Population Trends. US 71 Corridor Performance
|
|
- Ernest Stafford
- 5 years ago
- Views:
Transcription
1 Conex Te corridor rns 121 miles, from Willmar o e Iowa Sae Line. I connecs e ciies of Willmar,, Redwood Falls, Windom and. Crren Caracerisics Hiway: US 2009 AADT: 1,500 11, HCADT: 165 1,500 Nmber of lanes: 2-4 Key iway connecions: I-90, US 14, US 212, 23, 60 Pblic Transi Coonwood Cony Transi Kandiyoi Area Transi Renville Cony Hearland Express Wesern Commniy AcionCommniy Transi ( and Redwood Conies) Dial-a-ride and deviaed roe service alon corridor Bicycle/Pedesrian Glacial Lakes Sae Trail Rail Poplaion Trends BNSF line (Willmar o Twin Ciies) BNSF line (Willmar o Sae Line) DME line (Mankao o Tracy) DME line ( o Twin Ciies) UP line (S James o Sae Line) Cony US Performance Measre Resl Saewide Resl Infrasrcre Preservaion Condiion--% Good and saisfacory (by deck area) 89.1% 86.9% Condiion--% Poor (by deck area) 0% 3.2% Ride Qaliy Good--% of miles 82% 70.2% Ride Qaliy Poor--% of miles 1.5% 3.7% Disclaimer: Canes may be made periodically o e informaion on e map. If yo find any errors or omissions, we encorae yo o repor em online a Poplaion Projecion Coonwood 12,167 11,687 11,740 11,268 10,266 11,550 Kandiyoi 41,203 42,239 44,180 Redwood 16,815 16,059 15,200 Renville 17,154 15,730 17,660 Toal 98,607 95, ,330
2 US Spplemenary Frei Roe (Willmar - Iowa) Exisin Condiions - Safey Map S Safey Needs ± Trnk Hiways Cony Hiways Safey Prioriy Inersecions Class 1 Railroads Hi Prioriy Crves Bicycle Roes Mnicipal Bondaries Willmar Kandiyoi Co. Cony Bondaries 7 Toward Zero Deas Effors 2012 TZD TZD Safe Roads Enforcemen Gran Gran Cony TZD Reion Year Esablised (ATP) Cony Safey Plan Compleion Dae Coonwood So Cenral 2010 (ATP 7) Jne 2012 So Cenral 2010 (ATP 7) Jne 2012 Kandiyoi Sowes 2009 (ATP 8) Sep Redwood Sowes 2009 (ATP 8) Sep Renville Sowes 2009 (ATP 8) Sep Bir Renville Co. Redwood Falls US Safey Performance (Iowa o Willmar) 19 Percen of All Faal and Serios Injry Crases in Severe Crases in Top For Driver Relaed Cras Isses 8 Unbeled Driver* 36.4% 6 Speed Relaed 27.3% 4 Impaired Driver* 18.1% 3 Older Driver 13.6% Measre 67 Redwood Co. Top Tree Infrasrcre Relaed Cras Isses Lane Deparre Cras 11 Inersecion Relaed 9 Head-on Cras % 40.9% 27.3% Sprinfield Brown Co. In Saewide Toal for Trnk Hiways Toal Faal and Serios Injry Crases 22 2,440 Toal Miles 121 Comparison o Sae Crases 30 10,980 Coonwood Co. Waonwan Co Toal Faal and Serios Injry Crases per Mile 60 * Crases may be nder repored as is nmber is accordin o officer's firs impression Windom e. Daa presened inclde all faal and serios injry crases bew een See Disric Hiway Safey PlanLakefield for addiional isses and sraeies D7 Compleed Sep D8 Compleed Sep E Miles Co. Marin Co.
3 Fiscal Year Mobiliy Len (Miles) 3.8 Biminos overlay r of Willmar Overlay 10.8 Uiliy work So of Willmar Overlay 8.9 Oer Infrasrcre Projec So of Redwood Falls Replacemen N/A Invesmen Area 0.2 US Projecs Cos $ 230,000 $ 540,000 $ 1.5 $ 1.5 $ 5 Toal: $ 8.8 Cos Projec Len (Miles) Roe Fiscal Year Mobiliy Modificaion of a rn lane wes of 0.1 US 212 Overlay in Redwood Cony so of Redwood Falls Mill & overlay in Redwood Falls 1 Bike/ Pedesrian Sidewalk and pedesrian ADArelaed improvemens in Willmar 1.7 Concree reabbin eas of Willmar 0.8 Srfacin wes of Windom US 12 US Disclaimer: Canes may be made periodically o e informaion on e map. If yo find any errors or omissions, we encorae yo o repor em online a Invesmen Area 23.2 US Adjacen Projecs Toal $100,000 $1 $600,000 $180,000 $2.6 $3.1 $ 7.6
4 Performance Based Needs ( )* 3 s Preservaion 54 miles of Preservaion pavemen Clver 0 clvers Preservaion Pipe 3 poor pipes Replacemen 1 Prioriy Safey Inersecions Improvemens 2 i prioriy crves *Assmes compleion of STIP projecs. *Sysemaic safey improvemens are inclded as par of mos iway projecs. Refer o safey map for addiional safey informaion. Disclaimer: Canes may be made periodically o e informaion on e map. If yo find any errors or omissions, we encorae yo o repor em online a
5 Recen Invesmens ( )* Projec Projecs Disclaimer: Canes may be made periodically o e informaion on e map. If yo find any errors or omissions, we encorae yo o repor em online a Safey Projecs Toal Descripion 2002: resrfacin nor of Windom 2003: resrfacin from o Sae Line 2007: Mill & Overlay so of 2007: Overlay in Willmar 2008: Cable median barrier insalled nor of Willmar *Only incldes projecs over $100,000. Sysemaic safey improvemens are roinely inclded as par of mos iway projecs Cos $7 $300,000 $ 7.3
Population Trends. US 12 Corridor Performance
Corridor Context The corridor runs over 81 miles from Willmar to the Twins Cities metropolitan area. It connects the Twin Cities and the cities of Montrose, Howard Lake, Cokato, Dassel, Litchfield, Atwater,
More informationCurrent Corridor Characteristics. MN 62 Corridor Performance
Corridor Context The corridor runs 12 miles between I-494 and MN 55 south of Minneapolis. The corridor serves as an important East-West connection for the Metro area. A portion of the corridor has been
More informationUS 10 Corridor Performance
Corridor Context The corridor runs northwest 18 miles from I-35W to the edge of Anoka County. The corridor connects the cities of Ramsey, Anoka,, Mounds View, and Blaine. Current Corridor Characteristics
More informationI-394 Corridor Performance
Population Trends Corridor Context The corridor runs from edge of Hennepin County to downtown Minneapolis and serves the cities of Delano, Independence, Medina, and Wayzata. City Population 2000 2010 2,088
More informationClarendon Multimodal Transportation Study Existing Conditions Report
Clarendon Mulimodal Transporaion Sudy Exising Condiions Repor Ocober 21 Prepared for: Prepared by: Inroducion and Projec Background Toole Design Group (TDG) and Kielson & Associaes, Inc. (KAI) are conducing
More informationH Pin Voltage Surveillance with Time-out. Features. Typical Operating Configuration. Description. Pin Assignment. Applications.
EM MICELECTNIC-MIN S -Pin olage Surveillance wih Time-ou Feaures Proper microprocess resar afer power up Process rese a power down n-chip oscilla gives a ypical P of 60 ms ese oupu wking down o.6 No exernal
More informationFiscal Years Metropolitan Transportation Improvement Program
Winston-Salem Urban Area MEROPOLIAN PLANNING ORGANIZAION Fiscal Years 2016-2025 Metropolitan ransportation Improvement Program How to Read the FY 2016-2025 Metropolitan ransportation Improvement Program
More informationSCIENCE CHINA Technological Sciences. Vehicle survival patterns in China
SCIENCE CHINA Technological Sciences RESEARCH PAPER March 2011 Vol.54 No.3: 625 629 doi: 10.1007/s11431-010-4256-1 Vehicle survival paerns in China HAO Han 12 WANG HeWu 12* OUYANG MingGao 12 & CHENG Fei
More informationTransportation Improvement Program (TIP) Candidate Project List for Public Review
2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit
More informationCOUGAR RIDGE ELEMENTARY SCHOOL / MAY 2, 2017
COUGAR RIDGE ELEMENARY SCHOOL / MAY 2, 207 0 9 8 SIE PLAN / GROUND AS-BUIL UNDER ELEPHONE & POWER, CABLE Y LOCAOR LINES PER UILI BLOCK 2 EXISING 3 2 60' R/W BLOCK PAIN MARKS 70 ft 708 ft 706 ft 7 3 LAKEMON
More informationFlow Monitor FS10. Description FS10-.. Connection diagram FS10. Ordering information. Electrical connection. Flow rate ranges
Flow Monior FS0 Descripion Compac single poin flow monior, MIN or MAX monioring opions, suiable for waer, oil, air or media wih similar hermal conduciviies. Wih screw-in or plug-in ype monioring head for
More informationFlow Monitor FS10. Description FS10-.. Connection diagram FS10. Ordering information. Electrical connection. Flow rate ranges FS 10
Flow Monior FS0 Descripion Compac single poin flow monior, MIN or MAX monioring opions, suiable for waer, oil, air or media wih similar hermal conduciviies. Wih screw-in or plug-in ype monioring head for
More informationDistrict 7 10-Year Capital Highway Investment Plan ( )
District 7 10-Year Capital Highway Investment Plan (2018-2027) Cover Picture DRAFT JUNE 2017 Prepared by Office of Transportation System Management DISTRICT 7 10-YEAR CHIP OVERVIEW District 7 s 10-Year
More informationEXCEPTION TO STANDARDS REPORT
EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,
More informationSACE Emax 2. Low voltage air circuit-breakers Emax E1.2-E2.2-E4.2-E6.2. Instructions for using Ekip Touch protection trip units and Accessories.
DOC. N 1SDH001316R0002 - ECN000086018 - Rev. C SACE Emax 2 Low volage air circui-breakers Emax E1.2-E2.2-E4.2-E6.2 Insrucions for using Ekip Touch proecion rip unis and Accessories. 2 2018 ABB 1SDH001316R0002
More information5 (1.52 m) max. setback. Lower landing. Ramp side flare. Depressed curb and. gutter. Flush with top of (150) roadway curb and top of sidewalk
Sidewalk widh 5 (.5 m) ypical, 4 (. m) Sidewalk widh 5 (.5 m) ypical, 4 (. m) Side Lower landing 5 (.5 m) max. seback (.83 m) side flare :0 max. Lower 5 (.5 m) max. seback (.83 m) landing Side and side
More informationDesigning Smart Districts for Future Cities
Designing Smar Disrics for Fuure Ciies Damian Wagner Senior Projek Manager Smar Ciies Delhi, 10 May 2017 Folie 1 Fraunhofer leading global Applied Research Insiue Driver of Smar Ciies in Europe Fraunhofer
More informationReliability Analysis of Pre-stressed Concrete Continuous Girders Bridge using Incremental Launching Method on Different Codes
Applied Mechanics and Maerials Submied: 2014-08-27 ISSN: 1662-7482, Vol. 681, pp 205-208 Aeped: 2014-08-27 doi:10.4028/www.scienific.ne/amm.681.205 Online: 2014-10-20 2014 Trans Tech Publicaions, Swizerland
More informationWorkshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion
Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide
More informationtransit factoids Welcoming the Orange Line The newest member of the Metro family.
ransi Mero Liners are popping up all across he Valley. facoids Mero Liner ADA Compliance Highlighs > Wheelchair ramp a fron door deploys in 25 seconds > Ramp can be deployed hydraulically or manually >
More informationINSTALLATION AND OPERATION MANUAL
INSTALLATION AND OPERATION MANUAL COMMERCIAL GRADE ROLLING BRIDGE JACKS MODELS: RJ-45; RJ-45S; RJ-6; RJ-7: RJ-9; RJ-12; RJ-15; RJ-18; RJ-25. PLEASE READ THE ENTIRE CONTENTS OF THIS MANUAL PRIOR TO INSTALLATION
More informationAutomotive Controller for Utility Vehicles. Application Description
Auomoive Conroller for Uiliy ehicles Applicaion Descripion Auomoive Conroller for Uiliy ehicles Applicaion Descripion Overview DESCRIPTION The SauerDanfoss Transmission Conrol Concep allows a vehicle equipped
More informationNew M5 Arncliffe Fact sheet November 2015
New M5 Arncliffe Fac she November 2015 Aris s impssion of he New M5 unnels a Arncliffe The New M5 is proposed o mo han double he capaciy of he M5 Eas Moorway corridor by providing new win unnels from Kingsgrove
More informationMCL-5100, 5200, & 5400 Bar mount digital speedometer with indicators.
MCL-5100, 5200, & 5400 Bar mount digital speedometer with indicators. *To avoid damage to motorcycle, please see Speedometer and Indicators sections for details on locating VSS and indicator wires for
More informationTimor-Leste Second Chance Education Project - H633-TP Procurement Plan - Consultant Services
Public Disclosure Auhorized Public Disclosure Auhorized Public Disclosure Auhorized Timor-Lese Procuremen Plan - Consulan Services ICB-Inernaional Compeiive ding; NCB-Naional Compeiive ding [NCB 2 is wihou
More informationHistorical count data from Page 7-14
Project Background The annual Lawrence count data was collected following the National Bicycle & Pedestrian Documentation Project (NBPDP) methodology (http://bikepeddocumentation.org). The project aims
More informationWest Broadway Reconstruction/LRT Design. March 19, 2015
West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian
More informationValley Metro Overview. ITE/IMSA Spring Conference March 6, 2014
Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and
More informationSales and Use Transportation Tax Implementation Plan
Sales and Use Transportation Tax Implementation Plan Transportation is more than just a way of getting from here to there. Reliable, safe transportation is necessary for commerce, economic development,
More informationThe range of alternatives has been reviewed with the RTAC Subgroup and the preliminary analysis is proceeding on the following HCT alternatives:
Attachment 2 Boise Treasure Valley Phase 1 Alternatives Analysis August 14, 2009 Introduction The Treasure Valley High Capacity Transit Priority Corridor Phase 1 Alternatives Analysis is being prepared
More informationINSTALLATION AND OPERATION MANUAL
INSTALLATION AND OPERATION MANUAL 2-Ton Hydraulic Folding Shop Crane Model: RSC-2TF PLEASE READ THE ENTIRE CONTENTS OF THIS MANUAL PRIOR TO INSTALLATION AND OPERATION. BY PROCEEDING YOU AGREE THAT YOU
More informationXSz 8... XSz 50 Solenoid actuated fail-safe safety valve
> > /-way or size: G /4... G, /4... NT > > ouble valve conrol sysem, inherenly failsafe wihou residual pressure > > ynamic self monioring > > For use wih pneumaic cluch and brake sysems and oher -way safey
More informationThis corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.
Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be
More informationTopeka, Kansas Bicycle and Pedestrian Documentation Data report 2013, 2014, 2015, 2016 & 2017
Topeka, Kansas Bicycle and Pedestrian Documentation Data report 2013, 2014, 2015, 2016 & 2017 In September 2013, Topeka joined with other cities nationwide in participating in annual bike counts, using
More information2018 Corridors of Commerce Final Scoring
2018 Corridors of Commerce Final Scoring District Highway Description Cost Return on Investment Economic Impact Freight Efficiency Safety Improvem ents Regional Connectio ns Policy Objectives Community
More informationBreakout Session. The Mobility Challenges of Our Growing & Sprawling Upstate
Breakout Session The Mobility Challenges of Our Growing & Sprawling Upstate The Mobility Challenges of Our Growing & Sprawling Upstate Why is our suburban and sprawling development pattern a challenge
More informationNote t Metal glow plugs are always fitted in the 2.7 ltr. common rail engine.
Removing and insalling glow plugs Page 1 of 5 Removing and insalling glow plugs Noe Meal glow plugs are always fied in he 2.7 lr. common rail engine. Two differen ypes of glow plugs are fied in he 3.0
More information#4.. DOCKLESS MOBILITY. Packet page: 2
DOCKLESS MOBILITY Packet page: 2 1 BIKE AND SCOOTER SHARE HISTORY 2018- E-scooters Deployed in Dozens of U.S. Cities by Multiple Providers, Bird reports over 10 million rides in 1 year August 2017- Bird
More informationMPO Staff Report Technical Advisory Committee: July 12, 2017
MPO Staff Report Technical Advisory Committee: July 12, 2017 RECOMMENDED ACTION: 2 nd TAC Meeting with Kimley-Horn/WSB in Updating the Street/Highway Element of 2045 Metropolitan Transportation Plan. Matter
More informationB. ALTERNATIVES DEVELOPMENT AND SCREENING
Chaper 2: Projec Alernaives A. INTRODUCTION This chaper reviews he alernaives developmen and screening process, describes he No Acion Alernaive and he Build Alernaives reained for deailed sudy, and idenifies
More information1. (a) B2 for (B1 for 5.29 seen) (b) (i) 2 ( ) = B1 for ( )
1. (a) 4.232 2 B2 for 4.232 (B1 for 5.29 seen) (b) (i) 2 (14.5 2.6) 4.5 3.6 = 49.95 B1 for (14.5 2.6) 4.5 3.6 (ii) (14.5 2.6) (4.5 3.6) = 10.71 B1 for (14.5 2.6) (4.5 3.6) 2. 7.75 10 5 2 B2 for 7.75 10
More informationA NEW LOAD FREQUENCY CONTROL METHOD IN POWER SYSTEM USING VEHICLE-TO-GRID SYSTEM CONSIDERING USERS CONVENIENCE
A NEW LOAD FREQUENCY CONTROL METHOD IN POWER SYSTEM USING VEHICLE-TO-GRID SYSTEM CONSIDERING USERS CONVENIENCE Koichiro Shimizu*, Taisuke Masua, Yuaka Oa, and Akihiko Yokoyama The Universiy of Tokyo Tokyo,
More informationThis corridor section will carry commuter trains from Wilsonville to Portland and Portland to Longview/Kelso.
Alignment is double tracked for 80 mph commuter trains, 110 mph CHSR speeds between Bridgeport OR and 78 th Street in Vancouver WA. New alignment for freight trains will allow speeds up to 40 mph over
More informationHannah Goldsmith SPUR: California s Major EV Investment September 20, 2018
Hannah Goldsmith SPUR: California s Major EV Investment September 20, 2018 Abot CalETC CalETC spports and advocates for the transition to a zero-emission transportation ftre as a means to spr economic
More informationAbout the Company Sumy NPO PJSC
1 Abou he Company Sumy NPO PJSC Sumy NPO PJSC, founded in 1896, is now one of he larges machine-building enerprises in Europe manufacuring equipmen and developing complex soluions for oil, gas, chemical,
More information2. Under what condition is it unlawful to permit another person to drive your vehicle?
Lynden Bellingham Mt Baker HS Blaine HS Meridian HS Nooksack HS Driver Guide Review Nelson Driving School, LLC www.nelsondrivingschool.com (360) 756-8777 2300 James St, Suite 103 Bellingham WA 98225 Directions:
More information2.0 Development Driveways. Movin Out June 2017
Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.
More informationFUTURE OF MOBILITY. ACEC-PEPP Capital Improvements Design & Construction Seminar. Art Reinhardt, PE, CFM JANUARY 25, 2019
ACEC-PEPP Capital Improvements Design & Construction Seminar JANUARY 25, 2019 FUTURE OF MOBILITY Art Reinhardt, PE, CFM Interim Deputy Director City of San Antonio Transportation & Capital Improvements
More informationGARWIN, IOWA CHAPTER 62 CHAPTER 62 GENERAL PROVISIONS
TITLE II COMMUNITY PROTECTION DIVISION 2 ENFORCEMENT: TRAFFIC CODE CHAPTER 62 GENERAL PROVISIONS 62.01 Violation of Regulations 62.09 Tampering with Vehicle 62.02 Play Streets Designated 62.10 Eluding
More informationPublic Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)
Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement
More informationPage 1 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF RA2. (over NC/CC) (over O/OC) MUO
VMU (8, ) MDMU (8, 0, ) MU (9, ) NMU (9, ) MUD (over ) (over ) R RS0 R0 N V S age A B D E F G H J K L M N Q R S T U V W Y Z AA AB A AD AE AF 3 4 5 6 7 8 9 0 3 4 5 6 7 8 - ermied Use - ondiional Use ermi
More informationPush Buttons and Operator Interface Type K Rotary Cam Switch Class 9003
K Roary Cam Swich Class 900 The Class 900 K roary cam swich is a versaile means of providing inexpensive logic conrol. The Class 900 K cam swich is available wih: k Up o swiching posiions k Worldwide accepance
More informationEffectiveness of Median Cable Barriers and Rumble Strips
Effectiveness of Median Cable Barriers and Rumble Strips Chris Poole, Iowa Department of Transportation Peter Savolainen, Iowa State University Mid-Continent Transportation Research Symposium August 16,
More informationINSTALLATION AND OPERATION MANUAL
INSTALLATION AND OPERATION MANUAL 12,000 Pound capaciy SURFACE MOUNTED full-rise SCISSOR LIFTS Models: XR-12000 xr-12000a IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS Please read THE ENTIRE CONTENTS
More informationRegional Safety Study
BOONSLICK REGIONAL PLANNING COMMISSION Regional Safety Study PART I: General Crash Data and Trends SPRING 2012 BRPC REGIONAL SAFETY STUDY: PART 1 ~ GENERAL CRASH DATA & TRENDS 1 TABLE OF CONTENTS REPORT
More informationTELESCOPIC BOOM CRAWLER CRANE
MACHINE WEIGHTS 35 METRIC TON CAPACITY STANDARD CRANE wih 3 secion- 27.2 m boom, 5,670 kg counerweigh, Main winch wih wire rope, and 750 mm 3-bar semi grouser rack shoes 31,802 kg OPTIONAL EQUIPMENT Exendable
More informationStart of route 0.0
#4 CHEW South 2017 #4 CHEW South 2017 1 00 00 Start of route 00 2 00 00 L onto Celebration Park Rd 01 3 01 01 R onto S 330th St 04 4 05 04 R onto 20th Ave S at small traffic circle 04 5 09 04 L onto S
More informationDemag hot metal ladle cranes. Two-girder and four-girder process cranes for the ferrous and non-ferrous industry
Demag ho meal ladle cranes Two-girder and four-girder process cranes for he ferrous and non-ferrous indusry Demag process cranes providing performance in he ferrous and non-ferrous indusry Demag Cranes
More informationBusiness Advisory Committee. July 7, 2015
Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS
More informationStudy Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast
Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Suitland Parkway at Stanton Road SE Study Area and Location District PSA Ward ANC Phase Description
More informationCTR Employer Survey Report
CTR Employer Survey Report Employer Id : E12740 WA State Dept. of Agriculture Employer : Worksite : Cleveland Lab Street : 3939 Cleveland Ave Se Jurisdiction : City of Olympia Thank you for completing
More informationsystem performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.
system performance TxDOT is working to expand its busiest metropolitan corridors. Nine of the state s 100 most congested highways are located in Tarrant County. Six of these highways will be expanded and
More informationSpecifications for Europe
~Reliable Sales and Service Nework~ Elecric Servo Drive Shanghai Hong Kong Shenzhen Hanoi Bangkok Gurgaon Kuala Lumpur Singapore Jakara Tokyo Headquarer Taipei Tainan Manila Ho Chi Minh Los Angels Chicago
More informationI-35W Past, Present, and Future: METRO Orange Line
I-35W Past, Present, and Future: METRO Orange Line 2018 State Public Transportation Partnerships Conference Charles Carlson Director, BRT Projects Metro Transit Charles.Carlson@metrotransit.org Metro Transit:
More informationSpecification for Wire Rope Type Electrical Hoist
YUANTAI CRANE Specificaion for Wire Rope Elecrical Hois Compac srucure, ligh weigh, safe and reliable. High universaliy, inerchangeabiliy and lifing capaciy. Convenien,easy mainenance and operaion,sable
More informationcta 2010 Historical Calendar
2010 Hisorical alendar 2010 January uil in 1936 by he S. Louis ar ompany, hicago Surface Lines rolley bus #184 heads easbound via iversey o Wesern. Trolley bus service was firs inroduced in hicago on he
More informationSafety Audits in Iowa
Safety Audits in Iowa National RSA Peer Exchange April 29-10, 2008 Little Rock, AR Tom Welch, P.E. State Safety Engineer Office of Traffic and Safety Iowa Department of Transportation From 3R to 1R We
More informationTechnical data Hydraulic lift crane LR Courtesy of Crane.Market
Technical daa Hydraulic lif crane Complies wih ANSI/ASME B 0.5 LR Serial number 5xxx Couresy of Crane.Marke Dimensions Basic machine wih undercarriage R 8 0 7 9 0 9 0 6 0.5 59 8 8 7 5 6 7 5 7. 6 R 0 7.
More informationRefiner Perspec+ve. Dan Gordon VP Fuel Supply Delek US
Refiner Perspec+ve Dan Gordon VP Fuel Supply Delek US Safe Harbor Provision Delek US Holdings is traded on the New York Stock Exchange in the United States under the symbol DK and, as such, is governed
More informationBID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -
BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b
More informationGeneral Technical Approval
Deusches Insiu für Bauechnik General Technical Approval Approval body for consrucion producs and ypes of consrucion Consrucional Inspecion Body A public insiuion joinly suppored by he Federal Governmen
More informationChicago Milwaukee Intercity Passenger Rail Corridor
Chicago Milwaukee Intercity Passenger Rail Corridor Past, Present, and Future Arun Rao, Passenger Rail Manager Wisconsin Department of Transportation Elliot Ramos, Passenger Rail Engineer Illinois Department
More informationFatal and Serious Injury Crashes by Roadway Jurisdiction. Unknown. Township Road. County Highway
Southwest Region Fatal and Serious Injury Crashes by Roadway Jurisdiction Unknown Township Road Municipal Street Trunk Highway County Highway Southwest Region Minnesota Jurisdiction Crashes % Crashes Crashes
More information... (fie ()~")\'1DS\-" :\.ob lf. EFI Diagnostic Tool Instructions. Diagnostic Tool Setup for "Bench Testing"
EFI EFI Diagnosic Tool Insrucions Diagnosic Tool Seup for "Bench Tesing" The EFI diagnosic esing funcions: ool provides four key ECD CL"fNEOCTOR \ D~'jOSTlC MCOJlf.:o!'meCTQF' l Auomaic esing of EFI ECU
More informationGeneral System Authorisation by the Construction Authorities RIB-ROOF Speed 500 welted seam profile roof
General Sysem Auhorisaion by he Consrucion Auhoriies RIBROOF Speed 500 weled seam profile roof Seel: Nr. Z14.1473 Aluminium: Nr. Z14.1474 GERMAN INSTITUTE FOR BUILDING TECHOLOGY Incorporaed PublicLaw Insiue
More informationSouth Dakota Transportation Improvement Program Economic Stimulus Package ( AND STIPs) Report Date 09/26/2011
South Dakota Transportation Improvement Program Economic Stimulus Package (2009-2013 AND 2010-2014 STIPs) Report Date 09/26/2011 Item 1.00 ES 0903(78)142 000M Jackson 32.2 I90E EBL, Fm E of the SD73 N
More informationADDENDUM NO. 1 TENDER CALL NO CONTRACT NO. 15ECS-LU-22SU
Michael Pacholok Direcor Purchasing and Maerials Manageen Division Ciy Hall, 18 h Floor, Wes ower 100 Queen Sree Wes orono, Onario M5H 2N2 Joanne Kehoe Manager Consrucion Services March 31, 2015 Via Eail
More informationTHE CALCULUS OF LPG TOROIDAL FUEL TANK SCREWS
The 3 rd Inernaional Conference on DIAGNOSIS AND PREDICTION IN MECHANICAL ENGINEERING SYSTEMS DIPRE 1 Consanin ONESCU, Nicolae POPA Universiy of Pieşi, ROMANIA mihai.boan@ugal.ro, consanin.georgescu@ugal.ro
More informationSpeed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit
Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit Study Area and Location District PSA Ward ANC Phase Description
More informationValley Metro: Past, Present and Future. September 11, 2014
Valley Metro: Past, Present and Future September 11, 2014 Valley Metro Who are We? Two Boards of Directors Regional Public Transportation Authority Fund and operate regional transit services Valley Metro
More informationSpeed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 400 Block 14th Street SW
Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 4 Block 4th Street SW Study Area and Location District PSA Ward ANC Phase Description 27 6 6D Existing
More informationContents. Executive Summary...1 Introduction...2 Operating Plan...4 System Connectivity...5
Contents Executive Summary...1 Introduction...2 Operating Plan...4 System Connectivity...5 Project Benefits...6 Economic Growth...7 Infrastructure Improvements...9 Quality of Life... 11 Next Steps... 12
More informationBROWARD BOULEVARD CORRIDOR TRANSIT STUDY
BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,
More informationTempe Streetcar. March 2, 2016
Tempe Streetcar March 2, 2016 Tempe Profile 40 sq. miles, highest density in state University Town, center of region Imposed growth boundaries (density increase) Mixed use growth/intensifying land use
More informationBuilding our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013
Building our future, together Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013 Vision In 2030, the City of Tyler will be nationally known for its commitment to community,
More informationTABLE OF CONTENTS CRASHES.. VI TRENDS. VII
TABLE OF CONTENTS Introduction. I Letter from the Governor II Executive Summary of this Report. III-IV 1998 Nevada Quick Collision Facts V CRASHES.. VI a. Statewide Total Crashes by Severity... 1 b. Statewide
More informationSpecifications. ~Reliable Sales and Service Network~ Shanghai Hong Kong Shenzhen Hanoi Bangkok Gurgaon. Detroit. Chicago
~Reliable Sales and Service Nework~ Elecric Servo Drive Shanghai Hong Kong Shenzhen Hanoi Bangkok Gurgaon Kuala Lumpur Singapore Jakara Tokyo Headquarer Taipei Tainan Manila Ho Chi Minh Los Angels Chicago
More informationCATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE
CATEGORY 500 PAVING 1 of 9 SECTION 535.01 DESCRIPTION. This work shall consist of measuring the roughness of the final surface of hot mix asphalt (HMA) or portland cement concrete (PCC) pavements. The
More informationClearlake Road (State Road 501) Project Development & Environment (PD&E) Study
Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project
More informationCOMMISSION WORKSHOP Tuesday, May 12, :00 a.m. 12:00 p.m.
COMMISSION WORKSHOP Tuesday, 9:00 a.m. 12:00 p.m. AGENDA 1. Approval of the April 30, 2009 Workshop Minutes 2. Community Redevelopment Agency a. CRA Master Plan Update b. Downtown Parking Study 3. Economic
More informationRolling Road (Route 638) Widening Project
Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public
More informationCTR Employer Survey Report
CTR Employer Survey Report Employer Id : E11056 City of Lacey Employer : Worksite : City of Lacey Street : 420 College St Se Jurisdiction : City of Lacey Thank you for completing your Commute Trip Reduction
More informationXMPA Azionamenti a velocità variabile
Rif.: 2-08 A&D - C Informa ilano, 9 aggio 2008 XPA Azionameni a velocià variabile Oggeo: Sinamics S120 Compac Con effeo immediao è rilasciao alla vendia il Sinamics S120 Compac; la sruura è idenica al
More informationFederal Way Link Extension
Federal Way Link Extension Draft EIS Summary Route & station alternatives and impacts Link Light Rail System Map Lynnwood Mountlake Terrace Lynnwood Link Extension Shoreline 14th Northgate 40 Northgate
More informationArkansas State Highway and Transportation Department. Rotary Club of Stuttgart Tuesday, April 7, 2015
Arkansas State Highway and Transportation Department Rotary Club of Stuttgart Tuesday, April 7, 2015 The Facts: 12 th Largest System in USA 43 rd Highway Revenue Per Mile State Highway Systems State Mileage
More informationWelcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In -
Highway Gap New London to Paynesville Welcome Highway Gap New London to Paynesville Open House - Please Sign In - There is no formal presentation, but representatives are available to answer your questions.
More informatione u p e VEHICLE & EQUIPMENT INVENTORY
VEHICLE & EQUIPMENT INVENTORY THIS SECTION DELVES INTO AVERAGE FLEET AGE AND REPLACEMENT CYCLES, AS WELL AS UNITS FOR VARIOUS AGENCIES. How long are flees keeping heir equipmen? This seion looks a average
More informationStudy Area and Location District PSA Ward ANC Phase Description C Existing 100 Block Michigan Avenue Northeast Westbound
Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1 Block Michigan Avenue NE W/B Study Area and Location District PSA Ward ANC Phase Description 5 45
More informationCTR Employer Survey Report
CTR Employer Report Employer Id : E12146 Employer : WA State Dept. of Enterprise Services Worksite : Street : 7511 New Market St 7511 New Market St Sw Thank you for completing your Commute Trip Reduction
More informationSee the illustration on pages (15-22) which provide exact instructions on how to do this. Entering the BIR Donnybrook Track:
See the illustration on pages (15-22) which provide exact instructions on how to do this. Entering the BIR Donnybrook Track: Pit Zero up ahead 2. Once you get to pit zero, show wristand and official will
More information