1 Asphalt Technician Certification Program S - Smoothness (Operator) 2015 Presentation Manual In cooperation with the Colorado Asphalt Pavement Association, the Colorado Department of Transportation, and the Federal Highway Administration

2

3 October 2014 LabCAT Certification Program Information based on: Revisions of Sections Hot Mix Asphalt Pavement Smoothness and Revisions of Sections and 601 Introduction of CAPA & RMAEC Staff LabCAT Board of Directors LabCAT Technical Committee Program Description Safety General G l facility f ilit IInformation f ti 1

4 Tom Peterson, P.E. Tom Clayton, SET Diane Hammond Cindy Rutkoski Jim Fife Thomas Peterson, P.E. Bill Schiebel, P.E. Gary DeWitt, P.E. Mike Coggins, P.E. Randy Jensen, P.E. Jeff Keller Ken Coulson K C l Dale Miller Scott Sounart, P.E. Mike Skinner, PE CAPA Executive Director RMAEC Director of Training RMAEC Training Coordinator RMAEC Instructor CAPA Western Slope Consultant CAPA Co Chairman CDOT Co Chairman CDOT R 4 CDOT, R 5 FHWA APC Construction Coulson Excavating C l E i Larimer County Kleinfelder, Inc Skinner PE 2

5 Tom Clayton, SET Stanford P.E. PE Mike Stanford, Johnny Lam, EIT Darrell Harding, P.E. Donna Harmelink, P.E. Clayton Goodwin Ethan Weichert, P.E. David Fife John Cheever Todd Geneovese Carey Jones, P.E. Tom Hastings RMAEC, Co Chairman CDOT, Co Chairman CDOT Asphalt Pavements FHWA/CFLHD FHWA City/County of Denver Earth Engineering United Companies Aggregate Industries Martin Marietta Materials Kumar and Associates AG Wassenaar Inc Certification A Laydown Certification B Plant Materials Control Certification C Volumetrics & Stability Certification E Aggregates (A separate 1 day program) Certification I Asphalt Inspector (A separate 1 day program) Certification S HSP (Smoothness) (Operators) (Today s session) 3

6 Certification Level Overview: This certification will cover profiling for smoothness of HMA and PCCP materials using the high speed inertial profiler for HMA and PCCP. This is Certification for High Speed Profile operators, only. Equipment Certification will occur Annually and be administered by CDOT, at a different location. Item #1 Effective January 31, 2014 This change has been approved by the LabCAT Technical Committee and the LabCAT Board of Directors. Change took effect January 31, Written Exam Re Test Fees The written exam re test fee is $25 per level. 4 Item #2 Effective December 2,, 2014 This change has been approved by the LabCAT Technical Committee and the LabCAT Board of Directors. Change will take effect December 2,

7 Written Exam Re Test Administration re test The written exam re test will be administered immediately following failure of the initial written exam. If the re test is failed, the technician will not be allowed to continue the certification process. The level must be started over in a new session date. The full certification fee per level will be assessed. These policy supersede h l changes h d all ll references f regarding written re test fees and re test administration published in the 2014 RMAEC Policy and Procedure Manual. Written test will be given, You will have 45 minutes to complete the written test! 80% correct required to pass, Written and Proficiency. One written re re test will be allowed at a cost of $25. If a candidate Fails the p proficiencyy p portion of the exam, f ll be b charged h d at $150 and d will ll not b proficiency re exams will be allowed on the same day as the original testing. Retesting will need to be scheduled prior to the Retest occurring. Operator field proficiency testing will be done and administered at the approved track established by the RMAEC, near the RMAEC Training Facility. The operator will be tested on the setup and operation of the equipment. Operators must pass both parts to be eligible to operate the profiling equipment on a CDOT project. 80% correct will be required on both parts of the certification (Written and Proficiency) 5

8 If a candidate is re certifying, the proficiency examination mayy be conducted verbally. y The operators will be required to re certify on a 3 year basis. The contractor should survey the roadway for anything which mayy cause issues in obtaining g an accurate profile. It is important that the operator be able to drive the project from one point to another without having to alter the speed or without swerving from lane to lane. 6

9 High Speed Profiling has many challenges! At times the operator will need to make a decision on to move right or move left Here is an example of when this might occur! It is important for contractors to prepare the roadway prior to the actual p profile being performed. p gp The roadway must be sufficiently cleaned utilizing the most modern equipment available. 7

10 To achieve as accurate of a profile as possible, the paving contractor must prepare the roadways in attempt to have the surface be clean and free of debris and loose materials Using the best and most sophisticated machinery possible is a must! Over the next few slide we will present some process of obtaining information on the p g data for roadway smoothness. High speed profiling is based on research from the automobile companies and has evolved in what is being done today to measure roadway smoothness. 8

11 Ride Quality depends on: 1 Human response to vibration of vehicle 1. vehicle. 2. Vehicle response to the road. 3. Road roughness transferred through the vehicle limitations. Auto companies in the 1970 s spend considerable effort studyy vehicle vibrations,, theyy were determined to be: heave, waddle, shake, chatter, jitter, porpoise, tire nibble, etc. There are two major motions which ultimately effect the movement of a vehicle, they are; body bounce axle hop. 9

12 Th U.S. U S auto companies i The contracted with a University to research the human movements in a vehicle. The research determined g byy using g the manyy things services of University student. The data included the human response to vibration. The automobile industry estimates ride by at several interfaces: measuring g response p Seat/buttock Seat/back Floor/feet Steering Wheel/Hand 10

13 Vital organs in the abdominal cavity resonate at about 5 Hz. A human head resonates at about 25 Hz. Human eyes resonate at Hz. It is tough to grip a steering wheel if it is moving at Hz. The vehicle exaggerates some road features and isolates you from others. Each vehicle responds to the roughness of the road differently. Some features in the road are more significant to vehicle response than others. 11

14 Gain 4 Pickup 3 2 Sedan Frequency (Hz) History IRI Response Wavelength (ft)

15 International Roughness Index A filter that a road profile is passed through to estimate vehicle response to a road Quarter Car Model or Golden Car Units of in/mi (Up/Down deviation from a known ZERO Plane) Left Profile Average of Profiles Right Profile 1/2 Car = 1/4 Car using averaged profile input 13

16 The HRI is calculated from profile elevations in the LWP and the RWP The profiles are averaged point by point to create an average profile The IRI algorithm is applied to the resulting profile. Good way to isolate Localized Roughness High Speed Inertial Profiler Straight Edge Walking Profilographs Lightweight Inertial Profiler Pave set system 14

17 Inertial Profilers Diagram courtesy of LMI Taking the place of walking profilographs Using Laser and Technology U i L d IInertia ti T h l Faster response time Roughness and Rut Depth are the most common uses for inertial profilers 15

18 Components of a Profiler Vehicle GPS Optional Computer Vehicle to house q p Equip Sprung Vehicle Mass Suspension Spring & Dampener Speed & Distance Encoder Accelerometer & Laser Sprung Axle Mass Tire Spring 1960 s; GM Research Laboratories 16

19 Accelerometer Laser Photo cell used for auto triggering This is the Surface Area getting tested with a single spot laser Most common Laser is small spot size laser 17

20 100mm (4inches) 18

21 LMI Roline; 50mm measurement window is less resolute than the RoadMap. Standoff; 200mm Measurement Range; 200mm Actual Measurement Window; 50mm SO; 76.4mm FE; 147mm Profile Rate; 3kHz max. p ; 256max ((100 normal)) Points/profile; Tracking window 50mm measurement range (28 pixels) Scan rate 750Hz 19

22 Critical to finding the areas of concern Calibrating prior to each test is critical Has to be accurate to a certain tolerance Can manipulate the data 20

23 Components of a profiler? Lasers? Manufacturer off profilers M f t fil? Data collection? 21

24

25 The Smoothness Categories have been changed; the new Categories are I, II, III and I II IV 22

26 1. Use on Urban Reconstruction with or without curb and gutter; 2. Use on construction of one layer y over an intermediate treatment [Removal of Asphalt Mat (Planning), Cold Bituminous Pavement (Recycle), Heating and Remixing, Heating and Repaving, Full Depth Reclamation, leveling course with a thickness of 1.5 inches or less, or other intermediate treatment]; 3. May use on overlays meeting case No. 2 above, with curb and gutter when a shoulder separates driving lanes from the curb and gutter. A minimal amount of utility boxes, intersections and grade changes are allowed. Inset a plan note stating that lanes do not h have h the h new asphalt h l driving d l d to match curb and gutter. 4. May use on overlays meeting case No. 2 above, with curb and gutter when pavement smoothness is very important (Example: Speed limit higher than 39 mph). A minimal amount of utility boxes, intersections and grade changes are allowed. Inset a plan note stating that the new asphalt driving lanes do not have to match curb and gutter. 1. Use on new construction with or without curb and gutter; 2. Use on construction of more than one layer; 3 May use on overlays meeting case No 3. No. 2 above above, with curb and gutter when a shoulder separates driving lanes from the curb and gutter. A minimal amount of utility boxes, intersections and grade changes are allowed. Inset a plan note stating that the new asphalt driving lanes do not have to match curb and gutter grades. 4. May use on overlays meeting case No. 2 above, with curb and gutter when pavement smoothness is very important (Example: Speed limit higher than 39 mph). mph) A minimal amount of utility boxes, intersections and grade changes are allowed. Inset a plan note stating that the new asphalt driving lanes do not have to match curb and gutter. 23

27 1. Only one layer of pavement is being placed without an intermediate treatment. 2. Only one layer of pavement is being placed over Heating and Scarifying. 3. Heating and Repaving without an overlay. 4. May be used in urban overlays with curb and gutter when a shoulder separates driving lanes from the curb and gutter. A minimal amount of utility boxes, intersections and grade changes are allowed. A note needs to be placed in the plans stating that the new asphalt driving lanes will not have to match curb and gutter grades. 24

28 5. May be used in urban overlays with curb and gutter when pavement smoothness is very important (Example: Speed limit higher than 39 mph). A minimal amount of utility boxes, intersections and grade changes are allowed. A note needs to be placed in the plans stating that the new asphalt driving lanes will not have to match curb and gutter. HRI Category IV is applied to the following asphalt pavement construction: 1. Cold Recycling without an overlay. 2. Thin overlays (less than 1.5 inches thick) of HMA or SMA without an intermediate treatment. 3. Heating and Scarifying without an overlay. 4. Heating and Remixing without an overlay. 5. Urban rehabilitation treatments when smoothness is affected by matching existing curb ff t d b t hi i ti b and d gutter tt and/or d/ numerous intersections and/or utility boxes. This is not for reconstruction in urban areas. 25

29 Paving Category IV has no incentive 1-5 or disincentive and treatments 1 5 are is tested according to subsection (f). A force account for pavement smoothness is not needed if the project is only HRI Category IV. HRI Category I is for construction that will be affected by curb & gutter, numerous intersections, and utility boxes. HRI Category II is for express ways, interstates and any other PCCP that is not affected by curb & gutter, numerous intersections, and utility boxes. Short sections of PCCP panel replacement will not be subject to incentive/disincentive payment, but will be evaluated for localized roughness. Pick HRI Category I or II and use the following note: PCCP Panel Replacement shall not be subject to Incentive/Disincentive payments but shall be subject evaluation of localized roughness for HRI Category (I or II) 26

30 No pavement smoothness category is applied to the following asphalt pavement construction: Chip seals Chip seals are not tested at all for smoothness. Place the pavement smoothness category assignment in the General Notes. HRI Category II is the default smoothness category in the specification if a smoothness category is not listed in the plans. Do not assign Urban or Rural to any smoothness category. Do not assign percent improvement. improvement These smoothness categories are no longer in existence. 27

31 When appropriate, divide the project into different sections with different pavement smoothness categories instead of using the easier pavement smoothness category for the whole project If the designer intends for shoulders to be g lanes, add a note to the General future driving Notes stating whether these future driving lanes are subject to incentive/disincentive adjustments. Each lane shall be profiled at least once. Profiling shall be at a constant speed (+/ p ( / 5 mph p of the distance calibration speed ) with a minimum speed of 15 mph and a maximum speed of 70 mph. Shoulders with a width of 12 feet or more, ramps, tapers, turn slots, acceleration lanes and deceleration lanes shall be profiled. The profile shall be taken in the planned direction of travel. travel The left and right wheel paths shall be profiled simultaneously. The collected profiles shall be turned over immediately to the Engineer and will be analyzed using CP

32 Tests begin 25 feet outside joint This 25 ft plus 25 feet of new pavement is subject to Localized Roughness Only Table HMA PAVEMENT SMOOTHNESS (INCHES/MILE) HALF CAR HALF CAR ROUGHNESS INDEX When HRI 45.0 I = $1.28 When HRI 70.0 and 80.0 I = $0.00 When HRI > 80.0 and < I = x HRI (Disincentive) When HRI > 45.0 and < 70.0 I = x HRI When HRI 100 I = $1.28 (Disincentive) When HRI > 100 Corrective Work 29

33 Areas of localized roughness are determined to be where the continuous HRI report exceeds the values in Table Areas of localized roughness greater than 15.0 feet in length shall be considered deficient, and require corrective work. Areas of localized roughness less than 25 feet in distance that contain a valve box shall be tested in accordance with subsection (a) 2. for corrective work. Table CONTINUOUS HRI USING 25 FOOT AVERAGING FOR LOCALIZED ROUGHNESS CORRECTIVE WORK ON HMA PAVEMENTS HRI SMOOTHNESS CATEGORY HRI In/mile I / il I = II = III = IV does not have a threshold 30

34 HMA Recycling Treatment s, Thin Lifts Urban ifts and U ban Rehabilitation treatment s smoothness criteria. When HMA recycling, urban rehabilitation treatments or when only one layer less than 1.5 inches of HMA Pavement is p placed without an intermediate treatment are constructed as the final riding surface, the following shall be used for acceptance Report results to the nearest 0.1Mile f 2000 tons for f the h final fi l SQC test after layer Contractor notification of SA testing Contractor must wait maximum of 10 working days to do corrective work if SVT is i tto be b done d Contractor must mark profiling limits and excluded areas. 31

35 Certification should follow AASHTO guidelines Do not use another profiler to set the standard IRI<6 no worries Driving Styles Who has the best profiler? Do not certify on a smooth surface Needs to be med smooth to semi rough Do put out dots where WP will be Do make it long enough CDOT Equipment Certification Smoothness Assurance; Texture Micro vs. Macro; Too much or little Negative or positive Longitudinal or transverse Walking Profilograph Texture Texture Depths; Different HMA surface courses Surfacing Material Texture Depth Asphalt Concrete (fine graded) 0.4mm - 0.6mm (coarse graded) 0.6mm - 1.2mm Open Graded Friction Coarseness SMA 1.5mm - 3.5mm 32

36 Think Thi k about b t the th end d fifirstt CP (AASHTO PP 50 03) Height sensor check Accelerometer check Bounce Test Distance calibration Verification site check 33

37 Performed weekly To ensure accuracy of each height sensor Compare readings of blocks of known thickness The laser shall read the blocks thickness to within 0.01 of an inch Blocks are measured yearly with a certified caliper Base plate 0.25 inches h 0.50 inches 1 inches 2 inches Base plate At a minimum a 1 and 2 block will be checked per AASHTO PP 50 Each apparatus manufacturer will have specific height blocks for their equipment 34

38 Laser 1 Driver side New set Base check 2nd reading Laser 1 driver side Sensor block #1 March 2008 Laser 1 driver side S bl k # 2 Sensor block Continue with all required blocks per the manufacturers instructions i t ti Repeat same procedure for laser 2 March

39 The accelerometer calibration is performed to ensure the accuracy of each accelerometer Position the inertial profiler on a relatively flat and level area The accelerometer calibration performed everyday prior to testing or when the profiler measurements are in doubt. Software may vary from manufacturer to manufacturer Screen May appear different from Manufacturer to Manufacturer The bounce test is performed to verify that height sensors and accelerometers in the profiler are functioning properly together Measures the electrical noise of the profiler Performed weekly j with a smooth surface An object is placed on the pavement under each laser sensor so that the texture of the pavement will not affect the test Software may vary from manufacturer to manufacturer Screen May appear different from Manufacturer to Manufacturer 36

40 Prompt the Computer to run a bounce test Perform a bounce test per the manufacturers directions Analyze the data collected. Verifyy the data collected meets the manufacturers recommendations for this equipment Software may vary from manufacturer to manufacturer Screen May appear different from Manufacturer to Manufacturer Tires are warmed to assure proper tire pressure per the tire manufacturer Verify the tires are inflated to the tire manufactures recommendations Check Tire Pressure of all tires on the vehicle, record the date and pressure of each tire in a log book The Th pressure is i acceptable bl only l if all ll pressures are the same 37

41 The distance calibration is performed to ensure the accuracy of the profilers distance measuring instrument (DMI) Done prior to measurements at each project Prepare the equipment per the manufacturers directions Run the Distance Calibration, verify the distance measured. Continue following the on screen directions Site should be run at the same speed as distance calibration Done once a week at a known verification site. (This should be a site you create within a short period of time after you have your equipment certified by CDOT. It does not d to t be, b but b t can b tifi ti site.) it ) need be th the CDOT certification To ensure the accuracy of the profiler s data collection systems. A CDOT site will be established one or more times a year where the profile of the road should remain stable. This will be the site CDOT will use to Certify Equipment, yearly. The site should profiled 10 times. 38

42 The average of the 10 runs is the target for future runs. The weekly runs are considered acceptable if the IRI is within 2 standard deviations from the average of the 10 initial runs Conformity y to Roadway y Smoothness Criteria. Roadway smoothness testing and corrective work shall be performed as described in the CDOT Specifications and procedures 39

43 HMA Pavement Criteria: (Continued) Contractor Smoothness Quality Control. A profile shall be taken on the first 2,000 tons of each profiled lift and again after completion of that lift, submitted to the Project Engineer within 48 hours hours. NOTE: The contractor may at their own risk, continue to place materials without the final smoothness data being available. Test results shall show the Half Car Roughness Index (HRI) for each 0.10 mile QC and QA testing shall be performed using the Contractor s inertial profiler. The Contractor s QC will Profiler shall be certified byy CDOT, the operator p be required to have a current LabCAT Level S Certification at the time of equipment certification. The contractor shall notify the engineer in writing of his intention to perform the initial QA testing. This shall be at least 5 working days in advance of ant work that will affect the smoothness of the lanes. CDOT may elect to profile any project using the DOT HSP equipment. equipment The DOT profile will be considered an independent profile to verify the data collected by the contractors equipment 40

44 Production shall be suspended if QC testing indicates that corrective work is required. P d i will ill remain i suspended d d until il the h Production problem is identified and corrected. Each time production is suspended, corrective actions shall be proposed in writing by the Contractor. When production resumes, the Contractor shall profile the first 2,000 tons of HMA. The conditions above for suspension of work will apply. apply Contractor Corrective work shall be proposed in writing by the Contractor. Corrective work shall not be performed until approved in writing by the Engineer. Corrective work shall be completed on the top lift after the Quality Assurance Smoothness (QA) testing is complete. Corrective work on lower lifts will be at the Contractor s discretion. Incentive/disincentive payments will be based on the QA testing and analysis by CDOT. The Contractor shall verify and perform any corrective work in the areas indicated by the QA testing report by CDOT. The Contractor shall profile the roadway to verify that the required corrective work has been completed. 41

45 Half Car Roughness Index Corrective Work: The criteria for determining if a 0.1 mile section or fraction thereof requires corrective work is specified in Table In addition to determining if a 0.1 mile section or fraction thereof requires corrective work, the profiles shall be analyzed for areas of Localized Roughness. Localized Roughness. The profiles shall be analyzed to determine where areas of localized roughness occur. The profile shall be summarized using the continuous HRI reporting system using an averaging length of 25 feet. The latest release of the FHWA s ProVal software shall be used to generate the continuous HRI report. ( Areas shall be considered deficient, and require corrective work where the continuous HRI report exceed In/mile. ROUGHNESS CORRECTIVE WORK ON HMA PAVEMENTS Half Car Roughness Index Corrective Work. The criteria g if corrective for determining work is required for a 0.10 mile section or fraction thereof is within the CDOT Specifications HRI SMOOTHNESS CATEGORY HRI In/mile I II III

46 HRI Category g y I is for construction that will be affected by curb & gutter, numerous intersections, and utility boxes. HRI Category II is for express ways, interstates and d any other th PCCP that th t is i not affected by curb & gutter, numerous intersections, and utility boxes. PCCP Pavements Criteria: Conformity to Roadway Smoothness Criteria. Roadway smoothness testing and corrective work shall be performed as described in REVISION OF SECTIONS PORTLAND CEMENT CONCRETE PAVEMENT ROADWAY SMOOTHNESS (HIGH SPEED PROFILER) The pavement smoothness category shall be HRI Category II unless shown on the plans. The Contractor shall perform Smoothness Quality Control (SQC) testing. A profile shall be taken for each day s paving within 24 hours after the concrete has achieved sufficient strength. The Contractor shall not perform the SQC testing until after the concrete has attained a compressive strength of 1,000 psi if a light weight profiler is used or 2,000 psi if a high speed profiler is used. The test results shall be submitted to the Engineer within 48 hours of completion. completion SQC test results shall show the Half Car Roughness Index (HRI) for each 0.10 mile section and the results for localized roughness 43

47 All traffic control costs associated with SQC testing will be paid for in accordance with Section 630. SQC testing shall be performed using the Contractor s Contractor s inertial profiler, pursuant to the methods described in subsection (b) and in accordance with the manufacturer s recommendations. The Contractor s Profiler shall be certified according to CP 78. A list of certified profilers is located at Production shall be suspended if SQC testing indicates that corrective work is required in accordance with subsection (c). Production will remain suspended until the problem is identified and corrected. Each time production is suspended, corrective actions shall be proposed in writing by the Contractor. Corrective work shall not be performed prior to the Department s Initial Smoothness Acceptance testing. resumes the Contractor shall profile the first half When production resumes, mile of paving. The conditions above for suspension of work will apply. The finished transverse and longitudinal surface elevation of the pavement shall be measured using a 10 foot straightedge. The Contractor shall furnish an approved 10 foot straightedge and depth gauge and provide an operator to aid the Engineer in testing the finished pavement surface. Areas to be measured shall be as directed by the Engineer. Engineer Areas showing high spots of more than 3/16 inch in 10 feet shall be marked and diamond ground until the high spot does not exceed 3/16 inch in 10 feet. When longitudinal tining is required on concrete pavement, the pavement shall be grooved to restore the longitudinal texture (tining) as shown in the plans and specifications. 44

48 Initial Smoothness Acceptance (SA) Testing. The Department s smoothness testing results will be used for acceptance and calculation of incentive and disincentive payments. All traffic control costs associated with SA testing will be paid for by the Department in accordance with Section 630. Longitudinal Pavement Surface Smoothness Acceptance. Pavement surfaces shall be tested and accepted for longitudinal smoothness as described herein. Testing Procedure (General). The longitudinal surface smoothness of the final pavement surface shall be tested and evaluated by the Department in accordance with CP 74 using the Department's high-speed profiler (HSP). The HSP instrumentation will be verified in accordance with CP 74 prior to measurements. The Contractor shall lay out a distance calibration site. The distance calibration site shall be located no more than ten miles from the Project limits. The distance calibration site shall be 1056 feet long g and shall be on a relatively y flat, straight section of pavement as approved by the Engineer. The site shall have a speed limit equal to the Project s highest speed limit that allows for the HSP to operate uninterrupted. The limits of the site shall be clearly marked and the distance shall be measured to an accuracy of +/- 3 inches. The Contractor shall provide in writing the site location to the Engineer. The cost of the distance calibration site will not be measured and paid for separately, but shall be included in the work. The Contractor shall notify the Engineer in writing at least 10 working days in advance to schedule SA testing. The Engineer will not schedule pavement smoothness testing if the Contactor has not submitted SQC results 45

49 The Contractor shall notify the Department at least 48 hours prior to the scheduled SA testing date when the smoothness testing needs to be cancelled for any reason. The Contractor shall be charged $500 for failure to meet this requirement and rescheduling i required. i d Th i i th h is The E Engineer may waive the $500 charge if rescheduling is a result of weather or at the convenience of the Department. The entire length of each through lane, climbing lane and passing lane including bridge approaches, bridge decks and intersections from the beginning to the end of the project shall be profiled. A sufficient distance shall be deleted from the profile to allow the profiler to obtain the testing speed plus a 300 foot distance to stop and start when required. Incentive/disincentive payments will not be made for this area. The profile shall include transverse joints when pavement is placed by the project on both sides of the joint. When pavement is placed on only one side of the joint, the profile shall start 5 feet outside the project paving limits. Th profile fil off th h side id off every manhole, h l railroad il d The the area 25 ffeett each crossing, cattle guard, gutter pan and intersection (where there is a planned breakpoint in the profile grade line in the direction of testing) shall be deleted from the profile before the HRI is determined. When both new pavement and a new bridge or new bridge pavement are being constructed in a project, the profile of the area 25 feet each side of every bridge expansion device shall be deleted from the profile before the HRI is determined. Diamond grinding will not be measured and butt shall be iincluded the work. d paid id ffor separately, t l b h ll b l d d iin th k 46

50 Localized Roughness. The profiles shall be analyzed to determine where areas of Localized Roughness g occur. The profile shall be summarized using the continuous HRI reporting system using an averaging length of 25 feet. The FHWA s ProVal (Version 2.7 or later) software shall be used to generate the continuous HRI report. ProVal can be downloaded at www roadprofile com Corrective work on concrete pavements shall consist of diamond grinding. When any grinding on concrete pavement occurs where a core for determining pavement thickness has been previously taken, another core shall be taken after the grinding has been completed and shall replace the original core in the calculation of pavement thickness incentive and disincentive. Joint sealant that has been damaged by grinding on concrete pavement shall be repaired or replaced at the Contractor s expense. Cores shall be taken to verify that minimum pavement thicknesses have been maintained. A minimum of one core shall be taken every 100 cumulative feet per lane of diamond grinding, as directed by the Engineer. Coring shall be at the Contractor s expense. When longitudinal tining is required on concrete pavement, the pavement shall be grooved to restore the longitudinal texture (tining) as shown in the plans and specifications. 47

51 The Contractor shall lay out a distance calibration site. The distance calibration site shall be at least 1056 feet long pavement as approved byy the Engineer. g section of p pp g The site shall allow the HSP to operate at the testing speed without interruption. The limits of the site shall be clearly marked and the distance shall be measured to an accuracy of +/ 3 inches. The Contractor shall provide the measured distance of the site to the Engineer. The cost of the distance calibration site will not be measured and paid for separately, but shall be included in the work. The Contractor shall notify the Engineer in writing at in advance to of the intent to perform pavement smoothness Quality Assurance testing at the completion of paving and after corrections are completed. The Engineer will not accept finial pavement smoothness testing if the Contactor has nott submitted b itt d QC results. lt 48

52 A sufficient distance will be deleted from the profile to profiler to obtain the testing plus allow the p g speed p p a foot distance to stop and start when required. The profile will include transverse joints when pavement is placed by the project on both sides of the joint. Questions? Are you ready for your written test? October

53 Questions? If no questions, We will test now. 50

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) CFS:TEH 1 of 10 APPR:KPK:JFS:07-07-16 FHWA:APPR:07-15-16 a. Description. This

More information

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road

More information

SECTIO N 610 PAVEMENT SMO O THNESS

SECTIO N 610 PAVEMENT SMO O THNESS SECTIO N 610 PAVEMENT SMO O THNESS 610.1 Description. This work shall consist of measuring the smoothness of the final pavement surface. Smoothness shall be measured using the International Roughness Index

More information

Table Standardized Naming Convention for ERD Files

Table Standardized Naming Convention for ERD Files S-1 (2399) PAVEMENT SURFACE SMOOTHNESS (2013 version) DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. Always use with SP2005-111 (CONCRETE PAVING MIX SPECIFICATIONS PAVEMENT) and SP2005-140

More information

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE CATEGORY 500 PAVING 1 of 9 SECTION 535.01 DESCRIPTION. This work shall consist of measuring the roughness of the final surface of hot mix asphalt (HMA) or portland cement concrete (PCC) pavements. The

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION 03SP502(P) SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) C&T:TEH 1 of 8 C&T:APPR:JFS:MJE:01-28-08 FHWA:APPR:02-01-08 a. Description. Provide

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface.

DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface. 2399 PAVEMENT SURFACE SMOOTHNESS 2399.1 DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface. A Definitions The Department defines Smoothness as the Mean

More information

ITEM 585 RIDE QUALITY FOR PAVEMENT SURFACES Description. Measure and evaluate the ride quality of pavement surfaces.

ITEM 585 RIDE QUALITY FOR PAVEMENT SURFACES Description. Measure and evaluate the ride quality of pavement surfaces. ITEM 585 RIDE QUALITY FOR PAVEMENT SURFACES 585.1. Description. Measure and evaluate the ride quality of pavement surfaces. 585.2. Equipment. A. Surface Test Type A. Provide a 10-ft. straightedge. B. Surface

More information

DIVISION V SURFACINGS AND PAVEMENTS

DIVISION V SURFACINGS AND PAVEMENTS 36-3.01 GENERAL DIVISION V SURFACINGS AND PAVEMENTS 36 GENERAL 04-20-18 Replace section 36-3 with: 36-3 PAVEMENT SMOOTHNESS 36-3.01A Summary Section 36-3 includes specifications for measuring the smoothness

More information

MnDOT s Experience with IRI Specifications

MnDOT s Experience with IRI Specifications MnDOT s Experience with IRI Specifications Spring 2013 NCC Meeting April 4, 2013 Philadelphia, PA Maria Masten, P.E. MnDOT Concrete Engineer Evolution of Smoothness No Equipment Certification 2002 Profiler

More information

SECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS

SECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS SECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS 602.01 General 1. This specification establishes a standard for Portland cement concrete pavement smoothness, and defines defective pavement smoothness.

More information

An Update on Smoothness Specifications at ODOT

An Update on Smoothness Specifications at ODOT An Update on Smoothness Specifications at ODOT Brian L. Schleppi ODOT Pavement Engineering Ohio Asphalt Paving Conference Tuesday February 7, 2004 Overview Review Major Points from 2 yrs ago Smoothness

More information

Section 6. Ride Specification Special Provisions Step-by-Step Ride Guide for Inspectors and Project Engineers

Section 6. Ride Specification Special Provisions Step-by-Step Ride Guide for Inspectors and Project Engineers Section 6 Ride Specification 2399 Special Provisions Step-by-Step Ride Guide for Inspectors and Project Engineers 2 2399 PAVEMENT SURFACE SMOOTHNESS 2399.1 DESCRIPTION This work consists of measuring the

More information

NCDOT Rideability and IRI Special Provision. Nilesh Neel Surti, PE North Carolina DOT State Pavement Construction Engineer

NCDOT Rideability and IRI Special Provision. Nilesh Neel Surti, PE North Carolina DOT State Pavement Construction Engineer NCDOT Rideability and IRI Special Provision Nilesh Neel Surti, PE North Carolina DOT State Pavement Construction Engineer RPUG 2011 NCDOT - Ride Quality Background Fall 1995 Rideability addressed in Asphalt

More information

THE USE OF PERFORMANCE METRICS ON THE PENNSYLVANIA TURNPIKE

THE USE OF PERFORMANCE METRICS ON THE PENNSYLVANIA TURNPIKE Wilke, P.W.; Hatalowich, P.A. 1 THE USE OF PERFORMANCE METRICS ON THE PENNSYLVANIA TURNPIKE Paul Wilke, P.E. Principal Engineer Corresponding Author Applied Research Associates Inc. 3605 Hartzdale Drive

More information

Manitoba Infrastructure and Transportation

Manitoba Infrastructure and Transportation Provincial Smoothness Specifications (MB, SK, AB, BC) Darel Mesher PhD, PEng November, 2012 Manitoba Infrastructure and Transportation 2 1 Manitoba Infrastructure and Transportation Construction Smoothness

More information

Profiler Certification Process at the Virginia Smart Road

Profiler Certification Process at the Virginia Smart Road Pavement Surface Properties Consortium Profiler Certification Process at the Virginia Smart Road Center for Sustainable Transportation Infrastructure Outline Introduction Objectives Profiler Certification

More information

Control of Pavement Smoothness in Kansas

Control of Pavement Smoothness in Kansas Report No. FHWA-KS-8-5 Final REPORT Control of Pavement Smoothness in Kansas William H. Parcells, Jr., P.E. Kansas Department of Transportation Topeka, Kansas May 29 KANSAS DEPARTMENT OF TRANSPORTATION

More information

(2111) Digital Test Rolling REVISED 07/22/14 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. SP

(2111) Digital Test Rolling REVISED 07/22/14 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. SP S-xx (2111) Digital Test Rolling REVISED 07/22/14 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS. SP2014-54.2 The Veda Software and Digital Test Rolling forms are available on the MnDOT Advanced

More information

Profiler Certification Program at the NCAT Pavement Test Track. R. Buzz Powell Jason Nelson

Profiler Certification Program at the NCAT Pavement Test Track. R. Buzz Powell Jason Nelson Profiler Certification Program at the NCAT Pavement Test Track R. Buzz Powell Jason Nelson Background Certification startup costs via ALDOT project Satisfy requirements for Quality Assurance Leverage cooperative

More information

a road is neither cheap nor fast.

a road is neither cheap nor fast. TECHNOLOGY Speaker phone By David Grimmer Contributing Author New app tells you degree of road roughness Getting roughness information for a road is neither cheap nor fast. Many cities and counties don

More information

Asphalt Pavement Construction Update

Asphalt Pavement Construction Update Asphalt Pavement Construction Update 2013 FTBA Construction Conference Richard Hewitt, PE State Construction Pavement Engineer Smoothness Developmental Specification Smoothness Developmental Specification

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

Research Update Construction Conference Charles Holzschuher, P.E. February 3, Florida Department of Transportation

Research Update Construction Conference Charles Holzschuher, P.E. February 3, Florida Department of Transportation Research Update 2017 Construction Conference Charles Holzschuher, P.E. February 3, 2017 Laser Based Sensor Evaluation Goals: Evaluate Laser Based Sensors for Profilers Support RN and IRI Smoothness Specifications

More information

INLAND NORTHWEST REGIONAL PAVEMENT CUT POLICY

INLAND NORTHWEST REGIONAL PAVEMENT CUT POLICY INLAND NORTHWEST REGIONAL PAVEMENT CUT POLICY Howard Hamby Spokane County Road Maintenance Administrator PAVEMENT CUT FAILURES 1. Sloughing 2. Poor Compaction 3. Poor

More information

Non-Destructive Pavement Testing at IDOT. LaDonna R. Rowden, P.E. Pavement Technology Engineer

Non-Destructive Pavement Testing at IDOT. LaDonna R. Rowden, P.E. Pavement Technology Engineer Non-Destructive Pavement Testing at IDOT LaDonna R. Rowden, P.E. Pavement Technology Engineer Bureau of Materials and Physical Research Physical Research Section Bridge Investigations Unit Pavement Technology

More information

RUNWAY ROUGHNESS CONSIDERATIONS. SWIFT 2013 Chris Olidis, P.Eng.

RUNWAY ROUGHNESS CONSIDERATIONS. SWIFT 2013 Chris Olidis, P.Eng. RUNWAY ROUGHNESS CONSIDERATIONS SWIFT 2013 Chris Olidis, P.Eng. PRESENTATION OUTLINE A general overview of runway roughness Assessing roughness for new construction Assessing roughness of in service runways

More information

SMOOTH PAVEMENTS LAST LONGER! Diamond Grinding THE ULTIMATE QUESTION! Rigid Pavement Design Equation. Preventive Maintenance 2 Session 2 2-1

SMOOTH PAVEMENTS LAST LONGER! Diamond Grinding THE ULTIMATE QUESTION! Rigid Pavement Design Equation. Preventive Maintenance 2 Session 2 2-1 THE ULTIMATE QUESTION! Diamond Increased Pavement Performance and Customer Satisfaction Using Diamond How do I make limited budget dollars stretch and provide a highway system that offers a high level

More information

The INDOT Friction Testing Program: Calibration, Testing, Data Management, and Application

The INDOT Friction Testing Program: Calibration, Testing, Data Management, and Application The INDOT Friction Testing Program: Calibration, Testing, Data Management, and Application Shuo Li, Ph.D., P.E. Transportation Research Engineer Phone: 765.463.1521 Email: sli@indot.in.gov Office of Research

More information

FIGURE 15. MANUAL RUT DEPTH

FIGURE 15. MANUAL RUT DEPTH FIGURE 15. MANUAL RUT DEPTH Flexible Pavement Condition Survey Handbook, March 2012 Page 31 Ride Rating The longitudinal profile of each wheel path is measured at highway speeds by an ASTM E-950 Class

More information

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Revised April 5, 2005 Revised January 27, 2006 Prepared by: Steve Collin, Engineer 2.5 Revised by Douglas

More information

Ride Smoothness Measurement and Specification Issues. Nicholas Vitillo, Ph. D. Manager, Bureau of Research New Jersey Department of Transportation

Ride Smoothness Measurement and Specification Issues. Nicholas Vitillo, Ph. D. Manager, Bureau of Research New Jersey Department of Transportation Ride Smoothness Measurement and Specification Issues Nicholas Vitillo, Ph. D. Manager, Bureau of Research New Jersey Department of Transportation Components of Pavement Smoothness Surface Tolerance deviations

More information

Measurement of Tire/Pavement Noise

Measurement of Tire/Pavement Noise Measurement of Tire/Pavement Noise 34 Hot Mix Asphalt Technology JANUARY/FEBRUARY 2005 Sound caused by transportation systems is the number one noise complaint. Figure 1 Wayside measurements Research in

More information

SMOOTH MOVING - it's a measure of quality (1st of 3 articles) HMA = Smoothness

SMOOTH MOVING - it's a measure of quality (1st of 3 articles) HMA = Smoothness SMOOTH MOVING - it's a measure of quality (1st of 3 articles) HMA = Smoothness The traveling public cares about smooth roads. That was true in the early sixties, during the AASHO Road Tests, when drivers

More information

3. Application Fees, Certificate Of Insurance & Performance Bond

3. Application Fees, Certificate Of Insurance & Performance Bond SUBSECTION 13.10 CONSTRUCTION OF DRIVEWAYS 13.10A PERMIT REQUIREMENTS 1. General A driveway or access road serving private property and intersecting with a town road shall be constructed in such a manner

More information

SKID RESISTANCE EVALUATION PROGRAM

SKID RESISTANCE EVALUATION PROGRAM SKID RESISTANCE EVALUATION PROGRAM P a u l O w e n s Director ISH C Research and Training Center West Lafayette, Indiana H IS T O R Y Indiana started skidding roads in 1968 with a towed-trailer type skid

More information

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS CITY OF GRAND PRAIRIE TRANSPORTATION SERVICES DEPARTMENT SPEED CUSHION INSTALLATION POLICY A. GENERAL Speed cushions are an effective

More information

2017 Local Roads Workshop Local Agency HMA Acceptance Specification

2017 Local Roads Workshop Local Agency HMA Acceptance Specification 2017 Local Roads Workshop Local Agency HMA Acceptance March 2017 Review of Existing Spec Next Steps Construction Local Agency HMA Acceptance 1. Mix Design a. Submit Mix design and JMF to Engineer for

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

Presentation Outline. TRB MEPDG Workshop. Traffic Data & WIM Program. WIM Program in WIM program (prior to MEPDG) Utilizing WIM data

Presentation Outline. TRB MEPDG Workshop. Traffic Data & WIM Program. WIM Program in WIM program (prior to MEPDG) Utilizing WIM data Presentation Outline TRB MEPDG Workshop Traffic & Axle Weight Data Brian Diefenderfer, PhD, PE Research Scientist Virginia Transportation Research Council Charlottesville, VA January 13, 2008 WIM program

More information

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures Scarborough Fire Department Scarborough, Maine Standard Operating Procedures Book: Routine Operations Chapter: Apparatus Operations Subject: 2125 - Driver/Operator Recertification Revision Date: 06/17/2013

More information

Rehabilitated PCC Surface Characteristics

Rehabilitated PCC Surface Characteristics Rehabilitated PCC Surface Characteristics Dr. W. James Wilde, P.E. Professor, Minnesota State University Director, Center for Transportation Research and Implementation Mankato, Minnesota Mr. Elliott Dick

More information

Pavement Management Program Report

Pavement Management Program Report Pavement Management Program Report for the City of Placentia 2018 Citywide Pavement Management Program Update June 19, 2018 June 19, 2018 Luis Estevez Director of Public Works City of Placentia 401 East

More information

PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL

PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL Submit To Martin County Judge s Office P.O. Box 1330 Stanton Texas 79782-1330 mhernandez@co.martin.tx.us APPLICATION: Permittee

More information

TRANSPORTATION RESEARCH BOARD. TRB Straight to Recording for All. Rumble Strips/Stripes: Practices and Challenges

TRANSPORTATION RESEARCH BOARD. TRB Straight to Recording for All. Rumble Strips/Stripes: Practices and Challenges TRANSPORTATION RESEARCH BOARD TRB Straight to Recording for All Rumble Strips/Stripes: Practices and Challenges NCHRP Synthesis Report 490: Practice of Rumble Strips and Rumple Stripes NCHRP Project 20-05,

More information

EMERGENCY ACCESS POLICY

EMERGENCY ACCESS POLICY Cowlitz 2 Fire & Rescue Policies and Operating Guidelines Policy: EMERGENCY ACCESS POLICY Number Effective Date Approved and Issued: 4001 8/28/02 8/28/02 1.0 REFERENCE 23 CFR Part 650 Subpart C Code of

More information

Structural Considerations in Moving Mega Loads on Idaho Highways

Structural Considerations in Moving Mega Loads on Idaho Highways 51 st Annual Idaho Asphalt Conference October 27, 2011 Structural Considerations in Moving Mega Loads on Idaho Highways By: Harold L. Von Quintus, P.E. Focus: Overview mechanistic-empirical procedures

More information

Reduction of vehicle noise at lower speeds due to a porous open-graded asphalt pavement

Reduction of vehicle noise at lower speeds due to a porous open-graded asphalt pavement Reduction of vehicle noise at lower speeds due to a porous open-graded asphalt pavement Paul Donavan 1 1 Illingworth & Rodkin, Inc., USA ABSTRACT Vehicle noise measurements were made on an arterial roadway

More information

Thomas Bennert, Ph.D. Rutgers University Center for Advanced Infrastructure and Transportation (CAIT)

Thomas Bennert, Ph.D. Rutgers University Center for Advanced Infrastructure and Transportation (CAIT) Thomas Bennert, Ph.D. Rutgers University Center for Advanced Infrastructure and Transportation (CAIT) Rutgers University working on putting together a set of performance tests (rutting and cracking) that

More information

All Regional Engineers. Omer M. Osman, P.E. Special Provision for Hot-Mix Asphalt Mixture Design Composition and Volumetric Requirements July 25, 2014

All Regional Engineers. Omer M. Osman, P.E. Special Provision for Hot-Mix Asphalt Mixture Design Composition and Volumetric Requirements July 25, 2014 All Regional Engineers Omer M. Osman, P.E. Special Provision for Hot-Mix Asphalt Mixture Design Composition and Volumetric Requirements July 25, 2014 This special provision was developed by the Bureau

More information

Northeast Pavement Preservation Partnership Burlington, Vermont. Rhode Island DOT

Northeast Pavement Preservation Partnership Burlington, Vermont. Rhode Island DOT Northeast Pavement Preservation Partnership Burlington, Vermont Rhode Island DOT April 8, 2014 SHRP2 R26 (Preservation of High-Traffic Volume Roadways) and MAP-21 Impacts to RIDOT Pavement Management David

More information

Measuring Pavement Condition Data for a Long-term Pavement Performance Study on New Zealand Roads. D Brown

Measuring Pavement Condition Data for a Long-term Pavement Performance Study on New Zealand Roads. D Brown Measuring Pavement Condition Data for a Long-term Pavement Performance Study on New Zealand Roads. D Brown Measuring Pavement Condition Data for a Long-term Pavement Performance Study Background Measurement

More information

RUTGERS PAVEMENT RESOURCE CENTER RIDE QUALITY TOOLS

RUTGERS PAVEMENT RESOURCE CENTER RIDE QUALITY TOOLS 192-RU8485 RUTGERS PAVEMENT RESOURCE CENTER RIDE QUALITY TOOLS January 2011 Submitted by Ali Maher, Ph.D. Professor and Director Patrick Szary, Ph.D. Associate Director Nicholas Vitillo, Ph.D. Research

More information

Sight Distance. A fundamental principle of good design is that

Sight Distance. A fundamental principle of good design is that Session 9 Jack Broz, PE, HR Green May 5-7, 2010 Sight Distance A fundamental principle of good design is that the alignment and cross section should provide adequate sight lines for drivers operating their

More information

Long Life Asphalt Performance Testing January 17, 2018

Long Life Asphalt Performance Testing January 17, 2018 PennDOT District 11 Long Life Asphalt Performance Testing January 17, 2018 Jim Foringer, P.E. Assistant District Executive Construction Division Neal Fannin, P.E. Pavement Materials Engineer BOPD Construction

More information

Ultra-thin Bonded Wearing Course Performance Update, Minnesota

Ultra-thin Bonded Wearing Course Performance Update, Minnesota 2009-30 Ultra-thin Bonded Wearing Course Performance Update, Minnesota Take the steps... Research...Knowledge...Innovative Solutions! Transportation Research Ultra-thin Bonded Wearing Course Performance

More information

SPECIFICATION FOR SKID RESISTANCE INVESTIGATION AND TREATMENT SELECTION

SPECIFICATION FOR SKID RESISTANCE INVESTIGATION AND TREATMENT SELECTION SPECIFICATION FOR SKID RESISTANCE 1. SCOPE This specification outlines the process for identifying sites where treatment to improve skid resistance may be justified. 2. GLOSSARY AND DEFINITIONS Bleeding:

More information

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

This is a new permit condition titled, 2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP) This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)" Note to Permit Writer: This condition is for existing engines (commenced

More information

To facilitate the extension of departmental services through third party testing organizations as provided for by CRS (b)

To facilitate the extension of departmental services through third party testing organizations as provided for by CRS (b) DEPARTMENT OF REVENUE Division of Motor Vehicles MOTORCYCLE RULES AND REGULATIONS FOR ALMOST ORGANIZATIONS 1 CCR 204-20 [Editor s Notes follow the text of the rules at the end of this CCR Document.] A.

More information

TITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES

TITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES NOTE: This is a courtesy copy of this rule. The official version can be found in the New Jersey Administrative Code. Should there be any discrepancies between this text and the official version, the official

More information

TABLE OF CONTENTS 1.0 INTRODUCTION...

TABLE OF CONTENTS 1.0 INTRODUCTION... Advisory Circular Subject: Runway Grooving Issuing Office: Civil Aviation, Standards Document No.: AC 300-008 File Classification No.: Z 5000-34 Issue No.: 03 RDIMS No.: 12581035-V2 Effective Date: 2017-01-30

More information

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary 8" Physical gore ( ) ( ) 250 Varies 250 TYPICAL RUMBLE STRIP PLACEMENT AT EXIT AND ENTRANCE RAMPS This distance may vary This distance may vary ( ) 2 16" edge of R=12" Max ( ) Physical gore Texturing 1.

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BITUMINOUS SURFACE TREATMENT

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BITUMINOUS SURFACE TREATMENT 402-1(a-e) 99 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BITUMINOUS SURFACE TREATMENT These Special Provisions revise, amend, and where in conflict, supersede applicable sections of the

More information

I.D.O.T. Update Version -

I.D.O.T. Update Version - I.D.O.T. Update - 2007 Version - RUBBLIZATION Rubblization with HMA Overlay Rehabilitation method for deteriorated concrete pavements Alternative to extensive patching or reconstruction Pavement in effect

More information

Recommendations for AASHTO Superelevation Design

Recommendations for AASHTO Superelevation Design Recommendations for AASHTO Superelevation Design September, 2003 Prepared by: Design Quality Assurance Bureau NYSDOT TABLE OF CONTENTS Contents Page INTRODUCTION...1 OVERVIEW AND COMPARISON...1 Fundamentals...1

More information

Date of Issue: For: County Engineer. County Road No.: Maintenance Area: Section Forman Payment Required: (Options: Cash Cheque Credit Card)

Date of Issue: For: County Engineer. County Road No.: Maintenance Area: Section Forman Payment Required: (Options: Cash Cheque Credit Card) County of Wellington Engineering Services Department Roads Division 74 Woolwich Street Guelph, Ontario N1H 3T9 Phone: (519) 837-2601 Fax: (519) 837-8138 Email: roadsinfo@wellington.ca ENTRANCE PERMIT OWNER/APPLICANT

More information

CITY OF PORTSMOUTH PURCHASING DEPARTMENT PORTSMOUTH, NEW HAMPSHIRE. Annual Fuel Bid - #01-18 INVITATION TO BID

CITY OF PORTSMOUTH PURCHASING DEPARTMENT PORTSMOUTH, NEW HAMPSHIRE. Annual Fuel Bid - #01-18 INVITATION TO BID CITY OF PORTSMOUTH PURCHASING DEPARTMENT PORTSMOUTH, NEW HAMPSHIRE Annual Fuel Bid - #01-18 INVITATION TO BID The City of Portsmouth is soliciting bids for our primary supply and emergency supply of fuel.

More information

Fundamentals of Paving Smoothness

Fundamentals of Paving Smoothness Paving Smoothness Overview Fundamentals of Paving Smoothness Ty Huls Smoothness Measurements Smoothness on the Job Site Smoothness at the Paver Smoothness at the Rollers Continuous Paving Job Site Example

More information

Implementation and Thickness Optimization of Perpetual Pavements in Ohio

Implementation and Thickness Optimization of Perpetual Pavements in Ohio Implementation and Thickness Optimization of Perpetual Pavements in Ohio OTEC 2015 Issam Khoury, PhD, PE Russ College of Engineering and Technology Ohio University, Athens, Ohio Outline Background prior

More information

1400 MISCELLANEOUS Traffic Engineering Manual

1400 MISCELLANEOUS Traffic Engineering Manual TABLE OF CONTENTS Part 14 - MISCELLANEOUS 1400 GENERAL... 14-3 1415 RUMBLE STRIPS (INCLUDING STRIPES) IN THE ROADWAY... 14-4 1415-1 General... 14-4 1415-2 Transverse Rumble Strips... 14-4 1415-2.1 General...

More information

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62:

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62: 1365 S. Camino del Rio Durango, CO 81303 970-382-6363 DRIVEWAY STANDARDS Resolution 2014-40 EXHIBIT A The following definition shall replace the definition of driveway in Section 62: Driveway means a roadway,

More information

COUNTY ROAD SPEED LIMITS. Policy 817 i

COUNTY ROAD SPEED LIMITS. Policy 817 i Table of Contents COUNTY ROAD SPEED LIMITS Policy 817.1 PURPOSE... 1.2 APPLICABILITY... 1.3 DEFINITIONS... 1.4 STATE ENABLING LEGISLATION... 2.5 SPEED LIMITS ON COUNTY ROADS (CCC 11.04)... 2.6 ESTABLISHING

More information

D-25 Speed Advisory System

D-25 Speed Advisory System Report Title Report Date: 2002 D-25 Speed Advisory System Principle Investigator Name Pesti, Geza Affiliation Texas Transportation Institute Address CE/TTI, Room 405-H 3135 TAMU College Station, TX 77843-3135

More information

PART 665 BUS TESTING. Subpart A General. 49 CFR Ch. VI ( Edition)

PART 665 BUS TESTING. Subpart A General. 49 CFR Ch. VI ( Edition) Pt. 665 PART 665 BUS TESTING Subpart A General Sec. 665.1 Purpose. 665.3 Scope. 665.5 Definitions. 665.7 Grantee certification of compliance. Subpart B Bus Testing Procedures 665.11 Testing requirements.

More information

.MAINTENANCE. Strategic Initiative Four:

.MAINTENANCE. Strategic Initiative Four: The accompanying fact sheets explain specific components of the department s effort to prioritize maintenance activities. This information provides the basis of ODOT s 2001 Strategic Initiative Four: Re-Defining

More information

Maintaining Pavement Marking Retroreflectivity

Maintaining Pavement Marking Retroreflectivity Supplemental Notice of Proposed Amendment: Maintaining Pavement Marking Retroreflectivity Kyle Armstrong, P.E., PTOE Acting Engineer of Traffic Operations https://safety.fhwa.dot.gov/ Rule Making Process

More information

2/5/2019. Definitions. Consolidation. Compaction 101: Doing the Right Things, the Right Way Session W14 Dale Starry, Volvo Construction Equipment

2/5/2019. Definitions. Consolidation. Compaction 101: Doing the Right Things, the Right Way Session W14 Dale Starry, Volvo Construction Equipment Compaction 101: Doing the Right Things, the Right Way Session W14 Dale Starry, Volvo Construction Equipment Definitions Consolidation Compression Compaction 2 Consolidation Material volume change achieved

More information

MoDOT TECHNICIAN QUALIFICATION MANUAL For PROFILOGRAPH OPERATORS. Table of Contents. Profilograph Example (Pay Calculation)

MoDOT TECHNICIAN QUALIFICATION MANUAL For PROFILOGRAPH OPERATORS. Table of Contents. Profilograph Example (Pay Calculation) MoDOT TECHNICIAN QUALIFICATION MANUAL For PROFILOGRAPH OPERATORS Table of Contents Powerpoint Profilograph Example (Pay Calculation) Profilogram Analysis Exercise Profilograph Definitions Safety MoDOT

More information

MN Roads Low Volume Road Testing to Validate the Purdue TPTA Textures and Predicted Joint Effects

MN Roads Low Volume Road Testing to Validate the Purdue TPTA Textures and Predicted Joint Effects AMERICAN CONCRETE PAVEMENT ASSOCIATION MN Roads Low Volume Road Testing to Validate the Purdue TPTA Textures and Predicted Joint Effects Workplan Prepared by Larry Scofield American Concrete Pavement Association

More information

Lowering Pavement Evaluation Costs Using Big Data

Lowering Pavement Evaluation Costs Using Big Data SOLVING PROBLEMS OF GLOBAL IMPORTANCE www.ara.com Lowering Pavement Evaluation Costs Using Big Data Bill Buttlar UIUC Bill Vavrik ARA T.H.E. 2016 www.ara.com 2015 2014 Applied Research Associates, Inc.

More information

Based on NFPA 1002: Standard for Fire Apparatus Driver/Operator Professional Qualifications, 2009 Edition.

Based on NFPA 1002: Standard for Fire Apparatus Driver/Operator Professional Qualifications, 2009 Edition. Based on NFPA 1002: Standard for Fire Apparatus Driver/Operator Professional Qualifications, 2009 Edition. Certification Criteria Apparatus Operator ARFF Pre-Course Job Performance Requirement (Driving

More information

HydroGenerations PROGRAM HANDBOOK

HydroGenerations PROGRAM HANDBOOK HydroGenerations PROGRAM HANDBOOK TABLE OF CONTENTS Please ensure you are reading the most recent version of this handbook by visiting the NV Energy website, www.nvenergy.com/hydro. Contents HydroGenerations

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

Applicable California Vehicle Code Sections, 2015 Edition

Applicable California Vehicle Code Sections, 2015 Edition Applicable California Vehicle Code Sections, 2015 Edition Speed limits in California are governed by the California Vehicle Code (CVC), Sections 22348 through 22413; also, pertinent sections are found

More information

CEE 320 Midterm Examination (50 minutes)

CEE 320 Midterm Examination (50 minutes) Examination (50 minutes) Please write your name on this cover. Please write you last name on all other exam pages This examination is open-book, open-note. There are 5 questions worth a total of 100 points.

More information

The State of Michigan Transportation Asset Management Council 2005 PASER Survey Of Lapeer County

The State of Michigan Transportation Asset Management Council 2005 PASER Survey Of Lapeer County The State of Michigan Transportation Asset Management Council 2005 PASER Survey Of Lapeer County Prepared by the Genesee County Metropolitan Planning Commission Staff The State of Michigan Transportation

More information

Draft Autonomous Vehicles Legislation for Washington State. Provisions

Draft Autonomous Vehicles Legislation for Washington State. Provisions Draft Autonomous Vehicles Legislation for Washington State Introduction This draft legislation was researched and written by the University of Washington s Technology Law and Policy Clinic at the request

More information

EFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS

EFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS EFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS Graduate of Polytechnic School of Tunisia, 200. Completed a master degree in 200 in applied math to computer

More information

Worcester Public Schools Student Transportation Contract Proposed Bid Specification Change Summary Sheet

Worcester Public Schools Student Transportation Contract Proposed Bid Specification Change Summary Sheet Worcester Public Schools 2020-2022 Student Transportation Contract Proposed Bid Specification Change Summary Sheet 1 for a five-year period beginning the First Day of Summer School 2015 and ending on the

More information

Fleet Penetration of Automated Vehicles: A Microsimulation Analysis

Fleet Penetration of Automated Vehicles: A Microsimulation Analysis Fleet Penetration of Automated Vehicles: A Microsimulation Analysis Corresponding Author: Elliot Huang, P.E. Co-Authors: David Stanek, P.E. Allen Wang 2017 ITE Western District Annual Meeting San Diego,

More information

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required

More information

Ch. 157 ESTABLISHED SOUND LEVELS CHAPTER 157. ESTABLISHED SOUND LEVELS

Ch. 157 ESTABLISHED SOUND LEVELS CHAPTER 157. ESTABLISHED SOUND LEVELS Ch. 157 ESTABLISHED SOUND LEVELS 67 157.1 CHAPTER 157. ESTABLISHED SOUND LEVELS Subchap. A. GENERAL PROVISIONS... 157.1 B. NOISE LIMITS... 157.11 C. ADMINISTRATIVE PROVISIONS... 157.21 D. INSTRUMENTATION...

More information

Wet Accident Reduction Program (WARP) in Virginia. Bipad Saha, P.E. Pavement Design Engineer

Wet Accident Reduction Program (WARP) in Virginia. Bipad Saha, P.E. Pavement Design Engineer Wet Accident Reduction Program (WARP) in Virginia Bipad Saha, P.E. Pavement Design Engineer Presentation Outline Introduction to WARP Background WARP Outline 2008 WARP Results Historical Data and Results

More information

Correcting Low Asphalt Pavement Friction. Brian L. Schleppi OH DOT Office of Technical Services

Correcting Low Asphalt Pavement Friction. Brian L. Schleppi OH DOT Office of Technical Services Correcting Low Asphalt Pavement Friction Brian L. Schleppi OH DOT Office of Technical Services Overview AC Pavement Surface Features which give us Friction Ideas about Friction Demand (How much friction

More information

SANDAG Vanpool Program Guidelines as of February 2018

SANDAG Vanpool Program Guidelines as of February 2018 SANDAG Vanpool Program Guidelines as of February 2018 The San Diego Association of Governments (SANDAG) administers the SANDAG Vanpool Program to provide alternative transportation choices to commuters,

More information

Performance Tests of Asphalt Mixtures

Performance Tests of Asphalt Mixtures Performance Tests of Asphalt Mixtures Louay N. Mohammad, Ph.D. Department of Civil and Environmental Engineering LA Transportation Research Center Louisiana State University 42 nd Annual Rocky Mountain

More information

SAN JACINTO COLLEGE COMMERCIAL TRUCK DRIVING 2018 CLASS SCHEDULE

SAN JACINTO COLLEGE COMMERCIAL TRUCK DRIVING 2018 CLASS SCHEDULE SAN JACINTO COLLEGE COMMERCIAL TRUCK DRIVING 2018 CLASS SCHEDULE CVOP Day Class 2018 Monday through Thursday 7AM to 6PM -6 weeks PTD/DDC Day Defensive Driving Course Schedule January 2 - February 8 January

More information

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc.

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc. OHIO Department of Transportation Project #140378 Franklin County, OH ISSA Presidents Award Submission Strawser Construction Inc. Columbus, Ohio Applicant Information Strawser Construction Inc. 1392 Dublin

More information

Topics. Hauling, Laydown and Compaction. Optional Release Agent Hauling Vehicles. Delivery 7/6/2010

Topics. Hauling, Laydown and Compaction. Optional Release Agent Hauling Vehicles. Delivery 7/6/2010 Topics Hauling, Laydown and Compaction WisDOT/WAPA Asphalt Pavement Project Manager Training June 2010 Hauling Equipment pavers, MTDs, rollers Construction surface prep, placement and joints Compaction

More information