CHAPTER 6 - UTILITIES

Size: px
Start display at page:

Download "CHAPTER 6 - UTILITIES"

Transcription

1 CHAPTER 6 - UTILITIES 6.1 INTRODUCTION This chapter establishes criteria fr the design f all relcatins t achieve maintenance, supprt, cntinued service r mdificatin f existing utilities that will be affected by the cnstructin f the system. The criteria als gvern the design f utilities that may be installed n DART right-f-way t prvide utility services t DART s facilities. "Utilities" are defined as the lines, cnnectins and appurtenances frming a transmissin, distributin, cllectin r cmmunicatin system belnging t gvernmental agencies, public utility crpratins, railrads and privately wned cmpanies fr the prvisin f sewer, water, gas, electrical, telephne, telegraph, and cable televisin service. Other systems t be included as utilities are street lighting; petrleum pipelines; fire and security alarm systems; vaults; parking meters; pstal service facilities; railrad lines and equipment and ther cmmunicatins systems. Included are service cnnectins t adjacent prperties and DART-wned utility facilities r cmmunicatin systems. Fr purpses f prviding requirements prvided in this chapter t existing systems, strm sewers and drainage appurtenances will be cnsidered a utility, in as much as these requirements are nt prvided in Chapter 7 - Drainage. Terms used in this chapter are intended t have the fllwing meaning: "Facilities" - Includes "utilities" as described abve. May als include ther structures r systems, depending n usage. "Owner" - The wner f the utility system r systems in questin. The term "utility wner" may als be used fr clarity. DART will be cnsidered the wner if the utility in questin belngs, r will belng t DART. "Railrad, railrad cmpany", r the like" - Used t define railrad cmpanies wnership instead f the term "wner". "City" - Used t define a municipality's wnership f items that are traffic and transprtatin related, as ppsed t utility type items, such as streets and bridges, street lighting, and traffic signalizatin. The required design and cnstructin f utility relcatins due t the impact f DART cnstructin will be perfrmed either under cntracts directly with DART r entirely by the Nv Rev Cpyright DART, all rights reserved,

2 affected facility wner. The designer will be required t prepare designs f utility relcatins nly as specifically directed by DART. These criteria fr utilities relcatins shall be used by the designer nly t the extent f designing thse facilities specifically directed by DART in the `Scpe f Wrk' f the cntract. The criteria prvided herein are intended t cmply with and supplement, relative t DART systems cnstructin, the applicable City cdes, rdinances, regulatins, standards and specificatins fr utility relcatins and cnstructin. Such City standards shall include the Standard Specificatins fr Public Wrks Cnstructin published by the Nrth Central Texas Cuncil f Gvernments, lcal amendments theret, standard details, cnstructin methds, and design plicy and prcedures f the City. Utility wner standards and criteria that equal r exceed these criteria shall gvern. Specific criteria prvided herein shall be in additin t utility wner criteria and standards, and shall gvern in the absence f applicable criteria issued by the utility wner. In the perfrmance f utilities relcatins, cnsideratin shall be given t the needs f the utility system, the requirements and bligatins f the utility wners, traffic requirements, the service needs f adjining prperties, and plicies established, r t be established, by DART. Such cnsideratin shall als include making the fllwing determinatins accrding t criteria prvided in Systems Design Criteria Chapter 8 - Crrsin Cntrl and Chapter 9 - System Grunding: Utilities which d nt generate electrmagnetic interference (EMI) r any ther interference that wuld cmprmise either peratins r safety f any element f the system. Metallic pipes and casings are prtected against crrsin by the use f crrsin-resistant materials, prtective catings, and/r cathdic prtectin, and are made electrically cntinuus in accrdance with the requirements f Systems Design Criteria Chapter 8 - Crrsin Cntrl and Chapter 9 - System Grunding and the crrsin cntrl standard and directive drawings. Utility system design cvered by these criteria shall be crdinated with Systems Design Criteria Chapter 8 - Crrsin Cntrl. DART-wned utility structures may require atmspheric, sil and water, and/r stray current crrsin-preventin measures. Utility cmpany structures shall be designed and cnstructed in accrdance with each cmpany's standard crrsin cntrl practices and the prvisins f any agreements between DART and the utility wners Relcatin Alternatives Nv Rev Cpyright DART, all rights reserved,

3 The necessary relcatin f utilities shall be perfrmed by using ne f the fllwing alternative prcedures: Supprt and maintain impacted utility in place during cnstructin f DART s facility, and cntinue in service fllwing cmpletin f the DART system facilities. Temprary relcatin and maintenance, then, upn cmpletin f the DART system facilities, restratin f the existing facility. Temprary relcatin and maintenance, then, upn cmpletin f the DART system facilities, replacement with a new utility facility. Permanent utility relcatin beynd the DART cnstructin limits, preferably clear f the DART right-f-way. Replacement with a new utility facility t be supprted and maintained-in-place during DART s cnstructin, then cntinued in service fllwing cmpletin f the DART system facilities. N relcatin f utilities shall be dne within DART subways with the exceptin f DARTwned facilities such as fire mains and chilled water mains. Utilities service t adjining prperties shall nt be interrupted withut permissin f the facility wner, and, if temprarily relcated, shall be restred upn cmpletin f cnstructin Replacements and Relcatins Design Design f replacement r relcatin f utility facilities shall be perfrmed generally n a replacement-in-kind basis. Hwever, the minimum replacement r relcatin standards and design prcedures agreed t by DART and each wner, as listed in Sectin 6.4, shall gvern. If betterments are t be included, they shall be apprved by DART in accrdance with cperative and detailed agreements with the applicable agency, utility, r railrad. All design invlving utility relcatins and replacements will include maintenance f service, supprt in place, replacement due t damage and crdinatin f ther utilities wrk and all designs shall fllw the utility wner's design criteria and specificatins. The designer shall crdinate their wrk and submit utilities replacement and relcatin designs and plans fr review and apprval by DART in accrdance with their cntract and the terms and cnditins f the cperative agreements between DART and the utility wner. Detailed prcedures fr crdinating with the utility wner will be as established by DART. The designer shall Nv Rev Cpyright DART, all rights reserved,

4 crdinate their wrk with the ther designers f adjacent sectins, agencies, utility wners, and private develpers t ensure cmpatibility f the respective replacements r relcatins. Specificatins and design standards prvided by the utility wners knwn t be affected shall be btained directly frm them by the designer. The designer shall crdinate the lcatin f existing utilities and the new prpsed utilities with the DART facility r related cnstructin. It is cmmn practice, in the preparatin f cntract drawings, t specify cntrl elevatins fr nly thse utilities that are dependent n prper slpes fr their peratin, such as gravity sewers. Such practices in the design f the system may result in undergrund facilities cnflicts nt reslvable by field engineering. Pssible surces f cnflict include tw r mre f the fllwing facilities: ftings; sanitary and strm sewers; water, gas, and il lines; cnduits fr train cntrl, cmmunicatins, and auxiliary pwer systems; cnduits fr the tractin pwer system; DART electric service ducts; underdrains; retaining wall stems and cunterfrts; manhles and pull bxes; and structure walls. Elevatins f all utilities shall be crrected t the datum f the U.S. Cast and Gedetic Survey. Where critical t the design, utilities shall be expsed t verify elevatins. In particular, the elevatins f the inverts f all new manhles and ductbanks shall be clearly shwn n the plans and prfiles at the center f the manhle and at the break pints alng the ductbank r at the manhle r junctin bx, respectively. Other critical elevatins and dimensins shall als be highlighted n the plans r prfiles t ntify the Cntractr f any special cnditins. Wherever there is a ptential undergrund facilities cnflict in the system, and where required by utility wners, the designer shall design t eliminate the cnflict and shall indicate sufficient elevatins and hrizntal dimensins s that the design is effectively implemented in the cnstructin. Wherever inclusin f the abve data r the number f utilities invlved results in the plans becming cngested r difficult t interpret, separate drawings shall be prepared fr each utility wner's facilities. Separate utility drawings will be prepared fr City-wned utilities in accrdance with the City's plicies, design criteria, standards and prcedures. Plans prepared fr City-wned utilities and drainage facilities will be prepared in accrdance with the City's requirements, as published in design manuals, develpment guidelines, standard cnstructin details, standard specificatins, and related dcuments DART Service Cnnectins Utilities service cnnectins t DART facilities shall be shwn n the utilities plans; their design shall be crdinated with ther items f the wrk. The designer shall ensure that service Nv Rev Cpyright DART, all rights reserved,

5 cnnectins frm the utility mains are indicated n either their plans r thse fr the adjacent cnstructin cntracts t preclude the cutting f new pavement. 6.2 DART UTILITY DESIGN CRITERIA The fllwing sectin is general criteria t be used by the designer in the preparatin f cnstructin plans fr new utilities and the relcating r replacing f existing utilities parallel t, cntiguus with, r acrss and either n, belw r abve the surface f DART s right-f-way. The first part f this sectin discusses requirements fr all utilities related t DART s right-fway. The secnd part f this sectin discusses in detail the undergrund utilities, the verhead utilities and surface utilities General Categries Utilities relcatins r replacements are classified int three categries: 1) utilities crssing DART trackways: 2) utilities n DART right-f-way clear f tracks; and 3) utilities clear f DART right-f-way. Utilities Crssing DART Trackways. Utility crssings f DART system trackways, radways, and parking lts shall be kept t a minimum. Crssings under special trackwrk shuld be avided, if pssible. Utilities service cnnectins, ther than thse serving DART s system facilities, shall nt crss beneath system at-grade tracks. Hwever, prperly cnstituted and franchised utility agencies and licensees have the right t crss system rights-f-way with transmissin and distributin/cllectin facilities t fulfill their existing service bligatins. Utilities crssings shall be perpendicular t the DART s system trackway r radway alignment, r as nearly perpendicular as pssible. Utilities shall nt be placed within drainage culverts, r in any manner r psitin that might cause damage t, r impair the safety f the facility r the system. Existing utilities within the system right-f-way shall be relcated t the extent necessary t cnfrm t the criteria prescribed herein, unless specifically excluded frm this requirement by DART and the utility wner. New utilities crssings under perating DART s system trackways shall be made by bring, jacking, r tunneling, and shall be subject t DART apprval in each case. Open-trench methds may generally be used under streets, parking lts, and aerial structures. T facilitate maintenance peratins, utility markers shall be prvided t indicate the lcatin f undergrund utility lines, drainage lines, and appurtenances beneath at-grade tracks. Sectin 6.3, Utility Markers, f this chapter utlines design details and requirements fr utility markers. Nv Rev Cpyright DART, all rights reserved,

6 Flammable r hazardus liquid r gas lines crssing the trackways shall have a valve at each end f the line at the right-f-way fr shutff in emergencies. Utilities may exist n, r be relcated t crss the right-f-way fr subway, at-grade, r aerial trackways. Such utilities may pass abve r beneath the DART facilities. Undergrund utilities relcatins abve subways shall be designed accrding t Sectin 6.3, Design Criteria fr Undergrund Utilities. Thse beneath subways shall be encased as prvided in the utility wner's standards r criteria, r as prvided in the DART standard drawings. The designer shall perfrm their designs s that utilities service will be maintained when required by the facility wner. When practicable, the existing facilities shall be maintained cmplete-in-place. Utilities n DART Right-f-Way Clear f Tracks. Utilities extending lngitudinally alng the trackway shall be limited t thse serving DART s facilities. Facility relcatins clear f tracks but within thedart right-f-way may be allwed in sme instances. When utilities exist within the DART right-f-way and the mst feasible and ecnmical slutin wuld be t supprt r relcate the facility within the right-f-way, the designer shall submit cnceptual schematic designs t DART fr apprval prir t beginning f detailed facility design. Such designs shuld preclude future disruptin t DART peratins. These general criteria gvern the design f relcatins f utilities that are affected by the DART system and that will be relcated in public r private prperty clear f the DART right-f-way r beneath DART parking lts. The design f facility relcatins shall be n a replacement-in-kind basis. It is with the understanding that any upgrading in a replacement facility resulting slely frm the replacement f devices r materials n lnger regularly manufactured, prcessed, r installed shall be cnsidered as a replacement-in-kind. This is based n prvisins that such replacement shall be nly t that standard used n ther prjects financed slely by the utility wner. Minimum replacement standards and methds f design shall be in accrdance with the criteria f the utility wner, and as agreed by DART and each facility wner r, fr a facility that is t be supprted in place during system cnstructin, the standards must be sufficient t prvide required structural strength. Shuld a utility wner require the upgrading f a facility beynd the standard described abve, such upgrading shall cnstitute a betterment and shall nt be included in the wrk prir t an agreement being reached between DART and the utility wner. Nv Rev Cpyright DART, all rights reserved,

7 Facilities clear f DART right-f-way shall be supprted r relcated t facilitate system cnstructin and meet the requirements f facility wners. The designer shall crdinate their wrk with all affected utility wners s that the mst ecnmic verall slutin is btained accrding t these requirements. These facilities als include thse crssing railrad trackways. 6.3 DART DESIGN CRITERIA FOR UNDERGROUND UTILITIES The design criteria fr undergrund utilities will include utilities that will crss, parallel r clear f the DART right-f-way. These utilities will cnsist f strm sewers, sanitary sewers, water mains, gas lines, and petrleum lines. There are several general requirements related t the undergrund utilities, which need t be addressed as fllws: Utilities wires r cables installed in cnduits crssing under at-grade r subway structures shall be placed in plastic r ther apprved nnmetallic cnduits such as Ply Vinyl Chlride (PVC). The cnduits shall be encased in cncrete in accrdance with the utilities standards. The utility wner may perfrm the design and installatin f encased utility relcatins. In this instance, the designer shall prvide the wner with plans f the DART facilities and shall crdinate their wrk with that f the utility wner t ensure that the design cnfrms t these criteria. The designer shall crdinate the design f the encased utility with ther affected facility wners where necessary and shall include the relcatin in the utilities plans and cnstructin sequence plans. Pipelines crssing under aerial structures need nt be placed in casings unless there is danger f damage t the DART facilities. Even if such a danger exists, casings may be mitted if the design f the carrier pipe is specifically apprved by DART in each case. Pipelines crssing under at-grade sectins f the system r beneath subways shall be placed in casings as shwn n the utility wner's standards r minimum standards established by DART. Excluded frm this requirement are strm sewers that nrmally perate under intermittent r cntinuus pressure f less than 10 psi. Cnstructin f casing will be in accrdance with the utility wner s standards. The space between casings and carrier pipes shall be plugged s as t prevent the frmatin f a waterway under the trackway, and casings shall be installed with an even bearing thrughut their length. Installatin f pipeline crssings by pen-trench methds shall cmply with the requirements fr cnduit bedding and backfilling as cntained in the utility wners standards, r minimum standards established by DART. Nv Rev Cpyright DART, all rights reserved,

8 If n casing is required, bred r jacked installatins shall have a bred-hle diameter essentially the same as the utside diameter f the apprved carrier pipe. If vids shuld develp r if the bred-hle diameter is greater than the utside diameter f the casing r apprved carrier pipe, all vids shall be gruted. Bring peratins shall nt be stpped if such stppage wuld be detrimental t the system. Tunneling peratins shall be cnducted as apprved by DART. If vids are caused by the tunneling peratins, they shall be filled by pressure gruting r by ther apprved methds that will prvide prper supprt. Bring, jacking, and tunneling shall be perfrmed accrding t the utility wners standards r minimum standards established by DART. Shut-ff valves shall be used as mutually agreed t by DART and the utility wner. Other than drainage r sewer lines, accessible emergency shutff valves shall be installed in pipelines n each side f DART s system trackway. Wherever pssible, such shutff valves shall be lcated utside the DART right-f-way. Where pipelines are prvided with valved autmatic cntrl statins at lcatins and within distances apprved by DART, n additinal valves shall be required. Utilities may exist in public right-f-way and n private prperty that will becme part f the right-f-way fr a DART parking lt. When such utilities are encuntered, they will be allwed t remain in place beneath the DART parking lts prvided that: 1) The facility can withstand the cnstructin lading and permanent parking lt lading; 2) The depth f cver ver the facility upn cmpletin f cnstructin will nt be less than the minimum cver allwed by the facility wner, greater than the maximum depth used by the facility wner in its wn cnstructin, and greater than an existing utility cnduit may withstand; 3) The facility is nt lcated beneath majr access rads, r bus stalls; 4) The facility des nt cmprmise reliability, maintainability, r safety; 5) The cables are installed in cnduit; and 6) The cnstructin f the parking lt des nt vilate an existing utility easement, interfere with wners maintenance f utility, r is therwise unacceptable t the utility wner. When a utility facility must be relcated because f parking lt cnstructin, the relcatin may be placed beneath the parking lt, prvided the sectin designer shws it is mre ecnmical than relcatin in the public right-f-way r in right-f-way acquired specifically fr the purpse (and apprved by the wner). Such facility relcatins shall be lcated clear f the parking lt, majr access rads, and bus stalls t minimize pssible future disruptin t Nv Rev Cpyright DART, all rights reserved,

9 the parking lt by utilities maintenance peratins. The criteria used t design utilities relcatins beneath DART parking lts shall be thse used fr the design f each utility. Fr undergrund utilities specific criteria is required by DART and by the individual utility wner. The stricter f the tw criteria shall be used which is either DART r the utility wner s criteria fr each utility. The DART design criteria is as fllws: Excavatin Supprt. Refer t Chapter 16 - Excavatin Supprt fr design f trench excavatin and shring related t all utility facilities Strm and Sanitary Sewers The designer is respnsible fr the preparatin f cntract dcuments fr the relcatin f all cnflicting strm and sanitary sewers. Unless DART and the facility wner agree therwise, the design and relcatin f sanitary and strm sewer facilities that cnflict with the system shall be perfrmed withut the use f permanent ejectrs r pumping statins. Sewer facility relcatins shall be designed t cnfrm t the design criteria, standards, and rdinances f the utility wner and applicable regulatry agency requirements. Adequate clsed flumes shall be prvided t handle the flw f sanitary sewers temprarily remved frm service. N sewage shall be discharged int pen trench. Design strm sewers and capacity requirements fr strm sewers, and the design f strm sewer facilities, including the relcatin f existing facilities, shall be perfrmed accrding t the requirements f Chapter 7 - Drainage. Municipal requirements will be incrprated int the design as necessary. Where existing municipal strm sewer facilities crss beneath the DART alignment and must be relcated, the relcated facilities shall be designed t current standards and criteria f the municipality. The pipe size shall be determined by calculating the discharge frm the upstream cntributry area and cnsidering the future develpment trends f the area, as set frth in Chapter 7 - Drainage. The resulting flws shall be used t size the cmplete sewer relcatin. Where relcatin is an extensin f an existing strm sewer, and replacement is nt therwise required, the extensin shall be f similar size and shape and f a hydraulic capacity equal t r greater than the existing pipe. When n additinal flw is added t the strm sewer, cnditins dwnstream f the relcatin need nt be studied. Where increase in flw takes place as a result f cnstructin, cnditins dwnstream shall be evaluated. The extent f this evaluatin shall be determined n an individual basis. Shuld retentin/detentin be cnsidered a slutin t an increased rate f strm water discharge r dwnstream sewer inadequacy, the retentin/detentin facility must be in accrdance with Chapter 7 - Drainage. Nv Rev Cpyright DART, all rights reserved,

10 The Designer shall have the fllwing respnsibilities t: 1) Prvide the sewer utility wner with plans shwing the DART facilities and crdinate with the wner t determine the extent f the system impact upn the sewer facilities. The utility wner shall determine which facilities may be abandned r taken ut f service during the utility cnstructin. The utility wner and the designer shall determine which facilities may be supprted-in-place during utility cnstructin. The utility wner and the designer, thrugh DART, shall decide upn lcatins fr the relcatin f cnflicting sewer facilities that are acceptable t DART, the utility wner, and the wners f ther affected facilities. 2) Prepare the design s that service in sanitary and strm sewer facilities is maintained at all times, except in thse facilities previusly determined t be abandned as a result f cnstructin. 3) Prepare cntract dcuments fr the sewer facility relcatins including thse betterments requested by the wner and agreed t by DART. 4) Crdinate sewer facility relcatins with ther utilities wners and lcal gvernment agencies. 5) Include the sewer facility relcatins in the cnstructin sequence plans. 6) Include prvisins in the design t maintain service t all prperties, which are t remain cnnected t sanitary r strm sewers affected by the cnstructin. The Designer shall als cnsider in his design the fllwing factrs related t strm and sanitary sewers: Lcatin and Cver. The lcatin f sanitary sewers with respect t water supply wells and ptable water lines shall fllw the regulatins f the Texas Department f Health and the criteria and standards f the utility wner. Sanitary sewers shall be lcated with a minimum f 3 feet f cver in areas nt subject t vehicular traffic. N part f a prpsed strm sewer shall be designed within the imprved subgrade f a prpsed pavement. The minimum cver fr strm sewers in areas nt subject t vehicular traffic is 2 feet, althugh greater cver is desirable. Where exceptins t these prvisins are made necessary due t cnnectin t existing lines r fr ther causes, special material r bedding may be required. Design f sanitary and strm sewers utside f DART right-f-way shall cnfrm t the design criteria and standards f the respective lcal public agency invlved. Crss Cnnectins. Physical cnnectins between a public r private ptable water supply system and any sewer, drain, facility, r equipment shall nt be made, except in strict accrdance with applicable plumbing cdes and all lcal r state regulatins pertaining t crss cnnectins. Materials. Materials shall be selected t give best service under lcal cnditins and the requirements f the design. Special cnsideratin shall be given t the character f industrial Nv Rev Cpyright DART, all rights reserved,

11 wastes, pssibilities f septicity, exceptinally heavy external lads, abrasin, infiltratin and exfiltratin, sil cnditins, pipe bedding, and similar prblems. Unless therwise apprved by DART, reinfrced cncrete pipes shall be used fr strm sewers. Vitrified clay, reinfrced cncrete r PVC sewer pipe(s) will be used fr sanitary sewers. Materials shall cmply with utility wners criteria and standards. Size. The minimum allwable diameter fr sanitary sewers shall be 8 inches, 4 inches fr residential services, and 6 inches fr ther than residential services. Sanitary sewer laterals within easements r dedicated right-f-way shall be at least 6 inches in diameter. Slpes. All sewers shall be designed with slpes sufficient t give mean velcities, when flwing full r half full, f nt less than 2.0 feet per secnd t a maximum f 10 feet per secnd based n Manning's frmula. Sanitary sewer velcities shall be determined using a Manning's "n" f Optimum flw velcity is cnsidered t be 3.0 feet per secnd, and slpes prducing less than 3.0 feet per secnd shall be used nly with the apprval f the utility wner. Pipe Size Increases. At manhles where a sanitary sewer is increased in size and any pints where a smaller sewer cnnects int a larger sewer, the invert f the larger sewer shall be at a lwer elevatin s that the energy gradient is maintained. T achieve this, pipes shall be installed with the crwns at the same elevatin. Alignment. Sanitary sewer mains shall be designed with straight alignment wherever pssible. Where curved alignments are required, design shall nt exceed the minimum curve radius fr pipe material specified, and shall be in accrdance with the utility wner's standards. Manhles. Manhles shall be installed at the end f each sewer line; at all changes in grade, pipe size, junctins, and intersectins; at changes in alignment, except where an apprved curved alignment is invlved, and at ther lcatins as may be required by the utility wner. Manhle spacing shall be in accrdance with the utility wner's standards and criteria. Manhles and cvers shall be cnstructed accrding t the utility wner's criteria, specificatins and standard details. The invert elevatin f the manhle shall be clearly shwn n the plans and prfiles at the center f the manhle. Other critical elevatins and dimensins shall als be highlighted n the plans r prfiles t ntify the Cntractr f any special cnditins. The designer shall have the ptin t permit precast manhles t be used. The requirements, criteria and details shall be nted n the respective plans and defined in the general ntes fr the precast manhle. Inverted Siphns. If n ther ptin exists, and if apprved by the utility wner, design f inverted siphns shall fllw the utility wners standards and the requirements f the Texas Department f Health. Nv Rev Cpyright DART, all rights reserved,

12 Frce Mains. Frce mains shall be cnstructed f ductile irn r PVC pipe with mechanical r ther apprved jints, r, if apprved by the facility wner, ther materials such as prestressed cncrete cylinder pipe. Sanitary Sewer Flws. Where the design f new sanitary sewers is included in the wrk, such sewers shall be designed accrding t the utility wner's criteria. Cnnectins. Cnnectins t existing sanitary sewers shall be by manhles r ther cnstructin apprved by the utility wner. Drainage Reprt. A drainage reprt fr the design f the strm sewer shall be prepared fr submittal t the lcal gvernment agency having jurisdictin. The reprt shall describe the effect f cnstructin f a sectin f the DART system upn the existing drainage facilities and shall shw that the design cnfrms t the applicable DART and utility wner's plicies, criteria and standards. Fr further details f drainage reprt requirements refer t Chapter 7 - Drainage. Lw Pressurized Pipe. Pipelines included in this sectin are thse installed t carry water, r any ther nnflammable substance, which, frm its nature f pressure, might cause damage escaping n, r in the vicinity f, system prperty. The fllwing casing requirements apply t strm and sanitary sewer lines and waterlines. Water lines relcatins and replacements are discussed in mre detail later in this sectin. Relcatins f strm and sanitary sewer facilities that crss under at-grade system trackways and that nrmally perate under pressures f less than 10 psi shall be designed accrding t prcedures specified herein and by the utility wner. Hwever, the design shall be checked t prvide a safeguard fr the system shuld such facilities becme surcharged during a 100-year-frequency strm (Chapter 7 - Drainage). Nn-encased facilities shall have watertight jints and the capability f serving fr a perid f at least 50 years with minimal maintenance. Reinfrced cncrete pipe meeting ASTM C76 and having "O"-ring rubber gasket jints cnfrming t ASTM C443 will satisfy these requirements. Nnflammable Substance Pipelines. Pipelines cntaining nnflammable substances under lw pressure shall be designed as fllws: 1) Carrier pipe and jints fr lines under system trackways shall be f cmparable type, strength, and material t that required by the utility wner fr direct burial applicatin r by AREMA Manual, whichever is mre stringent. Jints fr carrier pipe perating under pressure shall be push-n, mechanical jints, r welded. Carrier pipes shall be in accrdance with the utility wner's criteria and standards, except where these requirements are mre stringent r have additinal requirements. Nv Rev Cpyright DART, all rights reserved,

13 2) Casing materials shall cnsist f crrugated metal, steel, r reinfrced cncrete pipe, all in accrdance with the requirements prescribed belw. Fr larger r high-pressure mains that require peridic inspectin, and where therwise apprpriate, reinfrced cncrete utilities tunnels may be used. The standards f the utility wners shall be cmplied with when mre restrictive r stringent. 3) Crrugated metal casing pipe requirements shall be designed accrding t the latest editin f Crrugated Metal Pipe Culverts - Structural Design Criteria and Recmmended Installatin Practices, published by the Federal Highway Administratin. Fr water mains and sanitary sewer casings, the standards f the utility wner fr crrugated metal pipe and circular liner plate shall be used. 4) Steel casing pipe requirements shall have a minimum yield strength f 35,000 psi. Wall thickness fr steel casing pipe with a prtective cating installed in a trench shall cnfrm t Table 6.1. The wall thicknesses shwn in Table 6.1 shall be increased by at least inch fr uncated casing and by at least inch fr cated r uncated casings t be installed by jacking r bring. Fr water mains and sanitary sewer, the standards f the utility wner will be used, subject t apprval by DART, in lieu f the freging. 5) Reinfrced cncrete pipe and fittings requirements shall cnfrm t the requirements f ASTM C76, Class IV, minimum, in accrdance with the wner's standards. "O"-ring gaskets shall cnfrm t the requirements f ASTM C443. 6) Casing pipe and jints shall be designed t withstand the impsed lading. Casings shall be slped t drain. They shall be prtected against crrsin in accrdance with the requirements f Systems Design Criteria Chapter 8 - Crrsin Cntrl and Chapter 9 - System Grunding and crrsin cntrl standards and directive drawings. Care shall be taken t select materials that will nt be damaged thrugh dissimilar metals cntact. Where bth carrier pipe and casing are metallic, they shall be separated electrically by using insulated spacers. The inside diameter f the casing shall be at least 2 inches greater than the largest utside diameter f the jint r cupling f the carrier pipe and shall als meet the requirements f the utility wner. In any case, the casing shall be large enugh t allw pressurized carrier pipe t be remved subsequently withut disturbing the casing pipe r trackbed. Fr water main and sanitary sewer casing pipes, the standards f the utility wner will be used. Fr sanitary sewer lines, vids between the encasement and carrier pipes shall be gruted. 7) The ends f the casing shall be suitably sealed t prtect against the entrance f freign materials. Utility wner's standard details fr seals and drainage shall be used. 8) The limits f the casing pipe unless therwise apprved by DART and the utility wner, casing pipe shall extend t the greater f the fllwing hrizntal distances, measured perpendicular t the centerline f track: a minimum distance f 2 feet utside the fenced prtin f the system right-f-way r minimum distance f 25 feet frm the centerline f the utside track. Nv Rev Cpyright DART, all rights reserved,

14 9) If additinal tracks are cnstructed in the future, the casing shall be extended crrespndingly. Where future additinal tracks are planned, utilities shall be installed n a straight line and grade fr the apprpriate distance t facilitate future casing extensin. 10) Minimum cver ver uncased pipe r ver casings shall be 3 feet at areas subject t vehicular traffic, unlined ditches, and ther unpaved surfaces, and 2 feet at lined ditches. Additinal cver shall be prvided where necessary t cmply with the utility wner's plicy r lcal gvernment rdinances. On at-grade DART trackways, the minimum clearance between the tp f uncased pipe r tp f casing pipe and the base f the system rails shall be 4 feet 6 inches. The standards f the utility wners will be used if mre stringent than the abve. 11) Sewer services shall be in accrdance with the cdes and standards f the utility wner. TABLE 6-1 MINIMUM WALL THICKNESS FOR STEEL CASING PIPE UNDER DART TRACKWAYS NOTE: Fr Cated Casings Installed in a Trench Height f Cver Diameter in inches in Feet 10 r less 11 t t r less 0.250" 0.250" 0.250" " 0.250" 0.250" " 0.250" 0.250" " 0.250" 0.281" " 0.250" 0.312" " 0.250" 0.344" " 0.281" 0.344" " 0.312" 0.375" " 0.312" 0.406" " 0.344" 0.438" " 0.344" 0.469" " 0.344" 0.469" " 0.375" 0.500" " 0.375" 0.500" " 0.406" 0.562" " 0.438" 0.562" Nv Rev Cpyright DART, all rights reserved,

15 NOTE: Fr water mains and sanitary sewers, the standards f the utility wner will be used, subject t apprval by DART, in lieu f the abve table. NOTE: The abve thicknesses pertain t cated pipe casings installed in a trench. A maximum allwable trench width shall be indicated t assure that trench cnditin lading actually ccurs. If casing is t be installed in an embankment and psitive prjecting installatin is anticipated, maximum allwable deflectin shall be equal t 0.05 f nminal pipe diameter, and wall thickness shall be determined frm Spangler's frmula Water Mains Water mains belnging t lcal gvernment agencies will be affected by cnstructin f the system. The sectin designer is respnsible fr the preparatin f cntract dcuments fr relcatin f all cnflicting water facilities nt perfrmed by the utility wner. Unless DART and the facility wner agree therwise, the design and relcatin f water facilities that cnflict with the system shall be perfrmed n a replacement-in-kind basis. Designer Requirements. It shall be the designer's respnsibility t implement the fllwing general requirements fr the relcatin r replacement f water mains and service lines: 1) Prvide the water utility wner with plans shwing the DART facilities and crdinate with the wner t determine the extent f the system impact upn the water facilities. The utility wner and the designer shall determine which facilities may be abandned r taken ut f service during DART system cnstructin and which facilities may be supprted-in-place during system cnstructin. All water mains with lead jints shall be replaced with ductile irn r PVC pipe having mechanical r push-n jints prir t supprting-in-place. The utility wner and the designer shall decide upn the lcatins fr the relcatin f cnflicting water facilities which are acceptable t DART, the facility wner, and the wners f ther affected facilities. 2) Prepare the designs s that water service is maintained at all times, except in thse facilities previusly determined t be abandned as a result f the recnstructin. N water main r fire hydrant shall be ut f service withut prir apprval f the utility wner. 3) Prepare cntract dcuments fr the water facility relcatins, including thse betterments requested by the wner and agreed t by DART. 4) Crdinate water facility relcatins with ther utilities wners and lcal gvernment agencies. 5) Include the water facility relcatins in the DART cnstructin sequence plans. Nv Rev Cpyright DART, all rights reserved,

16 The designer shall incrprate int the plans the fllwing design requirements fr the fllwing specific items and elements related t the relcatin r replacement f water mains and service lines. 1) Water mains, materials and fittings shall be as required by the wner. Relcatin alignments must meet the current standards f the utility wner. 2) Depth f cver shall be 4 feet minimum n DART right-f-way r prperty, and in accrdance with the utility wner's criteria in all public right-f-way, DART right-f-way, r utility easement. 3) Fire hydrant installatin shall cmply with the utility wner's standards. The sectin designer shall cnsider bth temprary and permanent requirements when designing hydrant relcatins. The fllwing pertains t fire hydrant installatin: a) Spacing: Residential and cmmercial/central business district areas: Hydrant spacing shall fllw utility wner and lcal fire department requirements. DART statins and ther DART facilities: Hydrant spacing shall fllw the requirements specified in Chapter 29 - Fire Prtectin Systems. DART yard facilities: Hydrant spacing shall be a maximum f 300 feet. b) Valving fr hydrants: Hydrants shall be installed n a 6-inch lateral and shall have a 6-inch gate valve lcated between the hydrant and the main. c) Bracing: Hydrants shall be anchred in accrdance with the utilities standards. 4) Valve type and spacing shall be in accrdance with the utility wner's criteria and standards. 5) Thrust blcks r apprved jint restraint systems shall be prvided at bends (hrizntal and vertical), tees, and plugs accrding t the utility wner's criteria and standard details. 6) Casings are required fr all water mains crssing under DART tracks. Crssings under DART trackways shall cnfrm t casing requirements detailed under Strm and Sanitary Sewers. 7) Crssings under ther facilities shall cmply with the standards and criteria f the specific facility wner. Where the facility must remain in peratin, the use f tunneling r jacking shall be cnsidered fr the installatin f relcating facilities crssing belw. 8) Services taps n new, relcated and replaced water mains shall be installed accrding t the requirements f the utility wner. 9) All cleaning, pressure and leakage tests, and chlrinatin fr disinfectin requirements shall be in cnfrmance with the criteria f the utility wner. 10) Water mains n bridge crssings r structure shall cmply with the fllwing requirements: Nv Rev Cpyright DART, all rights reserved,

17 a) All pipe jints that are t be aerially supprted ver r under a bridge r similar structure shall be thrughly restrained against bth lngitudinal and lateral mvement with a minimum f ne restraining device per jint. b) Pipe material shall be ductile irn r steel and in accrdance with utility wner's requirements. c) Each crssing shall have a valve n each side f the bridge and beynd the abutment lcated in prximity t the crssing. Valves shall nt be n the bridge structure. 11) Blw-ff valves, air vents r air/vacuum release valves shall be prvided when directed by the utility wner, and shall be in accrdance with the utility wner's criteria and standards. 12) Pipe insulatin, if required fr aerially supprted r ther abve grade lines, shall meet r exceed insulatin equivalent t the fllwing, and apprved by the wner: a) Insulating material: 3-inch-thick plyurethane pipe cvering, frmed t fit the particular pipe diameter. b) Outer cvering material: inch aluminum chiller jacket with misture shield secured with stainless steel straps. 13) Right-f-way fr publicly wned water facilities shall never be placed n private prperty. Shuld the area within the public right-f-way be insufficient fr facility installatin, sufficient right-f-way r an easement shall be prvided. 14) Cnnectins t water main shall be shwn n the plans. The designer shall prepare plans shwing details fr the cnnectin f new, relcated r replaced water mains t the existing mains. Such details shall include valves, temprary hydrants, fittings, and temprary and permanent plugs. The cnnectin plan shall delineate the fllwing respnsibility fr perfrmance f the wrk: unless specified therwise, all water main cnnectins shall be cnstructed by the cntractr after necessary valve peratin by the utility wner. 15) Service Cnnectins shall be shwn n the plans. Cmmercial and industrial service cnnectins 4 inches and larger shall be detailed n the plans. Residential service cnnectins shall be included by reference n the drawings. Respnsibilities fr relcatin f service cnnectins shall be in accrdance with the utility wner's standard prcedure and criteria. 16) Water services and meters shall be installed accrding t the cdes and standards f the utility wner. 17) DART fire and dmestic water service cnnectins shall be designed by the designer. The size f the dmestic cnnectin and meter shall be based upn peak-demand/pressure lss calculatins in cnjunctin with lcal cdes and rdinances. Fire flw and pressure data in the existing water main shall be btained frm the water utility wner. 18) The fire and dmestic services in public right-f-way and up t the DART right-f-way shall be installed by DART's cntractr. The dmestic service meter must be in public Nv Rev Cpyright DART, all rights reserved,

18 right-f-way r in a utility easement granted by DART t the water utility. The utility will install all dmestic meters, and either the utility r DART's cntractr may install fire service meters Gas Facilities The designer shall cmply with the fllwing general requirements as they relate t gas lines and facilities. These requirements will als apply t petrleum lines and lines which carry flammable and highly vlatile substances. The designer shall pay clse attentin t the facilities wner s requirements in the design f the relcatin r replacement f these lines. Pipelines fr Flammable Substances. Pipelines included in this sectin are thse installed t carry natural gas, il, petrleum prducts, r ther flammable r highly vlatile substances. They shall be encased under DART tracks and right-f-way in accrdance with the fllwing criteria: 1) Carrier pipe: a) The fllwing requirements fr carrier pipe apply t pipelines crssing under bth at-grade and aerial sectins f the system. These requirements apply fr a minimum hrizntal distance f 50 feet frm the centerline f the utside track r 25 feet beynd the end f casing when casing is required whichever is greater. b) Pipelines carrying il and ther flammable prducts shall cnfrm t the requirements f the current editin f ANSI B31.4, Liquid Petrleum Transprtatin Piping Systems, and ther applicable ANSI cdes. c) Wall thickness fr carrier pipe shall be based n the design criteria, standards, and specificatins used by the facility wner fr encased crssings beneath highways r railrads. In n case shall the encased facility be f lesser strength than the adjacent, direct-burial sectins. 2) Casing materials: Casing pipe and jints shall be f crrugated metal, steel, ductile irn, r reinfrced cncrete pipe accrding t the requirements prescribed fr nnflammable carrier pipe, excluding plastic pipe. Fr large r high-pressure mains that require peridic inspectin, reinfrced cncrete utilities tunnels may be used. 3) Casing design: Casing pipe and jints shall be watertight and shall be capable f withstanding the impsed lading. Casings shall be slped t drain. They shall be prtected against crrsin in accrdance with the requirements f Systems Design Criteria Chapter 8 - Crrsin Cntrl and Chapter 9 - System Grunding chapter and the crrsin cntrl standard and directive drawings. Care shall be taken t select materials that will nt be damaged thrugh dissimilar metals cntact. Where bth carrier pipe and casing are metallic, they shall be separated by using insulated spacers. The inside diameter f the casing shall be at least 2 inches greater than the largest utside diameter f the jint r cupling f the carrier pipe. The casing diameter shall always be large enugh t allw the carrier pipe t be remved subsequently withut disturbing the casing Nv Rev Cpyright DART, all rights reserved,

19 pipe r trackbed. All jints r cuplings, supprts, insulatrs, r centering devices fr the carrier pipe within a casing shall be taken int accunt. In additin, casing shall be designed s that its maximum vertical deflectin is 5 percent f its diameter and s that n lads frm the trackbed, track, traffic, r casing pipe itself are transmitted t the carrier pipe. 4) Ends f casings and vents: a) The ends f casings shall nt prject abve grund level. They shall be clsed with a liquid-tight seal bushing r bulkhead. b) Casing pipe shall extend t the greater f the fllwing hrizntal distances, measured perpendicular t the centerline f track, unless therwise apprved by DART and the utility wner: A minimum distance f 2 feet utside the fenced prtin f the DART right-f- way. A minimum distance f 25 feet frm the centerline f the utside track, when the casing is sealed at bth ends. c) If additinal tracks are cnstructed in the future, the casing shall be extended crrespndingly. d) Casings shall be vented at each end by vent pipes attached near the ends f the casing and having a minimum diameter f 2 inches. Vents shall prject thrugh the grund surface utside the DART right-f-way at a distance f nt less than 6 inches frm the right-f-way line r nt less than 25 feet measured at right angles frm the centerline f the nearest track, unless therwise apprved by DART and the utility wner. e) Vent pipes n DART right-f-way shall extend nt less than 4 feet abve the grund surface. The tp f the vent pipe shall be fitted with a dwn-turned elbw that shall be screened r fitted with a relief valve. Vents in lcatins subject t high water shall be extended abve the maximum elevatin f high water and shall be adequately supprted and prtected. f) Vent pipes n DART right-f-way shall terminate at least 8 feet belw aerial electric wires carrying 750 vlts r less and 12 feet belw aerial electric wires carrying ver 750 vlts. 5) Cver: Minimum cver ver uncased pipe r ver casings shall be 4 feet in areas subject t vehicular traffic, unlined ditches, and ther unpaved surfaces, and 2 feet at lined ditches. Additinal cver shall be prvided where necessary t cmply with the facility wner's plicy r lcal design cnditins. On at-grade trackways, the minimum clearance between the tp f encased pipe r tp f casing pipe and the base f the system rails shall be 5'-6". Natural gas transmissin and distributin facilities belnging t the gas cmpanies will be affected by cnstructin f the system. The gas cmpanies, crdinating thrugh DART and Nv Rev Cpyright DART, all rights reserved,

20 ther facility wners, shall decide upn lcatins fr the relcatin f affected gas facilities that are acceptable t DART, the cmpanies, and ther affected facility wners. Unless DART and the gas cmpany agree therwise, the design and relcatin f gas facilities that cnflict with the system shall be perfrmed n a replacement-in-kind basis by the gas cmpany accrding t their criteria and standards, and all lcal, State and federal standards and cdes. Abandned gas pipe lines within DART right-f-way shall be excavated and dispsed f after they have been purged by the gas cmpany. Designer Requirements. It shall be the designer's respnsibility t: 1) Prvide the gas cmpany with plans shwing the DART facilities. 2) Include the cmpany's requirements fr maintenance f gas facilities cmplete-in-place in the preparatin f the DART design. 3) Include the gas facility relcatins t be perfrmed by the cmpany in the DART cnstructin sequence plans. Gas Cmpany Respnsibilities. The gas cmpany shall crdinate with the designer thrugh DART t determine the extent f the system impact n the gas facilities, and the cmpany shall: 1) Determine facilities where service may be terminated n a temprary r permanent basis. 2) Delineate thse facilities that are t be maintained cmplete-in-place. Facilities that are t be maintained-in-place abve DART subways shall be cnstructed f steel; facilities f ther materials shall be replaced with steel by the gas cmpany prir t system cnstructin. Facilities t be maintained-in-place beneath at-grade DART tracks shall be enclsed in a casing in accrdance with the requirements fr Pipelines fr Flammable Substances. 3) Design and cnstruct new facilities necessary t maintain cntinuity f service t the cmpany s custmers Petrleum Prducts Pipelines High-pressure fuel and il transmissin pipeline facilities belnging t different privately wned pipeline cmpanies will be affected by cnstructin f the DART system. The design and relcatin f pipelines that cnflict with the system shall be perfrmed by the facility wner accrding t cmpany standards and all applicable lcal, state, and federal standards and cdes. The general requirements fr pipelines carrying flammable substances shall be implemented n petrleum lines. Nv Rev Cpyright DART, all rights reserved,

Design Standard - Fume Hoods & Fume Hood Exhausts

Design Standard - Fume Hoods & Fume Hood Exhausts 1.0 Intrductin Design Standard - Fume Hds & Fume Hd Exhausts The fume hd is the primary cntrl device in mst labratries fr prtecting emplyees and students frm expsure t hazardus chemicals. It is als an

More information

FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994

FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994 FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994 Guidelines fr Maintenance and Inspectin Prgrams fr Natural Gas and Prpane Appliances and their Fuel Features In Schls The Ontari Gas Utilizatin Cde states

More information

PUBLIC WORKS PRIMARY GRID - TYPICAL CROSS SECTION SUBGRADE DATE: 2017 SCALE: NTS DRAWN BY: WOOD E&I

PUBLIC WORKS PRIMARY GRID - TYPICAL CROSS SECTION SUBGRADE DATE: 2017 SCALE: NTS DRAWN BY: WOOD E&I PUBLIC WORKS PRIMARY GRID - TYPICAL CROSS SECTION SUBGRADE DATE: 2017 SCALE: NTS DRAWN BY: WOOD E&I 1. Descriptin Rad design and cnstructin standards fr graveled Primary Grid and Heavy Haul rads as designed

More information

Webinar: Ontario s 2012 Building Code: Electric Vehicle Charging. Presented by the Ministry of Municipal Affairs

Webinar: Ontario s 2012 Building Code: Electric Vehicle Charging. Presented by the Ministry of Municipal Affairs Webinar: Ontari s 2012 Building Cde: Electric Vehicle Charging Presented by the Ministry f Municipal Affairs Ntice This presentatin is intended fr general infrmatin purpses related t electric vehicle charging

More information

City of San Luis Obispo Zoning Regulations December 2013

City of San Luis Obispo Zoning Regulations December 2013 City f San Luis Obisp Zning Regulatins December 2013 parking areas, parking f vehicles fr purpses f vernight camping r sleeping is prhibited by and shall be subject t enfrcement in accrdance with Chapter

More information

ACCESSORY DWELLING UNITS (ADU)

ACCESSORY DWELLING UNITS (ADU) ACCESSORY DWELLING UNITS (ADU) San Francisc Public Wrks: Bureau f Street Use & Mapping Bureau f Urban Frestry Overview San Francisc Public Wrks Cde (SFPW) gverns permit requirements fr wrk in the public

More information

Texas: Texas Transportation Code link: TRANSPORTATION CODE TITLE 7. VEHICLES AND TRAFFIC

Texas: Texas Transportation Code link:  TRANSPORTATION CODE TITLE 7. VEHICLES AND TRAFFIC Texas: Texas Transprtatin Cde link: http://www.statutes.legis.state.tx.us/?link=tn TRANSPORTATION CODE TITLE 7. VEHICLES AND TRAFFIC (17) "Semitrailer" means a vehicle with r withut mtive pwer, ther than

More information

Application of size, weight, and load limitations for vehicles -- Exceptions.

Application of size, weight, and load limitations for vehicles -- Exceptions. Utah Vehicle Cde 41-1a-102. Definitins. As used in this chapter: (10) "Cmmercial vehicle" means a mtr vehicle, trailer, r semitrailer used r maintained fr the transprtatin f persns r prperty that perates:

More information

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314)

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314) Architectural Review Bard Sign Review Applicatin 139 S. Kirkwd Rd. Kirkwd, MO 63122 (314) 822-5816 Fax (314) 822-5898 Prperty Address: Case # Permit# _ Persn Requesting Review Applicatin Date: Name: Address:

More information

Texas Christian University Policy

Texas Christian University Policy Texas Christian University Plicy Plicy Number: 6.060 Subject: Off Rad Vehicle Plicy Effective Date: January 16, 2009 Apprved: By Chancellr s Cabinet, January 15, 2009 I. Purpse This plicy prvides guidelines

More information

CONTRACTOR MANAGEMENT SYSTEM LIGHT VEHICLE SITE ACCESS POLICY

CONTRACTOR MANAGEMENT SYSTEM LIGHT VEHICLE SITE ACCESS POLICY Page: 1 f 8 TABLE OF CONTENTS 1. Purpse... 2 2. Scpe... 2 3. Definitins... 2 4. General Rules... 3 5. Vehicles... 3 6. Site Access Areas... 4 7. Cnditin f Vehicles... 5 8. Drivers Licence Cnfirmatin...

More information

ROOF INSPECTION GUIDE

ROOF INSPECTION GUIDE INSURANCE INSTITUTE FOR BUSINESS & HOME SAFETY ROOF INSPECTION GUIDE COMMERCIAL ROOF-MOUNTED BALLASTED PHOTOVOLTAIC (PV) WIND PROTECTION ON LOW-SLOPED ROOFS Use the fllwing guidance t cnduct baseline and

More information

Temporary Use and Vendor Stand Online Permit Submittal

Temporary Use and Vendor Stand Online Permit Submittal Temprary Use and Vendr Stand Online Permit Submittal A Temprary Use Permit is an pen-air small business that is there fr a limited time fr the uses listed belw. Temprary Use Duratin Extensin Agricultural

More information

PSS INSTALLATION INSTRUCTIONS

PSS INSTALLATION INSTRUCTIONS PSS INSTALLATION INSTRUCTIONS Imprtant - Read Befre Starting! Befre starting yur installatin carefully read the fllwing warnings and instructins. Failure t prperly fllw the warnings and instructins culd

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST UNDERGROUND STORAGE TANK INSTALLATION PLAN REVIEW CHECKLIST

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST UNDERGROUND STORAGE TANK INSTALLATION PLAN REVIEW CHECKLIST July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST UNDERGROUND STORAGE TANK INSTALLATION PLAN REVIEW CHECKLIST Address: Permit #: Inspectr: Date: Status: Inspectr: Date:

More information

Pre-Planning Delivery Guide

Pre-Planning Delivery Guide Pre-Planning Delivery Guide Need Assistance? Call 1-888-768-6772 Pre-Delivery Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time f yur

More information

Underground Storage Tank Management Practices

Underground Storage Tank Management Practices Prgram #: Envirnmental Management Prgram Revisin # 1.0 Implementatin Date 1/30/08 Page #: 1 f 13 Authr: Envirnmental Prgrams Apprval: W. Brewer Undergrund Strage Tank Management Practices 1.0 Purpse /

More information

PRE-PLANNING & DELIVERY GUIDE

PRE-PLANNING & DELIVERY GUIDE TM PRE-PLANNING & DELIVERY GUIDE Need Assistance? Call 1-888-329-4847 PRE-DELIVERY Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time

More information

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314)

Architectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314) Architectural Review Bard Sign Review Applicatin 139 S. Kirkwd Rd. Kirkwd, MO 63122 (314) 822-5816 Fax (314) 822-5898 Prperty Address: Case # Persn Requesting Review Applicatin Date: Name: Address: City/State/Zip:

More information

BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE

BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE 1. INTRODUCTION... 3 2. PRECAUTIONS... 3 3. INSPECTION UPON RECEIPT OF GOODS... 4 3.1 GENERAL... 4 3.2 VISIBLE DAMAGE... 4 3.3 CONCEALED DAMAGE...

More information

Gearbox Installation Manual

Gearbox Installation Manual Gearbx Installatin Manual Rtrk Gears HOB/MPR & HOS/MPR ranges (Electrnic cpy available n www.rtrk.cm)! This manual cntains imprtant safety infrmatin. Please ensure it is thrughly read and understd befre

More information

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS 120 Mdel: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS IF YOU CANNOT READ OR UNDERSTAND THESE INSTALLATION INSTRUCTIONS DO NOT ATTEMPT TO INSTALL OR OPERATE INTRODUCTION This Wired Wall Timer system was

More information

CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52. Key Changes Prepared By Checked By Approved By Date

CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52. Key Changes Prepared By Checked By Approved By Date CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52 Respnsible Officer: Respnsible Executive: Grup Manager Health and Safety Executive General Manager Crprate DOCUMENT HISTORY Key Changes Prepared By Checked By

More information

MEDMASTER TROFFER Luminaires for MRI/Imaging Suites LED MRIT SERIES

MEDMASTER TROFFER Luminaires for MRI/Imaging Suites LED MRIT SERIES MEDMASTER TROFFER Luminaires fr MRI/Imaging Suites PRODUCT FEATURES: Recessed munt Grid; 2' 2', 2' 4' Nn-ferrus cnstructin safe fr sensitive MRI equipment High-utput, high-cri LED lamp ptins NSF2 rating

More information

Engineering Division Plan Review Application

Engineering Division Plan Review Application CITY OF WESTERVILLE Department f Planning and Develpment 64 E. Walnut Street, Westerville, Ohi 43081-2308 PO Bx 6107, Westerville, Ohi 43086-6107 Phne: (614) 901-6650 Fax: (614) 901-6666 Engineering Divisin

More information

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations Draft ADEM Guidance Prpsed Additins t the Alabama UST Regulatins Yu may have heard abut upcming changes t the undergrund strage tank regulatins (UST regulatins). On Octber 13, 2015 EPA finalized the first

More information

21 Econo Place, Silverdale, NSW 2752 P F SPAN TABLES

21 Econo Place, Silverdale, NSW 2752 P F SPAN TABLES 21 Ecn Place, Silverdale, NS 2752 P 1300 132 787 F 02 4774 2679 www.quickbuiltsystems.cm.au SPAN TABLES ROSS Engineers have prepared these tables fr use by peple skilled in the design and specificatin

More information

PARKING AND VEHICULAR RULES

PARKING AND VEHICULAR RULES PARKING AND VEHICULAR RULES General Rules 1. All residents and guests must abide by all psted traffic signs, CC&Rs, Rules & Regulatins, Califrnia Vehicle Cdes, and San Clemente Municipal Cdes. All vilatins

More information

REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES

REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES The Twn f Sundre is requesting prpsals frm qualified engineering firms fr civil engineering services. This will invlve prviding advice and recmmendatins

More information

General Faucet Installation Instructions

General Faucet Installation Instructions General Faucet Installatin Instructins Step 1: Psitin the Faucet Begin installing yur faucet by placing the gasket and faucet in psitin n the sink. (Diagram A) Frm under the sink, thread the plastic munting

More information

EnergyBar 6. Setup Guide

EnergyBar 6. Setup Guide EnergyBar 6 Setup Guide WELCOME Cngratulatins n yur purchase f the Apex EnergyBar 6! The EnergyBar 6 allws the Apex system t cntrl up t six 230 vlt items such as lights, pumps, fans, heaters, chillers

More information

RICHARD L. OREAIR & CO. Safety Management System

RICHARD L. OREAIR & CO. Safety Management System SAFETY Dc N: Revisin Date: Revisin N. 2 Initial Versin Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 5 Purpse This prgram is written t be in cmpliance with lcal regulatry

More information

How to Sweat (Solder) Copper Pipe By See Jane DrillTM Copyright 2013, All Rights Reserved

How to Sweat (Solder) Copper Pipe By See Jane DrillTM Copyright 2013, All Rights Reserved Hw t Sweat (Slder) Cpper Pipe By See Jane DrillTM Cpyright 2013, All Rights Reserved Objective T learn hw t attach pieces f cpper pipe by sweating r sldering the metal tgether. This is a helpful skill

More information

Safety Management System. Initial Revision Date: Version Revision No. 02 DRIVING SAFETY

Safety Management System. Initial Revision Date: Version Revision No. 02 DRIVING SAFETY Dc N: DRIVING Issue Date JAN 1995 Revisin Versin Revisin N. 02 Next Revisin Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 5 Purpse This prgram is written t be in cmpliance

More information

PARKING POLICY JULY 2012

PARKING POLICY JULY 2012 1. DEFINITIONS DRAFT POLICY RELATING TO PARKING Designated parking area: means basement parking bays, pen parking bays and ther parking bays at the Mangaung Metrplitan Municipality s premises. Lading Zne:

More information

BHC-P-11.1 Temporary Works

BHC-P-11.1 Temporary Works Berkeley Hme Cunties Safety Prcedures Cntents 1.0 Purpse 2.0 Scpe 3.0 Definitins 4.0 Main requirements 5.0 Guidance dcuments and references 6.0 Appendices Revisin register BHC-P-11.1 Temprary Wrks Date

More information

Building an ADDITION to an existing residence

Building an ADDITION to an existing residence Building an ADDITION t an existing residence Obtaining a permit fr yur cnstructin is a prcess that invlves review and apprval by multiple agencies. Brward Cunty Develpment and Envirnmental Regulatin Divisin,

More information

City of Elk Grove Encroachment Permit 8401 Laguna Palms Way Elk Grove, CA PHONE (916)

City of Elk Grove Encroachment Permit 8401 Laguna Palms Way Elk Grove, CA PHONE (916) City f Elk Grve Encrachment Permit 8401 Laguna Palms Way Elk Grve, CA 95758 PHONE (916) 478-2256 E-mail: epermitsline@elkgrvecity.rg PERMITTEE INFORMATION USA Phne N. (800) 227-2600 r 811 (TO BE COMPLETED

More information

Installation Guide Contigo 6100

Installation Guide Contigo 6100 Installatin Guide Cmmercial Vehicle Prductivity and Security The is a high-perfrmance beacn designed fr cmmercial prductivity and security. It is ideally suited t installatins in delivery and service fleets

More information

Effective Date: 10-January Table of Contents

Effective Date: 10-January Table of Contents Versin: 3 Page: 1 f 7 Table f Cntents 1.0 Intrductin... 2 1.1 Purpse... 2 1.2 Scpe... 2 1.3 Definitins... 2 1.4 Training Requirements... 3 2.0 General Requirements... 3 3.0 Inspectin... 3 4.0 Testing...

More information

OWNER S MANUAL. DCR-205-XX-DC Powered Drum Rotators

OWNER S MANUAL. DCR-205-XX-DC Powered Drum Rotators VESTIL MANUFACTURING CORP. 2999 N. Wayne St., Angla, IN 46703 Ph: 260-665-7586 Fax: 260-665-1339 E-mail: sales@vestil.cm Website: www.vestil.cm 0317 DCR-205-DC, MANUAL DCR-205-XX-DC Pwered Drum Rtatrs

More information

ENVIRONMENTAL HEALTH Prepackaged Food Booths with Open Sampling or Beverage Dispensing at Community Events

ENVIRONMENTAL HEALTH Prepackaged Food Booths with Open Sampling or Beverage Dispensing at Community Events STE 120 HE ALTH CARE AGENCY/PUBLIC HE ALTH ENVIRONMENTAL HEALTH Prepackaged Fd Bths with Open Sampling r Beverage Dispensing at Cmmunity Events WHY THIS INFORMATION IS IMPORTANT A temprary fd bth, r hw

More information

READ ALL INSTRUCTIONS THOROUGHLY FROM START TO FINISH BEFORE BEGINNING INSTALLATION!

READ ALL INSTRUCTIONS THOROUGHLY FROM START TO FINISH BEFORE BEGINNING INSTALLATION! www.fabtechmtrsprts.cm 4331 EUCALYPTUS AVE ~~ CHINO, CA 91710 PHONE 909-597-7800 ** FAX 909-597-7185 1994-2001 DODGE RAM 1500 & 2500 4 WHEEL DRIVE FTS3400-50 FRONT DUAL SHOCK SYSTEM PARTS LIST: 1 EA. FT3400-50-100P

More information

ADVISORY: General Motors Upfitter Integration Bulletin #108d P a g e 1 May 18, 2016

ADVISORY: General Motors Upfitter Integration  Bulletin #108d P a g e 1 May 18, 2016 Subject: Aftermarket ALDL r DLC Interface Devices Causing Multiple Issues Mdels All Passenger Cars and Trucks Affected: Mdel Years: 2006 and beynd Date: February 4, 2013 Revisin Date: May 18, 2016 ADVISORY:

More information

Lithium Battery Shipping Overview

Lithium Battery Shipping Overview Lithium batteries are used in many electrnic devices such as cameras, cell phnes, laptp cmputers, medical equipment and pwer tls. When shipping r imprting lithium batteries, including thse cntained in

More information

FOOD TRUCK VENDOR INSTRUCTIONS

FOOD TRUCK VENDOR INSTRUCTIONS FOOD TRUCK VENDOR INSTRUCTIONS City f Clumbia 208 S. Rapp Ave. Clumbia, IL 62236 618.281-7144 x 134 Please allw tw weeks fr prcessing. The fllwing dcuments must be submitted with this applicatin: - Cmpleted

More information

3000-series Remote Start System with Keyless Entry. Owner's Guide

3000-series Remote Start System with Keyless Entry. Owner's Guide 3000-series Remte Start System with Keyless Entry Owner's Guide Cngratulatins Cngratulatins n the purchase f yur state-f-the-art remte start system with keyless entry. Reading this Owner s Guide prir

More information

DriveCam Unit Installation Instructions

DriveCam Unit Installation Instructions DriveCam Unit Installatin Instructins Installatin f the DriveCam Unit is nt cmplicated, thugh care must be taken t avid specific prblems. Sme vehicles require additinal cnsideratin t determine the ptimum

More information

Proposed Changes to Ontario s Building Code Summer and Fall 2017 Consultation: Electric Vehicle Charging in Multi-Unit Residential Buildings

Proposed Changes to Ontario s Building Code Summer and Fall 2017 Consultation: Electric Vehicle Charging in Multi-Unit Residential Buildings Prpsed Changes t Ontari s Building Cde Summer and Fall 2017 Cnsultatin: Electric Vehicle Charging in Multi-Unit Residential Buildings Purpse T prvide infrmatin n prpsed changes t the Building Cde regarding

More information

Highfields Independent School and Day Nursery Mini Bus Policy

Highfields Independent School and Day Nursery Mini Bus Policy Highfields Independent Schl and Day Nursery Mini Bus Plicy Last Reviewed: Nv 2015 Apprved n: Cmmittee Respnsible: Pupil and Persnnel Next Review: Nv 2017 Apprved by: Full Gvs Highfields Schl is cmmitted

More information

6.2 An occasion for street acceptance shall only exist if the Board of Selectmen determines there is a public need.

6.2 An occasion for street acceptance shall only exist if the Board of Selectmen determines there is a public need. Altn Highway Plicies and Regulatins Sectin 6. STREET ACCEPTANCE PROCEDURES 6.1 Any persn may petitin the Selectmen t accept a street under this Sectin, prvided the street is an existing radway which crrespnds

More information

REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION

REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION The Twn f Salem, New Hampshire is requesting qualificatins frm qualified

More information

Franchised Hauler Exemption for Recycling Application

Franchised Hauler Exemption for Recycling Application Franchised Hauler Exemptin fr Recycling Applicatin City f Ann Arbr Franchised Hauler Exemptin fr Recycling Applicatin Exemptins frm cmmercial trash services prvided by the city-selected franchised hauler

More information

CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES

CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES Revised July 11, 2018 Prepared by: City f Elk Grve Public Wrks Department 1. INTRODUCTION BACKGROUND In 2002, the Public Wrks Department develped the

More information

E+ Battery Care Guide

E+ Battery Care Guide Electric Mtin Systems, LLC 45150 Business Curt, Suite 300 Dulles, VA 20166 USA E+ Battery Care Guide Welcme! Yur E+ Hub Battery Pack is a pwerful, sphisticated, and imprtant part f yur E+ Electric Bicycle.

More information

HANDLING AND STORAGE PRACTICE

HANDLING AND STORAGE PRACTICE PREFERRED RELIABILITY PRACTICES Practice N. PD-ED-1109 Page 1 f 5 Ni-H SPACECRAFT BATTERY HANDLING AND STORAGE PRACTICE Practice: Develp and implement handling and strage prcedures t ensure reliable peratin,

More information

Advanced 3 Million Wireless USB Limousine Underbody Kit

Advanced 3 Million Wireless USB Limousine Underbody Kit Advanced 3 Millin Wireless USB Limusine Underbdy Kit Warning: Please check yur state and lcal laws befre installing this LED underbdy kit. Every state has different plicies and prcedures in place regarding

More information

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools Vlume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE by BLUEROCK Tls UNPACKING THE ITEM Cautin: This machine is packed tgether with items that may be sharp, ily and verly heavy bjects.

More information

Kentucky: Kentucky revised vehicle code Link: Kentucky Revised Statutes.

Kentucky: Kentucky revised vehicle code Link:   Kentucky Revised Statutes. Kentucky: Kentucky revised vehicle cde Link: http://www.lrc.ky.gv/statutes/chapter.aspx?id=38038 Kentucky Revised Statutes 189.010 Definitins fr chapter. As used in this chapter: KRS Chapter 189 (17) "Trailer"

More information

Testing and Reporting Requirements for Linear Replacement Lamps

Testing and Reporting Requirements for Linear Replacement Lamps Testing and Reprting Requirements fr Linear Replacement Lamps The DLC defines all tube-style LED prducts that use the lamp hlders (i.e. sckets r tmbstnes) in the luminaire t mechanically r electrically

More information

ABTQ-103 rev 01 Last review:

ABTQ-103 rev 01 Last review: INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR ABTECH PCS Cntrl Statin Purpse f Instructins Wrking in hazardus areas, the safety f persnnel and plant depends n cmplying with all relevant safety

More information

SUBARU 5 YEAR/125,000 KILOMETRE SERVICE PLAN PROGRAM TERMS & CONDITIONS

SUBARU 5 YEAR/125,000 KILOMETRE SERVICE PLAN PROGRAM TERMS & CONDITIONS SUBARU 5 YEAR/125,000 KILOMETRE SERVICE PLAN PROGRAM TERMS & CONDITIONS Under the Subaru 5 Year/125,000 Kilmetre Service Plan ( Service Plan ) wners f eligible Subaru vehicles are cvered fr scheduled servicing

More information

TECHNICAL SPECIFICATION. SPC-4T Stirling Process Cryogenerator

TECHNICAL SPECIFICATION. SPC-4T Stirling Process Cryogenerator TECHNICAL SPECIFICATION SPC-4T Stirling Prcess Crygeneratr Reference 80 8044_00 Issue Date April 20, 2016 Stirling Crygenics is a registered trade name f DH Industries BV Fr mre infrmatin n the Stirling

More information

Technical Manual. eluma. Aluminum Frame LED Panels. patents pending. Technical Specifications Subject to Change

Technical Manual. eluma. Aluminum Frame LED Panels. patents pending. Technical Specifications Subject to Change Technical Manual eluma Aluminum Frame LED Panels patents pending TM Technical Specificatins Subject t Change TABLE OF CONTENTS General Specificatins.. Page 3 Prfile Specificatins EL001.. Page 4 Prfile

More information

Mobile Delineator Safe Work Practice Template with Application for Approval

Mobile Delineator Safe Work Practice Template with Application for Approval Mbile Delineatr Safe Wrk Practice Template with Applicatin fr Apprval [Insert yur cmpany name and graphic, if desired. Expand space as required] [Insert yur cmpany dcument reference number, if desired.

More information

Introduction Specifications Structure & Performance Assembly Folding Operation Care & Maintenance...

Introduction Specifications Structure & Performance Assembly Folding Operation Care & Maintenance... n Intrductin... 3 Specificatins... 4 Structure & Perfrmance... 5 Assembly... 6 Flding... 7 Operatin... 8-12 Care & Maintenance... 13-15 2 P a g e Read and fllw all instructins, warnings, and ntes in this

More information

PUBLIC ARTWORK LOAN AGREEMENT. THIS AGREEMENT is made and entered into on Town of Moraga ( Town ), a municipal corporation, and ( Artist/Donor ).

PUBLIC ARTWORK LOAN AGREEMENT. THIS AGREEMENT is made and entered into on Town of Moraga ( Town ), a municipal corporation, and ( Artist/Donor ). PUBLIC ARTWORK LOAN AGREEMENT THIS AGREEMENT is made and entered int n between the Twn f Mraga ( Twn ), a municipal crpratin, and ( Artist/Dnr ). RECITALS WHEREAS, pursuant t Reslutin 91-2015, the Twn

More information

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY January 31, 2017 VANCOUVER FRASER PORT AUTHORITY Nn-Rad Diesel Emissins Fuel Efficiency Plan Guideline Table f Cntents

More information

GLOBAL LIFT CORP Owner s Manual

GLOBAL LIFT CORP Owner s Manual GLOBAL LIFT CORP Owner s Manual 39 N. Caseville Rad PO Bx 559 Pigen, MI 48755 Tll Free: 866-712-0606 Fax: 989-453-3050 www.glballiftcrp.cm Page 1 COMMERCIAL SERIES POOL LIFTS C-350 ~ C-450 ~ C-550 TABLE

More information

Building a new single-family residence (SFR)

Building a new single-family residence (SFR) Building a new single-family residence (SFR) Obtaining a permit fr yur cnstructin is a prcess that invlves review and apprval by multiple agencies. Brward Cunty Develpment and Envirnmental Regulatin Divisin,

More information

Installation Guide Contigo 6150 & 6151

Installation Guide Contigo 6150 & 6151 Installatin Guide Cntig 6150 & 6151 Cmmercial Vehicle Prductivity and Security The Cntig 6150 & 6151* (cllectively knwn as the Cntig 615X) are highperfrmance beacns designed fr cmmercial prductivity and

More information

GLOBAL LIFT CORP. Owner s Manual. Superior Series Proformance Series S-350 / P-375

GLOBAL LIFT CORP. Owner s Manual. Superior Series Proformance Series S-350 / P-375 GLOBAL LIFT CORP Owner s Manual Superir Series Prfrmance Series S-350 / P-375 684 N Prt Crescent Rd Suite C Bad Axe, MI 48413 Tll Free: 866-712-0606 Fax: 989-269-5902 www.glballiftcrp.cm Page 1 SUPERIOR

More information

LED Driver Feedback Signs

LED Driver Feedback Signs LED Driver Feedback Signs Installatin Instructins (029-04151-0000) Nvember 2012 Slar Kit 35AH / 55W 70AH / 55W 70AH / 85W M75-SOLAR-000S M75-SLR70-000S M75-SOLAR-000C E. 5676 Seltice Way Pst Falls, Idah

More information

SECOND DRAFT Testing and Reporting Requirements for Linear Replacement Lamps

SECOND DRAFT Testing and Reporting Requirements for Linear Replacement Lamps SECOND DRAFT Testing and Reprting Requirements fr Nte: This draft represents updates t the existing Testing and Reprting Requirements fr t include 3-ft, 8-ft, and 2G11 base lamps. All changes frm the existing

More information

PV-70 Remotely Operated Cryogenic Globe Valve Installation, Operation, and Maintenance Manual

PV-70 Remotely Operated Cryogenic Globe Valve Installation, Operation, and Maintenance Manual PV-70 Remtely Operated Crygenic Glbe Valve Installatin, Operatin, and NOTIC: Printed cpies are uncntrlled. Page 1 f 12 TABL OF CONTNTS 1. INSTALLATION... 2 2. OPRATION... 4 3. MAINTNANC... 4 4. PRSSUR

More information

- No object may be left inside the vehicle;

- No object may be left inside the vehicle; GENERAL CONDITIONS AND RULES OF USE OF THE CAR PARK ARTICLE 1 General prvisins and respnsibilities 1.1 - In the absence f a prir written agreement with PARKING, upn entering these premises the USER uncnditinally

More information

Route Sheet Guidelines

Route Sheet Guidelines Fairfax VA H.O.G. Chapter Rute Sheet Guidelines THIS DOCUMENT IS A WORK IN PROGRESS AND IS NOT FOR GENERAL DISTRIBUTION. ANY INTERIM USE BY AN OFFICER OR VOLUNTEER OF FAIRFAX VA CHAPTER H.O.G. IS FOR THE

More information

You have a Chiller, Now What?

You have a Chiller, Now What? Yu have a Chiller, Nw What? Raschell Hickmtt Reginal Sales Manger Dimplex Thermal Slutins Klant Klers Brand Chillers Agenda This presentatin is develped t be a very brief and generic intrductin t anyne

More information

Machine Safeguarding

Machine Safeguarding Machine Safeguarding General This dcument will prvide yu a high-level verview n sme best practices pertaining t machine guarding and sample types f guards fund in manufacturing settings. The Main Causes

More information

Parts Checklist: XJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* *BOX 2* Jeep Cherokee XJ

Parts Checklist: XJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* *BOX 2* Jeep Cherokee XJ XJ Frnt 3-Link Lng Arm Upgrade Installatin Instructins 84-01 Jeep Cherkee XJ Parts Checklist: *BOX 1* Instructins Invice Lg decal 10001 (1) Rck-Link decal 13287 (2) Irnrckffrad.cm decal (1) Subframe center

More information

HIGH POWER RGB LED SERIES. The HB Series Advantage! Architectural Illumination Systems!

HIGH POWER RGB LED SERIES. The HB Series Advantage! Architectural Illumination Systems! The HB Series Advantage SGS listed cnfirming t UL Standard 2108 & 8750 Certified t CSA Standard C22.2 N.9 LED Life f 50K+ hurs, under nrmal perating cnditins Lw wattage, lw heat, lw vltage (12DVC & 24VDC

More information

Complete Solutions for Industrial Valves

Complete Solutions for Industrial Valves Butterfly Valves Cmplete Slutins fr Industrial Valves NEWAY VALVE Cat.n.:E-BFV-2006 T Series: Sft Seated Cncentric Butterfly Valve Figure Numbers 12 TC 1 W G WCB 338 Neway figure numbers are designed t

More information

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375 GLOBAL LIFT CORP Owner s Manual Rtatinal Series R-375 684 N Prt Crescent Rd Suite C Bad Axe, MI 48413 Tll Free: 866-712-0606 Fax: 989-269-5902 www.glballiftcrp.cm Page 1 ROTATIONAL SERIES POOL LIFTS R-375

More information

By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document

By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document By Authrity Of THE UNITED STATES OF AMERICA Legally Binding Dcument By the Authrity Vested By Part 5 f the United States Cde 552(a) and Part 1 f the Cde f Regulatins 51 the attached dcument has been duly

More information

SERVICE FACTORY DIRECTED MODIFICATION MC IMMEDIATE INSPECTION REPAIR ONLY AS REQUIRED ENGINE PULLEY WEAR

SERVICE FACTORY DIRECTED MODIFICATION MC IMMEDIATE INSPECTION REPAIR ONLY AS REQUIRED ENGINE PULLEY WEAR SERVICE REPLACES: Please discard MC 06-07 dated June 27, 2006 MODEL: 2004-2005 VULCAN 2000 (VN2000-A1/L-A2/L) MC 06-07 Date: July 28, 2006 First Issued: June 27, 2006 Page 1 f 7 TITLE: ENGINE PULLEY WEAR

More information

DINAK DWhp 0036 CPD APPLICATIONS MAIN FEATURES MATERIALS AVAILABLE DIAMETERS

DINAK DWhp 0036 CPD APPLICATIONS MAIN FEATURES MATERIALS AVAILABLE DIAMETERS DINAK DWhp DW 2.0 FTG-DWHP2-ENG-100 Twin wall stainless steel mdular duct with inner sealing jint, duble lcking band and intermediate rckwl islatin f 100 kg/m3 f density and 30 mm f thickness APPLICATIONS

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Observer Zning Bard ZONE0101ZP6 These instructins must be read and understd cmpletely befre attempting installatin Safety Labeling and Signal Wrds DANGER, WARNING, CAUTION, and

More information

DRAFT Testing and Reporting Requirements for Linear Replacement Lamps

DRAFT Testing and Reporting Requirements for Linear Replacement Lamps DRAFT Testing and Reprting Requirements fr Linear Replacement Lamps Nte: This draft represents updates t the existing Testing and Reprting Requirements fr Linear Replacement Lamps. All changes frm the

More information

Track Lateral Stability

Track Lateral Stability Discipline: Engineering (Track & Civil) Categry: Cde f Practice Track Lateral Stability Sectin 6 Applicability ARTC Netwrk Wide Primary Surce Dcument Status Versin Date Reviewed Prepared by Reviewed by

More information

FOR HISTORICAL REFERENCE ONLY

FOR HISTORICAL REFERENCE ONLY T: Frm: Subject: Electrnic Distributin Recipients MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Divisin Technical Memrandum N. 13-02-TS-01 Jn M. Chigl, P.E. Divisin Directr, Engineering Services

More information

HYDRAULIC BEARING PULLER

HYDRAULIC BEARING PULLER HYDRAULIC BEARING PULLER Parag Ambre 1, Akash Muppid 2, Prf. Nitin Mre 3, Anil Birajdar 4, Sandip Barathe 4 1,2,4,5 BE Mechanical, Dr. D.Y. Patil Schl f Engineering, Pune. 3 Faculty, Dr. D.Y. Patil Schl

More information

Idaho: Idaho revised vehicle code:

Idaho: Idaho revised vehicle code: Idah: Idah revised vehicle cde: http://www.legislature.idah.gv/idstat/title49/t49.htm (6) "Trailer" means: (a) General. Every vehicle withut mtive pwer designed fr carrying persns r prperty and fr being

More information

Installation Instructions AQ-5100, AQ-5200 & AQ-5300 Under Counter Water Filter Single Stage (5100), Two Stage (5200) and Three Stage (5300) systems

Installation Instructions AQ-5100, AQ-5200 & AQ-5300 Under Counter Water Filter Single Stage (5100), Two Stage (5200) and Three Stage (5300) systems Live Healthy s ' p V iv Installatin Instructins AQ-5100, AQ-5200 & AQ-5300 Under Cunter Water Filter Single Stage (5100), Tw Stage (5200) and Three Stage (5300) systems Welcme t the Aquasana experience.

More information

Motorized Pulley 320L, 320M & 320H, Ø in. (321 mm)

Motorized Pulley 320L, 320M & 320H, Ø in. (321 mm) Mtrized Pulley 320L, 320M & 320H, Ø 12.6 in. (321 mm) Our 12.6 diameter Mtrized Pulley range fers three different perfrmance levels fr BULK applicatins: - L fr Light duty - M fr Medium duty - H fr Heavy

More information

SCHEDULE NO. 02 SMALL GENERAL SERVICE RATE

SCHEDULE NO. 02 SMALL GENERAL SERVICE RATE APPLICABILIY his rate schedule is available t all Custmers fr electric lighting, pwer and heating service where facilities f adequate capability and suitable vltage are adjacent t the premises t be served.

More information

Solvent Filter. What is a Solvent Trap, Solvent Recycler or Solvent Filter? Why use a solvent filter? Why is the HIT Solvent Filter better?

Solvent Filter. What is a Solvent Trap, Solvent Recycler or Solvent Filter? Why use a solvent filter? Why is the HIT Solvent Filter better? Slvent Filter What is a Slvent Trap, Slvent Recycler r Slvent Filter? It is a device attached t the end f a threaded barrel that cllects all f the slvent and debris as it is cleaned frm the barrel and

More information

Annex to the EU Type-Examination Certificate No. EU-BD 758 of

Annex to the EU Type-Examination Certificate No. EU-BD 758 of Annex t the EU Type-Examinatin Certificate N. EU-BD 758 f 2016-04-01 1 Scpe f applicatin 1.1 Use as braking device part f the the prtectin device against verspeed fr the car mving in upwards directin permissible

More information

Tips & Technology For Bosch business partners

Tips & Technology For Bosch business partners Tips & Technlgy Fr Bsch business partners Current tpics fr successful wrkshps N. 35/2011 Gasline injectin Invented fr life Lambda sensr Knw-hw frm the market leader Bsch, innvative cmpany and wrld's largest

More information

MG1 TM COMPACT MAGNETIC SYSTEM FILTER

MG1 TM COMPACT MAGNETIC SYSTEM FILTER MG1 TM COMPACT MAGNETIC SYSTEM FILTER CT3070.0_00 EN Nvember 2015 Patent applicatin n. 202015000064159 Super cmpact Retains all impurities Fights crrsin Increases the lifespan f the biler Maintains ptimum

More information

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211C PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211C PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools Vlume 1.1 OPERATIONAL MANUAL MODEL: CG-211C PIPE TORCH/BURNER MACHINE by BLUEROCK Tls UNPACKING THE ITEM Cautin: This machine is packed tgether with items that may be sharp, ily and verly heavy bjects.

More information