1 ROAD SAFETY AUDIT Route 16 (Webster Street) Corridor From Webster Town Line to Main Street Intersection Town of Douglas June 2015 Prepared For: MassDOT Prepared By: Hoyle, Tanner & Associates, Inc. 150 Dow Street Manchester, NH 03101

2 Table of Contents Background...1 Project Data...2 Project Location Description...3 Audit Observations and Potential Safety Enhancements...7 Summary of Road Safety Audit...15 List of Appendices Appendix A. Appendix B. Appendix C. Appendix D. Appendix E. RSA Meeting Agenda RSA Audit Team Contact List Detailed Crash Data Additional Information Road Safety Audit References List of Figures Figure 1. Locus Map List of Tables Table 1. Table 2. Participating Audit Team Members... 2 Potential Safety Enhancements Summary...4

3 Background The Road Safety Audit (RSA) focused on the segment of Route 16 in Douglas, Massachusetts, from the Webster Town Line to the Main Street Intersection. The segment of Route 16 experienced 49 crashes from , including three fatal and two incapacitating injury crashes. The Massachusetts Department of Transportation (MassDOT) has determined that the Town of Douglas would be eligible to receive funding for resurfacing and other quality improvements for Route 16 under the High Risk Rural Roads (HRRR) program of the Highway Safety Improvement Program (HSIP) if a RSA were conducted and the proposed design incorporated the safety improvements identified in the RSA. The HRRR program requires a roadway to be classified as a collector or local roadway in a rural area on which the crash rate for injury crashes or fatal crashes is higher than the statewide average. The RSA study area is illustrated in Figure 1. In general, the RSA is intended to identify potential safety improvements that can be evaluated and included as part of current and/or future design efforts for resurfacing/reconstruction. The shortterm, lowcost potential improvements could be considered by the responsible agency for implementation prior to improvements proposed under MassDOT Project No , as appropriate. The MassDOT Project No for Webster Street (Route 16) Safety Enhancements is scheduled to complete the design phase and be ready for bid and construction in FY 2017 (October 1, 2016). Page 1

4 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Project Data The audit team conducted an RSA for the Route 16 corridor from the Webster Town Line to the Main Street Intersection in Douglas Massachusetts, on Monday, May 18, The RSA agenda appears in Appendix A. Table 1 lists the audit team members and their affiliations. Appendix B provides contact information for all team members. Table 1. Participating Audit Team Members Audit Team Member Sujatha Monanakrishnan Patrick Foley Nick Miglionico Kent Vinson Mike Guzinski John Furno William Cundiff Lola Campbell John Mastera William Ullom Todd Clark Stephen Haas Agency/Affiliation Central Massachusetts Regional Planning Commission (CMRPC) Town of Douglas Police Department Town of Douglas Police Department Town of Douglas Fire Department Town of Douglas Town Administrator Town of Douglas Highway Department Town of Douglas Town Engineer MassDOT District 3 Traffic MassDOT Highway Division Safety Section MassDOT Traffic Safety Hoyle, Tanner & Associates, Inc. Hoyle, Tanner & Associates, Inc. Prior to the RSA, in order to begin assessing possible safety issues, the team reviewed collision diagrams and a crash detail summary based on crash records supplied by the Douglas Police Department for the corridor. Appendix C provides the detailed crash data for the study area. For the 5 year period between January 2010 and December 2014, there were 49 crashes reported along Route 16 between the Webster town line and the Route 96 intersection. This included 3 fatal injury crashes, 2 incapacitating injuries, 7 minor injuries, and 37 property damage only crashes. The majority of the crashes were single vehicle crashes (73%) which generally involved loss of control of the vehicle and striking a fixed roadside object. In particular, 26% of the crashes involved collisions with roadside utility poles. A noticeably high percentage of the crashes (60%) within the study period occurred during a four month winter period. Of these crashes, 18 occurred while the roadway conditions were either snowy or icy. Finally, a large percentage of the corridor crashes (43%) occurred during nighttime hours potentially due to limited roadway delineation and street lighting. Additionally, the project team performed a drive through of the project area to familiarize ourselves with and video document the roadway for presentation at the RSA and reviewed previous studies, master plans, and development plans along the corridor. Page 2

5 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Project Location and Description The RSA area is located within the Town of Douglas, MA along an approximate 4 mile segment of Route 16 (Webster Street). The segment of roadway runs east/west from the Webster town line to the intersection of Route 96 (Main Street). The roadway is under Town of Douglas jurisdiction and is classified as an Urban Minor Arterial/Rural Major Collector and has a posted speed limit of 45 mph throughout the segment. Average Annual Daily Traffic (AADT) volumes for the corridor are approximately 5,700 to 6,000 vehicles per day with 7% to 8% trucks based on 2014 count data provided by the Central Massachusetts Regional Planning Commission. This roadway serves as the primary connection between downtown Webster & I395 to the west and Douglas Center & Route 146 to the east. Within the study area, the roadway consists of one (12 ) travel way in each direction with varied paved and unpaved shoulders (02 paved, unpaved and also a few trail head parking spots and bus turnarounds). This stretch of roadway is largely rural due to the adjacent Douglas State Forest and consists of only a few minor intersections (described below) and driveways to residential properties mainly on the east end of the corridor. As the roadway alignment consists of several long tangent segments with minimal defined access points, passing is permitted in several locations. During the RSA mention was made that due to the high elevation of the road situated within the Douglas State Forest, it is the road crews first assignment to sand/salt/plow Webster Street during winter weather events. There are two intersections along this stretch of Route 16 that were also evaluated: Route 16 (Webster Street) at Cedar Street is a fourway unsignalized intersection. Cedar Street, which is a local roadway under Town of Douglas jurisdiction, crosses Route 16 at an approximate 45 degree angle and is stop controlled. Dedicated turning lanes are not provided on any of the approaches. An aerial of this intersection in shown in Figure 2. Route 16 (Webster Street) at Route 96 (Main Street) is a threeway intersection with a flashing beacon. Route 96 (Main Street), which is also an Urban Minor Arterial/Rural Major Collector under Town of Douglas jurisdiction, moves freely while Webster Street is stop controlled. While dedicated turn lanes are not provided, an unconventional shared EB right/nb slip lane allows some traffic to bypass the main intersection. The large expanse of pavement and unclear traffic control create driver confusion and errors. An aerial of this intersection is shown in Figure 3. Page 3

6 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Figure 1. Locus Map Page 4

7 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Figure 2. Route 16 (Webster Street) at Cedar Street Page 5

8 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Figure 3. Route 16 (Webster Street) at Main Street Page 6

9 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Audit Observations and Potential Safety Enhancements During the preaudit video walkthrough and the field investigation performed on Monday, May 18, 2015; the RSA team identified several safety issues along the corridor and at intersections including travel speed, roadway geometry, surface drainage, signage, lighting, sight distance, and pavement condition. Route 16 (CorridorWide) Observations: Travel Speeds The posted speed limit throughout the Webster Street corridor is 45 mph. Speed data that was collected with RSA Team performs field investigation on the traffic counts indicated that the average running speed May 18, at the Webster Town line was approximately 45 mph with an 85% speed of 49 mph, while just east of the Main Street intersection the average speed was 40 mph with an 85% speed of 44 mph. However, the local public safety officials believe that speeding is a significant safety issue within the corridor. It is believed that the speed data is misleading, as the data locations are on either end of the project and do not cover the central tangent portion of the roadway. The straight roadway geometry and minimal driveways & intersections through the Douglas Town Forest section are believed to afford drivers the opportunity to travel at speeds significantly above the posted speed limit. The crash data supports this assumption as 17 of the 49 crashes cited motorists driving erratically or too fast for conditions. The Douglas Police Department indicated that some level of enforcement is done on this stretch of roadway each day during the AM or PM peak periods and that a large number of the citations in Town are given in this location. With existing pavement markings passing is allowed in several locations throughout the corridor and there are several crashes that have resulted from these maneuvers over the 5year period. Page 7

10 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Roadway Geometry The roadway alignment for Route 16 between the town line and Main Street generally consists of long tangents connected by fairly flat curvature (3000 R or larger). However as the roadway approaches Main Street and the residential density increases, a few of the curves have a significantly sharper radius (1500 or less) without proper warning and appear to be in poor relationship with the vertical curve (i.e. a horizontal curve located beyond a vertical crest curve. This relationship between the horizontal and vertical geometrics is undesirable as the crest blocks the drivers line of sight to see the Turneddown guardrail terminals increase horizontal curve ahead. Similarly, the vertical risk for serious injury if impacted. profile of the roadway throughout the Douglas State Forest section is generally flat with a constant downgrade from west to east which would tend to elevate travel speeds for eastbound traffic. After the Cedar Street intersection, the profile consist of shorter vertical curves which limit sight distance of approaching vehicles, intersections, and horizontal curves. Of particular concern is the utility pole adjacent to house #68. Due to roadway geometry the pole has been struck many times. The pavement section on Route 16 consists of one 12 travel lane in each direction and generally 6 to 2 of paved shoulder. A varying width gravel shoulder, from 0 up to 8 or 10, limit driver expectancy. The roadside along Route 16 consists of numerous obstructions within the clear zone. The clear zone is an area beyond the travelled way paint marking, measured perpendicular, to establish a zone free from obstruction to the driver. The clear zone for a roadway with a 45 mph speed limit and approximately 6,000 vpd should be 18 to 20 from the edge of travelway, which is generally not provided. Utility poles are located on one side of the road or the other throughout the corridor and are generally located within 4 6 of the edge of pavement. The tree line, while further back than the utility poles, are is still located within the clear zone. Additionally, there are several locations where large glacial boulders or rock faces are reachable by vehicles. This is indicative of the crash data as 26 of the 49 crashes or 53% involved a single vehicle and a fixed object along the roadside (13 of these crashes included utility poles). Guardrail is provided in numerous locations to protect steep side slopes, water, and other hazards. However, the majority of the guardrail terminals are simply turneddown type terminals rather than energy absorbing terminals. Turneddown terminals may not meet current state/federal roadside safety standards based on the 85 th percentile speed which is not yet determined. Finally, there are a couple of gravel areas used as school bus turnarounds for the Town s of Douglas and Webster located along the corridor. These locations are simply gravel bumpouts which allow the bus to pull out of traffic, but do not allow the bus to complete its maneuver without blocking traffic. Advanced signage for these bus turnarounds are provided, however, safety concerns have been raised in the past. Drainage Although effective capture of stormwater in roadside ditches and closed system pipes and structures is not known to be a concern, the RSA team noted that the heaved and rutted pavement surface along Route 16 allows water and ice to become trapped on the paved roadway surface, which can lead to hydroplanning Page 8

11 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. and ultimately result in vehicles losing control. Signage The RSA team identified that there is limited and ineffective signage throughout the corridor. Although it was not measured, it is believed that the corridor signing may not meet current retroreflective requirements, which is of particular concern for the warning signs. The posted speed limit signs are combined with a Radar Enforced message on the standard size sign which decreases the text size of the speed limit numerals and reduces visibility. The team also noted that curve warning signage is not provided along the corridor for any of the sharper horizontal curves. There have been several crashes related to the roadway curvature where vehicles have lost control and struck fixed objects resulting in incapacitating or fatal injuries. Delineation Roadway departures along the existing horizontal curve at #68 Webster Street have resulted in serious and fatal injuries. Route 16 contains limited roadside delineation throughout the corridor. These measures which include retroreflective pavement markings, post mounted delineators, and guardrail delineators allow motorists to identify the edge of the roadway. They are especially useful for identifying roadway curvature and provided added visibility during nighttime operation and inclement weather. This is a particular concern for Route 16 as 43% of crashes occurred during nighttime hours, while 32% of crashes were during weather events. The double yellow roadway centerline along Route 16 has been recently repainted, however, the white edge lines remain faded. Retroreflective roadside reflectors are not provided within the project limits. Guardrail delineator use is inconsistent and does little to help define the edge of the roadway. Additionally, the use of delineators on roadside utility poles is inconsistent. Lighting The RSA team identified that there is very little lighting along the Route 16 corridor and the Douglas State Forest section is particularly dark during nighttime hours. Utility pole lighting is provided at the project intersections and at a few of the sharper curve locations, however, the team believes it to be ineffective for providing adequate lighting and awareness of the roadway condition. Pavement Condition A major concern for the Town of Douglas is the condition of the pavement surface throughout the corridor. The Town s limited resources for roadway improvements and the large volume of trucks which utilize the corridor has led to a pavement surface that has become significantly cracked, heaved, and rutted; especially during the winter months when 60% of the crashes occur. The uneven pavement surface allows stormwater runoff to pond on the roadway and makes it significantly more difficult to clear the roadway during winter weather conditions. In addition, the Town has noted that the roadway is a regional cold spot in Town that freezes prior to other adjacent roadways due to the rise in elevation through this segment and that the substantial tree cover limits sun exposure and increases the duration of ice on the pavement. Page 9

12 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. This deteriorated pavement not only increases the likelihood of hydroplaning and wheel slippage during wet & icy conditions, but the significant bumps may also increase the likelihood of loss of control during dry periods as well. The crash data support this theory as 50% of crashes occurred when there was precipitation on the roadway. The Town also noted that the road crown has deteriorated over the years. Wildlife Collisions Due to its rural nature, the Route 16 corridor also experiences a significant amount of collisions with wildlife. During the 5year reporting period, seven collisions involving deer were reported. Town Officials indicated that this is a larger concern along the eastern residential end of the project where animals may be feeding in resident s yards. Bicycle Accommodations and Signs Due to statements made by Town officials, accommodations for cyclists, mountain bikes and pedestrians that travel along and cross the corridor should be made. The lack of bicycle facilities was stated. Also, pedestrians tend to cross in the areas of tail heads. Advance signage and trail designations would help alert drivers of upcoming pulloffs and possible pedestrians. Impaired Drivers The Police mentioned that OUI s have been an issue in the past with drivers returning from bars in Webster in the evening. Increased enforcement was mentioned as a method to address the issue. Potential Safety Enhancements: 1. Consider providing MUTCD compliant speed limit signage with standard numeral sizes and supplemental Radar Enforced plaques to aid in motorist identification of the posted speed limit. 2. If available, consider using both permanent and temporary speed display signs to alert motorists to their current speed in comparison to the posted speed. In rural corridors with long straight sections like Route 16, perception of speed can sometimes be challenging. 3. Remove passing zones along the corridor help reduce overly aggressive driving. Town Officials believed the passing zones were unnecessary due the relatively short corridor length between Webster and Douglas. If passing zones are to remain; length, sight distance, and signage to meet adequate design criteria should be evaluated. 4. Consider reducing travelway lane width to 11, particularly in the denser eastern section of the roadway, to attempt to reduce vehicle speeds traffic calming measure and alert motorists to the more thickly settled residential area. 5. Provide high friction surface course in sharper horizontal curvature to reduce roadway departure particularly at the #68 house. Consider maintenance issues associated with this. 6. Provide wider paved shoulders (5 for bicyclist accommodation) and a consistent gravel shoulder. This will allow additional recovery space for vehicles prior to departing the roadway and will allow bicyclists and pedestrians to keep out of the traveled way. Consider utilizing a Safety Edge, as Page 10

13 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. defined by FHWA to, along the edge of the shoulder to reduce tire scrubbing which causes vehicles to lose control as they depart the paved surface. 7. Work with utility companies to shift poles out to the ROW (particularly west of Cedar Street where the ROW is wide and at house #68) to provide a larger clear zone for errant vehicles. Most importantly in the case of the pole at house # Consider clearing trees out to the limits of the ROW or to the edge of the appropriate clear zone width of 18 to 20 feet from the traveled way for Route 16 according to AASHTO Roadside Design Guide standards to reduce the risk of vehicle fixed object collisions. 9. Consider replacing turndown guardrail terminals with Energy Absorbing Guardrail Terminals (EAGRT) to limit the potential for injury if guardrails are struck. 10. Expand and pave bus turnarounds to allow completion of maneuver using available ROW. Ensure that these locations are intended to be used by bus companies into the future. 11. Resurface roadway to provide an even pavement surface which will eliminate ponding on roadway and reduce out of control crashes due to hydroplaning, wheel slippage, and bumps. In the short term, consider tree trimming to allow additional sunlight to penetrate the corridor. 12. Consider providing Intelligent Transportation System (ITS) solution such as dynamic signing/flashers or roadway sensors that will allow Town Officials to be alerted and inform motorists to slippery road conditions. 13. Provide curve warning signage and advisory speed plaques, as needed, to alert motorists to unexpected sharp curvature and reduce the potential for roadway departure crashes. 14. Replace aged signage with new signs meeting current retroreflective standards to ensure visibility during nighttime and inclement weather. 15. Restripe roadway edge lines with retroreflective paint markings to help motorists identify the edge of the traveled way. 16. Provide retroreflective post mounted delineators along the corridor and chevrons on the curves, to help motorists identify the roadway horizontal geometry. Additionally, provide retroreflective markers on utility poles and other roadside hazards to increase visibility of these obstructions. 17. Provide deer crossing signage with supplemental mileage plaques (i.e. Next XX miles) to alert motorists to potential animals in the roadway. 18. Adding street lighting west of the Cedar Street intersection. Page 11

14 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Route 16 at Cedar Street Observations: Skew Angle and Vertical Geometry at Cedar Street limit intersection sign distance. Intersection Geometry Cedar Street forms a fourway intersection with Route 16 and has a skew angle of approximately 45 degrees and requires Cedar Street vehicles (especially southbound) pull out into the Route 16 travel lane and look over their right shoulder to see oncoming traffic. The resulting geometry from the skew also provides tight pavement radii on the acute angle side of the intersection and large sweeping radii on the opposite side. This allows for vehicles making right hand turns onto to Cedar Street to do so at high rates of speed, while vehicles making right hand turns out of Cedar Street (especially large vehicles) must travel slowly to remain on the paved surface. Additionally, the southbound approach for Cedar Street is an uphill grade at Route 16. This grade combined with a vertical crest curve located just to the east of the intersection make it difficult to see approaching westbound vehicles. While the crash data for the most recent fiveyear period does not indicate a significant amount of crashes in this location, the Douglas Police Department indicates that there is a history of approximately 1 crash per year over the last 20 years. Sight Distance In addition to the sight distance issues created by the skew angle and roadway profiles, the sight lines are further obstructed by trees, fences, guardrails, and utility poles that are located in close proximity to the edges of pavement. Also the southbound stop bar location is quite a ways back from Route 16 and requires vehicles to advance beyond it to get a clear view. Signage Intersection warning signage is provided on the approaches to Cedar Street, however, it does not stand out and is easily overlooked due to its placement behind the guardrail amongst the trees and utility poles obscures. In addition, these signs may not meet current retroreflective standards. Drainage Issues The catch basin grate and frame located in the southeast corner of the intersection is a continuous issue. It appears that larger vehicles making right turns onto Webster Street have and continue to cause damage to the structure. The Town struggles to keep it in good working order. Pedestrians Pedestrians cross the intersection to enter the State Forest from Cedar Street and no cross walk is provided. Page 12

15 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Potential Safety Enhancements: 1. Replace intersection warning signage to meet current retroreflective standard and confirm proper advanced warning distance for sign placement. Additionally, consider utilizing an oversized or flashing sign to increase visibility and alert motorists to this unanticipated intersection. 2. Consider installing a fourway flashing signal which would improve visibility of the Cedar Street intersection and alert motorists to the potential for conflicting traffic. The signal would flash yellow for Route 16 which operates freely, and red for Cedar Street which is under stop control. 3. Shift stop bar location on Cedar Street southbound approach to appropriate offset from Route 16 edge of travel way. 4. Consider removing/relocating trees, guardrail, fences, and utility poles, on intersection corners, as feasible, to improve sight lines for vehicles approaching and departing the intersection. 5. Consider installing additional street lighting to improve motorist recognition of the intersection and the potential for conflicting vehicular and pedestrian movements. 6. Lower frame and grate and provide paved apron for catch basins on southeast quadrant to reduce impacts and improve drainage capture with large turning vehicles within a built shoulder layout capable of accommodating offtracking. 7. Consider adding a cross walk with proper advanced signage. 8. Intersection reconstruction with approach realignment and profile improvements Route 16 at Route 96 (Main Street) Observations: Intersection Geometry Unconventional Intersection Geometry at Main Street leads to driver confusion and an increased crash rate. Route 16 forms a threeway intersection with Route 96 (Main Street) adjacent to the Old Douglas Center. Route 16 is under stop control while Route 96 operates freely. Previous iterations of this intersection provided an eastbound right turn/ northbound left turn slip ramp separated by a raised traffic island that formed a unconventional Yintersection. In recent years due to large vehicles driving over the curb and hitting a Town fire hydrant, the island was removed and replaced with pavement and a traffic barrel with a stop sign mounted to it. This large expanse of pavement results in driver confusion as to where turning maneuvers are supposed to be performed. Northbound left turning vehicles either use the former slip lane Page 13

16 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. (which places them adjacent to the eastbound queued vehicles) or utilize the actual Tintersection. Similar maneuvers are made by Eastbound right turning traffic. Southbound right turning traffic must also negotiate a sharp corner radii which reduces operating speeds and sometimes results in vehicles leaving the pavement. The traffic volumes combined with poor intersection geometry allows for a queue of 5 to 6 vehicles to form during the peak hour. Additionally, a vertical crest curve located approximately 350 west of the eastbound stop bar reduces awareness of the intersection and the drivers available stopping sight distance. Although the crash data (and local Safety Official memory) does not reveal any severe crashes at this location, several incidents of vehicles approaching this intersection and rearending stopped or turning vehicles have occurred over the 5year study period. The crash data for this intersection was not included in the analysis as it is beyond the extents of the corridor. Sight Distance As previously noted, the sight distance approaching the Route 96 intersection is compromised by the vertical geometry of the roadway. The result is that vehicles do not always recognize the need to reduce speed and are often required to come to more abrupt stops than anticipated. Signage Stopahead signage is provided for the Route 16 approach to the Route 96 intersection. In addition, a postmounted alternating yellow flashing beacon is provided to alert motorist of the condition. However, this infrastructure is located over 1,200 linear feet from the intersection which greatly exceeds the advanced warning distance for the posted speed limit with this condition. This deviates from drive expectancy and does not provide the motorist with an accurate estimate of how soon the required stopping condition will occur. Additionally as the flashing beacon is not located with the Stop Ahead sign, it is not clearly apparent what condition the beacon is attempting to alert motorist to. Potential Safety Enhancements: 1. Consider realigning intersection through pavement removal and restriping to eliminate the slip lane and form a more conventional tee intersection layout. This should help to eliminate driver confusion, reduce intersection queue, and reduce rearend collisions 2. Consider reducing speed limit below 45 mph in advance of intersection and alerting motorists to Congested District utilizing signage. Upon inspection of the regulatory speed limit it appears that the following exists: Begin Webster Town Line 45 MPH for 3.97 miles eastbound; then 20 MPH for 0.16 eastbound to the intersection. It appears that there is a speed reduction prior to the intersection that is not signed. Also, based on the great reduction it would require advanced reduced speed limit signs along the intersection approach. This should help to notify motorists that they have left the more rural portions of the corridor and roadway conditions are changing. 3. Revise Stop Ahead sign location and combine with flashing beacon to improve driver expectancy of the approaching intersection in conformance with MUTCD requirements. Page 14

17 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Summary of Road Safety Audit The RSA team identified several potential safety enhancements for the Corridorwide safety issues that were identified, as well as the specific issues at the Cedar Street and Main Street intersections. Table 2 summarizes the solutions that were discussed and identifies the location, safety issue, potential enhancement, safety payoff, time frame, relative cost, and the agency responsible for the enhancement. The summary table allows for a quick comparison of the potential solutions and forms the basis of a cost/benefit analysis. The safety payoff estimates are based on published Crashed Reduction Factors (CRF) for similar projects, if available, and engineering judgment. These have been categorized as low (<30%), medium (31% to 70%), and high (>71%). The time frame for potential enhancements were categorized as shortterm (<1 year), midterm (1 to 3 years), and longterm (>3 years). As HSIP funding through the HRRR program is expected to be available for construction along the corridor in FY 2017 (October 1, 2016), potential enhancements that would may be able to be accomplished as part of this project but would traditionally be considered longterm improvement were placed in the midterm category. Shortterm solutions could either be constructed as part of this larger construction effort or installed in advance by the responsible agency using other funding sources. The cost for potential enhancements have been broken up into Low (<$10,000), Medium ($10,001 to $50,000), and High (>$50,001). Page 15

18 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Table 2. Potential Safety Enhancement Summary Location Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Responsible Agency CorridorWide Travel Speeds MUTCD Complant Speed Limit Signage Low Shortterm Low Town of Douglas Travel Speeds Radar Speed Display Signage Low Shortterm Low Town of Douglas Cedar Street Intersection Main Street Intersection Travel Speeds Remove Passing Zones Low Shortterm Low Town of Douglas Travel Speeds Reduce Lane Width to 11' Low Shortterm Low Town of Douglas Roadway Geometry High Friction Surface Course in Curves Low/Med Midterm Medium Town of Douglas Roadway Geometry Wider Paved Shoulders Medium Longterm High Town of Douglas Roadway Geometry Utility Pole Relocation High Longterm High Town of Douglas Roadway Geometry Tree Clearing High Shortterm High Town of Douglas Roadway Geometry Replace Guardrail Terminals Low Midterm High Town of Douglas Roadway Geometry Expand Bus TurnArounds Low Midterm Low Town of Douglas Pavement Surface Resurface Roadway Medium Midterm High Town of Douglas Pavement Surface Roadway Conditions Signage Low Midterm Low Town of Douglas Signage Curve Warning Signage Low Shortterm Low Town of Douglas Signage Retroreflective Signage Replacement Low Shortterm Low Town of Douglas Delineation Restripe Edge Lines Low Shortterm Low Town of Douglas Delineation Install Post Mounted Delineators Low Shortterm Low Town of Douglas Wildlife Deer Crossing Signage Low Shortterm Low Town of Douglas Signage Replace Intersection Warning Signage Low Shortterm Low Town of Douglas Intersection Geometry Shift Stop Bar Location Low Shortterm Low Town of Douglas Intersection Control Install FourWay Flashing Signal High Midterm High Town of Douglas Sight Distance Removing /Relocating Trees, Poles, Fences, Etc. Medium Midterm Medium Town of Douglas Lighting Install Additional Intersection Lighting Medium Midterm Medium Town of Douglas Drainage Adjust Catch Basins and Pave Apron Low Shortterm Low Town of Douglas Intersection Geometry Realign and Restripe Intersection Medium Longterm High Town of Douglas Sight Distance Speed Limit Reduction Signage Low Shortterm Low Town of Douglas Signage Adjust "Stop Ahead" & Beacon Location Medium Midterm Medium Town of Douglas Page 16

19 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Appendix A. RSA Meeting Agenda

20 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Road Safety Audit LOCATION Meeting Location: Douglas Town Hall 29 Depot Street, Douglas, MA May 18, :00 AM 1:00 PM Type of meeting: Attendees: Please bring: High Crash Location Road Safety Audit Invited Participants to Comprise a Multidisciplinary Team Thoughts and Enthusiasm!! 9:00 AM Welcome and Introductions 9:15 AM Review of Site Specific Material Crash, Speed & Volume Summaries partially provided in advance Existing Geometries and Conditions 10:15 AM Visit the Site Drive to Webster Street (Route 16) As a group, identify areas for improvement 11:30 AM Post Visit Discussion / Completion of RSA Discuss observations and finalize findings Discuss potential improvements and finalize recommendations 12:00 noon Adjourn for the Day but the RSA has not ended Instructions for Participants: Before attending the RSA on May 18th, participants are encouraged to drive through the intersection and complete/consider elements on the RSA Prompt List with a focus on safety. All participants will be actively involved in the process throughout. Participants are encouraged to come with thoughts and ideas, but are reminded that the synergy that develops and respect for others opinions are key elements to the success of the overall RSA process. After the RSA meeting, participants will be asked to comment and respond to the document materials to assure it is reflective of the RSA completed by the multidisciplinary team.

21 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepare d by Hoyle, Tanner & Associates, Inc. Appendix B. RSA Audit Team Contact List

22 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Participating Audit Team Members Date: Location: Audit Team Members Agency/Affiliation Address Phone Number Sujatha Monanakrishnan Central Massachusetts Regional Planning Commission (CMRPC) Patrick Foley Town of Douglas Police Department Nick Miglionico Town of Douglas Police Department ext. 15 Mike Guzinski Town of Douglas Town Administrator John Furno Town of Douglas Highway Department William Cundiff Town of Douglas Town Engineer Lola Campbell MassDOT District 3 Traffic alolade.campbell@state.ma.us William Ullom MassDOT Traffic Safety William.ullom@state.ma.us John Mastera MassDOT Highway Division Safety Section John.mastera@dot.state.ma.us Todd Clark Hoyle, Tanner & Associates, Inc. tclark@hoyletanner.com Stephen Haas Hoyle, Tanner & Associates, Inc. shaas@hoyletanner.com

23 Road Safety Audit Route 16 (Webster Street) Corridor, Douglas Prepared by Hoyle, Tanner & Associates, Inc. Appendix C. Detailed Crash Data

24 Massachusens Department oftransportation Highway Division COLLISION DIAGRAM SHEET 1 OF 7 SYMBOLS Moving Vehicle ((( Backing Vehicle. Nonlnvolvwd Vehicle Pedestrian ~ Bicycle ~ Animal ~ Parked Vehicle a Fixed Object TYPE OF CRASH Head on I Rear End _/ Angle J. Turning Movement ~ Sideswipe ~ Out of Control Night Time Crash SEVERITY 0 Injury 0 Fatal DOUGLAS, MA WEBSTER STREET {STATE ROUTE 1 6) CENTRAL MASSACHUSETTS REGIONAL PLANNING COMMISSION TIME PERIOD ANAL.YlED: JANUARY 2010 DECEMBER 2014 SOURCE OF CRASH REPORT'S: LOCAL POLICE MTE PREPARED: FEBRUARY 25, 2015 PREPARED BY: JOHN J. MASTERA N t \ \ *NOT TO SCALE \ ~\o \t, \~ ~\~ ~,!n ~ \ \ WEBSTER ST (ROUTE 16) \ \ \ \ \

25 Massachusens Department oftransportation Highway Division COLLISION DIAGRAM SHEET 2 OF 7 SYMBOLS TYPE OF CRASH SEVERITY Moving Vehicle ((( Backing Vehicle. Nonlnvolvwd Vehicle ~ Pedestrian Head on I Rear End 0 _/ Angle Injury Bicycle J. Turning Movement 0 ~ ~ Animal Sideswipe ~ Parked Vehicle ~ Out of Control a Fixed Object Night Time Crash Fatal DOUGLAS, MA WEBSTER STREET {STATE ROUTE 1 6) CENTRAL MASSACHUSETTS REGIONAL PLANNING COMMISSION TIME PERIOD ANAL.YlED: JANUARY 2010 DECEMBER 2014 SOURCE OF CRASH REPORT'S: LOCAL POLICE MTE PREPARED: FEBRUARY 25, 2015 PREPARED BY: JOHN J. MASTERA N t UNLOCATED CRASHES: (ASSUMED IN THIS VICINITY) 0 0 OKl s 32 ~2 *NOT TO SCALE WEBSTER ST (ROUTE 16).

26 Massachusens Department oftransportation Highway Division COLLISION DIAGRAM SHEET 3 OF 7 SYMBOLS TYPE OF CRASH SEVERITY Moving Vehicle ((( Backing Vehicle. Nonlnvolvwd Vehicle ~ Pedestrian Head on I Rear End 0 _/ Angle Injury Bicycle J. Turning Movement 0 ~ Animal Sideswipe ~ ~ Parked Vehicle ~ Out of Control a Fixed Object Night Time Crash UNLOCATED CRASHES: (ASSUMED IN THIS VICINITY) Fatal WEBSTER DOUGLAS, MA WEBSTER STREET {STATE ROUTE 1 6) CENTRAL MASSACHUSETTS REGIONAL PLANNING COMMISSION TIME PERIOD ANAL.YlED: JANUARY 2010 DECEMBER 2014 SOURCE OF CRASH REPORT'S: LOCAL POLICE MTE PREPARED: FEBRUARY 25, 2015 PREPARED BY: JOHN J. MASTERA N t 0 0 OM]@)@ 49 *NOT TO SCALE WEBSTER ST {ROUTE 16).

27 Massachusens Department oftransportation Highway Division COLLISION DIAGRAM SHEET 4 OF 7 SYMBOLS TYPE OF CRASH SEVERITY Moving Vehicle ((( Backing Vehicle. Nonlnvolvwd Vehicle ~ Pedestrian Head on I Rear End 0 _/ Angle Injury Bicycle J. Turning Movement 0 ~ ~ Animal Sideswipe ~ Parked Vehicle ~ Out of Control a Fixed Object Night Time Crash Fatal DOUGLAS, MA WEBSTER STREET CENTRAL MASSACHUSETIS REGIONAL PLANNING COMMISSION TIME PERIOD ANAL.YlED: JANUARY 2010 SOURCE OF CRASH REPORT'S: LOCAL POLICE MTE PREPARED: FEBRUARY 25, 2015 PREPARED BY: JOHN J. MASTERA DECEMBER 2014 {STATE ROUTE 1 6) N t WEBSTER *NOT TO SCALE WEBSTER ST ( R OUT 16 ) 17

28 Massachusens Department oftransportation Highway Division COLLISION DIAGRAM SHEET 5 OF 7 SYMBOLS TYPE OF CRASH SEVERITY DOUGLAS, MA Moving Vehicle Head on ((( Backing Vehicle I Rear End WEBSTER STREET {STATE ROUTE 16). Nonlnvolvwd Vehicle 0 _/ Angle Injury Pedestrian CENTRAL MASSACHUSETTS REGIONAL PLANNING COMMISSION ~ Bicycle J. 0 Turning Movement N TIME PERIOD ANAL.YlED: JANUARY 2010 DECEMBER 2014 Animal Sideswipe Fatal SOURCE OF CRASH REPORT'S: LOCAL POLICE t ~ MTE PREPARED: FEBRUARY 25, 2015 Parked Vehicle ~ Out of Control PREPARED BY: JOHN J. MASTERA a Fixed Object Night Time Crash ~ ~ WEBSTER *NOT TO SCALE WEBSTER ST (ROUTE 16) i

29 Massachusens Department oftransportation Highway Division COLLISION DIAGRAM SHEET 6 OF 7 SYMBOLS TYPE OF CRASH SEVERITY Moving Vehicle ((( Backing Vehicle. Nonlnvolvwd Vehicle ~ Pedestrian Head on I Rear End 0 _/ Angle Injury Bicycle J. Turning Movement 0 ~ ~ Animal Sideswipe ~ Parked Vehicle ~ Out of Control a Fixed Object Night Time Crash Fatal TIME PERIOD ANAL.YlED: JANUARY 2010 DECEMBER 2014 SOURCE OF CRASH REPORT'S: LOCAL POLICE MTE PREPARED: FEBRUARY 25, 2015 PREPARED BY: JOHN J. MASTERA WEBSTER DOUGLAS, MA WEBSTER STREET {STATE ROUTE 1 6) CENTRAL MASSACHUSETTS REGIONAL PLANNING COMMISSION N t *NOT TO SCALE '~.~~~""7', ~. 11

30 Massachusens Department of Transportation Highway Division COLLISION DIAGRAM SHEET 7 OF 7 SYMBOLS TYPE OF CRASH SEVERITY Moving Vehicle ((( Backing Vehicle. Nonlnvolvwd Vehicle Pedestrian ~ Head on I Rear End 0 _/ Angle Injury Bicycle J. Turning Movement 0 Animal Sideswipe ~ ~~ Parked Vehicle ~ Out of Control a Fixed Object Night Time Crash UNLOCATED CRASHES: (NOT ENOUGH INFORMATION) IJilO 0 O~@ Fatal DOUGLAS, MA WEBSTER STREET {STATE ROUTE 1 6) CENTRAL MASSACHUSETTS REGIONAL PLANNING COMMISSION TIME PERIOD ANAL.YlED: JANUARY 2010 DECEMBER 2014 SOURCE OF CRASH REPORT'S: LOCAL POLICE MTE PREPARED: FEBRUARY 25, 2015 PREPARED BY: JOHN J. MASTERA WEBSTER N t 0 0 OMJ a *NOT TO SCALE Mi 8 40 l~mllllllll~~ ~ «< 12 ~.,.. ~.,.. ~. 24 ~ 44 WEBSTER ST (ROUTE 16) ~1141 ; 29

31 Crash Diagram 1 Crash Date 01/02/10 Crash Day Saturday Time of Day Manner of Collision 6:03 AM Single Vehicle Crash 2 01/28/10 Thursday 12:32 PM Angle Daylight Snow Snow Webster Street (Route 16) ; Douglas, MA January 2010 December 2014 Weather Light Condition Condition Road Surface Driver Contributing Code Ages Comments Dark roadway not No Injury Vehicle lost control and punctured tire on guardrail, then proceded to lighted Snow Snow No Improper Driving 29 come to rest prior to Utility Pole #56 Swerving or avoiding due to wind, slippery surface, vehicle, object, nonmotorist in roadway, etc /18/10 Thursday 11:36 AM Single Vehicle Crash Daylight Clear Dry Inattention 34 Dark roadway not 4 02/24/10 Wednesday 5:18 AM Single Vehicle Crash lighted Cloudy Snow Driving too fast for conditions /26/10 Friday 6:38 AM Single Vehicle Crash Daylight Cloudy Ice Driving too fast for conditions 71 Dark roadway not Sleet, Hail, 6 02/26/10 Friday 11:16 PM Single Vehicle Crash lighted Freezing Rain Ice No Improper Driving /27/10 Saturday 7:58 AM Single Vehicle Crash Daylight Snow Snow Overcorrecting/oversteering /03/10 Friday 9:36 AM Single Vehicle Crash Daylight Clear Dry No Improper Driving /21/10 Thursday 9:58 PM Single Vehicle Crash Dark roadway not lighted Clear Dry Unknown /26/10 Tuesday 7:34 AM Rearend Daylight Clear Wet Unknown /30/10 Saturday 10:37 AM Rearend Daylight Clear Dry Followed too closely /12/10 Sunday 6:19 AM Rearend Dawn Sleet, Hail, Freezing Rain Ice No Improper Driving Sleet, Hail, 13 12/12/10 Sunday 6:48 AM Single Vehicle Crash Dawn Freezing Rain Ice No Improper Driving 41 Operating Vehicle in erratic, reckless, Dark roadway not careless, negligent, or aggressive 14 01/18/11 Tuesday 4:27 AM Angle lighted Snow Snow manner Dark roadway not Sleet, Hail, Failure to keep in proper lane or 15 04/01/11 Friday 1:15 AM Single Vehicle Crash lighted Freezing Rain Slush running off road 25 Operating Vehicle in erratic, reckless, Dark roadway not careless, negligent, or aggressive 16 05/10/11 Tuesday 1:16 AM Single Vehicle Crash lighted Cloudy Dry manner 21 Dark roadway not 17 10/30/11 Sunday 4:39 AM Single Vehicle Crash Nonincapacitating Injury Vehicle began to lose control striking another vehicle headon. Another following vehicle attempted to avoid the indicent striking the first vehicle from behind. No Injury Vehicle lost control and came to rest off the roadway in a snow bank No Injury Vehicle lost control and spun 180 degrees before coming to rest in embankment No Injury Vehicle lost control and struck tree near Utility Pole #102 No Injury Vehicle lost control and struck tree near Utility Pole #87 No Injury Vehicle lost control and struck tree No Injury Vehicle struck deer crossing the road Fatal Injury Vehicle ran off the road hitting a broken utility pole and striking 2 trees prior to coming to rest on side No Injury Vehicle suddenly stopped for school bus and was struck from behind at 103 Webster Street No Injury Vehicle came to sudden stop due to road rage of following vehicle "tailgaiting" causing collision No Injury Sand/Salt truck attempted to reverse in order to cover road while following vehicle was unable to stop on road and hit from behind No Injury Vehicle lost control and struck tree Fatal Injury Vehicle crossed and hit headon with a tractor trailer due to road conditions No Injury Vehicle lost control and crossed roadway striking guardrail and redirected across the roadway NonIncapacitating Injury Vehicle lost control corssing roadway and struck Utility Pole #36 lighted Snow Snow No Improper Driving 62 No Injury Vehicle struck tree which had fallen into the roadway 18 11/02/11 Wednesday 7:09 AM Rearend Daylight Clear Dry Unknown No Injury Vehicle passed in the opposing lane and then proceeded to slow down which caused the following vehicle to strike from behind 19 11/11/11 Friday 1:35 AM Single Vehicle Crash Dark roadway not lighted Clear Wet Operating Vehicle in erratic, reckless, careless, negligent, or aggressive manner 15 Incapacitating Injury Vehicle ran off the road due to high rate of speed striking a fence, utility pole, and tree 20 01/12/12 Thursday 9:52 AM Single Vehicle Crash Daylight Rain Slush Overcorrecting/oversteering 42 No Injury Vehicle lost control and struck tree at 117 Webster Street 21 01/12/12 Thursday 3:54 AM Single Vehicle Crash Dark, unknown roadway lighting Snow Snow No Improper Driving 26 NonIncapacitating Injury Vehicle lost control and struck Utility Pole # /27/12 Friday 1:02 AM Single Vehicle Crash Dark roadway not lighted Rain Wet Driving too fast for conditions 24 No Injury Vehicle lost control and struck tree 23 05/03/12 Thursday 11:20 PM Single Vehicle Crash Dark roadway not lighted Cloudy Wet No Improper Driving 46 No Injury Vehicle struck deer crossing the road 24 07/30/12 Monday 8:12 AM Rearend Daylight Clear Dry Unknown Operating Vehicle in erratic, reckless, careless, negligent, or aggressive 25 08/11/12 Saturday 5:10 PM Single Vehicle Crash Daylight Cloudy Dry manner /06/12 Thursday 11:05 PM Single Vehicle Crash 27 09/15/12 Saturday 1:24 AM Single Vehicle Crash Dark roadway not lighted Clear Dry Crash Data Summary Table Operating Vehicle in erratic, reckless, careless, negligent, or aggressive manner 19 No Description Dark roadway not lighted Cloudy Dry Fatigued/asleep /17/12 Monday 6:15 PM Single Vehicle Crash Daylight Clear Dry No Improper Driving 31 No Injury Unknown vehicle stopped ubruptly causing a three car rearend collision Fatal Injury Vehicle ran off the road striking Utility Pole #23 and came to rest on roof in roadway. NonIncapacitating Injury Operator fell asleep causing the vehicle to hit guardrail and cross rooadway into embankment No Injury Vehicle struck tree which had fallen into the roadway DouglasWebsterRd( )_SUMMARY.xlsx 1 of 2 3/20/2015

32 Crash Diagram 29 Webster Street (Route 16) ; Douglas, MA January 2010 December 2014 Crash Weather Date Crash Day Time of Day Manner of Collision Light Condition Condition Road Surface Driver Contributing Code Ages Comments 09/20/12 Thursday 6:57 AM Rearend Daylight Clear Dry Visibility Obstructed No Injury Vehicle attempted slowed for traffic and was struck from behind 30 09/23/12 Sunday 2:57 AM Single Vehicle Crash Dark roadway not lighted Cloudy Wet Overcorrecting/oversteering /22/12 Thursday 10:11 AM Single Vehicle Crash Daylight Clear Dry Distracted /29/12 Saturday 3:39 PM Single Vehicle Crash Dusk Snow Snow Driving too fast for conditions 19 Operating Vehicle in erratic, reckless, careless, negligent, or aggressive 33 01/24/13 Thursday 3:21 PM Angle Daylight Clear Dry manner /29/13 Tuesday 10:24 AM Single Vehicle Crash Daylight Cloudy Wet No Improper Driving 18 No Injury Truck lost control striking guardrail on both sides of roadway, telephone box, and two trees No Injury Operator was distracted and bumped by passenger causing the vehicle to lose control and strike guardrail No Injury Vehicle lost control and struck Utility Pole #88 No Injury Vehicle attempted to pass on left while the vehicle ahead was turning left into driveway #31 Webster Street No Injury Vehicle attempted to pass a large truck when the truck veered to the opposing lane causing the vehicle to avoid collision and run off the road coming to rest in the shoulder 35 02/24/13 Sunday 11:19 AM Angle Daylight Snow Snow Driving too fast for conditions No Injury Vehicle lost control and cross roadway striking side of opposing vehicle 36 02/27/13 Wednesday 5:29 AM Single Vehicle Crash Dark roadway not lighted Cloudy Slush Driving too fast for conditions 59 No Injury Vehicle lost control before coming to rest in snow bank off the road 37 03/10/13 Sunday 9:05 AM Single Vehicle Crash Daylight Clear Dry Operating Vehicle in erratic, reckless, careless, negligent, or aggressive manner 50 NonIncapacitating Injury Vehicle lost control striking guardrail on both sides of roadway before coming to rest at Utility Pole # /11/13 Thursday 4:27 PM Rearend Daylight Cloudy Dry Followed too closely No Injury Vehicle stopped for vehicle waiting to turn into driveway and was struck from behind 39 11/02/13 Saturday 1:21 AM Single Vehicle Crash Dark roadway not lighted Clear Dry Physical Impairment /19/13 Thursday 6:55 AM Single Vehicle Crash Daylight Clear Dry No Improper Driving 48 Incapacitating Injury Vehicle lost control striking guardrail and overturning. Driving While Intoxicated No Injury Vehicle was struck on the side by deer crossing the roadway 41 12/29/13 Sunday 2:00 PM Rearend Daylight Rain Wet Operating Vehicle in erratic, reckless, careless, negligent, or aggressive manner No Injury Vehicle stopped waiting to turn into driveway and was struck from behind 42 01/24/14 Friday 9:50 PM Single Vehicle Crash Dark roadway not lighted Clear Dry Overcorrecting/oversteering 18 No Injury Vehicle attempted to avoid deer crossing and lost control striking Utility Pole # /26/14 Sunday 6:08 PM Single Vehicle Crash Dark roadway not lighted Clear Dry No Improper Driving 72 No Injury Vehicle struck deer crossing the road 44 02/19/14 Wednesday 5:26 PM Sideswipe, opposite direction Dusk Cloudy Ice Operating Vehicle in erratic, reckless, careless, negligent, or aggressive manner No Injury Vehicle attempted to pass in a nopassing zone, in the process lost control and sideswiped the other vehicle 45 03/01/14 Saturday 3:23 PM Single Vehicle Crash Daylight Clear Dry No Improper Driving 25 No Injury Vehicle struck deer crossing the road Operating Vehicle in erratic, reckless, careless, negligent, or aggressive manner 19 Dark roadway not 46 08/28/14 Thursday 3:42 AM Single Vehicle Crash lighted Clear Dry 47 11/13/14 Thursday 8:35 AM Single Vehicle Crash Daylight Clear Dry No Improper Driving 37 No Injury Vehicle struck deer crossing the road 48 11/30/14 Sunday 1:41 PM Single Vehicle Crash Daylight Clear Dry 49 12/01/14 Monday 5:42 PM Single Vehicle Crash Operating Vehicle in erratic, reckless, careless, negligent, or aggressive manner 30 Dark roadway not lighted Snow Ice No Improper Driving 19 *Courtesy Crash A term used to describe a crash that occurs subsequent to a noninvolved mainline driver who gives the right of way, contrary to the rules of the road, to another driver. Summary based on Crash Reports obtained from the Douglas Police Department Crash Data Summary Table NonIncapacitating Injury. Vehicle left roadway striking Utility Pole #33 and Tree. Driving while intoxicated NonIncapacitating Injury Vehicle lost control and struck Utility Pole. Poor tire tread and unworn seatbelt contributing factors No Injury Vehicle lost control striking guardrail and coming to rest in off street parking area DouglasWebsterRd( )_SUMMARY.xlsx 2 of 2 3/20/2015

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

ROAD SAFETY AUDIT. Main St. (U.S. Route 7, Routes 23 & 41) at South Main St. (U.S. Route 7) and Maple Ave. (Routes 23 & 41) MassDOT Project #607756

ROAD SAFETY AUDIT. Main St. (U.S. Route 7, Routes 23 & 41) at South Main St. (U.S. Route 7) and Maple Ave. (Routes 23 & 41) MassDOT Project #607756 ROAD SAFETY AUDIT Main St. (U.S. Route 7, Routes 23 & 41) at South Main St. (U.S. Route 7) and Maple Ave. (Routes 23 & 41) MassDOT Project #607756 Town of Great Barrington August 13, 2015 Prepared For:

More information

Understanding and Identifying Crashes on Curves for Safety Improvement Potential in Illinois

Understanding and Identifying Crashes on Curves for Safety Improvement Potential in Illinois Understanding and Identifying Crashes on Curves for Safety Improvement Potential in Illinois Priscilla Tobias, P.E. Mouyid Islam, Ph.D. Kim Kolody, P.E. Optional Agenda Image Title Background Workflow

More information

Speed Limit Study: Traffic Engineering Report

Speed Limit Study: Traffic Engineering Report Speed Limit Study: Traffic Engineering Report This report documents the engineering and traffic investigation required by Vermont Statutes Annotated Title 23, Chapter 13 1007 for a municipal legislative

More information

Traffic Accident Statistics

Traffic Accident Statistics 2000 Missouri State Highway System Traffic Accident Statistics Missouri State Highway System Traffic Accident Statistics Table of Contents Subject Chapter 1: Statewide Traffic Accident Statistics, Introduction

More information

1999 Missouri State Highway System. Missouri Department of Transportation - Transportation Management Systems

1999 Missouri State Highway System. Missouri Department of Transportation - Transportation Management Systems 1999 Missouri State Highway System Traffic Accident Statistics - Transportation Management Systems Missouri State Highway System Traffic Accident Statistics Table of Contents Subject Chapter 1: Statewide

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Collision Analysis Safety Tables

Collision Analysis Safety Tables Crash Severity Geography of Geography of Time and Date of Crash Conditions Features Features.. Queries Selected: Town(Hartford), Date(Year:All or //05 to 9/7/06), Severity(All), Route Class(Interstate),

More information

ACCIDENT REVIEW FORM

ACCIDENT REVIEW FORM ACCIDENT REVIEW FORM American Trucking Associations, Inc. Safety Management Council 950 N. Glebe Road, Suite 210, Arlington, VA 22203-4181 Fax: 703-838-1965 E-Mail: JPierce@trucking.org Members of the

More information

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Portable Temporary Rumble Strips (PTRS) SPECIFIC SUBJECT: Guidelines for the

More information

ROAD SAFETY AUDIT. Dascomb Road (Frontage Road to I-93 NB Ramps) Town of Andover. March 29, 2017

ROAD SAFETY AUDIT. Dascomb Road (Frontage Road to I-93 NB Ramps) Town of Andover. March 29, 2017 ROAD SAFETY AUDIT Dascomb Road (Frontage Road to I-93 NB Ramps) Town of Andover March 29, 2017 Prepared For: Massachusetts Department of Transportation Town of Andover, Massachusetts Prepared By: TEC,

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit Study Area and Location District PSA Ward ANC Phase Description

More information

a. A written request for speed humps must be submitted by residents living along the applicable street(s) to the Public Works Department.

a. A written request for speed humps must be submitted by residents living along the applicable street(s) to the Public Works Department. WASHOE COUNTY POLICY FOR INSTALLATION OF SPEED HUMPS BACKGROUND The quality of life in residential neighborhoods can be significantly affected by the traffic issues of speeding and high vehicle volumes.

More information

Recommendations for AASHTO Superelevation Design

Recommendations for AASHTO Superelevation Design Recommendations for AASHTO Superelevation Design September, 2003 Prepared by: Design Quality Assurance Bureau NYSDOT TABLE OF CONTENTS Contents Page INTRODUCTION...1 OVERVIEW AND COMPARISON...1 Fundamentals...1

More information

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Suitland Parkway at Stanton Road SE Study Area and Location District PSA Ward ANC Phase Description

More information

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS MCHENRY COUNTY DIVISION OF TRANSPORTATION 16111 NELSON ROAD WOODSTOCK, IL 60098

More information

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County Safety Assessment for Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County Prepared by: VIRGINIA DEPARTMENT OF TRANSPORTATION Northwestern Regional Operations - Traffic

More information

CITY OF POWAY MEMORANDUM

CITY OF POWAY MEMORANDUM CITY OF POWAY MEMORANDUM TO: FROM: Traffic Safety Committee Steve Crosby P.E., City Engineer DATE: February 14, 2018 SUBJECT: Espola Road speeding concerns BACKGROUND In 2017, staff received a request

More information

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B... Speed Hump Program CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 1. GENERAL... 3 2. ELIGIBILITY REQUIREMENTS... 3 A. PETITION... 3 B. OPERATIONAL AND GEOMETRIC CHARACTERISTICS OF

More information

.MAINTENANCE. Strategic Initiative Four:

.MAINTENANCE. Strategic Initiative Four: The accompanying fact sheets explain specific components of the department s effort to prioritize maintenance activities. This information provides the basis of ODOT s 2001 Strategic Initiative Four: Re-Defining

More information

Roadway Contributing Factors in Traffic Crashes

Roadway Contributing Factors in Traffic Crashes Transportation Kentucky Transportation Center Research Report University of Kentucky Year 2014 Roadway Contributing Factors in Traffic Crashes Kenneth R. Agent University of Kentucky, ken.agent@uky.edu

More information

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing.

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing. TECHNICAL COMMITTEE: Railroad and Light Rail Transit Technical Committee DATE OF ACTION: June 25, 2004 TOPIC: Crossbuck with Yield or Stop Signs and Advance Signs. STATUS: Accepted by the National Committee

More information

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd Abbreviated Study District: 12 County: Geauga Route: SR 44 Section: 1.58 GEA 44 1.58 213 HSP # 47 (Rural Intersection) Prepared April 23, 215 By Bryan Emery Existing Conditions This study contains the

More information

2016 Kansas Traffic Crash Facts. Definitions

2016 Kansas Traffic Crash Facts. Definitions Definitions SPECIAL NOTE: Prior to 2005, the minimum criteria for reporting motor vehicle crashes for statistical purposes in Kansas were a non-injury crash occurring on or from a public roadway with over

More information

High Risk Rural Road Program Road Safety Audit Report

High Risk Rural Road Program Road Safety Audit Report High Risk Rural Road Program Road Safety Audit Report Pasco County Audit Date: December 10-11, 2009 Task Work Order No. 16 District-wide Road Safety Audit Study FPN No.: 421040-1 prepared for: Florida

More information

2. ELIGIBILITY REQUIREMENTS

2. ELIGIBILITY REQUIREMENTS Speed Hump Policy 1. GENERAL The purpose of this policy is to provide guidelines for the application of speed humps. A "speed hump" is a gradual rise and fall of pavement surface across the width of the

More information

BEING A DEFENSIVE DRIVER

BEING A DEFENSIVE DRIVER BEING A DEFENSIVE DRIVER BEING A DEFENSIVE DRIVER Introduction... 1 Plan and Prepare... 2 A Defensive Attitude... 3 Tailgating...3 Driven to Distractions... 4 Practical Driving Procedures In the City...

More information

Study Area and Location District PSA Ward ANC Phase Description C Existing 100 Block Michigan Avenue Northeast Westbound

Study Area and Location District PSA Ward ANC Phase Description C Existing 100 Block Michigan Avenue Northeast Westbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1 Block Michigan Avenue NE W/B Study Area and Location District PSA Ward ANC Phase Description 5 45

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 400 Block 14th Street SW

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 400 Block 14th Street SW Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 4 Block 4th Street SW Study Area and Location District PSA Ward ANC Phase Description 27 6 6D Existing

More information

RTCSNV CRASH ANALYSIS REPORT

RTCSNV CRASH ANALYSIS REPORT 2011-2015 RTCSNV CRASH ANALYSIS REPORT TABLE OF CONTENTS Summary... 3 Crash Types... 4 Time and Day of Crashes... 7 Crash Factors... 9 Fatalities... 10 Driver s Behavior... 11 Crash Locations... 15 Non-Motorized

More information

TURN AND CURVE SIGNS

TURN AND CURVE SIGNS Page 1 of 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS WARNING SIGNS General Standard Unexpected changes in roadway alignment (such as abrupt turns, curves, or the termination of road

More information

Transverse Pavement Markings for Speed Control and Accident Reduction

Transverse Pavement Markings for Speed Control and Accident Reduction Transportation Kentucky Transportation Center Research Report University of Kentucky Year 1980 Transverse Pavement Markings for Speed Control and Accident Reduction Kenneth R. Agent Kentucky Department

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

INTERSECTION CONTROL EVALUATION

INTERSECTION CONTROL EVALUATION INTERSECTION CONTROL EVALUATION Trunk Highway 22 and CSAH 21 (E Hill Street/Shanaska Creek Road) Kasota, Le Sueur County, Minnesota November 2018 Trunk Highway 22 and Le Sueur CSAH 21 (E Hill Street/Shanaska

More information

1400 MISCELLANEOUS Traffic Engineering Manual

1400 MISCELLANEOUS Traffic Engineering Manual TABLE OF CONTENTS Part 14 - MISCELLANEOUS 1400 GENERAL... 14-3 1415 RUMBLE STRIPS (INCLUDING STRIPES) IN THE ROADWAY... 14-4 1415-1 General... 14-4 1415-2 Transverse Rumble Strips... 14-4 1415-2.1 General...

More information

ROAD SAFETY AUDIT. Salem Road at South Street. Town of Tewksbury. October 3, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Salem Road at South Street. Town of Tewksbury. October 3, Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT Salem Road at South Street Town of Tewksbury October 3, 2016 Prepared For: Massachusetts Department of Transportation Town of Tewksbury, Massachusetts Prepared By: TEC, Inc. 65 Glenn

More information

ROAD SAFETY AUDIT. Mystic Avenue (Route 38) / Temple Street / Temple Road. City of Somerville. June 16, Prepared For: MassDOT

ROAD SAFETY AUDIT. Mystic Avenue (Route 38) / Temple Street / Temple Road. City of Somerville. June 16, Prepared For: MassDOT ROAD SAFETY AUDIT Mystic Avenue (Route 38) / Temple Street / Temple Road City of Somerville June 16, 2014 Prepared For: MassDOT Prepared By: TEC, Inc. 65 Glenn Street Lawrence, MA 01843 Road Safety Audit

More information

Study Area and Location District PSA Ward ANC Phase Description B Existing 3700 Block Massachusetts Avenue Southeast Southeast-bound

Study Area and Location District PSA Ward ANC Phase Description B Existing 3700 Block Massachusetts Avenue Southeast Southeast-bound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 37 Block Massachusetts Avenue SE Study Area and Location District PSA Ward ANC Phase Description 6 65

More information

Alberta Speeding Convictions and Collisions Involving Unsafe Speed

Alberta Speeding Convictions and Collisions Involving Unsafe Speed Alberta Speeding Convictions and Collisions Involving Unsafe Speed 2004-2008 Overview This document was prepared under the Alberta Traffic Safety Plan, Strategic Research Plan for 2008-2010, with the objective

More information

Reduced Speed Limits or Curve Warning Signs? Northeast Traffic Safety Conference Cromwell, Connecticut October 24-25, 2017

Reduced Speed Limits or Curve Warning Signs? Northeast Traffic Safety Conference Cromwell, Connecticut October 24-25, 2017 Reduced Speed Limits or Curve Warning Signs? Northeast Traffic Safety Conference Cromwell, Connecticut October 24-25, 2017 Overview/Objectives Curve signing overview State signing history for curved alignments

More information

VEHICLE NO.1- Your Vehicle. Began From. License Plate # (Street, Highway, Mile Marker, Terminal or Other Landmark) Near At VEHICLE NO.2.

VEHICLE NO.1- Your Vehicle. Began From. License Plate # (Street, Highway, Mile Marker, Terminal or Other Landmark) Near At VEHICLE NO.2. Bates College Automobile Accident Report Please notify Security immediately after an incident. Complete and submit this report within 24 hours of the accident to Adam Mayo in Security. Please fill out

More information

Yarmouth Port Road Safety Audit Route 6A Willow Street to Union Street

Yarmouth Port Road Safety Audit Route 6A Willow Street to Union Street Yarmouth Port Road Safety Audit Route 6A Willow Street to Union Street Final Report, August 9, 2013 Prepared by the Cape Cod Commission In cooperation with The Town of Yarmouth And MassDOT Highway Division

More information

Study Area and Location District PSA Ward ANC Phase Description B Existing 600 Block New York Avenue Northeast Westbound

Study Area and Location District PSA Ward ANC Phase Description B Existing 600 Block New York Avenue Northeast Westbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 6 Block New York Avenue NE Study Area and Location District PSA Ward ANC Phase Description 5 55 5 5B

More information

In-depth analysis of speed-related road crashes

In-depth analysis of speed-related road crashes Summary In-depth analysis of speed-related road crashes TØI Report 1569/2017 Author: Alena Høye Oslo 2017 109 pages Norwegian language The report summarizes detailed results of in-depth investigations

More information

Over-Dimensional Vehicle Restriction Study for US 129 in TN

Over-Dimensional Vehicle Restriction Study for US 129 in TN Over-Dimensional Vehicle Restriction Study for US 129 in TN July 30,2015 TDOT Region 1 US 129 Location Map US 129 Topography and Scenery Operational and Safety Study August 2014, US129 Operational and

More information

Memorandum Federal Highway Administration

Memorandum Federal Highway Administration Memorandum Federal Highway Administration ELECTRONIC MAIL Subject: INFORMATION: Optional Use of Acknowledgment Date: August 10, 2005 Signs on Highway Rights-of-Way Original signed by From: J. Richard Capka

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed Monroe Street Northeast Eastbound at Rhode Island Avenue

Study Area and Location District PSA Ward ANC Phase Description A Proposed Monroe Street Northeast Eastbound at Rhode Island Avenue Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Monroe Street NE and Rhode Island Avenue NE Study Area and Location District PSA Ward ANC Phase Description

More information

Act 229 Evaluation Report

Act 229 Evaluation Report R22-1 W21-19 W21-20 Act 229 Evaluation Report Prepared for Prepared by Table of Contents 1. Documentation Page 3 2. Executive Summary 4 2.1. Purpose 4 2.2. Evaluation Results 4 3. Background 4 4. Approach

More information

/13/D /14/W /14/D /12/D /16/D /15/D /14/D /18/D /15/D /11/W SR 18

/13/D /14/W /14/D /12/D /16/D /15/D /14/D /18/D /15/D /11/W SR 18 Windfall Rd SI = 0.18 10-20-13/2/D 08-15-15/14/D 07-16-13/16/D 05-06-15/15/D 01-19-09/12/W 09-29-14/17/D 11-10-09/7/D 01-08-10/7/S 04-26-11/3/W 01-30-10/15/D 12-20-11/14/W 11-16-10/14/W 07-26-08/18/W 07-08-13/15/D

More information

South Lexington Transportation Study Lexington, Massachusetts

South Lexington Transportation Study Lexington, Massachusetts South Lexington Transportation Study Lexington, Massachusetts Preliminary Findings and Options for Consideration Businesses Meeting 10/10/13 Town of Lexington Engineering and Planning Departments Meeting

More information

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44 Engineering Report: Shasta-Trinity National Forest South Fork Management Unit Analysis of National Forest System Road 30N44 (milepost 0.00 to 0.40) for Motorized Mixed Use Designation Forest: Shasta-Trinity

More information

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 TECHNICAL COMMITTEE: ITEM NUMBER: TOPIC: ORIGIN OF REQUEST: AFFECTED SECTIONS OF MUTCD: NCUTCD Proposal for Changes

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Technical Memorandum To: Tom Hanrahan Jeff Sharp From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution: Barrie Lockhart Road LP Conformity Review Scott Young Sorbara Group

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

TRAFFIC CALMING PROGRAM

TRAFFIC CALMING PROGRAM TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic

More information

Traffic and Toll Revenue Estimates

Traffic and Toll Revenue Estimates The results of WSA s assessment of traffic and toll revenue characteristics of the proposed LBJ (MLs) are presented in this chapter. As discussed in Chapter 1, Alternatives 2 and 6 were selected as the

More information

REAL-TIME ELECTRONIC SPEED FEEDBACK DISPLAYS EVALUATION:

REAL-TIME ELECTRONIC SPEED FEEDBACK DISPLAYS EVALUATION: REAL-TIME ELECTRONIC SPEED FEEDBACK DISPLAYS EVALUATION: SHORE DRIVE TEST CASE Virginia Beach Traffic Engineering April 3, 2018 Introduction Safety is the most important aspect of our transportation system.

More information

Chapter III Geometric design of Highways. Tewodros N.

Chapter III Geometric design of Highways. Tewodros N. Chapter III Geometric design of Highways Tewodros N. www.tnigatu.wordpress.com tedynihe@gmail.com Introduction Appropriate Geometric Standards Design Controls and Criteria Design Class Sight Distance Design

More information

SIGNING UPDATES MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), 2009 EDITION. CLIFF REUER SDLTAP WESTERN SATELLITE (c)

SIGNING UPDATES MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), 2009 EDITION. CLIFF REUER SDLTAP WESTERN SATELLITE (c) SIGNING UPDATES MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), 2009 EDITION CLIFF REUER SDLTAP WESTERN SATELLITE 605-773-5108 605-209-8932 (c) MUTCD 2009 EDITION MUTCD http://mutcd.fhwa.dot.gov/ Purchase

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

AFFECTED SECTIONS OF MUTCD: Section 2C.36 Advance Traffic Control Signs Table 2C-4. Guidelines for Advance Placement of Warning Signs

AFFECTED SECTIONS OF MUTCD: Section 2C.36 Advance Traffic Control Signs Table 2C-4. Guidelines for Advance Placement of Warning Signs 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 RWSTC June 2012 RW # 3 TOPIC: Advance Traffic Control Signs TECHNICAL COMMITTEE: Regulatory &

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Study Area and Location District PSA Ward ANC Phase Description C Proposed 2600 Block Lincoln Road Northeast Northbound

Study Area and Location District PSA Ward ANC Phase Description C Proposed 2600 Block Lincoln Road Northeast Northbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 2600 Block Lincoln Road NE Study Area and Location District PSA Ward ANC Phase Description 5 502 5 5C

More information

GUIDE FOR DETERMINING MOTOR VEHICLE ACCIDENT PREVENTABILITY

GUIDE FOR DETERMINING MOTOR VEHICLE ACCIDENT PREVENTABILITY GUIDE FOR DETERMINING MOTOR VEHICLE ACCIDENT PREVENTABILITY Introduction 2 General Questions to Consider 2 Specific Types of Accidents: Intersection Collisions 4 Sideswipes 4 Head-On Collision 5 Skidding

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Public Meeting #2 March 13, 2018 Summit Park District Welcome to the second Public Meeting for the preliminary engineering and environmental studies of Illinois 43

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

and Members of Municipal Council City of Niagara Falls, Ontario Mewburn Road Speed Control Review

and Members of Municipal Council City of Niagara Falls, Ontario Mewburn Road Speed Control Review TS-2018-10 May 8, 2018 REPORT TO: SUBMITTED BY: SUBJECT: Mayor James M. Diodati and Members of Municipal Council City of Niagara Falls, Ontario Transportation Services Department TS-2018-10 Mewburn Road

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

POLICIES FOR THE INSTALLATION OF SPEED HUMPS (Amended May 23, 2011)

POLICIES FOR THE INSTALLATION OF SPEED HUMPS (Amended May 23, 2011) (Amended May 23, 2011) 1. Speed humps are an appropriate mechanism for reducing speeds on certain streets in Pasadena when properly installed under the right circumstances. 2. Speed humps can be considered

More information

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy A. GENERAL Speed humps are an effective and appropriate device for safely reducing vehicle speeds on certain types of streets when installed accordance with the provisions of this policy. In order for

More information

1.3 Research Objective

1.3 Research Objective 1.3 Research Objective This research project will focus on a solution package that can facilitate the following objectives: 1. A better delineation of the no-passing zone, in particular the danger zone,

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS CITY OF GRAND PRAIRIE TRANSPORTATION SERVICES DEPARTMENT SPEED CUSHION INSTALLATION POLICY A. GENERAL Speed cushions are an effective

More information

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements Existing Conditions Belmont Circle Bourne, MA Speakers Pam Haznar, MassDOT Ed Hollingshead, Fay Spofford & Thorndike Heather Ostertog, Fay, Spofford & Thorndike Goals for Group Local Knowledge Work through

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Male Semi-Truck Driver Killed In Rollover Crash On County Road Incident Number: 05KY008

Male Semi-Truck Driver Killed In Rollover Crash On County Road Incident Number: 05KY008 Male Semi-Truck Driver Killed In Rollover Crash On County Road Incident Number: 05KY008 Photograph of county road where a semi-tractor trailer left the pavement and turned over. Grade is steeper than it

More information

PASSENGER VAN DEFENSIVE DRIVING. Prepared By: The University of Southern Maine Campus Environmental Health & Safety Office

PASSENGER VAN DEFENSIVE DRIVING. Prepared By: The University of Southern Maine Campus Environmental Health & Safety Office PASSENGER VAN DEFENSIVE DRIVING Prepared By: The University of Southern Maine Campus Environmental Health & Safety Office Topics to be Discussed University of Maine System Motor Vehicle Policy Passenger

More information

Alberta Transportation Rumble Strips - C-TEP Lunch and Learn

Alberta Transportation Rumble Strips - C-TEP Lunch and Learn Alberta Transportation Rumble Strips - C-TEP Lunch and Learn Bill Kenny P.Eng, Director: Design, Project Management and Training, Technical Standards Branch. - July 2011 What are Rumble Strips? A preventative

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION MEMORANDUM

VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION MEMORANDUM VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION MEMORANDUM GENERAL SUBJECT: SPEED LIMITS, ADVISORY SPEEDS, SIGNS SPECIFIC SUBJECT: Pole Mounted Speed Display Signs: Requirements DIRECTED

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Driver Assessment Companion Document

Driver Assessment Companion Document Driver Assessment Companion Document The information below accompanies the Driver Assessment form (thanks and acknowledgement to the Pacific Traffic Education Centre) to explain evaluation terms and criteria,

More information

2013 Changes to the 2011 MMUTCD, Part 6 September 2013

2013 Changes to the 2011 MMUTCD, Part 6 September 2013 2013 Changes to the 2011 MMUTCD, Part 6 September 2013 The requirements for drum spacing in Sections 6C.07 (Page 557 (MI)) and 6F.63 (Page 604 (MI)) have been revised to more closely match the pavement

More information

Qualitative Assessment US 1 at Old Dixie Highway 1

Qualitative Assessment US 1 at Old Dixie Highway 1 Qualitative Assessment US 1 at Old Dixie Highway 1 Project Location Map NOT TO SCALE US 1 at Old Dixie Highway LEGEND STUDY INTERSECTION Feature Summary of Existing Conditions Description Main Street US

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Community Advisory Group Meeting #3 December 1, 2017 Bedford Park Public Library 1 Meeting Agenda 1. Welcome/Introductions (3 mins) 2. Project Overview and Re-Cap

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

USE RESTRICTED 23 USC 409

USE RESTRICTED 23 USC 409 Study Map & Totals Legend Fatality Injury Property Damage Remarks: NONE Date Range: 01-01-2010 thru 12-31-2014 2010 2011 2012 Fat Incap Inj Non-Incap Inj Poss Inj PD Tot Fat Incap Inj Non-Incap Inj Poss

More information

IH 35 FEASIBILITY STUDY

IH 35 FEASIBILITY STUDY IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE

More information

Traffic Regulations Guidelines

Traffic Regulations Guidelines Traffic Regulations Guidelines PREPARED BY TRAFFIC AND SAFETY June, 2012 Providing the highest quality transportation services for economic benefit and improved quality of life. MDOT Traffic and Safety

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic

More information

Citizens Committee for Facilities

Citizens Committee for Facilities Citizens Committee for Facilities AGENDA Thursday, December 11, 2014 City Council Chambers 305 3 rd Avenue East -Twin Falls, Idaho 11:30 A.M. AGENDA ITEMS Purpose By 1. Discussion and possible action on

More information

Study Area and Location District PSA Ward ANC Phase Description B Existing 2200 Block South Dakota Avenue Northeast Southeast bound

Study Area and Location District PSA Ward ANC Phase Description B Existing 2200 Block South Dakota Avenue Northeast Southeast bound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 22 Block South Dakota Avenue NE Study Area and Location District PSA Ward ANC Phase Description 5 53

More information

ROAD SAFETY AUDIT. Middlesex Turnpike between Wheeler Road (East) and I-95 Southbound Ramps Town of Burlington. December 21, 2012

ROAD SAFETY AUDIT. Middlesex Turnpike between Wheeler Road (East) and I-95 Southbound Ramps Town of Burlington. December 21, 2012 ROAD SAFETY AUDIT Middlesex Turnpike between Wheeler Road (East) and I-95 Southbound Ramps Town of Burlington December 21, 212 Prepared For: The Gutierrez Company Prepared By: TEC, Inc. 65 Glenn Street

More information