1 Note on preliminary cost estimate for an integrated tracker for the STAR experiment at RHIC Gerrit van Nieuwenhuizen (MIT), Ernst Sichtermann (LBL) and Bernd Surrow (MIT) August 2, 2004 Abstract The following document provides a first preliminary cost estimate for an integrated tracker for the STAR experiment at the Relativistic Heavy-Ion Collider (RHIC) at Brookhaven National Laboratory (BNL). This includes besides an overview of the various cost items in particular a funding profile starting from fiscal year 2005 until fiscal year 2009 to achieve the completion of an integrated tracker for the STAR experiment at RHIC in a timely fashion. Achieving such a funding profile will be crucial to continue with a competitive physics program of the STAR experiment by the end of this current decade for the relativistic-heavy ion program as well as for the polarized proton-proton program at RHIC at BNL. 1
2 Contents 1 Introduction 3 2 Preliminary cost estimate of the inner silicon barrel detector 6 3 Preliminary cost estimate of the inner forward silicon disk system 7 4 Preliminary cost estimate of the outer forward GEM detector 7 5 Funding profile for fiscal year 2005 until
3 1 Introduction Layout of STAR integrated tracking upgrade y (cm) 200 eta= eta=-1.0 eta= eta= Silicon disk area (m 2 ): 1: : : 0.39 (r,z): (8.5,24)cm(r,z): (11,36)cm(r,z): (14,48)cm Total: 0.77 Silicon barrel area (m 2 ): 1: : : 0.60 (r,z): (10,24)cm (r,z): (15,36)cm (r,z): (20,48)cm Total: 1.09 EEMC GEM tracker area (m 2 ): (rin,rout): (75,200)cm Total: 10.8 Pixel area (m 2 ): 1: : 0.05 (r,z): (1.5,20)cm (r,z): (4,20)cm Total: z (cm) Figure 1: Conceptual layout of the STAR integrated tracking upgrade (Y Z view). The study of heavy flavor production in Au-Au collisions as well as in polarized protonproton collisions in addition to the study of W production in polarized proton-proton collisions will require an upgrade of the STAR inner and forward tracking system. This program has been documented in the STAR Decadal Upgrade plan and recently presented at the DOE RHIC program review (June 30 - July 1, 2004) and at the NASAC subcommittee review on Relativistic Heavy Ions (June 2-6, 2004) at Brookhaven National Laboratory. A side view (Y -Z view) of the conceptual layout of the STAR integrated tracking upgrade is shown in Figure 1. A close-up view of the inner tracking system is shown in Figure 2. The inner layers are formed by a pixel detector based on two layers of Active-Pixel Sensors (APS) followed by a new silicon tracker in the pseudo-rapidity-range of 1 < η < 1. During a recent internal STAR review of the Silicon-Vertex-Tracker (SVT) it has been concluded that the SVT should not be regarded as a pointing device for the STAR pixel detector resulting in the recommendation to consider the design of a new pointing device linked to the pixel detector upgrade project. This together with the upgrade of the forward tracking system forms the basis of the STAR integrated tracking upgrade. 3
4 Layout of STAR integrated tracking upgrade y (cm) 40 eta=1.0 eta=-1.0 eta= eta=1.7 eta= z (cm) Figure 2: Conceptual layout of the inner STAR integrated tracking upgrade (Y Z view). The forward part as shown in Figure 1 consists of three inner silicon disks and a large area forward GEM tracking detector in front of the STAR Endcap Electromagnetic Calorimeter. The production of W bosons provides an ideal tool to study the spin-flavor structure of the proton. W bosons are produced in ū d (u + d) collisions and can be detected through their leptonic decay. Forward scattered e (+) tagged in the STAR EEMC (1.09 < η < 2) off the incoming polarized proton beam moving toward (away) from the STAR EEMC, yield a purity for W (+) coming from ū d (u + d) quarks of about 98% (75%). The discrimination of ū d (u + d) quark combinations requires distinguishing between high p T charged leptons through their opposite charge sign which in turn requires precise tracking information. This forms the main motivation for the forward tracking upgrade. The target date for the first installation of part of the integrated tracker is prior to the foreseen long Au-Au run at the end of this decade. This would include the installation of the APS pixel detector together with a new mechanical support system and a minimal barrel system (to be determined from on-going simulation work. This would be then followed by a completion of the inner forward system based on silicon detectors as shown in Figure 2 using a disk configuration together with a large area GEM tracker in front of the STAR EEMC: Stage 1: Installation of STAR APS pixel detector together with a minimal new barrel tracking detector based on silicon technology 1 < η < 1) (Heavy Flavor Physics) Goal: Proposal by summer
5 Installation of new inner tracking system prior to foreseen long Au-Au run at the end of this decade (2008) Stage 2: Upgrade of the forward tracking system (1 < η < 2) (W physics) Goal: Proposal by summer 2006 Installation of forward system prior to first long polarized pp production at s = 500 GeV (2009) The following three sections will provide a first cost estimate for the inner silicon barrel system, the inner silicon forward disks and the forward GEM tracking detector. It is understood that this is a preliminary cost evaluation which will be replaced by a refined cost analysis for the actual proposal of each proposal stage. Various details on the final layout such as the number of silicon barrel layers, the length and radius of each barrel layers as well as the the inner and outer radii and the distance to the nominal interaction point of the forward disks is subject to on-going simulation work. The last section provides a funding profile starting from fiscal year 2005 until fiscal year 2009 to achieve the completion of an integrated tracker for the STAR experiment at RHIC in a timely fashion. 5
6 2 Preliminary cost estimate of the inner silicon barrel detector Item Design A Design B Remarks Amount k$ Amount k$ Sensors $1000/sensor Sensor R&D $50k times 2 types Hybrids $500/berillia substrate thin film Hybrid R&D APV25 chips $25/chip Cables $500/low mass cable Cable R&D FEE $1/channel, in house R&D Integration FEE/DAQ Power Supply Power and bias supplies Cooling Under-pressure water cooling Mechanics Low mass, in house R&D Misc. items Total No contingency and overhead Table 1: Cost estimate for the inner silicon barrel system. This estimate is based on a sensor size of 40 cm 2 and one stereo pair per layer. Design A refers to system of 3 layers with radii of 70 mm, 150 mm and 170 mm whereas Design B refers to a system with radii of 100 mm, 150 mm and 200 mm. The following comments have to be taken into consideration for the cost estimate of the silicon barrel system: The exact layout is not finalized. The occupancy and required performance need to be still resolved through on-going simulation work. For the time being, an inner silicon barrel system of three layers covering the pseudo-rapidity region of 1 < η < 1 is assumed. A conservative design would then consist of silicon strip sensors with each layer consisting of stereo pairs. The size of the silicon sensors, quantified by the the strip length, will determine the occupancy. In principle, one would like to push the first layer as close as possible to the pixel layer. If one restricts the design to one (or rather 2 because of the required stereo angle) sensor type then the closest one can get is to a radius of 70 mm, below that the occupancy for central Au+Au collisions will be above 10%. It is foreseen to use the APV25-S1 chip which leads to a strip pitch of about 50 µm. It has been shown that by introducing an additional floating strip between the active strips, sub-10 µm resolutions are feasible. If a 90 stereo angle is used, each layer would then allow a space point resolution at the level of sub-10 µm precision. This would then result in a double metal sensor design. 6
7 The current estimate relies heavily on the PHOBOS experience gained during the silicon detector design and construction. The cost estimate does not include any contingency, overhead and any cost for personnel. The last cost item are expected to be already covered by existing personnel at participating institutes. Table 1 provides an overview of the various cost items for the inner silicon barrel system. This estimate is based on a sensor size of 40 cm 2 and one stereo pair per layer. Design A refers to system of 3 layers with radii of 70 mm, 150 mm and 170 mm whereas Design B refers to a system as shown in Figure 1 and 2 with radii of 100 mm, 150 mm and 200 mm. 3 Preliminary cost estimate of the inner forward silicon disk system The comments made in the previous section on the assumption of the preliminary cost estimate applies as well to the following discussion of the inner forward silicon disk system. The respective cost items are shown in Table 2 based on the conceptual layout shown in Figure 1 and 2. It is assumed that the main part of the mechanical support structure is in place after the Stage 1 installation. Item Disk design Remarks Amount k$ Sensors $1000/sensor Sensor R&D 100 $50k times 2 types Hybrids $500/berillia substrate thin film Hybrid R&D 25 APV25 chips $25/chip Cables $500/low mass cable Cable R&D 25 FEE $1/channel, in house R&D Integration FEE/DAQ 100 Power Supply 100 Power and bias supplies Cooling 100 Under-pressure water cooling Mechanics 300 Low mass, in house R&D Misc. items 100 Total 2288 No contingency and overhead Table 2: Cost estimate for the inner forward silicon disk system. 4 Preliminary cost estimate of the outer forward GEM detector The cost estimate of the outer forward GEM detector is based on the conceptual layout shown in Figure 3 using individual triple-gem chambers. Each considered cost item is shown in Table 3. 7
8 y (cm) STAR EEMC GEM tracker Ring 1: Modules: Ring 2: Modules: Ring 3: Modules: Ring 4: Modules: Ring 5: Modules: Total: x (cm) Figure 3: Conceptual layout of the outer forward GEM tracker in front of the STAR EEMC based on individual triple-gem chambers. 5 Funding profile for fiscal year 2005 until 2009 Based on the cost estimates provided in the last three sections, a funding profile has been developed from fiscal year 2005 until fiscal year 2009 to achieve the completion of an integrated tracker for the STAR experiment at RHIC in a timely fashion. Achieving such a funding profile will be crucial to continue with a competitive physics program of the STAR experiment by the end of this current decade for the relativistic-heavy ion program as well as for the polarized proton-proton program at RHIC at BNL. A preliminary funding profile is shown in Table 4 and 5. 8
9 Item Disk design Remarks Amount k$ GEM chamber mechanics $500/chamber GEM foils $200/GEM foil Hybrids $500/berillia substrate thin film Hybrid R&D 25 APV25 chips $25/chip Cables $500/low mass cable Cable R&D 25 FEE $1/channel, in house R&D Integration FEE/DAQ 100 Power Supply 100 Power and bias supplies Cooling 30 Air flow system Mechanics 300 Low mass, in house R&D Misc. items 100 Total 1684 No contingency and overhead Table 3: Cost estimate for the outer forward GEM detector based on individual triple-gem chambers. 9
10 Fiscal year Required funding k$ Remarks Barrel Sensor R&D batches 25 Barrel Hybrid R&D batches 40 Barrel misc. items Total FY Barrel Sensor R&D batches 25 Barrel Hybrid R&D batches 50 Barrel Prototype cables 1392 Barrel Sensor order 232 Barrel Hybrid order 174 Barrel APV25 chip order 500 Barrel mechanics 40 Barrel misc. items Total FY Barrel mechanics 1532 Barrel cables, FEE, Integration FEE/DAQ, Power supply and Cooling 100 Forward disk Sensor R&D batches 25 Forward disk Hybrid R&D batches 25 Forward disk Prototype cables 375 Forward disk Sensor order 50 Forward disk Hybrid order 45 Forward APV25 chip order 150 Forward mechanics 60 GEM foil order 25 GEM Hybrid R&D batches 25 GEM Prototype cables 120 GEM Hybrid order 15 GEM APV25 chip order 100 GEM chamber mechanics 50 Forward disk misc. items 20 Barrel misc. items Total FY Table 4: Preliminary funding profile starting from fiscal year 2005 until fiscal year
11 Fiscal year Required funding k$ Remarks Forward disk Sensor order 48 Forward disk Hybrid order 40 Forward APV25 chip order 150 Forward mechanics 880 Forward disk cables, FEE, Integration FEE/DAQ, Power supply and Cooling 60 GEM foil order 120 GEM Hybrid order 15 GEM APV25 chip order 150 GEM mechanics 275 GEM cables, FEE, Integration FEE/DAQ, Power supply and Cooling 50 Forward disk misc. items 50 GEM misc. items Total FY GEM foil order 124 GEM Hybrid order 10 GEM APV25 chip order 150 GEM mechanics 275 GEM cables, FEE, Integration FEE/DAQ, Power supply and Cooling 50 GEM misc. items Total FY Total FY05-FY Table 5: Preliminary funding profile starting from fiscal year 2008 until fiscal year 2009 and total costs using Design B for the silicon barrel system. 11
The ITk strips tracker for the phase-ii upgrade of the ATLAS detector of the HL-LHC
The ITk strips tracker for the phase-ii upgrade of the ATLAS detector of the HL-LHC Afroditi Koutoulaki on behalf of the ATLAS Collaboration 14th Topical Seminar on Innovative Particle and Radiation Detectors
More informationThe Phase-2 Upgrade of the Silicon Strip Tracker of the ATLAS experiment
The Phase-2 Upgrade of the Silicon Strip Tracker of the ATLAS experiment Physikalisches Institut, Albert-Ludwigs-Universitaet Freiburg E-mail: susanne.kuehn@physik.uni-freiburg.de The Large Hadron Collider
More informationPowering Schemes for the Strip Trackers
Powering Schemes for the Strip Trackers Peter W Phillips STFC Rutherford Appleton Laboratory and ATLAS ITk Strip Community ACES, CERN, 8 th March 2016 Outline Proposed CMS Tracker Distribution Scheme Module
More informationThe ATLAS Detector at the Large Hadron Collider. Peter Krieger IPP/University of Toronto
The ATLAS Detector at the Large Hadron Collider Peter Krieger IPP/University of Toronto The ATLAS Detector at the Large Hadron Collider Peter Krieger IPP/Toronto CAP Congress, Winnipeg 2004 2 Peter Krieger
More informationPowering Schemes for the Strip Trackers
Powering Schemes for the Strip Trackers Peter W Phillips STFC Rutherford Appleton Laboratory and ATLAS ITk Strip Community ACES, CERN, 8 th March 2016 Outline Proposed CMS Tracker Distribution Scheme ATLAS
More informationThe H1 Silicon Tracker. Benno List
The H1 Silicon Tracker Benno List HERA and H1 The H1 silicon tracker Recent results Changes in 2003 Lessons from the Pit VERTEX 2003 15.9.2003 Benno List, ETH Zürich Vertex 2003, 14. 19.9.2003: The H1
More informationThe LHCb experiment. The LHCb experiment. dedicated b-physics experiment at LHC to study CP-violating phenomena main challenges:
The LHCb experiment The LHCb experiment dedicated b-physics experiment at LHC to study CP-violating phenomena main challenges: highly selective trigger to collect large samples of B decays in specific
More informationCreated: 4/23/2003 Page: 1 of 12. Abstract
Collimators and Transport Solenoid Shielding Reference Design Document No: Created: 4/23/2003 Page: 1 of 12 MECO-MUB-03-002 Modified: 10/13/03 Version: 1.01 Prepared by: M. Hebert, V. Tumakov Approved
More informationMagnet, Support and Infrastructure. Whit Seay November 7, 2014
Magnet, Support and Infrastructure Whit Seay November 7, 2014 Engineering Progress Efforts in cost and labor estimate Contributions to pcdr document Visit to Cornell Dry Run - Magnet - Hall A Layout for
More informationBelle-II Silicon Vertex Detector
Belle-II Silicon Vertex Detector Outline Belle-II Experiment at SuperKEKB Belle-II Vertex Detector Belle-II Pixel Detector Belle-II Silicon Vertex Detector SVD Key Features Ladder Assembly Procedure Mechanical
More informationPreliminary Results of 25 ns Test Beam on Florence Detector. Simone Busoni - INFN Firenze for CMS Florence group
Preliminary Results of ns Test Beam on Florence Detector Simone Busoni - INFN Firenze for CMS Florence group S. Busoni INFN e Universita di Firenze CMS week June 2 Florence wedge detector Milestone detector
More informationM. A. Green, and S. Yu Lawrence Berkeley National Laboratory, Berkeley CA 94720, USA
LBNL-48445 SCMAG-749 SUPERCONDUCTING MAGNETS FOR INDUCTION LINAC PHASE-ROTATION IN A NEUTRINO FACTORY M. A. Green, and S. Yu Lawrence Berkeley National Laboratory, Berkeley CA 94720, USA ABSTRACT The neutrino
More informationLHCb Silicon Tracker & Testbeam Data Analysis
LHCb Silicon Tracker & Testbeam Data Analysis Tracking detectors Inner Tracker (and TT) layout IT testbeam analysis Sensor characteristics Cluster properties Inter-strip region HV-scans TT-testbeam preparation
More informationSupport and Infrastructure
Support and Infrastructure SoLID Director s Review Whit Seay February 23, 2014 SoLID Experimental Set-ups Design a system for mounting experimental apparatus that can be utilized by both set-ups. Integrate
More informationSBS Update Mark Jones
SBS Update Mark Jones 1 SBS experiments Neutron G M Q 2 = 3.5, 4.5, 6.0, 8.5, 10.0, 12.0 and 13.5 GeV 2 25 days of running Extract from ratio of d(e,e n)/d(e,e p) cross sections Neutron G E Q 2 = 1.5,
More informationDevelopment of low-mass, high-density, hybrid circuit for the silicon microstrip sensors in high track density environment
Development of low-mass, high-density, hybrid circuit for the silicon microstrip sensors in high track density environment 1 T. Kohriki, S. Terada, Y. Unno INPS, High Energy Accelerator Organization (KEK),
More informationRPCs for an atmospheric neutrino experiment
RPCs for an atmospheric neutrino experiment Detector General Layout RPC GSC Costs F.Murtas, G.Bencivenni,G.Mannocchi LNF C.Gustavino LNGS Possible Readout Possible Solutions on Detector Assembling Conclusions
More informationWheels for a MEMS MicroVehicle
EE245 Fall 2001 1 Wheels for a MEMS MicroVehicle Isaac Sever and Lloyd Lim sever@eecs.berkeley.edu, limlloyd@yahoo.com ABSTRACT Inch-worm motors achieve high linear displacements with high forces while
More informationCooling tests of the MSGC barrel B1 rod prototype
B1 note 98.10 August, 98 Cooling tests of the MSGC barrel B1 rod prototype Jussi Alanen Helsinki Institute of Physics Cooling system of the MSGC barrel B1 rod prototype was studied experimentally. The
More informationpa studies reminiscences Wit Busza BNL Workshop April
pa studies 1972-2013 reminiscences Wit Busza BNL Workshop April 2013 1 The pa play as seen through the eyes of one of the actors Act 1 before the early 1970 s Act 2 The 1970 s Act 3 late 1970 s, early
More informationConsideration of Anti-Vibration Performance Improvement of a Servo Motor
1 / 4 SANYO DENKI TECHNICAL REPORT No.10 November-2000 General Theses Consideration of Anti-Vibration Performance Improvement of a Servo Motor Hiroshi Hioki Hideyuki Ishii Akira Shimizu Satoru Onodera
More informationDesign of the Target Injection and Tracking Experimental System
Design of the Target Injection and Tracking Experimental System Ron Petzoldt, Neil Alexander, Gottfried Besenbruch, Mike Cherry, Walt Egli, Dan Goodin, and Chuck Gibson ARIES Meeting Princeton, New Jersey
More informationHD Truck Fuel Economy Phase 2 Update on Release of Draft Phase 2 Rules And Discussion
HD Truck Fuel Economy Phase 2 Update on Release of Draft Phase 2 Rules And Discussion A CALSTART Member Services Webinar Thursday July 16 Bill Van Amburg, CALSTART Alycia Gilde, CALSTART Webinar Process
More informationPeninsula Corridor Electrification Project (PCEP)
Peninsula Corridor Electrification Project (PCEP) Q4 Quarterly Update #11 April 1 June 30, 2017 JPB Board Meeting August 3, 2017 Agenda Item # 8a Electrification - Infrastructure Design Build Contract
More informationModule design and development for LHCb VELO Upgrade Project
Module design and development for LHCb VELO Upgrade Project Oscar Augusto de Aguiar Francisco on behalf of the VELO Upgrade group CERN Forum on Tracking Detector Mechanics 2018 Valencia - Spain Outline
More informationStraw Detectors for the Large Hadron Collider. Dirk Wiedner
Straw Detectors for the Large Hadron Collider 1 B-Mesons Bd π π? B-Mesons properties? Charge parity symmetry violation? 2 Proton-Proton Collision Bd proton LHC Start 2007 π proton 14 TeV π? B-Mesons properties?
More informationThanks to ATLAS and CMS (Plots are from both) SLAC Ian Hinchliffe 07/24/06 1
Thanks to ATLAS and CMS (Plots are from both) SLAC Ian Hinchliffe 07/24/06 1 Delays, delays... SLAC Ian Hinchliffe 07/24/06 2 Physics marched on... Individual lepton number not conserved Dark matter/energy
More informationCalorimeter Subsystem. Status and Issues. W. Neil Johnson Naval Research Laboratory. Gamma-ray Large Area Space Telescope
Gamma-ray Large Area Space Telescope Calorimeter Subsystem Status and Issues W. Neil Johnson Naval Research Laboratory neil.johnson@nrl.navy.mil W N Johnson Calorimeter Subsystem Status Outline Introduction
More informationHydraulic Flywheel Accumulator for Mobile Energy Storage
Hydraulic Flywheel Accumulator for Mobile Energy Storage Paul Cronk University of Minnesota October 14 th, 2015 I. Overview Outline I. Background on Mobile Energy Storage II. Hydraulic Flywheel Accumulator
More informationCHAPTER 1 INTRODUCTION
1 CHAPTER 1 INTRODUCTION 1.1 ELECTRICAL MOTOR This thesis address the performance analysis of brushless dc (BLDC) motor having new winding method in the stator for reliability requirement of electromechanical
More informationThe g-2 Project at FNAL. Horst Friedsam John Kyle IWAA 2014 at Beijing October 2014
Horst Friedsam John Kyle IWAA 2014 at Beijing 13-17 October 2014 Outline History and project purpose P5 and the Muon Campus development The meaning of the gyromagnetic ratio g Alignment requirements Status
More informationLESSON Transmission of Power Introduction
LESSON 3 3.0 Transmission of Power 3.0.1 Introduction Earlier in our previous course units in Agricultural and Biosystems Engineering, we introduced ourselves to the concept of support and process systems
More informationSheffield Hallam University Engineering Masterclass Programme 2015
Sheffield Hallam University For more information please contact Helen King Special Projects Officer Engineering and Tel: 0114 225 6459 Email: h.king@shu.ac.uk An overview We are excited to launch Sheffield
More informationRPC Upgrade for the CMS experiment
RPC Upgrade for the CMS experiment L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre, Mumbai 1 Restoration of the full TDR, RE4 ( ) Present experiment runs with 3 endcaps 2 one of the end
More informationMoon Exploration Lunar Polar Sample Return ESA Thematic information day BELSPO, 3 July 2012
Moon Exploration Lunar Polar Sample Return ESA Thematic information day BELSPO, 3 July 2012 Human Spaceflight and Operations (HSO)) 1 Introduction Moon Exploration has a very high priority in Roscosmos
More informationContinuing Research and Development of Linac and Final Doublet Girder Movers
Continuing Research and Development of Linac and Final Doublet Girder Movers Classification: Accelerator Science Institution and Personnel requesting funding: Colorado State University David W. Warner,
More informationDevelopment of a High Efficiency Induction Motor and the Estimation of Energy Conservation Effect
PAPER Development of a High Efficiency Induction Motor and the Estimation of Energy Conservation Effect Minoru KONDO Drive Systems Laboratory, Minoru MIYABE Formerly Drive Systems Laboratory, Vehicle Control
More informationFS5 Thermal Mass Flow Sensor For various gas flow applications
For various gas flow applications Benefits & Characteristics Easy adaptation in various applications and housings Simple signal processing Simple calibration No moving mechanical parts Excellent reproducibility
More informationSolenoid Magnets for the Front End of a Neutrino Factory
Solenoid Magnets for the Front End of a Neutrino Factory M.A. Green and S.S. Yu Lawrence Berkeley National Laboratory, Berkeley CA 94720 J.R. Miller and S. Prestemon National High Magnetic Field Laboratory,
More informationEstimation of Average Trip Lengths To and From Century City Center Century City, California
MEMORANDUM TO: FROM: LSA Associates, Inc. Jonathan Chambers, P.E. DATE: October 6, 2014 RE: Estimation of Average Trip Lengths To and From Century City Center Century City, California Ref: J1076 This memorandum
More informationSummary of Working Group C: Injection, Extraction, Accelerator Systems
Summary of Working Group C: Injection, Extraction, Accelerator Systems D. Johnson and S. Cousineau ICFA HB2010 Sept 27 Oct. 1 Morschach, Switzerland Outline of Summary 1. Essence of the Work Group New
More information4.0 TIER 2 ALTERNATIVES
4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation
More informationThe Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland
Available on CMS information server CMS CR -2016/330 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 07 November 2016 (v2, 14 November 2016)
More informationOMEGA and OMEGA EP Will Provide Key Physics Data for Laser IFE. J. M. Soures University of Rochester Laboratory for Laser Energetics
OMEGA and OMEGA EP Will Provide Key Physics Data for Laser IFE J. M. Soures University of Rochester Laboratory for Laser Energetics 2005 US-Japan Workshop on Laser IFE San Diego, CA 21 22 March 2005 Summary
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 19, 2008 DATE: July 10, 2008 SUBJECT: Enactment of an Ordinance to amend, reenact and recodify Section 25-14 (Rates of Fare) of Chapter
More informationSNS Operation and Upgrade Plans
SNS Operation and Upgrade Plans Andrei Shishlo SNS Project, Oak Ridge National Lab Warm Linac Physicist On behalf of Accelerator Physics Team June 21, 2018 Presented at the HB2018, Daejeon, Korea, June
More informationInitial Project and Group Identification Document. Metal detecting robotic vehicle (seek and find metallic objects using a robotic vehicle)
Initial Project and Group Identification Document Project Idea: Metal detecting robotic vehicle (seek and find metallic objects using a robotic vehicle) Team Members: Robertson Augustine (Computer Engineer)
More informationInterconnection System Impact Study Report Request # GI
Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Authorizing the Department of Public Works (DPW) to award DPW Contract
More informationSciFi. Forum on Tracking Detector Mechanics R. Walet. on behalf of the SciFi Tracker Group Rev_06
SciFi Forum on Tracking Detector Mechanics 2015 R. Walet on behalf of the SciFi Tracker Group 2015-05 Rev_06 National Institute for Subatomic Physics Science Park 105, 1098XG Amsterdam The Netherlands
More informationHow to Achieve a Successful Molded Gear Transmission
How to Achieve a Successful Molded Gear Transmission Rod Kleiss Figure 1 A molding insert tool alongside the molded gear and the gear cavitiy. Molded plastic gears have very little in common with machined
More informationCity of Palo Alto (ID # 6416) City Council Staff Report
City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building
More informationContinuing Research and Development of Linac and Final Doublet Girder Movers
Continuing Research and Development of Linac and Final Doublet Girder Movers Classification: Accelerator Science Institution and Personnel requesting funding: Colorado State University David W. Warner,
More information2F MEMS Proportional Pneumatic Valve
2F MEMS Proportional Pneumatic Valve Georgia Institute of Technology Milwaukee School of Engineering North Carolina A&T State University Purdue University University of Illinois, Urbana-Champaign University
More informationNuclear Energy Tribal Working Group
Office of Nuclear Energy Nuclear Energy Tribal Working Group Carbon Free Power Project Status Jared Fryar, Program Manager Department of Energy, Office of Nuclear Energy 4/17/2018 Overview 1. Background
More informationOverview of SOI development (from the HEP perspective)
Overview of SOI development (from the HEP perspective) International workshop on CEPC, 6-8 Nov. 2017, Beijing Yunpeng Lu on behalf of SOIPIX collaboration Outline Concept of SOI pixel sensor Technology
More informationA STUDY ON THE EFFECTIVITY OF HYDROGEN LEAKAGE DETECTION FOR HYDROGEN FUEL CELL MOTORCYCLES
A STUDY ON THE EFFECTIVITY OF HYDROGEN LEAKAGE DETECTION FOR HYDROGEN FUEL CELL MOTORCYCLES Kiyotaka, M., 1 and Yohsuke, T. 2 1. FC-EV Research Division, Japan Automobile Research Institute, 128-2, Takaheta,
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.5 DIVISION: Transit Services BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Requesting authorization for the SFMTA, through the Director of Transportation,
More informationFront-End Hybrids. CMS Silicon Tracker
Technology Choices and a some History Strasbourg New Developments in Rigid-Flex and Full-Flex Technology Next Steps and Preparation of Industrial Production and Testing (FHIT) Conclusions Front-End Hybrids
More informationChallenge H: For an even safer and more secure railway. SADCAT, a contactless system for OCS monitoring
SADCAT, a contactless system for OCS monitoring Author: Nesrine LAJNEF and Guillaume FOEILLET IG.LE (Electric Tests Laboratory Department), SNCF [French Railways] Infrastructure s Engineering Division,
More informationNew Jersey Solar Roundtable
New Jersey Solar Roundtable Transition to a Market-based REC Financing System Michael Winka, Director NJBPU, Office of Clean Energy Presented at Thomas Edison Institute March 5, 2007 NJ Solar Financing
More informationarxiv: v1 [physics.ins-det] 1 Jul 2014
Construction and test of high precision drift-tube (smdt) chambers for the ATLAS muon spectrometer arxiv:1407.085v1 [physics.ins-det] 1 Jul 014 Sebastian NOWAK E-mail: nowak@mppmu.mpg.de Oliver KORTNER
More informationApplication Note Thermal Mass Flow Sensor FS7
1. 3 1.1 About the Sensor 3 1.2 Benefits and Characteristics 3 1.3 Application Areas 3 1.4 Sensor Structure 3 1.5 Measurement Principle 5 1.6 Dimensions and Housing 5 1.7 Mounting 6 1.8 Delivery and Content
More informationEnabling Utility Scale PV: Challenges for Glass Makers
Enabling Utility Scale PV: Challenges for Glass Makers Romain Beau de Lomenie Director, Module Materials Management Thin Film Products, Solar Business Group Applied Materials International Workshop on
More informationNOTICE. The above identified patent application is available for licensing. Requests for information should be addressed to:
Serial No.. Filing Date July Inventor Richard Bonin NOTICE The above identified patent application is available for licensing. Requests for information should be addressed to: OFFICE OF NAVAL RESEARCH
More informationgskin Instruction Manual gskin Radiation Sensors for greenteg AG Technoparkstrasse 1 greenteg.com
gskin Instruction Manual for gskin Radiation Sensors 2 / 14 gskin Radiation Sensors: Instruction Manual CONTENT 1. SHORT USER GUIDE... 4 2. gskin RADIATION SENSOR INTRODUCTION... 5 3. FUNCTIONALITY TEST...
More informationEnergy Performance Information Request Timeline
Energy Performance Information Request Timeline Project Title: UT Project # Project Manager: Submitted by: Day Submitted: The timeline below outlines a comprehensive list of required documents and when
More informationBattery Evaluation for Plug-In Hybrid Electric Vehicles
Battery Evaluation for Plug-In Hybrid Electric Vehicles Mark S. Duvall Electric Power Research Institute 3412 Hillview Avenue Palo Alto, CA 9434 Abstract-This paper outlines the development of a battery
More informationHybrid torque standard machine for 1 kn m developed in CENAM
IMEKO 20 th TC3, 3 rd TC16 and 1 st TC22 International Conference Cultivating metrological knowledge 27 th to 30 th November, 2007. Merida, Mexico. Hybrid torque standard machine for 1 kn m developed in
More informationMultipulse Detonation Initiation by Spark Plugs and Flame Jets
Multipulse Detonation Initiation by Spark Plugs and Flame Jets S. M. Frolov, V. S. Aksenov N.N. Semenov Institute of Chemical Physics, Russian Academy of Sciences, Moscow, Russia Moscow Physical Engineering
More informationVehicle Dynamic Simulation Using A Non-Linear Finite Element Simulation Program (LS-DYNA)
Vehicle Dynamic Simulation Using A Non-Linear Finite Element Simulation Program (LS-DYNA) G. S. Choi and H. K. Min Kia Motors Technical Center 3-61 INTRODUCTION The reason manufacturers invest their time
More informationVAN NESS AVENUE BUS RAPID TRANSIT
VAN NESS AVENUE BUS RAPID TRANSIT Commission of the Environment Policy Committee May 22, 2014 Peter Gabancho Project Manager III Capital Programs & Construction SFMTA 1 Conceptual Visual Simulation Center-Running
More informationMaximum Solar Energy Saving For Sterling Dish with Solar Tracker Control System
2013, TextRoad Publication ISSN 2090-4304 Journal of Basic and Applied Scientific Research www.textroad.com Maximum Solar Energy Saving For Sterling Dish with Solar Tracker Control System Alireza Farivar
More informationSepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside
Los Angeles County Metropolitan Transportation Authority November 2012 Connecting the San Fernando Valley and the Westside Interstate 405 Sepulveda Pass THIS PAGE INTENTIONALLY LEFT BLANK Sepulveda Pass
More informationDevelopment of Japan s Next Flagship Launch Vehicle
20 Development of Japan s Next Flagship Launch Vehicle - To compete and survive in the global commercial market - ATSUTOSHI TAMURA *1 MAYUKI NIITSU *2 TAKANOBU KAMIYA *3 AKIHIRO SATO *4 KIMITO YOSHIKAWA
More informationinter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering August 2000, Nice, FRANCE
Copyright SFA - InterNoise 2000 1 inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering 27-30 August 2000, Nice, FRANCE I-INCE Classification: 7.6 ROLLING NOISE FROM
More informationTHINERGY MEC220. Solid-State, Flexible, Rechargeable Thin-Film Micro-Energy Cell
THINERGY MEC220 Solid-State, Flexible, Rechargeable Thin-Film Micro-Energy Cell DS1013 v1.1 Preliminary Product Data Sheet Features Thin Form Factor 170 µm Thick Capacity options up to 400 µah All Solid-State
More informationCBM Engineering. Mechanical Concept, design and prototyping of the STS for the CBM Experiment at FAIR
03.07.2017 Oleg Vasylyev Concept, design and prototyping of the STS ENMD CBM Engineering Mechanical Concept, design and prototyping of the STS for the CBM Experiment at FAIR Oleg Vasylyev, GSI Helmholtz
More informationRecent Cooling Tests on the Pixel Staves and Real Scale Circuits
Recent Cooling Tests on the Pixel Staves and Real Scale Circuits Prepared by Vic Vacek with thanks to M. Bosteels lab Team, Ph. Bouvier, G. Hallewell, M. Olcese Agenda: Pixel stave prototype measurements
More informationTask Cryomodule. Paolo Pierini INFN Sezione di Milano - LASA
Task 1.3.3 Cryomodule Paolo Pierini INFN Sezione di Milano - LASA Outline Schedule borrowed from Alex Karlsruhe presentation Aim of the task & work split Comment on existing cryomodule designs, trying
More informationComparison of different 600 kw designs of a new permanent magnet generator for wind power applications
Comparison of different 600 kw designs of a new permanent magnet generator for wind power applications E. Peeters, Vito, Boeretang 200, 2400 Mol, Belgium, eefje.peeters@vito.be, tel +32 14 33 59 23, fax
More informationCamarillo Collider Paul Spooner, P.E : 535 Keyser Rondo Camarillo, CA 93010
Camarillo Collider 2017-09-21 Paul Spooner, P.E. 805-910-5814 : mrpaulspooner@gmail.com 535 Keyser Rondo Camarillo, CA 93010 1 Overview Camarillo is emerging as a nexus of enthusiast racing. We need a
More informationElbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI
Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility
More informationOverdense gas jets for ion acceleration studies
Overdense gas jets for ion acceleration studies Nicholas Dover John Adams Institute at Imperial College London 2 nd Ion Instrumentation Workshop, École Polytechnique 7-8 th June 2012 http://www.adams-institute.ac.uk
More informationFabrication of 12 GeV Prototype Quadrupoles 1. Introduction 2. Design 3. Fabrication
Fabrication of 12 GeV Prototype Quadrupoles T. Hiatt, K. Baggett, M. Beck, L. Harwood, J. Meyers and M. Wiseman Thomas Jefferson National Accelerator Facility, Newport News, Virginia 23606 1. Introduction
More information2019 SpaceX Hyperloop Pod Competition
2019 SpaceX Hyperloop Pod Competition Rules and Requirements August 23, 2018 CONTENTS 1 Introduction... 2 2 General Information... 3 3 Schedule... 4 4 Intent to Compete... 4 5 Preliminary Design Briefing...
More informationImpact of Flotation Nozzle Design on Web Handling
Impact of Flotation Nozzle Design on Web Handling Abstract A number of different flotation nozzles designs are available and each is appropriate for application depending on the web handling issues facing
More informationPress release. Field Test on Wireless Charging of Electric Vehicles by Daimler and Conductix-Wampfler
Field Test on Wireless Charging of Electric Vehicles by Daimler and Conductix-Wampfler The idea sounds as easy as convincing: Instead of filling up an electric vehicle by cable the driver parks conveniently
More informationAurora Universal Protocol Converter (UPC) Zone Sensors. Submittal Data English Language/IP Units SD1582EW 06/18
Zone Sensors Submittal Data English Language/IP Units SD1582EW 06/18 ZS Series RNet Zone Sensors ZS Series RNet Sensor Overview The ZS Series line of intelligent zone sensors provides the function and
More information2030 Multimodal Transportation Study
2030 Multimodal Transportation Study City of Jacksonville Planning and Development Department Prepared by Ghyabi & Associates April 29,2010 Introduction Presentation Components 1. Study Basis 2. Study
More informationGA A23904 RESEARCH ACTIVITIES AT GENERAL ATOMICS
GA A23904 RESEARCH ACTIVITIES AT GENERAL ATOMICS by E.M. Campbell and K.R. Schultz JANUARY 2002 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government.
More informationTransmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015
No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the
More informationEvolving Bump Chip Carrier
FUJITSU INTEGRATED MICROTECHNOLOGY LIMITED. The Bump Chip Carrier, which was developed as a small pin type, miniature, and lightweight CSP, is not only extremely small due to its characteristic structure,
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.4 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Authorizing the Department of Public Works (DPW) to award DPW Contract
More informationEMaSM. Principles Of Sensors & transducers
EMaSM Principles Of Sensors & transducers Introduction: At the heart of measurement of common physical parameters such as force and pressure are sensors and transducers. These devices respond to the parameters
More informationBeam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev
Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics US N. Terentiev Carnegie Mellon University CMS EMU Meeting, Fermilab October 21, 2005 Outline Beam Test Data vs. ORCA Simulation
More informationFacilities. Presented by Jim Irby for the C-Mod Group
Facilities Presented by Jim Irby for the C-Mod Group Outline Machine History and Status 2008 run campaign Machine inspection Alternator and Flywheel Inspections Availability Chart Contributions to ITER
More informationCooperative EVA/Telerobotic Surface Operations in Support of Exploration Science
Cooperative EVA/Telerobotic Surface Operations in Support of Exploration Science David L. Akin http://www.ssl.umd.edu Planetary Surface Robotics EVA support and autonomous operations at all physical scales
More informationEvaluating the Techno-Economics of Retrofitting CO2 Capture Technologies in an Integrated Oil Refinery (Progress Report) Stanley Santos
Evaluating the Techno-Economics of Retrofitting CO2 Capture Technologies in an Integrated Oil Refinery (Progress Report) Stanley Santos IEA Greenhouse Gas R&D Programme Industry CCS Workshop Vienna, Austria
More informationDevelopment of Relief Valve Automatic assembly technology
Development of Relief Valve Automatic assembly technology Technology Explanation Development of Relief Valve Automatic assembly technology TAKIGUCHI Masaki Abstract Construction machinery is equipped with