An Empirical Assessment of the Success of Financial Rights Auctions in PJM and New York
|
|
- Annabella Thomas
- 5 years ago
- Views:
Transcription
1 An Empirical Assessment of the Success of Financial Rights Auctions in PJM and New York Prepared by Susan L. Pope EUCI Electric Power Market Performance Conference September 20, 2001
2 1 TOPICS Financial Transmission Rights Auction Mechanics Auction Example Counterflow Auction Results PJM New York Observations
3 2 FINANCIAL RIGHTS Overview The uncertainty of congestion charges for transmission use under an LMP system creates a demand for congestion hedges, or financial transmission rights (FTRs or TCCs). FTRs enable market participants to lock-in a price for transmission prior to the day-ahead market. The owner of an FTR is paid the hourly cost of congestion ($/MWh) between two locations on the transmission system designated by the FTR. If the FTR owner s net injections and withdrawals match the FTR quantities, then the FTR is equivalent to a physical transmission right. FTRs are financial investments that provide the financial equivalent of firm transmission for market participants that use their FTRs to support physical bilateral transactions.
4 3 FINANCIAL RIGHTS Financial Instruments The owner of an FTR is paid the hourly cost of congestion ($MWh) between two locations in the transmission system in every hour. There is a financial settlement after the dispatch in which the ISO collects congestion costs from users of the system through charges for energy and transmission and pays congestion rents to owners of FTRs. Market participants do not have to hold FTRs in order to schedule use of the system. Market participants with FTRs are paid the market value of their rights even if they do not undertake a corresponding energy transaction.
5 4 AUCTION MECHANICS Rationale An auction is one of the potential mechanisms for allocating financial transmission rights, such as FTRs or TCCs. An FTR auction is a desirable market element even if FTRs are also allocated using other mechanisms: Ensures that all feasible FTRs are made available to market participants. Allows FTR holders to reconfigure FTRs acquired through other mechanisms. Allows market participants to sell counterflow forward, making additional congestion hedges available in forward markets.
6 5 AUCTION MECHANICS PJM and NYISO The open access tariffs of PJM and the NYISO both provide for the sale of financial transmission rights via auctions. PJM holds monthly auctions for FTRs corresponding to uncommitted grid transfer capability. The NYISO holds periodic auctions for long-term TCCs (corresponding to uncommitted grid transfer capability and transfer capability initially allocated to native load), as well as monthly reconfiguration auctions. NEPOOL is in the process of developing a long-term FCR auction. The NYISO and PJM auctions have many common elements.
7 6 AUCTION MECHANICS In both PJM and the NYISO: Bidding Buyers can bid for an FTR between any combination of receipt and delivery buses, including the PJM hubs and NY zones. 1 Each bid to buy an FTR states the maximum price in dollars per MW that the buyer is willing to pay for that FTR. It will pay no more than its bid, but may pay less. Each bid to sell an FTR can state the minimum price in dollars per MW that the seller is willing to accept for that FTR. It will sell its FTR for no less than its bid, but it may receive more. 1 In New York, bids must be between locations (buses, zones or external proxy buses) at which the NYISO calculates prices in the day-ahead market.
8 7 AUCTION MECHANICS Selection of FTR Awards The FTRs awarded in the PJM and NYISO auctions are selected to maximize the value of the awarded FTRs (based on buyers bids) net of the value of FTRs sold (based on sellers reservation prices). The awards are made subject to the constraint that the awarded FTRs be simultaneously feasible in a contingency constrained dispatch in conjunction with all outstanding FTRs (i.e., previously acquired FTRs not sold into the auction). The simultaneous feasibility test means the ISO will generally collect enough congestion charges through the LMP system to pay congestion rents to FTR holders.
9 8 AUCTION MECHANICS FTR Pricing Each FTR buyer in the PJM and NYISO auctions pays the market-clearing price for the FTRs it purchases and each FTR seller receives the market- clearing price for the FTRs it sells. The prices of all FTRs sold in the auction are related through the impact of the transmission flows associated with those FTRs on binding transmission constraints. The auction therefore values all FTRs, whether or not they are bought or sold in the auction. The ISOs publish the prices of all FTRs relative to a reference bus.
10 On-Peak FTRs Purchased and Sold in PJM May 1999 FTR Auction Source Sink Owner Buy/Sell MW Price ($/MW) Price ($/MWh) WESTERN HUB ECARviaCEI Duke Energy Trading & Marketing L.L.C. Sell ATHENIA 26 KV IM GRP SADDLEBR 230 KV T2-3 Public Service Electric and Gas Company Buy 36.2 (1.00) (0.003) BRUNNERI 18 KV UNIT01 WHEMPFIE 69 KV BUS_N Public Service Electric and Gas Company Buy BRUNSWIC 230 KV 26KV EDISON 13 KV UNIT11 PP&L Inc. Buy BRUNSWIC 230 KV 26KV EDISON 13 KV UNIT11 PP&L Inc. Buy DEANS BRUNSWIC 230 KV 26KV Public Service Electric and Gas Company Buy DEANS PIERSOAV 230 KV T-2 Public Service Electric and Gas Company Buy EASTERN HUB NYPP-E Southern Company Energy Marketing L.P. Buy EASTERN HUB NYPP-E Southern Company Energy Marketing L.P. Buy EASTERN HUB NYPP-E Southern Company Energy Marketing L.P. Buy JCPL PSEG PP&L Inc. Buy PEACHBOTTOM PSEG PP&L Inc. Buy WESTERN HUB NYPP-E Southern Company Energy Marketing L.P. Buy WESTERN HUB NYPP-E Southern Company Energy Marketing L.P. Buy WESTERN HUB NYPP-E Southern Company Energy Marketing L.P. Buy WESTERN HUB NYPP-E PP&L Inc. Buy WESTERN HUB NYPP-W Southern Company Energy Marketing L.P. Buy WESTERN HUB NYPP-W Southern Company Energy Marketing L.P. Buy WESTERN HUB NYPP-W Southern Company Energy Marketing L.P. Buy WESTERN HUB NYPP-W PP&L Inc. Buy
11 10 AUCTION MECHANICS Reconfiguration The centralized FTR auction provides a mechanism for reconfiguring point-to-point FTRs. The FTRs acquired in the auction may be different from those sold into the auction. The FTRs acquired in the auction may even differ from any of the outstanding FTRs. The FTRs acquired in the auction are determined by the bids of the market participants, not by decisions of the transmission owners.
12 95 MW Thermal 80 MW Thermal 90 MW Thermal 80 MW Thermal SYSTEM CONFIGURATION New IPP L Orange DC Red DC Blue DC Green DC C W M New Gas A Old Gas Y D X Z B New Coal Old Nuke V N Yellow DC P New Gen 11
13 12 AUCTION EXAMPLE System The example assumes a transmission system with the following characteristics: Thermal constraints of 80 MW between Buses D and M and between Buses D and N, 95 MW between Buses M and X, and 90 MW between Buses N and X. The reactance on each transmission line is the same. There are no transmission losses.
14 13 AUCTION EXAMPLE Bids A set of bids to buy and sell FTRs in the auction is provided in the following table. BIDS IN FTR AUCTION Bids to Sell FTRs Bids to Buy FTRs Seller FTR Holdings FTRs Offered For Sale (MW) FTR Injection Bus FTR Withdrawal Bus Price Bid ($/MW) Buyer Offers to Buy FTRs (MW) FTR Injection Bus FTR Withdrawal Bus Price Bid ($/MW) Orange B W $5,000 Orange 25 A W $3,750 Orange B W 4,000 Yellow 25 L V 2,500 Yellow P V 8,750 Red 30 P W 6,900 Red A W 4,700 Red 20 L W 2,000 Red A W 4,125 Blue 20 P W 7,750 Red 5 0 P W Blue 25 B W 4,900 Blue 50 A W Blue 25 B W 4,000
15 14 AUCTION EXAMPLE The results of this auction are as follows: Value Maximization BIDS TO SELL FTRs FTRs Offered FTR FTR FTRs Owned Value of FTRs For Sale Injection Withdrawal Price Bid FTRs Sold After Auction Retained Seller (MW) Bus Bus ($/MW) (MW) (MW) ($) Orange 75 B W $5, $375,000 Orange 25 B W 4, Yellow 10 P V 8, ,500 Red 25 A W 4, Red 25 A W 4, BIDS TO BUY FTRs Offers to FTR FTR FTRs Purchased Value of FTRs Buy FTRs Injection Withdrawal Price Bid in Auction Acquired Seller (MW) Bus Bus ($/MW) (MW) ($) Orange 25 A W $3, Yellow 25 L V 2, $62,500 Red 30 P W 6, Red 20 L W 2, Blue 20 P W 7, ,000 Blue 25 B W 4, ,500 Blue 50 A W 4, ,000 Blue 25 B W 4, Total $874,500
16 15 MW 80 MW Thermal 80 MW Thermal 25 MW 95 MW Thermal 90 MW Thermal 15 AUCTION EXAMPLE Feasibility Test Injections and withdrawals corresponding to the set of awarded FTRs (along with Red s 5 MW FTR from Bus P to Bus W, which was not sold in the auction) are simultaneously feasible. POWER FLOW CORRESPONDING TO FTRs AWARDED IN THE AUCTION New IPP L Orange DC Red DC Blue DC Green DC W C M New Gas A 60 MW 85 MW 140 MW Old Gas Y B 100 MW D 55 MW 90 MW X 35 MW Z New Coal Old Nuke BINDING V 35 MW N Yellow DC P New Gen
17 16 AUCTION EXAMPLE Reconfiguration The power flow corresponding to the FTRs that are outstanding at the conclusion of the FTR auction differs from the power flow corresponding to the initial allocation of FTRs. This is because there has been some reconfiguration of FTRs. 35 MW of FTRs from Bus A to Bus W have been reconfigured into 20 MW of FTRs from Bus P to Bus W and 10 MW of FTRs from Bus L to Bus V. SALES AND PURCHASES OF FTRs IN AUCTION FTRs Sold in Auction FTRs Bought in Auction FTR FTR FTR Injection Withdrawal Injection FTR Seller Bus Bus MW Buyer Bus Withdrawal Bus MW Orange B W 25 Blue B W 25 Red A W 50 Blue P W 20 Yellow L V 10 Blue A W 15
18 POWER FLOW CORRESPONDING TO FTRs AWARDED IN THE AUCTION New IPP Green DC New Gas Old Nuke New Gen Orange DC Red DC Blue DC Old Gas 140 MW 85 MW New Coal 35 MW 90 MW L Yellow DC 25 MW C M 60 MW A BINDING 15 MW D 100 MW 55 MW B N 35 MW P W Y X Z V MW Thermal 90 MW Thermal 80 MW Thermal 80 MW Thermal
19 18 AUCTION EXAMPLE Reconfiguration This reconfiguration of FTRs has occurred as a result of the bids placed by bidders in the auction. In the auction power flow, the transmission line connecting Buses N and X is at its limit. Different FTRs have different impacts on flows on the constrained line, so that the number of FTRs that can be awarded without overloading the line varies from one FTR to another. 20 MW of FTRs from Bus P to Bus W plus 10 MW of FTRs from Bus L to Bus V cause the same flows on the N to X line as 35 MWs of FTRs from Bus A to Bus W. Blue s bid for 20 MW of FTRs from Bus P to Bus W plus the Yellow s bid for 10 MW of FTRs from Bus L to Bus V is greater than Blue s bid for 35 MW of FTRs from Bus A to Bus W.
20 POWER FLOW CORRESPONDING TO FTRs AWARDED IN THE AUCTION New IPP Green DC New Gas Old Nuke New Gen Orange DC Red DC Blue DC Old Gas 140 MW 85 MW New Coal 35 MW 90 MW L Yellow DC 25 MW C M 60 MW A BINDING 15 MW D 100 MW 55 MW B N 35 MW P W Y X Z V MW Thermal 90 MW Thermal 80 MW Thermal 80 MW Thermal
21 20 AUCTION EXAMPLE FTR Pricing The marginal FTR awarded in the auction is the FTR from A to W purchased by Blue at a price of $4,800/MW. All other FTRs can be valued based on how they trade off with the marginal award from A to W over the limiting line, which is N to X. TRADEOFFS FTR N-X Flows Price L-V ¼ $2,400 A-W ½ $4,800 P-W ¾ $7,200
22 21 AUCTION EXAMPLE The complete results of the auction are shown below: Results BIDS TO SELL FTRs PAYMENTS FOR FTRs PURCHASED AND SOLD IN THE AUCTION FTRs Offered FTR FTR FTRs Owned Value of FTRs for Sale Injection Withdrawal Price Bid FTRs Sold After Auction Retained Seller (MW) Bus Bus ($/MW) (MW) (MW) ($) Orange 75 B W $5, $375,000 Orange 25 B W 4, Yellow 10 P V 8, ,500 Red 25 A W 4, Red 25 A W 4, BIDS TO BUY FTRS Offers to FTR FTR FTRs Bought in Net Payment Buy FTRs Injection Withdrawal Price Bid Auction FTR Price Made for FTRs Buyer (MW) Bus Bus ($/MW) (MW) ($/MW) ($) Orange 25 A W 3, , Yellow 25 L V 2, ,400 60,000 Red 30 P W 6, , Red 20 L W 2, , Blue 20 P W 7, , ,000 Blue 25 B W 4, , ,000 Blue 50 A W 4, ,800 72,000 Blue 25 B W 4, , Total $36,000
23 22 COUNTERFLOW The New World The FTR auction provides a mechanism for market participants to: Value future locational differentials. Buy and sell redispatch services on a forward-market basis. Buy and sell energy on a forward-basis through a futures market at trading hub.
24 Off-Peak FTRs Purchased and Sold in June 1999 FTR Auction Source Sink Owner Class Buy/Sell MW Price ($/MW) Price ($/MWh) WESTERN HUB PECO Enron Energy Services, Inc. Off Buy 10.0 (3.50) (0.010) ATHENIA 26 KV IM GRP SADDLEBR 230 KV T2-3 Public Service Electric and Gas Company Off Buy 7.5 (1.00) (0.003) EDGEMOOR 23 KV UNIT05 HARMONY 138 KV ONE Public Service Electric and Gas Company Off Buy BRUNNERI 18 KV UNIT01 WHEMPFIE 69 KV BUS_N Public Service Electric and Gas Company Off Buy DEANS PIERSOAV 230 KV T-2 Public Service Electric and Gas Company Off Buy DEANS BRUNSWIC 230 KV 26KV Public Service Electric and Gas Company Off Buy PPL NYPP-E PP&L, Inc. Off Buy PEACHBOTTOM PSEG PP&L, Inc. Off Buy SUSQT KV T10 PSEG PP&L, Inc. Off Buy MICKLETO 69 KV CT_1 AECO Atlantic Electric Off Sell MICKLETO 69 KV MOBIL AECO Atlantic Electric Off Sell CHAMBERS 230 KV CCLP AECO Atlantic Electric Off Sell CONEMAUG 115 KV DIESEL AECO Atlantic Electric Off Sell CONEMAUG 22 KV UNIT 1 AECO Atlantic Electric Off Sell CONEMAUG 22 KV UNIT02 AECO Atlantic Electric Off Sell PEDRICKT 230 KV PCLP AECO Atlantic Electric Off Sell BRIDGEPO 230 KV LOGAN AECO Atlantic Electric Off Sell DELCOTAP 13 KV DELCO AECO Atlantic Electric Off Sell On-Peak FTRs Purchased and Sold in June 1999 FTR Auction Source Sink Owner Class Buy/Sell MW Price ($/MW) Price ($/MWh) BRUNSWIC 230 KV 26KV EDISON 13 KV UNIT11 PP&L, Inc. On Buy 5.0 (32.98) (0.094) BRUNSWIC 230 KV 26KV EDISON 13 KV UNIT11 PP&L, Inc. On Buy 5.0 (32.98) (0.094) ATHENIA 26 KV IM GRP SADDLEBR 230 KV T2-3 Public Service Electric and Gas Company On Buy 2.5 (1.00) (0.003) EDGEMOOR 23 KV UNIT05 HARMONY 138 KV ONE Public Service Electric and Gas Company On Buy BRUNNERI 18 KV UNIT01 WHEMPFIE 69 KV BUS_N Public Service Electric and Gas Company On Buy DEANS BRUNSWIC 230 KV 26KV Public Service Electric and Gas Company On Buy DEANS PIERSOAV 230 KV T-2 Public Service Electric and Gas Company On Buy TRENTON 138 KV 26KV-1 SEWAREN 26 KV 26KV PP&L, Inc. On Buy PENELEC PSEG PP&L, Inc. On Buy WESTERN HUB PSEG PP&L, Inc. On Buy AECO PSEG PP&L, Inc. On Buy NEWFREEDOM PSEG PP&L, Inc. On Buy PEACHBOTTOM PSEG PP&L, Inc. On Buy SUSQT KV T10 PSEG PP&L, Inc. On Buy SUSQT KV T10 PSEG PP&L, Inc. On Buy SUSQUEHA 24 KV UNIT01 PSEG PP&L, Inc. On Buy JCPL PSEG PP&L, Inc. On Buy MICKLETO 69 KV CT_1 AECO Atlantic Electric On Sell MICKLETO 69 KV MOBIL AECO Atlantic Electric On Sell CHAMBERS 230 KV CCLP AECO Atlantic Electric On Sell PEDRICKT 230 KV PCLP AECO Atlantic Electric On Sell BRIDGEPO 230 KV LOGAN AECO Atlantic Electric On Sell DELCOTAP 13 KV DELCO AECO Atlantic Electric On Sell
25 24 COUNTERFLOW Negative Purchases PJM data illustrate the potential for counterflow FTRs to be purchased at negative prices in the auction These transactions effectively permit generators (or other parties) to sell congestion management services on a forward basis through the FTR auction. The transactions arranged through the auction are more complex than bilateral exchanges of counterflow; the FTRs purchased at negative prices in the auction do not directly correspond to any sold at positive prices. The ability of generators to sell congestion management forward facilitates hedging by loads by increasing the available quantity of congestion hedges.
26 FORWARD SALE OF REDISPATCH BY NEW COAL New IPP Green DC New Gas Old Nuke New Gen Orange DC Red DC Blue DC Old Gas MW 1 MW New Coal 35 MW Yellow DC 85.5 MW 90 MW L 25 MW 60.5 MW A N 1 MW 16.5 MW 56 MW 100 MW B C D 35 MW P M W Y X Z V MW Thermal 90 MW Thermal 80 MW Thermal 80 MW Thermal
27 26 COUNTERFLOW Redispatch Example New Coal can sell redispatch services in the auction by bidding to buy an FTR from Bus Z to Bus P. Awarding a 1 MW FTR from Bus Z to Bus P to New Coal would free up 0.75 MW on the N to X constraint. This would allow the sale of a 1.5 MW FTR from Bus A to Bus W worth $7,200 MW. Thus New Coal would be paid $7,200 to hold the FTR from Bus Z to Bus P. This is equivalent to selling an FTR from Bus P to Bus Z into the auction.
28 FORWARD SALE OF REDISPATCH BY NEW COAL New IPP Green DC New Gas Old Nuke New Gen Orange DC Red DC Blue DC Old Gas MW 1 MW New Coal 35 MW Yellow DC 85.5 MW 90 MW L 25 MW 60.5 MW A N 1 MW 16.5 MW 56 MW 100 MW B C D 35 MW P M W Y X Z V MW Thermal 90 MW Thermal 80 MW Thermal 80 MW Thermal
29 28 COUNTERFLOW Redispatch Example By buying an FTR from Bus Z to Bus P, New Coal essentially sells its redispatch services in the forward market. In real time: New Coal would inject power at Bus Z and withdraw power at P, being paid the difference between Bus Z and Bus P. New Coal would pay the difference between Bus Z and Bus P to the ISO for holding the FTR. New Coal would receive the price at Bus P for energy sold into the spot market. New Coal has essentially sold the price difference between Bus Z and Bus P forward.
30 29 AUCTION RESULTS Forward Congestion Prices The PJM and New York auctions value FTRs between all points within their respective control areas NYPP - West PJM FTR On-Peak Auction Prices ($/MWh) May NYPP - East KV Transmission Line 345 KV Transmission Line 500 KV Transmission Line Western Hub is the Reference Bus The number reflects the price of on FTR from the Western Hub to that location
31 PJM
32 PJM FTR On-Peak Auction Prices ($/MWh) May 1999 NYPP - West NYPP - West KV Transmission Line 345 KV Transmission Line 500 KV Transmission Line Western Hub is the Reference Bus The number reflects the price of on FTR from the Western Hub to that location
33 32 FTR AUCTION RESULTS First Auction PJM held its first auction of financial transmission rights in mid- April 1999 for May FTRs. PJM auctions are for uncommitted grid transfer capability, as well as for the reconfiguration of outstanding FTRs. The auction resulted in forward market prices from the Western Hub to every location in PJM for both peak and off-peak periods. Although relatively few FTRs were sold in the first FTR auction, several thousand MWs were offered for sale by FTR holders.
34 May-01 Jun-01 Jul-01 Mar-01 Apr-01 Feb-01 Jan-01 Dec-00 Nov-00 Oct-00 Sep-00 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 - PJM FTR Auction FTR Purchases Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Feb-00 Jan-00 Dec-99 On-Peak Purchases Off-Peak Purchases Month 33 Jun-99 Jul-99 Aug-99 Sep-99 Oct-99 Nov-99 May-99 MW FTRs
35 34 PJM AUCTION RESULTS Trading Volume The volume of FTR purchases (at positive or negative prices) in the PJM auction has risen dramatically since the auction began in May Over 7,000 MW of on-peak FTRs have been purchased in recent FTR auctions. Over 6,000 MW of off-peak FTRs have been purchased in several recent auctions.
36 Mar-01 Apr-01 May-01 Feb-01 Jan Number of Purchase Transactions Jan-00 through May-01 Jun-00 Jul-00 Aug-00 Sep-00 Oct-00 Nov-00 Dec-00 Date Off-Peak Bought On-Peak Bought 35 May-00 Apr-00 Mar-00 Feb-00 Jan-00 Transactions
37 36 PJM AUCTION RESULTS Transaction Volume The number of separate purchase transactions has also increased dramatically since the monthly auctions began with 36 transactions in May 1999.
38 Mar-01 Apr-01 May-01 Feb-01 Jan PJM Average FTR MW/Transaction Jan-00 through May-01 Jun-00 Jul-00 Aug-00 Sep-00 Oct-00 Nov-00 Dec-00 Date Off-Peak Bought On-Peak Bought 37 May-00 Apr-00 Mar-00 Feb-00 Jan-00 MW
39 38 PJM AUCTION RESULTS Transaction Size Overall, the average size of an auction purchase (in MW/transaction) has declined. It appears that buyers have become increasingly sophisticated in sizing and targeting their bids.
40 Mar-01 Apr-01 May-01 Feb-01 Jan % 20.00% 15.00% 10.00% 5.00% 0.00% On-Peak PJM FTRs Into or Out of a Hub Jan-00 through May-01 Jun-00 Jul-00 Aug-00 Sep-00 Oct-00 Nov-00 Dec-00 Date Source Sink 39 May-00 Apr-00 Mar-00 Feb-00 Jan-00 Percent of MWs Transacted
41 40 PJM AUCTION RESULTS Trading at Hubs Interestingly, the volume of on-peak auction purchases going into or coming out of one of PJM s hubs has not shown a strong upward trend (at least since January 2000). It appears that more FTR purchases are made to hedge energy purchases at the hubs than to hedge energy sales at the hubs.
42 6,000 5,000 4,000 3,000 2,000 1,000 - PJM FTR Auction On-Peak FTR Purchases and Sales May-01 Jun-01 Jul Mar-01 Apr-01 Feb-01 Jan-01 Dec-00 Purchases -- Positive FTR Price Purchases -- Negative FTRPrice Sales Jun-99 Jul-99 Aug-99 Sep-99 Oct-99 Nov-99 Dec-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 Oct-00 Nov-00 Month May-99 MW FTRs
43 42 PM AUCTION RESULTS FTR Sales The volume of FTR sales in the PJM auction superficially appears rather low. Because FTRs are financial instruments and unidirectional, market participants can sell an FTR from B-A by purchasing an FTR from A-B. If account is taken of FTR purchases at negative prices, it can be seen that FTR sales have also been substantial.
44 6,000 5,000 4,000 3,000 2,000 1,000 - PJM FTR Auction Off-Peak FTR Purchases and Sales May-01 Jun-01 Jul-01 Mar-01 Apr-01 Feb-01 Jan-01 Dec-00 Purchases -- Positive FTR Price Purchases -- Negative FTR Price Sales Jul-99 Aug-99 Sep-99 Oct-99 Nov-99 Dec-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00 Jul-00 Aug-00 Sep-00 Oct-00 Nov-00 Jun-99 Month 43 May-99 MW FTRs
45 44 PJM AUCTION RESULTS FTR Sales Off-peak FTR purchases and sales in the form of FTR purchases at negative prices have also risen substantially.
46 45 PJM AUCTION RESULTS Trader Activity Between January 2000 and May 2001, the data show the following trends in participation in the PJM FTR auctions: The number of different winning bidders increased over time, from 5 or 6 in the spring of 2000 to in the spring of In all months, between 70% and 90% of the MW volume was transacted by the most active three traders in that month. A short list of parties were among the top three traders in any month, based on MW volume: El Paso Merchant Energy, Enron, First Energy Trading Services, Morgan Stanley Capital Group (15 months), Niagara Mohawk Energy Marketing, PECO Energy Power Team (16 months), PP&L, PSE&G.
47 New York
48 47 NY AUCTIONS Importance In New York, TCC auctions are the primary mechanism for allocating financial transmission rights. Thus, for example, 3,000 MW of TCCs were sold in the first auction even though no TCCs were released for sale.
49 Summary of Initial TCC Auctions -- New York Year Season Spring Autumn Spring Autumn (current) 1 Auction Type Initial Initial Initial Initial Initial Initial * Initial * Initial Initial * Initial * Initial 2 TCC Durations Two-Year Six-Month Five-Year Two-Year Six-Month Two-Year One-Year Six-Month Two-Year One-Year Six-Month 3 Valid All-Hours All-Hours All-Hours All-Hours All-Hours All-Hours All-Hours All-Hours All-Hours All-Hours All-Hours 4 Stage 1 Rounds % of TCCs Sold 35% 65% 23% 23% 54% 0% 0% 100% 0% 0% 100% 6 % /Round 9% 16% 8% 12% 27% 0% 0% 25% 0% 0% 25% 7 Start Date May-00 May-00 Nov-00 Nov-00 Nov-00 May-01 May-01 May-01 Nov-01 Nov-01 Nov-01 8 End Date Apr-02 Oct-00 Oct-05 Oct-02 Apr-01 Apr-03 Apr-02 Oct-01 Oct-03 Oct-02 Apr-02 [1] Note: Some TCC durations were not offered for sale in the Initial Auctions of 2001, but were offered in the Stage Two reconfiguration rounds. (Marked with asterisk). [2] Duration of TCCs offered in sub-auction. [3] All TCCs offered so far are valid in all-hours, but market rules make allowances for TCCs valid only during peak or off-peak times. [4] The number of rounds in Stage 1. [5] = Number of TCCs in given sub-auction / number of TCCs in all sub-auctions. [6] = Number of TCCs in given round of sub-auction / number of TCCs in all sub-auctions. [7] Date on which TCCs sold in sub-auction become valid. [8] Date on which TCCs sold in sub-auction expire. 48
50 49 NY AUCTIONS Auction Types New York currently holds two types of auctions: Initial auctions, held every 6 months to sell TCCs of varying durations (5-year, 2-year, 1-year and 6 months). Stage 1 sells TCCs for uncommitted grid transfer capability, transfer capability assigned to native load, and also allows reconfiguration of outstanding TCCs. Stage 2 is for reconfiguration only. Reconfiguration auctions, held monthly starting in June In addition, the NYISO has coordinated reconfiguration auctions for 1-year and 2-year TCCs in the spring and fall of 2001.
51 50 NY AUCTIONS Longer-Term TCCs The current allocation of transfer capability to support long-term TCCs is: 35%: 2-year TCCs sold spring %: 5-year TCCs sold fall %: 2-year TCCs sold fall %: 6-month TCCs sold spring 2001.
52 QUEBEC NY ISO 5-Year TCC Auction Average TCC Auction Prices ($/TCC hour) November 1, October 31, 2005 Prices portrayed for a TCC from the reference bus GLEN PARK ST. LAWRENCE FRANKLIN NINE MILE NIAGARA GINNA MARCY ALBANY DUNKIRK MILLIKEN JENNISON GILBOA HICKLING PJM GOUDEY HIGH FALLS Transmission Lines (345 kv and above) Transmission Lines (230 kv) BOWLINE ASTORIA PORT JEFFERSON BARRETT
53 52 NY AUCTION RESULTS 5 Year In the autumn of 2000, the NYISO held an auction of long-term TCCs valid for the period from November 1, 2000 through October 31, ,567 MW of TCCs were awarded. These awards defined a complete set of forward congestion prices for generators in New York.
54 NYISO 5-Year TCC Auction Nodal Prices PTID Generator Zone Round 1 Round 2 Round 3 Average LBMP $/MWh ASTORIA 5 N.Y.C. $ 182, $ 166, $ 217, $ 188, $ BOWLINE 1 HUD_VL $ 146, $ 127, $ 173, $ 149, $ BARRETT 1 LONGIL $ 155, $ 134, $ 183, $ 157, $ PORT_JEFF_3 LONGIL $ 157, $ 136, $ 185, $ 159, $ DUNKIRK 1 WEST $ 25, $ 20, $ 24, $ 23, $ ALBANY 3 CAPITL $ 175, $ 151, $ 206, $ 177, $ GOUDEY 7 CENTRL $ 45, $ 40, $ 52, $ 46, $ MILLIKEN 1 CENTRL $ 23, $ 19, $ 25, $ 22, $ GILBOA CAPITL $ 136, $ 117, $ 159, $ 137, $ ST_LAWRENCE NORTH $ (1,873.74) $ (1,944.57) $ (2,505.97) $ (2,108.09) $ (0.0481) GINNA GENESE $ 14, $ 11, $ 15, $ 13, $ HICKLING 1 CENTRL $ 35, $ 29, $ 39, $ 35, $ JENNISON 1 CENTRL $ 51, $ 45, $ 60, $ 52, $ NINE_MILE_2 CENTRL $ 8, $ 7, $ 9, $ 8, $ HIGH_FALLS HY HUD_VL $ 146, $ 126, $ 169, $ 147, $ NIAGARA WEST $ 16, $ 13, $ 18, $ 15, $ GLEN_PARK MHK_VL $ 5, $ 4, $ 6, $ 5, $ NYISO_LBMP_REFERENCE MHK_VL $ - $ - $ - $ - $ FRANKLIN_FALL_HYD NORTH $ (3,353.24) $ (3,596.40) $ (4,200.01) $ (3,716.55) $ (0.0848) PJM_PROXY_BUS PJM $ 33, $ 27, $ 35, $ 32, $
55 54 NY AUCTION RESULTS Auction Rounds A distinctive feature of the New York long-term TCC auctions is that they are structured to take place in rounds to allow market participants to adjust their strategies in the course of the auction. This is not an iterative bidding process; market-clearing prices are determined and TCCs are sold in each round. This process allows market participants to adjust the TCCs they seek to buy as the auction proceeds.
56 NYISO 5-Year TCC Auction Binding Constraints Contingency Constraints: Round 1 Round 2 Round 3 Freshkills 138 kv Phase Angle Regulator for tower contingency : X X X Goethals North to Freshkills 345 kv X X X Goethals South to Freshkills 345 kv X X X Goethals to Linden 230 kv X X X East 13 th St. 345/69 kv Transformer for bus contingency: X X West 49 th St. East 13 th St. 345 kv X X East 13 th St. Farragut 345 kv X X East 13 th St. 345/138 kv Transformer #14 X X East 13 th St. 345/138 kv Transformer # 15 X X Inghams Phase Angle Regulator 115 kv for tower contingency: X X X Marcy Coopers Corners 345 kv X X X Edic Fraser 345 kv X X X Plattsburgh Grand Island 115 kv X X X Parishville Colton 115 kv for contingency: X X Moses Willis 230 kv X Moses Willis 230 kv X Willis Plattsburgh 230 kv X Willis Plattsburgh 230 kv X Plattsburgh 230/115 kv Transformer X Marcy 765/345 kv Transformer T1 X Marcy 765/345 kv Transformer T2 X Chateauguay Massena 765 kv X Leeds Pleasant Valley 345 kv for loss of Leeds Pleasant Valley 345 kv X Nine Mile Pt. Scriba 345 kv for loss of Nine Mile Pt. Clay 345 kv X Packard Huntley 230 kv for loss of Packard Huntley 230 kv X X
57 56 NY AUCTION RESULTS Active Constraints A large number of constraints were binding in the three rounds of the 5-year FTR auction. 19 constraints were binding in all three rounds. 40 constraints were binding in one or more rounds. At least 25 constraints were binding in every round. NYISO 5-Year TCC Auction Binding Constraints Normal Loading Constraints: Round 1 Round 2 Round 3 Gowanus South Greenwood 138 kv X X X Fresh Kills Phase Angle Regulator 138 kv X X X Tremont Phase Angle Regulator 138 kv X Dunwoodie E179th Street 138 kv X X X Dunwoodie Sherman Creek 138 kv X E179th Street Hellgate 138 kv X X X Rainey Vernon 138 kv X X X Jamaica Corona 138 kv X X X Greenwood Vernon 138 kv X X West 49 th St. 345/138 kv Transformer X X X Dunwoodie Rainey 345 kv X X X Goethals South Gowanus South 345 kv X X X Cedars Rosemont 115 kv X X X Eastview Kensico 138 kv X Central East Interface X X X
58 New York TCC Monthly Reconfiguration Auction Purchases and Sales 3,500 Total TCCs Purchased Total TCCs Sold 3,000 2,500 MW TCCs 2,000 1,500 1, * * 0 Jun-00 Jul-00 Aug-00 Sep-00 Oct-00 Nov-00 Dec-00 Jan-01 Feb-01 Mar-01 Apr-01 May-01 Jun-01 Jul-01 * Data not posted Month 57
59 58 NY AUCTION RESULTS Reconfiguration Volume The volume of TCC purchases in New York s monthly reconfiguration auctions quickly reached a substantial level.
60 New York TCC Monthly Reconfiguration Auction Purchases, Sales and Purchases at Negative Prices 3,500 3,000 Purchases -- Positive TCC Price Purchases -- Negative TCC Price Sales 2,500 MW TCCs 2,000 1,500 1, * Jun-00 Jul-00 Aug-00 Sep-00 Oct-00 Nov-00 Dec-00 Jan-01 Feb-01 Mar-01 Apr-01 May-01 Jun-01 Jul-01 Date * Data not posted 59
61 60 NY AUCTION RESULTS Sales As in PJM, New York market participants have sold congestion management forward by purchasing TCCs at negative prices. Aquila and Mirant were among the entities selling counterflow TCCs in the June 2001 reconfiguration auction. June 2001 Seller Point of Injection Point of Withdrawal TCCs Price MW/Month Aquila Hudson Valley Zone G West Zone A 100 -$9, Mirant Mohawk Valley Zone E Marcy (NYISO Reference Bus)
62 61 OBSERVATIONS The experience to date with FTR auctions suggests a few conclusions: Conclusions Point-to-point financial transmission rights work and are accepted as a fundamental part of an open access electricity market. Auctions of point-to-point financial transmission rights can be implemented, either as periodic reconfiguration auctions or as the primary mechanism for allocating financial transmission rights. Monthly reconfiguration auctions have proved to be highly successful mechanisms for reconfiguring point-to-point financial transmission rights and have proved to be highly liquid.
63 62 OBSERVATIONS Next Steps The development of point-to-point financial transmission rights is not complete. Areas of continuing development include: Allocating point-to-point financial transmission rights for transmission expansions. Implementing point-to-point multi-duration financial transmission rights auctions. Implementing the simultaneous feasibility test for point-topoint financial options.
64 63 Susan L. Pope (617) Massachusetts Ave East Bypass 2000 Powell St Orrington Ave. Suite 300 Suite 4800 Suite 600 Suite 2000 Cambridge, MA College Station, TX Emeryville, CA Evanston, IL (617) (409) (510) (847) (617) fax (409) fax (510) fax (847) fax 445 S. Figueroa St Broadway 201 South Main 1725 Eye Street, NW 26th Floor 38th Floor Suite 900 Suite 800 Los Angeles, CA New York, NY Salt Lake City, UT Washington, DC (213) (212) (801) (202) (213) fax (212) fax (801) fax (202) fax Av. Julio A. Roca 781, Piso 4 40/43 Chancery Lane 180 Bloor Street West 9th Floor, 1 Willeston St. (1067) Buenos Aires London WC2A 1JA, England Suite 1400 P.O. Box 587 Argentina Toronto, Ontario M5S 2V6 CanadaWellington, New Zealand fax (416) fax (416) fax fax
EXCEPTIONS TO NYSRC RELIABILITY RULES
1 NYPA Run Back of EXCEPTIONS RELIABILITY RULES REVISION 1 MAY 11, 2010 Post Contingency Flow on Marcy-New Scotland The post-contingency flow on the Marcy-New Scotland 18 line is allowed to exceed its
More informationEXCEPTIONS TO RELIABILITY RULES REVISION 4 MAY 8, 2015
1 NYPA Run Back of EXCEPTIONS RELIABILITY RULES REVISION 4 MAY 8, 2015 Post Contingency Flow on Marcy-New Scotland The post-contingency flow on the Marcy-New Scotland 18 line is allowed to exceed its LTE
More informationMonthly Report November 2016
Monthly Report November 2016 TABLE OF CONTENTS Operations Performance Metrics Report Market Operation s Report Daily Loads Regulatory Filings November 2016 Operations Performance Metrics Monthly Report
More informationMonthly Report December 2017
Monthly Report December 2017 Table of Contents Operations Performance Metrics Report Market Operation s Report Daily Loads Regulatory Filings Operations Performance Metrics Monthly Report December 2017
More informationEXCEPTIONS TO RELIABILITY RULES Revision 11 February 9, 2018
1 NYPA Run Back of EXCEPTIONS RELIABILITY RULES Revision 11 February 9, 2018 Post Contingency Flow on Marcy-New Scotland The post-contingency flow on the Marcy-New Scotland 18 line is allowed to exceed
More information2017 Interim Area Transmission Review of the New York State Bulk Power Transmission System
2017 Interim Area Transmission Review of the New York State Bulk Power Transmission System A Draft Report by the New York Independent System Operator October 24, 2017 - DRAFT DRAFT PURPOSES ONLY NYISO
More informationMonthly Report May 2016
Monthly Report May 2016 TABLE OF CONTENTS Operations Performance Metrics Report Market Operation s Report Daily Loads Regulatory Filings May 2016 Operations Performance Metrics Monthly Report May 2016
More informationEXCEPTIONS TO RELIABILITY RULES Revision 10 August 11, 2017
1 NYPA Run Back of EXCEPTIONS RELIABILITY RULES Revision 10 August 11, 2017 Post Contingency Flow on Marcy-New Scotland The post-contingency flow on the Marcy-New Scotland 18 line is allowed to exceed
More informationOverview of ISO New England and the New England Wholesale Power Markets
Overview of ISO New England and the New England Wholesale Power Markets Boston Chapter of IEEE PES Technical Meeting June 15, 2010 Stephen J. Rourke Vice President, System Planning About ISO New England
More informationPower Systems Fundamentals
Power Systems Fundamentals Yachi Lin Senior Manager, Transmission Planning New York Independent System Operator Market Overview Course September 20, 2017 Rensselaer, NY 2017 New York Independent System
More informationThe Long-Range Transmission Plan
The Long-Range Transmission Plan 2015 2025 Matt Koenig Presentation to ESPWG / TPAS October 29 th, 2015 Long-Range Transmission Plan Driver of the Plan is to maintain local reliability 10-year planning
More informationThe New York State Bulk Power Transmission Facilities
7040 CHATEAUGUAY 765 MASSENA 765 BK 1 MARCY 765 MARCY 345 BK 2 MARCY 765 MARCY 345 MSU1 MASSENA 765 MARCY 765 BK 1 MASSENA 765 MASSENA A 230 BK 2 MASSENA 765 MASSENA B 230 5018 BRANCHBURG 500 RAMAPO 500
More informationAugust 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.
California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 August 15, 2017 Re: California
More information2013 CARIS Phase 1 Report
2013 CARIS Phase 1 Report Timothy Duffy Manager, Economic Planning New York Independent System Operator Business Issues Committee September 18, 2013 KCC 2013 New York Independent System Operator, Inc.
More informationOctober 17, Please contact the undersigned directly with any questions or concerns regarding the foregoing.
California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 October 17, 2017 Re: California
More informationDMM 2017 Q4 Report Highlights
DMM 2017 Q4 Report Highlights Gabe Murtaugh Senior Analyst Department of Market Monitoring Conference Call February 21, 2018 Outline Real-time market performance Higher prices in the 15-minute market Large
More informationDepartment of Market Quality and Renewable Integration November 2016
Energy Imbalance Market March 23 June 3, 216 Available Balancing Capacity Report November 1, 216 California ISO Department of Market Quality and Renewable Integration California ISO i TABLE OF CONTENTS
More informationPower System Fundamentals
Power System Fundamentals Horace Horton Senior Market Trainer, Market Training, NYISO New York Market Orientation Course (NYMOC) June 5-8, 2018 Rensselaer, NY 12144 Session Objectives At the end of this
More informationMarch 14, Please contact the undersigned directly with any questions or concerns regarding the foregoing.
California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 March 14, 2017 Re: California
More informationWestern NY Public Policy Transmission Planning Report
Western NY Public Policy Transmission Planning Report Dawei Fan Supervisor, Public Policy and Interregional Planning Business Issues Committee September 12, 2017 Operating Committee September 15, 2017
More informationTransmission Planning for Wind Energy Resources in the Eastern United States. Dale Osborn
Transmission Planning for Wind Energy Resources in the Eastern United States Dale Osborn Layered Design Typical utility planning Distribution delivery to loads Lower voltage transmission delivery from
More informationWholesale Electric Market Economics
Wholesale Electric Market Economics Sponsored by the Institute for Policy Integrity 15 June 2011 Presented by Doug Hurley and Paul Peterson New England Markets and Relative Size All other ancillary services
More informationDeregulating Electricity Markets: Naïve Hopes vs. Market Reality
Deregulating Electricity Markets: Naïve Hopes vs. Market Reality Lester Lave, Seth Blumsack, Jay Apt, & Sarosh Talukdar Electricity Center Carnegie Mellon University February 3, 2004 1 The U.S. Electricity
More informationJanuary 18, Docket: ER Energy Imbalance Market Special Report Transition Period August 2018 for Idaho Power Company
California Independent System Operator Corporation January 18, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California
More information2016 Load & Capacity Data Report
Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation, accuracy, completeness
More informationMeridian Energy monthly operating report for December 2017
Release Stock exchange listings: NZX (MEL) ASX (MEZ) Meridian Energy monthly operating report for December 217 Attached is Meridian Energy Limited's monthly operating report for the month of December 217.
More informationNet Consumption (GWh)
GEORGIAN ENERGY MARKET Over the last 20 years Georgia s power market has evolved from a vertically integrated single buyer utility, to a competitive regional power market model. The Georgian wholesale
More informationDecember 4, Docket: ER Energy Imbalance Market Special Report Transition Period July 2018 for Idaho Power Company
California Independent System Operator Corporation December 4, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California
More informationSUMMARY OF NYISO INTERFACE LIMITS AND OPERATING STUDIES
Summary of NYISO Interface Limits and Operating Studies SUMMARY OF NYISO INTERFACE LIMITS AND OPERATING STUDIES Summary of NYISO Interface Limits and Operating Studies SUMMARY OF NYISO INTERFACE LIMITS
More informationSECTION 3 - ENERGY MARKET, PART 2
ENERGY MARKET, PART 2 3 3 - ENERGY MARKET, PART 2 The Market Monitoring Unit (MMU) analyzed measures of PJM Energy Market structure, participant conduct and market performance for the first six months
More informationWhat is the Future of Competitive Markets? Some Fundamental Preliminaries and View from Events in the PJM Market
What is the Future of Competitive Markets? Some Fundamental Preliminaries and View from Events in the PJM Market Paul M. Sotkiewicz, Ph.D President December 7, 2016 What are the ideal properties of competitive
More informationCreating A Greener Energy Future For the Commonwealth. Massachusetts Solar Carve-Out (SRECs): Overview & Program Basics.
Massachusetts Solar Carve-Out (SRECs): Overview & Program Basics December 18, 2012 Outline Learn how the solar PV market has grown in MA since 2007 Understand the policy design of the MA Solar Carve-Out
More informationJanuary 18, Docket: ER Energy Imbalance Market Special Report Transition Period September 2018 for Idaho Power Company
California Independent System Operator Corporation January 18, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California
More informationCalifornia ISO. Q Report on Market Issues and Performance. December 8, Department of Market Monitoring
California Independent System Operator Corporation California ISO Q3 2017 Report on Market Issues and Performance December 8, 2017 Department of Market Monitoring TABLE OF CONTENTS Executive summary...
More informationPS North Closed Loop Interface. PJM FTRSTF Meeting July 16, Highlands Energy Group Martin Matijasich
PS North Closed Loop Interface PJM FTRSTF Meeting July 16, 2014 Highlands Energy Group Martin Matijasich 1 Closed Loop Interfaces Overview Closed Loop Interface Implemented Purpose BCPEP 2013 (?)? ATSI
More informationEITF Issue 15-A, Application of the Normal Purchases and Normal Sales Scope Exception to Certain Electricity Contracts within Nodal Energy Markets
EITF Issue 15-A, Application of the Normal Purchases and Normal Sales Scope Exception to Certain Electricity Contracts within Nodal Energy Markets Education Session January 22, 2014 1 Overview and agenda
More informationWhy Japan remains skeptical of restructuring Study of Electricity Market Bidding Characteristics for Modeling Generation Capacity Growth
Why Japan remains skeptical of restructuring Study of Electricity Market Bidding Characteristics for Modeling Generation Capacity Growth Satoru Ihara Retired (urotas@ieee.org) Tetsuo Sasaki, Toshihisa
More informationCommercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow
Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 2,038 2,922 4,089 4,349 6,256 7,124 8,885 8,885 8,885 8,885 8,885 8,885 9,107
More informationUpdate on the Philippine Wholesale Electricity Spot Market
Update on the Philippine Wholesale Electricity Spot Market A Presentation to the APEx Asia Pacific Conference New Delhi, India 1 Presentation WESM Overview 2010 Market Results Market Outlook 2 WESM Overview
More informationHurricane Sandy. Preparations, Response & Recovery. Wes Yeomans Vice President Operations Management Committee Meeting November 2, 2012
Hurricane Sandy Preparations, Response & Recovery Wes Yeomans Vice President Operations Management Committee Meeting November 2, 2012 Topics Storm Preparation Sequence of Events Infrastructure Status Operations
More informationNEWS Release. U.S. Manufacturing Technology Orders. Year-to-date U.S. manufacturing technology orders up 4.1% over 2011
U.S. Manufacturing Technology Orders A statistical program of AMT NEWS Release FOR RELEASE: October 8, 2012 Contact: Pat McGibbon, AMT, 703-827-5255 Year-to-date U.S. manufacturing technology orders up
More informationGridView An Analytic Tool for. ABB Inc. Electric Systems Consulting. Market Simulation & Asset Performance Evaluations. ABB Inc.
ABB Inc. Electric Systems Consulting GridView An Analytic Tool for Market Simulation & Asset Performance Evaluations Outline What is GridView about? GridView Capabilities and Functional Highlights Demonstration
More informationSecurity of Supply. on the European Electricity Market
Security of Supply on the European Electricity Market What is Security of Supply? A reliable supply of energy Reliable transportation of supply Reliable distribution and delivery of supply to the final
More informationMonthly Operating Report. September 2016
Monthly Operating Report September 20 September overview» For the month of September 20 Contact recorded: Electricity, gas and steam sales of 819 GWh (September 2015: 821 GWh) Netback of $79.50/MWh (September
More information2013 Intermediate Area Transmission Review Of the New York State Bulk Power Transmission System (Study Year 2018) DRAFT REPORT
2013 Intermediate Area Transmission Review Of the New York State Bulk Power Transmission System (Study Year 2018) DRAFT REPORT March 20, 2014 Caution and Disclaimer The contents of these materials are
More informationMonthly Operating Report. January 2019
Monthly Operating Report January 2019 January overview For the month of January 2019» The Customer business recorded: Mass market electricity and gas sales of 281 GWh (January 20: 282 GWh) Mass market
More informationParticipation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market
Beacon Power Corporation Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market Prepared for: New York Business Issues Committee May 21, 2008 Safe Harbor
More informationAncillary Services. Horace Horton Senior Market Trainer, Market Training, NYISO. New York Market Orientation Course (NYMOC)
Ancillary Services Horace Horton Senior Market Trainer, Market Training, NYISO New York Market Orientation Course (NYMOC) June 5-8, 2018 Rensselaer, NY 12144 1 Ancillary Services SESSION OBJECTIVES: attendees
More informationGenbright LLC. AEE Technical Round Table 11/15/2017
Genbright LLC AEE Technical Round Table 11/15/2017 About Genbright Founded in 2013, Genbright was created to develop and monetize distributed energy technologies across the power industry including distributed
More informationCITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS
CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS July 15, 2004 TABLE OF CONTENTS Page No. 1. Description of Pasadena s Transmission Lines and Facilities...1 A. Overview:... 1 B.
More informationDocket No. ER June 2018 Informational Report Energy Imbalance Market Transition Period Report Idaho Power Company
California Independent System Operator Corporation August 21, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California
More informationNEU Electric and Natural Gas Price Update
$ / MWH Jan-11 May-11 Sep-11 Sep-12 Jan-13 Electric: Short-Term Outlook The NYMEX Northern Illinois Hub 12-month forward price at the end of August 2016 for the September 2016 to August 2017 period was
More informationTransmission Congestion Contract Settlements
Transmission Congestion Contract Settlements Gina E. Craan Manager, Market Training New York Independent System Operator Accounting & Billing Workshop October 18 20, 2016 Latham, New York 2016 New York
More informationNational Electricity Market of Singapore: The Road to Liberalisation and Challenges Ahead
National Electricity Market of Singapore: The Road to Liberalisation and Challenges Ahead Yip Pak Ling Senior Vice President, Market Operations Energy Market Company 1 Agenda Singapore s reform programme
More informationElectric Power Transmission: Research Needs to Sustain a Critical National Infrastructure
Electric Power Transmission: Research Needs to Sustain a Critical National Infrastructure Robert J. Thomas Cornell University Energy Council s 2003 Federal Energy and Environmental Matters Conference March
More informationNew Jersey State Report
New Jersey State Report July 2017 Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast 2. Markets Capacity Market Results Market Analysis 3. Operations Emissions
More informationJanuary Manufacturing Technology Orders Off After a Strong December
Contact: Bonnie Gurney, AMT, 703-827-5277 bgurney@amtonline.org For Release: March 9, 2015 January Manufacturing Technology Orders Off After a Strong December January U.S. manufacturing technology orders
More informationTransmission Expansion Advisory Committee
Transmission Expansion Advisory Committee February 7, 2013 1 Issues Tracking 2 Issues Tracking Open Issues None New Issues 3 2013 RTEP Scenario Analysis 4 RTEP Scenario Analysis 2012 North Carolina Transmission
More informationMMP Investigation of Arthur Kill 2 and 3
MMP Investigation of Arthur Kill 2 and 3 Requestor Consolidated Edison Company of New York, Inc. Facility Name Arthur Kill 2 and 3 Date of Request January 27, 2003 Type of Facility NG Generator Topic of
More informationMonthly Operating Report. December 2017
Monthly Operating Report December 20 December overview» For the month of December 20 Contact recorded: Electricity and gas sales of 571 GWh (December 2016: 582 GWh) Netback of $79.23/MWh (December 2016:
More informationWestern NY Public Policy Transmission Report
Western NY Public Policy Transmission Report Dawei Fan Supervisor, Public Policy and Interregional Planning ESPWG/TPAS July 20, 2017, KCC Agenda Public Policy Transmission Planning Process Western NY Public
More informationEconomics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017
Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017 Presentation Outline Understanding LPEA s expenses and what drives them Economics of net metering
More informationIMM Quarterly Report: Summer 2017
IMM Quarterly Report: Summer 2017 MISO Independent Market Monitor David Patton, Ph.D. Potomac Economics September 19, 2017 Highlights and Findings: Summer 2017 The MISO markets performed competitively
More informationOperational Opportunities to Minimize Renewables Curtailments
Operational Opportunities to Minimize Renewables Curtailments Clyde Loutan Principal, Renewable Energy Integration July 24, 2017 2017 CAISO - Public Page 1 Agenda Background Real-time control performance
More informationProposal Concerning Modifications to LIPA s Tariff for Electric Service
Proposal Concerning Modifications to LIPA s Tariff for Electric Service Requested Action: LIPA Staff proposes revisions to the Tariff for Electric Service under Service Classification No. 11 ( SC-11 ),
More informationResidential Load Profiles
Residential Load Profiles TABLE OF CONTENTS PAGE 1 BACKGROUND... 1 2 DATA COLLECTION AND ASSUMPTIONS... 1 3 ANALYSIS AND RESULTS... 2 3.1 Load Profiles... 2 3.2 Calculation of Monthly Electricity Bills...
More informationOctober 1, Docket: ER Energy Imbalance Market Special Report Transition Period June 2018 for Powerex Corp.
California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 October 1, 2018 Re: California
More informationCreating A Greener Energy Future For the Commonwealth. Massachusetts RPS Solar Carve-Out: Overview & Program Basics.
Massachusetts RPS Solar Carve-Out: Overview & Program Basics November 2, 2011 Outline Learn how the solar PV market has grown in MA since 2007 Understand the policy design of the MA RPS Solar Carve-Out
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates For Internal Use Only. FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationM A N I T O B A ) Order No. 42/14 ) THE PUBLIC UTILITIES BOARD ACT ) April 23, 2014
M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Régis Gosselin, B ès Arts, M.B.A., C.G.A., Chair Larry Soldier, Member Marilyn Kapitany, B.Sc. (Hons.), M.Sc., Member Neil Duboff, B.A. (Hons.),
More informationReview of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items
Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items Stakeholder Meeting January 30, 2018 Keith Johnson Infrastructure and Regulatory Policy
More informationFebruary 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426
California Independent System Operator Corporation February 10, 2016 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California
More informationRevising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows
Revising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows 1961-2007 Background The Niagara River flow at Buffalo is currently computed
More informationGAZIFÈRE INC. Prime Rate Forecasting Process 2017 Rate Case
Overview A consensus forecast is used to estimate the prime rate charged by commercial banks. As the prime rate is subject to competitive pressures faced by individual lenders and is set on an individual
More information2017 State of the Market Report for PJM. Eagleville, PA
2017 State of the Market Report for PJM March 8, 2018 Eagleville, PA Joe Bowring Market Monitoring Unit Monitoring Analytics, LLC o Independent company o Formed August 1, 2008 Independent Market Monitor
More informationCapacity Market Rules for Energy Storage Resources
Capacity Market Rules for Energy Storage Resources Zachary T Smith Manager, Capacity Market Design ICAPWG August 23 rd, 2018 Agenda Background Energy Storage Resource (ESR) overview Capacity Market Rules
More informationMonthly Operating Report. February 2018
Monthly Operating Report February 2018 February overview» For the month of February 2018 Contact recorded: Electricity and gas sales of 534 GWh (February 20: 551 GWh) Netback of $82.16/MWh (February 20:
More informationDemystifying Your Utility Bill
New York City Chapter Hospitality Financial and Technology Professionals DEIRDRE LORD PH: (917) 750-3771 EMAIL: DLORD@THEMWH.COM Demystifying Your Utility Bill HFTP NYC CHAPTER MONTHLY MEETING JUNE 20,
More informationRobert L. Mitchell CEO and Co-Founder Atlantic Wind Connection
Robert L. Mitchell CEO and Co-Founder Atlantic Wind Connection New Jersey Energy Link Electric superhighway connecting northern, central and southern New Jersey Delivers 3,000 megawatts of electricity
More informationElectric Power Research Institute, USA 2 ABB, USA
21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Congestion Reduction Benefits of New Power Flow Control Technologies used for Electricity
More informationELECTRICITY GENERATION AND DISTRIBUTION. Electricity Generation & Distribution Q2,
Contact Statistician: Otsile Chelenyane Industry Statistics Unit Email: ochelenyane@statsbots.org.bw Tel: (+267) 367 1300; Ext. 333 ELECTRICITY GENERATION AND DISTRIBUTION Stats Brief, Quarter 2, 2018
More informationPassive Investors and Managed Money in Commodity Futures. Part 2: Liquidity. Prepared for: The CME Group. Prepared by:
Passive Investors and Managed Money in Commodity Futures Part 2: Liquidity Prepared for: The CME Group Prepared by: October, 2008 Table of Contents Section Slide Number Objectives and Approach 3 Findings
More informationFOR IMMEDIATE RELEASE
Article No. 7845 Available on www.roymorgan.com Roy Morgan Unemployment Profile Friday, 18 January 2019 Unemployment in December is 9.7% and under-employment is 8.8% FOR IMMEDIATE RELEASE Australian unemployment
More informationM onthly arket. Jan Table of Contents. Monthly Highlights
Table of Contents Market Inventory...2 www.gaar.com Monthly Highlights January 2014 had a 12.29% increase in the number of homes sales when compared to same time last year. The average sale price of single-family
More informationArizona Energy Consortium Conference
SunZia Southwest Transmission Project SunZia and Potential Impacts of Regionalization Arizona Energy Consortium Conference SUNZIA SOUTHWEST TRANSMISSION PROJECT SEPTEMBER 2018 0 SunZia: 500kV Project delivering
More informationThe Transmission Lay of the Land
The Transmission Lay of the Land Overview Energy Markets Transmission Planning Beth Soholt John Moore April 21, 2010 Overview Regional Transmission Organizations Organizations of transmission owners, users,
More informationNEPOOL Participants Committee Report
NEPOOL Participants Committee Report July 2017 Vamsi Chadalavada E X E C U T I V E V I C E P R E S I D E N T A N D C H I E F O P E R A T I N G O F F I C E R Table of Contents Highlights Page 3 System Operations
More informationMINIMUM OIL BURN/AUTOMATIC FUEL SWAPPING CAPABILITY
1.0 PURPOSE... 2 2.0 MINIMUM OIL BURNING/AUTOMATIC FUEL SWAPPING CAPABILITY NOTIFICATIONS... 3 3.0 MINIMUM OIL BURNING/AUTOMATIC FUEL SWAPPING CAPABILITY CRITERIA... 5 4.0 MINIMUM OIL BURNING/AUTOMATIC
More information2013 / 2014 Revenue Comparison: OCTOBER
CAR RENTAL GROSS REVENUES 2013 / Revenue Comparison: OCTOBER COMPANY 2013 incr./decr. % change Advantage 1,049,117.25 1,679,547.68 630,430.43 60.1% Alamo/National 5,448,360.80 8,262,318.28 2,813,957.48
More informationOperational Forum Meeting. Wednesday 12th December 2012, 10:30AM Radisson Grafton Hotel, 130 Tottenham Court Road, London.
Operational Forum Meeting Wednesday 12th December 212, 1:3AM Radisson Grafton Hotel, 13 Tottenham Court Road, London. System Management Principles Statement System Management Principles Statement Compliance
More informationPrice Category Breakdown - February 2010
SINGLE FAMILY RESIDENTIAL BREAKDOWN ruary 21 ruary Sales and Average Price Increase Annually TORONTO - Wednesday, March 3, 21 7.3 % 24.6 % 1.8 % 7.3%.2%.1 % Greater Toronto REALTORS reported 7,291 sales
More informationMONTHLY PERFORMANCE DASHBOARD
AUSTIN ENERGY MARCH 21 MONTHLY PERFORMANCE DASHBOARD A report highlighting key Austin Energy metrics for uary FY 21 FINANCIAL HEALTH Standard and Poor s Bond Rating Current AA AA Budget Based Revenues
More informationSound Transit Operations July 2016 Service Performance Report. Ridership
Ridership Total Boardings by Mode Mode Jul-15 Jul-16 % YTD-15 YTD-16 % ST Express 1,618,779 1,545,852-4.5% 10,803,486 10,774,063-0.3% Sounder 333,000 323,233-2.9% 2,176,914 2,423,058 11.3% Tacoma Link
More informationWESTERN EIM BENEFITS REPORT Second Quarter 2018
WESTERN EIM BENEFITS REPORT Second Quarter 2018 July 31, 2018 www.westerneim.com CONTENTS EXECUTIVE SUMMARY... 3 BACKGROUND... 4 EIM BENEFITS IN Q2 2018... 4 INTER-REGIONAL TRANSFERS... 5 WHEEL THROUGH
More informationRegulation Update. Operating Committee September 12, PJM 2017
Regulation Update Operating Committee September 12, 2017 Regulation Market Clearing Price *Data up to Aug 22 2 Mileage Ratio Mileage Ratio has increased since the new signal implementation Larger Utilization
More informationEnergy Markets in Turmoil The Consumer Perspective
Energy Markets in Turmoil The Consumer Perspective Sonny Popowsky Consumer Advocate of Pennsylvania Illinois State University Institute for Regulatory Policy Studies 63682 Springfield, IL May 17, 2001
More informationAncillary Services. Horace Horton. Market Overview Course. Senior Market Trainer, Market Training, NYISO. March 8, Rensselaer, NY 12144
Ancillary Services Horace Horton Senior Market Trainer, Market Training, NYISO Market Overview Course March 8, 2018 Rensselaer, NY 12144 1 Ancillary Services Objectives At the end of this session attendees
More informationNYISO OPERATING STUDY WINTER Prepared by Transmission Studies Staff New York Independent System Operator, Inc.
Prepared by Transmission Studies Staff New York Independent System Operator, Inc. Approved by the NYISO Operating Committee December 18, 2008 Caution and Disclaimer The contents of these materials are
More informationSettlements. Billing and Accounting Working Group April 20, Settlements Analysis Analyst New York Independent System Operator
Station Power Settlements Timothy Bulsiewicz Settlements Analysis Analyst New York Independent System Operator Billing and Accounting Working Group April 20, 2012 NYISO KCC 2012 New York Independent System
More information