1 Heliosiesmic & Magnetic Imager Doc# HMI00823 Contract #: PY-2223 Cage Code: Total Pages: 7 Monthly Progress Report January 2005 Lockheed Martin Space Systems Company Advanced Technology Center Lockheed Martin Solar & Astrophysics Laboratory (LMSAL) 3251 Hanover Street, Palo Alto, CA

2 Table of Contents 1.0 Introduction Executive Summary Technical Progress Report Filters and Optics Mechanical Mechanisms Electrical Software I&T Thermal Major Sub-contracts CCD e2v Camera Electronics - RAL Michelson LightMachinery Structure Vision Composites Design Updates Resource Requirements Schedule and Control Milestones Critical Path Risk Assessment... 7 Page 2 of 7

3 1.0 Introduction This is the monthly progress report for the month of December 2005 of the HMI program for the progress undertaken by LMSAL under the phase C/D/E contract with Stanford. The LMSAL team is in collaboration with Stanford University on the HMI/SDO solar physics investigation being led by Professor Phil Scherrer of Stanford University. 2.0 Executive Summary January was a hectic month getting the structural model done and the ETU oven done. Some more January highlights: HCM life test is at 38.7 of 180 M moves, the structural model was aligned and shipped to Wyle for vibration testing, ETU oven assembly was completed, the focus/cal was tested, held Michelson performance review (PSR), received the remaining optics and 7 CCD were packaged. The HMI team continues to hold weekly team meetings internally, with the SDO Project and with suppliers. 3.0 Technical Progress Report 3.1 Filters and Optics All the documentation for the request for quotation for the front window filter is completed. The specification was reviewed by Andover and was released. As soon as the quote is received, the order can be placed. The primary and secondary lens focus measurements were completed and are within specification. The Lyot filter is coming together. The polarizers were completed and integrated with the elements, the temperature compensation measurements were completed and the cells were received. The next thing is characterization within The dye laser technician is schedule to come this week (actually here today). The chamber for the plasma radiation test is up and running and the test has been scheduled for later in February. 3.2 Mechanical The structural model assembly was completed. The structure needed a little bit of rework. When the aft flange design was completed, the mounting holes for to the bracket were moved to the exterior to accommodate the secondary lens mount and it was over looked that the ears would not fit through the hole in the structure. The structure was modified to accommodate the ears and the supplier was notified to incorporate into the flight design. Also, an EMI labyrinth will be added to block the holes. The HOP alignment cube was measured relative to the vibration fixture and the internal cubes were measured relative to the HOP alignment cube. The repeatability was checked with removal of the cover and the HOP from the vibration fixture. The harness layout was completed and back-shells selected (order in progress). The sunshade for the CCD radiators was completed and incorporated into the thermal and structural models. The z lifting plate was completed. Lizzie Barnett has moved on to another program, thanks for all her hard work on the Page 3 of 7

4 mechanism, ISS mirror, Limb sensor, ISS beam splitter and BDS beam-splitter designs and drawings. Complete Structural Model (on CG table) 3.3 Mechanisms The HCM life test is up to 38.7 of 180M moves. The life test shutters are being tested prior to disassembly. The focus/cal wheel prototype assembly and testing was completed and has good torque margin and works great. The first set of flight HCMs were received and the remaining units will be received mid-march. The flight actuators for the alignment mechanism and front door were received. 3.4 Electrical All boards are in test except for the power and space-wire #2 boards, which are 80% assembled. The ISS board testing is completed. Testing continues on the space-wire/dcri board for the HSB test at Goddard in March. HEB assembly and testing is progressing. A lot of focus has been applied to getting ready for AIA CDR. 3.5 Software Kernel build 2 development continues. A lot of focus has been applied to getting ready for AIA CDR. 3.6 I&T The structural model was shipped to Wyle and the all three axis completed. No anomalies observed in the data. The structure was inspected and looks great. The structural model is on its way back to Palo Alto for alignment checks. The ETU oven assembly is complete and the heaters have been tested. The thermistors have been calibrated. The vacuum testing should begin very soon. Page 4 of 7

5 Structural Model in X-axis Configuration 3.7 Thermal The reduced thermal model has been completed and the CDRL submitted to Goddard and the RFA responses are near completion. 3.8 Major Sub-contracts CCD e2v Seven flight CCDs have been packaged and processing of the batches continues on schedule. It was decided to change the process. The first two sets of the CCD delivered will be of the old process and the second two sets will be of the new process. Testing continues on the droop affect and preliminary data was presented at the quarterly Camera Electronics RAL The DM2 Camera is schedule to be shipped to mid-february and progress continues on assembly of the DM1 camera. RAL has evaluated the schedule for switching to a 6V camera design and there are minimal schedule impacts. The additional power for the 6V is acceptable by the project. The last items being evaluated are part availability and mechanical impacts Michelson LightMachinery The first set of Michelsons will be ship toward the end of February and the pre-ship review was held. No issues were raised. The wideband assembly is completed and the mirror coatings are being applied. The narrowband is currently being assembled Structure Vision Composites The drawings were reviewed for flight release and to make sure all the little details learned from the structural model assembly are incorporated. The material is in house and the machine parts that had no changes were ordered. The schedule was reviewed in detail and there is a schedule slip, as expected, due to the delay in the structural model testing and incorporating the minor design changes. The metering tube schedule was reviewed and looks pretty good. The isolator tube schedule was also reviewed and looks good as well. Page 5 of 7

6 4.0 Design Updates No design changes to report. 5.0 Resource Requirements The mass and power updates are attached. No change in mass and the power shows a slight increase due to board testing. The CEB 6V change has not been incorporated, yet. 6.0 Schedule and Control Milestones An updated detailed schedule is attached and following is a list of the control milestones and their status. CM# Line# WBS Task Finish Date Jan Dec Slack Days % CM Primary and Secondary Lenses Fabrication 11/24/04 04/15/ % CM Fabricate Flight Blocker Filters 08/20/04 04/19/ % CM Development Camera 2 Delivery 11/16/04 11/16/ % CM Structural Model Test Complete 03/02/05 03/02/ % CM Test s/c High Rate Interface Brass Board 02/10/05 02/10/05 0 0% CM06 8 Critical Design Review 11/20/04 11/20/ % CM Michelson Delivery (first set) 02/03/05 02/03/ % CM BDS BS Assembly 03/08/05 02/23/ % CM Build 2 Test (Enhanced Kernel Complete) 12/13/04 12/13/ % CM Build 4 Test (ISS/Analog Data Acquisition Complete) 01/19/05 01/19/05 0 0% CM First Lyot Filter Complete 05/13/05 05/13/05 5 0% CM Build 3 Test (Mechanism/Oven/Op Heaters Complete) 01/17/05 01/17/05 0 0% CM Receive Pre-Amp Flight Electronics 03/01/05 03/01/ % CM Fabricate Flight Aperture Filter 03/31/05 11/26/ % CM AM Flight Assembly and Test 04/20/05 03/31/ % CM Flight Structure Delivery 05/05/05 05/05/ % CM Brassboard Acceptance Test (Build 3-7) 03/15/05 03/15/05 0 0% CM HMI ISS BB Testing Complete 01/24/05 01/24/ % CM Build 5 Test (Camera Interface and DCHRI Complete) 03/08/05 03/08/05 0 0% CM Door Flight Assembly and Test 08/03/05 06/09/ % CM Shutter Flight (2) Assembly and Test 01/18/05 12/01/ % CM Telescope Assembly and Alignment 04/28/05 04/08/05-4 0% CM FW Flight (2) assembly and test 03/21/05 02/08/ % CM HEB Brassboard Ready 06/20/05 06/20/ % CM HCM.7 quartz Optic Assembly 03/29/05 03/23/ % CM Oven Controller Pre-amp Needed 03/01/05 03/01/ % CM Flight Oven Complete 08/10/05 08/10/05 2 0% CM Flight CCD (2) Delivery 05/20/05 05/16/ % CM ProtoFlight Cameras 1,2 Delivery 10/10/05 10/10/ % CM Mass Model Delivery to SDO 07/15/05 07/15/05 0 0% CM OP Integration Complete 01/05/06 01/05/ % CM Build 3 updates 09/23/05 09/23/05 0 0% Page 6 of 7

7 CM Build 5 updates 10/27/05 10/27/05 0 0% CM HEB Flight Ready 11/21/05 11/21/05 0 0% CM HEB-HOP Flight Harness Completion at Goddard 11/11/05 10/24/05 2 0% CM FSW Acceptance Test 12/08/05 12/08/05 0 0% CM HMI Instrument Functional test 02/23/06 01/13/ % CM HMI Calibration (in Air) 06/08/06 04/28/ % CM HMI Pre-Environmental Review 03/16/06 03/15/06 0 0% CM Instrument Delivery 11/30/06 11/30/ % 7.0 Critical Path The structure schedule was recently learned and has a great affect on the critical path. The I & T schedule is being in evaluated. At quick glance, the schedule slip can be mitigated with incorporating parallel paths into the schedule. A schedule review will be held to discuss the changes and I & T plan prior to submission of the modified schedule. 8.0 Risk Assessment A risk management review board was held this month. ID Risk Comments RMHMI001 CEB Noise No change. LM tests are scheduled for February. RMHMI003 CCD Development No change. Flight CCDs are packaged, and are going into evaluation. RMHMI004 CEB-HEB Noise No Change in rankings. Breadboard circuit board is still in test. RMHMI005 Calcite Availability No change. We have acceptable calcite for all flight and flight spare components. Risk will be closed when elements are tested as a Lyot filter. Dye laser needed for test not yet available. RMHMI006 Front Window No change. We have agreed on an updated flight design. Revised spec, SOW, and drawings were informally provided to Andover; released versions are to be sent to Andover in the next week. RMHMI007 Mechanism Life Hollow core motor life test continues M moves completed out of 180 M (Tuning motor lifetime has been reached). Shutter life test has successfully completed. Likelihood reduced based on progress of life tests. RMHMI009 CCD Droop Raised likelihood: Subsequent CCD testing has shown much more device to device variation than previously appreciated. Future batches of CCDs will include e2v-recommended process change to minimize the droop. RMHMI010 EPDM and ERP rollout Mitigation strategy updated. Heritage purchasing system has been shut down. ERP has rolled out. RMHMI011 FPP Rework Likelihood reduced to Low. FPP has returned, current impact is as anticipated. RMHMI012 CEB 6 V Serial Drivers New risk. Page 7 of 7

NIRCam Filter Wheels

NIRCam Filter Wheels NIRCam Filter Wheels Sean McCully, Michael Schermerhorn, John Thatcher Lockheed Martin Advanced Technology Center, 3251 Hanover Street, Palo Alto, CA 94304 ABSTRACT The NIRCam instrument will provide near-infrared

More information

GLAST Large Area Telescope: Planning Meeting December 10, 2003 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6

GLAST Large Area Telescope: Planning Meeting December 10, 2003 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Planning Meeting December 10, 2003 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J. Thompson Thomas E. Johnson NASA Goddard

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

GLAST Large Area Telescope:

GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Calorimeter (CAL) Subsystem WBS: 4.1.5 W. Neil Johnson Naval Research Lab, Washington DC Calorimeter Subsystem Manager neil.johnson@nrl.navy.mil

More information

The Advanced Instrumentation and Technology Centre (AITC)

The Advanced Instrumentation and Technology Centre (AITC) The Advanced Instrumentation and Technology Centre (AITC) ACSER CUBESAT2017: Launching CubeSats for and from Australia 19 th -20 th April 2017 QB50 Test Campaign and CubeSat testing at the AITC Mike Petkovic

More information

GLAST Large Area Telescope:

GLAST Large Area Telescope: GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope MGSE Integration Readiness Status Two Tower Operations Eric Gawehn SU-SLAC LAT I&T MGSE Dept. Manager egawehn@slac.stanford.edu 650 926

More information

GLAST LAT Project 3-4 May MGSE Design. LAT Environmental Test PDR 1

GLAST LAT Project 3-4 May MGSE Design. LAT Environmental Test PDR 1 LAT LAT Environmental Environmental Test Test Planning Planning and and Design Design Review Review 3-4 3-4 4 May May 2005 2005 MGSE Design Martin Martin Nordby Nordby Mike Mike Foss Foss Marc Marc Campell

More information

Qualification of Lockheed Martin Micro Pulse Tube Cryocooler to TRL6

Qualification of Lockheed Martin Micro Pulse Tube Cryocooler to TRL6 #29 42 1 Qualification of Lockheed Martin Micro Pulse Tube Cryocooler to TRL6 T. C. Nast, E. Roth, J. R. Olson, P. Champagne, D. Frank Lockheed Martin Space Technology and Research (STAR) Lab, Palo Alto,

More information

GLAST Large Area Telescope: Cost/Schedule Review June 30, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6

GLAST Large Area Telescope: Cost/Schedule Review June 30, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Cost/Schedule Review June 30, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J. Thompson Thomas E. Johnson NASA Goddard

More information

F135 Propulsion Integration Topics for Symposium on Jet Engines Haifa, Israel

F135 Propulsion Integration Topics for Symposium on Jet Engines Haifa, Israel F135 Propulsion Integration Topics for Symposium on Jet Engines Haifa, Israel Tom Johnson Program Chief Engineer Operational Military Engines 25 October 2012 J6924_F135_Propulsion_2012-1 Agenda F135 Development

More information

Palamede, more than a microsatellite. Workshop on University Micro Satellites in Italy Rome, July 27, 2005

Palamede, more than a microsatellite. Workshop on University Micro Satellites in Italy Rome, July 27, 2005 Palamede, more than a microsatellite The Palamede Team (represented by Franco Bernelli and Roberto Armellin) Workshop on University Micro Satellites in Italy Rome, July 27, 2005 Outline Mission and educational

More information

PETRA III Damping Sections

PETRA III Damping Sections PETRA III Damping Sections Markus Tischer, HASYLAB 05.05.06 Damping wiggler sections BINP / DESY cooperation on Damping wiggler Vacuum system Absorber M. Tischer PETRA III Damping Sections (MAC meeting,

More information

EIS MTM/TTM THERMAL BALANCE TEST SPECIFICATION, PROCEDURES AND PREDICTIONS

EIS MTM/TTM THERMAL BALANCE TEST SPECIFICATION, PROCEDURES AND PREDICTIONS SOLAR-B Instrument EIS MTM/TTM THERMAL BALANCE TEST SPECIFICATION, PROCEDURES AND PREDICTIONS Document No. BU/SLB-EIS/TN/020.03 Compiled by H. Mapson-Menard and C. V. Goodall The University of Birmingham

More information

INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur , Uttar Pradesh, India Centre for Lasers and Photonics

INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur , Uttar Pradesh, India Centre for Lasers and Photonics INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur 208016, Uttar Pradesh, India Centre for Lasers and Photonics Enquiry no.: CELP/RV/EQP/MHR/2017/1 Enquiry date: 23/04/2018 Closing date: 17/05/2018 Sealed quotations

More information

Centerwide System Level Procedure

Centerwide System Level Procedure 5.ARC.0004.2 1 of 10 REVISION HISTORY REV Description of Change Author Effective Date 0 Initial Release J. Hanratty 7/17/98 1 Clarifications based on 7/98 DNV Audit and 6/98 Internal Audit (see DCR 98-029).

More information

AMSAT-NA FOX Satellite Program

AMSAT-NA FOX Satellite Program AMSAT-NA FOX Satellite Program Review, Status, and Future JERRY BUXTON, NØJY, AUTHOR AMSAT VP-ENGINEERING Review FOX-1 - WHY IT IS, WHAT IT IS Fox Development Strategy Take advantage of large and growing

More information

1291BL Series Technical Specification Single Axis Position and Rate Table System

1291BL Series Technical Specification Single Axis Position and Rate Table System Datasheet 1291BL Series Technical Specification Single Axis Position and Rate Table System DESCRIPTION The Model 1291BL Single Axis Position and Rate Table System is designed to provide precise position,

More information

Electric Vehicles and the Environment (EVE IWG)

Electric Vehicles and the Environment (EVE IWG) Submitted by the EVE informal working group Electric Vehicles and the Environment () 1 Informal document GRPE-77-28 77 th GRPE, 6-8 June 2018 Agenda item 9 REPORT TO GRPE 77 TH SESSION Current Mandate

More information

1291BL Series Technical Specification Single-Axis Rate and Positioning Table System

1291BL Series Technical Specification Single-Axis Rate and Positioning Table System Datasheet 1291BL Series Technical Specification Single-Axis Rate and Positioning Table System DESCRIPTION The Model 1291BL Single Axis Positioning and Rate Table System is designed to provide precise position,

More information

ABI Cooler System Protoflight Performance

ABI Cooler System Protoflight Performance ABI Cooler System Protoflight Performance R. Colbert, G. Pruitt, T. Nguyen, J. Raab Northrop Grumman Space Technology Redondo Beach, CA, USA 90278 S. Clark, P. Ramsey ITT Industries Space Systems Division

More information

MOS Section Ken McCracken

MOS Section Ken McCracken MOS Section Ken McCracken July 6, 2004 KHM 1 3D MOS Section KHM 2 MOS Section Component Discussion Vacuum Housing Corrector Optics Wheel Support Plate Dekker Wheel MOS Wheel MOS Plates and Long Slits Wheel

More information

LPT6510 Pulse-tube Cooler for K applications

LPT6510 Pulse-tube Cooler for K applications 1 LPT6510 Pulse-tube Cooler for 60-150 K applications R. Arts, J. Mullié, J. Tanchon 1, T. Trollier 1. Thales Cryogenics B.V., Eindhoven, The Netherlands 1 Absolut System SAS, Seyssinet-Pariset, France

More information

AMBR* Engine for Science Missions

AMBR* Engine for Science Missions AMBR* Engine for Science Missions NASA In Space Propulsion Technology (ISPT) Program *Advanced Material Bipropellant Rocket (AMBR) April 2010 AMBR Status Information Outline Overview Objectives Benefits

More information

76th UNECE GRPE session

76th UNECE GRPE session Submitted by the IWG on PMP Informal document GRPE-74-33 76 th GRPE, 11-12 January 2018 Agenda item 7 76th UNECE GRPE session PMP IWG Progress Report Geneva, 10 th -11 th January 2018 UNITED NATIONS PMP

More information

Electric Vehicles and the Environment (EVE IWG)

Electric Vehicles and the Environment (EVE IWG) Submitted by the EVE informal working group Electric Vehicles and the Environment () 1 Informal document GRPE-78-30-Rev.1 78 th GRPE, 10-11 January 2018 Agenda item 9 REPORT TO GRPE 78 TH SESSION Original

More information

FAA Aging Electrical Systems Research Program Update Prepared for: Aging Transport Systems Rulemaking Advisory Committee January 23, 2002

FAA Aging Electrical Systems Research Program Update Prepared for: Aging Transport Systems Rulemaking Advisory Committee January 23, 2002 FAA Aging Electrical Systems Research Program Update Prepared for: Aging Transport Systems Rulemaking Advisory Committee January 23, 2002 Robert A. Pappas Federal Aviation Administration Aging Electrical

More information

The European Lunar Lander Mission

The European Lunar Lander Mission The European Lunar Lander Mission Alain Pradier ASTRA Noordwijk, 12 th April 2011 European Space Agency Objectives Programme Objective PREPARATION FOR FUTURE HUMAN EXPLORATION Lunar Lander Mission Objective

More information

2019 SpaceX Hyperloop Pod Competition

2019 SpaceX Hyperloop Pod Competition 2019 SpaceX Hyperloop Pod Competition Rules and Requirements August 23, 2018 CONTENTS 1 Introduction... 2 2 General Information... 3 3 Schedule... 4 4 Intent to Compete... 4 5 Preliminary Design Briefing...

More information

Commuter Rail Performance. October

Commuter Rail Performance. October Commuter Rail Performance October 31 2016 1 Background - overall performance Year To Date: 89.67% YTD 125,629 trains North: 90.79% YTD 48,426 trains South: 89.07% YTD 77,203 trains 2 Background - overall

More information

User Manual for the RAMK Rotational Absolute Magnetic Kit Encoder

User Manual for the RAMK Rotational Absolute Magnetic Kit Encoder VISHAY MCB www.vishay.com Variable Resistors By Frederic Bourget and Emmanuel Lemelle INTRODUCTION The purpose of this user manual is to define the precautions for unpacking, mounting, and using RAMK encoder

More information

Statement of Jim Schoppenhorst, Director, DD(X) BAE Systems / Armament Systems Division. Before the

Statement of Jim Schoppenhorst, Director, DD(X) BAE Systems / Armament Systems Division. Before the Statement of Jim Schoppenhorst, Director, DD(X) BAE Systems / Armament Systems Division Before the House Armed Services Committee's Subcommittee on Projection Forces July 20, 2005 1 House Armed Services

More information

Coaxial Pulse Tube Microcryocooler

Coaxial Pulse Tube Microcryocooler Coaxial Pulse Tube Microcryocooler J. R. Olson 1, P. Champagne 1, E. W. Roth 1, G. B. Kaldas 1, T. Nast 1, E. Saito 2, V. Loung 2, B. S. McCay 2, A.C. Kenton 3, C.L. Dobbins 4 1 Lockheed Martin Space Systems,

More information

GLAST Large Area Telescope: Planning Meeting September 3, 2003 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6

GLAST Large Area Telescope: Planning Meeting September 3, 2003 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Planning Meeting September 3, 2003 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J. Thompson Thomas E. Johnson NASA Goddard

More information

Dual Spacecraft System

Dual Spacecraft System Dual Spacecraft System Brent Viar 1, Benjamin Colvin 2 and Catherine Andrulis 3 United Launch Alliance, Littleton, CO 80127 At the AIAA Space 2008 Conference & Exposition, we presented a paper on the development

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: September 27, 2012 SUBJECT: NOTICE OF AWARD PROCUREMENT AUTHORIZATION - ARTICULATED BUSES INFORMATION ITEM RECOMMENDATION

More information

GRID MODERNIZATION INITIATIVE PEER REVIEW GMLC Control Theory

GRID MODERNIZATION INITIATIVE PEER REVIEW GMLC Control Theory GRID MODERNIZATION INITIATIVE PEER REVIEW GMLC 1.4.10 Control Theory SCOTT BACKHAUS (PI), KARAN KALSI (CO-PI) April 18-20 Sheraton Pentagon City Arlington, VA System Operations, Power Flow, and Control

More information

Experiences from First Top-Off Injection At The Stanford Synchrotron Radiation Lightsource

Experiences from First Top-Off Injection At The Stanford Synchrotron Radiation Lightsource Experiences from First Top-Off Injection At The Stanford Synchrotron Radiation Lightsource Johannes Bauer, James Liu, Alyssa Prinz, Sayed Rokni Radiation Protection Department SLAC National Accelerator

More information

Cryocooler with Cold Compressor for Deep Space Applications

Cryocooler with Cold Compressor for Deep Space Applications 36 1 Cryocooler with Cold Compressor for Deep Space Applications T.C. Nast 1, B.P.M. Helvensteijn 2, E. Roth 2, J.R. Olson 1, P. Champagne 1, J. R. Maddocks 2 1 Lockheed Martin Space Technology and Research

More information

Electrical Ground Support Equipment Schedule and Cost. EGSE Schedule and Cost

Electrical Ground Support Equipment Schedule and Cost. EGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott Williams Stanford University scott.williams@stanford.edu S. Williams 1 Schedule The schedule is driven by the delivery of electronics hardware

More information

An Overview of CSA s s Space Robotics Activities

An Overview of CSA s s Space Robotics Activities An Overview of CSA s s Space Robotics Activities Erick Dupuis, Mo Farhat ASTRA 2011 ESTEC, Noordwijk, The Netherlands Introduction Key Priority Area for CSA Recent Reorganisation Strategy Guided by Global

More information

Overview. Battery Monitoring

Overview. Battery Monitoring Wireless Battery Management Systems Highlight Industry s Drive for Higher Reliability By Greg Zimmer Sr. Product Marketing Engineer, Signal Conditioning Products Linear Technology Corporation Overview

More information

George Carter III Dept. of Enterprise Services Olympia Washington

George Carter III Dept. of Enterprise Services Olympia Washington George Carter III Dept. of Enterprise Services Olympia Washington george.carter@des.wa.gov 360-664-9213 Agency Background 4,300 vehicles Electric vehicles in fleet since 2014 Central service provider to

More information

Contract No: OASRTRS-14-H-MST (Missouri University of Science and Technology)

Contract No: OASRTRS-14-H-MST (Missouri University of Science and Technology) Smart Rock Technology for Real-time Monitoring of Bridge Scour and Riprap Effectiveness Design Guidelines and Visualization Tools (Progress Report No. 7) Contract No: OASRTRS-14-H-MST (Missouri University

More information

LOCATION APPENDIX A. Forward Truss. Aft Dewar Shell. Aft Bulkhead. Number of Ballast Weights. Port. Starboard. Bottom

LOCATION APPENDIX A. Forward Truss. Aft Dewar Shell. Aft Bulkhead. Number of Ballast Weights. Port. Starboard. Bottom APPENDIX A Ballast Weight Station Table LOCATION Forward Truss Aft Dewar Shell Aft Bulkhead Port TEC Truss Starboard TEC Truss Port Starboard Bottom 4 4 5 6 7 8 4 5 6 Number of Ballast Weights GNIRS Service

More information

Gamma-ray Large Area Space Telescope (GLAST) Large Area Telescope (LAT) DAQ. Latch-up Test of 3 DC-DC MAXIM Converters

Gamma-ray Large Area Space Telescope (GLAST) Large Area Telescope (LAT) DAQ. Latch-up Test of 3 DC-DC MAXIM Converters Page 1 of 11 Document # Date Effective LAT-TD-2234-1 6/6/3 Author(s) Supersedes Riccardo Rando Hartmut Sadrozinski GLAST LAT Jozsef Ludvig PROCUREMENT DOCUMENT Subsystem/Office DAQ Document Title Latch-up

More information

SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update

SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update MEETING DATE: August 31, 2005 SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update RECOMMENDATION It is recommended that the Commission: i) Receive for information

More information

COMPLETE AND FLEXIBLE SMT SOLUTIONS. dispense ALL. Innovation and quality made in Germany

COMPLETE AND FLEXIBLE SMT SOLUTIONS. dispense ALL. Innovation and quality made in Germany COMPLETE AND FLEXIBLE SMT SOLUTIONS dispense ALL Innovation and quality made in Germany Basic machine Range of Applications Flexible system for dispensing of lines, dots and areas for underfill and coating

More information

Status of the Nuclotron-M project

Status of the Nuclotron-M project Status of the Nuclotron-M project PAC for Particle Physics, Dubna, 14 Jan 2010 G. Trubnikov for the project team NICA: Nuclotron based Ion Collider facility Nuclotron provides now performance of experiments

More information

GLAST LAT Project Subsystem Managers Meeting, May 13, Introduction. Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager

GLAST LAT Project Subsystem Managers Meeting, May 13, Introduction. Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Introduction Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager Klaisner@slac.stanford.edu 650-926-2726 Rev B 1 Two towers

More information

Equipment Strategy for Stand By Diesel Generators Strategy

Equipment Strategy for Stand By Diesel Generators Strategy Equipment Strategy for Stand By Diesel Generators Strategy Current version: 26/06/2018 EXTERNAL USE Page 1 of 6 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 Defined terms...

More information

CANON UK SERVICE CENTRE PRICE GUIDE

CANON UK SERVICE CENTRE PRICE GUIDE CANON UK SERVICE CENTRE PRICE GUIDE Our repair costs are categorised as either Parts & Labour or Fixed Price depending on the model. Please use the tables below to find the relevant price guide for your

More information

Routine Scheduled Space Access For Secondary Payloads

Routine Scheduled Space Access For Secondary Payloads SSC10-IX-8 Routine Scheduled Space Access For Secondary Jason Andrews, President and CEO, and Jeff Cannon, Senior Systems Engineer, Spaceflight Services, Inc. Tukwila, WA 98168 Telephone: 206.342.9934

More information

EPRI HVDC Research. Gary Sibilant, EPRI. August 30, 2011

EPRI HVDC Research. Gary Sibilant, EPRI. August 30, 2011 EPRI HVDC Research John Chan, Ram Adapa, Bernie Clairmont & Gary Sibilant, EPRI EPRI HVDC & FACTS Conference August 30, 2011 Presentation Contents 1. Team Members 2. Research Program Objective & Scope

More information

Nissan Advanced Technology Center

Nissan Advanced Technology Center Nissan Advanced Technology Center (NATC) Recent Technologies X-TRAIL FCV Altima Hybrid XTRONIC CVT for 3.5L Intelligent Cruise Control Lane Departure Warning Qashqai 4x4 4 Wheel Active Steer New Generation

More information

GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule Review 01/05/06

GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule Review 01/05/06 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule Review 01/05/06 Ken Fouts SU-SLAC Subsystem Engineering Manager kfouts@slac.stanford.edu

More information

We trust the foregoing is satisfactory. If you have any questions or comments, please contact the undersigned.

We trust the foregoing is satisfactory. If you have any questions or comments, please contact the undersigned. \ newfoundland labrador hydro a nalcor energy company Hydro Place. 00 Columbus Drive. P.O. Box 00. St. John's. NL Canada AB K t. 0..00 f. 0..00 www.nh.nl.ca December, 0 The Board of Commissioners of Public

More information

Electrovaya Provides Business Update

Electrovaya Provides Business Update News for Immediate Release Electrovaya Provides Business Update Toronto, Ontario November 8, 2016 Electrovaya Inc. (TSX: EFL) (OTCQX:EFLVF) is providing the following update on business developments previously

More information

This chapter gives details of the design, development, and characterization of the

This chapter gives details of the design, development, and characterization of the CHAPTER 5 Electromagnet and its Power Supply This chapter gives details of the design, development, and characterization of the electromagnets used to produce desired magnetic field to confine the plasma,

More information

Wind Blade Failure Identification and Prevention

Wind Blade Failure Identification and Prevention Wind Blade Failure Identification and Prevention Gary Kanaby Director of Sales/Wind Energy MFG Wind Molded Fiber Glass Companies www.compositesshow.org January 29-31, 2013 Orange County Convention Center,

More information

ANTENNA SCAN MECHANISM FOR AN INTER SATELLITE LINK OF A CONSTELLATION PROGRAM

ANTENNA SCAN MECHANISM FOR AN INTER SATELLITE LINK OF A CONSTELLATION PROGRAM ANTENNA SCAN MECHANISM FOR AN INTER SATELLITE LINK OF A CONSTELLATION PROGRAM Ingo Köker, AIRBUS DS GmbH, ingo.koeker@airbus.com Frank Härtel, AIRBUS DS GmbH, frank.haertel@airbus.com Abstract For a constellation

More information

Monitoring and Control

Monitoring and Control Andrea Polini Software Project Management MSc in Computer Science University of Camerino A.Y. 2016/2017 Andrea Polini Monitoring and Control SPM A.Y. 2016/2017 1 / 18 Monitoring and control Once the project

More information

DEFENSE AND AEROSPACE GUIDE

DEFENSE AND AEROSPACE GUIDE DEFENSE AND AEROSPACE GUIDE WWW.THERMISTOR.COM ABOUT QTI QTI is a privately-held manufacturer of temperature sensors and assemblies. Founded in 977, we have grown to be the trusted supplier of temperature

More information

Team 2228 CougarTech 1. Training L2. Electrical Design and Control System Wiring

Team 2228 CougarTech 1. Training L2. Electrical Design and Control System Wiring Team 2228 CougarTech 1 Training L2 Electrical Design and Control System Wiring Team 2228 CougarTech 2 Objectives Understand: Understand the electrical design process Understand the control system wiring

More information

PFIS Filter Mechanism SPECIFICATION SALT-3130AE VERSION February 2003

PFIS Filter Mechanism SPECIFICATION SALT-3130AE VERSION February 2003 PFIS Filter Mechanism SPECIFICATION SALT-3130AE-00012 VERSION 1.0 16 February 2003 1. Scope 1.1 Identification This document covers the design of the Filter Mechanism for PFIS. In it are detailed the specifications,

More information

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1 Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide Version 1.1 October 21, 2016 1 Table of Contents: A. Application Processing Pages 3-4 B. Operational Modes Associated

More information

NanoRacks External Payload Platform

NanoRacks External Payload Platform NanoRacks External Payload Platform Introduction NanoRacks has developed a hosted payload service, NanoRacks External Payload Platform (NREP) NREP will be installed on the JEM EF Hosted payloads will utilize

More information

Review and Procurement of Replacement Road Traffic Collision Rescue Tools (Ultra Heavy)

Review and Procurement of Replacement Road Traffic Collision Rescue Tools (Ultra Heavy) Review and Procurement of Replacement Road Traffic Collision Rescue Tools (Ultra Heavy) Subject: Procurement Report Date: 5 th February 2019 Reference: HWFRS/62 (DS212-17) Background Hereford & Worcester

More information

Transport Canada s ecotechnology for Vehicles (etv) Program

Transport Canada s ecotechnology for Vehicles (etv) Program Transport Canada s ecotechnology for Vehicles (etv) Program Task Force on Vehicle Weights and Dimensions Policy November 20, 2013 RDIMS # 8902239 PURPOSE The objective of this presentation is to provide

More information

BD FACSJazz Users Guide Satchmo Stanford Shared FACS Facility

BD FACSJazz Users Guide Satchmo Stanford Shared FACS Facility BD FACSJazz Users Guide Satchmo Stanford Shared FACS Facility PPE must be worn at all times in our BSL-2 environment *Lab coat, gloves, and closed toed shoes are mandatory; respirator and goggles are available*

More information

Solar Farm Electrical Control Buildings & Substation Build Project

Solar Farm Electrical Control Buildings & Substation Build Project Brock s Solar Farm Electrical Control Buildings & Substation Build Project PROJECT PROFILE Canadian Solar Inc. Recognized as a leading global solar manufacturer, Canadian Solar Inc. delivers high-efficiency

More information

Camera Electronics Systems

Camera Electronics Systems Camera Electronics Systems September 2008 Rick Van Berg Outline Camera Electronic Systems Science Electronics (including corner rafts) Power regulation and distribution Cabling Controllers / sensors Safety

More information

CPET 491 Senior Design Phase II. Solar Mini Blinds

CPET 491 Senior Design Phase II. Solar Mini Blinds CPET 491 Senior Design Phase II Solar Mini Blinds With DC DC converters and a supercapacitor storage medium By Josh Stetzel Date: April 24, 2017 Project Advisor: Dr. Hadi Alasti Course Instructor: Prof.

More information

congestion management program

congestion management program congestion management program 2550 Rail Vehicle Program March 2012 11-0319tr 2010 lacmta Q U A R T E R LY P R O J E C T S TAT U S R E P O R T 255O RAIL VEHICLE PROGRAM QUARTERLY PROJECT STATUS REPORT THE

More information

REGULATORY CONTROL OF NUCLEAR FUEL AND CONTROL RODS

REGULATORY CONTROL OF NUCLEAR FUEL AND CONTROL RODS REGULATORY CONTROL OF NUCLEAR FUEL AND CONTROL RODS 1 GENERAL 3 2 PRE-INSPECTION DOCUMENTATION 3 2.1 General 3 2.2 Initial core loading of a nuclear power plant, new type of fuel or control rod or new

More information

Advanced Cooling Technologies, Inc. Low-Cost Radiator for Fission Power Thermal Control NETS Conference

Advanced Cooling Technologies, Inc. Low-Cost Radiator for Fission Power Thermal Control NETS Conference Advanced Cooling Technologies, Inc. Low-Cost Radiator for Fission Power Thermal Control 2015 NETS Conference Advanced Cooling Technologies, Inc. Taylor Maxwell Calin Tarau Bill Anderson Vanguard Space

More information

Legal Aid Reform: what is supposed to happen when?

Legal Aid Reform: what is supposed to happen when? : what is supposed to happen when? Updated 9.2.07 The table below sets out various statements made by the DCA/LSC about the timing of the proposed changes in relation to non-family civil matters. Since

More information

Travel Action Plan De Montfort University

Travel Action Plan De Montfort University 1. Scope 3 emissions from commuting to be a three-year average of

More information

HERCULES-2 Project. Deliverable: D8.8

HERCULES-2 Project. Deliverable: D8.8 HERCULES-2 Project Fuel Flexible, Near Zero Emissions, Adaptive Performance Marine Engine Deliverable: D8.8 Study an alternative urea decomposition and mixer / SCR configuration and / or study in extended

More information

A proposal of collaboration workflow between DC, DTP and DHC has been presented and

A proposal of collaboration workflow between DC, DTP and DHC has been presented and DTP8 Wrap up an open issues WLTP DTP 08 05 The 8th DTP meeting was held on 18 th January 2012 during the whole day at UNOG offices. General issues 1. WLTP Roadmap Revision The WLTP revised roadmap was

More information

SCT OTA Service Pyrites Way Suite A - Rancho Cordova, CA

SCT OTA Service Pyrites Way Suite A - Rancho Cordova, CA SCT OTA Service Over the years Optic Wave Labs has performed a variety of repairs and modifications to the major brands of Schmidt Cassegrain and other Catadioptric telescopes. We now offer standard services

More information

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site. Project Manager Ed Collins LJA Engineering, Inc. Transportation Planning Manager 5316 Highway 290 West Austin Public Infrastructure Group Austin, TX 78735 (512) 762-6301 cell (512) 439-4757 office CARTS

More information

first issue : last change : MSD Platinum 15 R number of pages : 12 LE 2166

first issue : last change : MSD Platinum 15 R number of pages : 12 LE 2166 first issue : 2011-02-07 S FOR MSD Platinum LAMP SYSTEMS last change : 2013-01-11. MSD Platinum 15 R 9281 916 05300 number of pages : 12 Philips Innovative Applications N.V. Specifications subject to change

More information

Fiat - Argentina - Wheel Aligner / Headlamp Aimer #16435

Fiat - Argentina - Wheel Aligner / Headlamp Aimer #16435 2017 Fiat - Argentina - Wheel Aligner / Headlamp Aimer #16435 Wheel Aligner / Headlamp Aimer Operation & Maintenance Manual Overview Fori Automation Version 1.2 4/21/2017 TABLE OF CONTENTS Section 1.0

More information

Boston Scientific Energy Storage Project. Final Report (PUBLIC) November 2016

Boston Scientific Energy Storage Project. Final Report (PUBLIC) November 2016 Boston Scientific Energy Storage Project Final Report (PUBLIC) November 2016 Executive Summary Kingspan ESB Limited applied for Energy RD&D funding for the Boston Scientific Solar PV Energy Storage Project

More information

Airport Safety. Given by: Robert Bassey. IESALC Conference, October 24, 2016 San Diego, CA

Airport Safety. Given by: Robert Bassey. IESALC Conference, October 24, 2016 San Diego, CA Airport Safety Technology Research & Development Given by: Robert Bassey IESALC Conference, October 24, 2016 San Diego, CA LED Runway Closure Marker Study 2 LED Lighted X Testing 3 LED Lighted X Testing

More information

Revision Transmittal Sheet

Revision Transmittal Sheet 2 APPROVED WHITE IN LEARJET 31 RT 31-32-24 Revision Transmittal Sheet This page transmits Revision 1 to No. 31-32-24, Main Landing Gear Torque Link Replacement. Rework: No rework is required for aircraft

More information

Policy for TSO Aircraft Seats

Policy for TSO Aircraft Seats Policy for TSO Aircraft Seats Presented to: EASA ETSO/TSO Seat Workshop Presented to: By: By: Hal Jensen Date: 4 December 2008 Date: TSO Seat Policy FAA policy memos for TSO Seats: Using SAE ARP5526, Aircraft

More information

GRID MODERNIZATION INITIATIVE PEER REVIEW

GRID MODERNIZATION INITIATIVE PEER REVIEW GRID MODERNIZATION INITIATIVE PEER REVIEW GMLC 1.3.29 Grid Frequency Support from Distributed Inverter-based Resources in Hawaii ANDY HOKE, NREL April 18-20, 2017 Sheraton Pentagon City Arlington, VA Devices

More information

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm PUBLIC MEETING Bear Creek Park Community Center January 24, 2017 5:30 pm to 7:30 pm PURPOSE OF THE MEETING This is an open House No formal presentation Introduce the project to the public Present existing

More information

Deploying Smart Wires at the Georgia Power Company (GPC)

Deploying Smart Wires at the Georgia Power Company (GPC) Deploying Smart Wires at the Georgia Power Company (GPC) January, 2015 Contents Executive Summary... 3 Introduction... 4 Architecture of the GPC Installations... 5 Performance Summary: Long-term Test...

More information

Central Region Group Status and Positron Region

Central Region Group Status and Positron Region Central Region Group Status and Positron Region K. Yokoya 2016.9.14. Posipol2016, LAL 2016/9/14 Posipol2016 1 Issues Discussed in CRWG Positron-related 10Hz operation Auxiliary positron source (APS) Positron

More information

THE ISAAC NEWTON GROUP OF TELESCOPES INGRID AT CASS

THE ISAAC NEWTON GROUP OF TELESCOPES INGRID AT CASS THE ISAAC NEWTON GROUP OF TELESCOPES INSTRUMENT CHANGE CHECKLIST INGRID AT CASS Revision: 1.2 Date: 24/09/2002 Authors: P Jolley, M Blanken, S Rees Description: Location: Storage: ING Infra Red Detector

More information

Task summary from previous week/proposed Changes:

Task summary from previous week/proposed Changes: Project Status Letter PSL Number: PSL_04 Covering period: 02/25-03/03 Prepared by: J. Mahati Hari and Rachel Szteinberg Task summary from previous week/proposed Changes: TEAM CURRENT WBS TASKS COMPLETED

More information

laser shaft alignment

laser shaft alignment laser shaft alignment Protect your assets Using PRÜFTECHNIK laser alignment systems, our engineers provide comprehensive shaft alignment measurement service for your rotating machines that is unrivalled

More information

Mars 2018 Mission Status and Sample Acquisition Issues

Mars 2018 Mission Status and Sample Acquisition Issues Mars 2018 Mission Status and Sample Acquisition Issues Presentation to the Planetary Protection Subcommittee Charles Whetsel Manager, Advanced Studies and Program Architecture Office Christopher G. Salvo

More information

Municipality of Strathroy- Caradoc

Municipality of Strathroy- Caradoc Directed to: Prepared by: Department: Subject: Municipality of Strathroy- Caradoc Mayor Vanderheyden and Members of Council Mark Harris Environmental Services Strathroy WPCP Blower Replacement Update Page

More information

INSPECTION TECHNIQUE FOR BWR CORE SPRAY THERMAL SLEEVE WELD

INSPECTION TECHNIQUE FOR BWR CORE SPRAY THERMAL SLEEVE WELD More Info at Open Access Database www.ndt.net/?id=18479 INSPECTION TECHNIQUE FOR BWR CORE SPRAY THERMAL SLEEVE WELD ABSTRACT J.L. Fisher, G. Light, Jim Crane, Albert Parvin, Southwest Research Institute,

More information

Modernized Systems for 24 Solar Tower Tunnel Telescope at Kodaikanal. N. SIVA RAJ Indian Institute of Astrophysics, Bangalore

Modernized Systems for 24 Solar Tower Tunnel Telescope at Kodaikanal. N. SIVA RAJ Indian Institute of Astrophysics, Bangalore Modernized Systems for 24 Solar Tower Tunnel Telescope at Kodaikanal N. SIVA RAJ 13-04-2007 Indian Institute of Astrophysics, Bangalore 24 Solar Tower Tunnel Telescope Kodaikanal ******* INAUGURATED by

More information

THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER

THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca University of Perugia on behalf of the Virgo collaboration helios.vocca@pg.infn.it NEW VIRGO+ SENSITIVITY Sensitivity curve of

More information

Recharge Kick-off Meeting Recharge Activity Review Process for

Recharge Kick-off Meeting Recharge Activity Review Process for Recharge Kick-off Meeting Debra Fry Executive Director, Operating Budget and Recharge Review Gabriella Hato Manager, Recharge Review Sarah Hislen Analyst, Recharge Review Charet Wynn Analyst, Recharge

More information