1 Background Reliance on natural gas to produce electricity in Northeast Power Coordinating Council (NPCC) Region has been increasing since The disruption of natural gas pipeline transportation capability due to pipeline maintenance (or other factors 1 ) can result in an extended reduction of natural gas supply to the northeast. The associated risks to the reliable operation of the Bulk Power System is mitigated by gasfired generation with dual fuel capabilities (oil and natural gas). Pursuant to NPCC Corporate Goal IV-2 : Assess risks associated with cross sector dependencies and single points of disruptions, 2 this assessment estimates the loss of load expectation (LOLE) and expected use of Emergency Operating Procedures (EOPs) for NPCC (and neighboring Regions) due to unavailable gas-fired generation following reduced natural gas pipeline transportation capability to the northeast Region for a sustained, consecutive period using a multi-area probabilistic reliability approach. Summer The summer assessment estimates the impact of natural gas disruptions on the NPCC and neighboring PJM Area during the NPCC summer peak period. This study was based on the Base Case assumptions used in the NPCC Reliability Assessment for Summer 3 and utilizes the same GE MARS database for its simulations. GE Energy Consulting was retained by NPCC to conduct the simulations. Natural gas disruptions were modeled by reducing the available capacity of natural gas-only generators. Dual-fuel generators were not modified because it was assumed they could switch fuel during the disruption. Table 1 summarizes the number of generators and total capacity of natural gas units assumed in the GE MARS model for August. 1 Disruptions of the natural gas transmission and distribution systems can be caused by many factors, including outages related to related computer technology failures, communication infrastructure and supervisory control and data acquisition systems problems, and pipeline safety considerations. 2 See: Corporate_Goals.pdf. 3 See: Summer.pdf - Appendix VIII. NPCC June 30, Page 1

2 Table 1. Number of natural gas-only powered generators modeled in the NPCC Summer Assessment Area Number of generators Summer (August) capacity (MW) HQ 0 0 MT NE 35 8,567 NY 40 3,815 ON 57 6,397 PJM ,603 Total ,901 Gas disruptions were simulated by a proportional derating of gas-only generator capacity across all NPCC and PJM Areas in 10% increments, as shown in Table 2. Area Table 2. Gas-only generator capacity simulated in each scenario (MW) Base case 10% derated 20% derated 30% derated 40% derated 50% derated HQ MT NE 8,567 7,710 6,853 5,997 5,140 4,283 NY 3,815 3,434 3,052 2,671 2,289 1,908 ON 6,397 5,757 5,118 4,478 3,838 3,199 PJM 74,603 67,143 59,682 52,222 44,762 37,302 Total 93,901 84,511 75,121 65,731 56,340 46,950 The capacity derating in each scenario was applied for different lengths of time. All the disruptions were centered around August 9, the time of the GE MARS program estimated NPCC summer peak load. The disruptions were simulated in one week increments, as summarized in Table 3 and represented in Figure 1. Table 3. Duration of outages Disruption Duration Outage dates 1 week August 6 August 12 2 weeks August 2 August 15 3 weeks July 30 August 19 4 weeks July 26 August 22 NPCC June 30, Page 2

3 Figure 1. NPCC daily peak for the summer assessment, summer peak (red) and study windows (gray) The NPCC GE MARS databases was simulated for 1,000 replications for each of the scenarios described above. For each one of this 1,000 replications, the GE MARS program simulates a pattern of outages for generations and area interfaces, as indicated in the input provided by the Areas. Within each replication, GE MARS considers each one of the seven load levels in the NPCC database. For each combination of replication and load level, the GE MARS programs utilizes generators, contracts, EOPs, etc. to minimize shortages in each NPCC Area and subarea. Once the modeling is done, the output metrics are calculated. When looking at daily loss-of-load metrics, GE MARS examines for each combination of replication and load level and for each day whether an area has a shortage. This is considered to happen when, within a day, any subarea in an Area has a deficiency that cannot be solved through any of the means listed above. One or more deficient hours in a day in one or more subareas count as a single daily deficiency. Total metrics are then calculated for all 8,760 hours in the year. For a single hour, the GE MARS program sums the number of replications and load levels that present a deficiency. Each event is weighted by the load level probability (using the probabilities shown in Table 4) and divided by the number of replications. Table 4. Load forecast uncertainty probabilities in the NPCC GE MARS model Level 1 Level 2 Level 3 Level 4 Level 5 Level 6 Level NPCC June 30, Page 3

4 For example, if at 7 PM on July 10 th the first replication for an Area has a shortage for load level 1, the daily metric is increased by /1000. If both load levels 1 and 2 had a shortage, that metric would be increased by ( )/1000 and so on. When all the daily metrics have been calculated, they then can be aggregated. For instance, the NPCC summer and winter assessments (and this study) report these metrics in a monthly and seasonal basis, while the NPCC Long Range Adequacy Overview reports annual numbers. The estimated use of emergency operating procedures (EOPs) for the expected load level 4 for the May September summer period are summarized below, by Area. Quebec The results for the Quebec Area did not indicate an estimated need for EOP usage (<0.001 days/period) for all the cases simulated for the May September summer period, expected load level. Maritimes Figure 2 and Table 5 show the increase in estimated EOP use across all the cases simulated for the Maritimes Area. Occurrences greater than 0.5 days/period are highlighted. 5 None of the disruption cases resulted in a > 0.5 days/period estimated need to activate EOP steps. 4 The expected load level was based on the probability-weighted average of the seven load levels simulated. 5 Note: likelihoods of less than 0.5 days/period are not considered significant. NPCC June 30, Page 4

5 Figure 2. Estimated use of EOPs for the Maritimes Area May September summer period - Expected Load Level NPCC June 30, Page 5

6 Table 5. Estimated use of EOPs for the Maritimes Area May September summer period - Expected Load Level Gas-only unit derated Scenarios Disruption EOP 0% 10% 20% 30% 40% 50% Activation of DR/SCR Reduce 30-min Reserve week Initiate Interruptible Loads Reduce 10-min Reserve Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve New England Figure 3 and Table 6 show the increase in estimated EOP use across all the cases simulated for the New England Area. Occurrences greater than 0.5 days/period are highlighted. 5 For a 1-week disruption, the 10% derated scenario increased the estimated EOP usage by 15-20%, with that number growing to 45-50% for the 20% derated scenario. The estimated EOP usage roughly multiplied by a factor a 2, 2.5 and 3.5 for the derated scenarios of 30%, 40% and 50%, respectively. All of the disruption cases with a one week or greater disruption duration for the simulated 50% derated scenario resulted in a > 0.5 days/period estimated need to activate the Disconnect Load EOP. The 4- week disruption duration case for the 40% derated scenario also resulted in a > 0.5 days/period estimated need to activate the Disconnect Load EOP. NPCC June 30, Page 6

7 Figure 3. Estimated use of EOPs for the New England Area May September summer period - Expected Load Level NPCC June 30, Page 7

8 Table 6. Estimated use of EOPs for the New England Area May September summer period - Expected Load Level Gas-only unit derated Scenarios Disruption EOP 0% 10% 20% 30% 40% 50% Activation of DR/SCR Reduce 30-min Reserve week Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load New York Figure 4 and Table 7 show the increase in estimated EOP use across all the cases simulated for the New York Area. Occurrences greater than 0.5 days/period are highlighted. 5 For a 1 week disruption, the 10% derated scenario increased EOP usage 20-30%, with that number growing to 50-80% for the 20% derated scenario. EOP usage roughly multiplied by a factor a 2.5 and 5 for the derated scenarios of 30% and 40%, respectively. Note: New York initiates the Appeals EOP prior to the Reducing 10-min Reserve EOP. None of the simulated derated scenarios resulted in a > 0.5 days/period estimated need to activate the Disconnect Load EOP. NPCC June 30, Page 8

9 Figure 4. Estimated use of EOPs for the New York Area May September summer period - Expected Load Level NPCC June 30, Page 9

10 Table 7. Estimated use of EOPs for the New York Area May September summer period - Expected Load Level Gas-only unit derated Scenarios Disruption EOP 0% 10% 20% 30% 40% 50% Activation of DR/SCR Reduce 30-min Reserve week Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Ontario Figure 5 and Table 8 shows the increase in estimated EOP use across all the cases simulated for the Ontario Area. Occurrences greater than 0.5 days/period are highlighted. 5 While the estimated EOP usage increases, it is small for derated scenarios below 40%, except for Demand Response EOP activation. None of the simulated derated scenarios resulted in a > 0.5 days/period estimated need to activate the Disconnect Load EOP. NPCC June 30, Page 10

11 Figure 5. Estimated use of EOPs for the Ontario Area May September summer period - Expected Load Level NPCC June 30, Page 11

12 Table 8. Estimated use of EOPs for the Ontario Area May September summer period - Expected Load Level Gas-only unit derated Scenarios Disruption EOP 0% 10% 20% 30% 40% 50% Activation of DR/SCR Reduce 30-min Reserve week Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load PJM Figure 6 and Table 9 shows the increase in estimated EOP use across all the cases simulated for the PJM Area. Occurrences greater than 0.5 days/period are highlighted. 5 Estimated EOP usage increases primarily for the activation of the Demand Response EOP. Other EOP usage is small for the derated scenarios below 50%. Only the simulated 50% derated scenario for a 4-week disruption resulted in a > 0.5 days/period estimated need to activate the Disconnect Load EOP. NPCC June 30, Page 12

13 Figure 6. Estimated use of EOPs for the PJM Area May September summer period - Expected Load Level NPCC June 30, Page 13

14 Table 9. Estimated use of EOPs for the PJM Area May September summer period - Expected Load Level Gas-only unit derated Scenarios Disruption EOP 0% 10% 20% 30% 40% 50% Activation of DR/SCR Reduce 30-min Reserve week Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Observations Figure 7 and Figure 8 depict the estimated EOP usage across New England, New York and Ontario across all scenarios. The New England Area shows a gradual increase in estimated EOP use for more severe gas disruptions cases. The New York, Ontario and PJM Areas primarily experience an increase in the estimated Activation of DR/SCR EOP use below the 30% derated scenario. For all three of these Areas and across all EOPs, the results are similar for disruptions that last 2 and 3 weeks. Only the cases with disruptions lasting four weeks have a significant increase in EOP use. NPCC June 30, Page 14

15 Figure 7. Estimated use of EOPs across all Areas May September summer period - Expected Load Level NPCC June 30, Page 15

16 Figure 8. Estimated use of EOPs across all Areas May September summer period - Expected Load Level NPCC June 30, Page 16

17 Next Steps The summer assessment will be expanded to include cases simulating the May September 2019 summer period (expected load level) and the May September 2021 summer period (expected load level) based on the GE MARS model being developed for the NPCC Long Range Adequacy Overview. The model for these future years will be consistent with the data being reported for the NERC Long-Term Reliability Assessment. The results of the risk assessment will be analyzed to compare how the assumed scenarios of natural gas disruptions to the northeast impact the estimated use of EOPs for the future NPCC and PJM Area load and capacity mix Winter The winter assessment estimates the impact of natural gas disruptions on the NPCC and neighboring PJM Area during the NPCC winter peak period. This study was based on the Base Case assumptions used in the NPCC Reliability Assessment for Winter 2016/17 6 and utilizes the same GE MARS database for its simulations. GE Energy Consulting was retained by NPCC to conduct the simulations. Natural gas disruptions were modeled by reducing the available capacity of natural gas-only generators. Dual-fuel generators were not modified because it was assumed they could switch fuel during the disruption. Table 10 summarizes the number of generators and total capacity of natural gas units assumed in the GE MARS model for January. 6 See: Final_Report_including_CP-8.pdf - Appendix VIII. NPCC June 30, Page 17

18 Table 10. Number of natural gas-only powered generators modeled in the NPCC 2016/17 Winter Assessment Area Number of generators Winter (January) capacity (MW) HQ 0 0 MT NE 29 6,003 NY 37 3,775 ON 57 7,073 PJM ,093 Total ,479 Gas disruptions were simulated by a proportional derating of gas-only generator capacity across all NPCC and PJM Areas in 10% increments, as shown in Table 11. Area Table 11. Gas-only generator capacity simulated in each scenario (MW) Base case 10% derated 20% derated 30% derated 40% derated 50% derated HQ MT NE 6,003 5,403 4,802 4,202 3,602 3,001 NY 3,775 3,398 3,020 2,643 2,265 1,888 ON 7,073 6,366 5,658 4,951 4,244 3,536 PJM 78,093 70,284 62,474 54,665 46,856 39,047 Total 95,479 85,931 76,383 66,835 57,287 47,739 The capacity derating in each scenario was applied for different lengths of time. All the disruptions were centered around January 12, the time of the GE MARS program estimated NPCC winter peak load. The disruptions were simulated in one week increments, as summarized in Table 12 and represented in Figure 9. Table 12. Duration of outages Disruption Duration Outage dates 1 week January 9, January 15, 2 weeks January 5, January 18, 3 weeks January 2, January 22, 4 weeks December 29, 2016 January 25, NPCC June 30, Page 18

19 Figure 9. NPCC daily peak for the winter assessment, winter peak (red) and study windows (gray) The NPCC GE MARS databases was simulated for 1,000 replications for each of the scenarios described above. For each one of these 1,000 replications, the GE MARS programs simulates a pattern of outages for generations and area interfaces, as indicated in the input provided by the Areas. Within each replication, GE MARS considers each one of the seven load levels in the NPCC database. For each combination of replication and load level, the GE MARS programs utilizes generators, contracts, EOPs, etc. to minimize shortages in each NPCC Area and subarea. Once the modeling is done, the output metrics are calculated. When looking at daily loss-of-load metrics, GE MARS examines for each combination of replication and load level and for each day whether an area has a shortage. This is considered to happen when, within a day, any subarea in an Area has a deficiency that cannot be solved through any of the means listed above. One or more deficient hours in a day in one or more subareas count as a single daily deficiency. Total metrics are then calculated for all 8,760 hours in the year. For a single hour, the GE MARS program sums the number of replications and load levels that present a deficiency. Each event is weighted by the load level probability (using the probabilities Table 13) and divided by the number of replications. Table 13. Load forecast uncertainty probabilities in the NPCC GE MARS model Level 1 Level 2 Level 3 Level 4 Level 5 Level 6 Level For example, if at 7 PM on January 10 th the first replication has a shortage for load level 1, the daily metric is increased by /1000. If both load levels 1 and 2 had a shortage, that metric would be increased by ( )/1000 and so on. NPCC June 30, Page 19

20 When all the daily metrics have been calculated, then they can be aggregated. For instance, the summer and winter assessments (and this study) report these metrics in a monthly and seasonal basis, while the NPCC Long Range Adequacy Overview reports annual numbers. The estimated use of emergency operating procedures (EOPs) for the expected load level 7 for the November 2016 March winter period are summarized below, by Area. Quebec The results for the Quebec Area indicated a minimal estimated need for EOP usage for all the cases simulated for the November 2016 March winter period, expected load level, as shown in Table The expected load level was based on the probability-weighted average of the seven load levels simulated. NPCC June 30, Page 20

21 Table 14. Estimated use of EOPs for the Quebec Area November 2016 March winter period - Expected Load Level Gas-only unit derated Scenarios Disruption EOP 0% 10% 20% 30% 40% 50% Activation of DR/SCR Reduce 30-min Reserve week Initiate Interruptible Loads Reduce 10-min Reserve Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Maritimes Figure 10 and Table 15 show the increase in estimated EOP use across all the cases simulated for the Maritimes Area. Occurrences greater than 0.5 days/period are highlighted. 8 None of the disruption cases resulted in a > 0.5 days/period estimated need to activate EOP steps. 8 Note: likelihoods of less than 0.5 days/period are not considered significant. NPCC June 30, Page 21

22 Figure 10. Estimated use of EOPs for the Maritimes Area November 2016 March winter period - Expected Load Level Table 15. Estimated use of EOPs for the Maritimes Area November 2016 March winter period - Expected Load Level NPCC June 30, Page 22

23 Gas-only unit derated Scenarios Disruption EOP 0% 10% 20% 30% 40% 50% Activation of DR/SCR Reduce 30-min Reserve week Initiate Interruptible Loads Reduce 10-min Reserve Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve New England Figure 11 and Table 16 show the increase in estimated EOP use across all the cases simulated for the New England Area. Occurrences greater than 0.5 days/period are highlighted. 5 Only the 50% derated scenario resulted in the estimated need for the Activation of DR and the Reduce 30-min Reserve EOP usage for all the disruption periods. NPCC June 30, Page 23

24 Figure 11. Estimated use of EOPs for the New England Area November 2016 March winter period - Expected Load Level NPCC June 30, Page 24

25 Table 16. Estimated use of EOPs for the New England Area November 2016 March winter period - Expected Load Level Gas-only unit derated Scenarios Disruption EOP 0% 10% 20% 30% 40% 50% Activation of DR/SCR Reduce 30-min Reserve week Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load New York The results for the New York Area did not indicate an estimated need for EOP usage (<0.001 days/period) for all the cases simulated for the November 2016 March winter period, expected load level. Ontario Table 17 shows the estimated EOP use across all the cases simulated for the Ontario Area. There are no occurrences greater than 0.5 days/period. 5 NPCC June 30, Page 25

26 Table17. Estimated use of EOPs for the Ontario Area November 2016 March winter period - Expected Load Level Gas-only unit derated Scenarios Disruption EOP 0% 10% 20% 30% 40% 50% Activation of DR/SCR Reduce 30-min Reserve week Initiate Interruptible Loads Reduce 10-min Reserve Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve PJM Figure 12 and Table 18 shows the estimated EOP use across all the cases simulated for the PJM Area. There were no estimated occurrences greater than 0.5 days/period. 5 NPCC June 30, Page 26

27 Figure 12. Estimated use of EOPs for the PJM Area November 2016 March winter period - Expected Load Level NPCC June 30, Page 27

28 Table 18. Estimated use of EOPs for the PJM Area November 2016 March winter period - Expected Load Level Gas-only unit derated Scenarios Disruption EOP 0% 10% 20% 30% 40% 50% Activation of DR/SCR Reduce 30-min Reserve week Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Activation of DR/SCR Reduce 30-min Reserve weeks Initiate Interruptible Loads Reduce 10-min Reserve Appeals Disconnect Load Observations Figure 13 and Figure 14 depict the estimated EOP usage across New England, New York, Ontario and PJM across all scenarios. In general, compared to the results for the summer period, the results for the winter period are less severe for the summer peaking Areas (New York, New England, Ontario and PJM), due primarily to the lower forecasted winter peak loads. NPCC June 30, Page 28

29 Figure 13. Estimated use of EOPs across all Areas November 2016 March winter period - Expected Load Level NPCC June 30, Page 29

30 Figure 14. Estimated use of EOPs across all Areas November 2016 March winter period - Expected Load Level NPCC June 30, Page 30

31 Next Steps The winter assessment will be expanded to include cases simulating the November 2018 March 2019 winter period (expected load level) and the November 2020 March 2021 winter period (expected load level) based on the GE MARS model being developed for the NPCC Long Range Adequacy Overview. The model for these future years will be consistent with the data being reported for the NERC Long- Term Reliability Assessment. The results of the risk assessment will be analyzed to compare how the assumed scenarios of natural gas disruptions to the northeast impact the estimated use of EOPs in the future. NPCC June 30, Page 31

Per Meter, Per Month. Effective July 1, 2018 Customer Charge Flat Charge $8.86

Per Meter, Per Month. Effective July 1, 2018 Customer Charge Flat Charge $8.86 SCHEDULE D TOU TIERED DOMESTIC TIME OF USE SERVICE TIERED (This rate schedule is closed to new customers as of July 1, 2018. On July 1, 2019, existing customers will be transitioned to their otherwise

More information

Appendix G Examples and Recommended Methods

Appendix G Examples and Recommended Methods Reporting Outages to the Generating Availability Data System (GADS) Introduction The examples in this appendix illustrate the reporting of outages and deratings to GADS. They are based on a fictional 600

More information

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. PSC NO: 12 Electricity Leaf: 4 Rate I Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. Applicable to demand-metered service, street lighting in The City of New

More information

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. PSC NO: 12 Electricity Leaf: 4 Rate I Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. Applicable to demand-metered service, street lighting in The City of New

More information

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. PSC NO: 12 Electricity Leaf: 4 Rate I Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. Applicable to demand-metered service, street lighting in The City of New

More information

Overview of ISO New England and the New England Wholesale Power Markets

Overview of ISO New England and the New England Wholesale Power Markets Overview of ISO New England and the New England Wholesale Power Markets Boston Chapter of IEEE PES Technical Meeting June 15, 2010 Stephen J. Rourke Vice President, System Planning About ISO New England

More information

Interregional Gas/Electric Study Status Update

Interregional Gas/Electric Study Status Update Interregional Gas/Electric Study Status Update by John P. Buechler NYISO Executive Regulatory Policy Advisor NPCC Governmental/Regulatory Affairs Advisory Group November 27, 2012 Montreal, Canada Overview

More information

Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project (Part I: Reliability Improvements due to VITR)

Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project (Part I: Reliability Improvements due to VITR) Report-BCTC-R009A Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project (Part I: Reliability Improvements due to VITR) December 8, 2005 Prepared by Wenyuan Li

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

Overview of Electricity Trade Agreement between Québec and Ontario. May 10, 2017 For Information Purposes Only

Overview of Electricity Trade Agreement between Québec and Ontario. May 10, 2017 For Information Purposes Only Overview of Electricity Trade Agreement between Québec and Ontario May 10, 2017 For Information Purposes Only Purpose To provide an overview of the electricity trade agreement between the Independent Electricity

More information

PEAK DEMAND MANAGEMENT IN NEW ENGLAND A DYNAMIC SOLUTION TO MANAGING PEAK DEMAND CHARGES

PEAK DEMAND MANAGEMENT IN NEW ENGLAND A DYNAMIC SOLUTION TO MANAGING PEAK DEMAND CHARGES PEAK DEMAND MANAGEMENT IN NEW ENGLAND A DYNAMIC SOLUTION TO MANAGING PEAK DEMAND CHARGES What are peak demand (capacity) charges? Every month your business is charged a fee called a capacity charge or

More information

Rate Schedules. Effective 1/1/2019

Rate Schedules. Effective 1/1/2019 Rate Schedules 2019 Effective 1/1/2019 SUMMARY OF RATE SCHEDULES REVISIONS FOR RATES EFFECTIVE JANUARY 1, 2019 (1) Rate component changes for Residential and Heating Service rate schedules. (2) General

More information

Effects of Smart Grid Technology on the Bulk Power System

Effects of Smart Grid Technology on the Bulk Power System Effects of Smart Grid Technology on the Bulk Power System Rana Mukerji Senior Vice President Market Structures New York Independent System Operator Union College 2013 Environmental Science, Policy & Engineering

More information

Demand Response - An End-to-End Approach from Markets to Consumers

Demand Response - An End-to-End Approach from Markets to Consumers Demand Response - An End-to-End Approach from Markets to Consumers Rana Mukerji Senior Vice President Market Structures New York Independent System Operator EPRI PDU Sector Council Meeting Boston, MA September

More information

NEW HAMPSHIRE GAS CORPORATION WINTER PERIOD ORIGINAL FILING CONTENTS 3. CONVERSION OF GAS COSTS - GALLONS TO THERMS SCHEDULE A

NEW HAMPSHIRE GAS CORPORATION WINTER PERIOD ORIGINAL FILING CONTENTS 3. CONVERSION OF GAS COSTS - GALLONS TO THERMS SCHEDULE A NEW HAMPSHIRE GAS CORPORATION COST OF GAS RATE FILING - DG 13- WINTER PERIOD 2013-2014 ORIGINAL FILING CONTENTS 1. TARIFF PAGE - COST OF GAS RATE 2. MARKED TARIFF PAGE - COST OF GAS RATE 3. CONVERSION

More information

2018 Load & Capacity Data Report

2018 Load & Capacity Data Report Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation, accuracy, completeness

More information

2008 Capacity/Energy Planning

2008 Capacity/Energy Planning DOCKET DE 09-091 EXHIBIT - MDC-2 2008 Capacity/Energy Planning Background PSNH retains load serving responsibility for customers who have not selected a competitive supplier. PSNH's monthly peak load for

More information

Capacity Market Rules for Energy Storage Resources

Capacity Market Rules for Energy Storage Resources Capacity Market Rules for Energy Storage Resources Zachary T Smith Manager, Capacity Market Design ICAPWG August 23 rd, 2018 Agenda Background Energy Storage Resource (ESR) overview Capacity Market Rules

More information

Operational Opportunities to Minimize Renewables Curtailments

Operational Opportunities to Minimize Renewables Curtailments Operational Opportunities to Minimize Renewables Curtailments Clyde Loutan Principal, Renewable Energy Integration July 24, 2017 2017 CAISO - Public Page 1 Agenda Background Real-time control performance

More information

Methodology of Cost Allocation

Methodology of Cost Allocation Methodology of Cost Allocation Robin Kliethermes May 17, 2013 1 Purpose of Cost Allocation Determine whether each class of customers is providing the utility with a reasonable level of revenue necessary

More information

Western NY Public Policy Transmission Planning Report

Western NY Public Policy Transmission Planning Report Western NY Public Policy Transmission Planning Report Dawei Fan Supervisor, Public Policy and Interregional Planning Business Issues Committee September 12, 2017 Operating Committee September 15, 2017

More information

1. ESWG had an update regarding the SPP Probabilistic Assessment.

1. ESWG had an update regarding the SPP Probabilistic Assessment. Southwest Power Pool ECONOMIC STUDIES WORKING GROUP January 10, 2013 Web Conference SUMMARY OF ACTIONS TAKEN 1. ESWG had an update regarding the SPP Probabilistic Assessment. 1 of 18 Southwest Power Pool

More information

11. Electrical energy tariff rating

11. Electrical energy tariff rating 799 11. Electrical energy tariff rating 800 11. ELECTRICAL ENERGY TARIFF RATING There is no universal system for billing electrical energy. Each country generally adopts its own method, taking into account

More information

IMPACT ON THE ELECTRICITY SYSTEM QUESTION 5. Has Ontario s electricity system become more reliable and able to meet peak demand?

IMPACT ON THE ELECTRICITY SYSTEM QUESTION 5. Has Ontario s electricity system become more reliable and able to meet peak demand? Making Connections - Straight Talk About Electricity in Ontario: 2018 Energy Conservation Progress Report, Volume One IMPACT ON THE ELECTRICITY SYSTEM QUESTION 5 Has Ontario s electricity system become

More information

Solar Power. Demonstration Site. Annual Performance Report 2017

Solar Power. Demonstration Site. Annual Performance Report 2017 Solar Power Demonstration Site Annual Performance Report 217 Version :1. July 12, 218 Solar Power Demonstration Site 217 Performance Report Introduction INTRODUCTION The Solar Power Demonstration Site

More information

Electric Vehicle Cost-Benefit Analyses

Electric Vehicle Cost-Benefit Analyses Electric Vehicle Cost-Benefit Analyses Results of plug-in electric vehicle modeling in five Northeast & Mid-Atlantic states Quick Take With growing interest in the electrification of transportation in

More information

OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2018 RELIABILITY SCORECARD

OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2018 RELIABILITY SCORECARD OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2018 RELIABILITY SCORECARD June 1, 2018 Table of Contents 1.0 Introduction...3 2.0 Summary...3 3.0 Purpose...3 4.0 Definitions...4 5.0 Analysis...5

More information

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA (November 2018)

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA (November 2018) ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA () Availability This rate shall be available for the firm power requirements

More information

Cost Reflective Tariffs

Cost Reflective Tariffs Cost Reflective Tariffs for Large Government,Commercial and Industrial Customers Customer Guide Introduction On September 2016, the Council of Ministers had approved the introduction Cost of Reflective

More information

Flexible Capacity Needs and Availability Assessment Hours Technical Study for 2020

Flexible Capacity Needs and Availability Assessment Hours Technical Study for 2020 Flexible Capacity Needs and Availability Assessment Hours Technical Study for 2020 Clyde Loutan Principal, Renewable Energy Integration Hong Zhou Market Development Analyst, Lead Amber Motley Manager,

More information

Impact of Distributed Energy Resources on Transmission System Reliability

Impact of Distributed Energy Resources on Transmission System Reliability S E P T E M B E R 1 3, 2 0 1 8 W E B I N A R Impact of Distributed Energy Resources on Transmission System Reliability National Council on Electricity Policy (NCEP) Alan McBride D I R E C T O R, T R A

More information

Implications of Alberta s Evolving Electricity Market for Solar

Implications of Alberta s Evolving Electricity Market for Solar Implications of Alberta s Evolving Electricity Market for Solar Matt Ayres CEO, Market Surveillance Administrator matt.ayres@albertamsa.ca What does the Market Surveillance Administrator do? Investigation

More information

UK gas and electricity supplies. A review of the winter John Greasley and Simon Griew Commercial. UK Transmission

UK gas and electricity supplies. A review of the winter John Greasley and Simon Griew Commercial. UK Transmission UK gas and electricity supplies A review of the winter 2003-04 John Greasley and Simon Griew Commercial UK Transmission Agenda What were we saying before the winter? What happened in electricity? What

More information

Hybrid Wind Solar Generator

Hybrid Wind Solar Generator Jerry Bell Resource Adequacy Planning Department Planning Committee December 14th, 2017 How did this concept arise? Wind units rarely use their full inverter capability If wind units capacity factors in

More information

OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2017 RELIABILITY SCORECARD

OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2017 RELIABILITY SCORECARD OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2017 RELIABILITY SCORECARD May 1, 2017 Table of Contents 1.0 Introduction...3 2.0 Summary...3 3.0 Purpose...3 4.0 Definitions...4 5.0 Analysis...5

More information

2016 Load & Capacity Data Report

2016 Load & Capacity Data Report Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation, accuracy, completeness

More information

WHITE PAPER. Preventing Collisions and Reducing Fleet Costs While Using the Zendrive Dashboard

WHITE PAPER. Preventing Collisions and Reducing Fleet Costs While Using the Zendrive Dashboard WHITE PAPER Preventing Collisions and Reducing Fleet Costs While Using the Zendrive Dashboard August 2017 Introduction The term accident, even in a collision sense, often has the connotation of being an

More information

POWER SYSTEM OPERATION AND CONTROL YAHIA BAGHZOUZ UNIVERSITY OF NEVADA, LAS VEGAS

POWER SYSTEM OPERATION AND CONTROL YAHIA BAGHZOUZ UNIVERSITY OF NEVADA, LAS VEGAS POWER SYSTEM OPERATION AND CONTROL YAHIA BAGHZOUZ UNIVERSITY OF NEVADA, LAS VEGAS OVERVIEW Interconnected systems Generator scheduling/dispatching Load-generation balancing Area Control Error (ACE) Load

More information

Use of National Household Travel Survey (NHTS) Data in Assessment of Impacts of PHEVs on Greenhouse Gas (GHG) Emissions and Electricity Demand

Use of National Household Travel Survey (NHTS) Data in Assessment of Impacts of PHEVs on Greenhouse Gas (GHG) Emissions and Electricity Demand Use of National Household Travel Survey (NHTS) Data in Assessment of Impacts of PHEVs on Greenhouse Gas (GHG) Emissions and Electricity Demand By Yan Zhou and Anant Vyas Center for Transportation Research

More information

Accommodating High Levels of Variable Generation. EPRI Managing Complexity for Safety and Reliability September 14-15, 15, 2009

Accommodating High Levels of Variable Generation. EPRI Managing Complexity for Safety and Reliability September 14-15, 15, 2009 Accommodating High Levels of Variable Generation EPRI Managing Complexity for Safety and Reliability September 14-15, 15, 2009 Agenda About NERC About the Integration of Variable Generation Task Force

More information

TRANSMISSION PLANNING CRITERIA

TRANSMISSION PLANNING CRITERIA CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003-3502 Effective Date: TRANSMISSION PLANNING CRITERIA PURPOSE This specification describes Con Edison s Criteria for assessing

More information

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing. California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 August 15, 2017 Re: California

More information

Analysis of Turbophase System Deployment on Natural Gas Generating Stations located in Florida Reliability Coordinating Council

Analysis of Turbophase System Deployment on Natural Gas Generating Stations located in Florida Reliability Coordinating Council Analysis of Turbophase System Deployment on Natural Gas Generating Stations located in Florida Reliability Coordinating Council - BY ENERGY EXEMPLAR 1 Page Table of Contents Table of Figures... 2 About

More information

ERCOT Overview. Paul Wattles Senior Analyst, Market Design & Development. Solar Energy Industries Association July 11, 2012

ERCOT Overview. Paul Wattles Senior Analyst, Market Design & Development. Solar Energy Industries Association July 11, 2012 ERCOT Overview Paul Wattles Senior Analyst, Market Design & Development Solar Energy Industries Association History of Electric Reliability Council of Texas, Inc. 1941 Utilities band together to aid war

More information

Department of Market Quality and Renewable Integration November 2016

Department of Market Quality and Renewable Integration November 2016 Energy Imbalance Market March 23 June 3, 216 Available Balancing Capacity Report November 1, 216 California ISO Department of Market Quality and Renewable Integration California ISO i TABLE OF CONTENTS

More information

To: Honorable Public Utilities Board Submitted by: /s/ Barry Leska AGM Energy Resources Planning. From: Sarah Liuba Approved by: /s/

To: Honorable Public Utilities Board Submitted by: /s/ Barry Leska AGM Energy Resources Planning. From: Sarah Liuba Approved by: /s/ AGENDA ITEM NO.: 4.G. To: Honorable Public Utilities Board Submitted by: /s/ Barry Leska AGM Energy Resources Planning From: Sarah Liuba Approved by: /s/ Energy Resources Analyst Nicolas Procos General

More information

Power Systems Fundamentals

Power Systems Fundamentals Power Systems Fundamentals Yachi Lin Senior Manager, Transmission Planning New York Independent System Operator Market Overview Course September 20, 2017 Rensselaer, NY 2017 New York Independent System

More information

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008 Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008 2 Table of Contents Administrative Data...3 Network Performance...3 Reliability Measures

More information

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

WIM #37 was operational for the entire month of September Volume was computed using all monthly data. SEPTEMBER 2016 WIM Site Location WIM #37 is located on I-94 near Otsego in Wright county. The WIM is located only on the westbound (WB) side of I-94, meaning that all data mentioned in this report pertains

More information

Energy Efficiency Benefits

Energy Efficiency Benefits Energy Efficiency Benefits Heating and Cooling Energy Conservation Case Study 40 W 20 th Street, NRDC New York Headquarters October 2016 Authors Ryan Meinke Anthony Guerrero Contributors Milly Suarez Eileen

More information

Click to edit Master title style

Click to edit Master title style Click to edit Master title style Northeast Home Heating Oil Reserve (NEHHOR) June 16, 2011 Nancy Marland/Lindsay Partusch Operations and Readiness Office Petroleum Reserves 1 Northeast Click to edit Home

More information

ISO on Background. Energy-efficiency forecast. Anne George. Stephen J. Rourke VICE PRESIDENT, SYSTEM PLANNING DECEMBER 12, 2012

ISO on Background. Energy-efficiency forecast. Anne George. Stephen J. Rourke VICE PRESIDENT, SYSTEM PLANNING DECEMBER 12, 2012 DECEMBER 12, 2012 ISO on Background Energy-efficiency forecast Anne George VICE PRESIDENT, EXTERNAL AFFAIRS &CORPORATE COMMUNICATIONS Stephen J. Rourke VICE PRESIDENT, SYSTEM PLANNING Agenda 11:00-11:05

More information

2013 CARIS Phase 1 Report

2013 CARIS Phase 1 Report 2013 CARIS Phase 1 Report Timothy Duffy Manager, Economic Planning New York Independent System Operator Business Issues Committee September 18, 2013 KCC 2013 New York Independent System Operator, Inc.

More information

Presented by Eric Englert Puget Sound Energy September 11, 2002

Presented by Eric Englert Puget Sound Energy September 11, 2002 Results from PSE s First Year of Time of Use Program Presented by Eric Englert Puget Sound Energy September 11, 2002 Puget Sound Energy Overview 973,489 Total Electric Customers 908,949 are AMR Capable

More information

NEU Electric and Natural Gas Price Update

NEU Electric and Natural Gas Price Update $ / MWH Jan-11 May-11 Sep-11 Sep-12 Jan-13 Electric: Short-Term Outlook The NYMEX Northern Illinois Hub 12-month forward price at the end of August 2016 for the September 2016 to August 2017 period was

More information

Genbright LLC. AEE Technical Round Table 11/15/2017

Genbright LLC. AEE Technical Round Table 11/15/2017 Genbright LLC AEE Technical Round Table 11/15/2017 About Genbright Founded in 2013, Genbright was created to develop and monetize distributed energy technologies across the power industry including distributed

More information

COMPARISON OF ELECTRICITY PRICES IN MAJOR NORTH AMERICAN CITIES. Rates in effect April 1, 2011

COMPARISON OF ELECTRICITY PRICES IN MAJOR NORTH AMERICAN CITIES. Rates in effect April 1, 2011 COMPARISON OF ELECTRICITY PRICES IN MAJOR NORTH AMERICAN CITIES Rates in effect April 1, 2011 Amended November 2011 TABLE OF CONTENTS INTRODUCTION 3 METHOD 7 HIGHLIGHTS 9 Residential Customers 9 Small-Power

More information

Schedule DP-1 SMALL GENERAL SERVICE (EXPERIMENTAL)

Schedule DP-1 SMALL GENERAL SERVICE (EXPERIMENTAL) I. APPLICABILITY This schedule is applicable only to a Customer who qualifies for Electric Service in accordance with Schedule GS-1 as of the Customer s effective date for billing under this schedule.

More information

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014.

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014. NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service Effective: For bills rendered on and after January 1, 2014. SECTION 1. AVAILABILITY AND APPLICABILITY 1.1 This Rate Schedule

More information

Electric Vehicle Cost-Benefit Analyses

Electric Vehicle Cost-Benefit Analyses Electric Vehicle Cost-Benefit Analyses Results of plug-in electric vehicle modeling in eight US states Quick Take M.J. Bradley & Associates (MJB&A) evaluated the costs and States Evaluated benefits of

More information

Running the Electric Power Grid

Running the Electric Power Grid Running the Electric Power Grid Your electricity needs never stop, and neither do we. We keep power flowing across New England. Inside Our Control Room Before electricity is delivered to your street, it

More information

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AEP Texas (comprised of its Central and North Divisions

More information

OSI University. monarch Training Calendar

OSI University. monarch Training Calendar OSI University monarch 2014-2015 Training Calendar July 1 2 3 4 Fourth of July Holiday 7 8 9 10 11 Introductory: M1-101 monarch System Overview, 1 Day Introductory: M1-102 monarch Database Overview, 1

More information

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019.

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019. NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service Effective: For bills rendered on and after February 1, 2019. SEDC:60/7/8/9 SECTION 1. AVAILABILITY AND APPLICABILITY 1.1

More information

Crane Inspection Log. Mailing Address: P.O. Box Tulsa, OK Phone: (918) Fax: (918)

Crane Inspection Log. Mailing Address: P.O. Box Tulsa, OK Phone: (918) Fax: (918) 999978000 Crane Inspection Log Mailing Address: P.O. Box 581510 Tulsa, OK 74158-1510 Physical Address: 4707 North Mingo Road Tulsa, OK 74117-5904 Phone: (918) 836-0463 Fax: (918) 834-5979 www.autocrane.com

More information

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool WIRES University Overview of ISO/RTOs Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool 1 OUR MISSION Helping our members work together to keep the lights on

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

GENERAL INFORMATION 15. MARKET SUPPLY CHARGE ("MSC")

GENERAL INFORMATION 15. MARKET SUPPLY CHARGE (MSC) P.S.C. NO. 3 ELECTRICITY LEAF: 214 ORANGE AND ROCKLAND UTILITIES, INC. REVISION: 3 INITIAL EFFECTIVE DATE: November 1, 2015 SUPERSEDING REVISION: 1 Issued in compliance with Order in Case 14-E-0493 dated

More information

Agricultural Internal Combustion (IC) Engine Conversion Incentive Program Questions and Answers

Agricultural Internal Combustion (IC) Engine Conversion Incentive Program Questions and Answers CALIFORNIA FARM BUREAU FEDERATION Agricultural Internal Combustion (IC) Engine Conversion Incentive Program Questions and Answers Q1. Who is eligible to sign up for an AG-ICE program? A. In order to be

More information

A9 Data Monitoring and Analysis Report. January Content. 1. Executive Summary. 2. Overview. 3. Purpose. 4. Baseline Data Sources

A9 Data Monitoring and Analysis Report. January Content. 1. Executive Summary. 2. Overview. 3. Purpose. 4. Baseline Data Sources A9 Data Monitoring and Analysis Report January 2018 Content 1. Executive Summary 2. Overview 3. Purpose 4. Baseline Data Sources 5. Casualty Analysis 6. Vehicle Speed Data 7. Incident Frequency & Impact

More information

Who has trouble reporting prior day events?

Who has trouble reporting prior day events? Vol. 10, Issue 1, 2017 Who has trouble reporting prior day events? Tim Triplett 1, Rob Santos 2, Brian Tefft 3 Survey Practice 10.29115/SP-2017-0003 Jan 01, 2017 Tags: missing data, recall data, measurement

More information

The impact of electric vehicle development on peak demand and the load curve under different scenarios of EV integration and recharging options

The impact of electric vehicle development on peak demand and the load curve under different scenarios of EV integration and recharging options The impact of electric vehicle development on peak demand and the load curve under different scenarios of EV integration and recharging options Electricity demand in France: a paradigm shift Electricity

More information

ATTACHMENT - DFO STATEMENT OF NEED

ATTACHMENT - DFO STATEMENT OF NEED ATTACHMENT - DFO STATEMENT OF NEED Table of Contents Executive Summary... 3 1. Description of the Area... 5 1.1 Geographic Study Area... 5 1.2 Current System Configuration... 7 1.3 Distributed Generation...

More information

ENERGY MANAGEMENT AT COOPER TIRE

ENERGY MANAGEMENT AT COOPER TIRE OMA Energy Committee June 25, 2014 Anthony Smith, PE ENERGY MANAGEMENT AT COOPER TIRE 1 A Leader in the Tire Industry 5% 2012 Sales by Segment 35% North America 65% International 5% Sales by Product 20%

More information

INTEGRATING PLUG-IN- ELECTRIC VEHICLES WITH THE DISTRIBUTION SYSTEM

INTEGRATING PLUG-IN- ELECTRIC VEHICLES WITH THE DISTRIBUTION SYSTEM Paper 129 INTEGRATING PLUG-IN- ELECTRIC VEHICLES WITH THE DISTRIBUTION SYSTEM Arindam Maitra Jason Taylor Daniel Brooks Mark Alexander Mark Duvall EPRI USA EPRI USA EPRI USA EPRI USA EPRI USA amaitra@epri.com

More information

Effect of DG Installation on Customer Load Shapes

Effect of DG Installation on Customer Load Shapes Effect of DG Installation on Customer Load Shapes P R E S E N T E D T O Westar Energy P R E S E N T E D B Y The Brattle Group J u n e 2 3, 2017 Copyright 2017 The Brattle Group, Inc. Characteristics of

More information

August ATR Monthly Report

August ATR Monthly Report August ATR Monthly Report Minnesota Department of Transportation Office of Transportation Data and Analysis August 2011 Introduction The purpose of this report is to examine monthly traffic trends on

More information

A9 Data Monitoring and Analysis Report. March Content. 1. Executive Summary and Key Findings. 2. Overview. 3. Purpose

A9 Data Monitoring and Analysis Report. March Content. 1. Executive Summary and Key Findings. 2. Overview. 3. Purpose A9 Data Monitoring and Analysis Report March 2018 Content 1. Executive Summary and Key Findings 2. Overview 3. Purpose 4. Baseline Data Sources and Methodology 5. Casualty Analysis 6. Vehicle Speed Data

More information

Dawn Storage Pricing Summary last updated April 1, 2018

Dawn Storage Pricing Summary last updated April 1, 2018 Dawn Storage Pricing Summary last updated April 1, 2018 The table below illustrates how Union Gas enters into market priced storage services (park, loans, off peak, short & long term peak) and provides

More information

July 24, Project IR

July 24, Project IR July 24, 2017 Project IR13164420 Maria Pope Manager, Facilities Operation and Maintenance John Wayne Airport, Orange County 3160 Airway Avenue Costa Mesa, California 92626 Re: Central Utility Plant Operating

More information

New England East West Solutions (Formerly Southern New England Transmission Reliability) Report 2 Options Analysis. (Redacted)

New England East West Solutions (Formerly Southern New England Transmission Reliability) Report 2 Options Analysis. (Redacted) New England East West Solutions (Formerly Southern New England Transmission Reliability) Report 2 Options Analysis (Redacted) (c) ISO New England Inc. Southern New England Regional Working Group ISO New

More information

Residential Load Profiles

Residential Load Profiles Residential Load Profiles TABLE OF CONTENTS PAGE 1 BACKGROUND... 1 2 DATA COLLECTION AND ASSUMPTIONS... 1 3 ANALYSIS AND RESULTS... 2 3.1 Load Profiles... 2 3.2 Calculation of Monthly Electricity Bills...

More information

Expanding Capacity Eligibility

Expanding Capacity Eligibility Expanding Capacity Eligibility Zachary T. Smith Manager, Capacity Market Design ICAPWG/MIWG January 22 nd, 2019, 10 Krey Blvd Agenda Background Capacity Supplier Payment Structure SCR Program Capacity

More information

Illinois Regulatory and Energy Price Update

Illinois Regulatory and Energy Price Update Illinois Regulatory and Energy Price Update February 2009 Highlights in this update: Commonwealth Edison Company releases revised cost of service study... 1 Proposed order issued in NICOR rate increase

More information

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW-

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW- This document is scheduled to be published in the Federal Register on 08/29/2016 and available online at http://federalregister.gov/a/2016-20620, and on FDsys.gov 6450-01-P DEPARTMENT OF ENERGY Southeastern

More information

Meter Insights for Downtown Store

Meter Insights for Downtown Store Meter Insights for Downtown Store Commodity: Analysis Period: Prepared for: Report Date: Electricity 1 December 2013-31 December 2014 Arlington Mills 12 February 2015 Electricity use over the analysis

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: September 27, 2012 SUBJECT: NOTICE OF AWARD PROCUREMENT AUTHORIZATION - ARTICULATED BUSES INFORMATION ITEM RECOMMENDATION

More information

Assessing the Potential Role of Large-Scale PV Generation and Electric Vehicles in Future Low Carbon Electricity Industries

Assessing the Potential Role of Large-Scale PV Generation and Electric Vehicles in Future Low Carbon Electricity Industries Assessing the Potential Role of Large-Scale PV Generation and Electric Vehicles in Future Low Carbon Electricity Industries Peerapat Vithayasrichareon, Graham Mills, Iain MacGill Centre for Energy and

More information

ANNUAL ELECTRIC POWER INDUSTRY REPORT

ANNUAL ELECTRIC POWER INDUSTRY REPORT SCHEDULE 1. IDENTIFICATION SURVEY CONTACTS: Persons to contact with question about this form RESPONSE DUE DATE: Please submit by April 30th following the close of calendar year Contact Title: Jocelyn Gwynn

More information

April 2, Docket No. ER Independent Assessment Department of Market Monitoring Report on Performance of Energy Imbalance Market

April 2, Docket No. ER Independent Assessment Department of Market Monitoring Report on Performance of Energy Imbalance Market California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 April 2, 2015 Re: California Independent

More information

Association of Energy Engineers January 9, Michael Dirrane Director, Northeast Marketing

Association of Energy Engineers January 9, Michael Dirrane Director, Northeast Marketing Association of Energy Engineers January 9, 2013 Michael Dirrane Director, Northeast Marketing Spectra Energy U.S. Transmission Map Miles of Pipe 13,297 Number of Compressor Stations 129 Total Horsepower

More information

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS Appendix 6.7 SUR ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS SUR ENERGY PROGRAM INDUSTRIAL LOAD - OPTION 1 TABLE OF CONTENTS Page No. Eligibility...1 Reference Demand...1 Billing...2 Interruptions...3

More information

Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any

Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any Draft Version 1 Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation,

More information

Infrastructure Disruptions: What if?

Infrastructure Disruptions: What if? Infrastructure Disruptions: What if? NGA Executive Conference R.L.Levitan, rll@levitan.com September 12, 2016 Agenda Recap of TETCO Incident on 4/29/16 What if? Potential Impacts on Winter and Summer Peak

More information

in Major North American Cities

in Major North American Cities Comparison of Electricity Prices in Major North American Cities Rates in effect April 1, 2013 Table of Contents Introduction 3 Method 7 Highlights 9 Residential Customers 9 Small-Power Customers 10 Medium-Power

More information

Large General Service Time-of-Use Storage Program

Large General Service Time-of-Use Storage Program Large General Service Time-of-Use Storage Program AVAILABILITY Available throughout the Company s entire electric service area where the facilities of the Company are of adequate capacity and are adjacent

More information

P.S.C. No. 9 - Electricity Consolidated Edison Company First Revised Leaf No. 310 of New York, Inc. Superseding Original Leaf No.

P.S.C. No. 9 - Electricity Consolidated Edison Company First Revised Leaf No. 310 of New York, Inc. Superseding Original Leaf No. Consolidated Edison Company First Revised Leaf No. 310 of New York, Inc. Superseding Original Leaf No. 310 Applicable to Use of Service for SERVICE CLASSIFICATION NO. 12 MULTIPLE DWELLING SPACE HEATING

More information

COMPARISON OF ELECTRICITY PRICES IN MAJOR NORTH AMERICAN CITIES. Rates in effect April 1, ,0272

COMPARISON OF ELECTRICITY PRICES IN MAJOR NORTH AMERICAN CITIES. Rates in effect April 1, ,0272 COMPARISON OF ELECTRICITY PRICES IN MAJOR NORTH AMERICAN CITIES Rates in effect April 1, 2015 0,0272 TABLE OF CONTENTS INTRODUCTION 3 METHOD 7 HIGHLIGHTS 9 Residential Customers 9 Small-Power Customers

More information

Electricity Transmission Infrastructure Development in New England

Electricity Transmission Infrastructure Development in New England Electricity Transmission Infrastructure Development in New England NPCC Governmental/Regulatory Affairs Advisory Group Paul G. Afonso March 4, 2008 Transmission Infrastructure is Playing An Increasingly

More information

Impact Evaluation of 2004 Compressed Air Prescriptive Rebates

Impact Evaluation of 2004 Compressed Air Prescriptive Rebates Impact Evaluation of 2004 Compressed Air Prescriptive Rebates May 15, 2006 Prepared for: National Grid USA Service Company P.O. 0000027684 DMI# 05006.520 Prepared by: DMI 450 Lexington Street Newton, MA

More information