Volume 2 Appendix Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. June 18, 2018

Size: px
Start display at page:

Download "Volume 2 Appendix Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. June 18, 2018"

Transcription

1 Volume 2 Appendix 2727 Turtle Creek Boulevard Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project # Registered Firm F-928

2 Maple Avenue Drive 1 Fairmount Street Gillespie Street Cedar Springs Road North Not To Scale Drive 2 Drive 3 Brown Street Enid Street Drive 4 Drive 5 Sale Street Mansion Drive Turtle Creek Boulevard (10%) (10%) 10% (10%) (10%) 10% (10%) (10%) (15%) 10% 10% 10% 10% 15% (10%) EXHIBIT A1 Drive 1 Trip Distribution and Traffic Assignment: 3000 Turtle Creek Boulevard 2727 Turtle Creek Boulevard - Dallas, TX 10% (10%) (10%) LEGEND: X% (Y%) 10% 10% X% = Percentage of Inbound Site-Generated Traffic (Y%) = Percentage of Outbound Site-Generated Traffic Drive 2 Drive 3 *NOTE: Drive 2 combines both the central office driveway and the adjacent condominium driveway for a conservative analysis.

3 Maple Avenue (0) (0) (0) 0 (0) (0) (0) 0 (0) (0) (0) (0) 0 (0) 0 (0) 0 (0) 0 (0) Drive 4 Drive 5 Sale Street 0 (0) 0 (0) (0) 0 (0) (0) (0) 0 (0) (0) (0) (0) Drive 1 Fairmount Street Gillespie Street Cedar Springs Road North Not To Scale Enid Street Drive 2 Drive 3 Mansion Drive Brown Street Turtle Creek Boulevard (21) (0) (0) (21) (0) (0) (4) 0 (0) (0) (0) (0) 3 (21) (0) (0) 0 (0) (0) (0) (0) 3 (21) (0) (0) (4) 3 (21) 0 (0) 0 (0) 3 (21) 0 (0) 5 (32) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) 0 (0) (4) (4) 23 (4) 23 (4) (0) (0) (0) (0) 0 (0) (0) (0) (0) 0 (0) 0 (0) (0) (0) (6) 0 0 (0) (0) 0 (0) 3 (21) 0 (0) 23 (4) EXHIBIT A2 Site-Generated Traffic Volumes: 3000 Turtle Creek Boulevard 2727 Turtle Creek Boulevard - Dallas, TX Drive (0) (0) 0 (0) (0) (0) 0 (0) 3 (21) 3 (21) LEGEND: 0 (0) 0 (0) X (Y) 23 (4) 23 (4) X = Weekday AM Peak Hour Turning Movements Y = Weekday PM Peak Hour Turning Movements Volumes may not sum from point to point due to rounding and presence of smaller driveways not included in analysis. Drive 2 Drive 3 *NOTE: Drive 2 combines both the central office driveway and the adjacent condominium driveway for a conservative analysis.

4 City Comments to March 23, 2018 TIA and KHA Responses kimley-horn.com Noel Road, Two Galleria Office Tower, Suite 700, Dallas, TX

5 CITY OF DALLAS TRANSPORTATION REVIEW COMMENTS Traffic Engineer: Scot Johnson, P.E. (Kimley-Horn) Project Name: 2727 Turtle Creek Blvd Received: 3/22/2017 Reviewed By: David Nevarez, P.E., PTOE Zoning Case: Z (CY) Reviewed On: 4/20/2018 Sustainable Development and Construction Engineering Division received a Traffic Impact Analysis for the above-referenced project. The following comments are provided to Current Planning as comments for consideration based on a technical review of the analysis, findings and recommendations. A. General Comments 1. TIA presents a summary of trip generation comparisons between the proposed development and alternative as-of-right scenarios: 1) 850 MF DU, approx. 930 ksf of office, and 400 ksf of office to represent a theoretical full use of the existing building structures. Analysis shows that the proposed development will generate less than (or relatively similar trips to) the theoretical scenarios with the exception of a full MF development. The 850-MF scenario would still generate more outbound traffic during the morning peak hour than the proposed development. B. Request for Comments from Applicant 2. The office building element, located in the northernmost parcel (with direct access to Gillespie and Enid/Fairmount) will generate approximately 75-80% of the total traffic volumes during the morning and afternoon peak hours of adjacent street traffic. Yet, the analysis only assigns 45% to the two driveways toward Gillespie and Enid. Given the geographical location and projected downgrading in level-of-service at intersections on Turtle Creek Blvd, staff anticipates a higher trip generation will concentrate on residential streets (i.e. Enid, Gillespie) until they reach their corresponding capacity. 3. Study of Enid at Brown shows site generated traffic but does not take into account any background traffic already generated by adjacent residential properties. Staff requests comments on proposed driveway geometry without significantly disrupting existing traffic operations. 4. Staff requests comments on anticipated traffic operations of proposed hotel meeting space (if any). 5. The projected average control delay for the WBR approach at Maple and Turtle Creek increases from 65 (LOS E) to 83 seconds/vehicle (LOS F) at horizon background during the morning study peak period. Developer, however, proposes no mitigation for the anticipated development impact. C. Site Plan Evaluation Review 6. TIA also omits background traffic in the capacity analysis of all site driveways on Turtle Creek. 7. TIA includes only three driveways on Turtle Creek Blvd. However, the proposed development plan for 2727 Turtle Creek shows five driveways: Study Drive 1 (hotel), Study Drive 2 (access to office garage), Study Drive 3 (access to both residential and office garage), in addition to a fourth driveway (between Drive 1 and 2) with access to residential parking garage and a fifth driveway (between Drive 2 and 3) with access to residential lobby. Engineering recommends the consolidation of some driveways by means of shared access agreements to reduce conflict points on Turtle Creek Blvd. D. Summary of Findings & Recommendations 8. Traffic study recommends improvements to the intersection of Turtle Creek Blvd at Fairmount to accommodate two-lane approach for all directions with shared-through lanes. This recommendation is a viable option but should not be a condition to this development or the City of Dallas. The City of Dallas Transportation Department will reevaluate traffic operations at project buildout. Page 1 of 2

6 9. Analysis of roadway capacity for Turtle Creek Blvd assumes left turn lanes; staff concurs that although projected traffic will exceed theoretical capacity of a two-lane, undivided roadway, the existing width of Turtle Creek allows for through traffic to bypass turning vehicles without impacting traffic operations or on-street parking. At this point, there is no plan of any re-striping mitigations or restricting on-street parking on Turtle Creek Blvd. 10. Study does not evaluate actual traffic operations of Gillespie at Turtle Creek, located within close proximity of the intersection at Cedar Springs. These intersections (combined) currently operate at failing levels-of-service. The proposed development will only exacerbate these conditions without proposing any mitigations. END OF REVIEW Page 2 of 2

7 MEMORANDUM To: From: Prescott Realty Group Scot A. Johnson, P.E., PTOE Kimley-Horn and Associates, Inc. Date: April 30, 2018 Subject: Response to Transportation Review Comments Z (CY) 2727 Turtle Creek Boulevard The following are responses to the April 20, 2018 transportation review comments by the City of Dallas. Each comment needing a response is reproduced in italics and then the response is listed. Comment: 2. The office building element, located in the northernmost parcel (with direct access to Gillespie and Enid/Fairmount) will generate approximately 75-80% of the total traffic volumes during the morning and afternoon peak hours of adjacent street traffic. Yet, the analysis only assigns 45% to the two driveways toward Gillespie and Enid. Given the geographical location and projected downgrading in level-of-service at intersections on Turtle Creek Blvd, staff anticipates a higher trip generation will concentrate on residential streets (i.e. Enid, Gillespie) until they reach their corresponding capacity. Response: The office proportions of the site-generated traffic are 66% in the AM peak hour and 59% in the PM peak hour. The trip distribution assumed in the analysis is appropriate considering the relative attractiveness of Turtle Creek Boulevard and the major driveway direct from Turtle Creek Boulevard to the office parking area. The office traffic can reach the office garage from any of the main approach directions. Comment: 3. Study of Enid at Brown shows site generated traffic but does not take into account any background traffic already generated by adjacent residential properties. Staff requests comments on proposed driveway geometry without significantly disrupting existing traffic operations. Response: The 2025 Background and 2025 Background Plus Site traffic volumes at Enid street at Brown Street are shown in the updated Exhibit 8 and Exhibit 10 attached. The intersection would be set up in several ways: 1. In the existing configuration with the public streets forming an uncontrolled curve, and the driveway stopping when it approaches the public street. 2. A more formal T-intersection where southbound Brown Street is stop-controlled, and Enid Street and Drive 4 do not stop. 3. A 3-way Stop-controlled intersection, which would be preferred for consistency, traffic calming, and pedestrian friendliness and safety. Each of the potential configurations operates with favorable conditions on all approaches. The 3-way stop is the preferred alternative. kimley-horn.com Noel Road, Two Galleria Suite 700, Dallas, TX

8 Page 2 Comment: 4. Staff requests comments on anticipated traffic operations of proposed hotel meeting space (if any). Response: The amount of hotel meeting space is unremarkable for the size of the hotel (around 13,000 SF, or much less than 10% of the overall building area), so any trip generation is contained within the hotel s projection. Meeting space is specifically noted as a supporting facility or accessory use within the Hotel land use data in the ITE Trip Generation Manual. Vehicles will approach and depart in the same manner as hotel guests. As shown in the below hotel drop-off drawing by HKS, the hotel dropoff has large areas set aside for valet operations, which will accommodate any peak traffic flows due to events. There are two inbound lanes for car stacking in addition to the bypass lane, and a long outbound staging lane plus the outbound bypass lane. kimley-horn.com Merit Drive, Suite 1000, Dallas, TX

9 Page 3 Comment: 5. The projected average control delay for the WBR approach at Maple and Turtle Creek increases from 65 (LOS E) to 83 seconds/vehicle (LOS F) at horizon background during the morning study peak period. Developer, however, proposes no mitigation for the anticipated development impact. Response: The site is adding only 24 westbound right-turning vehicles in the AM peak hour, to a background volume of 446 right-turning vehicles in the 2025 AM peak hour. The site-generated traffic is making up only 5% of the combined right-turn traffic volume. The existing signal timing at the intersection of Maple Avenue and turtle Creek Boulevard was not modified in the future scenarios of the original report, as it continued to operate at excellent levels of service with the background traffic and the addition of the site-generated traffic. Under that timing plan, the Turtle Creek Boulevard approaches are given only 19 seconds out of each 60-second signal cycle, which is quite short considering the large volume of existing westbound right-turning traffic. A signal timing adjustment of only 2 seconds towards the Turtle Creek Boulevard (21 seconds green/yellow/all-red, 39 seconds for Maple Avenue) would result in a westbound right-turn delay of 61.5 seconds (LOS E), effectively removing any impact from the site traffic. The table below shows the approach and overall operating conditions using the signal timing tweak. The westbound approach has been improved to better conditions than in the 2025 background scenario, and the overall intersection remains favorable. INTERSECTION Maple Turtle Creek Boulevard APPROACH 2025 Background Traffic AM Peak Hour DELAY (SEC/VEH) LOS 2025 Background plus Site Traffic AM Peak Hour DELAY (SEC/VEH) LOS 2025 Background plus Site traffic With Signal Mod AM Peak Hour DELAY (SEC/VEH) EB 6.5 A 6.5 A 5.9 A WB 59.7 E 73.5 E 55.2 E NB 6.8 A 6.9 A 8.2 A SB 9.9 A 12.8 B 15.5 B Overall 21.6 C 26.4 C 23.0 C LOS kimley-horn.com Merit Drive, Suite 1000, Dallas, TX

10 Page 4 Comment: 6. TIA also omits background traffic in the capacity analysis of all site driveways on Turtle Creek. Response: The background traffic is updated to show correctly in the attached updated Exhibit 8 and Exhibit 10. The following table excerpt shows the driveway operating conditions with all background traffic included. All driveways continue to operate with minimal delays to the public streets (LOS A for inbound movements) and LOS C or better conditions for outbound movements. INTERSECTION APPROACH 2020 Background plus Site Traffic 2025 Background plus Site Traffic 2020 Background plus Site Traffic 2025 Background plus Site Traffic Drive Turtle Creek Boulevard Drive Turtle Creek Boulevard Drive Turtle Creek Boulevard Brown Drive 4 / Enid Street AM Peak Hour DELAY (SEC/VEH) LOS AM Peak Hour DELAY (SEC/VEH) LOS PM Peak Hour DELAY (SEC/VEH) LOS PM Peak Hour DELAY (SEC/VEH) EBL 8.6 A 8.6 A 8.4 A 8.4 A SB* 14.8 B 15.2 C 18.2 C 19.2 C EBL 8.6 A 8.7 A 8.3 A 8.4 A SB* 14.9 B 15.3 C 18.1 C 19.0 C EBL 8.7 A 8.7 A 8.2 A 8.3 A SB* 13.7 B 14.0 B 15.0 C 15.5 C EB* 7.8 A 7.8 A 7.7 A 7.7 A WB* 7.3 A 7.3 A 7.4 A 7.4 A EB* 7.3 A 7.3 A 7.1 A 7.1 A LOS Comment: 7. TIA includes only three driveways on Turtle Creek Blvd. However, the proposed development plan for 2727 Turtle Creek shows five driveways: Study Drive 1 (hotel), Study Drive 2 (access to office garage), Study Drive 3 (access to both residential and office garage), in addition to a fourth driveway (between Drive 1 and 2) with access to residential parking garage and a fifth driveway (between Drive 2 and 3) with access to residential lobby. Engineering recommends the consolidation of some driveways by means of shared access agreements to reduce conflict points on Turtle Creek Blvd. Response: Some driveways were combined for analysis purposes to ensure a conservative analysis of intersection operations, where the higher combined volumes result in increased delays. The TIA noted that Drive 2 was the combination of the central office driveway and the adjacent condo residential driveway. Drive 3 was the combination of the two multifamily residential driveways which are at opposite ends of the multifamily building porte-cochere. Even with the combined volumes, all the driveways operate at favorable levels of service with minimal delays and queuing. All the proposed driveways will meet the City of Dallas minimum driveway spacing standards. kimley-horn.com Merit Drive, Suite 1000, Dallas, TX

11 Page 5 Comment: 8. Traffic study recommends improvements to the intersection of Turtle Creek Blvd at Fairmount to accommodate two-lane approach for all directions with shared-through lanes. This recommendation is a viable option but should not be a condition to this development or the City of Dallas. The City of Dallas Transportation Department will reevaluate traffic operations at project buildout. Response: Noted. Comment: 9. Analysis of roadway capacity for Turtle Creek Blvd assumes left turn lanes; staff concurs that although projected traffic will exceed theoretical capacity of a two-lane, undivided roadway, the existing width of Turtle Creek allows for through traffic to bypass turning vehicles without impacting traffic operations or on-street parking. At this point, there is no plan of any re-striping mitigations or restricting on-street parking on Turtle Creek Blvd. Response: Additionally, parking is already prohibited on the north side of Turtle Creek Boulevard in the site vicinity. Comment: 10. Study does not evaluate actual traffic operations of Gillespie at Turtle Creek, located within close proximity of the intersection at Cedar Springs. These intersections (combined) currently operate at failing levels-of-service. The proposed development will only exacerbate these conditions without proposing any mitigations. Response: The analysis included the unsignalized intersection of Turtle Creek Boulevard at Gillespie Street, which operates favorably in all time periods when considered by itself. The southbound leftturn or through movement is blocked in some PM peak hour cycles by the eastbound left-turning queue extending back from the signal at Cedar Springs Road and Turtle Creek Boulevard, if the eastbound vehicles do not respect the Gillespie intersection by leaving gaps. Unfortunately there is no way to quantify this impact with the standard analysis tools. At its present location so close to Cedar Springs Road, there is no meaningful mitigation available for the Gillespie intersection. A Do Not Block sign is already installed for the eastbound traffic. Adjustment of the signal timing at Turtle Creek Boulevard and Cedar Springs Road has the potential for improving the eastbound operations to reduce the number of times the eastbound left-turning queue would extend back to Gillespie Street. Currently the Turtle Creek Boulevard approaches are given only 31 seconds out of each 120-second cycle in the PM peak hour. Increasing the proportion of the signal cycle available to Turtle Creek Boulevard would reduce the eastbound queue lengths. Considering the Cedar Springs Road coordinated signal timing, the intersection with Turtle Creek Boulevard has more time dedicated to the Cedar Springs Road approaches than do the adjacent signals at Carlisle Street or Bowen Street. This would indicate that some of the signal cycle can be redistributed to the Turtle Creek Boulevard approach without negatively affecting the Cedar Springs Road coordinated phase or green band. END Attachments: Updated Exhibit Background Plus Site-Generated Traffic Volumes Updated Exhibit Background Plus Site-Generated Traffic Volumes kimley-horn.com Merit Drive, Suite 1000, Dallas, TX

12 Maple Avenue (6) (373) (30) 43 (53) (33) (10) 8 (19) (19) (68) (16) 42 (19) 66 (37) 24 (57) 11 (8) Drive 4 Drive 5 Sale Street 28 (49) 17 (46) (29) 16 (40) (175) (48) 17 (23) (10) (87) (6) Drive 1 Fairmount Street Gillespie Street Cedar Springs Road North Not To Scale Enid Street Drive 2 Drive 3 Mansion Drive Brown Street Turtle Creek Boulevard (287) (113) (55) (24) (13) (685) (349) 4 (7) (60) (241) (116) 311 (271) (4) (12) 19 (8) (57) (11) (44) 479 (329) (172) (495) (38) 4 (27) 65 (86) 16 (43) 491 (385) 0 (1) 7 (34) 1 (13) 49 (28) 8 (0) 30 (19) 141 (451) 3 (11) (337) (541) 165 (451) 27 (4) (5) (2) (538) (74) 23 (66) (39) (83) (32) 16 (71) 56 (144) (83) (903) (6) (38) (38) 41 (19) 429 (417) EXHIBIT Background Plus Site-Generated Traffic Volumes 2727 Turtle Creek Boulevard - Dallas, TX 41 (19) 261 (484) Drive (38) (38) 41 (19) (38) (19) 20 (10) 453 (398) 478 (379) LEGEND: 41 (19) 41 (19) X (Y) 236 (503) 212 (522) X = Weekday AM Peak Hour Turning Movements Y = Weekday PM Peak Hour Turning Movements Volumes may not sum from point to point due to rounding and presence of smaller driveways not included in analysis. Drive 2 Drive 3 *NOTE: Drive 2 combines both the central office driveway and the adjacent condominium driveway for a conservative analysis.

13 (6) (391) (31) 44 (54) (35) (10) 8 (19) (19) (71) (17) 42 (19) 69 (37) 24 (57) 12 (9) Drive 4 Drive 5 Sale Street 29 (52) 17 (47) (29) 16 (40) (183) (50) 18 (23) (10) (91) (6) Maple Avenue Drive 1 Fairmount Street Gillespie Street Cedar Springs Road North Not To Scale Drive 2 Drive 3 Brown Street Enid Street Mansion Drive Turtle Creek Boulevard (298) (118) (58) (24) (14) (720) (365) 4 (8) (62) (253) (122) 325 (280) (4) (13) 19 (9) (60) (12) (45) 498 (342) (180) (520) (40) 4 (27) 68 (89) 17 (44) 511 (401) 0 (1) 7 (34) 1 (14) 50 (28) 9 (0) 31 (19) 147 (471) 3 (12) (352) (564) 170 (469) 27 (4) (5) (2) (565) (76) 24 (69) (41) (88) (33) 17 (75) 58 (148) (85) (949) (6) (38) (38) 41 (19) 449 (434) EXHIBIT Background Plus Site-Generated Traffic Volumes 2727 Turtle Creek Boulevard - Dallas, TX 41 (19) 269 (507) Drive (38) (38) 41 (19) (38) (19) 20 (10) 473 (415) 498 (396) LEGEND: 41 (19) 41 (19) X (Y) 244 (526) 220 (545) X = Weekday AM Peak Hour Turning Movements Y = Weekday PM Peak Hour Turning Movements Volumes may not sum from point to point due to rounding and presence of smaller driveways not included in analysis. Drive 2 Drive 3 *NOTE: Drive 2 combines both the central office driveway and the adjacent condominium driveway for a conservative analysis.

14 Traffic Counts and Historical Data Maple Avenue Record Year Link Start Link End Source 24-Hour Volume Annual Growth Rate Turtle Creek Boulevard Kitrell Street TxDOT 14, Turtle Creek Boulevard Kitrell Street TxDOT 15, % Turtle Creek Boulevard Kitrell Street TxDOT 13, % Turtle Creek Boulevard Kitrell Street TxDOT 15, % Turtle Creek Boulevard Kitrell Street TxDOT 14, % Turtle Creek Boulevard Kitrell Street TxDOT 15, % Turtle Creek Boulevard Average Growth : 1.7% Record Year Link Start Link End Source 24-Hour Volume Annual Growth Rate Fairmount Street Park Bridge Court COD 6, Park Bridge Court Mansion Driveway KHA 6,316 - Fairmount Street Average Growth : 0.2% Record Year Link Start Link End Source 24-Hour Volume Annual Growth Rate Turtle Creek Boulevard Kitrell Street TxDOT 3, Turtle Creek Boulevard Kitrell Street TxDOT 4,809 - Brown Street Record Year Link Start Link End Source Average Growth : 5.4% 24-Hour Volume Annual Growth Rate Enid Street Hood Street KHA Enid Street Record Year Link Start Link End Source 24-Hour Volume Annual Growth Rate Fairmount Street Brown Street KHA Gillespie Street Record Year Link Start Link End Source 24-Hour Volume Annual Growth Rate Welborn Street Oak Lawn Avenue TxDOT 1, Welborn Street Oak Lawn Avenue TxDOT 1, % Sale Street Turtle Creek Boulevard KHA % Average Growth : -5.1% kimley-horn.com Noel Road, Two Galleria Office Tower, Suite 700, Dallas, TX

15 NB Brown Street South of Hood Street TIME 0:00 0:15 0:30 0:45 TOTAL Date Began: 0: /9/2017 1: : : : : : : : : : : : : : : : : : : : : : : TOTAL: 300 The A.M. peak hour from 8:30 to 9:30 is 14 The P.M. peak hour from 18:30 to 19:30 is VOLUME TIME

16 SB Brown Street South of Hood Street TIME 0:00 0:15 0:30 0:45 TOTAL Date Began: 0: /9/2017 1: : : : : : : : : : : : : : : : : : : : : : : TOTAL: 353 The A.M. peak hour from 8:00 to 9:00 is 33 The P.M. peak hour from 17:45 to 18:45 is VOLUME TIME

17 NB Gillespie Street South of Sale Street TIME 0:00 0:15 0:30 0:45 TOTAL Date Began: 0: /9/2017 1: : : : : : : : : : : : : : : : : : : : : : : TOTAL: 283 The A.M. peak hour from 8:00 to 9:00 is 60 The P.M. peak hour from 23:00 to 0:00 is VOLUME TIME

18 SB Gillespie Street South of Sale Street TIME 0:00 0:15 0:30 0:45 TOTAL Date Began: 0: /9/2017 1: : : : : : : : : : : : : : : : : : : : : : : TOTAL: 331 The A.M. peak hour from 8:00 to 9:00 is 90 The P.M. peak hour from 23:00 to 0:00 is VOLUME TIME

19 EB Enid Street east of Fairmount Street TIME 0:00 0:15 0:30 0:45 TOTAL Date Began: 0: /15/2017 1: : : : : : : : : : : : : : : : : : : : : : : TOTAL: 479 The A.M. peak hour from 8:00 to 9:00 is 31 The P.M. peak hour from 17:15 to 18:15 is VOLUME TIME

20 WB Enid Street east of Fairmount Street TIME 0:00 0:15 0:30 0:45 TOTAL Date Began: 0: /15/2017 1: : : : : : : : : : : : : : : : : : : : : : : TOTAL: 438 The A.M. peak hour from 8:15 to 9:15 is 62 The P.M. peak hour from 16:15 to 17:15 is VOLUME TIME

21 EB Turtle Creek Boulevard West of Mansion TIME 0:00 0:15 0:30 0:45 TOTAL Date Began: 0: /9/2017 1: : : : : : : : : : : : : : : : : : : : : : : TOTAL: 2951 The A.M. peak hour from 8:15 to 9:15 is 176 The P.M. peak hour from 16:45 to 17:45 is VOLUME TIME

22 WB Turtle Creek Boulevard West of Mansion TIME 0:00 0:15 0:30 0:45 TOTAL Date Began: 0: /9/2017 1: : : : : : : : : : : : : : : : : : : : : : : TOTAL: 3365 The A.M. peak hour from 7:45 to 8:45 is 371 The P.M. peak hour from 17:00 to 18:00 is VOLUME TIME

23 1. Turtle Creek Blvd at Cedar Spring s Road - TMC Wed Nov 15, 2017 Full Length (7AM-9AM, 4:30PM-6:30PM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks, Pedestrians) All Movements ID: , Location: , , Site Code: 1 Provided by: C. J. Hensch & Associates Inc Sycamore Ave., Pasadena, TX, 77503, US Le g Turtle Cre e k Boule vard Drive way Ce dar Springs Road Turtle Cre e k Boule vard Dire ction Southbound We stbound Northbound Eastbound Time R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* Int :00AM :15AM :30AM :45AM Hourly Total :00AM :15AM :30AM :45AM Hourly Total :30PM :45PM Hourly Total :00PM :15PM :30PM :45PM Hourly Total :00PM :15PM Hourly Total Total % Approac h 27.8% 69.8% 0.4% 2.1% % 42.1% 23.7% 0% % 87.7% 11.9% 0% % 0.8% 82.3% 0% % Total 12.4% 31.2% 0.2% 0.9% 4 4.7% - 0.2% 0.2% 0.1% 0% 0.6% - 0.1% 33.4% 4.5% 0% 38.1% - 2.8% 0.1% 13.7% 0% 16.6% - - Lights % Lights 98.7% 99.6% 100% 100% 99.4 % - 100% 100% 100% 0% 100% - 100% 99.5% 100% 100% 99.6% % 100% 98.9% 0% 98.9% % Artic ulate d Truc ks % Artic ulate d Truc ks 0% 0% 0% 0% 0% - 0% 0% 0% 0% 0% - 0% 0% 0% 0% 0% - 0.5% 0% 0% 0% 0.1% - 0% Buse s and Single -Unit Truc ks % Buse s and Single -Unit Truc ks 1.3% 0.3% 0% 0% 0.6% - 0% 0% 0% 0% 0% - 0% 0.5% 0% 0% 0.4 % - 0.5% 0% 1.1% 0% 1.0% - 0.6% Pe de strians % Pe de strians % % % % - * Pedestrians and Bicycles on Crosswalk. L: Left, R: Right, T: Thru, U: U-Turn 1 of 6

24 1. Turtle Creek Blvd at Cedar Spring s Road - TMC Wed Nov 15, 2017 AM Peak (8AM - 9AM) All Classes (Lig hts, Articulated Trucks, Buses and Sing le-unit Trucks, Pedestrians) All Movements ID: , Location: , , Site Code: 1 Provided by: C. J. Hensch & Associates Inc Sycamore Ave., Pasadena, TX, 77503, US Le g Turtle Cre e k Boule vard Drive way Ce dar Springs Road Turtle Cre e k Boule vard Dire ction Southbound We stbound Northbound Eastbound Time R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* Int :00AM :15AM :30AM :45AM Total % Approac h 29.1% 70.7% 0.2% 0% % 20.0% 40.0% 0% % 75.7% 23.1% 0% % 2.7% 76.5% 0% % Total 18.2% 44.1% 0.1% 0% 62.4 % - 0.1% 0.1% 0.1% 0% 0.3% - 0.3% 21.9% 6.7% 0% 28.9% - 1.8% 0.2% 6.5% 0% 8.5% - - PHF Lights % Lights 98.4% 99.7% 100% 0% 99.4 % - 100% 100% 100% 0% 100% - 100% 99.2% 100% 0% 99.4 % - 100% 100% 98.2% 0% 98.7% % Artic ulate d Truc ks % Artic ulate d Truc ks 0% 0% 0% 0% 0% - 0% 0% 0% 0% 0% - 0% 0% 0% 0% 0% - 0% 0% 0% 0% 0% - 0% Buse s and Single -Unit Truc ks % Buse s and Single -Unit Truc ks 1.6% 0.3% 0% 0% 0.6% - 0% 0% 0% 0% 0% - 0% 0.8% 0% 0% 0.6% - 0% 0% 1.8% 0% 1.3% - 0.7% Pe de strians % Pe de strians % % % - * Pedestrians and Bicycles on Crosswalk. L: Left, R: Right, T: Thru, U: U-Turn 3 of 6

25 1. Turtle Creek Blvd at Cedar Spring s Road - TMC Wed Nov 15, 2017 PM Peak (5:15PM - 6:15PM) - Overall Peak Hour All Classes (Lig hts, Articulated Trucks, Buses and Sing le-unit Trucks, Pedestrians) All Movements ID: , Location: , , Site Code: 1 Provided by: C. J. Hensch & Associates Inc Sycamore Ave., Pasadena, TX, 77503, US Le g Turtle Cre e k Boule vard Drive way Ce dar Springs Road Turtle Cre e k Boule vard Dire ction Southbound We stbound Northbound Eastbound Time R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* Int :15PM :30PM :45PM :00PM Total % Approac h 21.3% 73.6% 0.2% 4.9% % 54.5% 18.2% 0% - - 0% 94.4% 5.5% 0.1% % 0% 82.0% 0% % Total 6.8% 23.3% 0% 1.6% 31.7% - 0.1% 0.3% 0.1% 0% 0.5% - 0% 42.6% 2.5% 0% 4 5.1% - 4.1% 0% 18.6% 0% 22.7% - - PHF Lights % Lights 99.3% 100% 100% 100% 99.8% - 100% 100% 100% 0% 100% - 0% 99.8% 100% 100% 99.8% % 0% 99.7% 0% 99.6% % Artic ulate d Truc ks % Artic ulate d Truc ks 0% 0% 0% 0% 0% - 0% 0% 0% 0% 0% - 0% 0% 0% 0% 0% - 0% 0% 0% 0% 0% - 0% Buse s and Single -Unit Truc ks % Buse s and Single -Unit Truc ks 0.7% 0% 0% 0% 0.2% - 0% 0% 0% 0% 0% - 0% 0.2% 0% 0% 0.2% - 1.2% 0% 0.3% 0% 0.4 % - 0.2% Pe de strians % Pe de strians % % % - * Pedestrians and Bicycles on Crosswalk. L: Left, R: Right, T: Thru, U: U-Turn 5 of 6

26 2. Turtle Creek Blvd at Gillespie St - TMC Thu Nov 9, 2017 Full Leng th (7AM-9AM, 4:30PM-6:30PM) All Classes (Lig hts, Buses and Sing le-unit Trucks, Pedestrians) All Movements ID: , Location: , , Site Code: 2 Provided by: C. J. Hensch & Associates Inc Sycamore Ave., Pasadena, TX, 77503, US Le g Gille spie Stre e t Turtle Cre e k Boule vard Gille spie Stre e t Turtle Cre e k Boule vard Dire ction Southbound We stbound Northbound Eastbound Time R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* Int :00AM :15AM :30AM :45AM Hourly Total :00AM :15AM :30AM :45AM Hourly Total :30PM :45PM Hourly Total :00PM :15PM :30PM :45PM Hourly Total :00PM :15PM Hourly Total T otal % Approac h 43.5% 28.8% 27.7% 0% % 85.4% 0.2% 0.1% - - 0% 0% 0% 0% % 76.7% 8.8% 0.1% % Total 4.8% 3.2% 3.1% 0% 11.1% - 6.9% 41.3% 0.1% 0% 4 8.3% - 0% 0% 0% 0% 0% - 5.8% 31.1% 3.6% 0% 4 0.5% - - Lights % Lights 96.1% 97.6% 98.8% 0% 97.3% % 99.4% 100% 100% 99.1% - 0% 0% 0% 0% % 99.4% 97.9% 100% 99.3% % Buse s and S ingle -Unit Truc ks % Buse s and S ingle -Unit Truc ks 3.9% 2.4% 1.2% 0% 2.7% - 2.7% 0.6% 0% 0% 0.9% - 0% 0% 0% 0% - - 0% 0.6% 2.1% 0% 0.7% - 1.0% Pe de strians % Pe de strians % - * Pedestrians and Bicycles on Crosswalk. L: Left, R: Right, T: Thru, U: U-Turn 1 of 6

27 2. Turtle Creek Blvd at Gillespie St - TMC Thu Nov 9, 2017 AM Peak (8AM - 9AM) All Classes (Lig hts, Buses and Sing le-unit Trucks, Pedestrians) All Movements ID: , Location: , , Site Code: 2 Provided by: C. J. Hensch & Associates Inc Sycamore Ave., Pasadena, TX, 77503, US Le g Gille spie Stre e t Turtle Cre e k Boule vard Gille spie Stre e t Turtle Cre e k Boule vard Dire ction Southbound We stbound Northbound Eastbound Time R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* Int :00AM :15AM :30AM :45AM Total % Approac h 20.0% 55.0% 25.0% 0% % 85.4% 0% 0% - - 0% 0% 0% 0% % 68.8% 19.4% 0.7% % T otal 1.9% 5.2% 2.4% 0% 9.5% - 9.8% 57.8% 0% 0% 67.6% - 0% 0% 0% 0% 0% - 2.5% 15.7% 4.4% 0.2% 22.9% - - PHF Lights % Lights 91.7% 100% 100% 0% 98.3% % 99.7% 0% 0% 99.5% - 0% 0% 0% 0% % 100% 100% 100% 100% % Buse s and S ingle -Unit Truc ks % Buse s and S ingle -Unit Truc ks 8.3% 0% 0% 0% 1.7% - 1.6% 0.3% 0% 0% 0.5% - 0% 0% 0% 0% - - 0% 0% 0% 0% 0% - 0.5% Pe de strians % Pe de strians % - * Pedestrians and Bicycles on Crosswalk. L: Left, R: Right, T: Thru, U: U-Turn 3 of 6

28 2. Turtle Creek Blvd at Gillespie St - TMC Thu Nov 9, 2017 PM Peak (5:15PM - 6:15PM) - Overall Peak Hour All Classes (Lig hts, Buses and Sing le-unit Trucks, Pedestrians) All Movements ID: , Location: , , Site Code: 2 Provided by: C. J. Hensch & Associates Inc Sycamore Ave., Pasadena, TX, 77503, US Le g Gille spie Stre e t Turtle Cre e k Boule vard Gille spie Stre e t Turtle Cre e k Boule vard Dire ction Southbound We stbound Northbound Eastbound Time R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* Int :15PM :30PM :45PM :00PM Total % Approac h 61.1% 12.2% 26.7% 0% % 84.8% 0% 0.3% - - 0% 0% 0% 0% % 79.7% 4.2% 0% % Total 6.7% 1.3% 2.9% 0% 11.0% - 5.4% 30.9% 0% 0.1% 36.4 % - 0% 0% 0% 0% 0% - 8.5% 41.9% 2.2% 0% 52.6% - - PHF Lights % Lights 96.4% 100% 100% 0% 97.8% % 99.6% 0% 100% 99.3% - 0% 0% 0% 0% % 100% 100% 0% 100% % Buse s and S ingle -Unit Truc ks % Buse s and S ingle -Unit Truc ks 3.6% 0% 0% 0% 2.2% - 2.3% 0.4% 0% 0% 0.7% - 0% 0% 0% 0% - - 0% 0% 0% 0% 0% - 0.5% Pe de strians % Pe de strians * Pedestrians and Bicycles on Crosswalk. L: Left, R: Right, T: Thru, U: U-Turn 5 of 6

29 3. Turtle Creek Blvd at Fairmount St - TMC Thu Nov 9, 2017 Full Length (7AM-9AM, 4:30PM-6:30PM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks, Pedestrians, Bicycles on Crosswalk) All Movements ID: , Location: , , Site Code: 3 Provided by: C. J. Hensch & Associates Inc Sycamore Ave., Pasadena, TX, 77503, US Le g Fairmount Stre e t Turtle Cre e k Boule vard Fairmount Stre e t Turtle Cre e k Boule vard Dire ction Southbound We stbound Northbound Eastbound Tim e R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* Int :00AM :15AM :30AM :45AM Hourly Total :00AM :15AM :30AM :45AM Hourly Total :30PM :45PM Hourly Total :00PM :15PM :30PM :45PM Hourly Total :00PM :15PM Hourly Total Total % Approac h 11.7% 64.5% 23.8% 0% % 70.8% 4.6% 0% % 43.4% 44.3% 0% % 76.8% 7.2% 0% % Total 3.3% 18.3% 6.8% 0% 28.3% - 7.4% 21.3% 1.4% 0% 30.0% - 2.3% 8.0% 8.1% 0% 18.4 % - 3.7% 17.9% 1.7% 0% 23.2% - - Lights % Lights 99.2% 99.7% 99.2% 0% 99.5% % 99.0% 98.1% 0% 98.8% - 100% 99.7% 100% 0% 99.9% - 100% 99.3% 98.4% 0% 99.3% % Articulated Trucks % Articulated Trucks 0% 0.1% 0% 0% 0.1% - 0% 0.2% 0% 0% 0.2% - 0% 0% 0% 0% 0% - 0% 0% 0% 0% 0% - 0.1% Buses and Single -Unit T ruc ks % Buses and Single - Unit Trucks 0.8% 0.1% 0.8% 0% 0.4 % - 1.8% 0.7% 1.9% 0% 1.0% - 0% 0.3% 0% 0% 0.1% - 0% 0.7% 1.6% 0% 0.7% - 0.6% Pe de strians % Pe de strians % % % % - Bicycle s on Crosswalk % Bicycle s on Crosswalk % % % % - * Pedestrians and Bicycles on Crosswalk. L: Left, R: Right, T: Thru, U: U-Turn 1 of 6

30 3. Turtle Creek Blvd at Fairmount St - TMC Thu Nov 9, 2017 AM Peak (8AM - 9AM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks, Pedestrians, Bicycles on Crosswalk) All Movements ID: , Location: , , Site Code: 3 Provided by: C. J. Hensch & Associates Inc Sycamore Ave., Pasadena, TX, 77503, US Le g Fairmount Stre e t Turtle Cre e k Boule vard Fairmount Stre e t Turtle Cre e k Boule vard Dire ction Southbound We stbound Northbound Eastbound Tim e R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* Int :00AM :15AM :30AM :45AM T otal % Approach 17.7% 68.6% 13.6% 0% % 75.7% 2.3% 0% % 35.9% 52.3% 0% % 61.2% 21.7% 0% % Total 4.2% 16.4% 3.3% 0% 23.8% - 8.5% 29.0% 0.9% 0% 38.4 % - 2.8% 8.6% 12.5% 0% 23.8% - 2.4% 8.6% 3.0% 0% 14.0% - - PHF Lights % Lights 100% 98.7% 100% 0% 99.1% % 99.3% 100% 0% 98.9% - 100% 100% 100% 0% 100% - 100% 98.7% 100% 0% 99.2% % Articulated Trucks % Articulated Trucks 0% 0.7% 0% 0% 0.5% - 0% 0.4% 0% 0% 0.3% - 0% 0% 0% 0% 0% - 0% 0% 0% 0% 0% - 0.2% Buses and Single -Unit T ruc ks % Buses and Single - Unit T ruc ks 0% 0.7% 0% 0% 0.5% - 2.6% 0.4% 0% 0% 0.8% - 0% 0% 0% 0% 0% - 0% 1.3% 0% 0% 0.8% - 0.5% Pe de strians % Pe de strians % % - Bicycle s on Crosswalk % Bicycle s on Crosswalk % % - * Pedestrians and Bicycles on Crosswalk. L: Left, R: Right, T: Thru, U: U-Turn 3 of 6

31 3. Turtle Creek Blvd at Fairmount St - TMC Thu Nov 9, 2017 PM Peak (5PM - 6PM) - Overall Peak Hour All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks, Pedestrians, Bicycles on Crosswalk) All Movements ID: , Location: , , Site Code: 3 Provided by: C. J. Hensch & Associates Inc Sycamore Ave., Pasadena, TX, 77503, US Le g Fairmount Stre e t Turtle Cre e k Boule vard Fairmount Stre e t Turtle Cre e k Boule vard Dire ction Southbound We stbound Northbound Eastbound Tim e R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* Int :00PM :15PM :30PM :45PM Total % Approac h 10.6% 62.1% 27.3% 0% % 59.7% 8.1% 0% % 57.9% 27.1% 0% % 77.9% 4.6% 0% % Total 3.4% 20.1% 8.8% 0% 32.3% - 7.8% 14.5% 2.0% 0% 24.3% - 1.8% 6.9% 3.3% 0% 12.0% - 5.5% 24.5% 1.5% 0% 31.4 % - - PHF Lights % Lights 97.5% 100% 100% 0% 99.7% % 98.2% 100% 0% 98.6% - 100% 100% 100% 0% 100% - 100% 99.7% 100% 0% 99.7% % Articulated Trucks % Articulated Trucks 0% 0% 0% 0% 0% - 0% 0.6% 0% 0% 0.4 % - 0% 0% 0% 0% 0% - 0% 0% 0% 0% 0% - 0.1% Buses and Single -Unit T ruc ks % Buses and Single - Unit T ruc ks 2.5% 0% 0% 0% 0.3% - 1.1% 1.2% 0% 0% 1.1% - 0% 0% 0% 0% 0% - 0% 0.3% 0% 0% 0.3% - 0.4% Pe de strians % Pe de strians % % - Bicycle s on Crosswalk % Bicycle s on Crosswalk % % - * Pedestrians and Bicycles on Crosswalk. L: Left, R: Right, T: Thru, U: U-Turn 5 of 6

32 4. Turtle Creek Blvd at Maple Ave - TMC Thu Nov 9, 2017 Full Length (7AM-9AM, 4:30PM-6:30PM) All Classes (Lights, Articulated Trucks, Buses and Single-Unit Trucks, Pedestrians, Bicycles on Crosswalk) All Movements ID: , Location: , , Site Code: 4 Provided by: C. J. Hensch & Associates Inc Sycamore Ave., Pasadena, TX, 77503, US Le g Maple Ave nue Turtle Cre e k Boule vard Maple Ave nue Turtle Cre e k Boule vard Dire ction Southbound We stbound Northbound Eastbound Tim e R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* R T L U App Pe d* Int :00AM :15AM :30AM :45AM Hourly Total :00AM :15AM :30AM :45AM Hourly Total :30PM :45PM Hourly Total :00PM :15PM :30PM :45PM Hourly Total :00PM :15PM Hourly Total Total % Approac h 1.0% 76.2% 22.8% 0% % 1.5% 11.7% 0% % 92.3% 0.7% 0% % 27.3% 45.5% 0% % Total 0.5% 34.3% 10.3% 0% 4 5.0% % 0.3% 2.1% 0% 18.3% - 2.5% 32.9% 0.2% 0% 35.7% - 0.3% 0.3% 0.4% 0% 1.0% - - Lights % Lights 100% 98.8% 99.4% 100% 98.9% % 100% 99.3% 0% 99.4 % % 99.0% 100% 0% 99.0% - 100% 100% 100% 0% 100% % Articulated Trucks % Articulated Trucks 0% 0.1% 0.1% 0% 0.1% - 0.1% 0% 0% 0% 0.1% - 0% 0.1% 0% 0% 0.1% - 0% 0% 0% 0% 0% - 0.1% Buses and Single -Unit T ruc ks % Buses and Single - Unit T ruc ks 0% 1.1% 0.4% 0% 1.0% - 0.5% 0% 0.7% 0% 0.6% - 1.1% 0.9% 0% 0% 0.9% - 0% 0% 0% 0% 0% - 0.9% Pe de strians % Pe de strians % % % % - Bicycle s on Crosswalk % Bicycle s on Crosswalk % % % % - * Pedestrians and Bicycles on Crosswalk. L: Left, R: Right, T: Thru, U: U-Turn 1 of 6

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015 Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z145-235 2720 Hillside Drive, Dallas, TX October 27, 2015 Introduction: The Lakehill Preparatory School is located on the northeast

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

4131 Chain Bridge Road

4131 Chain Bridge Road Traffic Impact Study 4131 Chain Bridge Road City of Fairfax, VA 05/04/16 May 4, 2016 Prepared for: Paradigm 1415 North Taft Street Suite 100 Arlington, VA 22201 This report is printed on environmentally

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com June 21,

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

Sugarland Crossing Gwinnett County, Georgia

Sugarland Crossing Gwinnett County, Georgia Sugarland Crossing Gwinnett County, Georgia S IGNAL W ARRANT A NALYSIS For the Intersection of: Sugarloaf Parkway / Richards Middle School Driveway / Sugarland Crossing Main Site Driveway Prepared for:

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Traffic Impact Analysis Update

Traffic Impact Analysis Update Willow Bend Traffic Impact Analysis Update TABLE OF CONTENTS Page I. INTRODUCTION -------------------------------------------------------------------------------------------- 1 II. EXISTING CONDITIONS

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701

December 5, Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Dynamic Traffic, LLC www.dynamic-traffic.com 1904 Main Street Lake Como, NJ 07719 T. 732.681.0760 December 5, 2016 Red Bank Planning Board Municipal Building 90 Monmouth Street Red Bank, NJ 07701 Re: Traffic

More information

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

Attachment F Transportation Technical Memorandum

Attachment F Transportation Technical Memorandum Attachment F Transportation Technical Memorandum Sounder Yard and Shops Facility Project Transportation Technical Memorandum March 25, 216 Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA SEPTEMBER 20, 2012 Prepared for: Golden Eagle Multi-Family Properties, LLC 6201 Oak Canyon Rd., Suite 250 Irvine, CA 92618 Prepared

More information

TRAFFIC IMPACT STUDY FOR

TRAFFIC IMPACT STUDY FOR TRAFFIC IMPACT STUDY FOR YUBA CROSSINGS MIXED USE DEVELOPMENT Yuba City, CA Prepared For: Yuba Crossings LLC 1825 Del Paso Blvd Sacramento, CA 95815 Prepared By: KDAnderson & Associates, Inc. 3853 Taylor

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION

TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION CATHOLIC DISTRICT SCHOOL BOARD OF EASTERN ONTARIO P.O. 61992 TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION SEPTEMBER 5, 218 TRAFFIC IMPACT STUDY FOR ST. JOSEPH'S ELEMENTARY SCHOOL ADDITION

More information

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS

ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS ARVADA TRIANGLE REDEVELOPMENT TRAFFIC IMPACT ANALYSIS Prepared for: Arvada Urban Renewal Authority 5601 Olde Wadsworth Boulevard, Suite 210 Arvada, Colorado 80002 (720) 898-7062 Prepared by: Felsburg Holt

More information

TRANSPORTATION TECHNICAL REPORT

TRANSPORTATION TECHNICAL REPORT TRANSPORTATION TECHNICAL REPORT for Sunrise Elementary School Replacement PREPARED FOR: Puyallup School District PREPARED BY: 6544 NE 61 st Street, Seattle, WA 98115 ph: (26) 523-3939 fx: (26) 523-4949

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

TRAFFIC IMPACT ANALYSIS FOR THE 630/650 SOUTH STREET RETAIL DEVELOPMENT WRENTHAM, MASSACHUSETTS

TRAFFIC IMPACT ANALYSIS FOR THE 630/650 SOUTH STREET RETAIL DEVELOPMENT WRENTHAM, MASSACHUSETTS PARE PROJECT NO. 17120.00 REPORT TRAFFIC IMPACT ANALYSIS FOR THE 630/650 SOUTH STREET RETAIL DEVELOPMENT WRENTHAM, MASSACHUSETTS SUBMITTED TO: GEORGETOWN CAPITAL MANAGEMENT PO BOX 369 GEORGETOWN, MA 01833

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

Peachtree Streetscape Atlanta, Georgia

Peachtree Streetscape Atlanta, Georgia Operational Analysis reetscape Atlanta, Georgia Prepared for: Central Atlanta Progress Prepared by: Kimley-Horn and Associates, Inc. Kimley-Horn and Associates, Inc. November 26 192812 reetscape Operational

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

1354 Carling Avenue. Community Transportation Study/ Transportation Impact Study

1354 Carling Avenue. Community Transportation Study/ Transportation Impact Study 354 Carling Avenue Community Transportation Study/ Transportation Impact Study prepared for: Holloway Lodging Corporation 69 Quinpool Road, th Floor Halifax, NS B3K 5J7 prepared by: 223 Michael Street

More information

LCPS Valley Service Center

LCPS Valley Service Center Traffic Impact Study LCPS Valley Service Center Loudoun County, Virginia November 4, 2015 Prepared For: Loudoun County Public Schools 21000 Education Court Ashburn, VA 20148 Prepared by: 1140 Connecticut

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

Revised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma.

Revised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma. Revised Report Traffic Study for Safeway Fuel Center at Washington Square Shopping Center In The Pleasanton Fresno Sacramento Santa Rosa TJKM www.tjkm.com Revised Report Traffic Study for Safeway Fuel

More information

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited King Street & Wyman Road Transportation Impact Study & Transportation Demand Management Paradigm Transportation Solutions Limited April 28 Project Summary Project Number 822 April 28 Client RISE Commercial

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS January 2, 2018 Mr. Paul DeBotton Marple Associates, L.P. 1604 Walnut Street, 4 th Floor Philadelphia, PA 19103 RE: Langford Run Road Traffic Analysis Proposed Mid County Shopping Center Marple Township,

More information

Traffic Analysis For Approved Uses within the St. Lucie West DRI Aldi Port St. Lucie, FL Prepared for: Bohler Engineering, LLC 1000 Corporate Drive Suite 250 Fort Lauderdale, FL 33334 Prepared by: 10795

More information

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By:

Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2. Prepared By: TRAFFIC IMPACT STUDY FOR THE TTC MCNICOLL BUS GARAGE CITY OF TORONTO Prepared For: Toronto Transit Commission 1138 Bathurst Street Toronto, Ontario M5R 3H2 Prepared By: Canada Inc. 4th Floor, 3 Leek Crescent

More information

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Residential Development - Ogilvie/Cummings Transportation Overview 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com March 28, 2012 OUR REF: TO3088TOY Barry J. Hobin & Architects 63 Pamilla Street Ottawa, ON K1S 3K7

More information

Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study )

Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study ) Submittal Document II.G. D-bar-A Project, Traffic Impact Study, prepared by Bergmman Associates, dated November 3, 2015 ( Traffic Study ) D-bar-A Project Traffic Impact Study November 3 rd, 2015 1427

More information

1012 & 1024 McGarry Terrace

1012 & 1024 McGarry Terrace December 217 112 & 124 McGarry Terrace Transportation Impact Study 112 & 124 McGarry Terrace Transportation Impact Study prepared for: Lépine Corporation 32 March Road Kanata, ON K2K 2E3 prepared by: 1223

More information

ENGINE COMPANY 42. Traffic Study. Chicago, Illinois. March 2018 FRIEDMAN PROPERTIES. Prepared for:

ENGINE COMPANY 42. Traffic Study. Chicago, Illinois. March 2018 FRIEDMAN PROPERTIES. Prepared for: ENGINE COMPANY 42 Traffic Study Chicago, Illinois March 2018 Prepared for: FRIEDMAN PROPERTIES INTRODUCTION Kimley-Horn and Associates, Inc. (Kimley-Horn) was retained by Friedman Properties to perform

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

Appendix 5. Haymeadow Interim Traffic Analysis

Appendix 5. Haymeadow Interim Traffic Analysis Appendix 5 Haymeadow Interim Traffic Analysis 20 MEMORANDUM To: From: Rick Pylman Gary Brooks Bill Fox Date: September 15, 2016 Project: Subject: Haymeadow Evaluation of interim access configuration Currently

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information