1 TRANSMISSION PLANNING Craig Quist Director of Area/Transmission Planning East PacifiCorp 1407 West North Temple, Suite 275 Salt Lake City, Utah (801) PH (801) FAX Date: March 15, 2013 To: Mr. David Franklin, Chairman WECC Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA Mr. Enoch Davies WECC Technical Staff 155 North 400 West, Suite 200 Salt Lake City, Utah Subject: PacifiCorp Updated Dear: David and Enoch, In accordance with reporting guidelines by the WECC Planning Coordinating Committee (PCC), please find attached PacifiCorp s on significant additions and changes to our system. Should you have any questions, or need additional information, please contact me at (801) Sincerely, Craig Quist Craig Quist TSS Member, PacifiCorp cc: TSS Members WECC Staff Rick Vail JD Podlesnik

2 Table of Contents A. Planned Transmission and Generation Projects 1 I. Black Rock 230/69 kv Substation (2013)...2 II. Carbon Plant Decommissioning (2015)...3 III. Grants Pass 500/230kV Substation (2019)...4 IV. Huntington- Mona/ 345 kv Line Series Reactor at Mona/Clover (2015)...5 V. Klamath Falls 500/230kV Substation (2016)...6 VI. Lakeside II Transmission Network Upgrades (2014)...7 VII. Midpoint-Summer Lake 500 kv Line - Increase West to East Rating to 550 MW (In service April 2012)...8 VIII. Pinto #3 Phase Shifting Transformer Addition (2015)...9 IX. Sigurd-Three Peaks-Hurricane-St. George 345 kv Line (delayed beyond 2022)...10 X. Standpipe 230 kv Synchronous Condenser (2014)...11 XI. TOT4A Voltage Support Project (June 2008 to December 2014)...12 XII. Vantage-Pomona Heights 230 kv Line (December 2015)...14 XIII. Wallula to McNary 230 kv (#2) Transmission Line (December 2017)...15 XIV. Gateway West Transmission Project...16 XV. Gateway South Transmission Project...23 XVI. Gateway Central Transmission Project...28 XVII. Future Generation Projects...30 B. Waiver of Significant Transmission Project Status 32 Table 7: Planned Transmission Projects (Waiver)...32 Table 8a: Planned Generation Interconnection Projects (PACE) Waiver...35 Table 8b: Planned Generation Interconnection Projects (PACW)- Waiver...39 C. Updates to the Annual Progress Report from the Previous Submittal (2012) 41

3 PacifiCorp to WECC This annual progress report submission is divided into three separate sections, including a summary of all BES transmission projects 1 and generation in Section A; a request for Waiver of Significant Project Status in Section B; and updates to the annual progress report from the previous submittal (2012) in Section C 2. A. Planned Transmission and Generation Projects This annual progress report is intended to 1) capture all BES transmission and generation projects that may have a significant impact on the reliability of the Western Interconnection; and 2) to inform neighboring systems in a timely manner regarding new facility additions to your system and associated system operation. Technical studies have demonstrated that all existing facilities and planned facility additions, as well as associated operating procedures, are in conformance with NERC Planning Standards and WECC System Performance Regional Business Practice. The following projects are included in this Annual Progress Report: All major new and upgraded BES transmission facilities. Such projects include, but are not limited to, new transmission facilities, transmission redesigns or upgrades, permanent removal of existing transmission facilities, or other changes (e.g., operating procedures) that may significantly alter the operation of the transmission facilities Any facilities not covered under the BES transmission definition that may have a significant impact on the reliability of the Western Interconnection All generation projects (200 MW or greater) connected to the transmission system through step-up transformers. Such projects include, but are not limited to, new generation plants, generation repower or upgrades that may significantly alter the operation of the generation facilities 1 BES projects will be determined based on the definition that will be in effect as of July 1, This last section is intended to be a guide for comparing back-to-back Annual Progress Report submissions. 1

4 I. Black Rock 230/69 kv Substation (2013) A. Project Description Name: Participants: One-Line Diagram: Black Rock 230/69 kv Substation PacifiCorp Status: The projected in-service date is November 1, 2013 Generation: Facilities: This project consists of looping in and out of Pavant-Gonder 230 kv line and the Delta-Graymont 69 kv line and installing a 75 MVA -230/69 kv transformer at Delta. B. Studies A five-year study was performed in the area and addressed contracted loads. C. Impact on Other Systems This substation connects to the Pavant-Gonder 230 kv tie line operated by NV Energy. 2

5 II. Carbon Plant Decommissioning (2015) A. Project Description Name: Participants: One-Line Diagrams: Carbon Plant Decommissioning PacifiCorp Status: The projected decommissioning date is April 15, 2015 Generation: Facilities: Carbon Plant The Carbon Plant decommissioning will require the addition of the following facilities: -15/+85 MVAR 138 kv static VAr system (SVS), two 138 kv 15 MVAR capacitor banks with associated breakers at the Mathington substation. The addition of a phase shifting transformer (PST) at the Upalco substation. Relocation of the Spanish Fork 138 kv series line reactors to the Upalco substation. B. Studies Ongoing. C. Impact on Other Systems The Carbon decommissioning has been prompted by EPA regulation changes, and as such the removal of a coal-fired power plant is projected to benefit the environment as a whole. The combined decommissioning and area reinforcement projects will not degrade the central Utah transmission system. 3

6 III. Grants Pass 500/230kV Substation (2019) A. Project Description Name: Participants: One-Line Diagram: Grants Pass 500/230kV Substation PacifiCorp Status: The projected in-service date for this project is 2019 Generation: Facilities: New 500/230 kv Substation tapping PacifiCorp s Meridian to Dixonville 500 kv Line. The 230 kv Line construction will include looping the existing Grants Pass to Meridian 230 kv line into the new substation as well as constructing a new 230 kv transmission line for the new substation to the existing Grants Pass 230 kv Substation B. Studies Studies are ongoing. Preliminary studies show system deficiencies for loss of one of the existing 500/230 kv transformers at Meridian Substation. The preliminary studies also show system impacts for loss of the existing 230 kv line from Meridian to Grants Pass. C. Impact on Other Systems This project requires coordination at the WECC level. The WECC project review process will begin in

7 IV. Huntington- Mona/ 345 kv Line Series Reactor at Mona/Clover (2015) A. Project Description Name: Participants: One-Line Diagram: Huntington- Mona/345 kv Line Series Reactor at Mona/Clover PacifiCorp Status: The projected in-service date for this project is 2015 Generation: Facilities: Install a 18 ohm series reactor in the Mona- Huntington 345 kv line to increase transfer capability across the North of Sigurd/Huntington transmission path. B. Studies A study was conducted to determine the optimum reactor size. It was determined that an 18 ohm series reactor provided the most optionality in future resource location (Huntington vs. Sigurd), while increasing the North of Huntington/Sigurd flow limits. C. Impact on Other Systems This project will support an increase in south to north transfers from southern to northern Utah. 5

8 V. Klamath Falls 500/230kV Substation (2016) A. Project Description Name: Participants: One-Line Diagram: Klamath Falls 500/230kV substation PacifiCorp Status: The projected in-service date for this project is 2016 Generation: Facilities: New 500/230kV substation tapping PacifiCorp s Captain Jack to Klamath CoGen 500 kv line. The 230kV line construction will include looping the existing Klamath Falls to Malin 230kV line into the new substation. B. Studies Studies are ongoing. Preliminary studies show system impacts for loss of the existing Malin 500/230 kv transformer starting in the 2018 period. C. Impact on Other Systems This project requires coordination at the WECC level. WECC project review process to start in

9 VI. Lakeside II Transmission Network Upgrades (2014) A. Project Description Name: Participants: One-Line Diagram: Lakeside II Transmission Network Upgrades PacifiCorp Status: The projected in-service date is 06/01/2014 Generation: Facilities: Lakeside generating facility Transmission of energy from the generation facility to beyond Steel Mill substation requires the installation of two new 345kV breakers and looping in of the Camp Williams Emery 345kV line at Spanish Fork substation. Also required is a reconductoring of the 10 mile Spanish Fork Tanner 138kV line and communication fiber to Hale substation B. Studies Technical studies have been performed to evaluate adding the Lake Side II Generation. Defined system improvements were identified as part of the studies. C. Impact on Other Systems Transmission improvement should have minimal inputs on the Western Interconnection. 7

10 VII. Midpoint-Summer Lake 500 kv Line - Increase West to East Rating to 550 MW (In service April 2012) A. Project Description Name: Participants: One-Line Diagram: Midpoint-Summer Lake 500 kv line-increase West to East Rating to 550 MW PacifiCorp Existing line Status: Project completed/in-service: April 1, 2012 Generation: Facilities: B. Studies Spring operating studies have been completed and reviewed by NOPSG. C. Impact on Other Systems Study results indicate that interactions exist between the Midpoint-Summer Lake 500 kv line, the NW-Idaho path and the COI path. 8

11 VIII. Pinto #3 Phase Shifting Transformer Addition (2015) A. Project Description Name: Participants: One-Line Diagram: Pinto #3 Phase Shifting Transformer Addition PacifiCorp Status: The projected in-service date for this project is 2015 Generation: Facilities: Install the (#3) 345 kv /400 MVA, phase shifting transformer in parallel with the two existing phase shifting transformer in a new bay at the Pinto substation. B. Studies Studies have shown that the Pinto phase shifters are the limiting element for the TOT2B1 transmission path rating, phase shifting capacity must be increased in order to meet network obligations. C. Impact on Other Systems Addition of a third PST at Pinto will ultimately result in an increase in the TOT2B1 transmission path rating, which has an interaction with other TOT2 paths (TOT2A, TOT2C and Path 27-IPP DC Line). Ultimately, path rating studies will be performed to fully define this interaction. 9

12 IX. Sigurd-Three Peaks-Hurricane-St. George 345 kv Line (delayed beyond 2022) A. Project Description Name: Participants: One-Line Diagram: Sigurd-Three Peaks-Hurricane-St. George 345kV PacifiCorp Status: The projected in-service date for this project is beyond 2022 Generation: Facilities: This project would entail constructing one 345 kv line from Sigurd to St. George via Three Peaks and Hurricane. The project in service date was delayed after technical studies demonstrated that loads in SW Utah can be reliably served through 2025 with the existing line and planned second Sigurd to Red Butte #2 line. B. Studies Technical studies have demonstrated that this line will effectively serve loads in south west Utah. C. Impact on Other Systems This line could affect the southern Utah and southern Nevada transmission paths. 10

13 X. Standpipe 230 kv Synchronous Condenser (2014) A. Project Description Name: Participants: One-Line Diagram: Standpipe 230kV Synchronous Condenser PacifiCorp Status: The projected in-service date for this project is 12/31/2014 Generation: Facilities: Synchronous Condenser Construct a new Standpipe 230 kv substation to be located near Miners substation and will result in the Platte- Standpipe- Freezeout 230kV line. The Treasureton 75 MVAr synchronous condenser will be relocated to Standpipe. B. Studies The 2012 TOT4A Path Rating Study included a sensitivity with the Standpipe reactive device. The results were shared with other utilities. C. Impact on Other Systems As these facilities are required for central Wyoming voltage support, no other paths are affected. 11

14 XI. TOT4A Voltage Support Project (June 2008 to December 2014) A. Project Description Name: Participants: One-Line Diagram: Status: Generation: Facilities: TOT4A Voltage Support Project PacifiCorp (Sponsor) Technical studies have been completed and voltage support facilities have been included in the PacifiCorp capital budget. The projected in-service date for each facility is noted below. The following facilities have been identified for Wyoming voltage support: Atlantic City 230 kv, 15 MVAr Capacitor (In-service: October 2010) Riverton 230 kv, 30 MVAr Capacitor (In-service: August 2010) Midwest 230 kv, 30 MVAr Capacitor (In-service: October 2010) Dynamic voltage control in the Miners Area has been superseded by Standpipe 230 KV Synchronous Condenser project-projected in-service date for 12/31/2014) [see Section X] B. Studies Wyoming 2010 transfer capability studies, which evaluated the impacts of projected Wyoming load growth (both projected and large customer) on the TOT4A path rating, have identified the need for additional voltage support facilities (see facilities above). Studies have been shared with other Wyoming transmission owners. C. Impact on Other Systems 12

15 Technical studies have indicated that based on projected load growth, the reactive support is needed to maintain the TOT4A/4B Nomogram at its current transfer levels. As these facilities are required for central Wyoming voltage support, no other paths are affected. 13

16 XII. Vantage-Pomona Heights 230 kv Line (December 2015) A. Project Description Name: Participants: One-Line Diagram: Status: Generation: Facilities: Vantage to Pomona Heights 230 kv line PacifiCorp This project is in the process of obtaining the necessary permits for construction. The projected in-service date is December This project will construct a new 230 kv line between the Vantage and Pomona Heights 230 kv buses in Washington State. B. Studies Joint studies performed by the Mid Columbia Study Team indicated the need for this project. For the loss of the existing Pomona - Wanapum 230 kv transmission line, impacts are evident in the Yakima/Mid C area. This project mitigates these problems. C. Impact on Other Systems This project is needed as reinforcement to the area transmission system and relieves system problems to the MIDC transmission owners, most notably BPA. 14

17 XIII. Wallula to McNary 230 kv (#2) Transmission Line (December 2017) A. Project Description Name: Participants: One-Line Diagram: Status: Generation: Facilities: Wallula to McNary 230 kv (#2) Transmission Line PacifiCorp (Sponsor) This project is in Phase 2 of the WECC Three Phase Rating Process. The project has a planned in service date of December The Wallula to McNary 230 kv #2 line would be a single circuit transmission line with line terminals at Wallula and McNary substations. B. Studies Phase 2 studies are being performed; when complete they will be reviewed by the project review group. C. Impact on Other Systems This project has impacts to other regional facilities most notably BPA as the project has a terminal at BPA s McNary Substation. Phase 2 studies are being performed and when complete will be reviewed by the project review group. 15

18 XIV. Gateway West Transmission Project Idaho Power and PacifiCorp (Rocky Mountain Power) jointly announced the Gateway West project in May 2007, to build and operate approximately 900 miles of new high-voltage transmission lines between the Windstar substation near Glenrock, Wyoming and the Hemingway substation near Melba, Idaho. After completing Regional Planning and initial path rating studies, on February 6, 2009, Idaho Power was granted Phase 2 path rating status for the Gateway West Transmission Project, which included Stage 1 facilities needed to meet Idaho Power s and PacifiCorp s long-term regulatory requirement to serve loads, and Stage 2 facilities which were intended to provide extra transmission system capacity if commercially supported by other third parties requestors. The Gateway West Stage 1 project will include approximately 150 miles of 230 kilovolt (kv) lines in Wyoming and approximately 800 miles of 500 kv lines in Wyoming and Idaho. Gateway West Stage 2 transmission facilities primarily consist of a second set of 500 kv circuits from southern Wyoming to western Idaho. At the March 30, 2010, Gateway West and Gateway South combined project review meeting participants approved the Gateway Phase 2 Study Plan and agreed that Gateway transmission segments could be grouped into two logical project stages [1 and 2], which would be evaluated separately by WECC Phase 2 study group (or sub groups). Additionally, it was agreed that incremental transmission limitations for transmission segments that are added between stages, will be addressed via SOL (System Operating Limit) studies. [This same process was previously followed and successfully demonstrated by BPA and Avista for the West of Hatwai Expansion project.] PacifiCorp reported in the 2011 Annual Progress Report submission that the third party requests and financial commitments that are necessary to support the Energy Gateway Stage 2 facilities have not materialized. Therefore, PacifiCorp indicated that it would continue to pursue WECC path ratings for Stage 1 of Energy Gateway only at that time, and will not further pursue ratings for Stage 2 facilities. This Energy Gateway Project status update was also reported to TSS at the April 20-22, 2011, meeting in Westminster, Co. For Gateway West Stage 1 transmission paths located west of Populus [specifically Borah West and Midpoint West], Idaho Power was the project sponsor for each of the path ratings studied; additionally for Gateway West transmission paths located east of Populus [specifically TOT 4A, Aeolus West, Path C and Bridger/Anticline West], PacifiCorp was the project sponsor for the path ratings studied. At the completion of the Phase 2 path rating process, TOT 4A transmission path was granted Phase 3 status on December 13, 2010; Aeolus West, Bridger/Anticline West and Path C transmission paths were granted Phase 3 status on January 5, 2011; and Borah West and Midpoint West transmission paths were granted Phase 3 status on July 21, Both the Gateway West and Gateway South siting and permitting requirements are currently being reviewed separately under the National Environmental Policy Act (NEPA) process. Future 16

19 changes to the Energy Gateway Project facilities and configuration may be influenced by the NEPA process and permitting requirements until this process concludes, which today expected to conclude for Gateway West in 2013 and for Gateway South in At the conclusion of the NEPA process, specific path rating performance issues relative to any necessary changes in Energy Gateway Project facilities and configuration will be addressed with affected Project Review Groups rather than approach the group with piece wise changes, at the time each change becomes known throughout the NEPA process. Based on the agreement between PacifiCorp and Idaho Power, executed in early 2012, PacifiCorp will assume responsibility for sponsoring all Gateway West transmission facilities through the NEPA process and through the project construction agreement phase. Gateway West Stage 1 Plan of Service and Planned Operating Date An overview of the Gateway West Stage 1 transmission system modification and in-service dates are summarized in Table 1 below and illustrated in Figures 1 and 2. Table 1: Gateway West Stage 1 Facilities and In-Service Dates Gateway West Stage 1 Transmission Project Facilities Date TOT 4A (Path 37) Construction of one new 230 kv circuit from Windstar to Aeolus (76 miles) [PAC owned facility] Rebuild the DJ-Difficulty-Shirley Basin-Aeolus 230 kv line from ACSR/phase to a higher rated conductor. [PAC owned facility] Aeolus West Addition of three 500/230 kv (1650 MVA) autotransformers (9 x 1Φ) at Aeolus [PAC owned facility] Aeolus 230 kv SVC (-150/+300 MVAr), one-150 MVAr (230 kv MSC), one- 50 MVAr (230 kv), three 100 MVAr (230 kv), four MVAr (500 kv) shunt capacitors. [PAC owned facility] Construction of one new 500 kv circuit from Aeolus to Anticline with 50% of series compensation (154 miles) [PAC owned facility] Addition of a generator tripping scheme at Aeolus and Windstar [PAC owned facility] Bridger/Anticline West (Path 19) Addition of one - 500/345 kv (1500 MVA) auto transformer (3 x 1Φ) at Anticline [PAC owned facility]

20 Addition of two 345 kv (750 MVA) phase-shifting transformers at Anticline [PAC owned facility] Construction of one new 500 kv circuit from Anticline to Populus with 50% of series compensation (203 miles) [PAC owned facility] Addition of one - 500/345 kv ( 2000 MVA) autotransformer (3 x 1Φ) at Populus [PAC owned facility] Borah [/Populus] West (Path 17) Construction of one new 500 kv circuit from Populus to Borah (55 miles) and new 500 kv circuit between Borah and Midpoint (88 miles). These line sections will be built by conversion of the operating voltage of the existing Kinport/Borah to Midpoint 345 kv line section to 500 kv [IPC owned facility], and the addition of a new 500 kv circuit between Populus and Borah [PAC owned facility]. A 500/345 kv (1500 MVA) autotransformer (3 x 1Φ) will be installed at Borah. Construction of one new 500 kv circuit from Populus to Cedar Hill with approximately 45% series compensation. (118 miles) [PAC owned facility] Construction of one new 500 kv circuit from Cedar Hill to Hemingway with approximately 45% series compensation. (161 miles) [PAC/IPC jointly owned facility] Construction of one new 500 kv circuit from Cedar Hill to Midpoint. This line will connect the Idaho southern route to Midpoint for improved reliability. (34 miles) [PAC/IPC jointly owned facility] This facility has been advanced from Gateway West Stage 2 Midpoint West Midpoint Hemingway Section This section of the project will include two-500 kv circuits: The first 500 kv circuit from Midpoint to Hemingway will be developed by interconnecting the existing Midpoint Summer Lake 500 kv line into the Hemingway Station. [PAC owned facility] Construction of the second 500 kv circuit from Midpoint to Hemingway with approximately 50% series compensation. (126 miles) ) [PAC/IPC jointly owned facility] In-Service July

21 This facility has been advanced from Gateway West Stage

22 Gateway West Single-Line Diagrams The following diagrams depict the project and adjacent transmission paths. Figure 1: Gateway West Stage 1 (West of Bridger/Anticline) Gateway West (Hemingway - Bridger/Anticline) 500 kv to Boardman Hemingway Midpoint 500 kv to Garrison (MISTI) 500 kv to Summer Lake 500 kv to Captain Jack Existing MP-SL 88 miles Skylark Kinport Borah 345 kv Goshen Three Mile Knoll MVA 500 kv Cedar Hills Populus 500 kv to Robison Summit (Northern SWIP) MVA 230 kv Bridger MVA 230 kv to Aeolus/Creston 500 kv to Aeolus 500 kv 345 kv 230 kv 345 kv to Terminal 345 kv to Ben Lomond Gateway Central 230 kv to Point of Rocks 230 kv to Rock Springs 230 kv to Mustang Anticline 500 kv MVA 345 kv MVA O +20 PST 20

23 Figure 2: Gateway West Stage 1 (East of Bridger/Anticline) 345 kv to Populus Bridger 345 kv to Three Mile Knoll 230 kv 230 kv to 230 kv to Rock Springs Mustang 230 kv to Point of Rocks 500 kv to Populus 500 kv 345 kv Anticline MVA MVA O +20 PST Gateway West (Bridger - Aeolus - Windstar) Windstar 230 kv to Pumpkin Butte 230 kv to Casper 230 kv 230 kv to Yellow Cake Dave Johnston 44 miles Rebuilt Heward Aeolus SVC 230 kv MVA 27 miles Rebuilt 500 kv 500 kv to Clover 500 kv 345 kv 230 kv Gateway South 21

24 Transfer Capability The transfer capabilities vary for different portions of the Gateway West project, and are detailed in Table 2: Table 2: Gateway West Stage 1 Transmission Segments and Transfer Levels Path Existing Rating (MW) New Rating (MW) Simultaneous Interaction TOT 4A (Path 37) 937 (North to South) 2175 (North to South) No Interaction Bridger/Anticline West (Path 19) Aeolus South (East to West) (East to West) Path C (Path 20) Bonanza West (Path 33) Monument-Naughton Rock Springs/Firehole West Path C (Path 20) 1600/1250 (North- South/ South- North) 2250 Bi-Directional Montana-Idaho (Path 18) Bridger West (Path 19) Bonanza West (Path 33) Aeolus West 2670 (East to West) Aeolus South TOT 1A (Path 30) Bonanza West (Path 33) Borah West (Path 17) 2557 (East-West) 4450 (East-West) No Interaction Midpoint West 2487 (East-West) 4400 (East-West) No Interaction For the Gateway West Transmission Project, all study results comply with NERC TPL thru TPL Standards as well as WECC TPL - (001 thru 004) WECC-CRT- 2-System Performance Criterion. Additionally, PacifiCorp, Idaho Power and NV Energy planning criteria were applied. Technical studies demonstrated that the transmission path ratings noted in Table 2 are independent of other established path ratings, with the exception of the simultaneous interactions noted. 22

25 XV. Gateway South Transmission Project As part of Energy Gateway Transmission Expansion, PacifiCorp (Rocky Mountain Power) is planning to build a new high-voltage transmission line, known as Gateway South, extending approximately 400 miles from the Aeolus substation in southeastern Wyoming into the new Clover substation near Mona, Utah and 160 miles from Sigurd to Red Butte. After completing Regional Planning and initial path rating studies, on February 6, 2009, PacifiCorp was granted Phase 2 path rating status for the Gateway South Transmission Project, which included Stage 1 facilities needed to meet PacifiCorp s long-term regulatory requirement to serve loads, and Stage 2 facilities which were intended to provide extra capacity if commercially supported by equity partners and other third parties. The Gateway South Stage 1 transmission facilities include a 500 kv transmission line from the proposed Aeolus substation in southeast Wyoming (constructed as part of the Gateway West Project) to the Clover substation in central Utah, and a second 345 kv transmission line from the Sigurd substation near Richfield, Utah to the Red Butte substation near Central, Utah in southwestern Utah. Gateway South Stage 2 transmission facilities primarily consist of a second 500 kv circuit from Aeolus substation to Clover substation and a 500 kv segment from Clover substation to the Crystal substation in southern Nevada. At the March 30, 2010, Gateway West and Gateway South combined project review meeting participants approved the Gateway Phase 2 Study Plan and greed that Gateway transmission segments could be grouped into two logical project stages [1 and 2], which would be evaluated separately by WECC Phase 2 study group (or sub groups). Additionally, it was agreed that incremental transmission limitations for transmission segments that are added between stages, will be addressed via SOL (System Operating Limit) studies. PacifiCorp reported the 2011 Annual Progress Report submission that the third party financial commitments that are necessary to support the Energy Gateway Stage 2 facilities have not materialized. Therefore, PacifiCorp indicated that it would continue to pursue WECC path ratings for Stage 1 of Energy Gateway only at that time, and will not further pursue ratings for Stage 2 facilities. This Energy Gateway Project status update was also reported to TSS at the April 20-22, 2011, meeting in Westminster, Co. For the transmission paths associated with Gateway South Stage 1, specifically Aeolus South and TOT 2B/2C, PacifiCorp was the project sponsor for each of the path ratings studied. At the completion of the Phase 2 path rating process, Aeolus South transmission path was granted Phase 3 status on December 16, 2010, while the TOT 2B/2C transmission paths was granted Phase 3 status on June 21, Both the Gateway West and Gateway South siting and permitting requirements are currently being reviewed separately under the National Environmental Policy Act (NEPA) process. Future changes to the Energy Gateway Project facilities and configuration may be influenced by the NEPA process and permitting requirements until this process concludes, which today expected to conclude for Gateway West in 2013 and for Gateway South in As part of this process, on October 7, 2012 the BLM and Forest Service signed the Record of Decision (ROD) providing an easement for the Sigurd-Red Butte project. At the conclusion of the NEPA process, specific path rating performance issues relative to any necessary changes in Energy Gateway Project facilities and configuration will be addressed with affected Project 23

26 Review Groups rather than approach the group with piece wise changes, at the time each change becomes known throughout the NEPA process. 24

27 Plan of Service and Planned Operating Date An overview of the Gateway South Stage 1 transmission system modifications and in-service dates are summarized in Table 3 and are illustrated in Figure 3. Table 3: Gateway South Stage 1 Facilities and In-Service Dates Gateway South - Stage 1 Transmission Project Facilities TOT 2B1 (Path 78) Addition of 60% series compensation on the 345 kv line between Huntington and Pinto, at Pinto [PAC owned facility] TOT 2C (Path 35) Construction of Red Butte 345 kv SVC (-75/+350 MVAr) for southwest Utah voltage control [PAC owned facility] Addition of the Harry Allen 345/230 kv #3 (375 MVA) transformer [NVE owned facility] Upgrade the series compensation on the 345 kv line between Three Peaks and Sigurd, at Three Peaks, to 1800/2160 Amps (Normal/Emergency) [PAC owned facility] Construction of one new 345 kv circuit from Sigurd to Red Butte with 46% series compensation. (170 miles) [PAC owned facility] Modification of the Huntington RAS scheme to address transmission outages south of Red Butte. [PAC owned facility] Aeolus South Loop-in both 345 kv circuits between Mona and Sigurd into Clover and add one - 345/138 kv ( MVA) autotransformer at Clover [PAC owned facility] Construction of one new 500 kv circuit from Aeolus to Clover with 50% series compensation (400 miles) and add one - 500/345 kv (2000 MVA) autotransformer (3 x 1Φ) at Clover [PAC owned facility] Loop-in the 345 kv circuit between Huntington and Mona into Clover. [PAC owned facility] Dates In-Service, March 2011 In-Service, May 16, 2011 June 17, 2011 June 2013 June 2015 June 2015 Dec

28 Figure 3: Gateway South Stage 1 Single-Line Diagram The following diagrams depict the project and adjacent transmission paths. Gateway South Single-line Gateway West Aeolus SVC 230 kv to Windstar 230 kv Gateway Central 500 kv to Anticline 500 kv 500 kv construction, Energized at 345 kv 345 kv to Oquirrh/Limber Mona 345 kv to Camp Williams #4 #2 #1 #3 Middle 2 Middle 1 Clover #1 500 kv 345 kv Sigurd 345 kv Red Butte 345 kv to Huntington SVC 345 kv Harry Allen 345 kv 230 kv 500 kv 345 kv 230 kv 26

29 Transfer Capability The transfer capabilities vary for different portions of the Gateway South project, and are detailed in Table 4. Table 4: Gateway South Stage 1 Transmission Segments and Transfer Levels Project Section Path Existing Rating (MW) New Rating (MW) Simultaneous Interaction Aeolus Clover Aeolus South 1700 Aeolus West, (North-South) Bridger/Anticline West IPPDC (S-N) Red Butte- Harry Allen TOT 2C (Path 35) 300/300 (North- South / South- North) 400/580 (North- South/South- North) in 2011; increased to 600/580 MW (North- South/South- North) in 2015 IPP DC line, net 345 kv imports and line flows Potentially the SWIP project path ratings Pinto Four Corners TOT 2B1(Path 78) 530/600 (North-South / South-North) 600/600 (North- South / South- North) in 2011 IPP DC line, net 345 kv imports and line flows Potentially the SWIP project path ratings For the Gateway South Stage 1 Project, all study results comply with NERC TPL thru TPL Standards as well as WECC TPL - (001 thru 004) WECC-CRT- 2-System Performance Criterion. Additionally, PacifiCorp, Idaho Power and NV Energy planning criteria were applied. Technical studies demonstrated that the transmission path ratings noted in Table 4 are independent of other established path ratings, with the exception of the simultaneous interactions noted. 27

30 XVI. Gateway Central Transmission Project To meet the increasing demand of northern Utah, future Gateway Central transmission facilities are needed. These facilities would provide a link between Gateway West and Gateway South transmission facilities and would provide needed load service to the Wasatch Front. Populus to Terminal Extending from southeast Idaho into northern Utah, the Populus to Terminal transmission line adds a new double-circuit, 345-kilovolt transmission line stretching approximately 135 miles from the Populus Substation built near Downey, Idaho, to the Terminal substation near the Salt Lake City airport. The Populus to Terminal project was placed in service November 19, Mona (Clover) to Oquirrh PacifiCorp is committed to providing safe, reliable, cost-effective power and has proposed a project to establish a new high-voltage transmission line and two new substations in Utah. The line will originate at the Clover substation to be built near the existing Mona substation in Juab County, and run north to the proposed Limber substation to be built in Tooele County. The line will continue from Limber and connect to the Oquirrh Substation in West Jordan. This project will traverse the areas around the communities of Cedar Fort, Eureka, Grantsville, Mona, Salt Lake City, South Jordan, Stockton, Tooele and West Jordan. The in-service date for this line is noted in Table 5. Depending on the load service request of the Tooele Valley, a new 345/138 kv substation will be installed at Limber. Oquirrh to Terminal The line will be located in an existing high-voltage transmission line corridor. It will run from the Oquirrh substation near South and 5600 West in West Jordan, north to the Terminal substation, located due south of the Salt Lake City international airport. This section of new transmission will link together other new transmission sections Mona to Oquirrh and Populus to Terminal to complete the Gateway Central portion of the Energy Gateway Transmission Expansion Project. The in-service date for this line is noted in Table 5. Plan of Service and Planned Operating Dates An overview of the Gateway Central transmission system modification is summarized below. Table 5: Gateway Central Facilities and In-Service Dates Gateway Central - Transmission Facilities Dates Populus- Terminal double circuit 345 kv (135 miles) In-Service November 19,

31 Addition of the 500 kv single circuit between Clover (Mona) and Limber, energized at 345 kv (65 miles) Addition of the 345 kv double circuit between Limber and Oquirrh (32 miles) Addition of the 345 kv double circuit between Oquirrh and Terminal (14 miles) May 2013 May 2013 June 2015 Transfer Capabilities The transfer capabilities of Path C vary, depending on Gateway West project staging, as indicated in Table 2. 29

32 XVII. Future Generation Projects This section includes all significant generation projects (200 MW or greater) connected to or removed from the transmission system through step-up transformers or generation project that may have a significant impact on the reliability of the Western Interconnection. All projects not included in this list are in table 8a and 8b. Table 6: Significant Generation Additions- PacifiCorp East/ West Project Queue Number/Name Location Participants One-Line Diagram Status Generation Capacity Type Transmission Facilities (kv) Studies Lake side 2 Utah, Utah PacifiCorp TBD Under construction 637 MW Thermal Upgrade TBD complete 2014 Current Creek-phase 1&2 Juab, Utah PacifiCorp TBD MW Thermal Upgrade TBD complete Carbon Utah PacifiCorp On File MW Coal 138/13.8 kv Complete Retirement Carbon Utah PacifiCorp On File MW Coal 138/13.8 kv Complete Retirement 61 Beaver, UT PacifiCorp TBD suspended 200 MW Wind 230 suspended 130 Carbon, UT PacifiCorp TBD n/a 300 MW Wind 230 suspended 132 Albany, UT PacifiCorp TBD n/a 361 MW Wind 230 suspended 191 Carbon, WY PacifiCorp TBD suspended 500 MW Wind 345 suspended 199 Carbon, WY PacifiCorp On file MW Wind 230 underway 30

33 Project Queue Number/Name Location Participants One-Line Diagram Status Generation Capacity Type Transmission Facilities (kv) Studies 224-A Juab, UT PacifiCorp TBD suspended 320 MW Natural Gas 224-B Juab, UT PacifiCorp TBD suspended 230 MW Natural Gas 345 suspended 345 suspended 233 Carbon, WY PacifiCorp TBD suspended MW Wind 230 suspended 234 Umatilla, OR PacifiCorp On file suspended 300 MW Wind 230 underway 289 Lake, OR PacifiCorp TBD suspended 501 MW Wind TBD suspended 295 Carbon, WY PacifiCorp On file MW Wind 345 underway 375 Carbon, WY PacifiCorp On file MW Wind 230 underway 403 Sevier, UT PacifiCorp On file n/a 525 MW Natural Gas 345 underway 409 Albany, WY PacifiCorp On file n/a 320 MW Wind 230 underway 31

34 B. Waiver of Significant Transmission Project Status Table 7 and 8 (a and b) summarize planned transmission and generation projects, respectively, within the PacifiCorp system for which waivers of the Significant Transmission Project Status for the purpose of Project Coordination Review Process are being requested. The purposes of these projects are for serving local load, to enhance or maintain local reliability, and/or to reduce local capacity requirements. These projects are not expected to have significant impacts on the operation of the Western Interconnection. Number Table 7: Planned Transmission Projects (Waiver) Project Name Project Description In Service Date 1 Clover Substation - Add 345/138 kv transformer This project would add a 345/138 kv Transformer 450 MVA to the Clover substation. Project would include looping the Mona-Sigurd 345 kv #1 & #2 lines into Clover substation Terminal 345/138 kv #1 & #2 Transformer Upgrade Replace two - 345/138 kv 450 MVA transformers at Terminal with 700 MVA. Transformer would be added to meet projected load growth needs Copco Substation Increase Replace existing 125 MVA kv transformer with a 250 MVA Ben Lomond 345/138 kv #2 transformer 450 MVA Ben Lomond 345/138 kv #2 transformer, a 450 MVA transformer is moved from Terminal substation Carbon County System Upgrade This project would involve two or more phases and would begin with the installation of a kv transformer substation tied to the Helper-Moab 138 kv line and the Helper-Coal #1 46 kv line. Subsequent phases would include converting the Helper-Coal Creek #1 46 kv line to 138 kv and connecting the line to the new substation and expanding the Helper 138 kv substation. 2013

35 Number Project Name 7 Line 3 Conversion Project Project Description Rebuilt Baldy switching station, add three circuit breakers on the ring bus, convert Line 3, relocate the 115 to 69 kv transformers to Belknap sub, and install 115 kv breakers at Oak Knoll & Ashland subs. This project requires reconductoring line 19 from Lone Pine to Baldy. In Service Union Gap 230/115 kv increase in capacity, add a third 250 MVA transformer Increase capacity at Union Gap Substation by adding a third 150 MVA transformers Whetstone 230/115 kv Substation Construct new 230 to 115 kv in the White City Oregon vicinity with a 250 MVA transformer. This substation will tap PacifiCorp s existing 230 kv line between Meridian and Grants Pass Substations Red Butte/ St. George Double Circuit Line and 345/138 kv Transformer Summer 2015: Build St. George 345 kv substation with 700 MVA, 345/138 kv transformer and operate second Red Butte-St. George circuit at 345 kv Syracuse 345/138 kv #2 Transformer This project would install a second 345/138 kv 400 MVA transformer at the Syracuse substation for load service Midvalley 345/138 kv #1 & #2 transformer replacement 700 MVA This project would replace existing Midvalley 450 MVA transformers with 700 MVA transformers and a 4th kv circuit breaker

36 Number Project Name Project Description In Service 13 Yellowtail 230/138 kv #2 transformer Yellowtail substation, install 2nd 230/161 kv (100 MVA) transformer Beyond Fry Substation, install 115 kv capacitors This project will install 100 MVAR of shunt capacitors at Fry Substation Troutdale Substation, 230 kv switchyard addition This project will add kv circuit breakers in a breaker and a half configuration

37 Table 8a: Planned Generation Interconnection Projects (PACE) Waiver Project Queue Number/Name Location Participants One-Line Diagram Status Generation Capacity Type Transmission Facilities (kv) Studies Planned Generation East 154 Bonneville, ID PacifiCorp On file MW Wind 69 Underway 128 Beaver, UT PacifiCorp TBD MW Wind 138 suspended 172-A Sweetwater, WY 172-B Sweetwater, WY 173 Sweetwater, WY PacifiCorp TBD n/a 150 MW Wind 230 suspended PacifiCorp TBD n/a 150 MW Wind 230 suspended PacifiCorp TBD n/a 150 MW Wind 230 suspended 175 Lincoln, WY PacifiCorp TBD MW Wind 230 suspended 184 Albany, WY PacifiCorp TBD MW Wind 230 suspended 185 Albany, WY PacifiCorp TBD MW Wind 230 suspended 186 Albany, WY PacifiCorp TBD MW Wind 230 suspended 200 Carbon, WY PacifiCorp On file MW Wind 230 Underway 201 Carbon, WY PacifiCorp On file MW Wind 230 Underway 255 Bingham, ID PacifiCorp On file MW Wind 161 Underway 267-A Sweetwater, PacifiCorp On file MW Wind 230 Underway

38 Project Queue Number/Name Location Participants One-Line Diagram Status Generation Capacity Type Transmission Facilities (kv) Studies WY 267-B Sweetwater, WY 267-C Sweetwater, WY 267-D Sweetwater, WY 290-A Sweetwater, WY 290-B Sweetwater, WY 290-C Sweetwater, WY PacifiCorp On file n/a 22 MW Wind 230 Underway PacifiCorp On file n/a 22 MW Wind 230 Underway PacifiCorp On file n/a 22 MW Wind 230 Underway PacifiCorp On file n/a MW Wind 230 Underway PacifiCorp On file n/a MW Wind 230 Underway PacifiCorp On file n/a 50.4 MW Wind 230 Underway 291 Carbon, UT PacifiCorp TBD n/a 100 MW Wind 345 suspended 306-A Converse, WY PacifiCorp TBD MW Wind 230 suspended 313 Beaver, UT PacifiCorp On file MW Geothermal 138 Underway 323-B Power, ID PacifiCorp On file MW Wind 230 Underway 324 Iron, UT PacifiCorp TBD MW Solar 138 suspended 36

39 Project Queue Number/Name Location Participants One-Line Diagram Status Generation Capacity Type Transmission Facilities (kv) Studies 335 Converse, WY PacifiCorp On file MW Wind 230 Underway 367 Iron, UT PacifiCorp On file n/a 172 MW Solar 345 Underway 384 San Juan, UT PacifiCorp On file n/a 60 MW Wind 345 Underway 397 Washington, UT 407 Sweetwater, WY PacifiCorp On file MW Wind 138 Underway PacifiCorp TBD n/a 79.8 MW Wind 230 suspended 420 San Juan, UT PacifiCorp On file n/a 140 MW Wind 138 Underway 425 Sublette, WY PacifiCorp On file n/a MW Natural Gas 138 Underway 426 San Juan, UT PacifiCorp On file n/a 80 MW Wind 230 Underway 427 Sweetwater, WY PacifiCorp On file n/a 80 MW Wind 69 Underway 432 Salt Lake, UT PacifiCorp On file n/a 6.3 MW Other 230 Underway 436 Iron, UT PacifiCorp On file n/a 50 MW Solar 230 Underway 440 Carbon, WY PacifiCorp On file n/a 80 MW Wind 138 Underway 442 Madison, ID PacifiCorp On file n/a 5.6 MW Natural Gas 230 Underway 37

40 Project Queue Number/Name Location Participants One-Line Diagram Status Generation Capacity Type Transmission Facilities (kv) Studies 450 Millard, ID PacifiCorp On file n/a 50 MW Solar 69 Underway 460 Millard, UT PacifiCorp On file n/a 160 MW Wind 230 Underway 461 Iron, UT PacifiCorp On file n/a 51 MW Solar 230 Underway 465 San Juan, UT PacifiCorp On file n/a 50.4 MW Solar 138 Underway 466 Iron, UT PacifiCorp On file n/a 25.6 MW Solar 138 Underway 468 Duchesne, UT PacifiCorp On file n/a 40 MW Solar 138 Underway 470 Tooele, UT PacifiCorp On file n/a 78.2 MW Wind 46 Underway 38

41 Table 8b: Planned Generation Interconnection Projects (PACW)- Waiver Project Queue Number Location Participants One-Line Diagram Status Generation Capacity Type Transmission Facilities (kv) Studies Planned Generation West 148 Umatilla, OR PacifiCorp suspended suspended MW Wind 230 suspended 225 Umatilla, OR PacifiCorp suspended suspended MW Wind 230 suspended 226 Umatilla, OR PacifiCorp On file n/a MW Wind 230 underway 230 Klamath, OR PacifiCorp On file MW Geothermal 69 underway 237-A Skamania, WA 237-B Skamania, WA 237-C Skamania, WA PacifiCorp suspended suspended 25 MW Hydro 230 suspended PacifiCorp suspended suspended 25 MW Hydro 230 suspended PacifiCorp suspended suspended 25 MW Hydro 230 suspended 247 Lake, OR PacifiCorp On file n/a 90 MW Wind 115 underway 276 Umatilla, OR PacifiCorp On file MW Wind 230 underway 316 Umatilla, OR PacifiCorp On file MW Wind 230 underway 319 Lake, OR PacifiCorp suspended suspended 26 MW Biomass 115 suspended 39

42 Project Queue Number Location Participants One-Line Diagram Status Generation Capacity Type Transmission Facilities (kv) Studies 350 Jackson, OR PacifiCorp suspended MW Hydro 69 underway 351 Klamath, OR PacifiCorp suspended suspended 39 MW Biomass 69 suspended 373 Klamath, OR PacifiCorp On file MW Solar 500 underway 393 Lake, OR PacifiCorp On file n/a 27 MW Geothermal 115 underway 411 Umatilla, OR PacifiCorp On file n/a 98.4 MW Wind 69 underway 429 Klamath, OR PacifiCorp On file MW Geothermal 69 underway 430 Klamath, OR PacifiCorp On file n/a 12 MW Geothermal 69 underway 431 Siskiyou, CA PacifiCorp On file n/a 12 MW Geothermal 69 underway 441 Umatilla, OR PacifiCorp On file n/a 98.9 MW Wind 230 underway 443 Crook, OR PacifiCorp On file n/a MW Solar 115 underway 445 Klamath, OR PacifiCorp On file n/a 12 MW Geothermal 69 underway 447 Crook, OR PacifiCorp On file n/a 80 MW Solar 115 underway 448 Crook, OR PacifiCorp On file n/a 80 MW Solar 115 underway 40

43 C. Updates to the Annual Progress Report from the Previous Submittal (2012) The following updates to the PacifiCorp were made in developing this document: 1) Black Rock added existing project which was not included in the 2012 report 2) Carbon Plant Decommissioning- added existing project which was not included in the 2012 report 3) Lakeside II Transmission Network Upgrades- added existing project which was not included in the 2012 report 4) Third Phase Shifter at Pinto- added as a new project to report 5) Huntington- Mona/ 345 kv Line Series Reactor at Mona/Clover - added as a new project to the report 6) Pinto-Huntington 345 kv Series Capacitor- removed from project list, completed March ) Casper-Dave Johnston 230kV #1 and #2 Line Rebuild- removed from project list, completed January ) Red Butte Static VAr Compensator- removed from project list, completed May ) Camp Williams-Terminal 345 kv#1 line loop in to Oquirrh Sub- removed from project list, completed June ) Meridian Substation-Install Two 230kV shunt capacitor banks of 130 MVAr each- removed from project list, completed June ) California-Oregon Intertie Upgrade- removed from project list, completed May ) Big Grassy Substation 161kV Install- project was not needed as part of the 2012 Assessment.

44 13) TOT4A Voltage Support Project has been divided into two projects. TOT4A Voltage support and Standpipe 230kV Synchronous Condenser 14) Table 6: Significant Generator Additions this table has been updated from the 2012 submission to give a more accurate depiction of significant generator additions. 15) Table 8a - Future Generation Projects-Significant Generation Additions Table (PACE) - this table has been updated from the 2012 submission to give a more accurate depiction of future generator additions. 16) Table 8b -Future Generation Projects-Significant Generation Additions Table (PACW) - this table has been updated from the 2012 submission to give a more accurate depiction of future generator additions. 17) Wallula to McNary 230 kv transmission Line #2- changed in service date from December 2013 to December ) Vantage-Pomona Heights 230kV Line- changed in service date from November 2013 to December ) Klamath Falls 500/230 kv Substation- changed in service date from 2018 to ) Grants Pass 500/230 kv substation- changed in service date from 2016 to ) Table 7- Planned Transmission Projects (Section B): Line 37 Conversion Project removed from table Mt. Shasta Substation- removed from table Copco to Weed Junction Line Conversion- removed from table Copco Substation Increase- changed in service date from 2012 to 2013 Line 3 Conversion project - changed in service date from 2013 to 2014 Union Gap 230/115 k V Increase in capacity, add a third 150 MVA transformerchanged in service date from 2013 to 2016 and change MVA on transformer from 150 to 250 MVA. Whetstone 230/115 kv substation- changed in service date from 2014 to 2015 Fry substation, install 115 kv capacitors added new project to list Troutdale substation 230kV switchyard addition - added new project to list Three Mile Knoll, install 2nd 345/138 kv transformer- project has been cancelled 42

Gateway South Transmission Project

Gateway South Transmission Project Phase 1 Comprehensive Progress Report Volume 1 - Technical Report Report Prepared by PacifiCorp Transmission Planning Department November 21, 2008 WECC1-V4 Phase 1 Comprehensive Progress Report Executive

More information

Craig Quist Craig Quist

Craig Quist Craig Quist TRANSMISSION PLANNING Craig Quist, Manager Transmission Development & Planning PacifiCorp 1407 West North Temple, Suite 275 Salt Lake City, Utah 84140 801-220-4264 FAX 801-220-2842 craig.quist@pacificorp.com

More information

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions. March 8, 2013 David Franklin Chair, Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA 91768 MHanson@idahopower.com (208) 388-2253 Enoch Davies Western Electricity Coordinating

More information

2013 ANNUAL PROGRESS REPORT

2013 ANNUAL PROGRESS REPORT March 1, 2013 Mr. David Franklin, Chairman WECC Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA 91768-2560 Mr. Enoch Davies WECC Technical Staff 155 North 400 West,

More information

Rocky Mountain Power Exhibit RMP (RAV-4SD) Docket No Witness: Rick A. Vail BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Rocky Mountain Power Exhibit RMP (RAV-4SD) Docket No Witness: Rick A. Vail BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH Rocky Mountain Power Exhibit RMP (RAV-4SD) Docket No. 17-035-40 Witness: Rick A. Vail BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Exhibit Accompanying Supplemental Direct

More information

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona Transmission Planning & Engineering P.O. Box 53933 MS 3259 Phoenix, Arizona 85072-3933 March 9, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1 Energy Division P.O. Box 937 333 E. Barioni Blvd. Imperial, CA 92251 www.iid.com March 18, 2014 Mr. Tracy Rolstad Chair, WECC Technical Studies Subcommittee Senior Power System Consultant Avista System

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Direct Testimony of Richard A. Vail

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Direct Testimony of Richard A. Vail Application No. -0- Exhibit PAC/00 Witness: Richard A. Vail BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP Investment in Distribution and Transmission Systems April 0 PAC/00

More information

Process Timeline. Area Bubbles. Legend. Problem Area that have been resolved. Recurring Areas from previous System Assessment.

Process Timeline. Area Bubbles. Legend. Problem Area that have been resolved. Recurring Areas from previous System Assessment. Process Timeline Legend Problem Area that have been resolved Recurring Areas from previous System Assessment New Areas Area Bubbles Flows Modeled for One-Year Heavy Winter Peak Conditions Base Case Conditions

More information

March 7, Subject: Southern California Edison 2011 Annual Progress Report

March 7, Subject: Southern California Edison 2011 Annual Progress Report March 7, 2011 Mr. Kyle Kohne Mr. Kent Bolton Chair, WECC Technical Studies Subcommittee WECC Technical Staff Bonneville Power Administration University of Utah Research Park P.O. Box 61409 615 Arapeen

More information

Pacific Gas and Electric Company s Revised 2015 Annual Progress

Pacific Gas and Electric Company s Revised 2015 Annual Progress March 02, 2015 Mr. Tracy Rolstad Chair, WECC Technical Studies Subcommittee Avista PO Box 3727 MSC-16 1411 East Mission Ave Spokane, WA 99220-3727 Mr. Enoch Davies WECC Technical Staff 155 North 400 West

More information

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Pacific Gas and Electric Company s Revised 2016 Annual Progress March 06, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff 155 North 400 West Salt Lake City, UT 84103-1114 Subject: Report Pacific Gas and Electric

More information

Consulting Agreement Study. Completed for Transmission Customer

Consulting Agreement Study. Completed for Transmission Customer Completed for Transmission Customer Proposed Resource & Transmission Carbon County, MT & 230 kv Transmission in North Wyoming August 2016 Table of Contents 1.0 Description... 1 2.0 Overall Assumptions...

More information

Transmission Planning. WECC 2014 Progress Report. March 14, 2014

Transmission Planning. WECC 2014 Progress Report. March 14, 2014 Transmission Planning WECC 2014 Progress Report March 14, 2014 Report Prepared By: Dennis Stevens -TPP (360) 619-6821 BPA TS TPP 2014-022 Page 1 Table of Contents 1 Introduction... 1 2 Planned Transmission

More information

Transmission Planning Attachment K Public Input Meeting

Transmission Planning Attachment K Public Input Meeting Transmission Planning Attachment K Public Input Meeting FERC 890 6 th Quarter Meeting May 25, 2011 Agenda Mountain Time Topic Presenter 1:00 1:15 Greetings and Introduction Dennis Desmarais 1:15 1:30 Attachment

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

Rocky Mountain Power Five Year Study Findings & Kick Off Meeting

Rocky Mountain Power Five Year Study Findings & Kick Off Meeting 2000 PACIFICORP PAGE 1 Attachment K Rocky Mountain Power Five Year Study Findings & Kick Off Meeting Thursday, December 8 2016 2000 PACIFICORP PAGE 2 Study Areas for 2016 Findings Reports Southeast, Utah

More information

Q0044 interconnection at

Q0044 interconnection at Generation Interconnection Feasibility Study Report for Q0044 interconnection at Utah County Utah on PacifiCorp s Transmission System (138 kv Transmission System) September 15, 2004 Page 1 1.0 Description

More information

Wyoming electricity use is growing

Wyoming electricity use is growing Wyoming electricity use is growing 12,000 $40 gigawatt-hours 11,000 10,000 9,000 8,000 7,000 6,000 5,000 $38 $36 $34 $32 $30 $28 $26 $24 $22 gross state product (economic growth) ($ billions) 4,000 2004

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,

More information

BC Hydro System 2016 Annual Progress Report

BC Hydro System 2016 Annual Progress Report March 11, 2016 Philip Augustin, P.E. Chair, Technical Studies Subcommittee 503-464-7783 philip.augustin@pgn.com Mr. Enoch Davies WECC Technical Staff 155 North 400 West, Suite 200 Salt Lake City, UT 84103-1114

More information

Wyoming Energy Projects

Wyoming Energy Projects Wyoming Energy Projects Wyoming Infrastructure Authority Spring Conference March 28-29, 2019 PacifiCorp Overview Two divisions Rocky Mountain Power and Pacific Power 5600 Employees 1.9 million electricity

More information

BC Hydro System 2011 Annual Progress Report

BC Hydro System 2011 Annual Progress Report March 1, 2011 Mr. Kyle R. Kohne, Chairman WECC Technical Studies Subcommittee Bonneville Power Administration P.O. Box 491 MS, TPP-OPP-3 Vancouver, WA 98666 Mr. Kent Bolton WECC Technical Staff 155 North

More information

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal TransWest Express Transmission AC and DC Project 2018 2019 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission

More information

TransWest Express AC and DC Project Comprehensive Progress Report (CPR) 3,000 MW DC and 1,500 MW AC WECC Phase 1 Analysis

TransWest Express AC and DC Project Comprehensive Progress Report (CPR) 3,000 MW DC and 1,500 MW AC WECC Phase 1 Analysis TransWest Express AC and DC Project Comprehensive Progress Report (CPR) 3,000 MW DC and 1,500 MW AC WECC Phase 1 Analysis July 25, 2018 Table of Contents 1. Introduction... 5 1.1. Project Description and

More information

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Status of PNM s Completed Transmission Construction Projects 11/30/2017 Status of s Completed Transmission Construction Projects Second Tah Ta Hey 115/345 kv Transformer Yah Ta Hey Switching Station On January 9, 2015, filed with the NMPRC under NMPRC Rule 440 information

More information

Pacific Gas and Electric Company s 2013 Annual Progress Report

Pacific Gas and Electric Company s 2013 Annual Progress Report March 14, 2013 Mr. David Franklin Chair, WECC Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA 91768 Mr. Enoch Davies WECC Technical Staff 155 North 400 West Salt Lake

More information

Appendix D Black Hills Project Summary

Appendix D Black Hills Project Summary Page 1 of 28 Appendix D Black Hills Project Summary Table of Contents Black Hills Project Summary... D-1 Boone-Nyberg 115 kv Project... D-3 Rattlesnake Butte 115 kv Substation Terminal... D-6 Fountain

More information

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES: TransWest Express Transmission Project TABLE OF CONTENTS 7.0 DESIGN OPTIONS... 7-1 7.1 OVERVIEW OF DESIGN OPTIONS... 7-1 7.2 DESIGN OPTIONS PURPOSE AND NEED AND DESIGN CHARACTERISTICS... 7-4 7.2.1 Design

More information

Ten-year Plan. Figure 1 and Table 1. Each of the facilities shown in the plan is described in greater depth in the last appendix of this report.

Ten-year Plan. Figure 1 and Table 1. Each of the facilities shown in the plan is described in greater depth in the last appendix of this report. Ten-year Plan As a result of the analysis completed for the 2009 System Assessment, the follow-up sensitivity studies, analysis completed by the study teams, and individual planning participant studies,

More information

2013 ANNUAL PROGRESS REPORT

2013 ANNUAL PROGRESS REPORT Bonneville Power Administration 2013 ANNUAL PROGRESS REPORT Report Prepared By: Dennis Stevens Bonneville Power Administration Transmission Planning TPP/OPP-3 (360) 619-6821 BPA TS TPP 2013-018 Page 1

More information

Transmission Planning Report

Transmission Planning Report Transmission Planning Report Board of Directors Meeting December 15, 2010 1 Overview Study Team Reports Puget Sound Area Study Team Northern Mid-Columbia Study Team Cross Cascades Study Team Centralia

More information

TransWest Express Project

TransWest Express Project TransWest Express Project Phase One--Feasibility Study Final Study Report November 2006 A subsidiary of Pinnacle West Capital Corporation Executive Summary On October 21, 2005 Arizona Public Service Company

More information

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS July 15, 2004 TABLE OF CONTENTS Page No. 1. Description of Pasadena s Transmission Lines and Facilities...1 A. Overview:... 1 B.

More information

BC Hydro System 2017 Annual Progress Report

BC Hydro System 2017 Annual Progress Report March 14, 2017 Philip Augustin, P.E. Chair, Technical Studies Subcommittee 503-464-7783 philip.augustin@pgn.com Mr. Enoch Davies WECC Technical Staff 155 North 400 West, Suite 200 Salt Lake City, UT 84103-1114

More information

Black Hills Project Summary

Black Hills Project Summary 2016 Rule 3627 Report Black Hills Project Summary Page 1 of 38 Black Hills Project Summary Colorado PUC E-Filings System D 1 2016 Rule 3627 Report Black Hills Project Summary Page 2 of 38 Category Transmission

More information

Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project.

Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project. Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project April 23, 2003 Introduction Eurus originally requested an interconnection

More information

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04 Western Area Power Administration Rocky Mountain Region 2014 Annual Progress Report Projects Weld Substation Stage 04 Lovell Yellowtail 115-kV rebuild Curecanti 230/115-kV 150 MVA transformer Terry Ranch

More information

Salt Lake County Electrical Plan Task Force October Douglas N. Bennion, P.E. Vice President Rocky Mountain Power

Salt Lake County Electrical Plan Task Force October Douglas N. Bennion, P.E. Vice President Rocky Mountain Power Salt Lake County Electrical Plan Task Force October 2009 Douglas N. Bennion, P.E. Vice President Rocky Mountain Power 1 Rocky Mountain Power s Bright History In 1881, Salt Lake City became the fifth city

More information

Illinois State Report

Illinois State Report July 2016 Illinois State Report Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast Gas Pipeline Information 2 Executive Summary (July 2016) Existing Capacity:

More information

Chapter 7: Transmission

Chapter 7: Transmission Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission Summary of Key Findings... 1 Background... 1 Northwest Transmission Planning... 6 SUMMARY OF KEY FINDINGS For a number of years

More information

TransCanyon Cross-Tie Transmission Project

TransCanyon Cross-Tie Transmission Project TransCanyon Cross-Tie Transmission Project Cross-Tie Phase I Progress Report Supplemental Simultaneous Analysis Final Report Revision 1.1 August 2017 Table of Contents 2 Page Executive Summary -------------------------------------------------------------------------------------------

More information

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

2018 Annual Progress Report to WECC Pacific Gas and Electric Company 2018 Annual Progress Report to WECC Pacific Gas and Electric Company Waiver of Significant Transmission Project Status Table 1 and 2 update the planned transmission and generation projects, respectively,

More information

TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30)

TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30) TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30) Submitted to TOT1A Stakeholders and TOT1A Interconnected Utilities And Western Electricity Coordinating Council June 6, 2013

More information

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation Transmission Improvements Plan for 575 MW Network Service Request CC 7 Generation Facility (OASIS # 143556) Georgia Transmission Corporation November 11, 2010 CC7 TIP 11-11-2010 (2).docx PROBLEM STATEMENT

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

Rocky Mountain Power Five Year Study Findings & Kick Off Meeting

Rocky Mountain Power Five Year Study Findings & Kick Off Meeting 2000 PACIFICORP PAGE 1 Attachment K Rocky Mountain Power Five Year Study Findings & Kick Off Meeting Thursday, June 9 th 2016 2000 PACIFICORP PAGE 2 Rocky Mountain Power Area Transmission Planning Manager:

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2015 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., SGC

More information

Updates and Modifications to Report

Updates and Modifications to Report QUARTERLY COMPLIANCE REPORT (JULY 2015) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2014 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting E M i R t ti Emera Maine Representative: Jeffrey Fenn,

More information

TransCanyon Cross-Tie Transmission Project

TransCanyon Cross-Tie Transmission Project TransCanyon Cross-Tie Transmission Project WECC Path Rating Studies and Comprehensive Progress Report (Phase 1) Final Report Revision 1.0 July 2017 1 Table of Contents Page Executive Summary ----------------------------------------------------------------------------------

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

Updates. Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission and Regional Updates Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission Overview 16,400 circuit-miles of transmission lines 12,685 MW record peak demand

More information

Supplemental Report on the NCTPC Collaborative Transmission Plan

Supplemental Report on the NCTPC Collaborative Transmission Plan Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for

More information

Sub Regional RTEP Committee - Southern. August 19, 2011

Sub Regional RTEP Committee - Southern. August 19, 2011 Sub Regional RTEP Committee - Southern August 19, 2011 2011 RTEP Analysis Summary 2010 2015 Project Updates 2016 Analysis NERC Category A, B NERC Category C (N-1-1 in progress) Load Deliverability Generator

More information

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Executive Summary Interconnection Feasibility Study Report Request # GI-2016-6 Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Public Service Company of Colorado Transmission

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

MILLIGAN SOLAR PROJECT

MILLIGAN SOLAR PROJECT February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission

More information

PSE Attachment K Puget Sound Area Transmission Meeting

PSE Attachment K Puget Sound Area Transmission Meeting PSE Attachment K Puget Sound Area Transmission Meeting Stephanie Lu Senior Engineer December 15, 2011 Agenda Attachment K Review Economic Studies Process PSE Planning Process and Assumptions PSE Projects

More information

North Oregon Coast Area Study. Adam Lint

North Oregon Coast Area Study. Adam Lint North Oregon Coast Area Study Adam Lint PAGE 2 North Oregon Coast System Overview - Clatsop Study Covers: Transmission Switching Stations (Clatsop District): Astoria Lewis and Clark 115 kv Distribution

More information

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC OCTOBER 17, 2018 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC

More information

best to you all Gail Carbiener Page 1 of 5

best to you all Gail Carbiener Page 1 of 5 Please accept this attachment as my up dated response to the B2H DEIS. If this is not acceptable, please let me know. Nice meeting last Monday in Boardman. 300316 best to you all Gail Carbiener 2 Page

More information

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation Intentionally left blank F1 Description and Functional Specifications of Proposed

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82 Decision 21447-D01-2016 August 23, 2016 Decision 21447-D01-2016 Proceeding 21447 Application 21447-A001 August 23, 2016 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary,

More information

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station East Asian Alternative Energy Futures Workshop By the Nonproliferation Policy Education Center

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016 Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

Falcon-Midway 115 kv Line Uprate Project Report

Falcon-Midway 115 kv Line Uprate Project Report Falcon-Midway 115 kv Line Uprate Project Report 12/1/2008 1 Background The function of this project is to uprate the 26.7 miles of Tri-State s 115 kv line between Midway and Falcon substations from 50

More information

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G

PJM Sub Regional RTEP Committee Mid-Atlantic January 22, Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G PJM Sub Regional RTEP Committee Mid-Atlantic January 22, 2016 Esam Khadr, Sr. Director Electric Delivery Planning, PSE&G PSE&G System Characteristics New Jersey utility characterized by densely populated

More information

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Interconnection Feasibility Study Report GIP-084-FEAS-R2 Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power

More information

New Jersey State Report

New Jersey State Report New Jersey State Report July 2017 Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast 2. Markets Capacity Market Results Market Analysis 3. Operations Emissions

More information

2016 Load & Capacity Data Report

2016 Load & Capacity Data Report Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation, accuracy, completeness

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Updates and Modifications to Report

Updates and Modifications to Report QUARTERLY COMPLIANCE REPORT (OCTOBER 2016) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision

More information

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009 State Regulatory Affairs and Local Relations Update ATC Customer Meeting November 19, 2009 Project Certification Steve Parker Manager State Regulatory Affairs CA/CPCN Applications (Filed/Ordered/Under

More information

APPENDIX F: Project Need and Description

APPENDIX F: Project Need and Description APPENDIX F: Project Need and Description California ISO/MID F-1 Intentionally left blank California ISO/MID F-2 Name Brief Description Type Lugo Victorville 500 kv Upgrade (SCE portion) The project was

More information

Feasibility Study Report

Feasibility Study Report Report For: Orion Renewable Resources LLC ( Customer ) Queue #: Service Location: Rockingham County, NC Total Output Requested By Customer: 100 MW Commercial Operation Date Requested By Customer: 11/1/2019

More information

SPP Notification to Construct

SPP Notification to Construct February 19, 2014 SPP Notification to Construct Mr. Mo Awad Westar Energy, Inc. P.O. Box 889 Topeka, KS 66601 RE: Notification to Construct Approved Reliability Network Upgrades Dear Mr. Awad, Pursuant

More information

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 14, 2005 1 2004-06 EGSI-TX Transmission Western Region Reliability

More information

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid

More information

ATTACHMENT Y STUDY REPORT

ATTACHMENT Y STUDY REPORT Attachment Y Study Edwards Unit 1: 90 MW Coal Retirement December 31, 2012 ATTACHMENT Y STUDY REPORT 7/5/2013 PUBLIC / EXECUTIVE SUMMARY MISO received an Attachment Y Notification of Potential Generation

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic July 26, 2016 Reliability Analysis Update MetEd Transmission Zone N-1 First Energy Planning Criteria (FERC Form 715): The North Boyertown West Boyertown 69 kv is

More information

SPP Notification to Construct

SPP Notification to Construct February 19, 2014 SPP Notification to Construct Mr. John Fulton Southwestern Public Service Company P.O. Box 1261 Amarillo, TX 79105 RE: Notification to Construct Approved Reliability Network Upgrades

More information

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007 High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM-2006-02) Interconnection Facility Study Final Report November 2, 2007 Prepared by: Public Service Company of New Mexico Electric Services

More information

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY 2011-2020 P+ PowerPlus Engineering A Department of STAR Energy Services, LLC TEN YEAR PLANNING GUIDE 2011-2020 SHASTA LAKE ELECTRIC UTILITY CITY OF

More information

Georgia Transmission Corporation Georgia Systems Operations Corporation

Georgia Transmission Corporation Georgia Systems Operations Corporation Georgia Transmission Corporation Georgia Systems Operations Corporation Reactive Power Requirements for Generating Facilities Interconnecting to the Georgia Integrated Transmission System with Georgia

More information

2015 System Assessment

2015 System Assessment 2015 System Assessment Copies of this report are available from: ColumbiaGrid 8338 NE Alderwood Rd Suite 140 Portland, OR 97220 503.943.4940 www.columbiagrid.org July 2015 Photos provided by: Bonneville

More information

Avista BPA, IPCO, PAC Project identified as long term need. Project Committed under Network Open Season. Plan of Service Determined

Avista BPA, IPCO, PAC Project identified as long term need. Project Committed under Network Open Season. Plan of Service Determined Name Region In Ten Year Plan? by Link to More Detail Stage Commitment Need/Driver & Other A1 Bronx-Cabinet 115 kv Rebuild Northeastern Yes 5, 10 ColGrid SA Rebuild/reconductor Bronx-Cabinet 115 kv Avista

More information

Arizona Transmission Challenges

Arizona Transmission Challenges Power Task Force Agenda Number 2. Arizona Transmission Challenges Central Arizona Water Conservation District Power Committee Presentation May 18, 2017 Transmission Planning Efforts NATIONAL Section 368

More information

Facilities Study for Alberta to US Available Transfer Capability

Facilities Study for Alberta to US Available Transfer Capability Facilities Study for Alberta to US Available Transfer Capability Report No: NPP2002-05 June 3, 2002 System Planning & Grid Operations, Transmission Line of Business Engineering Services Executive Summary

More information

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS El Paso Electric Company System Operations Department System Planning Section May 2004

More information

Feasibility Study Report

Feasibility Study Report Generator Interconnection Request Feasibility Study Report For: Customer --- Service Location: Rutherford County Total Output: 79.2 MW Commercial Operation Date: 9/1/2014 In-Service Date (if given): 9/1/2014

More information

New Mexico Transmission Expansion Concepts For Wind Resources

New Mexico Transmission Expansion Concepts For Wind Resources New Mexico Transmission Expansion Concepts For Wind Resources May 2008 Update Electric Services Transmission Operations FOREWORD This document contains PNM s latest concepts for expanding the transmission

More information

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008 PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral

More information

Connection Engineering Study Report for AUC Application: AESO Project # 1674

Connection Engineering Study Report for AUC Application: AESO Project # 1674 APPENDIX A CONNECTION ASSESSMENT Connection Engineering Study Report for AUC Application: AESO Project # 1674 Executive Summary Project Overview FortisAlberta Inc. (FortisAlberta) submitted a System

More information

SERTP rd Quarter Meeting

SERTP rd Quarter Meeting 2015 SERTP SERTP 2015 3 rd Quarter Meeting 2nd RPSG Meeting September 24 th, 2015 APC Headquarters Birmingham, AL 2015 SERTP Process Information The SERTP process is a transmission planning process. Please

More information