2 SOUTHERN REGIONAL POWER COMMITTEE BANGALORE Minutes of the 25 th Meeting of Protection Coordination Sub-Committee of SRPC held on Introduction 1.1 The 25 th Meeting of Protection Coordination Sub-Committee (PCSC) was held on 22 nd October 2013 in the Conference Hall of Southern Regional Power Committee, Bangalore. The list of participants for the PCSC meeting is enclosed as Annexure-I. 1.2 Shri S. R. Bhat, Member Secretary i/c, SRPC welcomed the Members and Participants to the 25 th Meeting of the Protection Coordination Sub- Committee. 1.3 MS i/c, SRPC informed the forum that the issue regarding high voltage trippings had been discussed in the recent meeting of OCC and PCSC and few recommendations had been suggested for implementation. Though the constituents were requested to revert back in case of specific issues, no feedback had been received from any of the constituents. He also informed the forum that swapping of voltage settings on 400 KV Kaiga- Guttur lines had been carried out as suggested in the last PCSC meeting. 1.4 MS i/c stated that there needed to be a proper mechanism to follow up on the recommendations made in earlier Meetings. The endeavor should be to have logical conclusion for every critical tripping incident. This would happen only when the identified measures are implemented in a time bound manner. 1.5 MS i/c informed that Unit 1 of Kudankulam Nuclear Power Plant had now been synchronized and hence the proposed SPS needed to be finalized. SRLDC had already furnished the study results to NPCIL but the response was awaited.he also stated that the fortnightly reports on implementation of measures as submitted by the constituents were being perused by higher level bodies. Hence the recommendations as suggested by the protection coordination committee and the other subcommittee needed to be given

3 more focus and carried out on priority basis. He also noted that as per earlier decision, TANTRANSCO was to complete the islanding scheme by October MS i/c SRPC requested the constituents to furnish the status of implementation of pending issues and accordingly the same was taken up for discussion. 2. Confirmation of the Minutes of the 24 th Protection Coordination Sub-Committee meeting held on 26 th September, 2013 The Minutes of the 24 th PCSC meeting were confirmed, since no comments were received from the constituents. 3. Grid Disturbances in Southern Region 3.1. Generation loss & tripping of 220kV lines at Kothagudam TPS and Tripping of ICT s at Khammam substation (i) Date and Time of event (ii) Location (iii) (iv) Plant and/or Equipment directly involved Reported Disturbance / Fault at Hrs Kothagudam TPS,Khammam ICTs, Andra Pradesh Kothagudam TPS, Khammam ICTs Triggering incident was a fault in 220kV KTPS-Managuru line-1. Running Units # 1, 2,3,4,5,6,8,9&10 tripped. 220kV lines connected to KTPS tripped on Zone-2 from remote ends. ICT s at Khammam tripped on overload. Frequency dropped from Hz to 49.71Hz (v) Generation Loss 1100 MW (vi) Duration of interruption 30 Minutes to 6 Hrs 15 Minutes (vii) Category GD 1 The Grid Disturbance analysis as submitted by SRLDC is enclosed as Annexure-II. The Grid Disturbance Report as submitted by APTRANSCO is enclosed as Annexure-III. SRLDC informed the forum that data pertaining to this incident had not Minutes of the 24 th Protection Coordination Sub Committee Meeting held on Page 2

4 been posted by APGENCO and APTRANCO for detailed analysis of the Grid Disturbance. APGENCO informed that at Kothagudam TPS one unit was under planned shutdown and another unit tripped on Generator overload. APGENCO informed that a jumper got cut on the terminal tower at Kothagudam Thermal Power Station (KTPS) end resulting in arcing followed by phase to ground earth fault. It was informed that 3 to 4 jumpers of CVT and other equipment got cut after jumper cut on terminal tower. The CB however did not trip since there was a contact problem with master trip relay. The faulty relay had been replaced with new one. At the same time at remote end, one pole opened while the other poles did not open leading to LBB/BB operation. It was noted that LBB had not initiated at KTPS end though the relay was faulty. It was informed that 132kV system at KTPS got tripped due to low vacuum in the CB. APGENCO said that GT-4 at generator end tripped on O/L and GT-3 tripped on back up O/C. SRLDC pointed out that it was a case of relay mal-operation. NTPC stated that the load was thrown off due to line tripping. AVR had to take care of the voltage issues of the Generator so that generator did not trip on over voltage. SRLDC enquired about the setting of IDMT characteristics for ICTs in SRTS-I of PGCIL. PGCIL informed that adjoining utilities should also follow CBIP guidelines. It was noted from PGCIL that the existing setting of 380 ms for DTOC would be increased to 500 ms pending instructions from their management regarding adoption of IDMT settings for ICT. KPTCL requested POWERGRID to share its Protection settings with the adjoining utilities for better protection coordination of the SR System. They were also ready to share their settings with the adjoining utilities. SRTS I, PGCIL was requested to adopt only IDMT settings for ICTs in all its substations. The DTOC settings could be removed latest by and information submitted to SRPC Secretariat. Minutes of the 24 th Protection Coordination Sub Committee Meeting held on Page 3

5 Recommendations a) APTRANSCO and APGENCO were requested to send the detailed analysis report of the above incident at the earliest. b) PCSC forum also requested all the constituents to submit grid disturbance report at the earliest to analyze the Disturbance / Incident to avoid similar occurrence. c) PCSC forum requested the utilities to share their protection settings with the adjoining utilities also for better protection coordination and to avoid in spurious trippings. d) Due to lack of proper incident report, Protection coordination Sub Committee decided to send the Protection Expert Group (5 Members) to visit KTPS substation in November 2013 after analyzing the Grid disturbance report to be sent by APGENCO. e) SRTS I, PGCIL to adopt only IDMT settings for ICTs in all its substations. 3.2 Generation loss and multiple tripping at Vijayawada TPS (i) Date and Time of event (ii) Location Plant and/or Equipment (iii) directly involved (iv) Reported Disturbance / Fault (v) Generation loss (vi) Duration of interruption (vii) Category at 14:55 hrs Vijayawada TPS,APGENCO,AP Vijayawada TPS As reported that triggering incident was B Phase CT failure in 220kV VTPS- Narasarapeta line. Running Units # 2,3,4,5 &6 and all 220kV feeders connected to Vijayawada TPS tripped on operation of Bus bar protection. Frequency dropped from Hz to 49.62Hz 900 MW GD1 The Grid Disturbance analysis as submitted by SRLDC is enclosed as Annexure-IV. The Grid Disturbance Report as submitted by APTRANSCO isenclosed as Annexure-V. SRLDC informed that the tripping analysis report had not been received by them to analyze the Grid Disturbance. APTRANSCO informed that 'B' Phase CT had failed in the VTPS- Narasarapeta line. Minutes of the 24 th Protection Coordination Sub Committee Meeting held on Page 4

6 Recommendations a) APTRANSCO and APGENCO were requested to send the detailed analysis report of the above incident at the earliest. b) The Disturbance would be discussed in the 26 th PCSC. 4. Grid Incidences 4.1 Tripping of Unit#1 at North Chennai TPS ST2 (i) Date and Time of event (ii) Location Plant and/or Equipment (iii) directly involved Reported Disturbance / (iv) Fault (v) Generation loss (vi) Duration of interruption (vii) Category at 14:50 Hrs North Chennai TPS ST2,TN North Chennai TPS As reported Unit#1 tripped due to operation of differential protection of Unit# MW GI2 TANTRANSCO informed that since the plant had not yet been formally handed over to them, it was difficult to get the report from the plant. It was noted that there was a CB problem and M/s Areva had attended the same. TANTRANSCO informed that the plant was still under outage and its COD too was not yet declared. SRLDC stated that the relevant tripping details should be made available to it, as per Regulations. Recommendations a) TANTRANSCO was requested to send the detailed analysis report of the above incident at the earliest. b) The Grid Incidence would be discussed in the 26 th PCSC. 4.2 Tripping of HVDC Badrawathi Pole - 1 & 2 (i) Date and Time of event (ii) Location Plant and/or Equipment (iii) directly involved (iv) Reported Disturbance / Fault at 16:26 Hrs HVDC Badrawathi, PGCIL,AP HVDC Badrawathi As reported tripping occurred due to auxiliary supply failure. Frequency dropped from Hz to Minutes of the 24 th Protection Coordination Sub Committee Meeting held on Page 5

7 (v) Generation loss (vi) Duration of interruption (vii) Category 49.28Hz 1000MW 17 Minutes GI2 It was informed that failure of auxiliary power supply to HVDC station was the cause of tripping. Concerns were raised over the absence of redundancy of auxiliary supply. SRLDC queried about status of installation of 315 MVA ICT. ED, SRLDC stated that system operator should get the complete tripping reports as per IEGC guidelines. He also informed that SRLDC may not be in a position to certify the availability certification for the interregional links for the above said period with out getting the complete tripping reports. Recommendations a) PGCIL was requested to send the detailed analysis report of the above incident at the earliest. b) The Grid incidence would be discussed in the 26 th PCSC. 4.3 Tripping of Unit#7 at Raichur TPS & 400kV BTPS-Raichur line (i) Date and Time of event at 05:49 hrs (ii) Location Raichur TPS, KPCL, Karnataka (iii) Plant and/or Equipment directly involved Raichur TPS (iv) Reported Disturbance / Fault (v) Generation loss 210 MW (vi) Duration of interruption (vii) Category GI2 As reported fault had occurred in Generator transformer of Unit#7 at Raichur. The tripping of 400kV BTPS-Raichur line on Zone-2 from BTPS end needs to be further investigated It was noted that a fault indication was sensed on RTPS- BTPS line. At RTPS end fault indication was in zone 1 while at BTPS end it was in Zone 2 for RTPS Unit 7 GT Failure. SRLDC pointed out that line protection should not operate for GT fault. It was reported that GT has failed and no D/R was sent within the stipulated time. Minutes of the 24 th Protection Coordination Sub Committee Meeting held on Page 6

8 Recommendations a) KPCL was requested to send the detailed analysis report of the above incident at the earliest. b) The Grid incidence would be discussed in the 26 th PCSC. 5. Status of Pending Protection issues The following pending protection issues were discussed in the 25th PCSC meeting. SN Recommendation The meeting in which the issue was Discussed 1 The Main I and Main II Protection of Different make- Sharavathy 2 Replacement of OLD CBs at Sharavathy 3 COMPLIANACE OF 3RD PARTY AUDIT REPORT- Sharavathy 4 BUSBAR PROTECTION AT KAYATAR 110KV SUBSTATION 21st PCSC held on st PCSC held on th PCSC - 25th PCSC ( to ) 21st PCSC held on Anticipated date of completion Agency Status 25 th PCSC Dec-13 KPCL Pending KPCL informed that the protection issue would be sorted within the agreed time. Dec-13 KPCL Pending KPCL informed that the protection issue would be sorted within the agreed time. Dec-13 KPCL Pending KPCL informed that the protection issue would be sorted within the agreed time. Dec-13 TANTR ANSCO Pending TANTRANSCO informed that the protection issue would be sorted within the agreed time. 5 Thermo vision Scanning of Jumpers 6 PROVIDING DR AND EL- MAMIDAPALY 22nd PCSC held on rd PCSC held on Dec-13 Dec-13 TANTR ANSCO APTRA NSCO Pending Pending TANTRANSCO informed that it is an operational issue and requested PCSC forum to put it in the operational agenda.the forum agreed for the same. APTRANSCO informed that the protection issue would be sorted within the agreed time. Minutes of the 24 th Protection Coordination Sub Committee Meeting held on Page 7

9 7 EARTH PITS at EDAMON 8 DG SET NOT AVAILABLE- EDAMON 9 48 V DC SUPPLY REDUNDANCY NOT AVAILABLE- EDAMON 10 ONLY ONE BUS IS AVAILABLE, TRANSFER BUS SHALL BE PROVIDED - EDAMON 11 CARRIER INTERTRIPPING IS NOT AVAILABLE FOR SBEM 1,2,3 FEEDERS- EDAMON 12 MAIN2 DISTANCEPROT ECTION FOR EMPC#1 FEEDER NOT AVAILABLE- EDAMON 13 LBB NOT IN SERVICE FOR SBEM 2,3 AND EMPC#1-EDAON 14 IDMT characteristics for Earth Fault Relay of the GTs in UPCL 15 UPCL -Kemar Line Protection would be coordinated by KPTCL and UPCL 17th PCSC ( ) 17th PCSC ( ) 17th PCSC ( ) 17th PCSC ( ) 17th PCSC ( ) 17th PCSC ( ) 17th PCSC ( ) 24th PCSC ) 24th PCSC ) Mar-14 KSEB Pending KSEB informed that the protection issue would be sorted within the agreed time. Nov-13 KSEB Pending KSEB informed that the protection issue would be sorted within the agreed time. Dec-13 KSEB Pending KSEB informed that the protection issue would be sorted within the agreed time. Mar-14 KSEB Pending KSEB informed that the protection issue would be sorted within the agreed time. Nov-13 KSEB Pending KSEB informed that the protection issue would be sorted within the agreed time. Nov-13 KSEB Pending KSEB informed that the protection issue would be sorted within the agreed time. Nov-13 KSEB Pending KSEB informed that the protection issue would be sorted within the agreed time. Nov-13 UPCL Pending UPCL and KPTCL were requested to coordinate and change the relay settings. Oct-13 KPTCL /UPCL Attended KPTCL and UPCL checked the relay settings to avoid trippings like incident. Minutes of the 24 th Protection Coordination Sub Committee Meeting held on Page 8

10 16 Reviewing of Distance Protection relay settings at Hassan by PGCIL SR II 24th PCSC ( ) Oct-13 SR II, PGCIL Attended Distance Protection relay settings at Hassan was coordinated by PGCIL SR II 17 NPCIL and KPTCL in coordination to review the protection settings at Kaiga 18 Modification of the present breaker tripping scheme of Haveri line-2 so that the trip coils are activated through two different DC sources 19 The non availability of 220 KV and 400 KV bus coupler is affecting the reliability of 400/220 KV Guttur Substation 20 Relay/CVT error in 400 KV Kaiga-2 Line 21 The non tripping of breaker at Pondy SS would be checked for NLC tripping 24th PCSC ( ) 24th PCSC ( ) 24th PCSC ( ) 24th PCSC ) 23rd PCSC held on Nov-13 KPTCL Pending Kaiga,NPCIL and KPTCL were requested to coordinate and change the relay settings. Dec-13 KPTCL Pending KPTCL informed that the protection issue would be sorted within the agreed time. Oct-13 KPTCL Pending KPTCL informed that the protection issue would be sorted within the agreed time. Oct-13 KPTCL Attended KPTCL informed that the protection issue was sorted out. Oct-13 NLC Attended NLC informed that the protection issue was sorted out. The PCSC forum requested the constituents to implement the above protection committee recommendations on priority basis. 6. SPS for Kudankulam Nuclear Power Station SRLDC brought to the notice of the PCSC forum that therehad been re-orientation recently in respect of 400 KV lines emanating from Kudankulam. Three 400kV lines were now from Kudankulam to Thirunelveli while remaining one line is from Kudankulam to Madurai. Hence the following logic was proposed for SPS at Kudankulam on account of the change in the configuration: Minutes of the 24 th Protection Coordination Sub Committee Meeting held on Page 9

11 Contingency Tripping of all three lines from Kudankulam to Thirunelveli and two units in running condition at Kudankulam. Action One unit at Kudankulam to go on house load and the second unit generation would be evacuated through 400kV Kudankulam- Madurai line. 25 th PCSC The PCSC forum requested KKNPP, NPCIL to send the detailed analysis report about the SPS and modifications if any in the SPS as suggested by SRLDC latest by Review of Power swing block settings of Distance protection relay PCSC forum decided that the issue would be discussed in detail by the Sub Group Meeting to be held on (Wednesday) preceding the PCSC meeting. Issues relating to Over voltage and staggered tripping and any other Protection relay setting issues may please be sent to the SRPC Secretariat latest by to have fruitful discussions in the Sub Group meeting of PCSC. 8. Compliance status of Protection Audit conducted in the Substations of Southern Region PGCIL informed that regarding Munirabad SS the issue was taken up with KPTCL. KPTCL informed that that Main-1 and Main-2 relays have been included in the DPR but however for the same tender has also been called for. 9. Tripping Incidents in the Southern Region The trippingdetails that had occurred in the Southern Region during the month of September - October 2013 is attached herewith as Annexure-VI. Constituents were requested to update the details in the SRLDC Website at the earliest to analyze the incidents and suggest remedial measures if any. Minutes of the 24 th Protection Coordination Sub Committee Meeting held on Page 10

12 10. SPS for 400 KV Kolar - Hosur line SRTS II, PGCIL informed that the Original Equipment Manufacturer (OEM, i.e. Siemens) had advised against having too many Logics (in this instancerunback) in the HVDC system. It was agreed that the SPS for 400 KV Kolar-Hosur Line would be discussed in a Special Meeting to be convened at Kolar SS. 11. Status of implementation: SPS in Southern Region S N Name of the Scheme 1 Proposed Modification in the SPS at Kolar SS Details of the scheme In the 16 th PCSC the forum proposed an additional trip logic (dp/dt )to the Kolar SPS during contingencies similar to New Grid disturbance on Impleme nting Agency PGCIL 25 th PCSC PGCIL informed that the SPS is under Process. Would be completed by end October PCSC Recommendations The forum requested PGCIl to complete the modification within the agreed time. 2 Kudankulam SPS 3 Modification in NTPC Talcher SPS In case of tripping one or two units at Kudankulam nuclear power plant, trip signal-1 or Trip signal-1&2 will be generated depending on number of units tripping. Trip signal-1:793 MW and Trip Signal-2:710 MW SPS would be modified to back down all the generating units instead of tripping the units PGCIL NTPC Second Mock Exercise was conducted on 29 th August New Scheme with SPS 1000 may be kept in service under normal Operating conditions The PCSC forum requested NLDC/SRLDC to convey the decision at the earliest. 12. Status of implementation: SPS in Andhra Pradesh S N Name of the Scheme 1 Vijayawada- Nellore SPS Details of the scheme if one of 400kV Vijayawada- Nellore D/C line trips and before tripping flow each circuit is >550 MW then back down generation or trip one generating unit each at GMR Vemagiri, Gouthami, Konaseema, Jegurupadu-II and Lanco. Total generation back down of 430 MW. Proposed in 9th PCSC ( ) Impleme nting Agency PGCIL./ APTRA NSCO/IP Ps 25 th PCSC PGCIL informed that the SPS would be completed by 10 th November PCSC Recommendations The PCSC forum decided to conduct mock exercise on 30th November Minutes of the 24 th Protection Coordination Sub Committee Meeting held on Page 11

13 2 Nellore-Almatti SPS If one of 400kV Nellore-Almatti DC line trips and before tripping flow each circuit is >520 MW then trip one generating unit each at SEPL and MEPL. Total generation back down of 300 MW. Proposed in 15th PCSC ( ) PGCIL MEPL sent the confirmation. The PCSC forum decided to conduct mock exercise on 15th November 2013 at 12:00 Hrs. APTRANSCO was requested to coordinate the Mock exercise with IPPs. 13. Status of implementation: SPS in Karnataka S N Name of the Scheme 1 Somanahally& Bangalore water supply Details of the scheme a) To trip all 220kV lines & 220 / 66kV trfs except 220 kv Harohalli & Tataguni lines at Somanahally and to trip Vrishabhavathi line at Tataguni when ICTs at Somanahally trip. b) To trip 220 kv Vajamangala and Madhuvanahally-1 & 2 lines at TK Hally when ICTs at Mysore trip. Impleme nting Agency KPTCL 25 th PCSC KPTCL informed that the Substation feeding configuration. KPTCL is modifying the logic as per the latest configuration. PCSC Recommendations The PCSC forum requested KPTCL to submit the SPS Logic to the SRPC Secretariat. 14. Status of implementation: SPS in TamilNadu S N Name of the Scheme 1 Thirunelveli SPS Details of the scheme To avoid overloading of Thirunelveli ICTs in the contingency of tripping of Thirunelveli-Edamon lines. 2 Madurai SPS To avoid overloading of Madurai ICTs. Impleme nting Agency TANTR ANSCO TANTR ANSCO 15. Implementation of Islanding schemes in SR 25 th PCSC TANTRANSC O informed that the scheme was implemented on TANTRANSC O informed that the scheme would be ready by end of October PCSC Recommendation s The forum requested PGCIL / TANTRANSCO to send the scheme details (Logic and SLD) to SRPC Secretariat latest by The forum requested TANTRANSCO to implement the scheme within the agreed time. The PCSC forum requested TANTRANSCOto implement the remaining part of Stage II of the Islanding Scheme latest by end of October 2013 since other utilities had completed their part.. TANTRANSCO agreed to complete their part by the agreed time line. Minutes of the 24 th Protection Coordination Sub Committee Meeting held on Page 12

14 16. The issue of AUFR stages and implementation in SR In the second NPC Meeting, ithad been agreed that there would be four stages for AUFLS starting with 49.2 Hz. The various stages for AUFLS operation are 49.2 Hz, 49 Hz, 48.8 Hz and 48.6 Hz. It was noted that all the stages had been implemented except portion of the last stage of 48.6 Hz in TN. 17. Submission of completed dynamic study data All SLDCs were requested to direct the embedded IPPs connected at 220 KV and above voltage level to submit completed dynamic study format to SRPC, Secretariat. NPCIL, MAPS was requested to submit the dynamic study data of their system. 18. Synchronizing facility for Black start restoration The PCSC forum requested KPTCL to provide synchronizing facility in Hubli S/S within the agreed time (i.e. by August 2014 ). 19. Requirement of Under Voltage Relays (UVR) for SR The PCSC forum had proposed for the provision of under voltage relays in various low voltage pockets to ensure reliable power supply and grid safety Constituents were requested to install the UVR at least in a phased manner in the SRLDC specified nodes. Progress in this regard may be reported to the PCSC forum at the earliest. 20. Implementation of recommendations of Grid Disturbance enquiry committee : Healthiness of Batteries: All the constituents were requested to send the status of healthiness of Batteries to the SRPC Secretariat on monthly basis (i.e by 7 th of every month) Detailed Project Report (DPR) KPTCL informed that the implementation of 765 kv system in SR would increase the fault level which may require replacing the existing CBs with new high capacity CBs. KPTCL also informed the forum that in the DPR as sent by the many of the constituents did not include high capacity CBs. Minutes of the 24 th Protection Coordination Sub Committee Meeting held on Page 13

15 Hence KPTCL requested for revision in the DPR to include high capacity CB's due to configuration changes in the SR system. MS (I/c) suggested that this issue be discussed in the ensuing SRPC Meeting. 22. Remedial measures taken for the critical tripping events in the Southern Region. The constituents were requested to submit the remedial measures taken by them for the critical tripping events sent by SRPC secretariat by filing the remedial measure column of the word file at the earliest to SRPC secretariat. It was also requested that the complete tripping analysis report with (DR, EL) for the tripping incidents may please uploaded in the SRLDC website. 23. Sending Agenda items for the PCSC meetings. As per the Guidelines of CEA/MOP it had been decided to conduct the PCSC meetings on a monthly basis.it was requested that Agenda Items for the PCSC meetings, if any, may please be sent latest by 5 th working day of every month to SRPC Secretariat to compile and circulate the sameso as to have fruitful discussions in the PCSC meetings. 24. Agenda for the Sub Group meeting of PCSC. The following issues would be discussed in the Sub Group meeting the same was communicated vide SRPC Lr. Dated a) Power Swing Blocking Setting of Distance Relays b) Philosophy of Zone 3 Settings (POWERGRID to furnish details) c) Time delays in df/dt Relays d) Changes in over voltage setting if any, for 400 kv lines. (Changes in the present settings, if any, may please be sent to SRPC Secretariat latest by 11 th November 2013). 25. Date & Venue of the next Meeting The 26 th PCSC meeting would be conducted on (Thursday) preceded by the Sub Group meeting on Member Secretary i/c thanked all the Members &participants for their active contribution in the Meeting. ***** Minutes of the 24 th Protection Coordination Sub Committee Meeting held on Page 14

16

17

18

19

20

21 Tripping of Khammam ICT-1&2 at 11:45 hrs on 25 th September 2013 SRLDC observations: FIR reported that ICT s had tripped on operation of overload protection. It was reported that the triggering incident was a fault in 220kV KTPS-Manuguru line-1. All the 220kV lines at KTPS tripped from remote ends on Zone-2 protection. Figure 1 : SLD of 220kV Khammam switchyard

22 Figure 2 : Gooty 400kV bus voltage from PMU From Gooty PMU voltage it is observed that fault started at 11:45: hrs and cleared at 11:45: hrs i.e., in 560 milli seconds (approx). From D.R of ICT-2 the current in neutral starts from 11:45: hrs. From D.R of ICT-2 it is observed that the current was A in Secondary i.e Amps (CT Ratio = 1000/1A) and tripped in 450ms. In ICT-1 the maximum current observed was 1.8 A in secondary R and Y phase i.e. 1800A (CT ratio=1000/1a). Recommendation and further actions required: 1) It appears that the ICT s at Khammam have tripped before tripping of 220kV Khammam- KTPS line-1&2 which was not desired. 220kV Khammam-KTPS line-1&2 should have tripped in distance Zone-2 protection or on Directional earth fault (for high resistance fault) before tripping of the ICT s. The ICT protection needs to be coordinated with 220kV line protection at 400/220kV Khammam substation. 2) It is to be ensured that the ICT s have an IDMT characteristics for directional over current and earth fault and DMT characteristic s for high set of directional over current and earth fault. 3) The D.R of ICT-1 is not time synchronized with GPS and same needs to be rectified.

23 TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FAX MASSAGE DATED From The Chief Engineer/ Power Systems, APTRANSCO, Vidyut Soudha, Hyderabad. To 1) The Member Secretary, SRPC, 29, Race Course Road Bangalore ) The Executive Director, SRLDC, 29, Race Course Road Bangalore Lr.No.CPS/SP/111 /SRPC-FAX/Vol.3/D.No. 569/13, Dt: Sir, Sub: Grid breaker tripping at 11:46 Hrs on at KTPS - Reg. >>*<< INCIDENT: It is reported that at 11:46 Hrs on , a heavy fault occurred on 220 KV KTS-Manuguru I feeder and the conductors snapped at the following locations: 1. Yph conductor snapped between Tower locations 1 and Rph CVT jumper got cut. 3. Yph conductor got cut after the line isolator. 4. Bph jumper at the wave trap. 5. Rph jumper between line-in isolator and breaker. Due to the above incidents the following units and feeders got tripped: At KTS(O&M): The 220KV Nunna, Miryalaguda, Manuguru-1&2 and Lower sileru feeders from KTS(O&M) tripped on Zone-2 at remote ends. Also, the busbar protection operated, tripping all the 220 KV feeders and Units 2-8 at KTS(O&M) At KTS-V Stage: The 220KV Budidampadu-1&2, Seetharampatnam-1&2 and Lowersileru feeders from KTS-V stage tripped at other ends on Zone-2. Also, the units 9 and 10 are tripped at KTS-V

24 RESTORATION: By 12:15 Hrs the 220 KV KTS-V - Lower sileru and KTS-V Budidampadu 1&2 were taken in to service By 12:15 Hrs the 220 KV Shapurnagar, Lower sileru and Miryalaguda feeders from KTS(O&M) were taken into service. At 14:05 Hrs Unit-2 was synchronized at KTS(O&M) At 14:05 Hrs the 220 KV KTS-Manuguru II feeder was taken into service. At 14:18 Hrs the Unit-10 was synchronized at KTS-V. At 14:30 Hrs the Unit-4 was synchronized at KTS(O&M). At 14:37 Hrs, the Unit-8 was synchronized at KTS(O&M). At 14:53 Hrs, the Unit-9 was synchronized at KTS-V At 15:15 Hrs, the Unit-5 was synchronized at KTS(O&M). At 17:56 Hrs, the Unit-6 was synchronized at KTS(O&M). At 18:00 Hrs, the Unit-1 was synchronized at KTS(O&M). This is for the favour of information please. CHIEF ENGINEER POWER SYSTEMSt

25 Tripping of running units at Vijayawada TPS at 14:55 hrs on Running units-2,3,4,5&6 at Vijayawada TPS (connected at 220kV) tripped at 14:55 hrs on (Unit#1 was under shutdown). The generation loss was 900MW and change in frequency was 0.25 Hz

26 Analysis of the incident: From synchrophasor data of Ramagundam it can be observed that two faults had occurred, 1 st in B-Phase which was immediately followed by a fault in R-Phase. Both the faults were timely cleared. As per FIR of APTRANSCO the triggering incident was failure of triggering incident was B phase CT failure in 220kV VTPS-Narsaraopeta line at VTPS end. During discussion of the tripping in 25 th protection sub-committee meeting of SRPC on , it was informed by APTRANSCO representative that CT failure had also occurred in 220kV VTPS-Podili line at VTPS end. The 220kV Nasaraopeta line is connected to 220kV bus-2 and 220kV Podili line to 220kV Bus-1 at VTPS. Bus-bar protection of both the buses got acted due to failure of above CT s. D.R, E.L and final trip report not furnished by APTRANSCO/ APGENCO.

27 TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FAX MASSAGE DATED From The Chief Engineer/ Power Systems, APTRANSCO, Vidyut Soudha, Hyderabad. To 1) The Member Secretary, SRPC, 29, Race Course Road Bangalore ) The Executive Director, SRLDC, 29, Race Course Road Bangalore Lr.No.CPS/SP/111 /SRPC-FAX/Vol.26/D.No. 590/13, Dt: Sir, Sub: Grid breaker trippings on Reg. >>*<< Sl. No. Date Tripping Time (Hrs:mm) Element Type Element Remarks Normalisation Date Time (Hrs:mm) :56 220kV Line 220kV VTS- Narasaraopeta feeder The B-Phase CT on 220kV VTS- Narasaraopeta feeder got blasted at VTS end. The fault got cleared by the operation of Busbar protection, tripped all the 220kV feeders and units connected to Bus-1 & Bus-2. Failed CT to be replaced CHIEF ENGINEER POWER SYSTEMSt

28 ANNEXURE VI (1/4) Pending Tripping Details for Month of SEP-OCT 2013 ANNEXURE VI : File Avilable and Received Within 24 Hrs. : File Avilable and Received after 24 Hrs. (S): SENDER END TRIPPING DATE TRIPPING TIME 22-Oct-13 2:59 22-Oct-13 2:58 ELEMENT NAME kv VIJAYAWADA - VEMAGIRI kv RAMAGUNDAM HYDERABAD kv VEMAGIRI - GOUTHAMI CCCP 1 22-Oct-13 2: kv MYSORE - HASAN 2 21-Oct-13 23: kv NELLORE - ALAMATHI 400 kv TIRUNELVELI KUDAMKULAM 4 21-Oct-13 2:59 21-Oct-13 2: Kv KOLAR - SPDR 20-Oct-13 23: Oct-13 22:51 20-Oct-13 2: kv MYSORE - HASAN Kv GAJWEL - BHOOPALAPALLY kv WARANGAL - BOOPALPPALLI 2 20-Oct-13 2: kv MYSORE - HASAN 2 19-Oct-13 23: Kv GOOTY - NPS 2 19-Oct-13 16: kv SEDAM - TANDUR 17-Oct-13 13: kv HYDERABAD - N'SAGAR 17-Oct-13 12: kv KAIGA - GUTTUR 2 17-Oct-13 3: kv MYSORE - HASAN 2 17-Oct-13 3: kv MADURAI - PUGALUR 1 16-Oct-13 21: kv MADURAI - TIRUNELVELI 16-Oct-13 21: kv KANIAMPET - KADAKOLA 16-Oct-13 12: kv KAIGA - GUTTUR 2 16-Oct-13 11: kv AMBEWADI - PONDA 2 16-Oct-13 11: Kv KLVDPT - VALLUR 1 HVDC TALCHER - KOLAR POLE 1 AT TALCHER HVDC TALCHER - KOLAR POLE 1 AT TALCHER HVDC TALCHER - KOLAR POLE 2 AT TALCHER 13-Oct-13 19:03 13-Oct-13 1: Oct-13 0:42 12-Oct-13 23: kv MYSORE - HASAN 2 12-Oct-13 23: kv EDAMON - EDAPPON 11-Oct-13 12: Kv NCTPS - VALLUR 2 10-Oct-13 16: /220 kv ICT-1 AT CHITTOOR 9-Oct-13 13: /220 kv ICT-1 AT CUDDAPAH 9-Oct-13 12: /220 kv ICT-2 AT CHITTOOR 9-Oct-13 10: kv KURNOOL - SRISAILAM 8-Oct-13 15:53 25 File Not Avilable. (R): RECEIVER END SN 2 : kv SRISAILAM-MAMIDIPALLI 2 8-Oct-13 15: Kv TRICHUR - KOCHI 1 8-Oct-13 13: /220 kv ICT-2 AT CHITTOOR 8-Oct-13 12: kv KAIGA - GUTTUR 1 8-Oct-13 10: /220 kv ICT-1 AT N'SAGAR 7-Oct-13 23: kv KALPAKKA - VEMAGIRI 1 7-Oct-13 17: kv VTPS IV - SRISAILAM 2 7-Oct-13 17: kv VIJAYAWADA - VEMAGIRI 1 7-Oct-13 14: kv VIJAYAWADA - VEMAGIRI 1 7-Oct-13 14: kv KALPAKKA - VEMAGIRI 1 7-Oct-13 14: kv KAIGA - GUTTUR 1 7-Oct-13 12: /220 kv ICT-2 AT GOOTY 6-Oct-13 12:56 FIR (S) 1 DR (S) EL (S) FIR (R) DR (R) EL (R) DETAILS

29 Pending Tripping Details for Month of SEP-OCT 2013 ANNEXURE VI /220 kv ICT-2 AT CHITTOOR 6-Oct-13 12: kv KANIAMPET - KADAKOLA 6-Oct-13 11: kv TALAGUPPA - HASSAN 5-Oct-13 22:50 48 VIJAYAWADA TPS-UNIT 2 4-Oct-13 14:56 49 VIJAYAWADA TPS-UNIT 3 4-Oct-13 14:56 50 VIJAYAWADA TPS-UNIT 4 4-Oct-13 14:56 51 VIJAYAWADA TPS-UNIT 5 4-Oct-13 14:56 52 VIJAYAWADA TPS-UNIT 6 4-Oct-13 14: kv MAHABOOB NAGAR - RAICHUR 4-Oct-13 10: Kv GAJWEL - BHOOPALAPALLY 2 3-Oct-13 16: kv VEMAGIRI - GOUTHAMI CCCP 2 3-Oct-13 15: /230 Kv ICT-1 AT SUNGUVARCHATRAM 3-Oct-13 15: kv AMBEWADI - PONDA 2 3-Oct-13 12: kv VIJAYAWADA - VTPS IV 2 3-Oct-13 6:49 59 GOOTY-SOMANAHALLI AT GOOTY 3-Oct-13 3: kv NEYVELI TS 2- PONDICHERY 2-Oct-13 23: Kv PONDICHERY - SPCHATRAM 2-Oct-13 23: kv AMBEWADI - PONDA 2 2-Oct-13 14: kv GUMMUDIPUNDI - 63 SULLURPET 2-Oct-13 14:00 64 HVDC BHADRAVATHI POLE 1 1-Oct-13 16:28 65 HVDC BHADRAVATHI POLE 2 1-Oct-13 16: kv TIRUNELVELI - KUDAMKULAM 2 1-Oct-13 3: kv TIRUNELVELI - KUDAMKULAM 2 1-Oct-13 2: kv AMBEWADI - PONDA 1 29-Sep-13 21:47: kv KAIGA - KODASALLY 29-Sep-13 21:47: kv MYSORE - HASAN 2 29-Sep-13 17:59: kv KAIGA - GUTTUR 2 29-Sep-13 15:12: kv KHAMMAM - MAMIDIPALLY Sep-13 19:44: kv AMBEWADI - PONDA 1 28-Sep-13 15:23: kv KANIAMPET - KADAKOLA 28-Sep-13 12:08: kv IDUKKI - UDUMALPET 27-Sep-13 13:07: kv TIRUNELVELI - KUDAMKULAM 3 27-Sep-13 12:41: /220 kv ICT-1 AT KHAMMAM 25-Sep-13 11:45: /220 kv ICT-2 AT KHAMMAM 25-Sep-13 11:45: kv TALAGUPPA - HASSAN 24-Sep-13 22:17: /230 kv ICT-1 AT NEYVELI 24-Sep-13 14:06: kv KAIGA - GUTTUR 1 24-Sep-13 0:16: Kv HASSAN - UPCL 2 23-Sep-13 23:44: Kv GOOTY - NPS 1 22-Sep-13 3:02: kv RAMAGUNDAM - GAJWEL 20-Sep-13 17:09: kv SEDAM - TANDUR 20-Sep-13 7:23: kv VTPS IV - SRISAILAM 2 19-Sep-13 10:05: Kv VTPS - MALKARAM 2 19-Sep-13 9:54: kv TALAGUPPA - HASSAN 18-Sep-13 23:56: kv MYSORE - HASAN 1 18-Sep-13 23:29: kv KAIGA - NARENDRA 1 18-Sep-13 23:20: Kv HASSAN - UPCL 1 18-Sep-13 16:00: Kv HASSAN - UPCL 2 18-Sep-13 16:00: kv RAMAGUNDAM - N'SAGAR 1 18-Sep-13 3:23: kv MADURAI - PUGALUR 1 17-Sep-13 15:01:00 2

30 Pending Tripping Details for Month of SEP-OCT 2013 ANNEXURE VI Kv HIRIYUR-BTPS 1 17-Sep-13 4:33: kv TALAGUPPA - HASSAN 16-Sep-13 23:43: kv GOOTY - NELAMANGALA 16-Sep-13 23:16: /220 kv ICT-2 AT CUDDAPAH 16-Sep-13 4:14: /220 kv ICT-1 AT CUDDAPAH 16-Sep-13 4:14: kv GUTTUR - HIRIYUR 1 16-Sep-13 1:56: Kv GOOTY - NPS 1 16-Sep-13 0:01: kv MYSORE - HASAN 1 15-Sep-13 23:31: kv CHITTOR - THIRUVALEM 15-Sep-13 22:45: kv GUTTUR - NARENDRA 1 15-Sep-13 0:01: kv KAIGA - NARENDRA 1 15-Sep-13 0:01: kv MYSORE - HASAN 1 15-Sep-13 0:01:00 400/230 kv ICT 1 AT 107 PONDYCHERRY 13-Sep-13 12:52: kv HASSAN - NEELAMANGALA 1 13-Sep-13 3:02: kv KAIGA - GUTTUR 2 13-Sep-13 0:05: kv MYSORE - HASAN 1 12-Sep-13 23:10: Kv GOOTY - NPS 2 12-Sep-13 2:55: /220 kv ICT-1 AT HOODY 12-Sep-13 0:04: kv MYSORE - HASAN 1 12-Sep-13 0:01: kv MYSORE - HASAN 1 11-Sep-13 0:01: kv VIJAYAWADA - NELLORE 1 10-Sep-13 3:04: Kv KRISHNAPATNAM NELLORE 1 10-Sep-13 3:04: Kv NPS - NELLORE Sep-13 3:04: kv VIJAYAWADA - NELLORE 2 10-Sep-13 3:04: Kv GOOTY - NPS 2 10-Sep-13 3:04: kv KURNOOL - GOOTY 10-Sep-13 3:04: kv NELLORE - ALAMATHI 10-Sep-13 3:04: Kv NELLORE - SPDR 10-Sep-13 3:04: Kv NPS - NELLORE Sep-13 2:46: kv KAIGA - GUTTUR 1 10-Sep-13 0:23: kv HASSAN - NEELAMANGALA 1 9-Sep-13 23:59: kv MYSORE - HASAN 1 9-Sep-13 23:49: kv VIJAYAWADA - NELLORE 2 9-Sep-13 2:24: Kv KRISHNAPATNAM NELLORE 2 9-Sep-13 1:34: kv NELLORE - ALAMATHI 9-Sep-13 1:34: kv VIJAYAWADA - NELLORE 1 9-Sep-13 1:34: Kv NPS - NELLORE -2 9-Sep-13 1:34: Kv NELLORE - SPDR 9-Sep-13 1:33: Kv NPS - NELLORE -1 9-Sep-13 1:01: kv MYSORE - HASAN 1 8-Sep-13 22:57: kv MYSORE - HASAN 1 7-Sep-13 23:56: /220 kv ICT-2 AT N'SAGAR 7-Sep-13 17:16: kv RAMAGUNDAM - N'SAGAR 1 7-Sep-13 17:16: kv SEDAM - TANDUR 7-Sep-13 0:13: Kv NPS - NELLORE -1 6-Sep-13 4:03: kv PONDYCHERRY- VILLIANUR 5-Sep-13 18:51: Kv GOOTY - NPS 2 4-Sep-13 0:24: kv HASSAN - NEELAMANGALA 1 3-Sep-13 23:58: Kv KOLAR - SPDR 3-Sep-13 23:58: Kv NPS - NELLORE -1 3-Sep-13 23:55: kv MYSORE - HASAN 1 3-Sep-13 23:48: /220 kv ICT-1 AT HYDERABAD 3-Sep-13 18:15: kv KANIAMPET - KADAKOLA 3-Sep-13 12:57: kv AMBEWADI - PONDA 2 3-Sep-13 12:52: kv TALAGUPPA - HASSAN 1 2-Sep-13 22:42:00 3

31 Pending Tripping Details for Month of SEP-OCT 2013 ANNEXURE VI Kv HIRIYUR-BTPS 2 2-Sep-13 22:36: kv KAIGA - GUTTUR 2 2-Sep-13 11:41: /220 kv ICT-1 AT GUTTUR 2-Sep-13 11:41: /220 kv ICT-2 AT GUTTUR 2-Sep-13 11:41: kv UDUMALPET - TIRUNELVELI Sep-13 17:59: kv AMBEWADI - PONDA 2 1-Sep-13 3:05: Kv KRISHNAPATNAM NELLORE 1 1-Sep-13 2:13: Kv NELLORE - SPDR 1-Sep-13 2:01: Kv NPS - NELLORE -1 1-Sep-13 2:01: kv VIJAYAWADA - NELLORE 2 1-Sep-13 2:01:00 4

1. CONFIRMATION OF THE MINUTES OF THE 14 th PROTECTION SUB- COMMITTEE MEETING HELD ON 21 st March Grid Disturbances in the Southern Region

1. CONFIRMATION OF THE MINUTES OF THE 14 th PROTECTION SUB- COMMITTEE MEETING HELD ON 21 st March Grid Disturbances in the Southern Region SOUTHERN REGIONAL POWER COMMITTEE BANGALORE AGNEDA FOR THE 15 th MEETING OF PROTECTION SUB- OF SRPC TO BE HELD ON 18.07.2012. COMMITTEE 1. CONFIRMATION OF THE MINUTES OF THE 14 th PROTECTION SUB- COMMITTEE

More information

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 15 th MEETING OF PROTECTION SUB- SRPC HELD ON 18.07.2012. COMMITTEE OF 1. INTRODUCTION 1.1 The 15 th meeting of Protection Sub-Committee was held

More information

MINUTES OF THE 1 st MEETING OF THE PROTECTION SUB-COMMITTEE HELD ON 25 th JULY 2006.

MINUTES OF THE 1 st MEETING OF THE PROTECTION SUB-COMMITTEE HELD ON 25 th JULY 2006. 1 MINUTES OF THE 1 st MEETING OF THE PROTECTION SUB-COMMITTEE HELD ON 25 th JULY 2006. The 1st meeting of Protection Sub-Committee was held on 25 th July 2006 in the Conference Hall of Southern Regional

More information

SYSTEM OCCURRENCE: Various system occurrences during the period were analysed. Details are as under:

SYSTEM OCCURRENCE: Various system occurrences during the period were analysed. Details are as under: MINUTES OF THE 2nd MEETING OF THE PROTECTION SUB-COMMITTEE HELD ON 08th DECEMBER 2006. The 2nd meeting of Protection Sub-Committee was held on 08th December 2006 in the Conference Hall of Southern Regional

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Minutes of the 45 th Meeting of Protection Coordination Sub-Committee (PCSC 45) of SRPC held on 25.06.2015 1. Introduction The 45 th meeting of Protection Coordination

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 110066. No. 51/4/SP&PA-2006/ Date: 08-08-2006 To 1. The Member Secretary, Southern Regional

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 110066 No. 51/4/SP&PA-2011/ 497-507 Date: 23 May 2011 To 1.The Member Secretary, Southern Regional

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 100 66. No. 51/4/SP&PA-2001/ Date :, 2003. To 1.The Member Secretary, Southern Regional Electricity

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R K Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R K Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R K Puram, New Delhi 110066 No. 51/4/SP&PA-2008/ 298-307 Date: April 24, 2008 To 1.The Member Secretary, Southern

More information

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Minutes of the 49 th Meeting of Protection Coordination Sub-Committee (PCSC 49) of SRPC held on 30.11.2015 1. Introduction The 49 th meeting of Protection Coordination

More information

MINUTES OF THE 47 th SLCF MEETING HELD ON

MINUTES OF THE 47 th SLCF MEETING HELD ON MINUTES OF THE 47 th SLCF MEETING HELD ON 23.11.2016 Shri. Rafikul Islam, Chief Engineer (SLDC), WBSETCL & Chairperson, SLCF welcomed all the participant members to the 47 th SLCF meeting.. ITEM-1: CONFIRMATION

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 110066 No. 51/4/SP&PA-2011/ 883-893 Date: 07 th June 2011 To 1.The Member Secretary, Southern

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 100 66. No. 51/4/SP&PA-2001/ Date : 10-3-2004 To 1.The Member Secretary, Southern Regional

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 110066. No. 51/4/SP&PA-2009/ 246-255 Date: March 17, 2009 To 1.The Member Secretary, Southern

More information

A. Operational Issues relating to recent Disturbances in Gajuwaka Simhadri - Kalpaka corridor

A. Operational Issues relating to recent Disturbances in Gajuwaka Simhadri - Kalpaka corridor SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Minutes of the Special Meeting on issues relating to recent Grid Disturbances in Gajuwaka Simhadri - Kalpaka corridor A Special Meeting was held on 4 th May,

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 110066 No. 51/4/SP&PA-2011/ 1493-1504 Date: 13 th Oct 2011 To 1.The Member Secretary, Southern

More information

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I

Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on )In-principle Approval_Tumkur Phase-I Annex_Tumkur In-principle(Phase-I) 1)Minutes of the meeting held on 16-12-2015 2)In-principle Approval_Tumkur Phase-I Government of India Ministry of Power Central Electricity Authority PSP & PA- I Division

More information

SPECIAL ENERGY METERS IN SOUTHERN REGION (HAND BOOK)

SPECIAL ENERGY METERS IN SOUTHERN REGION (HAND BOOK) SPECIAL ENERGY METERS IN SOUTHERN REGION (HAND BOOK) TALCHER BHADRAVATI JEYPO RE RSTPP KAIGA NARENDRAMUNIRABAD RAICHUR BTPS JINDAL DITCHIPALLY GAJWEL P GHANAPUR MAHABOOB NAGAR P KURNOOL GOOTY MALKARAM

More information

Agenda of 11 th System Studies Meeting in NER

Agenda of 11 th System Studies Meeting in NER Agenda of 11 th System Studies Meeting in NER Date: 16.12.2015. Venue: Hotel Nandan, Guwahati 1. Review of SPS I, II, III & SPS IV related to Palatana GBPP, OTPC after commissioning of Palatana Module

More information

ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT

ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT ISLANDING SCHEME FOR STATION DURING GRID BLACK-OUT By Girija Shankar Sharma, M.Tech (Power System), DGM (O&M-Opn), NTPC-Rihand, E-mail: gssharma@ntpc.co.in Presentation Points System Description and Grid

More information

दव ण त र य व द य त सवमवत

दव ण त र य व द य त सवमवत भ रत सरक र GOVERNMENT OF INDIA व द य त म त र लय MINISTRY OF POWER क द र य व द य त प र व करण CENTRAL ELECTRICITY AUTHORITY दव ण त र य व द य त सवमवत SOUTHERN REGIONAL POWER COMMITTEE तकन क सम तत क पच च सव

More information

CONTINGENCY ANALYSIS AND RANKING ON 400 KV KARNATAKA NETWORK BY USING MIPOWER

CONTINGENCY ANALYSIS AND RANKING ON 400 KV KARNATAKA NETWORK BY USING MIPOWER CONTINGENCY ANALYSIS AND RANKING ON 400 KV KARNATAKA NETWORK BY USING MIPOWER Swaroop N S 1, Lekshmi M 2 1PG Student [Power System Engineering], Dept. of EEE, Acharya Institute of Technology, Bengaluru,

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

दक ष ण त र क ष द य त सक ष क षत, ब गल र. Southern Regional Power Committee, Bangalore

दक ष ण त र क ष द य त सक ष क षत, ब गल र. Southern Regional Power Committee, Bangalore दक ष ण त र क ष द य त सक ष क षत, ब गल र Southern Regional Power Committee, Bangalore त प य / Thermal : आ ध र प रद श / Andhra Pradesh 2016-17 क द र न, उदप दन क न द र क आऊट ज य जन Outage Planning Report for

More information

Observations/Remarks. Sl. No.

Observations/Remarks. Sl. No. Name of Substation Date of Audit Observations/Remarks 00kV Thrichy SS..0 The old electromagnetic/static relays may be replaced with numerical relays. The possibility of testing relays as per schedule may

More information

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority ,.,.;i')!i,:;;',;~~~. 'ffrff mm I Government of India ~ ~.I Ministry of Power 4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority III ~~~~~~I"1",~~1 ;J' :. r System Planning & Project Appraisal Division

More information

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011 POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011 PREPARED BY: Electricity System Operations Planning and Performance DATE: 22 March 2012 FINAL

More information

PRAGATI ENGINEERING COLLEGE

PRAGATI ENGINEERING COLLEGE Report on Industrial Visit to Power Grid 765/400 KV (GIS) Sub-Station No. of days of Visit : Two days Date(s) of Visit : 19 th September, 2017& 7 th October, 2017 Faculty In-charges : 4 Members 1. Mr.S.Ashokreddy,

More information

दव ण त र य व द य त सवमवत

दव ण त र य व द य त सवमवत भ रत सरक र GOVERNMENT OF INDIA व द य त म त र लय MINISTRY OF POWER क द र य व द य त प र व करण CENTRAL ELECTRICITY AUTHORITY दव ण त र य व द य त सवमवत SOUTHERN REGIONAL POWER COMMITTEE तकन क सम तत क छब ब सव

More information

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012 POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 PREPARED BY: Electricity System Operations Planning and Performance DATE: 5 June 2012 FINAL

More information

FAX : Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore FAX :

FAX : Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore FAX : Distribution List : 1. Shri Ravinder Member (Power Systems) Central Electricity Authority Sewa Bhawan, R K Puram New Delhi-110 066 FAX : 011-26102045 3. CEO POSOCO B-9, Qutab Institutional Area Katwaria

More information

North Eastern Regional Power Committee

North Eastern Regional Power Committee North Eastern Regional Power Committee Agenda For 6 th Protection Coordination Sub-Committee Meeting Time of meeting : 10:00 AM. Date of meeting : 11 th December, 2012 (Tuesday) Venue : Hotel Grand Starline

More information

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region 1.0 Applications for Connectivity and Long Term (Open) Access. Applications for grant of Connectivity

More information

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi 110066 No. 51/4/SP&PA-2011/ 1647-58 Date: 15 November 2011 To 1.The Member Secretary, Southern

More information

POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010

POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010 POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010 PREPARED BY: Electricity System Operations Planning and Performance FINAL Disclaimer (a) Purpose - This report

More information

POWER SYSTEM OPERATING INCIDENT REPORT TRIPS OF YALLOURN W POWER STATION UNITS W1 AND W3 ON 14 NOVEMBER 2012

POWER SYSTEM OPERATING INCIDENT REPORT TRIPS OF YALLOURN W POWER STATION UNITS W1 AND W3 ON 14 NOVEMBER 2012 POWER SYSTEM OPERATING INCIDENT REPORT TRIPS OF YALLOURN W POWER STATION UNITS W1 AND W3 ON 14 NOVEMBER 2012 PREPARED BY: System Performance and Commercial DATE: 7 March 2013 FINAL Disclaimer Purpose This

More information

POWER SYSTEM OPERATING INCIDENT REPORT: TRIP OF 837 TARONG MT. ENGLAND 275 KV LINE AND MT. ENGLAND NO KV BUSBAR ON 30 OCTOBER 2011

POWER SYSTEM OPERATING INCIDENT REPORT: TRIP OF 837 TARONG MT. ENGLAND 275 KV LINE AND MT. ENGLAND NO KV BUSBAR ON 30 OCTOBER 2011 POWER SYSTEM OPERATING INCIDENT REPORT: TRIP OF 837 TARONG MT. ENGLAND 275 KV LINE AND MT. ENGLAND NO.1 275 KV BUSBAR ON 30 OCTOBER 2011 PREPARED BY: Electricity System Operations Planning and Performance

More information

Agenda Note for Long Term Open Access Applications of New Generation in Southern Region

Agenda Note for Long Term Open Access Applications of New Generation in Southern Region Agenda Note for Long Term Open Access Applications of New Generation in Southern Region EXECUTIVE SUMMARY 1. Long Term Open Access Applications POWERGRID has received following Long Term Open Access applications

More information

2013 Grid of the Future Symposium. Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited Plant

2013 Grid of the Future Symposium. Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited Plant 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2013 Grid of the Future Symposium Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited

More information

Key DRAFT OPERATING CODE 2 LEGAL TEXT

Key DRAFT OPERATING CODE 2 LEGAL TEXT Key DRAFT OPERATING CODE 2 LEGAL TEXT 1) Blue Text From Grid Code 2) Black Text Changes / Additional words 3) Orange/ Brown text From RfG 4) Purple From HVDC Code 5) Green From DCC (not used in this document)

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd Embedded Generation - Technical Access Standards Embedded Generation - 5 MW or Greater ELE SP 0003 Public 1 October 2014 TABLE OF CONTENTS TABLE OF CONTENTS Abbreviations...

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner

More information

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008 Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008 2 Table of Contents Administrative Data...3 Network Performance...3 Reliability Measures

More information

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION Presentation by Engr. O. C. Akamnnonu Chief Executive Officer, Ikeja Electricity Distribution Company AGENDA WORK THROUGH

More information

DG SYNCHRONIZING &AMF PANEL

DG SYNCHRONIZING &AMF PANEL A 80, Sector 80, Phase 2, Noida 201305, Utter Pradesh, India DG SYNCHRONIZING &AMF PANEL Clients Bharat Petroleum Corp.Ltd PROJECT- DG Synchronization panel with AMF function. Design BY:- Errection By

More information

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017 MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017 REVIEWABLE OPERATING INCIDENT REPORT UNDER THE NATIONAL ELECTRICITY RULES Published: 3 August 2017 INCIDENT CLASSIFICATIONS

More information

13. ü Ö Ö Öê Ö Öë 400 ¾ÖÓ 220/230 ú ¾ÖÖê úß Ö Ô ÖÖ êüâö Ö»ÖÖ ÖÖêÓ êú Ö ÖÖÔ Ö úöµöô úß ÖÏ Ö ŸÖ úß ÃÖ Öß ÖÖ

13. ü Ö Ö Öê Ö Öë 400 ¾ÖÓ 220/230 ú ¾ÖÖê úß Ö Ô ÖÖ êüâö Ö»ÖÖ ÖÖêÓ êú Ö ÖÖÔ Ö úöµöô úß ÖÏ Ö ŸÖ úß ÃÖ Öß ÖÖ 25 13. ü Ö Ö Öê Ö Öë 400 ¾ÖÓ 220/230 ú ¾ÖÖê úß Ö Ô ÖÖ êüâö Ö»ÖÖ ÖÖêÓ êú Ö ÖÖÔ Ö úöµöô úß ÖÏ Ö ŸÖ úß ÃÖ Öß ÖÖ REVIEW OF PROGRESS OF WORKS ON NEW 400 KV AND 220/230 KV TRANSMISSION LINES UNDER STATE SECTOR

More information

CURRICULUM VITAE. Having an experience and knowledge in Testing, Commissioning and Maintenance of power plant, substation and process plant.

CURRICULUM VITAE. Having an experience and knowledge in Testing, Commissioning and Maintenance of power plant, substation and process plant. CURRICULUM VITAE Personal details MANIKANDAN. Y manikandan.y@gmail.com Date of Birth : 17.07.1988 Nationality : Indian Sex : Male Marital Status: Single Passport No : J2470486 Current Visa : S pass Contact

More information

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 6

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 6 The University of New South Wales School of Electrical Engineering and Telecommunications Industrial and Commercial Power Systems Topic 6 PROTECTIONS 1 FUNCTION OF ELECTRICAL PROTECTION SYSTEMS Problems:

More information

Summary of Revision, IEEE C , Guide for Breaker Failure Protection of Power Circuit Breakers

Summary of Revision, IEEE C , Guide for Breaker Failure Protection of Power Circuit Breakers Summary of Revision, IEEE C37.119-2016, Guide for Breaker Failure Protection of Power Circuit Breakers Kevin Donahoe GE Grid Solutions 2018 Texas A&M Protective Relaying Conference Agenda Introduction

More information

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS 1. PURPOSE AND SCOPE OF THIS DOCUMENT... 3 2. DEFINITIONS...

More information

GC108: EU Code: Emergency & Restoration: Black start testing requirement

GC108: EU Code: Emergency & Restoration: Black start testing requirement Stage 01: Modification Proposal Grid Code GC108: EU Code: Emergency & Restoration: Black start testing requirement Purpose of Modification: This modification seeks to align the GB Grid Code with the European

More information

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 1 of 5. Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 2 Definitions 2 Not seen the definition for Inspector. But with, - Qualifications,

More information

Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER

Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER 1 Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER Lisa Dangelmaier Hawaii Electric Light lisa.dangelmaier@hawaiielectriclight.com Hawai'i Electric Light System Overview

More information

पत स च / Address List

पत स च / Address List पत स च / Address List 1. मह ब धक, एसआरएलड स, प स क, बगल र/ GM, SRLDC, POSOCO, Bengaluru 2. म U य अ भय त (एचप स व जल पEरय जन ) एप ज नक, 4व म जल, ग णदल, वजयव ड आ 520004/ Chief Engineer (Generation), APGENCO,

More information

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design Presented at the 2018 Transmission and Substation Design and Operation Symposium Revision presented at the

More information

2015 WDC Disturbance and Protection Standards Overview

2015 WDC Disturbance and Protection Standards Overview NERC Update 2015 WDC Disturbance and Protection Standards Overview Rich Bauer Senior Manager Reliability Risk Management / Event Analysis IEEE PSRC meeting Denver, Co May 12, 2016 2 System Protection and

More information

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian Shunt Capacitor Bank Protection in UHV Pilot Project Qing Tian 2012-5 INTRODUCTION State Grid Corp. of China, the largest electric power provider in the country, has first build a 1000 kv transmission

More information

POWER SYSTEM OPERATING INCIDENT REPORT MULTIPLE CONTINGENCY EVENT IN NORTH WEST TASMANIA ON 6 APRIL 2012

POWER SYSTEM OPERATING INCIDENT REPORT MULTIPLE CONTINGENCY EVENT IN NORTH WEST TASMANIA ON 6 APRIL 2012 POWER SYSTEM OPERATING INCIDENT REPORT MULTIPLE CONTINGENCY EVENT IN NORT WEST TASMANIA ON 6 APRIL 2012 PREPARED BY: Systems Capability DATE: 28 September 2012 FINAL IN NORT WEST TASMANIA ON 6 APRIL 2012

More information

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION Work Order No: File Reference: 16/2/1 This application form for the connection of small scale embedded generation is for small

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th Alex Bettencourt Managing Director National Association Made Up of Entire Industry Utilities Industry Academia / R&D

More information

PHILIPPINE DISTRIBUTION CODE 2017 EDITION

PHILIPPINE DISTRIBUTION CODE 2017 EDITION PHILIPPINE DISTRIBUTION CODE 2017 EDITION PDC 2017- Background Revised the PDC 2001 Starts of revision in 2010 April 18 and 24, 2012 conducted a series of expository presentation for Visayas and Mindanao

More information

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew. Guide Department: Interconnection Services Document No: GD-1401 v1.0 Title: WIND ISLANDING Issue Date: 11-24-2014 Previous Date: N/A Contents 1 PURPOSE... 2 2 SCOPE AND APPLICABILITY... 2 3 ROLES AND RESPONSIBILITIES...

More information

The Long-Range Transmission Plan

The Long-Range Transmission Plan The Long-Range Transmission Plan 2015 2025 Matt Koenig Presentation to ESPWG / TPAS October 29 th, 2015 Long-Range Transmission Plan Driver of the Plan is to maintain local reliability 10-year planning

More information

Cost Benefit Analysis of Faster Transmission System Protection Systems

Cost Benefit Analysis of Faster Transmission System Protection Systems Cost Benefit Analysis of Faster Transmission System Protection Systems Presented at the 71st Annual Conference for Protective Engineers Brian Ehsani, Black & Veatch Jason Hulme, Black & Veatch Abstract

More information

TRIP OF HORSHAM-REDCLIFFS 220 KV TRANSMISSION LINE AND MURRAYLINK INTERCONNECTOR ON 12 NOVEMBER 2015

TRIP OF HORSHAM-REDCLIFFS 220 KV TRANSMISSION LINE AND MURRAYLINK INTERCONNECTOR ON 12 NOVEMBER 2015 TRIP OF HORSHAM-REDCLIFFS 220 KV TRANSMISSION LINE AND MURRAYLINK INTERCONNECTOR ON 12 AN AEMO POWER SYSTEM OPERATING INCIDENT REPORT FOR THE NATIONAL ELECTRICITY MARKET Published: August 2016 IMPORTANT

More information

ANNEXURES. ANNEXURE-I SRLDC vide letter dated 18 th September The updated status of upcoming Inter Regional Scheme ANNEXURE-II

ANNEXURES. ANNEXURE-I SRLDC vide letter dated 18 th September The updated status of upcoming Inter Regional Scheme ANNEXURE-II ANNEXURES ANNEXURE-I SRLDC vide letter dated 18 th September 2015 ANNEXURE-II ANNEXURE-III The updated status of upcoming Inter Regional Scheme Upcoming schemes for Renewable in Southern Region ANNEXRE-IV

More information

Power System Operating Incident Report Trip of Red Cliffs Horsham and Red Cliffs-Wemen Kerang 220 kv transmission lines on 15 January 2014

Power System Operating Incident Report Trip of Red Cliffs Horsham and Red Cliffs-Wemen Kerang 220 kv transmission lines on 15 January 2014 Power System Operating Incident Report Trip of Red Cliffs Horsham and Red Cliffs-Wemen Kerang PREPARED BY: AEMO Systems Capability DATE: 19 May 2014 STATUS: FINAL CONTENTS 1 Introduction... 3 2 The Incident...

More information

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2.

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2. Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft 2012-11-29 Proposed New ISO Rules Section 502.5 Version 2.0 Generating Unit Technical Requirements

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level)

(i) Establishment of 400kV Pooling Station at Fatehgarh (with a provision to upgrade at 765kV level) Annex-I Corrigendum to Minutes of the 36 th meeting of the Empowered Committee on Transmission held on 26 th July, 2016 at 3:30 PM at Conference Room of CEA, 2 nd Floor, Sewa Bhawan, R.K. Puram, New Delhi

More information

Power System Operating Incident Report Trip of Murray Lower Tumut No kv Transmission Line at Murray End Only on 18 November 2013

Power System Operating Incident Report Trip of Murray Lower Tumut No kv Transmission Line at Murray End Only on 18 November 2013 Power System Operating Incident Report Trip of Murray Lower Tumut No.66 0 kv Transmission PREPARED BY: AEMO Systems Capability DATE: 1 December 201 FINAL Version Release History VERSION DATE BY CHANGES

More information

ELE-MPT-E-2009 Senior Maintenance & Protection Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

ELE-MPT-E-2009 Senior Maintenance & Protection Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 103382-ELE-MPT-E-2009 Senior Maintenance & Protection Engineer Holds a B. Sc. in Electrical Power Engineering and has about 8 years hands-on experience working in testing, commissioning, protection and

More information

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1 TRANSMISSION CAPACITY ADDITION PROGRAMME DURING 2006-07 Sl. No. Contents Page No. 1 Introduction 1 2 Chapter 1 Transmission Capacity Additions During 2005-06 of 10 th plan period 3 Chapter 2 Construction

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

School of Electrical and Information Engineering. ELEC High Voltage. University of Sydney. Dr Keith Mitchell. Engineering

School of Electrical and Information Engineering. ELEC High Voltage. University of Sydney. Dr Keith Mitchell. Engineering University of Sydney School of Electrical and Information Engineering Dr Keith Mitchell ELEC 5205 - High Voltage Engineering ELEC 5205 - High Voltage Engineering 3. Switchgear Types of Power System Switchgear

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli 620014, TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT ENQUIRY NOTICE INVITING TENDER Phone:

More information

GC108: EU Code: Emergency & Restoration: Black start testing requirement

GC108: EU Code: Emergency & Restoration: Black start testing requirement Stage 01: Modification Proposal Grid Code GC108: EU Code: Emergency & Restoration: Black start testing requirement Purpose of Modification: This modification seeks to align the GB Grid Code with the European

More information

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region

R.S.USHA CHIEF ENGINEER/ PLANNING & RC. Encl: Report and detailed estimate. To The Chief Engineer/D/Madurai Region TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD ABSTRACT --------------------------------------------------------------------------------------------------------- Electricity - Madurai Region -

More information

EL PASO ELECTRIC COMPANY SHORT CIRCUIT ANALYSIS FOR XXX S PROPOSED GENERATION INTERCONNECTION

EL PASO ELECTRIC COMPANY SHORT CIRCUIT ANALYSIS FOR XXX S PROPOSED GENERATION INTERCONNECTION EL PASO ELECTRIC COMPANY SHORT CIRCUIT ANALYSIS FOR XXX S PROPOSED GENERATION INTERCONNECTION El Paso Electric Company System Operations Department System Planning Section August 2006 I. INTRODUCTION The

More information

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region

Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region Transmission System Bottlenecks & Planning for Mumbai Metropolitan Region TRANSMISSION GROUP MERC 5 th August 2011 2 Actual Flows for Mumbai Peak FY12 ( 3209 MW) Tie Line Flows (Amp & MW) during Mumbai

More information

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

GOVERNMENT OF ANDHRA PRADESH ABSTRACT 1 GOVERNMENT OF ANDHRA PRADESH ABSTRACT PUBLIC SERVICES Employees Welfare Scheme Andhra Pradesh State Employees Group Insurance Scheme 1984 Revised Rate of Interest on accumulated Savings Fund Communication

More information

CHAPTER 4 PROTECTION REQUIREMENTS

CHAPTER 4 PROTECTION REQUIREMENTS CHAPTER 4 PROTECTION REQUIREMENTS CHAPTER 4 PROTECTION REQUIREMENTS 4.1 General Means of protection for automatic disconnection against phase and earth faults shall be provided on the customer main switch.

More information

SOUTHERN REGIONAL LOAD DESPATCH CENTRE , RACE COURSE CROSS ROAD, BANGALORE

SOUTHERN REGIONAL LOAD DESPATCH CENTRE , RACE COURSE CROSS ROAD, BANGALORE SOUTHERN REGIONAL LOAD DESPATCH CENTRE 2006-07 29, RACE COURSE CROSS ROAD, BANGALORE 560 009 WWW.SRLDC.ORG Preface The Southern Regional Grid during the year 2006-07 experienced a sharp increase in the

More information

Seabrook Substation Reliability Improvement Project

Seabrook Substation Reliability Improvement Project New England Division Seabrook Substation Reliability Improvement Project 1. Project Summary Description Seabrook Substation is critical to ISO-New England as a Pool Transmission Facility, to grid availability

More information

Distribution List Chief Engineer (SP & PA) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX :

Distribution List Chief Engineer (SP & PA) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX : Distribution List 1 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. FAX : 011-26102045 3. Member Secretary Southern Regional Power Committee 29, Race Course Cross

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded

Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED Evacuation of Wind Power in Kadapa, Anantapur and Kurnool districts of Andhra Pradesh. Revised Administrative Approval - Accorded T.O.O.{CE-Constructionl400kV)

More information

Modular Standardized Electrical and Control Solutions for Fast Track Projects

Modular Standardized Electrical and Control Solutions for Fast Track Projects Modular Standardized Electrical and Control Solutions for Supporting fast track projects ABB is the leading supplier of electrical and control equipment for power plants. The company offers a comprehensive

More information

Electric Vehicles and the Environment (EVE IWG)

Electric Vehicles and the Environment (EVE IWG) Submitted by the EVE informal working group Electric Vehicles and the Environment () 1 Informal document GRPE-78-30-Rev.1 78 th GRPE, 10-11 January 2018 Agenda item 9 REPORT TO GRPE 78 TH SESSION Original

More information

Northeast Wisconsin/Upper Peninsula Separation 11/14/01. Incident Investigation Report

Northeast Wisconsin/Upper Peninsula Separation 11/14/01. Incident Investigation Report Northeast Wisconsin/Upper Peninsula Separation 11/14/01 Incident Investigation Report Summary Contact by a high voltage electric transmission line with a tree in northeastern Wisconsin initiated a series

More information

GC0023 Protection Fault Clearance Time & Back-Up Protection

GC0023 Protection Fault Clearance Time & Back-Up Protection Stage 03: Report to Grid Code GC0023 Protection Fault Clearance Time & Back-Up Protection What stage is this document at? 01 02 03 Workgroup Report Industry Consultation Report to the This proposal seeks

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

2018 CG Transient Stability and MOD 33 Updates

2018 CG Transient Stability and MOD 33 Updates 2018 CG Transient Stability and MOD 33 Updates CG Planning Meeting Oct. 4, 2018 1 Transient Stability Study Updates 2 Studied Case Study performed for 2024HS case Two Colstrip units retired, with ATR model

More information

Electric Vehicles and the Environment (EVE IWG)

Electric Vehicles and the Environment (EVE IWG) Submitted by the EVE informal working group Electric Vehicles and the Environment () 1 Informal document GRPE-77-28 77 th GRPE, 6-8 June 2018 Agenda item 9 REPORT TO GRPE 77 TH SESSION Current Mandate

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0 ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES 2018-04-24 - Revision 0 EUB Decision 2007-071 Board Direction 52 For questions or comments regarding

More information

SYSTEM PROTECTION AND CONTROL WORKING GROUP

SYSTEM PROTECTION AND CONTROL WORKING GROUP Southwest Power Pool SYSTEM PROTECTION AND CONTROL WORKING GROUP and SPP UFLS Standard Drafting Team Meeting MINUTES November 12, 2010 9:00 a.m. 11:00 a.m. Net conference Item 1 Administrative: Shawn Jacobs,

More information