Low-Impact Special Trackwork Research at Transportation Technology Center, Inc.

Size: px
Start display at page:

Download "Low-Impact Special Trackwork Research at Transportation Technology Center, Inc."

Transcription

1 Low-Impact Special Trackwork Research at Transportation Technology Center, Inc. David D. Davis Transportation Technology Center, Inc 2009 TRB Annual Meeting - 1 Transportation Technology Center, Inc., a subsidiary of the Association of American Railroads, 2009

2 Low Impact Special Trackwork for Heavy Haul Freight Operations Background: Heavy Axle Loads Compelling Economics Effects of wheel loads on special trackwork Third leading track cause of accidents Cost Center x more expensive to operate than conventional track Capacity Stealer many condition related speed restrictions. >$500M per year Performance improvements under HAL 50% reduction in maintenance 100%+ increase in service life 2009 TRB Annual Meeting> -2

3 Low Impact Special Trackwork for Heavy Haul Freight Operations Technologies Successfully Implemented: Flange Bearing Frogs Diamond Crossings Turnout Frogs Improved Switch Geometries Low Entry Angle Switches for HAL Frog Running Surface Profiles Conformal Profiles Ramps for High Angle Frogs Curved Entry Guard Rails Foundations for Frogs 2009 TRB Annual Meeting> -3

4 Load Environment Vertical loads on high angle diamond crossing at FAST (315 K hopper) 2009 TRB Annual Meeting> -4

5 Vehicle Performance on Diamond Crossings Pictures of damage to diamonds 2009 TRB Annual Meeting> -5

6 Diamond Crossings Track Transition Problems Background: Car parts graveyard around diamond 2009 TRB Annual Meeting> -6

7 Types of Crossing Diamonds Conventional Tread Bearing Frog Unsupported flangeway gaps Wheel is tread bearing throughout Advantages: Lower first cost Allowed by FRA Track Safety standards Flange Bearing Frog Continuous wheel support Wheel transitions from tread to flange bearing Advantages: Lower dynamic loads 2009 TRB Annual Meeting> -7

8 Types of Crossing Diamonds Flange Bearing Frog 2009 TRB Annual Meeting> -8

9 Crossing Diamond Dynamic Loads Potential to Reduce Dynamic Loads Measured performance Conventional diamonds Measured performance FBF test diamonds Class 4 Track 2778-B1b 2009 TRB Annual Meeting> -9

10 Flange Bearing Frogs First Full FBF Diamond Installed under Waiver CSX Shelby, OH 40 mph Wheel fleet and diamond performance monitored by TTCI 2009 TRB Annual Meeting> -10

11 Evaluation of Designs and Initial Performance of FB Turnout Frogs Application: Mainline turnouts with very little diverging traffic Set out tracks Benefits: Expected service life: RBM: 200 MGT FB Frog: 1,000 MGT? Mainline ride quality Continuous surface 2009 TRB Annual Meeting> -11

12 Turnout Geometry and Components Evaluation Best Practices Prototype(s) for FAST Joint-Less Frog New Helper Arrangement Double Spiral Geometry Thicker Switch Point Composite Material Rods 2009 TRB Annual Meeting> -12 Hollow Switch Ties

13 Turnout Performance Next Generation Turnout Key Findings: Design Features Recommended for Revenue Service Application Spiral, Tangential switch alignment With Thicker point Switch rods out of ballast Hollow Steel Ties Need a stiffer clip to reduce point roll Over-tie rods Improved vertical stability: lining & surfacing requirements reduced by 60% 2009 TRB Annual Meeting> -13

14 SRI 9A STW Super Turnout Next Generation Turnout Key Findings: Forces lower Lateral forces continue to be ~30% lower Vertical forces are 10% lower than RBM s 30 MAXIMUM LATERAL FORCE (KIPS) TRB Annual Meeting> MGT 100+ AREMA STR AREMA CRV LOW ENTRY TANG, SPIRAL

15 SRI 9A STW Super Turnout Next Generation Turnout Key Findings: Service Life of Switch Points Thicker point and lower forces Longer average life than AREMA style 300 Switch Point Life FAST SERVICE LIFE (MGT) AREMA STR AREMA CRV LOW ENTRY TANG, SPIRAL 2009 TRB Annual Meeting> -15

16 SRI 9A STW Super Turnout Next Generation Turnout Key Findings: Design Features Recommended for Revenue Service Application Low dynamic load frog Moveable point or wing frogs Fixed point Solid with improved running surface profiles 2009 TRB Annual Meeting> -16

17 Frog Profile Design Cross Section Profile P Designs High Stresses Relocated Corner Stress Distributed Stress Current profiles Point contact on flangeway corner 2009 TRB Annual Meeting> -17 Conventional prototype Flat running surface, larger corner radius Point contact away from flangeway corner Conformal prototype 1/20 taper running surface, larger corner radius Conformal contact away from flangeway corner

18 Frog Cross Section Profile Design Conformal Conventional 2009 TRB Annual Meeting> -18

19 High Performance Crossing Diamonds Ramped Flangeway Corners Background: Frog corners are deformed Castings made to desired shape AMS deforms rapidly to undesired shape Effective flangeway gap goes from ~2 to Dynamic forces increase significantly Ramp designed to: Provide for initial deformation Lift wheel over gap 2009 TRB Annual Meeting> -19

20 Running Surface Ramping for High Angle Frogs WHEEL LOAD DYNAMIC AUGMENT SPEED (KPH) PREDICTED w/ramp PREDICTED wo/ramp MEASURED XING wo/ramp MEASURED w/ramp 2009 TRB Annual Meeting> -20

21 Guard Rail Entry Analysis Dynamic simulation modeling - curved entry will: Lower maximum forces Control wheel path better Circular entry contacts wheel sooner Provides smoother transition instead of abrupt impact Conventional Entry 14,000 12,000 10,000 8,000 Circular Entry Lateral loads (lbs) 6,000 4,000 2,000 6ftconvex 6ft standard 0-2, TRB Annual Meeting> -21-4, Distance from end of guardrail (ft)

22 Load Environment of the Crossing Diamond Two types of impact loads seen at diamond crossings Higher frequency load due to wheel impacts. Contribute to broken components Lower frequency loading due to wheel bounce. Contributes to: ballast and subgrade breakdown tie deterioration surface and alignment problems 2009 TRB Annual Meeting> -22

23 NUCARS Study Optimal track damping is above measured Current Damping 2009 TRB Annual Meeting> -23

24 Diamond Crossing Foundation Design Attenuate Impacts (platework) Ballast designed to reduce settlement Attenuate Impacts (subgrade) Reduce Settlement 2009 TRB Annual Meeting> -24

25 Development of Low Impact Special Trackwork Implementation: Flange Bearing Frogs are successful Full FB diamonds being implemented under waiver OWLS diamonds being widely implemented FB turnout frogs in revenue service tests Premium turnout components becoming standard for HAL lines Ramped running surface diamonds are industry standard Curved Entry Guard Rails are being adopted as Industry Standard Optimally damped foundations in test by industry 2009 TRB Annual Meeting> - 25

Installation of Flange. Bearing Crossing Diamond. Shelby Flange Bearing Diamond

Installation of Flange. Bearing Crossing Diamond. Shelby Flange Bearing Diamond Installation of Flange Bearing Crossing Diamond Shelby Flange Bearing Diamond David C. Clark, P.E. CSX Transportation James E. Beyerl, P.E. CSX Transportation David D. Davis, P.E. Transportation Technology

More information

Research Results Digest 72

Research Results Digest 72 December 2005 TRANSIT COOPERATIVE RESEARCH PROGRAM Sponsored by the Federal Transit Administration Responsible Senior Program Officer: Christopher W. Jenks Subject Areas: VI Public Transit, VII Rail Research

More information

Track Transitions and the Effects of Track Stiffness

Track Transitions and the Effects of Track Stiffness Track Transitions and the Effects of Track Stiffness D. Plotkin, D.D. Davis, S. Gurule and S.M. Chrismer AREMA 2006 IJ presentation - 1 Transportation Technology Center, Inc., a subsidiary of the Association

More information

Table Common AREMA Lateral Turnouts Currently in Use in Passenger Rail Systems

Table Common AREMA Lateral Turnouts Currently in Use in Passenger Rail Systems DRAFT CHAPTER 11 SECTIONS 3.5.11.8, 3.5.11.9 Part 3 Track and Roadway Considerations SECTION 3.5 TRACK AND ROADWAY CONSIDERATIONS 3.5.11.8 Turnouts and Crossovers (2012) Turnouts and crossovers are used

More information

REDESIGN OF FROG GEOMETRY AT NEW YORK CITY TRANSIT TO REDUCE VIBRATION, NOISE AND ACCELERATED WEAR

REDESIGN OF FROG GEOMETRY AT NEW YORK CITY TRANSIT TO REDUCE VIBRATION, NOISE AND ACCELERATED WEAR REDESIGN OF FROG GEOMETRY AT NEW YORK CITY TRANSIT TO REDUCE VIBRATION, NOISE AND ACCELERATED WEAR Antonio Cabrera, P.E. and Gustavo Gobbato, P.E., Track Engineering, MOW MTA New York City Transit ABSTRACT

More information

Track Safety Standards (49 CFR Part 213)

Track Safety Standards (49 CFR Part 213) TRACK INSPECTOR EXAMINATION Track Safety Standards (49 CFR Part 213) IDAHO NORTHERN & PACIFIC RAILROAD NEBRASKA CENTRAL RAILROAD NEW ORLEANS & GULF COAST RAILWAY WICHITA, TILLMAN & JACKSON RAILWAY EMPLOYEE:

More information

HEAVY HAUL TURNOUT SYSTEMS INNOVATIVE WEICHENSYSTEME. voestalpine VAE Führend bei Weichen und Signaltechnik Strong turnout system solutions

HEAVY HAUL TURNOUT SYSTEMS INNOVATIVE WEICHENSYSTEME. voestalpine VAE Führend bei Weichen und Signaltechnik Strong turnout system solutions IMG_VAE HH_VAE _2 HEAVY HAUL TURNOUT SYSTEMS INNOVATIVE WEICHENSYSTEME voestalpine VAE Führend bei Weichen und Signaltechnik Strong turnout system solutions voestalpine VAE GmbH www.voestalpine.com/vae

More information

UPDATE OF TTCI S RESEARCH IN TRACK CONDITION TESTING AND INSPECTION. Dingqing Li, Randy Thompson, and Semih Kalay

UPDATE OF TTCI S RESEARCH IN TRACK CONDITION TESTING AND INSPECTION. Dingqing Li, Randy Thompson, and Semih Kalay Dingqing Li 1 UPDATE OF TTCI S RESEARCH IN TRACK CONDITION TESTING AND INSPECTION Dingqing Li, Randy Thompson, and Semih Kalay Transportation Technology Center, Inc. Pueblo, CO 81001 Phone: (719) 584-0740,

More information

Inspection & Maintenance of Spring Rail Frogs

Inspection & Maintenance of Spring Rail Frogs Inspection & Maintenance of Spring Rail Frogs Leslie Strezo, BNSF Railway Spring Rail Frog Importance of Inspection Safety Prevents derailments If spring is not tight enough or force is not strong enough,

More information

Australian 5" Gauge Track Notes

Australian 5 Gauge Track Notes Australian 5" Gauge Track Notes Track gauge The track gauge is normally specified as 5" with a tolerance of -0 / + 1 / 32 " or 127mm -0 / +0.8mm. The rail is generally made from rectangular bar (25 x 10

More information

Port of Vancouver Schedule 1 Rail Engineering, Operations, and Safety Review Final Report Prepared for: HDR

Port of Vancouver Schedule 1 Rail Engineering, Operations, and Safety Review Final Report Prepared for: HDR Port of Vancouver Schedule 1 Rail Engineering, Operations, and Safety Review Final Report Prepared for: HDR Prepared by: TÜV Rheinland Mobility Rail Sciences Division March 25, 2014 1 Who We are TUV Rheinland

More information

Switch design optimisation: Optimisation of track gauge and track stiffness

Switch design optimisation: Optimisation of track gauge and track stiffness 1 Switch design optimisation: Optimisation of track gauge and track stiffness Elias Kassa Professor, Phd Department of Civil and Transport Engineering, NTNU Trondheim, Norway E-mail: elias.kassa@ntnu.no

More information

Erol Tutumluer, Yu Qian, Youssef Y.M.A. Hashash, and Jamshid Ghaboussi

Erol Tutumluer, Yu Qian, Youssef Y.M.A. Hashash, and Jamshid Ghaboussi Field Validated Discrete Element Model for Railroad Ballast Erol Tutumluer, Yu Qian, Youssef Y.M.A. Hashash, and Jamshid Ghaboussi University of Illinois at Urbana-Champaign (UIUC) David D. Davis Transportation

More information

BART Wheel Profile Change

BART Wheel Profile Change BART Wheel Profile Change Cylindrical to Modified Tapered Ben Holland, P.E., Manager Vehicle Systems Engineering Rolling Stock & Shops Gregory Shivy Principal Track Engineer Maintenance & Engineering 1

More information

Performance Based Track Geometry: Optimizing Transit System Maintenance

Performance Based Track Geometry: Optimizing Transit System Maintenance Performance Based Track Geometry: Optimizing Transit System Maintenance Charity Duran Ketchum Transportation Technology Center, Inc. Pueblo, Colorado Nicholas Wilson Transportation Technology Center, Inc.

More information

Basics of Vehicle Truck and Suspension Systems and Fundamentals of Vehicle Steering and Stability

Basics of Vehicle Truck and Suspension Systems and Fundamentals of Vehicle Steering and Stability Basics of Vehicle Truck and Suspension Systems and Fundamentals of Vehicle Steering and Stability Ralph Schorr, PE Senior Product Development Engineer Vehicle/Truck Dynamicist 1 Truck Nomenclature Wheel/rail

More information

Quantification of Lateral Forces in Concrete Crosstie Fastening Systems

Quantification of Lateral Forces in Concrete Crosstie Fastening Systems in Concrete Crosstie Fastening Systems Transportation Research Board 94 th Annual Meeting Washington D.C. 13 January 21 Brent Williams, Donovan Holder, Marcus Dersch, Riley Edwards, and Christopher Barkan

More information

FRA High Speed Adjustable Perturbation Slab Track

FRA High Speed Adjustable Perturbation Slab Track FRA High Speed Adjustable Perturbation Slab Track ALI TAJADDINI, PE TRACK TRAIN INTERACTION PROGRAM MANAGER OFFICE OF RESEARCH, DEVELOPMENT, AND TECHNOLOGY OFFICE OF RAILROAD POLICY AND DEVELOPMENT 1 Two

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Turnouts and Yard Tracks TM 2.1.8 Prepared by: Signed document on file 21 June 09 George Harris Date Checked by: Signed document on file 15 July 09 Thomas Carroll Date Approved by:

More information

Updating the horizontal VUC: Progress update

Updating the horizontal VUC: Progress update Updating the horizontal VUC: Progress update Mark Burstow Principal Vehicle Track Dynamics Specialist September 2012 Horizontal VUC update 1 Scope of review 1. Converting damage to cost Can better relationships

More information

ANALYZING THE DYNAMICS OF HIGH SPEED RAIL

ANALYZING THE DYNAMICS OF HIGH SPEED RAIL ANALYZING THE DYNAMICS OF HIGH SPEED RAIL 10 th Hydrail Conference 22 June 2015 George List, NC State Motivation Rail is a very attractive technology for moving people and goods Suspension system is extremely

More information

Loaded Car Hunting and Suspension Systems

Loaded Car Hunting and Suspension Systems Loaded Car Hunting Mechanical Association Railcar Technical Services Loaded Car Hunting and Suspension Systems 18 September 2009 Jay P. Monaco Vice President Engineering Amsted Rail Company, Inc. Loaded

More information

W heel climb in switches remains

W heel climb in switches remains development of: Hand Gauges for Inspection of Switch Points to Prevent Wheel Climb Researchers look to techniques established abroad to develop improved tools for switch inspection in order to reduce wheel

More information

Switch Life Improvement Through Application of a Water Based, Drying Friction Modifier Richard Stock, Barnaby Temple. L.B. Foster Rail Technologies

Switch Life Improvement Through Application of a Water Based, Drying Friction Modifier Richard Stock, Barnaby Temple. L.B. Foster Rail Technologies Switch Life Improvement Through Application of a Water Based, Drying Friction Modifier Richard Stock, Barnaby Temple L.B. Foster Rail Technologies 1 Outline Definitions Trial at NetworkRail/UK The impact

More information

Interaction of Tread-hollow Wheel and Worn Switch Point / Stock Rail

Interaction of Tread-hollow Wheel and Worn Switch Point / Stock Rail Interaction of Tread-hollow Wheel and Worn Switch Point / Stock Rail by Brad Kerchof Division Engineer Norfolk Southern Railway 1400 Norfolk Southern Drive Birmingham, AL 35213 205-951-4724 205-951-4706

More information

Experimental Field Investigation of the Transfer of Lateral Wheel Loads on Concrete Crosstie Track

Experimental Field Investigation of the Transfer of Lateral Wheel Loads on Concrete Crosstie Track Experimental Field Investigation of the Transfer of Lateral Wheel Loads on Concrete Crosstie Track AREMA Annual Conference Chicago, IL 30 September 2014 Brent A. Williams, J. Riley Edwards, Marcus S. Dersch

More information

CONVENTIONAL TURNOUTS

CONVENTIONAL TURNOUTS RAILWAY CONVENTIONAL Basic description Turnout mounted in the track enables passing of the vehicle in either straight or branch direction. Depending on the design we distinguish the following types of

More information

A Guide to Key Railroad Terminology for the Northeast Corridor

A Guide to Key Railroad Terminology for the Northeast Corridor A Guide to Key Railroad Terminology for the Northeast Corridor Index of terms Approach signal, 8 Diverging route, 5 Ladder, 6 Section break, 12, 13 Tie replacement, 7 Ballast, 3, 4, 7 Double slip switch,

More information

Gauge Face Wear Caused with Vehicle/Track Interaction

Gauge Face Wear Caused with Vehicle/Track Interaction Gauge Face Wear Caused with Vehicle/Track Interaction Makoto ISHIDA*, Mitsunobu TAKIKAWA, Ying JIN Railway Technical Research Institute 2-8-38 Hikari-cho, Kokubunji-shi, Tokyo 185-8540, Japan Tel: +81-42-573-7291,

More information

METHODOLOGY FOR THE SELECTION OF SECOND HAND (RELAY) RAIL

METHODOLOGY FOR THE SELECTION OF SECOND HAND (RELAY) RAIL METHODOLOGY FOR THE SELECTION OF SECOND HAND (RELAY) RAIL The G-Index and Wear Rates. Written By Michael R. Garcia, P.E. Chief, Rail Engineering Bureau of Railroads Room 302 Illinois Department of Transportation

More information

Mike Hale CSX Transportation Director of Train Accident Prevention

Mike Hale CSX Transportation Director of Train Accident Prevention Train Accident Prevention & Investigation Mike Hale CSX Transportation Director of Train Accident Prevention Train Accidents and Derailments Train Accident An event involving the operation of on-track

More information

High Speed S&C Design and Maintenance

High Speed S&C Design and Maintenance High Speed S&C Design and Maintenance Dr Sin Sin Hsu Head of Track Engineering, NRHS 1 st March 2018 What is a High Speed Turnout? Three main parts: Switch Geometry, profile, components Intermediate Part

More information

Impact of Environment-Friendly Tires on Pavement Damage

Impact of Environment-Friendly Tires on Pavement Damage Impact of Environment-Friendly Tires on Pavement Damage Hao Wang, PhD Assistant Professor, Dept. of CEE Rutgers, the State University of New Jersey The 14th Annual NJDOT Research Showcase 10/18/2012 Acknowledgement

More information

Shoulder Ballast Cleaning Effectiveness

Shoulder Ballast Cleaning Effectiveness Shoulder Ballast Cleaning Effectiveness Word count: 3539 ABSTRACT AREMA 2015 Annual Conference 4 October 7 October 2015 Minneapolis, MN Scott Diercks Loram Maintenance of Way, Inc. 3900 Arrowhead Drive

More information

Industrial Quality Turnouts Industrial Quality turnouts or IQ turnouts are standard turnouts consisting of new industrial quality material and/or relay material and are sold at a lesser cost than traditional

More information

Shoulder Ballast Cleaning Effectiveness

Shoulder Ballast Cleaning Effectiveness Shoulder Ballast Cleaning Effectiveness AREMA 2015 Annual Conference 4 October 7 October 2015 Minneapolis, MN Scott Diercks Loram Maintenance of Way, Inc. 3900 Arrowhead Drive Hamel, MN 55340 763-478-2622

More information

Rules Respecting Track Safety Guidelines for British Columbia Provincial Industrial Railways

Rules Respecting Track Safety Guidelines for British Columbia Provincial Industrial Railways Rules Respecting Track Safety Guidelines for British Columbia Provincial Industrial Railways PART I GENERAL 1. SHORT TITLE These Guidelines may be cited as the Track Safety Rules (TSR). 2. INTERPRETATION

More information

Study on System Dynamics of Long and Heavy-Haul Train

Study on System Dynamics of Long and Heavy-Haul Train Copyright c 2008 ICCES ICCES, vol.7, no.4, pp.173-180 Study on System Dynamics of Long and Heavy-Haul Train Weihua Zhang 1, Guangrong Tian and Maoru Chi The long and heavy-haul train transportation has

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM California High-Speed Train Project TECHNICAL MEMORANDUM Alignment Standards for Shared Use Corridors (Specific to Los Angeles to Anaheim) TM 1.1.6 Prepared by: Signed document on file 17 Dec 07_ George

More information

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment APPENDIX Q SUBWAY OPERATIONS REPORT Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

More information

Horizontal Alignment

Horizontal Alignment Session 8 Jim Rosenow, PE, Mn/DOT March 5-7, 2010 Horizontal Alignment The shortest distance between two points is: A straight line The circumference of a circle passing through both points and the center

More information

Using Wheel Rail Interface Analysis to Evaluate Rail Transit Maintenance Priorities: A Case Study on Los Angeles Metro BLUE Line

Using Wheel Rail Interface Analysis to Evaluate Rail Transit Maintenance Priorities: A Case Study on Los Angeles Metro BLUE Line Using Wheel Rail Interface Analysis to Evaluate Rail Transit Maintenance Priorities: A Case Study on Los Angeles Metro BLUE Line 1 Reasons for Outside Analysis New MAP 21 State of Good Repair Requirements

More information

Rehabilitation Techniques to Improve Long-term Performance of Highway-Railway At-Grade Crossings

Rehabilitation Techniques to Improve Long-term Performance of Highway-Railway At-Grade Crossings Rehabilitation Techniques to Improve Long-term Performance of Highway-Railway At-Grade Crossings Dr. Jerry G. Rose, P.E. Professor of Civil Engineering 261 Raymond Building University of Kentucky 859-257-4278

More information

Optimized Readjustment Length Requirements for Improved CWR Neutral Temperature Management

Optimized Readjustment Length Requirements for Improved CWR Neutral Temperature Management Optimized Readjustment Length Requirements for Improved CWR Neutral Temperature Management David M. Read Principal Investigator Andrew Kish, Ph.D. Railway Technology Consultant Dwight W. Clark Director

More information

Rules Respecting Track Safety: Guidelines for British Columbia s Provincial Industrial Railways

Rules Respecting Track Safety: Guidelines for British Columbia s Provincial Industrial Railways Rules Respecting Track Safety: Guidelines for ritish Columbia s Provincial Industrial Railways PART I GENERAL 1. SHORT TITLE These Guidelines may be cited as the Track Safety Rules (TSR). 2. INTERPRETATION

More information

Brent Spence Bridge Design Exceptions - Alternative I

Brent Spence Bridge Design Exceptions - Alternative I s - Alternative I ITERCHAGE umber Existing Reason(s) For Potential Impact(s) to Eliminate s Potential Mitigation Solutions CURVE O. 5 PI Sta. 24+98.87 Y 1 57 mph (60) 526' (570') 44 mph The line of sight

More information

EXTENDING PRT CAPABILITIES

EXTENDING PRT CAPABILITIES EXTENDING PRT CAPABILITIES Prof. Ingmar J. Andreasson* * Director, KTH Centre for Traffic Research and LogistikCentrum AB. Teknikringen 72, SE-100 44 Stockholm Sweden, Ph +46 705 877724; ingmar@logistikcentrum.se

More information

The Deployable Gage Restraint Measurement System - Description and Operational Performance

The Deployable Gage Restraint Measurement System - Description and Operational Performance The Deployable Gage Restraint Measurement System - Description and Operational Performance GARY A. MARTIN ENSCO, INC 5400 PORT ROYAL ROAD SPRINGFIELD, VA 22151 703-321-4513 703-321-7619 (FAX) JEFFREY A.

More information

Effect of Hand Tamping on Transition Zone Behavior

Effect of Hand Tamping on Transition Zone Behavior Effect of Hand Tamping on Transition Zone Behavior Timothy D. Stark Professor of Civil and Environmental Engineering University of Illinois at Urbana-Champaign 205 N Mathews Ave Urbana, IL 61801 Office:

More information

OSCALE. URNOUTS, INC. Ready to Lay on your Right of Way

OSCALE. URNOUTS, INC. Ready to Lay on your Right of Way OscaleTurnouts, Inc., a Michigan Corporation, was formed to offer the O-scale 2-rail community (¼ scale and P48), an engineered, high quality and prototypical looking turnout that will outperform any ready

More information

A Long-Term Investment. Planning Your Layout... Temporary or Permanent Layout? Running Qualities. Electrical Connection.

A Long-Term Investment. Planning Your Layout... Temporary or Permanent Layout? Running Qualities. Electrical Connection. A Long-Term Investment. UNITRACK was originally created for the Japanese market (Estimated 9 Million Modellers) where space is at a premium. Very elaborate layouts are created for the day or night, directly

More information

Tomorrow and beyond in Equipment Evolution Innovations & Trends

Tomorrow and beyond in Equipment Evolution Innovations & Trends Tomorrow and beyond in Equipment Evolution Innovations & Trends Presented by Robert E. Pickel Senior Vice President, Marketing and Sales National Steel Car N.A. Inc. June 18, 2013 1 Today s Railcars Provide

More information

Maximum Superelevation: Desirable, Allowable, and Absolute

Maximum Superelevation: Desirable, Allowable, and Absolute Maximum Superelevation: Desirable, Allowable, and Absolute Nazmul Hasan, M. Eng. SNC-Lavalin Inc. ancouver, ON ABSTRACT The maximum values of superelevation are often qualified as desirable, allowable

More information

Vertical Loads from North American Rolling Stock for Bridge Design and Rating

Vertical Loads from North American Rolling Stock for Bridge Design and Rating Vertical Loads from North American Rolling Stock for Bridge Design and Rating By Duane Otter, Ph.D., P.E., and MaryClara Jones Transportation Technology Center, Inc., Pueblo, Colorado Abstract As a part

More information

Proposed Two Ballots Considerations for Layout of Wayside Applicators

Proposed Two Ballots Considerations for Layout of Wayside Applicators Proposed Two Ballots Considerations for Layout of Wayside Applicators To be incorporated into AREMA Recommended Practices for Rail / Wheel Friction Control - Section 4.11 Updated at AREMA Committee 4 Meeting,

More information

Conveyor Structure. Turn Key Projects: Engineering, Manufacturing, Installation. Belt Drives & Terminal Groups

Conveyor Structure. Turn Key Projects: Engineering, Manufacturing, Installation. Belt Drives & Terminal Groups Conveyor Structure Turn Key Projects: Engineering, Manufacturing, Installation Belt Drives & Terminal Groups TECHNICAL INFO PIONEER STYLE CATENARY STYLE IMPACT STRUCTURE RETRO-FIT TERMINAL GROUPS TURN

More information

PERFORMANCE BENEFITS OF CONNECTED VEHICLES FOR IMPLEMENTING SPEED HARMONIZATION

PERFORMANCE BENEFITS OF CONNECTED VEHICLES FOR IMPLEMENTING SPEED HARMONIZATION PERFORMANCE BENEFITS OF CONNECTED VEHICLES FOR IMPLEMENTING SPEED HARMONIZATION Richard Dowling, Brandon Nevers, Anxi Jia, Alexander Skabardonis Kittelson & Associates Cory Krause, Meenakshy Vasudevan

More information

ONE-WAY DERAILING for FREIGHT CARS and ALL LOCOMOTIVES. For use on wood ties or full length pre-stressed concrete ties. ALDON Company, Inc.

ONE-WAY DERAILING for FREIGHT CARS and ALL LOCOMOTIVES. For use on wood ties or full length pre-stressed concrete ties. ALDON Company, Inc. SaberTooth Portable Derail U. S. Patent No. 7,753,317 Tool-Free Installation Guide ONE-WAY DERAILING for FREIGHT CARS and ALL LOCOMOTIVES For use on wood ties or full length pre-stressed concrete ties

More information

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS D-Rail Final Workshop 12 th November - Stockholm Monitoring and supervision concepts and techniques for derailments investigation Antonella

More information

Discipline: Engineering (Track & Civil) Category: Code of Practice. Clearances. Section 7. Applicability. ARTC Network wide.

Discipline: Engineering (Track & Civil) Category: Code of Practice. Clearances. Section 7. Applicability. ARTC Network wide. Discipline: Engineering (Track & Civil) Category: Code Practice Clearances Section 7 Applicability ARTC Network wide Primary Source Document Status Version Date Reviewed Prepared by Reviewed by Endorsed

More information

Improved Brake Systems AAR SRI Project Steve Belport AAR Brake Systems Committee

Improved Brake Systems AAR SRI Project Steve Belport AAR Brake Systems Committee Improved Brake Systems AAR SRI Project Steve Belport AAR Brake Systems Committee TTCI, a subsidiary of the AAR, 2010. p0 Improved Brake System Performance Objective: Improve brake system performance by

More information

SASKATCHEWAN TRACK SAFETY STANDARDS

SASKATCHEWAN TRACK SAFETY STANDARDS RRD1000 SASKATCHEWAN TRACK SAFETY STANDARDS For use on provincially regulated railways These standards were approved by the Deputy Minister of Highways and Transportation on August 01, 2003 under the authority

More information

Southeastern Pennsylvania Transportation Authority

Southeastern Pennsylvania Transportation Authority Southeastern Pennsylvania Transportation Authority Railroad Division SMW-100 Track Department Manual RECEIPT PAGE TABLE OF CONTENTS INTRODUCTION REVISION PROCEDURES ENGINEERING DIRECTIVES PART 1 - TRACK

More information

CHANGE LIST for MDOT Traffic and Safety Geometric Design Guides. May 23, 2017: The following update was made to the web site.

CHANGE LIST for MDOT Traffic and Safety Geometric Design Guides. May 23, 2017: The following update was made to the web site. CHANGE LIST for MDOT Traffic and Safety Geometric Design Guides Note: Located at https://mdotjboss.state.mi.us/tssd/tssdhome.htm May 23, 2017: The following update was made to the web site. GEO-650-D Flares

More information

Test Facilities. (1) Vehicle Technologies

Test Facilities. (1) Vehicle Technologies Test Facilities (1) Vehicle Technologies Rolling Stock Test Plant The rolling stock test plant simulates the conditions of running trains and tracks at a maximum speed of 500km/h. This enables testing

More information

IEC Standard Compliant Vacuum Circuit-Breaker (12 kv, 24 kv) for Southeast Asian Markets

IEC Standard Compliant Vacuum Circuit-Breaker (12 kv, 24 kv) for Southeast Asian Markets IEC Standard Compliant Vacuum Circuit-Breaker (12 kv, 24 kv) for Southeast Asian Markets OKAZAKI, Takayuki KIKUCHI, Masanori TOKUNAGA, Yoshihide A B S T R A C T As Southeast Asia continues to experience

More information

A Derailment Investigation Leads to Broken Spikes. Brad Kerchof Research & Tests

A Derailment Investigation Leads to Broken Spikes. Brad Kerchof Research & Tests A Derailment Investigation Leads to Broken Spikes Brad Kerchof Research & Tests 1 Google Earth image of the derailment site Vandergrift, PA, January 2014 8.3 curve, river grade (0.3% descending to 0%)

More information

MagneMotion Maglev Demonstration on ODU Guideway

MagneMotion Maglev Demonstration on ODU Guideway MagneMotion Maglev Demonstration on ODU Guideway SUMMARY MagneMotion and Old Dominion University undertook a cooperative agreement to demonstrate the MagneMotion M3 urban maglev technology on an existing

More information

School Bus Driver Trainer Inservice

School Bus Driver Trainer Inservice 2017-2018 School Bus Driver Trainer Inservice TITLE OF LESSON: REFERENCE POINTS AND DRIVING SKILLS Objectives of Lesson: At the end of this lesson you will be able to: Describe how a reference point is

More information

SF-LA (125 mph) 2: : :32. SF-SJ (110 mph)

SF-LA (125 mph) 2: : :32. SF-SJ (110 mph) California High-Speed Rail Program Management Team To: Fr: Re: 3 January 203 Jeff Morales, CEO, California High-Speed Rail Authority Frank Vacca, Chief Program Manager, California High-Speed Rail Authority

More information

Technical Report Lotus Elan Rear Suspension The Effect of Halfshaft Rubber Couplings. T. L. Duell. Prepared for The Elan Factory.

Technical Report Lotus Elan Rear Suspension The Effect of Halfshaft Rubber Couplings. T. L. Duell. Prepared for The Elan Factory. Technical Report - 9 Lotus Elan Rear Suspension The Effect of Halfshaft Rubber Couplings by T. L. Duell Prepared for The Elan Factory May 24 Terry Duell consulting 19 Rylandes Drive, Gladstone Park Victoria

More information

Effects of Superelevation and Speed on Vehicle Curving In Heavy Axle-Load Service. Authors

Effects of Superelevation and Speed on Vehicle Curving In Heavy Axle-Load Service. Authors Effects of Superelevation and Speed on Vehicle Curving In Heavy Axle-Load Service Authors Brad Kerchof Norfolk Southern Railway 209 Shenandoah Ave, NE Roanoke, VA 24016 Telephone: (540) 524-4669 Harry

More information

Lateral and Vertical Load Path Summary of Field Results

Lateral and Vertical Load Path Summary of Field Results Slide 1 Lateral and Vertical Load Path Summary of Field Results 214 International Crosstie & Fastening System Symposium Urbana, IL 3 June 214 Matthew Greve, Brent Williams, J. Riley Edwards, Marcus Dersch,

More information

Standardized Technical Specification. Bi-Level Passenger Rail Cars for Intercity Corridor Service. Chapter 5. Trucks. Revision H

Standardized Technical Specification. Bi-Level Passenger Rail Cars for Intercity Corridor Service. Chapter 5. Trucks. Revision H Standardized Technical Specification Bi-Level Passenger Rail Cars for Intercity Corridor Service Chapter 5 Trucks Revision H Table of Contents 5-1 Table of Contents 5.0 Trucks... 5-3 5.1 Overview... 5-3

More information

Understanding FRA's Alternative Crashworthiness Compliance Approach. Marcin Taraszkiewicz, PE CH2M HILL, Principal Technologist Baltimore, MD

Understanding FRA's Alternative Crashworthiness Compliance Approach. Marcin Taraszkiewicz, PE CH2M HILL, Principal Technologist Baltimore, MD Understanding FRA's Alternative Crashworthiness Compliance Approach Marcin Taraszkiewicz, PE CH2M HILL, Principal Technologist Baltimore, MD Discussion Topics Introduction Key Facts Case Study: TEX Rail

More information

S&C: Understanding Root Causes & Assessing Effective Remedies C4R Final Dissemination Event, Paris 15 th March 2017

S&C: Understanding Root Causes & Assessing Effective Remedies C4R Final Dissemination Event, Paris 15 th March 2017 Capacity for Rail S&C: Understanding Root Causes & Assessing Effective Remedies C4R Final Dissemination Event, Paris 15 th March 2017 Presenter: Dr Yann Bezin Institute of Railway Research, University

More information

TWO-WAY DERAILING for FREIGHT CARS and 4-AXLE LOCOMOTIVES. For use on wood ties or full length pre-stressed concrete ties S

TWO-WAY DERAILING for FREIGHT CARS and 4-AXLE LOCOMOTIVES. For use on wood ties or full length pre-stressed concrete ties S SaberTooth Portable Derail U. S. Patent No. 7,753,317 Tool-Free Installation Guide TWO-WAY DERAILING for FREIGHT CARS and 4-AXLE LOCOMOTIVES For use on wood ties or full length pre-stressed concrete ties

More information

N Code 80 Track. Item # Radius Snap-Track Section (6 pcs.) See page 48 for tips on how to use Flex-Track!

N Code 80 Track. Item # Radius Snap-Track Section (6 pcs.) See page 48 for tips on how to use Flex-Track! Code 80 Track CODE 80 TRACK - BLACK TIES & ICKEL SILVER RAIL! Our popular Scale Code 80 track has been used on thousands of model railroads over the last 30 years. Easy to use and affordable, you will

More information

Multilayer Energy Dissipating Inlet Column in Center-Feed Clarifiers 1

Multilayer Energy Dissipating Inlet Column in Center-Feed Clarifiers 1 Multilayer Energy Dissipating Inlet Column in Center-Feed Clarifiers 1 References 6,276,537 08/21/2001 Esler et al 210/519 6,800,209 10/05/2004 Wright 210/801 Field of Invention Clarifiers are tanks where

More information

Steeda Bumpsteer Kit (94-04) - Installation Instructions

Steeda Bumpsteer Kit (94-04) - Installation Instructions Steeda Bumpsteer Kit (94-04) - Installation Instructions The below installation instructions work for the following products: Steeda Bumpsteer Kit (94-04) Please read through the instructions carefully

More information

Enterprise Services, General Manager Technical Standards. Track and Civil Code of Practice Section 7 Clearances Technical Note ETD-07-01

Enterprise Services, General Manager Technical Standards. Track and Civil Code of Practice Section 7 Clearances Technical Note ETD-07-01 TO FROM Network Wide Enterprise Services, General Manager Technical Standards DATE 09/11/2017 SUBJECT Track and Civil Code of Practice Section 7 Clearances Technical Note ETD-07-01 TITLE Technical Note

More information

ISSN: SIMULATION AND ANALYSIS OF PASSIVE SUSPENSION SYSTEM FOR DIFFERENT ROAD PROFILES WITH VARIABLE DAMPING AND STIFFNESS PARAMETERS S.

ISSN: SIMULATION AND ANALYSIS OF PASSIVE SUSPENSION SYSTEM FOR DIFFERENT ROAD PROFILES WITH VARIABLE DAMPING AND STIFFNESS PARAMETERS S. Journal of Chemical and Pharmaceutical Sciences www.jchps.com ISSN: 974-2115 SIMULATION AND ANALYSIS OF PASSIVE SUSPENSION SYSTEM FOR DIFFERENT ROAD PROFILES WITH VARIABLE DAMPING AND STIFFNESS PARAMETERS

More information

SMART CUSHION INNOVATIONS

SMART CUSHION INNOVATIONS SMART CUSHION The World s Only Speed-Dependent Crash Attenuators SMART CUSHION INNOVATIONS MASH AND NCHRP 350 APPROVED The only attenuator that is tested to MASH and NCHRP 350 Marketed and Distributed

More information

Forklift Safety Plan Contents: Forklift Safety Plan

Forklift Safety Plan Contents: Forklift Safety Plan Forklift Safety Plan Contents: Forklift Safety Plan Introduction... ii Plan Cover Sheet... 1 Purpose... 2 Supervisory Responsibilities... 2 Maintenance, Fueling, and Repair... 3 General Rules for Operator

More information

Assessing Pavement Rolling Resistance by FWD Time History Evaluation

Assessing Pavement Rolling Resistance by FWD Time History Evaluation Assessing Pavement Rolling Resistance by FWD Time History Evaluation C.A. Lenngren Lund University 2014 ERPUG Conference 24 October 2014 Brussels 20Nm 6 Nm 2 Nm Background: Rolling Deflectometer Tests

More information

Simulating Rotary Draw Bending and Tube Hydroforming

Simulating Rotary Draw Bending and Tube Hydroforming Abstract: Simulating Rotary Draw Bending and Tube Hydroforming Dilip K Mahanty, Narendran M. Balan Engineering Services Group, Tata Consultancy Services Tube hydroforming is currently an active area of

More information

USA Published online: 29 May To link to this article:

USA Published online: 29 May To link to this article: This article was downloaded by: [University of Illinois at Urbana-Champaign] On: 1 August 214, At: 19:18 Publisher: Taylor & Francis Informa Ltd Registered in England and Wales Registered Number: 172954

More information

Derailments and Derailment Prevention

Derailments and Derailment Prevention Derailments and Derailment Prevention Dr. Allan M Zarembski Professor and Director Railroad Engineering and Safety Program University of Delaware dramz@udel.edu 2015 Allan M Zarembski Railroad Safety and

More information

TITLE: Drainage, Better Drainage, and More Drainage PRESENTER: DARRELL D. CANTRELL CANTRELL RAIL SERVICES, INC VICE PRESIDENT ENGINEERING

TITLE: Drainage, Better Drainage, and More Drainage PRESENTER: DARRELL D. CANTRELL CANTRELL RAIL SERVICES, INC VICE PRESIDENT ENGINEERING TITLE: Drainage, Better Drainage, and More Drainage PRESENTER: DARRELL D. CANTRELL CANTRELL RAIL SERVICES, INC VICE PRESIDENT ENGINEERING AREMA CONFERENCE- SEPTEMBER 23, 2009 INTRODUCTION Most of the heavy

More information

Manual for Assessing Safety Hardware

Manual for Assessing Safety Hardware American Association of State Highway and Transportation Officials Manual for Assessing Safety Hardware 2009 vii PREFACE Effective traffic barrier systems, end treatments, crash cushions, breakaway devices,

More information

AASHTO Manual for Assessing Safety Hardware, AASHTO/FHWA Joint Implementation Plan Standing Committee on Highways September 24, 2015

AASHTO Manual for Assessing Safety Hardware, AASHTO/FHWA Joint Implementation Plan Standing Committee on Highways September 24, 2015 AASHTO Manual for Assessing Safety Hardware, 2015 AASHTO/FHWA Joint Implementation Plan Standing Committee on Highways September 24, 2015 Full Scale MASH Crash Tests (NCHRP 22-14(02)) Conducted several

More information

Optimisation of Wheelset Maintenance using Whole System Cost Modelling

Optimisation of Wheelset Maintenance using Whole System Cost Modelling Optimisation of Wheelset Maintenance using Whole System Cost Modelling Adam Bevan, Paul Molyneux-Berry University of Huddersfield Steve Mills Rail Safety & Standards Board Andy Rhodes, Daniel Ling Serco

More information

Optimization of vehicle handling performance by increasing the ARB effectiveness. Date :- 22 June 2010

Optimization of vehicle handling performance by increasing the ARB effectiveness. Date :- 22 June 2010 Optimization of vehicle handling performance by increasing the ARB effectiveness Date :- 22 June 2010 BY Dr. A K Jindal, M.G. Belsare and T. M. Arun Prakash 1 Contents Vehicle Specifications Suspension

More information

Sustainable Rail Strategy The Value of Quality

Sustainable Rail Strategy The Value of Quality Graz University of Technology Institute of Railway Engineering and Transport Economics Sustainable Rail Strategy The Value of Quality Peter Veit June 30 th, 2015 www.ebw.tugraz.at Challenge Graz, Austria

More information

Three ULTra Case Studies examples of the performance of the system in three different environments

Three ULTra Case Studies examples of the performance of the system in three different environments Three ULTra Case Studies examples of the performance of the system in three different environments airport application: London Heathrow : linking business and staff car parks through the access tunnel

More information

ANALYSIS OF THE LATERAL LOAD PATH IN CONRETE CROSSTIE FASTENING SYSTEMS

ANALYSIS OF THE LATERAL LOAD PATH IN CONRETE CROSSTIE FASTENING SYSTEMS Proceedings of the 2014 Joint Rail Conference JRC2014 April 2-4, 2014, Colorado Springs, CO, USA JRC2014-3754 ANALYSIS OF THE LATERAL LOAD PATH IN CONRETE CROSSTIE FASTENING SYSTEMS Brent Williams bwillms3@illinois.edu

More information

GEOMETRIC PARAMETERS Affecting Capacity ICD 2

GEOMETRIC PARAMETERS Affecting Capacity ICD 2 Single Lane Roundabouts Geometric Design in Context -Urban versus Rural 1 GEOMETRIC PARAMETERS Affecting Capacity ICD 2 Effective Geometry V = Approach Road half width 3 E = Entry Width L = Effective Flare

More information

TCRP. REPORT 71, Volume 2. Transit Switch Design Analysis (Phase I) TRANSIT COOPERATIVE RESEARCH PROGRAM

TCRP. REPORT 71, Volume 2. Transit Switch Design Analysis (Phase I) TRANSIT COOPERATIVE RESEARCH PROGRAM TCRP PROGRAM REPORT 71, Volume 2 TRANSIT COOPERATIVE RESEARCH Transit Switch Design Analysis (Phase I) Sponsored by the Federal Transit Administration TCRP OVERSIGHT AND PROJECT SELECTION COMMITTEE (as

More information

ABT5020 P8 Inspectors Gauge

ABT5020 P8 Inspectors Gauge ABT5020 P8 Inspectors Gauge Instruction Manual 1.0 Index 1.0 Index 2.0 Overview 3.0 Specification 4.0 Getting Started 4.1 Measuring Flangeway 4.2 Measuring Check Gauge 4.3 Measuring Track Gauge 4.4 Measuring

More information

High-Speed Intercity Passenger Rail

High-Speed Intercity Passenger Rail September 13, 2011 LTRC Seminar Series: Congestion Management Baton Rouge New Orleans High-Speed Intercity Passenger Rail AGENDA LTRC Seminar Series: Congestion Management Baton Rouge, Louisiana Project

More information