term Investments Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail MetroExpress Connectors Circulators Project Connect

More information

Alcohol Related Accidents in Mahoning County:

Alcohol Related Accidents in Mahoning County: Alcohol Related Accidents in Mahoning County: 2013-2015 Alcohol Related Accidents in Mahoning County: 2013-2015 Each year the Eastgate Regional Council of Governments collects crash data from the Ohio

More information

REAL-TIME ELECTRONIC SPEED FEEDBACK DISPLAYS EVALUATION:

REAL-TIME ELECTRONIC SPEED FEEDBACK DISPLAYS EVALUATION: REAL-TIME ELECTRONIC SPEED FEEDBACK DISPLAYS EVALUATION: SHORE DRIVE TEST CASE Virginia Beach Traffic Engineering April 3, 2018 Introduction Safety is the most important aspect of our transportation system.

More information

SUCCESSFUL PERFORMANCE PAVEMENT PROJECTS 2015 TxAPA Annual Meeting September 23, 2015 Austin District Mike Arellano, P.E. Date

SUCCESSFUL PERFORMANCE PAVEMENT PROJECTS 2015 TxAPA Annual Meeting September 23, 2015 Austin District Mike Arellano, P.E. Date SUCCESSFUL PERFORMANCE PAVEMENT PROJECTS 2015 TxAPA Annual Meeting September 23, 2015 Austin District Mike Arellano, P.E. Date AUSTIN DISTRICT SAFETY PERFORMANCE OF HIGH- FRICTION MIXTURES Mike Arellano,

More information

INTERSECTION CONTROL EVALUATION

INTERSECTION CONTROL EVALUATION INTERSECTION CONTROL EVALUATION Trunk Highway 22 and CSAH 21 (E Hill Street/Shanaska Creek Road) Kasota, Le Sueur County, Minnesota November 2018 Trunk Highway 22 and Le Sueur CSAH 21 (E Hill Street/Shanaska

More information

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project Chapter 3 Transportation Environment and Consequences 3. Introduction This chapter summarizes the characteristics of the transportation system in the East Link Project vicinity and discusses potential

More information

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018 I-405 and SR 522/NE 145th Bus Rapid Transit Elected Leadership Groups Meeting November 30, 2018 Agenda Welcome and Introductions Public Comment BRT Connection in Bothell Common Elements: Bus base, Station

More information

U.S. Department of Energy s Vehicle Technologies Program -

U.S. Department of Energy s Vehicle Technologies Program - U.S. Department of Energy s Vehicle Technologies Program - A Summary of Results Thus Far from The EV Project John Smart Idaho National Laboratory National Governor s Association State and Local Plug-in

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

Travel Demand Modeling at NCTCOG

Travel Demand Modeling at NCTCOG Travel Demand Modeling at NCTCOG Arash Mirzaei North Central Texas Council Of Governments for Southern Methodist University The ASCE Student Chapter October 24, 2005 Contents NCTCOG DFW Regional Model

More information

TOLL TRUCKWAYS: Increasing Productivity and Safety in Goods Movement. By Robert W. Poole, Jr., and Peter Samuel

TOLL TRUCKWAYS: Increasing Productivity and Safety in Goods Movement. By Robert W. Poole, Jr., and Peter Samuel TOLL TRUCKWAYS: Increasing Productivity and Safety in Goods Movement By Robert W. Poole, Jr., and Peter Samuel Trucks Are America s Lifeblood Trucks carry 90% of all freight (by value). Truck shipment

More information

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside Los Angeles County Metropolitan Transportation Authority November 2012 Connecting the San Fernando Valley and the Westside Interstate 405 Sepulveda Pass THIS PAGE INTENTIONALLY LEFT BLANK Sepulveda Pass

More information

Benefit Cost Analysis

Benefit Cost Analysis Benefit Cost Analysis The Benefit Cost Analysis (BCA) was performed in accordance with the ARRA guidance provided in the Federal Register. These benefits and costs were quantified in accordance with the

More information

Bella Vista Bypass Benefit Cost Analysis

Bella Vista Bypass Benefit Cost Analysis Bella Vista Benefit Cost Analysis The Benefit Cost Analysis (BCA) was performed in accordance with the ARRA guidance provided in the Federal Register. These benefits and costs were quantified in accordance

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

Spatial and Temporal Analysis of Real-World Empirical Fuel Use and Emissions

Spatial and Temporal Analysis of Real-World Empirical Fuel Use and Emissions Spatial and Temporal Analysis of Real-World Empirical Fuel Use and Emissions Extended Abstract 27-A-285-AWMA H. Christopher Frey, Kaishan Zhang Department of Civil, Construction and Environmental Engineering,

More information

7 COMPARATIVE EVALUATION OF ALTERNATIVES

7 COMPARATIVE EVALUATION OF ALTERNATIVES 7 COMPARATIVE EVALUATION OF ALTERNATIVES 7.1 INTRODUCTION This chapter presents the comparative analysis of the four Level 2 build alternatives along with a discussion of the relative performance of the

More information

Aging of the light vehicle fleet May 2011

Aging of the light vehicle fleet May 2011 Aging of the light vehicle fleet May 211 1 The Scope At an average age of 12.7 years in 21, New Zealand has one of the oldest light vehicle fleets in the developed world. This report looks at some of the

More information

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling.

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling. Mode Selection Report 7 Cost Evaluation The cost evaluation criteria used in the evaluation of the transit modes are: Capital cost. operating costs. Fare revenue. Net cost per passenger/passenger-mile.

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Annex 10: Equations used for Direct Cost Calculation

Annex 10: Equations used for Direct Cost Calculation Annex 10: Equations used for Direct Cost Calculation In this section, the formulas that are used to estimate the direct economic costs of traffic congestion in the following themes are presented: Travel

More information

UNDERSTANDING THE SIGNIFICANCE OF AXLE VERSUS LENGTH CLASSIFICATION ON AXLE FACTORS AND THE EFFECT ON AADT TO ENSURE RELIABLE TRAFFIC DATA

UNDERSTANDING THE SIGNIFICANCE OF AXLE VERSUS LENGTH CLASSIFICATION ON AXLE FACTORS AND THE EFFECT ON AADT TO ENSURE RELIABLE TRAFFIC DATA WISCONSIN DOT CASE STUDY FINDINGS UNDERSTANDING THE SIGNIFICANCE OF AXLE VERSUS LENGTH CLASSIFICATION ON AXLE FACTORS AND THE EFFECT ON AADT TO ENSURE RELIABLE TRAFFIC DATA NATMEC 2014, Chicago, Illinois

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

US 69/75 Controlled Access Highway and Grade Separations Benefit-Cost Analysis Narrative

US 69/75 Controlled Access Highway and Grade Separations Benefit-Cost Analysis Narrative US 69/75 Controlled Access Highway and Grade Separations Introduction The Oklahoma Department of Transportation (ODOT) proposes to improve safety and efficiency of high volume freight traffic along the

More information

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] Jackson/Teton Integrated Transportation Plan 2015 Appendix I. Fixed-Guideway Transit Feasibility Jackson/Teton County Integrated Transportation Plan v2

More information

Central Park Drives Traffic Management Overview

Central Park Drives Traffic Management Overview Central Park Drives Traffic Management Overview Spring 2015 New York City Department of Transportation Existing Traffic Management From Labor Day thru Last Day of NYC Public School: 8-10 AM weekdays (Southbound)

More information

Online Appendix for Subways, Strikes, and Slowdowns: The Impacts of Public Transit on Traffic Congestion

Online Appendix for Subways, Strikes, and Slowdowns: The Impacts of Public Transit on Traffic Congestion Online Appendix for Subways, Strikes, and Slowdowns: The Impacts of Public Transit on Traffic Congestion ByMICHAELL.ANDERSON AI. Mathematical Appendix Distance to nearest bus line: Suppose that bus lines

More information

ITEM 9 Information October 19, Briefing on the Performance Analysis of the Draft 2016 CLRP Amendment

ITEM 9 Information October 19, Briefing on the Performance Analysis of the Draft 2016 CLRP Amendment ITEM 9 Information October 19, 2016 Briefing on the Performance Analysis of the Draft 2016 CLRP Amendment Staff Recommendation: Issues: Background: Receive briefing None The board will be briefed on a

More information

Maine Medical Center Campus-Wide Parking Study

Maine Medical Center Campus-Wide Parking Study Overview Maine Medical Center (MMC) retained VHB to conduct a campus-wide parking study that includes an analysis of demand and supply for patient, visitor, and employee parking on MMC s Bramhall Campus.

More information

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Introduction The Brigham Young University Institute of Transportation Engineers (BYU ITE) student chapter completed a trip generation

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

CHAPTER 7: EMISSION FACTORS/MOVES MODEL

CHAPTER 7: EMISSION FACTORS/MOVES MODEL CHAPTER 7: EMISSION FACTORS/MOVES MODEL 7.1 Overview This chapter discusses development of the regional motor vehicle emissions analysis for the North Central Texas nonattainment area, including all key