TOWN OF BRUNSWICK NOTICE OF PUBLIC HEARING

Size: px
Start display at page:

Download "TOWN OF BRUNSWICK NOTICE OF PUBLIC HEARING"

Transcription

1 TOWN OF BRUNSWICK NOTICE OF PUBLIC HEARING In accordance with Maine law, 23 M.R.S.A. 3026, notice is hereby given that the Town Council of the Town of Brunswick will hold a Public Hearing in the Town Council Chambers of the Town Hall, located at 85 Union Street, Brunswick, Maine at 7:00 p.m. on Monday, November 20, 2017 to consider input from neighbors and the general public regarding the potential discontinuance of a portion of Pine Street, a public way in Brunswick Maine, more particularly described as follows: Beginning on the northeasterly sideline of Pine Street at the southerly sideline of Bath Road; thence southeasterly by and along the northeasterly sideline of Pine Street to the southwesterly corner of land now or formerly of William C. Elmore, as conveyed by the deed recorded in the Cumberland County Registry of Deeds in Book 31754, Page 25; thence southwesterly perpendicular to the northeasterly sideline of Pine Street, crossing Pine Street, to the southwesterly sideline of Pine Street; thence northwesterly by and along the southwesterly sideline of Pine Street to the southerly sideline of Bath Road; thence easterly by and along the southerly sideline of Bath Road to the point of beginning. The names of the owners of the abutting properties are as follows: Parcel ID Location Owner U35-B 0 Bath Road Pine Grove Cemetery U35-E 0 Pine Street Bowdoin College U35-F 0 Sills Drive Bowdoin College No public easement shall be retained in the said portion of Pine Street being discontinued; however, should the discontinuance be approved, the abutters will grant an easement to the Town for general public access over the discontinued street until such time as Bowdoin College constructs a new public access way between Bath Road and Pine Street. No damages are to be paid to the abutting property owners pursuant to a separate agreement executed between said abutters and the Town of Brunswick. All interested persons are invited to attend the public hearing and will be given an opportunity to be heard. The text of the order or discontinuance and exhibits is too extensive to be included with this notice. Anyone having questions about the order of discontinuance or wishing to obtain copies of it should contact the Brunswick Town Clerk's or Town Manager's Office during regular office hours Monday through Wednesday from 8:30 a.m. to 4:30 p.m., Thursday from 8:30 a.m. to 6:00 p.m., and Friday from 8:30 a.m. to 3:00 p.m. The order of discontinuance may also be found on the Town s website at INDIVIDUALS NEEDING AUXILIARY AIDS FOR EFFECTIVE COMMUNICATION PLEASE CONTACT THE TOWN MANAGER'S OFFICE AT (TDD ) Frances M. Smith Town Clerk of Brunswick, Maine Public Hearing Pine Street Discontinuance KMC edit docx

2 Town of Brunswick, Maine INCORPORATED 1739 TOWN COUNCIL 85 UNION STREET BRUNSWICK, MAINE TELEPHONE FAX November 9, 2017 Property Owner Pine St., Bowker St., McLellan St., Chamberlain Ave., and Hawthorne St. Brunswick, Maine Re: Notice of Public Hearing Discontinuance of a Portion of Pine Street Dear Property Owner: The Brunswick Town Council will be holding a public hearing on Monday, November 20th at the Brunswick Town Hall, 85 Union Street, to take public comments on an order that would discontinue as a public way a section of Pine Street. The section to be discontinued is illustrated on the enclosed map. To be clear, approval of the discontinuance order would mean that section of Pine Street would no longer be a public street. Discontinuance of the street would allow Bowdoin College to utilize the land on both sides of the discontinued portion of the street to construct improvements related to its Whittier Field athletic complex. Bowdoin College has agreed to construct a new access road from Bath Road to the remaining section of Pine Street. This new road could be a new public road. Alternatively the road could be designated as a private way and not be connected to Pine Street, meaning that the new road would not provide public access from Bath Road to the neighborhood. Brunswick public safety services prefer that the new access be a public road. A traffic study commissioned by the Town of Brunswick predicted that the proposed new road would have little impact on neighborhood traffic. A map depicting an approximate location of a new public road is enclosed. Including the maps cited above the following materials are enclosed: Map 1 Pine Street Section proposed for discontinuance Map 2 Location of a new access road from Bath Road (see Easement Agreement below) Public Hearing Notice Order of Discontinuance Easement Agreement (Includes Map 2) Letter from Bowdoin College Image Possible development on Pine Street A full package of materials including traffic studies may be obtained at the Town Hall or from the Town s website at www. brunswickme.org. Please consider attending the hearing and expressing your opinion. A decision as to whether to discontinue the road has not been made. It will not be made until at least ten days following the public hearing. Brunswick Town Council Enclosures

3

4 TOWN OF BRUNSWICK, MAINE IN TOWN COUNCIL November 6, 2017 Order of Discontinuance of a portion of Pine Street THE TOWN OF BRUNSWICK HEREBY ORDAINS AS FOLLOWS: That, pursuant to 23 M.R.S. 3026, the proposed order of discontinuance set forth below be filed with the Town Clerk. It is further ordered that the Town Clerk notify the owners of the abutting parcels of land of the proposed discontinuance and of the time and place for a public hearing on that discontinuance. Such notice shall be mailed by United States Postal Service, postage prepaid, first class, to the owners of the abutting parcels at the addresses which appear in the Town s assessment records. PROPOSED ORDER: Pursuant to 23 M.R.S. 3026, the Town of Brunswick hereby discontinues the public way of the portion of Pine Street more particularly described as follows: Beginning on the northeasterly sideline of Pine Street at the southerly sideline of Bath Road; thence southeasterly by and along the northeasterly sideline of Pine Street to the southwesterly corner of land now or formerly of William C. Elmore, as conveyed by the deed recorded in the Cumberland County Registry of Deeds in Book 31754, Page 25; thence southwesterly perpendicular to the northeasterly sideline of Pine Street, crossing Pine Street, to the southwesterly sideline of Pine Street; thence northwesterly by and along the southwesterly sideline of Pine Street to the southerly sideline of Bath Road; thence easterly by and along the southerly sideline of Bath Road to the point of beginning. The names of the owners of the abutting properties are as follows: Parcel ID Location Owner U35-B 0 Bath Road Pine Grove Cemetery U35-E 0 Pine Street Bowdoin College U35-F 0 Sills Drive Bowdoin College No public easement shall be retained in the said portion of Pine Street being discontinued. The Town of Brunswick determines that no damages are to be paid to the abutting property owners pursuant to a separate agreement executed between said abutters and the Town of Brunswick

5 Approval of this Order of Discontinuance by the Town Council shall be expressly conditioned upon the Council s acceptance of an Easement Agreement from Bowdoin College and Pine Grove Cemetery in the form attached hereto as Exhibit A

6 EASEMENT AGREEMENT This agreement is made by and between Bowdoin College ( Bowdoin ), a Maine corporation, Pine Grove Cemetery Association of Brunswick, Maine ( Pine Grove ), and the Town of Brunswick (the Town ), a body politic and corporate in Cumberland County, Maine. Bowdoin owns land abutting Pine Street in Brunswick, Maine. At the request of Bowdoin, a portion of Pine Street has been discontinued and is no longer a public way, with no public easement retained. As used in this agreement, the Road means the said discontinued portion of Pine Street. In order to provide for the continued use of the Road by the Town, Bowdoin and the Town agree as follows. 1. Bowdoin grants to the Town an easement to use the Road for pedestrian and vehicular traffic. During the term of this easement, the Town shall be responsible for the maintenance of the Road, at its own expense. Neither Bowdoin nor Pine Grove shall be liable for any claims for injury or loss arising from or occasioned by the maintenance of the Road (or lack thereof), except for its willful misconduct or bad faith. This easement shall terminate in accordance with Section 5 below. 2. Bowdoin also grants to the Town an easement to use a portion of the Road for a pedestrian walkway and/or a bicycle path (the Walkway/Path ) providing access between Bath Road and the portion of Pine Street remaining a public way. The locations of the Walkway/Path shall be subject to the right of Bowdoin to relocate them from time to time, provided that any such substituted locations shall be of reasonable convenience and safety for the said uses. Said easement for the Walkway/Path shall continue notwithstanding construction of the Substitute Road pursuant to Section 5 below. 3. Bowdoin shall be responsible for the maintenance of the Walkway/Path, at its own expense. The Walkway/Path shall be maintained in a passable condition, but passage may be adversely affected by snow, ice, and other weather conditions. Bowdoin shall not be liable for any claims for injury or loss arising from or occasioned by its maintenance of the Walkway/Path (or lack thereof), except for its willful misconduct or bad faith. 4. Routine maintenance services shall be performed at such intervals as will keep the Walkway/Path in good repair, but some services may be delayed or deferred to obtain a better rate or to make a more efficient work schedule. Any condition which renders the Walkway/Path impassable shall be repaired or remedied as soon as practicable. 5. At its own expense, Bowdoin shall construct a new road (the Substitute Road ) to provide access between Bath Road and the portion of Pine Street that remains a public way. The approximate location of the Substitute Road is shown on Exhibit A attached hereto. The Substitute Road shall be constructed to meet all applicable standards of the Town. When the Substitute Road is completed, the easement set forth in Section 1 above and the Town s maintenance obligations shall terminate, and Bowdoin shall deliver to the Town s officers a duly executed deed conveying the Substitute Road to the Town for use as a public way, in accordance - 1 -

7 with 23 M.R.S Alternatively, at the election of the Town, Bowdoin shall retain the Substitute Road as a private way and shall grant the Town an easement to use the Substitute Road for access by emergency and municipal vehicles. 6. The use of the Road and the rights granted hereby shall at all times comply with all applicable governmental laws, ordinances, and regulations. 7. This agreement benefits and burdens the parties hereto and their successors and assigns. References herein to the named parties refer also to all future owners of their lands affected by this agreement. 8. Pine Grove joins in this agreement for the purpose of granting the easement, as set forth in Section 1 above, over the discontinued portion of Pine Street, a portion of which is owned by Pine Grove. By this limited joinder, Pine Grove does not undertake any obligation for any of the other provisions of this agreement. 9. This agreement assumes the discontinuance of a portion of Pine Street, but may be executed and delivered before such discontinuance. This agreement shall take effect upon the later of (a) the date of its execution stated below or (b) the date of said discontinuance. In witness whereof, the said parties have caused this instrument to be signed and sealed in their corporate names by their undersigned officers, hereunto duly authorized, as of this day of November, Bowdoin College By Witness, [Print Name] [Title] Town of Brunswick By Witness, [Print Name] [Title] Pine Grove Cemetery Association of Brunswick, Maine By Witness, [Print Name] [Title] - 2 -

8 STATE OF MAINE Cumberland County November, 2017 Personally appeared the above named, [Name] [Title] of Bowdoin College, and acknowledged before me the foregoing instrument to be her/his free act and deed in her/his said capacity and the free act and deed of said corporation. Notary Public/Attorney at law Print or type name as signed - 3 -

9

10

11

12

13 Town of Brunswick, Maine OFFICE OF THE TOWN MANAGER MEMORANDUM TO: FROM: DATE: SUBJECT: Town Council John Eldridge Town Manager November 2, 2017 (revised 11/9/17 for website) Discontinuance of Pine Street Staff Analysis of Request By letter dated October 20, 2017, Bowdoin College has requested that the Town discontinue, as a public way, a portion of Pine Street that runs from its intersection with Bath Road to the boundary of Bowdoin's ownership near the intersection of Pine and Bowker Streets. A map depicting the portion of the street proposed to be discontinued is attached. This memorandum summarizes staff s analysis of Bowdoin s request. Background Pine Street is a public way over land owned by the abutters. Bowdoin College is one of the abutters and its property is bisected by Pine Street. The College has recently made substantial improvements to its Whittier Field athletic complex, a facility the College owns, located on the south side of Pine Street. Phase I of the improvements included widening and resurfacing of the track, installation of a turf field, installation of bleachers on the north side of the field, and other improvements. Bowdoin College is currently planning Phase II of the project. Part of Phase II would include the location of locker room facilities on the north side of Whittier Field and an extension of the recently installed north side bleachers. These two improvements would encroach into the Pine Street rightof way. Bowdoin has determined that this location best serves the activities at Whittier Field. It also believes that locating the facilities on the north side of the field responds to the residents of Bowker Street who requested that improvements and traffic be moved away from the Bowker street residential properties. A neighborhood site walk was conducted by the Town s Planning and Development Department on August 14, This was followed by a meeting at Town Hall on the same date. The purpose of the site walk and meeting was to get a sense of the neighborhood reaction to the discontinuance of Pine Street and the creation of a new access road from Bath Road to the section of Pine Street that would remain. Subsequent to the site walk and Town Hall meeting, Town Staff met to discuss the public safety and traffic implications of the discontinuance, as the public has significant rights and responsibilities related to this right of way. Analysis Staff reviewed the request for discontinuance and concluded a newly constructed publicly owned and maintained connection from Bath Road to Pine Street would best serve public safety access and

14 Memorandum to Town Council November 2, 2017 Re: Discontinuance of Pine Street Staff Analysis Page 2 of 3 egress to and from the neighborhood and Whittier Field. Fire/EMS stated a strong preference for a public connection. Police also preferred a public connection to Maine Street. From the site walk and public meetings, there did not seem to be a clear neighborhood consensus about creating a new access road. Those who opposed or had reservations about the plan were concerned that a new public connection in the proposed location would increase the potential for traffic to cut through the neighborhood by using the new access to avoid the Bath Road/Sills Drive/Federal Street intersection. To address the cut through concerns the Town commissioned Maine Traffic Resources (MTR) to conduct an analysis to determine the likelihood of increased neighborhood traffic from a perceived cut through. In its report dated October 27, 2017, Maine Traffic Resources concluded that it is the professional opinion of MTR that cut through traffic would be highly unlikely on any of these three side streets. 1 2 MTR went on to add that, As previously determined, while no traffic from outside the neighborhood would be expected to cut through the neighborhood due to the proposed relocation of Pine Street, some of the neighborhood residents may be expected to alter their travel to use the relocated Pine Street connection from Bath Road. 3 So while MTR concluded that no additional traffic would likely cut through the neighborhood, it is possible that the residents of the neighborhood would find the new access/egress useful. In the event that the MTR s analysis did not accurately predict the impact, and there in fact was greater cut through traffic, staff and MTR believes this could be mitigated by several traffic calming measures. For one, the new connection to Bath Road could be converted to a private driveway that only allowed public safety vehicles pass through access. Another possibility is a one way public road. Should a new public access be constructed, staff recommends additional traffic counts be conducted post construction to ascertain traffic impacts on the neighborhood and the necessity for any traffic calming measures. As Pine Street serves as a bike and pedestrian access, staff also considered the impact discontinuing Pine Street would have on bike and pedestrian access to the Brunswick Landing Perimeter Road. In 2015, the Town constructed and opened a new connection to the Perimeter Road from the terminus of Pine Street. Staff does not believe that bike and pedestrian traffic should be encouraged to travel on Bath Road to reach the new access road. To minimize this concern, Bowdoin has agreed to maintain public bike and pedestrian access from Bath Road, near the route of the existing Pine Street. Another issue raised was traffic to and from the three cemeteries that are accessed from Pine Street. Bowdoin and the Pine Grove Cemetery Association have reached an access agreement that would allow visitors to the Pine Grove Cemetery to access the cemetery over a private way. That private way would be maintained by Bowdoin College and be located essentially where Pine Street now exists. It would not be a public way for general access; only a private way to access the cemetery. For the Varney and St. John s cemeteries, the public would be encouraged to access via Bath Road and the new connector to Pine Street. Should this new connector not allow public access, those visiting the cemeteries would travel on the neighborhood streets. The level of impact here is not clear, but staff believes that most cemetery traffic now uses Pine Street. 1 Bowker, McLellan, Chamberlain 2 Maine Traffic Resources, October 27, 2017, Re: Traffic Review and Additional Analysis for the Pine Street Relocation for Whittier Field Improvements at Bowdoin College, Brunswick (Page 5) 3 Ibid

15 Memorandum to Town Council November 2, 2017 Re: Discontinuance of Pine Street Staff Analysis Page 3 of 3 In analyzing the request for discontinuance, staff identified current issues that could and should be addressed. On street parking on game or event days occurs throughout the neighborhood. Busses carrying athletes to and from events use local streets. If Pine Street is discontinued and a new connection made to Bath Road, staff expects Bowdoin College to utilize the new access and development flexibility to address these issues. Summary Discontinuance of Pine Street and the establishment of a public connection provide Bowdoin College with the greatest flexibility in planning improvements to Whittier Field and for the future development of College property between Pine Street and Bath Road. It also allows the College to meet the neighborhood preference that activities related to the field occur away from residential properties. A potential drawback is that a new access from Bath Road could result in increased vehicular traffic in the neighborhood. However, the Town s traffic consultant believes that cutthrough traffic was unlikely and that any increase in traffic in the neighborhood would result from the neighborhood residents use of the new access. The traffic consultant and the staff believe that any negative traffic impacts, determined from the post construction traffic counts, can be mitigated with traffic calming measures. Attachments: Map of Pine Street and Neighborhood Maine Traffic Resources, October 27, 2017, Re: Traffic Review and Additional Analysis for the Pine Street Relocation for Whittier Field Improvements at Bowdoin College, Brunswick

16 Pine S McLellan Street Bath Road Pine Street Bowker Street Access Easement to be Given to Cemetery Section of Pine Street to be Discontinued F Proposed Approximate Location of Relocated Pine Street Town of Brunswick Concept Plan for Relocation and Discontinuation of Part of Pine Street Sills Drive Harpswell Ro 1 inch = 200 feet Map by JAF, Public Works Dept. September 23, 2016

17 SUMMARY MEMORANDUM TO: Mr. John S. Eldridge DATE: October 27, 2017 Town Manager Town of Brunswick 85 Union Street Brunswick, ME RE: Traffic Review and Additional Analysis for the Pine Street Relocation for Whittier Field Improvements at Bowdoin College, Brunswick Maine Traffic Resources (MTR) was retained by the Town of Brunswick to review a memorandum completed by Sebago Technics regarding the potential Pine Street relocation due to planned improvements at Whitter Field at Bowdoin College. The memorandum was prepared by Derek H. Caldwell, P.E. and dated May 23, This memorandum summarizes the review of Sebago Technics study, which was performed to determine the effect of the Pine Street relocation on the Bowker Street neighborhood. In addition, the Town of Brunswick requested additional traffic analysis regarding the potential for cut-through traffic destined to the neighborhoods on Bowker Street, McLellan Street and Chamberlain Avenue, specifically as related to potential diverted trips due to the relocation of Pine Street, as opposed to traffic simply cutting through these neighborhoods. Pine Street currently intersects Bath Road at a skew away from Sills Drive, approximately 525 feet from the signalized intersection of Bath Road, Federal Street and Sills Drive. According to the Sebago memorandum, Bowdoin College is proposing to relocate Pine Street approximately 1,375 feet east of the existing location. The new intersection would intersect Bath Road at approximately a 90-degree angle, as opposed to the current skew, which is less than 45 degrees. Data Collection Sebago Technics obtained turning movement counts on April 19, 2017 at the Bath Road intersections of Federal Street/ Sills Drive and Pine Street during the AM (7:00 9:00 AM) and PM (4:00 6:00 PM) peak hour periods. The AM peak hour for both intersections occurred 8:00 to 9:00 AM. The PM peak hour for both intersections occurred from 4:00 to 5:00 PM. In addition, automatic traffic recorder (ATR) data was also collected at 20 Bath Road and 54. Page 1

18 Pine Street Relocation, Brunswick 10/27/2017 To provide additional information regarding diverted neighborhood trips, which would potentially use a relocated Pine Street, Maine Traffic Resources conducted turning movement counts at the following intersections during the AM (7:00 9:00) and PM (3:30 5:30) peak hour periods: Intersection Description Count Date Peak Hour & Bowker Street AM October 19, :00 9:00 AM & Bowker Street PM October 17, :15 5:15 PM & McLellan Street AM October 19, :00 9:00 AM & McLellan Street PM October 19, :45 4:45 PM & Chamberlain Avenue AM October 18, :00 9:00 AM & Chamberlain Avenue PM October 12, :30 5:30 PM The count records are attached to this memorandum. The counts, including Sebago s counts, were factored to the first week in September, which is generally considered peak for school and college areas, using MaineDOT urban group mean factors. These factors are derived by MaineDOT from numerous continuous count stations located throughout Maine since peak volumes are used for traffic design and analysis purposes. The factored volumes are also shown on the count records. The resulting 2017 peak hour volumes for both the AM and PM peak hours, expected under early September conditions, are summarized graphically in Figure 1. Travel Time Analysis Sebago Technics calculated travel times between 20 Bath Road and 54 Harpswell Road by utilizing the traffic simulation software, VISSIM. This model simulated the total travel time along the 4,000-foot route from Bath Road through the signalized intersection of Bath Road, Federal Street and Sills Drive to and vice versa. Their results for the AM and PM peak hours are shown below: Sebago Technics Travel Time Simulation Results Travel Route AM Peak Hour PM Peak Hour to Bath Road 93 seconds 98 seconds Bath Road to 100 seconds 101 seconds In comparison, Maine Traffic Resources conducted field measured travel time runs for both paths during the AM peak hour period on October 12, 2017 and during the PM peak hour period on October 18, A table showing all of the travel time results is attached to this memorandum. MTR calculated the average travel time for each route. It is important to note that MTR s runs were conducted from Chamberlain Avenue to 20 Bath Road since MTR was also interested in projecting Chamberlain Road residents who Page 2

19 Pine Street Relocation, Brunswick 10/27/2017 may utilize a relocated Pine Street. The timed difference in the field between Chamberlain Avenue and 54 was approximately 7 to 8 seconds. Therefore, 7 seconds was subtracted from the MTR field observed travel times for comparison purposes. The results are summarized below: MTR Field Measured Travel Time Results Between 54 and 20 Bath Road Travel Route AM Peak Hour PM Peak Hour to Bath Road 94 seconds 94 seconds Bath Road to 118 seconds 128 seconds As shown above, MTR s field results were similar to the Sebago simulation results for the to Bath Road direction. However, MTR found the travel times for the Bath Road to direction to be significantly longer, primarily due to delay at the signal. As one would expect, the PM peak hour delays were longer than the AM peak hour delays given the greater PM traffic volumes. To compare the mainline travel times to the potential cut through route with a relocated Pine Street, Sebago calculated total travel time by using the distance of each piece of the cut through route between 54 Harpswell and 20 Bath Road and the 85 th percentile speeds. They assumed the cut through route would result in a vehicle traveling from Bath Road taking a left onto Pine Street, a right onto Bowker Street and then a left onto. Based on their calculations this would result in a travel time of 76 seconds, not including associated delays at each of the turns. MTR concurs with this methodology to calculate travel times for portions of the roadway that do not currently exist. However, given that the majority of the potential cut-through routes are on existing roadways, MTR again performed field measured travel time runs to determine actual travel times. Additionally, MTR believes that McLellan Street and Chamberlain Avenue also have the potential to carry cut through traffic, not just Bowker Street, due to a relocation of Pine Street. Therefore, travel time runs were completed for all three of these residential roadways. The travel time runs were completed from the existing Bowdoin Pines drive on Pine Street (the approximate new location for Pine Street) to 54 and vice versa. The run via Chamberlain Avenue was started and completed at the intersection with given the ATR was located north of the intersection and cut through traffic would not be making that maneuver. The remainder of the relocated route via the new Pine Street to and from Bath Road was calculated based on roadway lengths and assumed speeds, as shown in Figure 2. Given that Pine Street is proposed to be relocated approximately 1,375 feet east and that 20 Bath Road is about 1,550 feet east, this results in a 175-foot span of Bath Road that needs to be accounted for. In this distance, a vehicle would not get up to the posted Page 3

20 Pine Street Relocation, Brunswick 10/27/2017 speed limit of 40 miles per hour. Therefore, an average speed of 30 miles per hour was utilized which results in a travel time of 4 seconds for this portion of Bath Road. The length of the new piece of Pine Street was measured to be approximately 450 feet from the existing Pine Street to Bath Road. Based on a travel speed of 25 miles per hour, this proposed section of roadway would take 12 seconds. To account for the two turning maneuvers unmeasured along Bath Road and Pine Street, 5 additional seconds was added on. This totals 21 additional seconds for the portions that could not be field measured. The average field measured travel time runs are summarized in a table attached to this memorandum. The results with the measured times added to the 21 seconds of calculated time are shown below: MTR Field Measured Travel Time Results Travel Route AM Peak Hour PM Peak Hour to Bath Road via Bowker 101 seconds 104 seconds Bath Road to via Bowker 119 seconds 109 seconds to Bath Road via McLellan 113 seconds 117 seconds Bath Road to via McLellan 120 seconds 141 seconds to Bath Road via Chamberlain 117 seconds 131 seconds Bath Road to via Chamberlain 119 seconds 134 seconds As demonstrated above, all three cut-through routes would be expected to take longer to traverse from to Bath Road, during both the AM and PM peak hours, given that the mainline is estimated to take an average of 94 seconds during both the AM and PM peak hour periods. Hence, no outside traffic would be expected to cut through the neighborhood during either peak hour to travel from to Bath Road since there would be no time savings and the route would require four turning maneuvers and would be on densely developed residential streets as opposed to wider numbered state highways. Traveling in the opposite direction, from Bath Road to, during the AM peak hour is also longer on all three of the potential cut-through routes compared to the mainline (118 seconds), by a small margin. Although the cut-through route times are comparable to the mainline in this situation, the typical driver would not be expected to veer off the mainline given that they will not be saving time and four turns would be required. Additionally, both Bowker Street and McLellan Streets are fairly narrow roadways as opposed to Harpswell and Bath Roads. This potential cut-through route would require two left-turns, one from Bath Road onto the new Pine Street and one from the side street back to, one or both of which might be challenging during peak hours. It is important to note that cut-through traffic is most likely to occur during peak hours since this is when roads are most congested, accommodating the heaviest traffic volumes. As such, this analysis focused upon those peak hour travel times. Page 4

21 Pine Street Relocation, Brunswick 10/27/2017 During the PM peak hour, traveling from Bath Road to via the mainline is estimated to take an average of 128 seconds. Only one cut-through route, via Bowker Street is estimated to take less time. However, the same possible left-turn delays (onto Pine Street and onto ) would be expected via this route. It is also important to again note that Bowker Street is very narrow with a significant number of pedestrians. Bowker Street was also noted in the field to have poor sightlines at the intersection of making it difficult to enter. For all of these reasons, and based upon the travel time results, outside traffic would not be expected to use Bowker Street to travel from Bath Road to if Pine Street was relocated to align with Bath Road at a 90-degree angle. Based upon all of the travel time results, it is the professional opinion of MTR that cut-through traffic would be highly unlikely on any of these three side streets. In addition, cut-through routes are generally straight and fairly apparent to users on the main roads. Bowker, McLellan and Chamberlain would not appear to be a cut-through route as one passed by them. Cut-through routes are generally direct and not circuitous with as many turns as all these would require. A driver would need to purposely seek out an alternate route on a map to locate these routes. Lastly, as previously noted, given the narrow streets and dense residential development with pedestrian activity, as opposed to the wider numbered state highways, the potential cut-through routes are simply not as comfortable to drive regardless of the travel time results. The neighborhood residents are the ones with the knowledge of the area that may be likely to divert to the relocated Pine Street from Bath Road. This potential is evaluated in the following section. Diverted Neighborhood Trips As previously determined, while no traffic from outside the neighborhood would be expected to cut-through the neighborhood due to the proposed relocation of Pine Street, some of the neighborhood residents may be expected to alter their travel to use the relocated Pine Street connection from Bath Road. The existing traffic volumes in Figure 1 were reviewed to determine potential diverted trips from within the neighborhood. During the AM peak hour, 15 trips enter the neighborhood as an entering left from. Similarly, during the AM peak hour, 36 vehicles exit the neighborhood to as a right-turn. During the PM peak hour, 51 enter from as a left in with 34 exiting as a rightturn. Some of these trips may instead use the relocated Pine Street if they are destined to or from Bath Road. Based upon the traffic patterns recorded by the turning movement counts at the intersection of Bath Road, Federal Street and Sills Drive and at Pine Street and Bath Road, the following percentage of vehicles were found to be destined to and from Bath Road. Page 5

22 Pine Street Relocation, Brunswick 10/27/2017 Percentage of Vehicles Travel Route AM Peak Hour PM Peak Hour Right-Turns from Harpswell Rd to Bath Rd 30 % 34 % Left-Turns from Bath Rd to Harpswell Rd 38 % 28 % Using these percentages, left-turns onto and right-turns from Bowker Street, McLellan Street and Chamberlain Avenue were reduced based on the assumption that the vehicles will instead take the relocated Pine Street given its new 90-degree alignment to and from their respective street. Based upon these distributions up to 11 additional trips may travel Pine Street to Bath Road during the AM peak with up to 11 during the PM peak hour. In the opposite direction, traveling from Bath Road, up to 6 additional vehicles would enter at the new Pine Street during the AM peak hour with up to 14 during the PM peak hour. These are the maximum number of trips that would be expected to alter their travel patterns as it assumes that every vehicle destined to and from the neighborhood from Bath Road would now use Pine Street. In actuality, given the number of turns and narrow roads, many neighborhood residents residing towards may still elect to travel versus Pine Street. The numbers are also conservative since they assume that all of the commercial trips to the laundromat and convenience store now using Chamberlain and McLellan would also divert to the relocated Pine Street. The reduction and relocation of this maximum number of potentially relocated trips that could utilize the relocated Pine Street are shown in Figure 3. Summary of Findings Based upon field measured times, all three neighborhood street routes (Chamberlain, McLellan and Bowker) from to Bath Road would take longer to traverse than staying on Harpswell/Bath Roads during both AM and PM peak hour periods, hence no outside cut-through trips would be expected in this direction. In the opposite direction, traveling from Bath Road to, it is faster to remain on Bath Road/ during the AM peak hour so no AM cutthrough trips would be expected. For the Bath Road to direction, during the PM peak hour, only one neighborhood route, via Bowker Street, is expected to be any shorter than staying on the mainline route and this is likely due to the fact that some of that route is on. However, given the time savings is minimal at 6 seconds and given that the route requires four turning maneuvers and would be on densely developed residential streets, as opposed to wider numbered state highways, no outside cut-through traffic is expected. Page 6

23

24 63 (63) 19 (4) 89 (86) Approx. North Federal Street (XX) = AM Trips XX = PM Trips Signalized 19 (9) 137 (105) 107 (35) 347 (290) 181 (108) 139 (146) 90 (58) 371 (234) 166 (123) 109 (88) Bath Road 523 (415) 8 (3) 2 (5) 8 (12) 613 (409) 12 (9) 400 (209) 6 (4) Sills Drive (6) 6 (1) 8 Bowker Street Pine Street 427 (199) 340 (316) 3 (1) (10) 14 (1) 6 McLellan Street 413 (235) 26 (7) 324 (310) 4 (3) (20) 14 (1) 2 Chamberlain Avenue 302 (309) 1 (1) Figure Existing Peak Hour Volumes Pine Street Relocation Brunswick, Maine Maine Traffic Resources 25 Vine Street Gardiner, ME tel: (207) fax: (207)

25 1,550' 1,375' 175' Figure 2 Cut-Through Route Map Pine Street Relocation Brunswick, Maine Maine Traffic Resources 25 Vine Street Gardiner, ME tel: (207) fax: (207)

26 -2 (-1) -5 (-1) -7 (-4) 5 (1) 7 (4) Approx. North Federal Street (XX) = AM Trips XX = PM Trips Signalized -14 (-6) Bath Road 14 (6) -11 (-11) 11 (11) Sills Drive 2 (1) (-2) -2 Bowker Street 2 (2) (-3) -4 McLellan Street 4 (3) (-6) -5 Chamberlain Avenue 5 (6) Pine Street Figure 3 Maximum Potential Relocated Trips Pine Street Relocation Brunswick, Maine Maine Traffic Resources 25 Vine Street Gardiner, ME tel: (207) fax: (207)

27 Title: & Bowker St AM Town: Brunswick, Maine Counter: DWM Weather: Sunny Maine Traffic Resources 25 Vine Street Gardiner, ME mainetrafficresources.com File Name : BrunswickHarpswellBowkerAM Site Code : Start Date : 10/19/2017 Page No : 1 Groups Printed- Passenger Vehicles - Light Trucks - Heavy Trucks From North Bowker Street From East From South From West Start Rig Thr Time ht u Left Ped App. Rig Thr s Total ht u Left Ped App. Int. s Total Total Factor :00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total Grand Total Apprch % 0.0 Total % From North Bowker Street From East From South From West Start Rig Thr Time ht u Left Ped App. Rig Thr s Total ht u Left Ped App. Int. s Total Total Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1 Intersecti on 08:00 AM Volume Percent :45 Volume Peak Factor High Int. 08:45 AM 08:45 AM 08:45 AM 6:45:00 AM Volume Peak Factor

28 Title: Haprswell Rd & Bowker St PM Town: Brunswick, Maine Counter: NLS Weather: Sunny Maine Traffic Resources 25 Vine Street Gardiner, ME mainetrafficresources.com File Name : BrunswickHarpswellBowkerPM Site Code : Start Date : 10/17/2017 Page No : 1 Groups Printed- Passenger Vehicles - Light Trucks - Heavy Trucks From North Bowker Street From East From South From West Start Rig Thr Time ht u Left Ped App. Rig Thr s Total ht u Left Ped App. Int. s Total Total Factor :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM Grand Total Apprch % 0.0 Total % From North Bowker Street From East From South From West Start Rig Thr Time ht u Left Ped App. Rig Thr s Total ht u Left Ped App. Int. s Total Total Peak Hour From 03:30 PM to 05:15 PM - Peak 1 of 1 Intersecti on 04:15 PM Volume Percent :30 Volume Peak Factor High Int. 05:00 PM 04:15 PM 04:30 PM 3:15:00 PM Volume Peak Factor

29 Title: & Mclellan St AM Town: Brunswick, Maine Counter: NLS Weather: Sunny Maine Traffic Resources 25 Vine Street Gardiner, ME mainetrafficresources.com File Name : BrunswickHarpsMclellanAM Site Code : Start Date : 10/19/2017 Page No : 1 Groups Printed- Passenger Vehicles - Light Trucks - Heavy Trucks From North Mclellan Street From East From South From West Start Rig Thr Time ht u Left Ped App. Rig Thr s Total ht u Left Ped App. Int. s Total Total Factor :00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total Grand Total Apprch % 0.0 Total % From North Mclellan Street From East From South From West Start Rig Thr Time ht u Left Ped App. Rig Thr s Total ht u Left Ped App. Int. s Total Total Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1 Intersecti on 08:00 AM Volume Percent :45 Volume Peak Factor High Int. 08:45 AM 08:15 AM 08:45 AM 6:45:00 AM Volume Peak Factor

30 Title: & Mclellan St PM Town: Brunswick, Maine Counter: NLS Weather: Sunny Maine Traffic Resources 25 Vine Street Gardiner, ME mainetrafficresources.com File Name : BrunswickHarpsMclellanPM Site Code : Start Date : 10/19/2017 Page No : 1 Groups Printed- Passenger Vehicles - Light Trucks - Heavy Trucks From North Mclellan Street From East From South From West Start Rig Thr Time ht u Left Ped App. Rig Thr s Total ht u Left Ped App. Int. s Total Total Factor :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM Grand Total Apprch % 0.0 Total % From North Mclellan Street From East From South From West Start Rig Thr Time ht u Left Ped App. Rig Thr s Total ht u Left Ped App. Int. s Total Total Peak Hour From 03:30 PM to 05:15 PM - Peak 1 of 1 Intersecti on 03:45 PM Volume Percent :45 Volume Peak Factor High Int. 03:45 PM 04:00 PM 03:45 PM 3:15:00 PM Volume Peak Factor

31 Title: Harpswell Rd & Chamberlain Ave AM Town: Brunswick, Maine Counter: NLS Weather: Sunny Maine Traffic Resources 25 Vine Street Gardiner, ME mainetrafficresources.com File Name : BrunswickHarpswellChambAM Site Code : Start Date : 10/18/2017 Page No : 1 Groups Printed- Passenger Vehicles - Light Trucks - Heavy Trucks From North Chamberlain Avenue From East From South From West Start Rig Thr Time ht u Left Ped App. Rig Thr s Total ht u Left Ped App. Int. s Total Total Factor :00 AM :15 AM :30 AM :45 AM Total :00 AM :15 AM :30 AM :45 AM Total Grand Total Apprch % 0.0 Total % From North Chamberlain Avenue From East From South From West Start Rig Thr Time ht u Left Ped App. Rig Thr s Total ht u Left Ped App. Int. s Total Total Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1 Intersecti on 08:00 AM Volume Percent :45 Volume Peak Factor High Int. 08:45 AM 08:30 AM 08:15 AM 6:45:00 AM Volume Peak Factor

32 Title: Harpswell Rd & Chamberlain Ave PM Town: Brunswick, Maine Counter: NLS Weather: Partly Cloudy Maine Traffic Resources 25 Vine Street Gardiner, ME mainetrafficresources.com File Name : BrunswickHarpswellChambPM Site Code : Start Date : 10/12/2017 Page No : 1 Groups Printed- Passenger Vehicles - Light Trucks - Heavy Trucks From North Chamberlain Avenue From East From South From West Start Rig Thr Time ht u Left Ped App. Rig Thr s Total ht u Left Ped App. Int. s Total Total Factor :30 PM :45 PM Total :00 PM :15 PM :30 PM :45 PM Total :00 PM :15 PM Grand Total Apprch % 0.0 Total % From North Chamberlain Avenue From East From South From West Start Rig Thr Time ht u Left Ped App. Rig Thr s Total ht u Left Ped App. Int. s Total Total Peak Hour From 03:30 PM to 05:15 PM - Peak 1 of 1 Intersecti on 04:30 PM Volume Percent :00 Volume Peak Factor High Int. 05:00 PM 04:30 PM 05:00 PM 3:15:00 PM Volume Peak Factor

33 Project: Pine Street Location for Whittier Field Improvements, Bowdoin Location: Brunswick, Maine Date: October 12, 2017 (AM) and October 19, 2017 (PM) Mainline Path Time Period Start Time Total Travel Time (seconds) Chamberlain to 20 Bath Road AM Peak 7:09 91 Chamberlain to 20 Bath Road AM Peak 7:15 90 Chamberlain to 20 Bath Road AM Peak 7:23 93 Chamberlain to 20 Bath Road AM Peak 7:30 99 Chamberlain to 20 Bath Road AM Peak 7: Chamberlain to 20 Bath Road AM Peak 7:45 91 Chamberlain to 20 Bath Road AM Peak 8: Chamberlain to 20 Bath Road AM Peak 8: Chamberlain to 20 Bath Road AM Peak 8: Chamberlain to 20 Bath Road AM Peak 8: Average : 101 seconds Chamberlain to 20 Bath Road PM Peak 3: Chamberlain to 20 Bath Road PM Peak 3: Chamberlain to 20 Bath Road PM Peak 4:08 94 Chamberlain to 20 Bath Road PM Peak 4:14 99 Chamberlain to 20 Bath Road PM Peak 4: Chamberlain to 20 Bath Road PM Peak 4:28 86 Chamberlain to 20 Bath Road PM Peak 4: Chamberlain to 20 Bath Road PM Peak 4:41 98 Chamberlain to 20 Bath Road PM Peak 5:05 94 Chamberlain to 20 Bath Road PM Peak 5:10 88 Average: 101 seconds

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017 Memorandum engineering planning environmental construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 To: Sue Polka, City Engineer, City of Arden Hills From:

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

City of Lafayette Staff Report Circulation Commission

City of Lafayette Staff Report Circulation Commission City of Lafayette Staff Report Circulation Commission Meeting Date: September 5, 2016 Staff: Subject: James Hinkamp, Transportation Planner Consideration of a No Parking Zone on Victoria Avenue Summary

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 5.a Meeting Date: November 20, 2017 Department: Public Works SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Director of Public Works TOPIC: IMPLEMENTATION OF PARKING TIME

More information

Speed Evaluation Saw Mill Drive

Speed Evaluation Saw Mill Drive Speed Evaluation Saw Mill Drive Prepared for: Mount Laurel Township Burlington County, New Jersey Prepared by: Dana Litwornia Litwornia & Associates, Inc. Transportation, Traffic & Environmental Engineering

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

NOTICE OF PUBLIC HEARING ANAHEIM PUBLIC UTILITES BOARD IS HOLDING A PUBLIC HEARING ON THE FORMATION OF UNDERGROUND DISTRICT No. 66 (BEACH) TO UNDERGROUND OVERHEAD FACILTIIES, INCLUDING POWER AND COMMUNICATION

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82 Decision 21447-D01-2016 August 23, 2016 Decision 21447-D01-2016 Proceeding 21447 Application 21447-A001 August 23, 2016 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary,

More information

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508) Associates Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508) 885-5121 Ms. Teri Ford, Associate 800 Boylston Street, Suite 1570 Boston, MA July

More information

CITY OF STEVENS POINT AGENDA

CITY OF STEVENS POINT AGENDA CITY OF STEVENS POINT BOARD OF PUBLIC WORKS MEETING Monday, September 11, 2017 6:00 p.m. (or immediately following previously scheduled meeting) Lincoln Center 1519 Water Street Stevens Point, WI 54481

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016 Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth

More information

CORE AREA SPECIFIC PLAN

CORE AREA SPECIFIC PLAN only four (A, B, D, and F) extend past Eighth Street to the north, and only Richards Boulevard leaves the Core Area to the south. This street pattern, compounded by the fact that Richards Boulevard is

More information

TECHNICAL MEMORANDUM. Part A: Introduction

TECHNICAL MEMORANDUM. Part A: Introduction TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,

More information

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For: Appendix B SRF Traffic Study (Revised November 2005) Draft Environmental Impact Statement University Commons Town of Allegany, Cattaraugus County, NY December 2005 Traffic Impact Study for the proposed

More information

TOWN OF BRIDGTON TRAFFIC ORDINANCE

TOWN OF BRIDGTON TRAFFIC ORDINANCE TOWN OF BRIDGTON TRAFFIC ORDINANCE AN ORDINANCE REGULATING TRAFFIC UPON THE PUBLIC STREETS OF THE TOWN OF BRIDGTON AND REPEALING ALL OTHER ORDINANCES AND SECTIONS OF ORDINANCES IN CONFLICT HEREWITH. Be

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

ANN ARBOR CITY NOTICE ORDINANCE NO. ORD OFF STREET PARKING CHAPTER 59

ANN ARBOR CITY NOTICE ORDINANCE NO. ORD OFF STREET PARKING CHAPTER 59 ANN ARBOR CITY NOTICE ORDINANCE NO. ORD-12-04 OFF STREET PARKING CHAPTER 59 AN ORDINANCE TO AMEND SECTIONS 5:168 AND 5:169 OF CHAPTER 59 (OFF- STREET PARKING) OF TITLE V OF THE CODE OF THE CITY OF ANN

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

STAFF REPORT # CHANGE OF ZONING

STAFF REPORT # CHANGE OF ZONING STAFF REPORT #17-2000-0007 CHANGE OF ZONING PLANNING COMMISSION MEETING DATE: November 16, 2017 (Applicant Provided Materials / Traffic Study = Blue) 1. APPLICATION: A public hearing for an application

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS

DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY NOVEMBER 30, 2017 SUBMITTED BY: LYDON LYNCH ARCHITECTS TABLE OF CONTENTS LETTER OF INTRODUCTION PROJECT

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

AVE MARIA STEWARDSHIP COMMUNITY DISTRICT

AVE MARIA STEWARDSHIP COMMUNITY DISTRICT AVE MARIA STEWARDSHIP COMMUNITY DISTRICT GOLF CART USE AGREEMENT To receive a registration decal, please complete the AMSCD Golf Cart Use Agreement and return the form to: AVE MARIA STEWARDSHIP COMMUNITY

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR MEMORANDUM TO: FROM: BY: SUBJECT: CITY COUNCIL TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR JIM GARING, INTERIM CITY ENGINEER CONSIDERATION OF TRUCK PARKING RESTRICTIONS ALONG BELL STREET, FAEH AVENUE

More information

The remainder of this memorandum contains the details of our peer review findings.

The remainder of this memorandum contains the details of our peer review findings. REF: MAX-2014067.00 DATE: June 20, 2014 TO: FROM: RE: Mr. Leo Bartolini, Jr. Chairman, Zoning Board of Appeals 17 Common Street Southborough, MA 01772 Mr. Jason DeGray, P.E., PTOE Proposed Residence at

More information

Operations Center FAQs

Operations Center FAQs RICHARDSON INDEPENDENT SCHOOL DISTRICT Where all students learn, grow and succeed Operations Center FAQs Richardson ISD is constructing an operations center on vacant district land between Greenville Avenue

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015 Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z145-235 2720 Hillside Drive, Dallas, TX October 27, 2015 Introduction: The Lakehill Preparatory School is located on the northeast

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

APPENDIX VMT Evaluation

APPENDIX VMT Evaluation APPENDIX 2.7-2 VMT Evaluation MEMORANDUM To: From: Mr. Jonathan Frankel New Urban West, Incorporated Chris Mendiara LLG, Engineers Date: May 19, 2017 LLG Ref: 3-16-2614 Subject: Villages VMT Evaluation

More information

University of Alberta

University of Alberta Decision 2012-355 Electric Distribution System December 21, 2012 The Alberta Utilities Commission Decision 2012-355: Electric Distribution System Application No. 1608052 Proceeding ID No. 1668 December

More information

CITY COUNCIL OF THE CITY OF NOVATO ORDINANCE NO. 1620

CITY COUNCIL OF THE CITY OF NOVATO ORDINANCE NO. 1620 G-12 CITY COUNCIL OF THE CITY OF NOVATO ORDINANCE NO. 1620 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF NOVATO AMENDING THE NOVATO MUNICIPAL CODE BY ADDING SECTION 4-19 (ELECTRIC VEHICLE CHARGING SYSTEMS)

More information

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Revised April 5, 2005 Revised January 27, 2006 Prepared by: Steve Collin, Engineer 2.5 Revised by Douglas

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com April 23, 2014 OUR REF: TO3157TOA00 BY EMAIL: mark.larose@urbanrisedevelopment.com Urban Rise

More information

This letter summarizes our observations, anticipated traffic changes, and conclusions.

This letter summarizes our observations, anticipated traffic changes, and conclusions. Mr. David Jorschumb Project Manager Boulder Valley School District Re: Review of proposed school access improvements at the Foothills Elementary School in Boulder Dear Mr. Jorschumb, At your request, the

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

traversing them. Speed dips may be installed in lieu of speed humps where the 85 th percentile speed on a street is at least 36 mph.

traversing them. Speed dips may be installed in lieu of speed humps where the 85 th percentile speed on a street is at least 36 mph. County of San Mateo Department of Public Works Residential Speed Control Device Program PURPOSE The purpose of the Residential Speed Control Devices 1 Program is to provide a consistent, fair and cost-effective

More information

City of Lawrence Traffic Safety Commission Agenda June 1, :00 PM City Commission Room, City Hall

City of Lawrence Traffic Safety Commission Agenda June 1, :00 PM City Commission Room, City Hall traffic@ci.lawrence.ks.us 785-832-3034 City of Lawrence Traffic Safety Commission Agenda June 1, 2009-7:00 PM City Commission Room, City Hall MEMBERS: Richard Heckler, Chair; Jim Woods, Vice-Chair; Robert

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

POLICIES FOR THE INSTALLATION OF SPEED HUMPS (Amended May 23, 2011)

POLICIES FOR THE INSTALLATION OF SPEED HUMPS (Amended May 23, 2011) (Amended May 23, 2011) 1. Speed humps are an appropriate mechanism for reducing speeds on certain streets in Pasadena when properly installed under the right circumstances. 2. Speed humps can be considered

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS CITY OF GRAND PRAIRIE TRANSPORTATION SERVICES DEPARTMENT SPEED CUSHION INSTALLATION POLICY A. GENERAL Speed cushions are an effective

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

OSCODA COUNTY ORV ORDINANCE NO

OSCODA COUNTY ORV ORDINANCE NO OSCODA COUNTY ORV ORDINANCE NO. 2009-001 AN ORDINANCE PURSUANT TO ACT 240 OF THE PUBLIC ACTS OF 2008 AUTHORIZING AND REGULATING THE OPERATION OF OFF-ROAD VEHICLES ON ROADS WITHIN OSCODA COUNTY, PROVIDING

More information

Agenda Cover Memorandum

Agenda Cover Memorandum Agenda Cover Memorandum Meeting Date: August 21, 2017 Meeting Type: COW (Committee of the Whole) City Council Budget Workshop Item Title: Final approval of an Ordinance amending various sections of Article

More information

Vista Municipal Code

Vista Municipal Code Section 16.57.050 Private streets prohibited in certain zones. No lots zoned for multi-family, commercial, or industrial uses may be created using private street easements for access, except as provided

More information

ADOPTION OF AN ORDINANCE ADDING SECTION TO THE NOVATO MUNICIPAL CODE PROHIBITING THE PARKING OF RV S ON PUBLIC STREETS WITHOUT A PERMIT

ADOPTION OF AN ORDINANCE ADDING SECTION TO THE NOVATO MUNICIPAL CODE PROHIBITING THE PARKING OF RV S ON PUBLIC STREETS WITHOUT A PERMIT G-10 STAFF REPORT MEETING DATE: October 10, 2017 TO: City Council FROM: Adam McGill, Chief of Police SUBJECT: ADOPTION OF AN ORDINANCE ADDING SECTION 18-7.22 TO THE NOVATO MUNICIPAL CODE PROHIBITING THE

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

MEMORANDUM TERESA MCCLISH, DIRECTOR OF COMMUNITY DEVELOPMENT

MEMORANDUM TERESA MCCLISH, DIRECTOR OF COMMUNITY DEVELOPMENT MEMORANDUM TO: FROM: BY: CITY COUNCIL TERESA MCCLISH, DIRECTOR OF COMMUNITY DEVELOPMENT MATTHEW DOWNING, PLANNING MANAGER SUBJECT: CONSIDERATION OF TEMPORARY USE PERMIT CASE NO. 18-017; AUTHORIZING HALLOWEEN

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 24, 2018

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 24, 2018 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of February 24, 2018 DATE: February 20, 2018 SUBJECT: Request to authorize advertisement of a public hearing to consider an amendment to Section

More information

Attachment F: Transport assessment report on implications if Capell Avenue never formed

Attachment F: Transport assessment report on implications if Capell Avenue never formed Attachment F: Transport assessment report on implications if never formed CCL Ref: 14447-181118-williams.docx 18 November 2018 Tim Williams Williams and Co Limited By e-mail only: tim@williamsandco.nz

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS MCHENRY COUNTY DIVISION OF TRANSPORTATION 16111 NELSON ROAD WOODSTOCK, IL 60098

More information

Additional $200 Speeding Fine Signs

Additional $200 Speeding Fine Signs CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: June 18, 2007 Action Required: Presenter: Staff Contacts: Title: Adopt Ordinance Jeanie Alexander, P.E. Jeanie Alexander Additional $200

More information

Re: 233 Armstrong Street Residential Condominium Traffic Brief

Re: 233 Armstrong Street Residential Condominium Traffic Brief 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com August 8, 2008 TO3031TOP00 BY E-MAIL: gerry.lalonde@rogers.com Spencedale Properties 7 Cobb Court Ottawa,

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

MIDWAY CITY Municipal Code

MIDWAY CITY Municipal Code TITLE 8 STREETS AND SIDEWALKS MIDWAY CITY Municipal Code CHAPTER 8.01 UTAH CRIMINAL AND TRAFFIC CODE ADOPTED CHAPTER 8.02 UNLAWFUL PARKING CHAPTER 8.03 TRAFFIC REGULATIONS CHAPTER 8.04 RIGHT-OF-WAY REGULATIONS

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN

2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN 2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated

More information

Denver Car Share Program 2017 Program Summary

Denver Car Share Program 2017 Program Summary Denver Car Share Program 2017 Program Summary Prepared for: Prepared by: Project Manager: Malinda Reese, PE Apex Design Reference No. P170271, Task Order #3 January 2018 Table of Contents 1. Introduction...

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Regular Meeting and Public Hearing of the Zoning Subcommittee

Regular Meeting and Public Hearing of the Zoning Subcommittee Regular Meeting and Public Hearing of the Zoning Subcommittee Tuesday, October 02, 2018 7:00 PM Council Chambers, City Hall, 2nd Floor, 27 West Main Street, New Britain, Connecticut NOTICE - The Common

More information

INDUSTRIAL HAUL AGREEMENT

INDUSTRIAL HAUL AGREEMENT INDUSTRIAL HAUL AGREEMENT PUBLIC WORKS MEMORANDUM OF AGREEMENT entered into this day of, A.D., 20(yr). BETWEEN: PARKLAND COUNTY a County incorporated under the laws of the Province of Alberta, (hereinafter

More information

TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT

TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT MICHIGAN OHIO UNIVERSITY TRANSPORTATION CENTER Alternate energy and system mobility to stimulate economic development. Report No: MIOH UTC TS41p1-2 2012-Final TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION

More information

Citizens Committee for Facilities

Citizens Committee for Facilities Citizens Committee for Facilities AGENDA Thursday, December 11, 2014 City Council Chambers 305 3 rd Avenue East -Twin Falls, Idaho 11:30 A.M. AGENDA ITEMS Purpose By 1. Discussion and possible action on

More information

BUS SERVICES IN CHAMBERLAYNE ROAD NW10

BUS SERVICES IN CHAMBERLAYNE ROAD NW10 INTRODUCTION BUS SERVICES IN CHAMBERLAYNE ROAD NW10 1 LONDON BUSES 1. This note reviews the issues in Chamberlayne Road, Kensal Rise. It covers the range of bus routes in the area, their characteristics

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services

More information

TOWN OF WINDSOR AGENDA REPORT

TOWN OF WINDSOR AGENDA REPORT ITEM NO. : 11.4 TOWN OF WINDSOR AGENDA REPORT Town Council Meeting Date: December 6, 2017 To: From: Subject: Mayor and Town Council Kristina Owens, Administrative Operations Manager Amendment to Waste

More information

Travel Time Savings Memorandum

Travel Time Savings Memorandum 04-05-2018 TABLE OF CONTENTS 1 Background 3 Methodology 3 Inputs and Calculation 3 Assumptions 4 Light Rail Transit (LRT) Travel Times 5 Auto Travel Times 5 Bus Travel Times 6 Findings 7 Generalized Cost

More information

CHAPTER 3. Driveways (Rev. 9/04, Ord )

CHAPTER 3. Driveways (Rev. 9/04, Ord ) CHAPTER 3 Driveways (Rev. 9/04, Ord. 2004-6) 6-3-1 Driveway Permit Required 6-3-2 Driveway Location, Design and Construction Requirements 6-3-3 Driveway Aprons Installation/Replacement Improvement Policy

More information

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation February 10, 2016 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

DATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC

DATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC PUBLIC WORKS COMMISSION PUBLIC WORKS COMMISSION DATE: March 21, 2017 REPORT NO. PW2017-022 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger, General Manager

More information

Access Management Standards

Access Management Standards Access Management Standards This section replaces Access Control Standards on Page number 300-4 of the Engineering Standards passed February 11, 2002 and is an abridged version of the Access Management

More information

INSTALLATION OF A CONVEX MIRROR FOR A PRIVATE DRIVEWAY OR STREET

INSTALLATION OF A CONVEX MIRROR FOR A PRIVATE DRIVEWAY OR STREET DPW Form 40(1) 9/8/09 County of Hawai i DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION INSTALLATION OF A CONVE MIRROR FOR A PRIVATE DRIVEWAY OR STREET INSTRUCTIONS FOR APPLICANT: 1) Fill out top portion

More information

4 Circulation & Transportation

4 Circulation & Transportation 4.1 Mobility Network The mobility network at the new St. Paul s hospital and health campus is comprised of an interconnected system of sidewalks, cycle paths, transit routes and roadways. Figure 4-1: Indicative

More information