REVISION VIRGINIA WORK AREA PROTECTION MANUAL. Effective April 1, 2015 for State Forces & Effective starting on the July 2015 Advertisement

Size: px
Start display at page:

Download "REVISION VIRGINIA WORK AREA PROTECTION MANUAL. Effective April 1, 2015 for State Forces & Effective starting on the July 2015 Advertisement"

Transcription

1 REVISION VIRGINIA WORK AREA PROTECTION MANUAL Effective April 1, 2015 for State Forces & Effective starting on the July 2015 Advertisement

2 VA Supplements to the MUTCD Revisions to VDOT developed Supplements: VA Work Area Protection Manual Effective for daily operations April 1, 2015 Effective for projects advertised for bid July 1, 2015 VA Standard Highway Signs book (living document) 2

3 2011 VA WAPM Revision Documentation Technical Changes in Revision 1 of the 2011 Virginia Work Area Protection Manual Lists all revisions in the manual by: Chapter Section Paragraph/Figure/ Table Sign Designation Provides specific information: What was revised Why it was revised, as applicable 3

4 2011 VA WAPM Revision Documentation Changes/Revisions Identified by: New date at the top of the page (April 2015) Content; Gray Shading Superscript 1 following the revision Revised TTC Figures designated by superscript 1 Footnote at the bottom of the page noting the revision number and date 4

5 Chapter 6A General 5

6 Section 6A.03 Definitions of Words and Phrases in This Manual 24. Limited Access Highway revised 33. Portable Temporary Rumble Strip (PTRS) Alerts driver Transverse rumble strip Extends across the travel lane Installed & removed quickly Section 6A.04 Meanings of Acronyms and Abbreviations 26. PTRS Portable Temporary Rumble Strip 6

7 Chapter 6B Fundamental Principles A number in paraphrases represents the revised Section s paragraph. 7

8 Section 6B.01 Fundamental Principles of TTC (15) When flagging operation is suspended: The flagger symbol sign shall be removed or covered. 8

9 Chapter 6C Temporary Traffic Control Elements A number in paraphrases represents the revised Section s paragraph. 9

10 Figure 6C-1, Component Parts of TTC Zone Added: 2 mile is the Max. length of a work space unless approved by the RTE Paved shoulder taper reference 6C.09(11). 10

11 Table 6C-1 & Table 6H-5, Recommended Spacing of Advance Warning Signs Road Type Spacing (Feet) Urban street with 25 mph or less posted speed Urban street with 30 to 40 mph posted speed * All Other Roadways with 45 mph or less posted speed All Other Roadways with greater than 45 mph posted speed Limited Access highways Changed title to Recommended Spacing of Advance Warning Signs 11

12 Table 6C-2, Length of the Longitudinal Buffer Space Table 6E-1, Longitudinal Buffer Space 1 (title change) Table 6H-3, Longitudinal Buffer Space 1 (title change Posted Speed Limit (mph) Distance (Feet) < Changed distances: 25 mph mph mph mph Buffer Space lengths changed in TIMC-1 to TIMC-4 Section 6C.06 Buffer Space (05) These distances should be increased for downgrades and other geometric conditions that affect stopping distance. 1 12

13 Section 6C.08 Termination Area (02) The END ROAD WORK sign should be used to inform road users they can resume normal operations. (04) END WORK ZONE SPEED LIMIT sign is used on un-posted secondary roads, otherwise the SPEED LIMIT sign is used. When part of a project speed is reduced, the original speed limit shall be posted 500'+ past the work area. 13

14 Table 6C-4, Taper Chart Table 6H-2, Taper Chart Changed 40 MPH length

15 Chapter 6C Section 6C.09 Tapers: (11) Paved shoulder having a width of 8 feet or more, a shoulder taper shall be used in advance of the merging taper Channelizing devices match those used in the merging taper 15

16 Figure 6C-2, Example of Types of Tapers Changed: Work space to Activity Area Channelizing device spacing to match roadway spacing 16

17 Figure 6C-3, Example of a One-Lane, Two-Way Taper Changed: Work space to Activity Area 17

18 Chapter 6D Pedestrian and Worker Safety A number in paraphrases represents the revised Section s paragraph. 18

19 Section 6D.03 Worker Safety Consideration (05) & (06) Defines Class E trousers: Full length waistband trousers or overalls that meet minimum requirements of Performance Class 3 risk requirements of ANSI/ISEA Shorts shall note be worn at any time. (07) ANSI/ISEA 107/2010 headwear may be worn 19

20 Section 6D.03 Worker Safety Consideration (09) Uniform law enforcement personnel highvisibility safety apparel shall meet Performance Class 2 or 3 requirements of ANSI/ISEA 107/2010 when exposed to traffic (11) High-visibility safety apparel shall: be securely fastened be visible for 360 around the wearer provide conspicuity of fluorescent colors, retroreflectivity and pattern 20

21 Chapter 6E Flagger Control A number in paraphrases represents the revised Section s paragraph. 21

22 Section 6E.01 Qualifications for a Flagger (03) Recertification for Flaggers 2 years VDOT Flagger Certification 4 years Flagger Certification with: VDOT Basic Work Zone Traffic Control Training VDOT Intermediate Work Zone Traffic Control Training ATSSA s classroom Flagger Certification Program 22

23 Section 6E.02 High Visibility Apparel (04) Flaggers: Required to wear ANSI 107/ISEA Performance Class 3 Nighttime flaggers apparel includes full length Type E trousers or overalls Shorts shall not be worn (05) Defines Class E trousers as full length waistband trousers or overalls that meet minimum requirements of ANSI/ISEA

24 Section 6E.02 High Visibility Apparel (06) Apparel shall be securely fasten apparel so retroreflectivity is visible 360 around wearer. (07) Uniformed law enforcement personnel shall wear ANSI/ISEA Performance Class 2 or 3 to: Direct traffic, investigate crashes, handle lane closures, obstructed roadways and disasters (09) ANSI/ISEA headwear may be worn. 24

25 Section 6E.03 Hand Signaling Devices: (10) Flag: 24 x 24 inches square Flag Staff: 1 to 1 ¾ inches in diameter staff (12) Nighttime both side of the flag shall be retroreflectorized orange/red in color 25

26 Section 6E.04, Automated Flagger Assistances Devices: (13) - Described Method 1 as Stop/Slow AFAD - Described Method 2 as Red/Yellow Lens AFAD (14) Two AFADs shall be used to control onelane two-way traffic (15) When one flagger operates both AFADs, the flagger shall have an unobstructed view of approaching traffic in both directions 26

27 Figure 6E-1, Example of the Use of Stop/Slow AFAD Figure 6E-2, Example of the Use of Red/Yellow Lens AFAD AFADs control one-lane two-way traffic on both ends Figure 6E-1 Figure 6E-2 27

28 Figures 6E-1 & 6E-2 Continued Changed channelizing devices spacing to match typical spacing of channelizing devices Certified flagger(s) trained to operate AFAD unit 28

29 Figure 6E-4, Flagger Requirements (Sheet 2 of 2) Matches Table 6E-1: Longitudinal Buffer Space 29

30 Section 6E.08, Flagger Station (01) When the Flagger operation is suspended: The Flagger (W20-1) symbol sign shall be removed or covered from road user No longer allowed to be turned sign from traffic 30

31 Chapter 6F Temporary Traffic Control Devices A number in paraphrases represents the revised Section s paragraph. 31

32 Section 6F.02, General Characteristics of Signs (22) Post-mounted rigid sign material changed to allow aluminum inch thickness 32

33 Table 6F-1, Temporary Traffic Control Zone Sign and Plaque Sizes New Regulatory Signs: Revision 1 Proceed When Way Is Clear (R1-V1) Work Zone $500 Max. Fine For Exceeding Speed Limit When Flashing (R2-V1) Begin Right Turn Lane w/ Arrow (R3-20L, R3-20R) Turning Vehicles Yield to Pedestrians (R10-15) 33

34 Table 6F-1, TTC Zone Sign and Plaque Sizes New Warning Signs: Crash Area Keep Clear (WO-V1) Grooved Pavement Ahead (W20-V14) Median Crossover Closed Ahead (W20-V15) Median Crossover Closed (W20-V16) Rumble Strips Ahead (W20-V26) Emergency Work Ahead (W20-V27) Road Patching Ahead (W21-V18) Road Patching Next X Miles (W21-V19) 34

35 Table 6F-1, TTC Zone Sign and Plaque Sizes New Vehicle Mounted Sign: Work Vehicle Frequent Turns (G20-V1a) New Turn Lane Open/Closed Signs: Turn Lane Open (E5-V3L, EV-3R) Turn Lane Closed (E5-V4L, EV-4R) 35

36 Table 6F-1, TTC Zone Sign and Plaque Sizes Additional Guide Signs: Interstate Route Shields U. S. Route Markers VA Primary Route Markers VA Circular Secondary Route Markers Cardinal Directional Auxiliary Directional Arrows Auxiliary Detour Route Shield Assemblies (Long-term) WZ Orange Arrows Incident Management Pink Arrows 36

37 Section 6F.03, Sign Placement & Figure 6F-1 Post may extend 2' above sign (08) (10) Height to bottom of Plaque 7' max 6' min Sign 8' max 7' min Adjusted measurements for 6x6 breakaway holes as related to ground line Verify post installation in STANDARDS/Plans Fig. 6F-1Height and Lateral Location of Signs Typical Post-Mounted Installations 37

38 Section 6F.03, Sign Placement Portable sign supports: (20) Legs fully extended for stability or add weight (26) Portable support weight: 25 pound sand bag per leg or 2 drum collars center of sign stand Cones weights no longer allowed 38

39 Section 6F.04, Sign Maintenance (03) When used, plywood shall only be attached to ground-mounted TTC sign 39

40 Section 6F.13 & Figure 6F-2 Work Zone $500 Max. Fine For Exceeding Speed Limit When Flashing Sign (R2-V1) (01) Code of VA amended (02) New sign shown has been required since July 1, 2012 (03) (06) Ty B flashing light shall be activated remotely when workers are present 40

41 Section 6F.17 Special Regulatory Signs (04) An engineering study should determine the use of the PROCEED WHEN WAY IS CLEAR sign when a stop or yield condition is used to control traffic on a two-lane roadway (TTC-25). 41

42 Section 6F.17, Special Regulatory Signs (09) Turning Vehicles Yield To Pedestrian sign reminds turning motorists to yield to pedestrians Section 6F.18, Warning Signs Function, Design, Application (14) Advance warning signs shall be installed on entrance ramps if they are not visible to ramp users 42

43 Section 6F.21,. Emergency Work Ahead (16) Used when unexpected or natural event must be dealt with urgently; not part of daily operation or planned work (13) Should be first sign in Temporary Incident Management Control Zone (14) May be used in lieu of ROAD WORK AHEAD (15) Supporting warning signs may be florescent orange with black legend & border 43

44 MEDIAN CROSSOVER CLOSED AHEAD Revision 1 Section 6F.26 (05). Median Crossover Closed Ahead & Median Crossover Closed Shall be used in advance of the point where the median crossover is closed A NO LEFT TURN (R3-2) sign shall be used in conjunction with the MEDIAN CROSSOVER signs Median Crossover Closed installed MEDIAN CROSSOVER CLOSED at the beginning of the turn lane taper or 200' to 300' in advance of the of a crossover without turn lane. 44

45 Section 6F.26 Section 6F.28 Required as of July 1,

46 Section 6F.35, Exit Open & Exit Closed signs (04) For better visibility the minimum mounting height shall be 7 feet from the pavement surface to the bottom of the sign 46

47 Section 6F.38, Flagger Sign, XX Feet Plaque (02) When flagging operation is suspended the Flagger symbol sign shall be removed or covered 47

48 Section 6F.40, Trucks Entering Highway sign (05) The Truck Entering Highway sign shall be used for Logging operations. LOG TRUCKS ENTERING HIGHWAY sign shall not be use. 48

49 Section 6F.41 Revision 1 (02) GROOVED PAVEMENT (W20-V14) sign may be alternative to the ROUGH ROAD sign. (03) A MOTORCYCLE (W8-15P) plaque may supplement a post mounted ROUGH ROAD or GROOVED PAVEMENT sign. GROOVED PAVEMENT 49

50 Section 6F.44 Section 6F.50 Section 6F.53 Required as of July 1,

51 Section 6F.50 Section 6F.53 Section 6F.58 Section 6F.59 51

52 Section 6F.58 Section 6F.59 Required as of July 1,

53 Section 6F.64 Work Vehicle Frequent Turns sign Optional Until June 30, 2017 OR (04) Required as of July 1, 2017 (01) Mounted on rear of a vehicle hauling/delivering material (02) May be displayed at all times or covered or removed when not in use (05) Not required when the tailgate has been removed or lowered for work operations (05) Not required on vehicles which can enter or exit the work zone at higher speeds (03) Work Vehicle Do Not Enter is not required on 1-way, 2-lane operation 53

54 Figure 6F.5 Detour Signs for TTC Orange directional arrow auxiliary will be required on long-term detours to improve visibility and help identify work zone detour. 54

55 Section 6F.68, Portable Changeable Message Boards (33) PCMS other non-crashworthy trailer mounted devices Intelligent Transportation Systems (ITS) Highway Advisory Radio Speed Trailers CB Wizards ITS cameras Portable Traffic Control Signals AFAD units Light towers, etc. Delineate with 4-drum taper at all times 55

56 Section 6F.69, Arrow Boards & Figure 6F-6 Minimum 4 channelizing device taper delineates the arrow board at all times Shoulder taper required if placed on paved shoulders with a width of 8 feet or more Delineation/channelizing devices match those used in merging taper 56

57 Section 6F.73, Tubular Marker: (01) Constructed of lightweight, formable material. (02) Retroreflective sheeting, ASTM Type III Reboundable, 1 4- to 6-inch wide alternating orange and white strips 247 Specification Required on projects advertised July 1, Advertised prior to July 1, 2012 may be used until July 1, Regardless of dates all shall comply by July 1,

58 Section 6F.75, Drum: (01) Retroreflective sheeting, ASTM Type III Reboundable, 6-inch wide alternating orange and white strips. Required on projects advertised July 1, Advertised prior to July 1, 2012 may be used until July 1, Regardless of dates all shall comply by July 1, (02) Retroreflectivity sheeting should be grouped together. 58

59 Section 6F.75, Drum: (09) A four drum taper shall be used to delineate PCMS or other unmanned trailer mounted devices. Fig. 6F-6 (10) Drums may be left on the shoulder but must not prohibit the use of the shoulder. 59

60 Section 6F.76, Type 3 Barricades & Figure 6F-8 Type 3 Barricades: (04) Rail width approximately 8 to 12 inches. (17) Shall be used to close work access - entrances openings (18) A person shall be assigned to ensure proper closure at the end of the work day (21) Signs mounted on Ty. 3 barricade should not cover more than the 60 top rail.

61 Section 6F.83 Temporary Raised Islands (07) Added reference for flex post delineators See Figure 6 in Appendix A of this manual or IIM-LD-93 for specific details on Temporary Asphalt Medians Section 6F.86 Temporary Markings (05) Flexible temporary pavement markers (FTPMs) 1 for up to ten consecutive days as directed by the Engineer 61

62 Section 6F.90 Floodlights (06) Added anti-glare shields to eliminate glare 62

63 Section 6F.92 Vehicle Warning Lights (02) Deleted strobe lights ( 02 1.) Sealed beams shall have a flash rate of 75 to 135 flashes per minute. (06) Both day and night, vehicle warning lights should be used on work vehicles entering and exiting a work zone and visible from 360 degrees. 63

64 Section 6F.94 Temporary Traffic Barrier (06) Shall be crashworthy and selected from VDOT s Approved Products list 64

65 Section 6F.95 Crash Cushion (04) CRASH AREA KEEP CLEAR sign shall be installed when a non-redirective crash cushion (impact attenuator) is directed by the plan assembly. 65

66 Section 6F.95 Crash Cushion Truck Mounted Attenuator (TMA) shall: (06) - only be used to protect a fixed object for incident management operation. - remain in place for no more than 24 hours after the initial scene response. (07) have a rear panel with 6 to 8 inches wide black and fluorescent yellow (Orange still allowed) strips. (08) be installed as tested per NCHRP350/Mash Test Level 3 criteria 66

67 Section 6F.95 Crash Cushion (18) Additional shadow vehicle(s) may be used to protect workers in separate locations throughout the work area. (20) - Channelizing devices and signs shall not be store on a shadow vehicle with a TMA. - All other material and/or equipment on the shadow vehicle TMA shall be properly secured to prevent spillage if struck by an errant vehicle. 67

68 Section 6F.96 Rumble Strips Portable Temporary Rumble Strips (PTRS) (03) Transverse rumble strip Installed/removed quickly (06) Interlocking or hinged segments (07) - With stand 80,000 lbs. - No more that 6 inches parallel incidental movement during 8 hour use - 3 rumble strips equals an array 68

69 (15) Revision 1 Section 6F.96 Rumble Strips & Figure TTC-23 Approval must be granted by the Engineer Used in one-lane, two-way flagging operations. PTRS should extend across the travel lane but not encroach into the opposing lane. Only one array of PTRS should be used in the advance warning area. 69

70 Section 6F.96 Rumble Strips & Figure TTC-23 (16) PTRS should be installed/removed with the advance warning signs for the work operation. (07) PTRS Spacing center to center 0 35 mph 5 feet mph 8 feet Lane Closure on a Two-Lane Roadway Using Flaggers (Figure TTC-23.1) 70

71 Chapter 6F Section 6G.02 Work Duration (02 E.) Mobile is work that moves intermittently (1 to 15 minutes) or continuously. (11) Removed reference to strobe light for vehicle mounted lights and throughout Chapter 6G. 71

72 Section 6G.10 Work Within the Traveled Way of a Two-Lane Highway Support: (06) When a work zone on a two-lane highway transitions to a multi-lane highway the temporary traffic control continues as a two-lane highway. Lane closure signs and arrow boards typically used for temporary traffic control on multi-lane highways are not needed. 72

73 Chapter 6F Section 6G.24 Slow Roll Temporary Traffic Control Operation (02) Shall be approve by Regional Traffic Engineer or their designee. (07) A control vehicle can be a contractor s, public agency s or VSP s 73

74 Section 6G.25 Installing/Removing Temporary Traffic Control - On a two-lane roadway: (02) Non-stationary flagging operation using: Temporary Traffic Control (TTC) Spotter(s) (06) Highly visible at all times (06) Position after Road Work Ahead sign Shadow Vehicle and Work Operations Vehicle (03) May act as a shadow vehicle when one is not available. 74

75 Section 6G.25 Installing/Removing Temporary Traffic Control - On a two-lane roadway: (02) Non-stationary flagging operation using: Temporary Traffic Control (TTC) Spotter (04) Uses red or red-orange flag (05) May use STOP/SLOW paddle (07) Two TTC spotters should be used when the work operations vehicle acts as a shadow vehicle. One controls traffic other watches and alerts workers and stops traffic when necessary 75

76 Section 6G.25 Installing/Removing Temporary Traffic Control - On a multi-lane roadway: (08) Begins and ends as a modified mobile operation (for an example see TTC.62) uses: Shadow vehicles shall be equipped with an arrow board & vehicle warning lights A shadow vehicle closes the shoulder. A shadow vehicle closes the lane. Work Operations vehicle equipped with vehicle warning lights (11) TMA required when shadow vehicle encroaches partially or fully in the travel lane when speed 76 limit is 45 or greater.

77 Section 6G.25 Installing/Removing Temporary Traffic Control - On a multi-lane roadway: (09) A work operations vehicle may be equipped with a TMA but must be protected by a shadow vehicle with a TMA. (10) - TTC devices shall not be stored, installed or removed from a shadow vehicle equipped with or without a TMA - TTC devices shall be installed or removed from a work operation vehicle. 77

78 Section 6G.25 Installing/Removing Temporary Traffic Control - On a multi-lane roadway: (17) A shadow vehicle with a TMA will not be required for operations that can be performed quickly with no further use of the TMA vehicle is needed such as: Work beyond the shoulder (TTC-1) Litter removal or mowing (non-limited Access) off of the travelway and shoulder Surveying operations (TTC-49) Logging operations (TTC-63) 78

79 Section 6G.26, Temporary Traffic Control During Nighttime Hours (10) NIGHT WORK AHEAD on the PCMS may be used to supplement the advance warning signs for a night work zone. 79

80 Section 6G.27 Work Area Ingress/Egress Considerations (05) Work area ingress/egress spacing should be: One every 0.5 to 0.75 mile if activity area length is up to 2.0 miles. One every mile if activity area length is greater than 2.0 miles. 80

81 Section 6G.27 Work Area Ingress/Egress Considerations (06) Minimum length of the ingress/egress should be 1320 feet with the desirable with of 15 feet width. (08) Minimum width ingress/egress may be reduced to 12 feet if right-of-way constraints exist. 81

82 Section 6G.27 Work Area Ingress/Egress Considerations (09) Type 3 barricades shall be used to close or partially close a work access opening or construction entrance. (10) A vehicle-mounted sign shall be placed on the rear of trucks hauling/delivering material to the work space (see Section 6F.64).. 82

83 Chapter 6H Temporary Traffic Control Devices A number represent TTC note. 83

84 Section 6H.01 Typical Applications (11) Prior to the installation of an approved lane closure, notification as defined in the contract/permit shall be made to the Regional Transportation Operations Center advising of the closure and the estimated duration time for the lane closure. As soon as practical, the Regional TOC shall be notified when the lane closure has been removed. 84

85 Table 6H-2 and Table 6C-4 Taper Chart Changed 40 MPH length

86 Table 6H-3, Longitudinal Buffer Space Table 6C-2, Length of the Longitudinal Buffer Space Table 6E-1, Longitudinal Buffer Space Posted Speed Limit (mph) Distance (Feet) < Changed distance 25 mph mph mph mph

87 Table 6H-5 and Table 6C-1, Recommended Spacing of Advance Warning Signs Road Type Spacing (Feet) Urban street with 25 mph or less posted speed Urban street with 30 to 40 mph posted speed * All Other Roadways with 45 mph or less posted speed All Other Roadways with greater than 45 mph posted speed Limited Access highways Changed title to Recommended Spacing of Advance Warning Signs 87

88 Chapter 6H Figure 6H-1 TEMPORARY TRAFFIC BARRIER Changed CONCRETE to TRAFFIC 88

89 Eliminated STROBE light as a vehicle warning light in: Figure Note Number(s) Figure Note Number(s) TTC-1 Notes 4 & 5 TTC-3 Notes 3 & 4 TTC-4 Notes 4 & 5 TTC-5 Notes 5 & 6 TTC-9 Note1 TTC-10 Note1 TTC-11 Notes 1 & 2 TTC-12 Notes 1 & 2 TTC-13 Note 1 TTC-14 Note 1 TTC-15 Note 2 TTC-16 Notes 8 & 9 TTC-17 Notes 8 & 9 TTC-18 Notes 8 & 9 TTC-19 Notes 8 & 9 TTC-20 Note 6 TTC-21 Note 6 TTC-22 Note 7 89

90 Eliminated STROBE light as a vehicle warning light in: Figure Note Number(s) Figure Note Number(s) TTC-23 Note 7 TTC-24 Note 10 TTC-26 Notes 4 & 6 TTC-27 Notes 4 & 6 TTC-28 Notes 4 & 5 TTC-31 Notes 7 & 8 TTC-32 Notes 3 & 5 TTC-33 Notes 8 & 9 TTC-37 Note 7 TTC-38 Note 4 TTC-39 Note 8 TTC-40 Note 9 TTC-41 Note 7 TTC-42 Note 6 TTC-49 Notes 3 & 4 TTC-56 Notes 10 & 11 TTC-61 Notes 1 & 4 TTC-62 Note 1 90

91 Mobile or Short Duration Shoulder Operation TTC A TMA shall be used on Limited Access highways and multi-lane roadway where the posted speed limit is 45 or greater and the work operation last more than 60 minutes. 9. Vehicle warning lights may be used when the work operation is off the shoulder 1 15 minutes. 10. A sign should supplement the vehicle warning lights when the work is off the shoulder for minutes. 91

92 Mobile or Short Duration Shoulder Operation TTC Channelizing devices at a reduced spacing may be used to delineate the work area. They would start at the front of the shadow vehicle & extend through the work area. 92

93 Stationary Operation on a Shoulder TTC Divided highway: For work operations less than 3 days, sign assemblies only required on the side of the shoulder closure. 93

94 Shoulder Operation with Minor Encroachment TTC Divided highway: Long-term stationary work left and right sign assemblies required when median is wider than 8'. 94

95 Shoulder Closure with Barrier Operation TTC Shoulder Taper for Limited Access highway shall be 360 feet otherwise 1/3L on all other roadways. 95

96 Mowing Operation with Encroachment on Non-Limited Access Roadways - TTC Weed eating and push mowing should be preformed using the mowing series of warning signs. 11. If only litter pick up operation is performed then the LITTER PICK UP signs shall be used. 12. If warning signs for mowing and litter pick up operations cannot be seen by ramp traffic, then warning signs shall be installed on the ramp. 96

97 Mowing Operation with Encroachment on Non-Limited Access Roadways - TTC Litter pick up may be preformed with the mowing series of warning signs during mowing operations. 13. If only litter pick up operations are performed then the LITTER PICK UP signs shall be used. 14. A shadow vehicle with a TMA may be used behind the slow moving vehicle to protect motorists and the operator. 97

98 Non-Licensed Vehicle Operation with Encroachment on Limited Access Highways - TTC If only litter pick up operation is performed then the LITTER PICK UP signs shall be used. 16. If warning signs for mowing and litter pick up operations cannot be seen by ramp traffic, then warning signs shall be installed on the ramp. 98

99 Non-Licensed Vehicle Operation with Encroachment on Limited Access Highways - TTC Weed eating and push mowing should be preformed using the mowing series of warning signs. 14. Litter pick up may be preformed with the mowing series of warning signs during mowing operations. 17. If only litter pick up operations are performed then the LITTER PICK UP signs shall be used. 99

100 Moving/Mobile Operations on Limited Access Highways (Multiple Lane Closure) - TTC-12.1 In Figure added optional Shadow Vehicle 5 5. Non Limited Access Highways Shadow Vehicle 1 shall have the option to use a PCMS or Arrow Board 100

101 Short Duration Operation on a Multi-Lane Roadway - TTC Channelizing devices at a reduced spacing may be used to delineate the work area. They would start at the front of the shadow vehicle & extend through the work area. 101

102 TTC-19.1, TTC-22.1 & TTC-32.1 TTC-19.1 & TTC Corrected Lane Width (Feet) TTC Corrected Lane Width (Feet) 102

103 Lane Closure Operation with Temporary Traffic Barrier - TTC-20.1 Title changed Temporary Traffic Barrier 8. Change slope rate to Flare Rate in text and table. Speed Limit (mph) Flare Rate 1 Speed Limit (mph) Flare Rate 1 Speed Limit (mph) Flare Rate : : : : : : : : :1 103

104 Right Lane Closure Operation on a Three-Lane Roadway - TTC Channelizing device spacing shall be a maximum of 20' on center in the buffer & activity area. 10. Four channelizing devices should be used to beyond the downstream end of the transition area as depicted to provide additional guidance for motorists. 104

105 Lane Closure on a Two-Lane Roadway Using Flaggers - TTC Portable Temporary Rumble Strips (PTRS) when used: Must be approved by the Engineer Installed in conjunction with BE PREPARED TO STOP sign. RUMBLE STRIP AHEAD sign required. PTRS Spacing: Posted Speed 0 35 mph mph PTRS Spacing (Center to Center) 5 Feet 8 Feet 105

106 Lane Closure on a Two-Lane Roadway Using Flaggers - TTC Portable temporary rumble strips (PTRS) should be adjusted when the queue of traffic reaches the BE PREPARED TO STOP sign. 106

107 Lane Closure Operation on a Two-Lane Roadway Using Traffic Control Signals - TTC Long-term 1 rumble strips may be used to enhance the work zone. 107

108 Lane Closure Operation Near Side of an Intersection - TTC If the left turn lane is closed a NO LEFT TURN (Symbol) (R3-2) shall be used. New sign required R3-20L 108

109 Lane Closure Operation - Far Side of an Intersection - TTC If the left turn lane is closed a NO LEFT TURN (Symbol) (R3-2) shall be used. New sign required R3-20L 109

110 Turn Lane Closure Operation TTC Changed buffer space lengths: Posted Speed Limit (mph) Distance (Feet)

111 Flagging Operation at a Signalized Intersection - TTC-30.1 Notes 3 & 4 When FLAGGERS control a signalized intersection. Turn lanes are closed. Lane closures are installed on a multilane roadways. 111

112 Flagging Operation at a Signalized Intersection - TTC-30.1 Notes 12 & 13: When a Law Enforcement Officer directs traffic: The signal may be on the flash mode The travel and turn lanes may remain open at the discretion of the Law Enforcement Officer. 112

113 Street Closure Operation with Detour - TTC-34.1 Changed NO RIGHT TURN to 113

114 Crosswalk Closure and Pedestrian Detour Operation - TTC Motorists shall yield to pedestrians 24" x 36" yield lines required 114

115 Work Operation in the Vicinity of an Exit Ramp -TTC EXIT OPEN, EXIT w/ ARROW, EXIT Closed signs shall be a min of 7' from pavement surface to bottom of the sign 115

116 Figure: Adjusted L Revision 1 Work Operation in the Vicinity of an Exit Ramp -TTC-37.1 Added 1 MILE distance in advance of warning signs Added PCMS & 4 drum taper 116

117 Work Operation in the Vicinity of an Entrance Ramp - TTC STOP and YIELD signs shall be mounted a minimum of 7 feet from the pavement surface to the bottom of the sign. 117

118 Interior Lane Closure Operation on a Multi-Lane Roadway - TTC Four channelizing devices should be used to beyond the downstream end of the transition area. 10. NO LEFT TURN should be use when high volume turning movement exists. 118

119 Road Closure Operation with a Diversion TTC-43.1 In figure: Added Chevrons Added two-way pavement markers throughout diversion 119

120 Median Cross-Over Operation on a Multi-Lane Roadway TTC-44.1 Optional or required Ty. 3 Barricade Temporary pavement markers required in merging and shifting tapers 120

121 Total Limited Access Highway Closure Operation - TTC-45.1 Added to Figure a 4 drum taper for the PCMS 121

122 Limited Access Highway Closure Operation with a Short Term Detour - TTC-46.1 Changed stripes of Ty. 3 Barricade 122

123 Limited Access Highway Closure Operation with a Long Term Detour - TTC-47.1 Changed stripes of Ty. 3 Barricade All directional arrows shall be fluorescent orange 123

124 Road Closure Operation with a Detour TTC-48.1 Changed stripes of Ty. 3 Barricade All directional arrows shall be fluorescent orange Changed sign designations Add confirmation detour or route shield assembly and distance from intersection. 124

125 Surveying Operation - TTC-49.1 Change work area to work space Defines maximum work space as 2 miles 125

126 Haul Road Crossing Operation - TTC-51.1 Added titles to Figure: SIGNALIZED METHOD FLAGGER METHOD 126

127 Signing for Speed Limit and Fine Signs in Work Zones - TTC A Traffic Engineering (TE) investigation shall be performed and evaluated to reduce the speed limit per TE-350 Memo. 5. When the WORK ZONE $500 MAX FOR EXCEEDING SPEED LIMIT WHEN FLASHING sign is used Type B warning lights shall be installed above the sign and shall be controlled remotely and activated when workers are present in the work zone. 127

128 Signing for Speed Limit and Fine Signs in Work Zones - TTC When the WORK ZONE $500 MAX FOR EXCEEDING SPEED LIMIT WHEN FLASHING is used the WORK ZONE plaque shall be installed above the SPEED LIMIT sign and the FINES HIGHER plaque below. 128

129 Signing for Speed Limit and Fine Signs in Work Zones - TTC Speed Limits may be reduced for shortterm (less than 72 hours) operations If the speed limit is reduced portable sign supports may be used for the Reduced Speed Limit Ahead graphic an the SPEED LIMIT signs 129

130 Signing for Speed Limit and Fine Signs in Work Zones - TTC END WORK ZONE SPEED LIMIT only required on road without a posted speed limit In figure: Added or deleted reference notes for sign Change WORK ZONE MAX FINE sign and added Ty. B Warning Lights 130

131 Eradication of Pavement Markings in a Work Zone - TTC In lane shift areas pavement markings and markers shall be removed when: not behind temporary traffic barrier within 6' of the new edge line 8. Addition pavement markings & pavement markers should be removed based on roadway geometrics & specific site conditions so traffic is guided safely in case TTC devices become displaces. 131

132 End of Day Signing for Partial Paving Operations on a Multi-Lane Roadway - TTC-57.1 & End of Day Signing for Full Paving Operations on a Multi-Lane Roadway - TTC Portable sign supports shall be supported by a sand bag weighing approximately 25- pounds on each leg or two (2) drum collar weights positioned on the center of the sign stand for: 132

133 End of Day Signing for Paving Operations on a Two-Lane Roadway - TTC & 6.: Portable sign supports shall be supported by a sand bag weighing approximately 25-pounds on each leg or two (2) drum collar weights positioned on the center of the sign stand for: 133

134 End of Day Signing for Paving Operations on a Two-Lane Roadway - TTC Other devices may be need to control traffic through work area. 10. LOW SHOULDER sign may be used where there is an elevation difference of less than 2 inches between the shoulder and travel lane. 134

135 End of Day Signing for Paving Operations on a Two-Lane Roadway - TTC Added sign spacing distances. In Figure changed note references for: Begin & end pavement drop-off Sign spacing 135

136 Logging Operations - TTC Logging operations Truck Entering Highway shall be used. LOG TRUCKS ENTERING HIGHWAY sign shall not be use. 136

137 NEW - End of Day Signing for Surface Treatment, Slurry Seal and Latex Emulsion Treatment Operations - TTC-64.0 Standard: 1. LOOSE GRAVEL (W8-7) signs shall be installed on surface treated roadways and shall be removed when the roadway has been swept or loose gravels have been removed from the roadway. 2. NO CENTER LINE (W8-12) signs shall be installed whenever the centerline has been obliterated or until permanent pavement markings have been installed. The sign shall be installed in both directions when the centerline is not present. In addition, NO CENTER LINE signs shall be installed every mile if the unmarked area is less than 3 miles, or every 2 miles if the unmarked area is longer than 4 miles. 3. A DO NOT PASS (R401) sign shall be used when the centerline has been obliterated or until permanent pavement markings have been installed. The DO NOT PASS sign shall be installed after the NO CENTER LINE sign and their sign stand shall be supported with a sand bag weighting approximately 25-pounds on each leg or two (2) drum collar weights positioned on the center of the sign stand. Thereafter, the DO NOT PASS sign installed every mile if the unmarked area is less than 3 miles, or every 2 miles if the unmarked area is longer than 4 miles. 4. Signs shall be post-mounted at locations after 72 consecutive hours of non-work activities. 5. If temporary construction or permanent pavement markings cannot be installed in accordance with Road and Bridge Specification 704, then yellow flexible temporary pavement markers (FTPMs) spaced at 20-foot centers for two-way traffic shall be placed along the centerline for lane division. No edge markers will be required. Guidance: 6. Sign spacing distance should be 350'-500' where the posted speed limit is 45 mph or less, 500'- 800' where the posted speed limit is greater than 45 mph. Option 7. Only traffic control signing for surface treatment/slurry/latex emulsion treatment operations is shown. Other traffic control; devices may be used for the control of traffic through the work area. 8. The advanced warning signs shown may also be used on multi-lane roadways, replacing the NO CENTER LINE signs with UNMARKED PAVEMENT AHEAD (W8-V4) signs and adding a ROAD WORK AHEAD (W20-1) sign as the first advanced warning sign. 137

138 NEW - Short Duration Road Patching Operation on a Low Volume Two-Lane Roadway -TTC-65.0 Guidance: 1. Sign spacing distance should be 350'-500' where the posted speed limit 45 mph or less, and 500'-800' where the posted speed limit is greater than 45 mph. Standard: 2. A ROAD PATCHING NEXT 5 MILES (W21-V19) sign, a BE PREPARED TO STOP (W3-4) sign and a Flagger (W20-7) symbol sign shall be installed at the intersection of each end of the route being patched. See Figure TTC-67 for guidance on the requirements for intersections within the limits of the operation. 3. Flagging Station Options: A. A single flagger can be used when adequate sight distance is available from both travel directions; B. When adequate sight distance is not available to utilize a single flagger, traffic shall be stopped in the direction of the work vehicles until work is completed. C. When adequate sight distance is not available to use a single flagger to control two-way traffic, two flaggers shall be used to control the two-way traffic until the work is complete. 4. Each vehicle involved in the moving/mobile operation shall be equipped with at least one high-intensity amber rotating, oscillating, or flashing light. Vehicle hazard warning signals shall not be used instead of rotating lights or flashing lights, but as a supplement. 5. If using a Type B (60" x 30") or Type C (96" x 48") arrow board on the shadow vehicle, it shall operate in the four corner caution mode. Guidance: 6. When using a CMS to replace the arrow board it should display the Type B caution mode. 7. Care should be exercised when establishing the flagger station to insure maximum possible sight distance based on the posted speed limit and at least equal to or greater than the values in Table 6H Where practical and when needed, the work and shadow vehicles should pull over periodically to allow motor vehicle traffic to pass. 9. Whenever adequate stopping sight distance exists to the rear, the shadow vehicle should maintain the minimum distance from the work vehicle/operation and proceed at the same speed. The shadow vehicle should slow down or stop if necessary in advance of vertical or horizontal curves that restrict sight distance. 10. A truck-mounted attenuator should be used on the shadow vehicle. Option: 11. A ROAD PATCHING NEXT 2 MILES (W21-V19) sign or ROAD PATCHING AHEAD (W21-V18) sign may be used to meet field condition. 12. The distance between the work and shadow vehicles may vary according to speed, terrain, curing time and other factors. 13. A PCMS may be used in advance of the work operation to supplement the static advance warning signs. 14. The vehicle mounted arrow board may be replaced with a vehicle-mounted CMS with a minimum character height of 10". 138

139 NEW - Slow Roll Operation on a Multi-Lane Roadway - TTC-66.0 Standard: 1. Slow Roll operation shall be submitted to and approved by the Regional Traffic Engineer or their designee prior to use and shall be performed according to Section 6G Slow Roll operation shall include the use of the Virginia State Police (VSP) or other law enforcement personnel unless an exception is granted by the Regional Traffic Engineer. 3. A portable changeable message sign (PCMS) or, if available, an overhead changeable message sign (CMS) shall be used a minimum of 1 mile in advance of the beginning of the Slow Roll operation with the following messages: ROAD WORK AHEAD; BE PREPARED TO STOP. 4. A control vehicle (contractor or state) shall occupy each travel lane of the route affected by the Slow Roll operation. All entrance ramps within the Slow Roll operation shall be temporarily closed. A drive through of the route shall be performed prior to beginning the Slow Roll operation to ensure there are no parked vehicles along the roadway which could enter the travel lane during the Slow Roll operation. Option 5. Once the Slow Roll operation has passed a closed entrance ramp, the ramp may be reopened. Standard: 6. Prior to utilizing Slow Roll operation, a coordination meeting shall be held with all entities involved in the operation to discuss each person s role. 7. The starting point for the Slow Roll operation shall be in a tangent section (both horizontal and vertical) of the approach roadway with adequate sight distance. 8. Law enforcement vehicles in the Slow Roll operation shall display full emergency lights. 9. Each slow roll control vehicle shall be equipped with at least one high-intensity amber rotating, oscillating, or flashing light. Vehicle hazard warning signals shall not be used instead of rotating lights or flashing lights, but as a supplement. 10. Each slow roll control vehicle shall be equipped with a Type C (96" x 48") arrow board on the shadow vehicle, it shall operate in the four corner caution mode. 11. Each slow roll control vehicle controlling traffic shall be equipped with a truck- mounted attenuator. 12. Upon a sufficient gap in traffic, each slow roll vehicle will pull out and occupy a travel lane with their warning lights and hazard lights operating and will travel at a minimum of 10 miles per hour. A lead vehicle shall follow the last motorist vehicle traveling in advance of the slow roll operation vehicles to notify the work crew when the roadway is closed and free of approaching motorist. 13. The lead vehicle in the Slow Roll operation shall have radio/telephone communication with the work crew. Once the need for the road closure is complete, the work crew shall notify the lead vehicle in the slow roll operation, who in turn will notify the other work vehicles. The slow roll vehicles shall gain speed and pull over to the right side of the roadway; starting from the vehicle occupying the left lanes first (the VSP should continue with the flow of traffic). 14. If the Slow Roll operation vehicles reach the work site before receiving notification that the operation has been completed, they shall slow down and/or stop until signaled that the roadway is safe to release traffic. 15. Once the Slow Roll operation is complete and free flow travel conditions have been re-established, the PCMS or overhead CMS messages shall be modified to remove the BE PREPARED TO STOP message. 139

140 NEW - Lane Closure Operation through an Unsignalized Intersection - TTC-67.0) Guidance: 1. Sign spacing distance should be 350'-500' where the posted speed limit is 45 mph or less, 500'-800' where the posted speed limit is greater than 45 mph. Standard: 2. Channelizing device spacing shall be on 20' centers or less 100 feet in advance of the intersection. Guidance: 3. If room permits, a shadow vehicle with at least one rotating amber light or high intensity amber strobe light should be parked 80'-120' in advance of the first work crew. 4. If the posted speed limit is 45 mph or greater, the shadow vehicle should have a truck-mounted attenuator. 5. If the work space extends across a crosswalk, the crosswalk should be closed using the information and devices shown in Figure TTC-36. Option 6. At the stop condition intersecting roadway, additional flagger sign may be used (BE PREPARED TO STOP (W3-4)) between the ROAD WORK AHEAD and the flagger station in the proper sequence, as directed by the Regional Traffic Engineer. 140

141 CHAPTER 6I CONTROL OF TRAFFIC THROUGH TRAFFIC INCIDENT MANAGEMENT AREAS A number represent TTC note. 141

142 Chapter 6I 5. Change Buffer Space Table in: TIMC-1.1 TIMC-2.1 TIMC-3.1 TIMC-4.1 Posted Speed Limit (mph) Distance (Feet) Vehicles and equipment shall not park in the buffer space. 142

143 Incident Blocking a Lane on a Two-Lane Roadway TIMC Eliminated STROBE light as a vehicle warning light 143

144 Incident Closing a Highway TIMC Added: see Figures TTC- 46 or TTC-47. Detour with a Route Assembly sign. 144

145 Highway Closure Incident with a Temporary Detour - TIMC-8.1 Changed stripes of Ty. 3 Barricade 145

146 APPENDIX A GUIDELINES FOR THE USE OF BARRIER/CHANNELIZING DEVICES IN WORK ZONES 146

147 Appendix A 1. Channelizing Device/Barrier Selection Process Page A-5: 2. Change Figure 3b, ROR Frequency Factor Chart for All Other Highways to Figure 3a, ROR Frequency Factor Chart for Limited Access Highways Figure 3a added note under title: Data presented is for 2 way ADT. When applying this chart to divided roadways, reduce ADT by one-half before entering chart. 147

148 Appendix A 1. Channelizing Device/Barrier Selection Process Page A-6: Changed Figure 4 to Table 1 Figure 3b added note under title: Data presented is for 2 way ADT. When applying this chart to divided roadways, reduce ADT by one-half before entering chart. 148

149 Appendix A 3. BARRIER DESIGN CONSIDERATIONS Page A-14 ADDED: Temporary Longitudinal Steel Barriers 1 Acceptance based on the following NCHRP 350/Mash08 Test Criteria Dynamic deflection is based on: ¾ Ton pick-up truck at 45 mph and 25 impact angle (TL-2). ¾ Ton pick-up truck at 62 mph and 25 impact angle (TL-3). For additional information on longitudinal steel barriers, length of need and impact attenuator application, please refer to IIM-LD-93, Construction Work Zone/ Safety Guidelines and Pay Items for Construction Work Zone: 149

150 Appendix A 3. Barrier Design Considerations Page A-14 - Added Table 3, Acceptable Longitudinal Steel Barriers FHWA Code Manufacturer Device Description Test Level Dynamic Deflection Anchorage B134 Energy Absorption Systems, Inc. Vulcan Barrier TL-3 13'- 2" 302' Lg. (a) B134 Energy Absorption Systems, Inc. Vulcan Barrier with Anchoring System VAS TL-3 6'- 11" (b) B-131 Highway Care, Inc. Barrier Guard 800 TL-3 4'- 11" (c) B-158 Highway Care, Inc. Barrier Guard 800 MDS TL-3 0'- 3" (d) B-176A Hill & Smith, Inc. Zone Guard Standard TL-3 6'- 4" (e) B-176A Hill & Smith, Inc. Zone Guard Minimum Deflection TL-3 1'- 4" (f) 150

151 Appendix A 3. Barrier Design Considerations Page A-15 - Added (references to Table 3) a Freestanding barrier with no anchorage and is defined as the additional length of barrier needed, upstream and downstream of the work zone, to ensure the system does not exceed the maximum dynamic deflection noted in the adjacent column. b System was anchored using a QuadGuard CZ. This system is acceptable for uni-directional (run-on only) conditions. Refer to FHWA acceptance letter B-131 for additional guidance for this application. c System was anchored each end with four anchors. System must be terminated outside of clear zone or shielded with a crashworthy device. d System was anchored each end with four anchors. Each barrier of the system was also anchored every 20 feet with either joint anchors or intermediate anchors. System must be terminated outside of clear zone or shielded with a crashworthy device. e System was anchored with four anchors at each end. System must be terminated outside of clear zone or shielded with a crashworthy device. f System was anchored with four anchors at each end. The system was also anchored every 33'- 4" along the barrier. System must be terminated outside of clear zone or shielded with a crashworthy device. 151

152 Appendix A 3. Barrier Design Considerations Page A-15 - Added Table 4, Acceptable Longitudinal Channelizing Devices FHWA Code Manufacturer Device Description Test Level Dynamic Deflection Anchorage B111 Creative Building Products Water Filled Plastic Barrier. TL-2 10'- 4" 16' - 6'' Lg. Segments (96') B101 Rhino Safety Barrier LLC Water-Filled Plastic Barrier. TL-2 13'- 2" 59' B-97 Yodock Wall Company, Inc. Yodock Model 2001M/2001 Plastic Barriers w/ steel tubes. TL-2 TL-3 12' 14' 46' B-48 Energy Absorption Systems, Inc. Triton water-filled temporary barrier. TL-3 19'- 0" 22'- 8" 97' - 6" 65' B-34 B-30 Armorcast Products Co. Guardian Safety Barrier System TL-3 TL-2 11'- 2" 6'- 6" (a) 152

153 Appendix A Figure 5, Construction Access Technique and Introduced Barrier Added Ty. 3 Barricade & DO NOT ENTER sign at construction access & work entrances 153

154 APPENDIX D PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) DISPLAYS 154

155 Appendix D Page D-1 The revision to Appendix D provides uniformity across the Commonwealth by standardizing PCMS messages for temporary traffic control applications as shown in Chapter 6H. Three phase may be displayed on a PCMS but the use of 2 PCMSs is preferred. The Engineer will provide guidance. 155

156 Appendix D Page D-1 The revision to Appendix D provides uniformity across the Commonwealth by standardizing PCMS messages for temporary traffic control applications as shown in Chapter 6H. Three phase may be displayed on a PCMS but the use of 2 PCMSs is preferred. The Engineer will provide guidance. 156

157 Page D-1 Revision 1 Appendix D PCMS use on long-term projects: should be used to advise motorists of the initial change in traffic pattern. should only display the initial message should for 2 weeks to retain its effectiveness. may display daily standardized messages based on the TTC application that affect the mainline traffic. non-standardized messages should be approved by the Regional Traffic Operations Manager, authority of a public agency or official having jurisdiction. 157

158 Appendix D Page D-2, Alternate Route Messages PCMS should only be used: where the CMS operator has current and continuously updated knowledge of the traffic conditions on the alternative route. where the alternate route will result in a significant savings in time for the detoured motorists. 158

159 Appendix D Page D-2, Traffic Detour Messages PCMS messages should be used when a complete road closure is required. A detour is warranted when positive guidance is provide to motorist by: a properly marked detour or guide signs to the major destination, or law enforcement or traffic control personnel control and guide traffic at critical locations. 159

160 Appendix D Pages D-3 to D-6 Table D-1, PCMS Message for TTC Applications 160

161 Appendix D Page D-6 Display of Future Roadwork: may be displayed shall be replaced by current information should not be given more than six (6) days prior to roadwork should display the days of the week may display be a that requires calendar dates under special situation 161

162 Page D-7 Revision 1 Appendix D Table D-2, Portable Changeable Messages for Advance Closures or Road Work?? ST / CLOSED / 7/1-8/31 RT 50 / CLOSED / MON-FRI EXIT 123 / CLOSED / JUL14-18 RD WORK / CLOSED / MON-FRI

163 Page D-7 Revision 1 Appendix D Table D-3, Unacceptable Portable Changeable Messages BEAWARE, BEWARE BE ALERT (any form or combination of BE ALERT messages) CARE (any form or combination of CARE messages) USE CARE CAUTION (any form or combination of CAUTION messages) USE CAUTION NOTICE (messages) WARNING, WARN (any form or combination of WARN messages)

164 Appendix D Pages D-8 to D-9, Table D-4, Abbreviations That Shall be Used Only on PCMS Signs 164

165 Appendix D Page D-10 Table D-5, Acceptable Abbreviations Word abbreviations shown shall be used when necessary. Abbreviations should either precedes or follow prompt word shown. 165

166 Appendix D Page D-11 Table D-6, Unacceptable Abbreviations Abbreviations that shall not be used because of their potential to be misinterpreted by road users. 166

167 Effective April 1, 2015 for State Forces Effective starting on the July 2015 Advertisement 167

Section 6H.01 Typical Applications

Section 6H.01 Typical Applications December 27, 2010 Draft Page 6H-1 Section 6H.01 Typical Applications Support: 01 Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. 02 The needs and control of all

More information

REVIEW OF THE DRAFT 2011 VA WORK AREA PROTECTION MANUAL. December 14, 2010 David Rush VDOT WZS Program Manager

REVIEW OF THE DRAFT 2011 VA WORK AREA PROTECTION MANUAL. December 14, 2010 David Rush VDOT WZS Program Manager REVIEW OF THE DRAFT 2011 VA WORK AREA PROTECTION MANUAL December 14, 2010 David Rush VDOT WZS Program Manager Manual on Uniform Traffic Control Devices (MUTCD) Released in December 2009 States have until

More information

REVIEW OF SIGNIFICANT CHANGES IN THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL. VDOT Traffic Engineering Division Oc7, 2011 Presentation

REVIEW OF SIGNIFICANT CHANGES IN THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL. VDOT Traffic Engineering Division Oc7, 2011 Presentation REVIEW OF SIGNIFICANT CHANGES IN THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL VDOT Traffic Engineering Division Oc7, 2011 Presentation VA Supplement to the MUTCD VDOT developed Supplements which consist

More information

Work Zone Safety. Guidelines for Temporary Traffic Control

Work Zone Safety. Guidelines for Temporary Traffic Control Work Zone Safety Guidelines for Temporary Traffic Control Revised April 2015 1 Table of Contents Introduction 3 Traffic Control Devices 4 Signs 4 Channelizing Devices 7 Lighting Devices 11 Component Parts

More information

South Carolina. It s serious. Deadly serious.

South Carolina. It s serious. Deadly serious. South Carolina It s serious. Deadly serious. Work Zone Safety Guidelines for the South Carolina Department of Transportation, Municipalities, Counties, Utilities, and Contractors 2013 1 Table of Contents

More information

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Portable Temporary Rumble Strips (PTRS) SPECIFIC SUBJECT: Guidelines for the

More information

Work Zone Worker Protection

Work Zone Worker Protection Work Zone Worker Protection Field Guide Developed by American Traffic Safety Services Association 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406 (800) 272-8772 Web Address: www.atssa.com E-mail:

More information

2013 Changes to the 2011 MMUTCD, Part 6 September 2013

2013 Changes to the 2011 MMUTCD, Part 6 September 2013 2013 Changes to the 2011 MMUTCD, Part 6 September 2013 The requirements for drum spacing in Sections 6C.07 (Page 557 (MI)) and 6F.63 (Page 604 (MI)) have been revised to more closely match the pavement

More information

Work Zone Safety. Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene

Work Zone Safety. Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene Work Zone Safety Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene 1 Agenda Manuals/Codes/Statistics Setup & Removal of Work Zones Devices and Locations

More information

Work Zone Safety Best Practices Traffic Engineering & Safety Conference October 18, Dean Mentjes Federal Highway Administration

Work Zone Safety Best Practices Traffic Engineering & Safety Conference October 18, Dean Mentjes Federal Highway Administration Work Zone Safety Best Practices Traffic Engineering & Safety Conference October 18, 2017 Dean Mentjes Federal Highway Administration Juan Pava Illinois Department of Transportation 1 Setting the Stage:

More information

TRAFFIC CONTROL PLAN ONE-LANE TWO-WAY TRAFFIC CONTROL TCP(1-2)-12 ONE LANE TWO-WAY CONTROL WITH YIELD SIGNS ONE LANE TWO-WAY CONTROL WITH FLAGGERS

TRAFFIC CONTROL PLAN ONE-LANE TWO-WAY TRAFFIC CONTROL TCP(1-2)-12 ONE LANE TWO-WAY CONTROL WITH YIELD SIGNS ONE LANE TWO-WAY CONTROL WITH FLAGGERS DISCLAIMER: The use of this standard is governed by the "Texas Engineering Practice Act". No warranty of any kind is made by TxDOT for any purpose whatsoever. TxDOT assumes no responsibility for the conver-

More information

SCDOT TRAFFIC SIGNAL SPECIAL PROVISIONS TRAFFIC CONTROL FOR TRAFFIC SIGNAL PROJECTS MAINTENANCE OF TRAFFIC

SCDOT TRAFFIC SIGNAL SPECIAL PROVISIONS TRAFFIC CONTROL FOR TRAFFIC SIGNAL PROJECTS MAINTENANCE OF TRAFFIC SCDOT TRAFFIC SIGNAL SPECIAL PROVISIONS TRAFFIC CONTROL FOR TRAFFIC SIGNAL PROJECTS MAINTENANCE OF TRAFFIC TRAFFIC CONTROL: The Contractor shall execute the item of Traffic Control as required by the Standard

More information

Temporary Traffic Control Plans

Temporary Traffic Control Plans Temporary Traffic Control Plans US Department of Transportation Federal Highway Administration (FHWA) MUTCD 2009 EDITION Adopted by WSDOT December 19, 2011 with modifications per WAC 468-95. 2-1 Standard

More information

Anticipated Changes Based on 2009 Federal MUTCD

Anticipated Changes Based on 2009 Federal MUTCD Anticipated Changes Based on 2009 Federal MUTCD Section 1A.13 Meanings of text headings (Standard, d Guidance, Option, Support) relocated and clarified Standard d statements shall hll not be modified difid

More information

PERFORMANCE ACTIVITY 603 SIGNS

PERFORMANCE ACTIVITY 603 SIGNS PERFORMANCE ACTIVITY 603 SIGNS WORK DESCRIPTION 3 WORK DESCRIPTION 4 WORK DESCRIPTION 6 New Install Maintenance / Replace Temporary 603 SIGNS ACTIVITY DESCRIPTION Install new signs and maintain and replace

More information

TRAFFIC CONTROL PLAN FOR SURVEYING OPERATIONS END ROAD WORK END ROAD WORK * ** END ROAD WORK END ROAD WORK. TCP (S-1a) TCP (S-1b)

TRAFFIC CONTROL PLAN FOR SURVEYING OPERATIONS END ROAD WORK END ROAD WORK * ** END ROAD WORK END ROAD WORK. TCP (S-1a) TCP (S-1b) kind is made by TxDOT for any purpose whatsoever. TxDOT assumes no responsibility for the conversion of this standard to other formats or for incorrect results or damages resulting from its use. 3 for

More information

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS SUB TOTAL SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT

More information

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing.

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing. TECHNICAL COMMITTEE: Railroad and Light Rail Transit Technical Committee DATE OF ACTION: June 25, 2004 TOPIC: Crossbuck with Yield or Stop Signs and Advance Signs. STATUS: Accepted by the National Committee

More information

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary 8" Physical gore ( ) ( ) 250 Varies 250 TYPICAL RUMBLE STRIP PLACEMENT AT EXIT AND ENTRANCE RAMPS This distance may vary This distance may vary ( ) 2 16" edge of R=12" Max ( ) Physical gore Texturing 1.

More information

2014 Fall Asphalt Conference October 7, 2014 Richmond, VA Review of Virginia s 2013 Work Zone Crash Statistics

2014 Fall Asphalt Conference October 7, 2014 Richmond, VA Review of Virginia s 2013 Work Zone Crash Statistics 2014 Fall Asphalt Conference October 7, 2014 Richmond, VA Review of Virginia s 2013 Work Zone Crash Statistics David Rush WZ Safety Program Manager Traffic Engineering Division Review of Virginia s 2013

More information

60 70 Guidelines. Managing Speeds. Work Zones

60 70 Guidelines. Managing Speeds. Work Zones 50 40 30 60 70 Guidelines on Managing Speeds in Work Zones 50 40 30 60 70 This document summarizes available guidance on setting speed limits and managing speeds in work zones. The Manual on Uniform Traffic

More information

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS Section Page 12-1 GENERAL...12.1 12-2 FLAGGING...12.1 12-2.01 Flaggers...12.1 12-2.02 Flagging Costs...12.1 12-3 TRAFFIC-HANDLING EQUIPMENT

More information

Handbook for Temporary Traffic Control - Construction, Maintenance, and Utility Operations

Handbook for Temporary Traffic Control - Construction, Maintenance, and Utility Operations Purdue University Purdue e-pubs Indiana Local Technical ssistance Program (LTP) Publications Indiana Local Technical ssistance Program (LTP) 7-2004 Handbook for Temporary Traffic Control - Construction,

More information

Section 2B.59 Weight Limit Signs - Interim Revisions

Section 2B.59 Weight Limit Signs - Interim Revisions Note: this document is an interim modification to Section 2B.59 of the Virginia Supplement to the MUTCD, Revision #1. Once the VDOT District Structure & Bridge section has made the determination that a

More information

Diagram 1 - Shoulder Assistance

Diagram 1 - Shoulder Assistance Diagram - Shoulder Assistance Approx. skip (40 ). Notify K. C. Scout. Turn on the emergency directional flashers and top rear facing strobe lights. 3. Pull to the shoulder and stop approximately 40 feet

More information

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 FLASHING YELLOW ARROW SIGNALS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 FLASHING YELLOW ARROW SIGNALS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON STANDARD NOTES SN01 2 OF 8 ROADWAY PLAN PL01 3 OF 8 ROADWAY PLAN PL02 4 OF 8 LANE 10 105 150 205 270 450 500 550 11 12 SHOULDER 115 125 MINIMUM LANE CLOSURE TAPER LENGTH = L 165 225 295 180 245 320 5 25

More information

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 INTERSECTION IMPROVEMENTS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 INTERSECTION IMPROVEMENTS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON STANDARD NOTES SN01 2 OF 17 STANDARD NOTES SN02 3 OF 17 SITE PREP & T.E.S.C. NOTES GENERAL NOTES SITE PREP & T.E.S.C. PLAN SP01 4 OF 17 SITE PREP & T.E.S.C. NOTES GENERAL NOTES SITE PREP & T.E.S.C. PLAN

More information

2003 EDITION. Illinois Supplement to the National Manual on Uniform Traffic Control Devices. Division of Highways

2003 EDITION. Illinois Supplement to the National Manual on Uniform Traffic Control Devices. Division of Highways 2003 EDITION Illinois Supplement to the National Manual on Uniform Traffic Control Devices Division of Highways ILLINOIS SUPPLEMENT TO THE NATIONAL MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 808 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 808 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY. 808.01 Description 808.02 Materials 808.03 Design Speed 808.04 Construction 808.05 Method of Measurement 808.06 Basis of Payment STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 808

More information

LCDOT DETOUR PROCEDURES. and GUIDELINES

LCDOT DETOUR PROCEDURES. and GUIDELINES LCDOT DETOUR PROCEDURES and GUIDELINES LCDOT Traffic Department (847) 377-7400 Rev 2/3/2017 ADVANCE ROAD CLOSED SIGNS (W20-3) These signs shall be a 48" x 48" Black Legend on Fluorscent Orange Sheeting.

More information

DESIGNATED CONSTRUCTION ZONE SPEED FINES DOUBLE. Manitoba Infrastructure and Transportation. Infrastructure and Transportation. Traffic Engineering

DESIGNATED CONSTRUCTION ZONE SPEED FINES DOUBLE. Manitoba Infrastructure and Transportation. Infrastructure and Transportation. Traffic Engineering CONSTRUCTION DESIGNATED ZONE SPEED FINES DOUBLE Manitoba Infrastructure and Transportation Work Zone Traffic Control Manual Provincial Roads and Provincial Trunk Highways Infrastructure and Transportation

More information

CLAY COUNTY MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION PLANS FOR PROPOSED STATE HIGHWAY NOT TO SCALE LENGTH OF PROJECT

CLAY COUNTY MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION PLANS FOR PROPOSED STATE HIGHWAY NOT TO SCALE LENGTH OF PROJECT DI E INDE OF SHEETS TYPICAL SECTIONS (TS) ( SHEET)--- QUANTITIES (QU) (7 SHEETS)--------- 3 PLAN-PROFILE (PP)------------------ REFERENCE POINTS (RP)-------------- COORDINATE POINTS (CP)------------- CULVERT

More information

AGC/MoDOT Annual COOP Meeting. Safety/Traffic Division & Specialty Contractors/Suppliers Breakout Session. December 5, 2018

AGC/MoDOT Annual COOP Meeting. Safety/Traffic Division & Specialty Contractors/Suppliers Breakout Session. December 5, 2018 AGC/MoDOT Annual COOP Meeting Safety/Traffic Division & Specialty Contractors/Suppliers Breakout Session December 5, 2018 District Work Zone Review St. Louis June 11-14, 2018 Central July 16-18, 2018 Northeast

More information

Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November January 2005

Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November January 2005 Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November 2008 1 January 2005 Reference Norwich Township Fire Department SOG #30 Page 1 of 6 Purpose: The purpose of this

More information

Night Work Specification

Night Work Specification Night Work Specification 1.0 Hours of Work The contractor is advised that most work for this contract will be carried out during night time hours. For the purposes of this contract night is defined as

More information

Lee County DOT Traffic Section Design Standard for Sign Installation

Lee County DOT Traffic Section Design Standard for Sign Installation Lee County DOT Traffic Section Design Standard for Sign Installation Traffic Section Table Of Contents Section Title 1. Sign Panel Material 2. Sign Shape 3. Posts 4. Fasteners 5. Retro reflectivity and

More information

PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS

PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS CHAPTER 8A. GENERAL Section 8A.01 Introduction... 8A-1 Section 8A.02 Use of Standard Devices, Systems, and Practices... 8A-4

More information

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 TECHNICAL COMMITTEE: ITEM NUMBER: TOPIC: ORIGIN OF REQUEST: AFFECTED SECTIONS OF MUTCD: NCUTCD Proposal for Changes

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

Louisiana s s Work Zone Task Force Work Zone Improvements

Louisiana s s Work Zone Task Force Work Zone Improvements Louisiana s s Work Zone Task Force Work Zone Improvements Louisiana Asphalt Technology Conference Shreveport, Louisiana February 24, 2005 Charles Adams, P.E., PTOE Why Improve Work Zones? Number of Work

More information

Work Zone Safety & New Interstate Resurfacing Provision

Work Zone Safety & New Interstate Resurfacing Provision 2017 CAPA Presentation Work Zone Safety & New Interstate Resurfacing Provision Steve Kite, PE State Work Zone Engineer Work Zone Safety Data In 2016, Approximately 600 construction projects across NC (not

More information

Two-Lane, Two-Way Roads

Two-Lane, Two-Way Roads Two-Lane, Two-Way Roads road consisting of two opposing lanes of undivided traffic. Two-Lane Two-Way *Drawings Not To Scale mndot.gov/fieldmanual Field Manual January 08 Intermediate Volume Up to 00 DT

More information

Created by: St. Louis County

Created by: St. Louis County Created by: Victor Lund, PE Traffic Engineer St. Louis County Ken Johnson, PE, PTOE State WZ, etc. MnDOT Why do workers want speed limits? How effective are speed limits in work zones? New legislation

More information

Act 229 Evaluation Report

Act 229 Evaluation Report R22-1 W21-19 W21-20 Act 229 Evaluation Report Prepared for Prepared by Table of Contents 1. Documentation Page 3 2. Executive Summary 4 2.1. Purpose 4 2.2. Evaluation Results 4 3. Background 4 4. Approach

More information

GARDEN STATE. 1 Active Work Zone When Flashing 36x36 W Advisory Speed 10 18x18 W Advisory Speed 15 18x18 W

GARDEN STATE. 1 Active Work Zone When Flashing 36x36 W Advisory Speed 10 18x18 W Advisory Speed 15 18x18 W ROAD SIGNS, SIGN POSTS AND TRAFFIC CONTROL ITEMS - BID TABULATION IFB #15-012 (All Bids) Garden State Highway Products Contact: Joe McCracken 1740 E. Oak Road Vineland, NJ 08361 Phone: 856-692-7572 Fax:

More information

SIGNING UPDATES MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), 2009 EDITION. CLIFF REUER SDLTAP WESTERN SATELLITE (c)

SIGNING UPDATES MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), 2009 EDITION. CLIFF REUER SDLTAP WESTERN SATELLITE (c) SIGNING UPDATES MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), 2009 EDITION CLIFF REUER SDLTAP WESTERN SATELLITE 605-773-5108 605-209-8932 (c) MUTCD 2009 EDITION MUTCD http://mutcd.fhwa.dot.gov/ Purchase

More information

Brownwood Portable Traffic Signals and AFADs Evaluation. Carl Johnson, P.E., TxDOT Brownwood District Melisa Finley, P.E., TTI

Brownwood Portable Traffic Signals and AFADs Evaluation. Carl Johnson, P.E., TxDOT Brownwood District Melisa Finley, P.E., TTI Brownwood Portable Traffic Signals and AFADs Evaluation Carl Johnson, P.E., TxDOT Brownwood District Melisa Finley, P.E., TTI Using Portable Traffic Signals (PTS) in Maintenance Operations: Brownwood District

More information

Work Zone Changes Since We Last Met 2016 Louisiana Transportation Conference. Barry L. Lacy, P.E. Work Zone/Claims/Audit Engineer

Work Zone Changes Since We Last Met 2016 Louisiana Transportation Conference. Barry L. Lacy, P.E. Work Zone/Claims/Audit Engineer Work Zone Changes Since We Last Met 2016 Louisiana Transportation Conference Barry L. Lacy, P.E. Work Zone/Claims/Audit Engineer Louisiana State Motto Why is Work Zone Safety Important? US Work Zone Fatalities

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007 07-08001 Sheet 1 of 2 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007 SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY TYPICAL TRAFFIC CONTROL, 2-LANE

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION MEMORANDUM

VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION MEMORANDUM VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION MEMORANDUM GENERAL SUBJECT: SPEED LIMITS, ADVISORY SPEEDS, SIGNS SPECIFIC SUBJECT: Pole Mounted Speed Display Signs: Requirements DIRECTED

More information

Exhibit H: Typical Traffic Control Plans. North Metro Natural Gas Pipeline Project Routing Study

Exhibit H: Typical Traffic Control Plans. North Metro Natural Gas Pipeline Project Routing Study Exhibit H: Typical Traffic Control Plans North Metro Natural Gas Pipeline Project Routing Study North Metro Natural Gas Pipeline Project Routing Study This page intentionally left blank. Contractor: CAMPOS

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

1400 MISCELLANEOUS Traffic Engineering Manual

1400 MISCELLANEOUS Traffic Engineering Manual TABLE OF CONTENTS Part 14 - MISCELLANEOUS 1400 GENERAL... 14-3 1415 RUMBLE STRIPS (INCLUDING STRIPES) IN THE ROADWAY... 14-4 1415-1 General... 14-4 1415-2 Transverse Rumble Strips... 14-4 1415-2.1 General...

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAPLE STREET UNDERPASS BRIDGE (MM 106.0)

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAPLE STREET UNDERPASS BRIDGE (MM 106.0) MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT 2016.04 MAPLE STREET UNDERPASS BRIDGE (MM 106.0) Make the following changes to the bid documents: In the Contract Documents, Part 2 Special Provisions,

More information

CHANGE LIST for MDOT Traffic and Safety Geometric Design Guides. May 23, 2017: The following update was made to the web site.

CHANGE LIST for MDOT Traffic and Safety Geometric Design Guides. May 23, 2017: The following update was made to the web site. CHANGE LIST for MDOT Traffic and Safety Geometric Design Guides Note: Located at https://mdotjboss.state.mi.us/tssd/tssdhome.htm May 23, 2017: The following update was made to the web site. GEO-650-D Flares

More information

VULCAN BARRIER TL-3 GENERAL SPECIFICATIONS

VULCAN BARRIER TL-3 GENERAL SPECIFICATIONS VULCAN BARRIER TL-3 GENERAL SPECIFICATIONS I. GENERAL A. The VULCAN BARRIER TL-3 (VULCAN TL-3) shall be a highly portable and crashworthy longitudinal barrier especially suited for use as a temporary barrier

More information

LaDOTD s s New Traffic Control Details

LaDOTD s s New Traffic Control Details LaDOTD s s New Traffic Control Details Louisiana Pavement Conference Baton Rouge, Louisiana October 7, 2004 Charles Adams, P.E., PTOE Objectives Traffic Background Information What Drove the Department

More information

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS MCHENRY COUNTY DIVISION OF TRANSPORTATION 16111 NELSON ROAD WOODSTOCK, IL 60098

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation

More information

Page 1 of KA

Page 1 of KA Page 1 of 10 5 Contact the Area Engineer at 620-384-7821 for RAP sample location. Page 2 of 10 SS-1HP or approved alternate shall be used for Tack. Page 3 of 10 Ú City limit or Urban boundary No Centerline

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 961 PORTABLE TRAFFIC SIGNALS OCTOBER 17, 2008

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 961 PORTABLE TRAFFIC SIGNALS OCTOBER 17, 2008 961.01 Description 961.02 Prequalification 961.03 Requirements STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 961 PORTABLE TRAFFIC SIGNALS OCTOBER 17, 2008 961.01 Description. This

More information

DEPARTMENTAL MATERIAL SPECIFICATIONS TRAFFIC CONTROL PLAN TYPICAL DETAILS WZ(TD)-13 BARRIER DELINEATION WITH MODULAR GLARE SCREENS

DEPARTMENTAL MATERIAL SPECIFICATIONS TRAFFIC CONTROL PLAN TYPICAL DETAILS WZ(TD)-13 BARRIER DELINEATION WITH MODULAR GLARE SCREENS Concrete Barrier NOTES: 1. Length of Safety Glare Fence will be specified elsewhere in the plans. 2. The cumulative nominal length of the modular units shall equal the length of the individual sections

More information

D-25 Speed Advisory System

D-25 Speed Advisory System Report Title Report Date: 2002 D-25 Speed Advisory System Principle Investigator Name Pesti, Geza Affiliation Texas Transportation Institute Address CE/TTI, Room 405-H 3135 TAMU College Station, TX 77843-3135

More information

Worksite Safety Update Promoting safety in road construction

Worksite Safety Update Promoting safety in road construction Worksite Safety Update Promoting safety in road construction No 116 February 2012 In this Edition: Temporary Safety Barrier Developments Page 1 Internal Traffic Control Plans for Improved Site Safety Page

More information

AFFECTED SECTIONS OF MUTCD: Section 2C.36 Advance Traffic Control Signs Table 2C-4. Guidelines for Advance Placement of Warning Signs

AFFECTED SECTIONS OF MUTCD: Section 2C.36 Advance Traffic Control Signs Table 2C-4. Guidelines for Advance Placement of Warning Signs 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 RWSTC June 2012 RW # 3 TOPIC: Advance Traffic Control Signs TECHNICAL COMMITTEE: Regulatory &

More information

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER DESIGN DESIGNATION A.A.D.T - XXXX = XXXX V = XX M.P.H PLANS FOR PROPOSED HIGHWAY INDEX OF SHEETS SHEET DESCRIPTION NUMBER TITLE SHEET ----------------------- 1 TYPICAL SECTIONS (TS) (1 SHEET)-- QUANTITIES

More information

801-R-xxx LAW ENFORCEMENT OFFICER FOR WORK ZONE SAFETY. (Adopted xx-xx-17)

801-R-xxx LAW ENFORCEMENT OFFICER FOR WORK ZONE SAFETY. (Adopted xx-xx-17) 801-R-xxx LAW ENFORCEMENT OFFICER FOR WORK ZONE SAFETY (Adopted xx-xx-17) Description This work shall consist of providing a Law Enforcement Officer, LEO, to assist with the safe, efficient, orderly movement

More information

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 TECHNICAL COMMITTEE: ITEM NUMBER: TOPIC: ORIGIN OF REQUEST: AFFECTED SECTIONS OF MUTCD: NCUTCD Proposal for Changes

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.

More information

Crash Testing Growth Common Roadside Hardware Systems Draft FHWA and AASHTO Requirements for Implementing MASH 2015

Crash Testing Growth Common Roadside Hardware Systems Draft FHWA and AASHTO Requirements for Implementing MASH 2015 64 th Annual Illinois Traffic Safety and Engineering Conference October 14, 2015 Crash Testing Growth Common Roadside Hardware Systems Draft FHWA and AASHTO Requirements for Implementing MASH 2015 1 https://www.youtube.com/watch?feature

More information

CITY OF SAN MARCOS ENGINEERING DIVISION

CITY OF SAN MARCOS ENGINEERING DIVISION The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. A. AN APPLICANT S GUIDE TO PROCEDURES FOR: B. C. D.

More information

TITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES

TITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES NOTE: This is a courtesy copy of this rule. The official version can be found in the New Jersey Administrative Code. Should there be any discrepancies between this text and the official version, the official

More information

TTI TRAFFIC SAFETY CONFERENCE. John A. Barton, P.E.

TTI TRAFFIC SAFETY CONFERENCE. John A. Barton, P.E. TTI TRAFFIC SAFETY CONFERENCE John A. Barton, P.E. Introduction TxDOT Mission Work with others to provide safe and reliable transportation solutions for Texas. 2 Mission Zero Is a Journey toward: Zero

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

Work Zone Safety Initiatives and Research Efforts. Irene Soria Safety Evaluation Engineer Illinois Department of Transportation Safety Engineering

Work Zone Safety Initiatives and Research Efforts. Irene Soria Safety Evaluation Engineer Illinois Department of Transportation Safety Engineering Work Zone Safety Initiatives and Research Efforts Irene Soria Safety Evaluation Engineer Illinois Department of Transportation Safety Engineering TES Conference - October 17 th, 2012 Outline Work Zone

More information

Temporary Traffic Control Manual

Temporary Traffic Control Manual Temporary Traffic Control Manual For Street Construction and Maintenance Operations in the City of Appleton Prepared by the City of Appleton Department of Public Works Engineering Division Traffic Section

More information

ArmorGuard Barrier Portable Longitudinal Barrier

ArmorGuard Barrier Portable Longitudinal Barrier ArmorGuard Barrier Portable Longitudinal Barrier Installation & Maintenance Manual AGB I&M 112811 Page 1 of 13 ArmorGuard Barrier Table of contents Preface... 2 Applications and System Characteristics

More information

Purdue Road School West Lafayette IN

Purdue Road School West Lafayette IN Purdue Road School West Lafayette IN Plastic Safety Systems, Inc. Tim Cox National Sales Manager Kenny Kolberg Roadway Safety Consultant Indiana Work Zone Facts Source: IN DOT In 2013, 13 fatalities in

More information

CHAPTER 11 - TRAFFIC

CHAPTER 11 - TRAFFIC CHAPTER 11 - TRAFFIC Article 11-1 ENFORCEMENT 1 It shall be the duty of the Town Law Enforcement and/or its designated agency to provide for the enforcement of the traffic regulations of the town and all

More information

OPERATING PROCEDURES FOR ROADWAY INCIDENTS

OPERATING PROCEDURES FOR ROADWAY INCIDENTS FIRE AND RESCUE DEPARTMENTS OF NORTHERN VIRGINIA FIREFIGHTING AND EMERGENCY OPERATIONS MANUAL OPERATING PROCEDURES FOR ROADWAY INCIDENTS Third Edition Issued: November 2003 Revised: October 2012 ACKNOWLEDGEMENTS

More information

BID SUMMARY SHEET CONTRACT NO

BID SUMMARY SHEET CONTRACT NO 1 EACH R1-1 - 30" X 30" Stop Sign $23.61 $23.58 2 EACH R1-2 - 36" x 36" x 36" Yield Sign $16.36 $16.61 3 EACH R1-2 - 24" x 24" x 24" Yield Sign $12.55 $13.24 4 EACH R3-1 - 12" x 6" 4-Way $2.76 $1.98 5

More information

Work Zone Traffic Control

Work Zone Traffic Control Work Zone Traffic Control AGC/ Annual Meeting Bob Pappe, PE, PLS Traffic-Roadway Engineer Oregon Department of Transportation Chapter 1: TCP Design Introduction 1 Work Zone Traffic Control Update from

More information

Traffic Regulations Guidelines

Traffic Regulations Guidelines Traffic Regulations Guidelines PREPARED BY TRAFFIC AND SAFETY June, 2012 Providing the highest quality transportation services for economic benefit and improved quality of life. MDOT Traffic and Safety

More information

Ch. 212 OFFICIAL TRAFFIC-CONTROL DEVICES CHAPTER 212. OFFICIAL TRAFFIC-CONTROL DEVICES

Ch. 212 OFFICIAL TRAFFIC-CONTROL DEVICES CHAPTER 212. OFFICIAL TRAFFIC-CONTROL DEVICES Ch. 212 OFFICIAL TRAFFIC-CONTROL DEVICES 67 212.1 CHAPTER 212. OFFICIAL TRAFFIC-CONTROL DEVICES Subchap. Sec. A. GENERAL PROVISIONS... 212.1 B. SIGNS... 212.101 C. MARKINGS... 212.201 D. HIGHWAY TRAFFIC

More information

ArmorGuard Barrier Portable Longitudinal Barrier

ArmorGuard Barrier Portable Longitudinal Barrier ArmorGuard Barrier Portable Longitudinal Barrier Installation & Maintenance Manual AGB I&M 082409 Page 1 of 12 ArmorGuard Barrier Table of contents Preface... 2 Applications and System Characteristics

More information

SafeZone Sign Stands. Stand Features

SafeZone Sign Stands. Stand Features SafeZone Sign Stands Stand Features Crash Designed Break-Away Base Quick Release System for all modular attachments and accessories Pull Pin/Kick Release for easy deployment of legs Independently adjustable

More information

Lesson 5 4-Hour Version Slide: 4H-90

Lesson 5 4-Hour Version Slide: 4H-90 Lesson 5 4-Hour Version Slide: 4H-90 Lesson Objectives 4-Hour Version Slide: 4H-91 Lesson Objective: 5.1 4-Hour Version Slide: 4H-92 Making responder vehicles more visible improves safety by reducing the

More information

TxDOT Guidelines for Acknowledgment Signing

TxDOT Guidelines for Acknowledgment Signing TxDOT Guidelines for Acknowledgment Signing Section 1. General Description Acknowledgment signs are a way of recognizing an individual, company, business, volunteer group or other jurisdictions that provide

More information

Manual for Assessing Safety Hardware

Manual for Assessing Safety Hardware American Association of State Highway and Transportation Officials Manual for Assessing Safety Hardware 2009 vii PREFACE Effective traffic barrier systems, end treatments, crash cushions, breakaway devices,

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

Moving Operations. Introduction by. National Traffic Management & Work Zone Safety Conference March 2009

Moving Operations. Introduction by. National Traffic Management & Work Zone Safety Conference March 2009 Driver Behavior Around Moving Operations Introduction by Mli Melisa D. Fil Finley, PE P.E. National Traffic Management & Work Zone Safety Conference March 2009 Mobile Operation Intrusions New York State

More information

TRAFFIC ENGINEERING DIVISION

TRAFFIC ENGINEERING DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION MEMORANDUM GENERAL SUBJECT: Traffic Signs SPECIFIC SUBJECT: Speed Limit and Fine Signs in Work Zones DIRECTED TO: District Administrators

More information

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25 TABLE OF CONTENTS CHAPTER 25 FILE NO. TITLE DATE TABLE OF CONTENTS AND INTRODUCTION 25.TOC-1 Table of Contents Chapter 25... 08Aug2018 25.00 Introduction Chapter 25... 03May2018 VDOT STANDARD PARAPETS

More information

28, Approved and Ordered JAN!

28, Approved and Ordered JAN! PROVINCE OF BRITISH COLUMBIA ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL Order in Council No. 28, Approved and Ordered JAN! 2 2001 111114 11:17. Executive Council Chambers, Victoria Lieutenant Governor

More information

safedirection.com.au Ref: PM 017/02

safedirection.com.au Ref: PM 017/02 DISTRIBUTOR 0 Product Manual Ref: PM 017/02 Table of Contents 1.0 Introduction... 3 2.0 The... 3 3.0 How the Functions... 4 4.0 Crash Test Performance... 4 5.0 Characteristics of Terminals... 5 5.1 Gating

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

ALLEGAN COUNTY ROAD COMMISSION. Adopted by the Board of County Road Commissioners, December 28, Sign Policy

ALLEGAN COUNTY ROAD COMMISSION. Adopted by the Board of County Road Commissioners, December 28, Sign Policy ALLEGAN COUNTY ROAD COMMISSION Adopted by the Board of County Road Commissioners, December 28, 2016 Sign Policy Common/Policies/Sign Policy 2016 TABLE OF CONTENTS Page I. Purpose and Background.................................

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Section 502 Definition 2009 International Fire Code Access Road Requirements 502.1 Fire Apparatus Access Road is a road that provides fire apparatus

More information

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25 TABLE OF CONTENTS CHAPTER 25 FILE NO. TITLE DATE TABLE OF CONTENTS AND INTRODUCTION 25.TOC-1 Table of Contents Chapter 25... 28Dec2016 25.00 Introduction Chapter 25... 28Dec2016 VDOT STANDARD PARAPETS

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EMERGENCY APPARATUS ACCESS WAYS STANDARD #B-003 EFFECTIVE 05-05-2009 PURPOSE To establish a consistent guideline for fire access roadways required by

More information