1 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 24, 2004 DATE: April 14, 2004 SUBJECT: Arlington Boulevard (U.S. 50) Bridge Deck Replacement at Washington Boulevard - Overhead Utility Relocation C. M. RECOMMENDATION: Adopt the attached Resolution endorsing the undergrounding of existing overhead utility lines adjacent to the Arlington Boulevard interchange with Washington Boulevard. ISSUE: Whether the County desires to have the existing overhead utility lines relocated underground and at what cost to the County. SUMMARY: The Virginia Department of Transportation (VDOT) is proposing to replace the deck of the Arlington Boulevard overpass at Washington Boulevard in the fall of 2004 due to its deteriorating condition. VDOT has determined that it is necessary to relocate existing overhead utility lines in order to comply with the Overhead High Voltage Lines Safety Act. To comply, the overhead utility lines could be relocated approximately 135 feet to the west and remain overhead. This would require the trimming and removal of some existing trees in the VDOT right of way along Arlington Boulevard. To save these trees, the overhead utility lines could be relocated underground. It is recommended that Arlington County participate with VDOT in the cost of relocating the utility lines underground in conjunction with the bridge replacement. BACKGROUND: VDOT policy allows for the undergrounding of existing overhead utility lines in conjunction with transportation improvement projects. Under the VDOT policy, the difference between the cost of undergrounding and the estimated cost of moving the overhead utility lines to another overhead location is shared equally between the State and Arlington County. To be eligible for this 50 percent State funding, the transportation improvement project must be located in a locally adopted underground utility district. In addition, the local governing body must request the utility improvement by the project resolution, and commit the financial resources for the locality s 50 percent share of the undergrounding cost. DISCUSSION: VDOT is proposing to redeck the Arlington Boulevard overpass at Washington Boulevard due to its deteriorating condition. One of the County s priority requests has been an County Manager: County Attorney: Staff: David Robinson, Department of Transportation

2 interchange improvement. However, VDOT has not been able to allocate the substantial amount of funding (about $30 million) for a comprehensive improvement at this location. VDOT has determined that it is necessary to relocate existing overhead utility lines in order to comply with the Overhead High Voltage Lines Safety Act. The overhead utility lines could be relocated approximately 135 feet to the west of the interchange to comply with the Act. The utility lines could be replaced in kind as overhead utility lines, but would require the trimming and removal of existing trees in the VDOT right of way along Arlington Boulevard. With an overhead relocation, VDOT and Dominion Virginia Power (DVP) would be responsible for all of the relocation costs. A site area location map is shown in Figure 1. Alternatively, VDOT could relocate the overhead utility lines underground in conjunction with a transportation improvement project. Both the Arlington and Washington Boulevard Corridors are identified on the adopted Arlington County Underground Utility Plan. VDOT and DVP have developed a cost estimate to underground the overhead utility lines across Arlington Boulevard at Washington Boulevard. Minus the theoretical relocation credit, and DVP easement rights, the total estimated cost is approximately $44,000. The County s share of the estimated cost would be approximately $22,000. The cost estimates are preliminary and subject to change. The final cost and the County s 50 percent share would be determined after the project is completed. Because the County should not agree to pay a share of such undergrounding costs without limitation, the attached resolution limits the County s share to $44,000 which must be subject to appropriation. FISCAL IMPACT: The project is being funded through VDOT using bridge maintenance funds. Project costs are currently estimated to be $4.5 million. These project costs include engineering, utility relocation and bridge construction. If the County wants the existing overhead utility facilities to be placed underground, then the County must agree to pay its 50 percent share of the overhead utility relocation which is presently estimated to be approximately $22,000. The cost estimates are preliminary and subject to change. The final cost and the County s 50 percent share would be determined after the project is completed. Sufficient funds are available in the County s Developer Contributions Utility account to cover the County share of the relocation costs of the project.

3 Figure 1 Arlington Boulevard Bridge at Washington Boulevard

4

5 ATTACHMENT Resolution of the County Board of Arlington, Virginia Concerning Improvements to Arlington Boulevard at Washington Boulevard State Project: WHEREAS, in 2004 the Virginia Department of Transportation ( VDOT ), proposed to develop a project to replace the Arlington Boulevard (U.S. Route 50) bridge deck over Washington Boulevard, also known as State Project: (the Project ); and WHEREAS, VDOT has determined that it is necessary to relocate the existing overhead electric lines to comply with adopted safety standards; and WHEREAS, the County Board of Arlington County, Virginia desires to maintain and enhance existing trees and other landscaping adjacent to Arlington Boulevard; and WHEREAS, the Arlington Boulevard and Washington Boulevard Corridors are both located within an underground utility district as adopted by the County Board; NOW, THEREFORE, BE IT RESOLVED THAT the County Board of Arlington County, Virginia requests that VDOT underground existing overhead utilities adjacent to the Project limits in accordance with VDOT s Utility Relocation Policy; and BE IT FURTHER RESOLVED THAT the County Board, subject to appropriation of funds for such specific project, agrees to pay the County s share of the incremental cost of placing the overhead utility facilities adjacent to the Project underground, in accordance with VDOT policy in an amount not to exceed $44,000. ADOPTED THIS DAY OF, County Board of Arlington, Virginia BY ATTEST

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Exhibit A Sound Transit Board Resolution R2016-07 Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Access Improvement Project. RESOLUTION NO. R2016-07 Selecting

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 18, 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 18, 2017 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of November 18, 2017 DATE: November 7, 2017 SUBJECT: Six-Month Extension of car2go Demonstration Study Agreement C. M. RECOMMENDATIONS: 1. Authorize

More information

Improving Accessibility of Regional Bus Stops and Pathways

Improving Accessibility of Regional Bus Stops and Pathways Customer Service and Operations Committee Board Information Item III-A March 13, 2014 Improving Accessibility of Regional Bus Stops and Pathways Page 3 of 17 Washington Metropolitan Area Transit Authority

More information

~ u..v Q- c./ Adopt a Resolution authorizing the City Engineer/Public Works Director to install parking lot speed bumps on Hall Park Drive.

~ u..v Q- c./ Adopt a Resolution authorizing the City Engineer/Public Works Director to install parking lot speed bumps on Hall Park Drive. Agenda No. KeyWords: Hall Park Drive Parking Lot Speed Bumps Meeting Date: May 1 0. 2016 SUMMARY REPORT CITY COUNCIL PREPARED BY: Jason Riley, Senior Civil Engineer City Engineer/Public Works Department

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension Date of Meeting: July 20, 2017 # 6 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Design Endorsement for Sterling Boulevard Extension

More information

MSRC CLEAN TRANSPORTATION FUNDING LOCAL GOVERNMENT PARTNERSHIP

MSRC CLEAN TRANSPORTATION FUNDING LOCAL GOVERNMENT PARTNERSHIP MSRC CLEAN TRANSPORTATION FUNDING LOCAL GOVERNMENT PARTNERSHIP PROGRAM DUE: AUGUST 2, 2018 CITY OF "Agency Name" LOCAL GOVERNMENT PARTNERSHIP PROGRAM PROPOSAL SUBMITTED: "Month XX, 2018" TABLE OF CONTENTS

More information

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.

More information

CITY OF VANCOUVER ADMINISTRATIVE REPORT

CITY OF VANCOUVER ADMINISTRATIVE REPORT CITY OF VANCOUVER A19 ADMINISTRATIVE REPORT Report Date: July 10, 2007 Author: Chris Darwent Phone No.: 604.873.7358 RTS No.: 6866 VanRIMS No.: 13-1400-20 Meeting Date: July 24, 2007 TO: FROM: SUBJECT:

More information

Turnpike Mitigation Program Application

Turnpike Mitigation Program Application Ohio Department of Transportation & Ohio Turnpike and Infrastructure Commission Turnpike Mitigation Program Application Please note the following eligibility criteria: 1) Projects must be sponsored by

More information

Schedule Based on the City of Los Angeles, the District should be formed by April 2016 to allow the design and construction to be complete by 2019.

Schedule Based on the City of Los Angeles, the District should be formed by April 2016 to allow the design and construction to be complete by 2019. EXECUTIVE SUMMARY PURPOSE To report the findings of the Feasibility Study for an Underground Utility District along Segment C of the proposed Park to Playa Trail. BACKGROUND The City of Los Angeles Department

More information

Proposed HRTAC FY2018 FY2023 Plan of Finance Update

Proposed HRTAC FY2018 FY2023 Plan of Finance Update Chair, MICHAEL J. HIPPLE Vice Chair, LINDA T. JOHNSON Executive Director, KEVIN B. PAGE Proposed HRTAC 2018 2023 Plan of Finance Update HRTAC 2018 2023 Six Year Operating and Capital Program of Projects

More information

LACEY CITY COUNCIL MEETING July 09, 2015

LACEY CITY COUNCIL MEETING July 09, 2015 LACEY CITY COUNCIL MEETING July 09, 2015 SUBJECT: 2016-2021 Six-Year Transportation Improvement Plan and Mitigation List RECOMMENDATION: Adopt Resolution approving the proposed 2016-2021 Six- Year Transportation

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Washington Metropolitan Area Transit Authority Board Action/Information Summary Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: Resolution: Yes No TITLE: LRT and Streetcar Interoperability Study PURPOSE: To brief the

More information

April 18, Mr. David Schmit, County Manager Arapahoe County 5334 S. Prince Street Littleton, CO Conoco Phillips Section 6 Swan Well

April 18, Mr. David Schmit, County Manager Arapahoe County 5334 S. Prince Street Littleton, CO Conoco Phillips Section 6 Swan Well April 18, 2018 Mr. David Schmit, County Manager Arapahoe County 5334 S. Prince Street Littleton, CO 80120 Re: Conoco Phillips Section 6 Swan Well Dear David, It is our understanding that Conoco Phillips

More information

To: Honorable Public Utilities Board Submitted by: /s/ Rebecca Irwin AGM Customer Resources

To: Honorable Public Utilities Board Submitted by: /s/ Rebecca Irwin AGM Customer Resources AGENDA ITEM NO.: 5.E.1 ADMINISTRATIVE REPORT NO.: 2018-02 To: Honorable Public Utilities Board Submitted by: /s/ Rebecca Irwin AGM Customer Resources From: Kelly Brezovec Approved by: /s/ Utility Energy

More information

Business Item No

Business Item No Business Item No. 2014-162 Metropolitan Council Meeting date: July 9, 2014 Subject: Southwest Light Rail Transit (Green Line Extension): Kenilworth Corridor Public Ownership Memorandum of Understanding

More information

Reston Transportation Strategy July 9, 2018

Reston Transportation Strategy July 9, 2018 Reston Transportation Strategy July 9, 2018 Background: On February 11, 2014, the Board of Supervisors adopted the Reston Phase I Comprehensive Plan Amendment for the core areas of Reston between Sunset

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.5 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Capital Programs & Construction BRIEF DESCRIPTION: Awarding San Francisco Municipal Transportation Agency

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of May 16, 2015

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of May 16, 2015 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of May 16, 2015 DATE: May 8, 2015 SUBJECT: A. Ordinance to Amend, Reenact and Reordain Chapter 14.2 (Motor Vehicles and Traffic), Article I,

More information

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 8.5 AGENDA TITLE: Adopt resolution approving the acquisition and transfer of ownership of five 2006 CNG Orion VII buses from the Transit Joint

More information

Report by Planning, Development & Real Estate Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Report by Planning, Development & Real Estate Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary Report by Planning, Development & Real Estate Committee (B) 06-26-08 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 100027 Resolution: Yes

More information

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action MOTION NO. M2018-160 Purchase of Thirteen 42-foot Double Deck Expansion Buses MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations Committee PROPOSED ACTION 12/06/2018 12/20/2018 Recommend to Final

More information

Driveway Entrance Policy for Residential Properties - District 3 - All Wards

Driveway Entrance Policy for Residential Properties - District 3 - All Wards Driveway Entrance Policy for Residential Properties - District 3 - All Wards (City Council on August 1, 2, 3 and 4, 2000, adopted this Clause, without amendment.) The North York Community Council recommends

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 19, 2008 DATE: July 10, 2008 SUBJECT: Enactment of an Ordinance to amend, reenact and recodify Section 25-14 (Rates of Fare) of Chapter

More information

EMERGING REQUIREMENTS

EMERGING REQUIREMENTS Page of 0 EMERGING REQUIREMENTS EXTERNALLY INITIATED PLANT RELOCATIONS THESL distributes electricity to residential, commercial, and industrial customers via overhead and underground infrastructure. This

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

Rolling Road (Route 638) Widening Project

Rolling Road (Route 638) Widening Project Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public

More information

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion MOTION NO. M2016-66 Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations Committee 07/07/16

More information

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 10.1 AGENDA TITLE: Consider adoption of a resolution authorizing the City Manager to execute the Third Amendment to Contract No. C-07-188 with

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE

More information

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Mission Statement We Care for Our Residents by Working Together to Build a Better Community for Today and Tomorrow. CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT ITEM NO. 8 Meeting Date: May 13, 2014

More information

DATE: MAY 3, 2007 ENVIRONMENTAL MANAGEMENT DIVISION

DATE: MAY 3, 2007 ENVIRONMENTAL MANAGEMENT DIVISION DATE: MAY 3, 2007 FROM: ENVIRONMENTAL MANAGEMENT DIVISION SUMMARY: This Board item requests that the Board of Harbor Commissioners approve the allocation and expenditure, from funds previously disbursed

More information

All territory within the incorporated limits of the City and land owned or leased by the City.

All territory within the incorporated limits of the City and land owned or leased by the City. A. APPLICABILITY: This schedule applies to all connections, expansions, and upgrades to the City's Electric Distribution System except those that serve street lighting or traffic signals. B. TERRITORY:

More information

Dear New Clean Cities Stakeholder:

Dear New Clean Cities Stakeholder: Dear New Clean Cities Stakeholder: I am writing to invite you to join the Florida Gold Coast Clean Cities Coalition. We are a voluntary public and private partnership, which is dedicated to reducing the

More information

E) That the General Manager be authorized to execute and deliver such documentation on behalf of the Park Board.

E) That the General Manager be authorized to execute and deliver such documentation on behalf of the Park Board. Date: May 30, 2012 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Electric Vehicle Charging Stations and Cellular Infrastructure in English Bay Parks RECOMMENDATION

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: March 26, 2013 CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM To: From: The Honorable City Council c/o City Clerk, Room 395 Attention: Honorable Mitchell Englander, Chair, Public Safety Committee

More information

MEMORANDUM DEBBIE MALICOAT, DIRECTOR OF ADMINISTRATIVE SEVICES RAUL JUAREZ, FLEET MAINTENANCE COORDINATOR GLENDA BONER, ADMINISTRATIVE SECRETARY

MEMORANDUM DEBBIE MALICOAT, DIRECTOR OF ADMINISTRATIVE SEVICES RAUL JUAREZ, FLEET MAINTENANCE COORDINATOR GLENDA BONER, ADMINISTRATIVE SECRETARY MEMORANDUM TO: FROM: BY: CITY COUNCIL DEBBIE MALICOAT, DIRECTOR OF ADMINISTRATIVE SEVICES RAUL JUAREZ, FLEET MAINTENANCE COORDINATOR GLENDA BONER, ADMINISTRATIVE SECRETARY SUBJECT: CONSIDERATION OF THE

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

Public Works Department

Public Works Department Public Works Department SUBJECT: Consideration of Resolutions authorizing one-year contract extensions for snow/ice removal services during the 2015-2016 winter season with: 1. Tovar Snow Professionals

More information

Washington Metropolitan Area Transit Authority

Washington Metropolitan Area Transit Authority Executive Summary: Metrobus Network Evaluation and Future Fleet Needs Presented to: Washington Metropolitan Area Transit Authority Submitted by: In Association with P 2 D Joint Venture Introduction Metrobus

More information

Update on Bus Stop Enhancements

Update on Bus Stop Enhancements Customer Service and Operations Committee Board Information Item III-A February 2, 2012 Update on Bus Stop Enhancements Page 3 of 15 Washington Metropolitan Area Transit Authority Board Action/Information

More information

TOWN OF WINDSOR AGENDA REPORT

TOWN OF WINDSOR AGENDA REPORT ITEM NO. : 11.4 TOWN OF WINDSOR AGENDA REPORT Town Council Meeting Date: December 6, 2017 To: From: Subject: Mayor and Town Council Kristina Owens, Administrative Operations Manager Amendment to Waste

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 24, 2018

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 24, 2018 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of February 24, 2018 DATE: February 20, 2018 SUBJECT: Request to authorize advertisement of a public hearing to consider an amendment to Section

More information

MEMORANDUM TERESA MCCLISH, DIRECTOR OF COMMUNITY DEVELOPMENT

MEMORANDUM TERESA MCCLISH, DIRECTOR OF COMMUNITY DEVELOPMENT MEMORANDUM TO: FROM: BY: CITY COUNCIL TERESA MCCLISH, DIRECTOR OF COMMUNITY DEVELOPMENT MATTHEW DOWNING, PLANNING MANAGER SUBJECT: CONSIDERATION OF TEMPORARY USE PERMIT CASE NO. 18-017; AUTHORIZING HALLOWEEN

More information

Action 6A: HRTAC FY2018 FY2023 Funding Plan

Action 6A: HRTAC FY2018 FY2023 Funding Plan Action 6A: HRTAC 2018 2023 Funding Plan Presentation to: HRTAC Finance Committee Kevin Page, HRTAC Liang Shan, PFM June 5, 2017 PFM Financial Advisors LLC 300 S. Orange Avenue Ste 1170 Orlando, Florida

More information

JCP&L Verbatim Response to Middletown Township s Questions

JCP&L Verbatim Response to Middletown Township s Questions JCP&L Verbatim Response to Middletown Township s Questions Township officials sent 13 questions about the proposed Monmouth County Reliability Project to JCP&L on June 10 th. JCP&L provided direct responses

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 24, 2018

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 24, 2018 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of February 24, 2018 DATE: February 20, 2018 SUBJECT: Request to authorize advertisement of a public hearing on an ordinance to amend, reenact,

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.5 DIVISION: Transit Services BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Requesting authorization for the SFMTA, through the Director of Transportation,

More information

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses MOTION NO. M2018-161 Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations and Administration Committee PROPOSED ACTION

More information

Minnesota Avenue Station Parking Garage Repair Project

Minnesota Avenue Station Parking Garage Repair Project Finance & Administration Committee Action Item III-B July 10, 2014 Minnesota Avenue Station Parking Garage Repair Project Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014 Arterial Bus Rapid Transit System Policy Oversight Committee April 7, 2014 1 Meeting Agenda Welcome and Introductions A Line - Project Status Shelter and Pylon Development Arterial BRT Branding Update

More information

MEMORANDUM CITY COUNCIL STEVEN N. ANNIBALI, CHIEF OF POLICE

MEMORANDUM CITY COUNCIL STEVEN N. ANNIBALI, CHIEF OF POLICE MEMORANDUM TO: FROM: CITY COUNCIL STEVEN N. ANNIBALI, CHIEF OF POLICE SUBJECT: CONSIDERATION TO DECLARE AN EXISTING COMMAND TRAILER AS SURPLUS PROPERTY/AUTHORIZE TRANSFER TO THE CITY OF SAN LUIS OBISPO

More information

RECOMMENDATION APPROVED; RESOLUTION NO (PERMIT 930) ADOPTED BY THE BOARD OF HARBOR COMMISSIONERS. August 17, 2017

RECOMMENDATION APPROVED; RESOLUTION NO (PERMIT 930) ADOPTED BY THE BOARD OF HARBOR COMMISSIONERS. August 17, 2017 RECOMMENDATION APPROVED; RESOLUTION NO. 17-8154 (PERMIT 930) ADOPTED BY THE BOARD OF HARBOR COMMISSIONERS August 17, 2017 LA THE PORT OF LOS ANGELES Executive Director's Report to the Board of Harbor Commissioners

More information

RON ROBERTS SUPERVISOR, FOURTH DISTRICT SAN DIEGO COUNTY BOARD OF SUPERVISORS

RON ROBERTS SUPERVISOR, FOURTH DISTRICT SAN DIEGO COUNTY BOARD OF SUPERVISORS DATE: June 14, 2005 RON ROBERTS SUPERVISOR, FOURTH DISTRICT SAN DIEGO COUNTY BOARD OF SUPERVISORS AGENDA ITEM TO: SUBJECT: Board of Supervisors SUMMARY: Overview Today s action will direct a letter of

More information

Turnpike Mitigation Program Application

Turnpike Mitigation Program Application Ohio Department of Transportation & Ohio Turnpike and Infrastructure Commission Turnpike Mitigation Program Application Please note the following eligibility criteria: 1) Projects must be sponsored by

More information

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B... Speed Hump Program CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 1. GENERAL... 3 2. ELIGIBILITY REQUIREMENTS... 3 A. PETITION... 3 B. OPERATIONAL AND GEOMETRIC CHARACTERISTICS OF

More information

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing.

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing. LISA D. NORDSTROM Lead Counsel lnordstrom@idahopower.com December 28, 2018 Public Utility Commission of Oregon Filing Center 201 High Street SE, Suite 100 P.O. Box 1088 Salem, Oregon 97301 Re: Tariff Advice

More information

Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street

Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street Department of Environmental Services, Transportation Division Sept. 27, 2018

More information

City of Grand Island Tuesday, March 13, 2018 Council Session

City of Grand Island Tuesday, March 13, 2018 Council Session City of Grand Island Tuesday, March 13, 2018 Council Session Item G-14 #2018-69 - Approving Purchase of a New ½ Ton, Four-Wheel Drive, Extended Cab Pick-up for the Streets Division of the Public Works

More information

RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation Trust

RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation Trust May 24, 2018 Oklahoma Department of Environmental Quality Air Quality Division P.O. Box 1677 Oklahoma City, OK 73101-1677 RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation

More information

To: Honorable Public Utilities Board Submitted by: /s/ Rebecca Irwin Interim AGM Customer Resources. From: Kelly Birdwell Approved by: /s/

To: Honorable Public Utilities Board Submitted by: /s/ Rebecca Irwin Interim AGM Customer Resources. From: Kelly Birdwell Approved by: /s/ AGENDA ITEM NO.: 5.B.1 MEETING DATE: 10/20/2014 ADMINISTRATIVE REPORT NO.: 2015-18 To: Honorable Public Utilities Board Submitted by: /s/ Rebecca Irwin Interim AGM Customer Resources From: Kelly Birdwell

More information

Salary Compaction Adjustment Tractor Trailer Driver and Solid Waste Loader Operator Classifications

Salary Compaction Adjustment Tractor Trailer Driver and Solid Waste Loader Operator Classifications Office of the City Manager CONSENT CALENDAR September 22, 2009 To: From: Honorable Mayor and Members of the City Council Phil Kamlarz, City Manager Submitted by: David W. Hodgkins, Director of Human Resources

More information

City of La Palma Agenda Item No. 11

City of La Palma Agenda Item No. 11 City of La Palma Agenda Item No. 11 MEETING DATE: July 7, 2015 TO: FROM: SUBMITTED BY: CITY COUNCIL CITY MANAGER Eric R. Nuñez, Police Chief AGENDA TITLE: Civil Penalties for Street Sweeping Fines RECOMMENDED

More information

Current Corridor Characteristics. MN 62 Corridor Performance

Current Corridor Characteristics. MN 62 Corridor Performance Corridor Context The corridor runs 12 miles between I-494 and MN 55 south of Minneapolis. The corridor serves as an important East-West connection for the Metro area. A portion of the corridor has been

More information

Authorize Public Hearing To Discontinue Non- Regional Metrobus Routes 2W, 12A-S and 20F-Y in Fairfax County

Authorize Public Hearing To Discontinue Non- Regional Metrobus Routes 2W, 12A-S and 20F-Y in Fairfax County Customer Services, Operations, and Safety Committee Board Action Item IV-A October 2, 2008 Authorize Public Hearing To Discontinue Non- Regional Metrobus Routes 2W, 12A-S and 20F-Y in Fairfax County Washington

More information

San Joaquin Valley Air Pollution Control District Governing Board Meeting. June 15, 2017

San Joaquin Valley Air Pollution Control District Governing Board Meeting. June 15, 2017 San Joaquin Valley Air Pollution Control District Governing Board Meeting June 15, 2017 May 2015, Board approved comprehensive action plan for securing the Valley s fair share of Cap and Trade funds 20

More information

Link LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion

Link LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion Project Number SYS-LRT Subareas All Primary Mode Impacted Link Facility Type Link Service Version Number 4.0 Date Last Modified 7/24/2008 Project Locator Map Short Project Description Construct new light

More information

The Eastern Connector Study November, 2007 planning for the future

The Eastern Connector Study November, 2007 planning for the future The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team

More information

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION ENERGY STRATEGY FOR YUKON Net Metering Policy DRAFT FOR CONSULTATION February 2011 Page 1 of 4 BACKGROUND The Yukon government released the Energy Strategy for Yukon in January 2009. The Energy Strategy

More information

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which: DATE: July 16,2007 TO: FROM: SUBJECT: CITY COUNCIL CITY MANAGER CONSIDERATION OF ADOPTION OF NEW FEDERAL STANDARDS RELATING TO ELECTRIC UTILITIES UNDER THE PUBLIC UTILITIES REGULATORY POLICIES ACT AND

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of April 16, 2016

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of April 16, 2016 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 16, 2016 DATE: April 8, 2016 SUBJECT: Request to Advertise a Public Hearing by the County Board on Proposed Changes to the Taxicab Ordinance

More information

City of Grand Island Tuesday, June 27, 2017 Council Session

City of Grand Island Tuesday, June 27, 2017 Council Session City of Grand Island Tuesday, June 27, 2017 Council Session Item G-13 #2017-186 - Approving Purchase of Two (2) Hydraulic Bulk Salt Spreaders for the Streets Division of the Public Works Department Staff

More information

Contract Awards for Tender Calls and for the Construction of Works Associated with the City's Basement Flooding Protection Program

Contract Awards for Tender Calls and for the Construction of Works Associated with the City's Basement Flooding Protection Program STAFF REPORT ACTION REQUIRED Contract Awards for Tender Calls 319-2013 and 70-2014 for the Construction of Works Associated with the City's Basement Flooding Protection Program Date: April 30, 2014 To:

More information

City of Grand Island

City of Grand Island City of Grand Island Tuesday, May 25, 2010 Council Session Item G10 #2010-139 - Approving Bid Award for Substation Power Transformers Staff Contact: Gary R. Mader City of Grand Island City Council Council

More information

SERVICE CLASSIFICATION NO. 4

SERVICE CLASSIFICATION NO. 4 P.S.C. NO. 3 ELECTRICITY LEAF: 281 ORANGE AND ROCKLAND UTILITIES, INC. REVISION: 0 INITIAL EFFECTIVE DATE: April 1, 2012 SUPERSEDING REVISION: SERVICE CLASSIFICATION NO. 4 APPLICABLE TO USE OF SERVICE

More information

Work Session. Agenda Item # 2. Meeting Date April 20, Daryl Braithwaite Public Works Director. Prepared By. Suzanne Ludlow City Manager

Work Session. Agenda Item # 2. Meeting Date April 20, Daryl Braithwaite Public Works Director. Prepared By. Suzanne Ludlow City Manager Agenda Item # 2 Work Session Meeting Date April 20, 2015 Prepared By Approved By Daryl Braithwaite Public Works Director Suzanne Ludlow City Manager Discussion Item Background Discussion of Options for

More information

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1 Snelling Bus Rapid Transit May 13, 2013 Technical Advisory Committee Meeting #1 1 Today s meeting TAC Introductions Project Overview Arterial BRT Concept Background Snelling Corridor Plan, Funding & Schedule

More information

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

City of Lafayette Staff Report Circulation Commission

City of Lafayette Staff Report Circulation Commission City of Lafayette Staff Report Circulation Commission Meeting Date: September 5, 2016 Staff: Subject: James Hinkamp, Transportation Planner Consideration of a No Parking Zone on Victoria Avenue Summary

More information

DRAFT Subject to modifications

DRAFT Subject to modifications TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M DRAFT To: Council Members AGENDA ITEM 7A From: Date: Subject: Staff September 17, 2010 Council Meeting High Speed Rail Update Introduction The

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: COMMUNITY BUS SERVICES ACTION ITEM RECOMMENDATION It is recommended that the Board not approve any routing

More information

Regarding: North Industrial Park/Infrastructure Build Project - Contractor Payments

Regarding: North Industrial Park/Infrastructure Build Project - Contractor Payments To: From: Mayor Pat Humphrey and the Clare City Commission Steven J. Kingsbury, MBA, CPFA, MiCPT Treasurer, Finance and Technology Director Date: May 15, 2015 AGENDA REPORT Regarding: North Industrial

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

To: Honorable Public Utilities Board Submitted by: /s/ Barry Leska AGM Energy Resource Planning. From: Alan Hanger Approved by: /s/

To: Honorable Public Utilities Board Submitted by: /s/ Barry Leska AGM Energy Resource Planning. From: Alan Hanger Approved by: /s/ AGENDA ITEM NO.: 4.J.1 To: Honorable Public Utilities Board Submitted by: /s/ Barry Leska AGM Energy Resource Planning From: Alan Hanger Approved by: /s/ Senior Energy Resource Analyst Glenn O. Steiger

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.4 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Authorizing the Department of Public Works (DPW) to award DPW Contract

More information

Change to the Arlington County Code prohibiting the parking of commercial vehicles and recreational vehicles on residential streets

Change to the Arlington County Code prohibiting the parking of commercial vehicles and recreational vehicles on residential streets November 21, 2002 TO: FROM: SUBJECT: The County Board of Arlington, Virginia Ron Carlee, County Manager Change to the Arlington County Code 14.2-34 prohibiting the parking of commercial vehicles and recreational

More information

To: Honorable Public Utilities Board Submitted by: Senior Energy Resources Analyst Deborah Whiteman Senior Energy Resources Analyst Approved by:

To: Honorable Public Utilities Board Submitted by: Senior Energy Resources Analyst Deborah Whiteman Senior Energy Resources Analyst Approved by: AGENDA ITEM NO.: 5.G.1 MEETING DATE: 07/16/2018 ADMINISTRATIVE REPORT NO.: 2018-73 To: Honorable Public Utilities Board Submitted by: /S/ Vidhi Chawla AGM-Energy Resource Planning From: Alan Hanger Senior

More information

CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: July 18, 2012

CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: July 18, 2012 CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: July 18, 2012 TO: VIA: FROM: Mayor and City Council Members Gus Vina, City Manager Paul Bussey, Finance Department Planning & Building Department

More information

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project MOTION NO. M2014 64 Preferred Alternative for the Puyallup Station Access Improvement Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 8/14/14 8/28/14 Recommendation

More information

1) Introduction. a) Name of city/utility Utilities Commission, City of New Smyrna Beach

1) Introduction. a) Name of city/utility Utilities Commission, City of New Smyrna Beach Utilities Commission, City of New Smyrna Beach Storm Hardening Report to the Florida Public Service Commission Pursuant to Rule 25-6.0343, F.A.C. Calendar Year 2016 1) Introduction a) Name of city/utility

More information

Department of Legislative Services Maryland General Assembly 2012 Session

Department of Legislative Services Maryland General Assembly 2012 Session Department of Legislative Services Maryland General Assembly 2012 Session SB 401 Senate Bill 401 Judicial Proceedings FISCAL AND POLICY NOTE Revised (Senator Pugh, et al.) Environmental Matters Motor Vehicles

More information

City of Grand Island Tuesday, October 10, 2017 Council Session

City of Grand Island Tuesday, October 10, 2017 Council Session City of Grand Island Tuesday, October 10, 2017 Council Session Item G-12 #2017-276 - Approving Change Order No. 1 for Lift Station No. 20 Upgrade and Force Main Rehabilitation & Lift Station No. 14 Abandonment;

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Ketchum Energy Advisory Committee Annual Update and Recommendation for Electric Vehicle Charging Station

Ketchum Energy Advisory Committee Annual Update and Recommendation for Electric Vehicle Charging Station March 21, 2016 Mayor Jonas and City Councilors City of Ketchum Ketchum, Idaho Mayor Jonas and City Councilors: Ketchum Energy Advisory Committee Annual Update and Recommendation for Electric Vehicle Charging

More information

Alternative and Renewable Fuel and Vehicle Technology Program. Advisory Committee Meeting

Alternative and Renewable Fuel and Vehicle Technology Program. Advisory Committee Meeting Alternative and Renewable Fuel and Vehicle Technology Program Advisory Committee Meeting December 4, 2012 California Energy Commission Hearing Room A 1 Meeting Agenda 10:00 Introductions and Opening Remarks

More information