January Final. Phase 2 Initial Screening Memorandum

Size: px
Start display at page:

Download "January Final. Phase 2 Initial Screening Memorandum"

Transcription

1 January 2018 Final Phase 2 Initial Screening Memorandum

2 This page intentionally left blank

3 Table of Contents 1. Introduction Project Area, Context, and Description Study Evaluation Process and Phasing Purpose of this Memorandum Overview of Phase Overview of Investment Corridor Screening Mode (Technology) Assessment Connector Corridor Screening Overview of Enhancement Projects Screening Enhancement Project Compatibility/Integration Gap Analysis Phase 2 Investment Corridor Initial Screening Methodology Mode (Technology) Assessment Typical Capital Cost per Mile Typical Route Length Operations and Maintenance Cost per Revenue Hour Typical Weekday Ridership Past Federal Transit Administration Capital Investment Grant Funding Timeframe for Implementation Economic Development Potential Average Travel Speed Mode (Technology) Assessment Results Connector Corridor Screening Current Corridor Ridership Income-Rent Balance Zero-Car Households Corridor Employment Corridor Population Density Local Project Coordination Downtown Segment (#99) Connector Corridor Screening Results Phase 2 Enhancement Project Screening Methodology Enhancement Project Gap Analysis Overview Phase 1 Survey Results Enhancement Project Gap Analysis Recommendations Enhancement Project Phase 2 Initial Screening Results Next Steps: Phase 2 Detailed Definition of Alternatives Partner Projects and Initiatives Investment Corridor Alignment and Logical Termini Options Doc Control#

4 List of Figures Figure 1-1: Project Connect Regional Study Area and Focus Area... 2 Figure 1-2: Project Connect Study Phases... 4 Figure 2-1: Phase 1 Investment Corridor Recommendations... 6 Figure 2-2: Phase 1 Enhancement Project Recommendations... 7 Figure 2-3: Phase 2 Investment Corridor Workflow... 8 Figure 2-4: Phase 2 Enhancement Project Workflow... 8 Figure 3-1: Investment Corridor Alternative Definition Components Figure 3-2: Phase 2 Connector Corridor Screening Criteria Figure 3-3: Downtown Austin Connector Corridor Segment # Figure 4-1: Enhancement Project Gap Analysis Summary Figure 4-2: Phase 2 MetroExpress Enhancement Projects Figure 4-3: Phase 2 MetroRail Enhancement Projects Figure 4-4: Phase 2 MetroRapid Enhancement Projects Figure 4-5: Phase 2 Mobility Hubs Enhancement Projects Figure 5-1: Phase 2 Connector Corridors and Possible Extensions List of Tables Table 3-1: Phase 1 Investment Corridors Table 3-2: Phase 2 Mode (Technology) Assessment Results Table 3-3: Phase 2 Connector Corridor Screening Results Table 4-1: Phase 1 Enhancement Project Recommendations Table 4-2: Most A-C-R Responses (by Location) Table 4-3: Most S-I-T Responses (by Location) Table 4-4: Most A-C-R Comments (Non-Location-Specific, by Service Type) Table 4-5: Most S-I-T Comments (Non-Location-Specific, by Service Type) Table 4-6: Enhancement Project Gap Analysis Recommendations Table 5-1: Regional Transportation Partners and Coordinated Planning Initiatives Table 5-2: Potential Phase 2 Connector Corridor Extension Options Doc Control#

5 1. Introduction 1.1 Project Area, Context, and Description Project Connect is a 30-month project being led by the Capital Metro Transportation Authority (CMTA) that will identify, analyze, and prioritize potential high-capacity transit solutions to facilitate travel into, out of, and within Central Austin. The project objectives will focus on enhancements to transit services and infrastructure that would improve existing high-capacity transit services (MetroRail, MetroRapid, and MetroExpress). Additionally, this project will examine corridors that may be suitable for the implementation of future high-capacity transit solutions. Project Connect builds on the Project Connect Central Texas High-Capacity Transit System Plan (2012) that outlined and established a framework for moving forward with developing high-capacity transit in the region. The project worked with regional partners and community stakeholders to define how transit should evolve in the region, how the system and expansions would be financed, and what regional partnerships could be organized to develop and operate the system. Today, Project Connect has a defined Focus Area in Central Austin that is generally bounded by US 183 to the north and east, Mopac Expressway (SL 1) to the west, and US 290/Ben White Boulevard to the south. While the Focus Area examines a more centralized area of service, the project also includes a regional Study Area that provides connections to the Focus Area from the surrounding five-county metropolitan statistical area of Bastrop, Caldwell, Hays, Travis, and Williamson counties. Figure 1-1 displays the mutual relationship between the Study Area and the Focus Area. Due to unprecedented employment and population growth, the Central Texas region is approaching a critical juncture for addressing the mounting transportation needs that are affecting all of the communities, agencies, and regional partners who can collectively build a more connected region. It is clear that a comprehensive set of mobility solutions is needed to support and sustain the continued success of the region. Since the 1980s, Central Texas has been studying opportunities to implement high-capacity transit service (initially focusing on light rail investment) in the region. Project Connect began the process by reviewing locally-adopted, community-supported, or agency-produced transportation plans that identify potential high-capacity transit projects, starting with CMTA s first application for capital funding to the Federal Transit Administration (FTA) in Study Evaluation Process and Phasing Project Connect is following a three-phase process to develop and evaluate alternatives for highcapacity transit investment (Investment Corridors) and enhancements to existing MetroRail, MetroRapid, and MetroExpress service (Enhancement Projects). The Corridors and Projects will be evaluated concurrently and generally following the same methodology, but will be evaluated separately so Corridors will only be compared to Corridors, and Projects will only be compared to Projects. This process will help to ensure an apples-to-apples comparison of the various Corridors and Projects. The outcome of Project Connect will be a program of projects for implementation, including Investment Corridors and Enhancement Projects. Page 1 of 41 Doc Control#

6 Figure 1-1: Project Connect Regional Study Area and Focus Area The study goals and evaluation criteria identified for Project Connect were developed to largely align with the stated goals and objectives of CMTA and cooperating agencies, such as the City of Austin and FTA. The following goals have been established for Project Connect and serve as the foundation from which the evaluation criteria were developed. Details can be found in the Purpose and Need Memorandum and the Phase 1 Evaluation Criteria Memorandum. Customer Experience: Increase efficiency, attractiveness, and utilization of high-capacity transit service to/from/within Central Austin. Reliability: Provide frequent, reliable high-capacity transit service along dedicated right-of-way to/from/within Central Austin. Sustainability: Contribute to a socially, economically, and environmentally-sustainable highcapacity transit network. Land Use and Policy: Support compact and connected land use and development patterns. Page 2 of 41 Doc Control#

7 Implementation and Operations: Develop and select constructible, affordable, and communitysupported transit projects for implementation. A summary of the three Project Connect evaluation phases is outlined below and shown on Figure 1-2. Phase 2 is described in more detail in Chapter 2 of this report, and detail regarding the Phase 2 evaluation criteria can be found in Chapters 3 and 4 of this report. Phase 1: Investment Corridors and Enhancement Projects were identified by reviewing locallyadopted, community-supported, or agency-produced transportation plans that identify potential high-capacity transit projects. A full list of the studies and plans that were consulted is included in the Enhancement Project and Investment Corridor Identification Methodology report. Through this effort, 29 Corridors and 44 Projects were identified by CMTA staff in coordination with study committee members. These Projects and Corridors are being subjected to a two-step evaluation process that included quantitative and qualitative components. Based on the evaluation results, Projects and Corridors were broken into three tiers. Projects and Corridors identified as Tier 1 were recommended for further study in Phase 2. Projects and Corridors identified as Tier 2 or 3 were removed from further consideration. The outcome of the Phase 1 evaluation was a list of Corridors and Projects to move forward into Phase 2. Phase 2 includes the detailed definition and evaluation of the Corridors and Projects that scored in Tier 1 of the Phase 1 evaluation. Project- and Corridor-specific information will be generated to help support detailed evaluation, including capital costs, operating and maintenance (O&M) costs, ridership forecasts, socioeconomic impacts, environmental impacts, traffic and parking impacts, and a number of other factors. The outcome of this phase will be a list of Corridors and Projects to move forward for refinement in Phase 3. Phase 3 will include the refinement of the Projects and Corridors recommended for further study in Phase 2. The Corridors and Projects will be optimized during Phase 3 to maximize competitiveness in the FTA s New/Small Starts capital funding program (for Corridors) and to balance benefits, impacts, costs, and funding sources (for Projects). The outcome of Phase 3 will be the identification of Corridors to take forward in a capital funding application to FTA through the New/Small Starts Capital Investment Grant (CIG) Program and the identification of Projects for CMTA to implement as capital and operating funding sources are identified and available. Page 3 of 41 Doc Control#

8 Figure 1-2: Project Connect Study Phases Page 4 of 41 Doc Control#

9 2. Purpose of this Memorandum Project Connect completed the Phase 1 evaluation of preliminary Investment Corridors and Enhancement Projects on June 26, 2017, with the CMTA s adoption of the resolution approving the results of the Phase 1 evaluation. Phase 1 identified 18 potential high-capacity transit Investment Corridors for detailed definition and evaluation in Phase 2 (see Figure 2-1). Investment Corridors are categorized according to the travel markets they serve: Commuters, Connectors, or Circulators. Commuter Corridors are typically established highway or rail corridors that travel through suburban and rural environments. Commuter Corridors most often take users from the Study Area to the Central Austin Focus Area (exurbs to downtown). Connector Corridors serve high population and high employment dense areas with multiple concentrations of activity centers. They connect multiple modes of density. Circulators Corridors mainly provide service within Austin s downtown area (central business district) and the areas immediately around downtown. The Phase 1 evaluation of preliminary Investment Corridors recommended 3 Commuters, 12 Connectors, and 3 Circulators for further evaluation in Phase 2. The CMTA Board resolution also approved 19 Enhancement Projects for Phase 2 (see Figure 2-2). Enhancement Projects are categorized by the type of existing high-capacity transit service they would potentially improve. MetroRail: Red Line commuter rail service MetroRapid: Rapid Bus routes 801 and 803 MetroExpress: Express bus routes Mobility Hubs: Identified through the Connections 2025 service plan update The Phase 1 evaluation of preliminary Enhancement Projects recommended three MetroRail, five MetroRapid, two MetroExpress, and nine Mobility Hubs for further evaluation in Phase 2. Phase 2 focuses on detailed definition and evaluation of potential high-capacity transit solutions (alternatives) and selection of locally preferred alternatives (LPAs). Alternatives will be developed to include different combinations of Service operation, Infrastructure, and Technology (S-I-T) recommendations for Corridors and Projects. The LPAs will consist of Investment Corridors and Enhancement Projects selected for implementation by the project team (CMTA and consultant staff), Central Texas agency stakeholders, and affected communities. To ensure consistency when developing alternatives for Investment Corridors and Enhancement Projects, the Phase 2 process applied an initial screening of S-I-T components that may be included in the detailed alternatives, which will be developed during the remainder of Phase 2. This document identifies the approaches, methodologies, and results of the Phase 2 initial screening. Page 5 of 41 Doc Control#

10 Figure 2-1: Phase 1 Investment Corridor Recommendations Page 6 of 41 Doc Control#

11 Figure 2-2: Phase 1 Enhancement Project Recommendations Page 7 of 41 Doc Control#

12 2.1 Overview of Phase 2 The goal of Phase 2 is to determine how the CMTA high-capacity transit system should grow, the investments needed to facilitate that growth, and the right types of infrastructure and vehicles to meet both future demand and constraints. Phase 2 includes a multi-level screening of the Phase 1 Investment Corridors and Enhancement Projects, and is designed to define the appropriate combination of S-I-T options that should be used to develop draft alternatives for further refinement in Phase 3. The Phase 2 initial screening of Investment Corridors featured two distinct components: Mode (Technology) Assessment: Pair modes with appropriate Corridor market types. Connector Corridor Screening: Prioritize the list of Phase 1 Connector Corridor recommendations for detailed definition. Figure 2-3 illustrates the Phase 2 Investment Corridor workflow. The mode assessment and corridor screening will be followed by development of detailed alternatives through the combination of modes/guideway options and market types. The Phase 2 initial screening of Enhancement Projects involved two decision points: Phase 1 Enhancement Project Compatibility/Integration: Identify CMTA and partner agency constraints that must be addressed to implement Phase 1 recommended projects. Gap Analysis: Ensure that the Phase 2 Enhancement Projects address the most significant needs of the existing MetroRail, MetroRapid, MetroExpress, and Mobility Hubs. Figure 2-4 illustrates the workflow for identification of Gap Analysis Projects and the refinement of Phase 1 Enhancement Projects for evaluation in Phase 2. Figure 2-3: Phase 2 Investment Corridor Workflow Figure 2-4: Phase 2 Enhancement Project Workflow Page 8 of 41 Doc Control#

13 2.2 Overview of Investment Corridor Screening Mode (Technology) Assessment The purpose of the Mode (Technology) Assessment was to identify viable high-capacity transit modes that could potentially be implemented in the Phase 2 Investment Corridors. The assessment did not link transit modes to specific corridors, but to market types (Commuter, Connector, Circulator). This approach enabled the project team to streamline the assessment process by focusing on the combinations of mode and market that had the highest likelihood of success. The Mode (Technology) Assessment included the following transit technology modes: Bus (arterial and dedicated bus rapid transit [BRT]) Rail (streetcar, light rail transit [LRT], commuter rail transit [CRT], and heavy rail transit [HRT]) Emerging transit technologies (autonomous vehicles, electric bus, and gondola) BRT Streetcar LRT CRT HRT Emerging Technologies The project team analyzed peer agencies nationwide for best practices related to each high-capacity transit mode. The team also considered the typical travel market characteristics of the Commuter, Connector, and Circulator Corridors. The project team used transit service characteristics such as trip purpose, trip length, average travel speed, weekday ridership capacity, and capital and annual O&M cost to match high-capacity transit modes (bus, rail, emerging transit technology) with the Corridor market types (Commuter, Connector, Circulator). Details of the Mode (Technology) Assessment methodology and results are included in Section Connector Corridor Screening The Phase 1 evaluation identified Investment Corridors that best meet the project goals and objectives (as defined in the project Purpose and Need Statement), and are most likely to be competitive for FTA CIG program funding opportunities. The final list of Phase 1 Investment Corridors consisted of: 3 Commuter Corridors 12 Connector Corridors 3 Circulator Corridors Due to a limited amount of resources available to develop detailed alternative solutions, the project team began Phase 2 with a high-level screening of the Phase 1 Connector Corridors. Details of the Connector Corridor screening are included in Section Overview of Enhancement Projects Screening Enhancement Projects are designed to improve the operations and ridership of existing high-capacity transit services. Enhancement Projects would not adversely impact or interfere with new Investment Corridors. The Enhancement Project screening approach consisted of a two-step process: Page 9 of 41 Doc Control#

14 Phase 1 Enhancement Project Compatibility/Integration: Identify CMTA and partner agency constraints that must be addressed to implement Phase 1 recommended projects. Gap Analysis: Ensure that the Phase 2 Enhancement Projects address the most significant needs of the existing MetroRail, MetroRapid, MetroExpress, and Mobility Hubs. Details of the Enhancement Project screening are included in Chapter Enhancement Project Compatibility/Integration The Phase 2 screening of Enhancement Projects assessed the degree to which these Projects overlap with projects identified in the CMTA Short Range Planning and Long-Range Planning (Project Connect) and any required implementation coordination with partner agencies Gap Analysis The screening also identified additional Enhancement Projects based on community input from the Phase 1 online survey. Feedback received during the survey period identified general S-I-T concerns regarding existing MetroRail, MetroRapid, MetroExpress, and Mobility Hub services, and issues at specific high-capacity transit stations that were not addressed by the Phase 1 Enhancement Projects. Page 10 of 41 Doc Control#

15 3. Phase 2 Investment Corridor Initial Screening Methodology The Phase 1 evaluation process resulted in the advancement of 18 potential high-capacity transit Investment Corridors for detailed definition and evaluation in Phase 2 (Table 3-1). The definition of Phase 2 Investment Corridors involved identifying the combination of mode, guideway, technology, and service operating conditions that best serve the needs of each Corridor (Figure 3-1). Table 3-1: Phase 1 Investment Corridors Commuter Connector Circulator IH 35 Green Line MetroRail Red Line 7th/Lake Austin Airport Boulevard Congress S Lamar N Lamar/Guadalupe MLK Jr. Oltorf Pleasant Valley Highland/Red River/Trinity Manor/Dean Keeton Riverside 45th/Burnet Downtown S Congress Red River Figure 3-1: Investment Corridor Alternative Definition Components Phase 2 used a streamlined process to limit the number of potential Investment Corridors to only those that best met the project s goals and objectives, as defined by the Purpose and Need Statement. The Phase 2 initial screening of Investment Corridors featured two distinct components: Page 11 of 41 Doc Control#

16 Mode (Technology) Assessment: Pair modes with appropriate Corridor market types. Connector Corridor Screening: Prioritize the list of Phase 1 Connector Corridor recommendations for detailed alternatives. 3.1 Mode (Technology) Assessment The first step in the Mode (Technology) Assessment was to identify modes that may be appropriate to provide high-capacity transit service. The assessment did not link modes with specific Investment Corridors, but was designed to link the modes with appropriate market types (Commuter, Connector, Circulator) to further define the Corridor alternatives. The mode technologies considered in the Mode (Technology) Assessment included: BRT: including alternative fuel vehicles Rail: Streetcar, LRT, CRT, HRT Emerging transit technologies: autonomous vehicles, electric bus, gondola Mode technologies were compared based on basic operating characteristics and national industry standards, which were reported for the following metrics: Typical capital cost per mile Typical route length O&M cost per revenue hour Typical weekday ridership Past FTA CIG funding Timeframe for implementation Economic development potential Average travel speed The following sections provide an overview of the metrics, including the methodology and data sources, that were applied during the Phase 2 Mode (Technology) Assessment Typical Capital Cost per Mile This criterion identifies the typical capital cost per mile of construction for dedicated guideway transit. This data point is an early indicator of overall financial viability. Methodology The typical capital cost per mile for each mode was calculated by averaging the capital costs of FTA New Starts CIG projects that are currently recommended for Full Funding Grant Agreements. An average permile capital cost of autonomous vehicles and aerial gondola was calculated because those modes have not been funded through the CIG program, and currently there is no standardized, reliable capital cost data source for them. Data Sources FTA New Starts CIG Projects Recommended for Full Funding Grant Agreements Page 12 of 41 Doc Control#

17 3.1.2 Typical Route Length This criterion identifies the average length of operational transit services (by mode) from peer agencies around the country. This criterion was designed to identify the typical corridor length that is considered appropriate for each mode, based on current operations. Methodology The typical route length for each mode was gathered from the list of New Starts CIG projects that were recommended for funding, as of July The average was calculated by using the following formula: Average route length per mode = (sum of project lengths per mode/number of projects per mode) The typical route length was not presented as a single data point, but was reported as a range in order to emphasize the varied nature of projects. For each mode, the projects were listed in order of their length and a range of typical project lengths was calculated through a rough standard deviation from the average value. For example, the average length of BRT projects was miles, but the majority of projects range between 7 and 16 miles. The typical route length for aerial gondola was gathered through a comparison of two active transit aerial gondolas (Portland and Roosevelt Island). Data Sources New Starts CIG Projects Recommended for Full Funding Grant Agreements Portland Aerial Gondola in Portland, Oregon Roosevelt Island Tramway in New York, New York Operations and Maintenance Cost per Revenue Hour This criterion identifies a typical range of O&M costs per revenue hour per mode type. This data point, like capital costs, is an early indicator of overall financial viability. Methodology The O&M costs per hour by mode were derived from an average of the 2015 National Transit Database data for operating expense per hour. The average was calculated by analyzing the sum of operation costs per revenue hour per mode divided by the number of projects per mode, as shown in the following formula: Average O&M costs per revenue hour = (sum of costs per mode/number of projects per mode) Similar to the typical route length criterion output, the O&M cost per revenue hour was not presented as a single data point, but was reported as a range in order to emphasize the varied nature of the projects. For each mode, the modes were listed in order of their O&M cost per revenue hour and a range of typical costs was calculated through a rough standard deviation from the average value. Page 13 of 41 Doc Control#

18 For example, the average cost per revenue hour of BRT projects was $127.03, but the majority of modes had costs per revenue hour between approximately $90 and $160. Data Sources National Transit Database (2015), Operating Expense per Hour Portland Aerial Gondola in Portland, Oregon Roosevelt Island Tramway in New York City, New York Typical Weekday Ridership Typical weekday ridership is an important metric because it is an early step in matching corridor demand with transit mode capacity. Based on the anticipated or forecasted ridership demand in a proposed transit corridor, it is important to select a mode technology that is right-sized for the market that it will serve. Methodology The typical weekday ridership was gathered from the New Starts CIG projects that were recommended for funding, as of July The average weekday ridership by mode was calculated using the following formula: Average weekday ridership per mode = (sum of weekday riders per mode/number of projects per mode) The typical weekday ridership was not presented as a single data point, but was reported in a range in order to emphasize the varied nature of the projects. For each mode, the projects were listed in order of their weekday ridership. The range of weekday ridership was gathered through a rough standard deviation from the average value. The typical weekday ridership for aerial gondola was calculated through a comparison of two active transit aerial gondolas (Portland and Roosevelt Island). Data Sources New Starts CIG Projects Recommended for Full Funding Grant Agreements Portland Aerial Gondola in Portland, Oregon Roosevelt Island Tramway in New York, New York Past Federal Transit Administration Capital Investment Grant Funding This criterion was designed to assess the likeliness of each mode to attract CIG funding, based on whether the mode was part of a project that had previously been funded through the CIG program. As stated in the Purpose and Need Statement, the ability to attract FTA CIG funding will be critical to project implementation. Methodology Annual funding recommendations from the FTA CIG program were reviewed to determine which modes have been used in projects that have received CIG funding. Page 14 of 41 Doc Control#

19 Data Sources Federal Transit Administration Annual Reports on Funding Recommendations ( ) Timeframe for Implementation The timeframe required to design and construct transit capital investments can be influenced by the mode technology that is selected. This criterion was designed to identify the typical timeframe that is required to design and construct projects using each mode under consideration. Methodology The typical implementation timeframe was calculated for each mode by reviewing the implementation schedules of projects that are currently recommended for CIG Full Funding Grant Agreements. Data Sources New Starts CIG Projects Recommended for Full Funding Grant Agreements ( ) AECOM (standard implementation timeframes based on previous projects and professional expertise) Economic Development Potential This criterion was designed to assess each mode s economic development potential and overall ability to induce additional investment. Methodology An analysis of peer cities with various modes of high capacity transit that are currently in operation, including New Starts CIG Projects, was completed. While the potential for catalysis of development is dependent upon several factors, a corollary relationship has been observed between capital investment in high capacity transit and economic development in locations where local policies and strong market conditions are supportive. Dependent upon mode technology, installing dedicated guideway transit solutions may require reconstructing major arterials, allowing for Complete Streets and Context Sensitive Solutions principles to be implemented. Data Sources New Starts CIG Projects Recommended for Full Funding Grant Agreements Average Travel Speed Modes operate at different speeds due to design characteristics (dedicated right-of-way versus undedicated right-of-way) and market type served (Commuter, Connector, Circulator). This criterion was designed to identify the average travel speed per mode type. Methodology The average travel speed per mode was calculated based on a review of systems from across the country. Page 15 of 41 Doc Control#

20 Data Sources AECOM (average travel speed based on previous projects and professional expertise) Mode (Technology) Assessment Results The results of the Mode (Technology) Assessment are summarized below and in Table 3-2. Mode Project Connect Assessment Dedicated BRT is recommended for further consideration in Phase 2 Commuter, Connector, and Circulator Corridors. BRT BRT in dedicated guideway is a cost-effective solution that can mimic rail operations, with a lower passenger capacity per vehicle. Dedicating roadway for bus can be installed cheaper and faster than rail. Streetcar is recommended for further consideration in Phase 2 Connector and Circulator Corridors. Streetcar Modern streetcars are higher capacity vehicles than bus and provide added economic development potential. While it can be used to serve longer corridors, it is typically operated as a downtown circulator or very dense urban areas. It has higher capital and annual operating costs for rail guideway and electrified systems. LRT is recommended for further consideration in Phase 2 Commuter and Connector Corridors. LRT LRT technology can couple multiple vehicles to carry very high passenger volumes along greater distances than streetcar. Vehicle length and conflicts with auto traffic may limit ability to operate in the densest areas, but it can contribute to economic development. It has higher capital and annual operating costs for rail guideway and electrified systems. CRT is recommended for further consideration in Phase 2 Commuter Corridors. CRT CRT is effective for moving large numbers of passengers over long distances during high demand periods, but can become costly to operate. It requires a completely separate guideway and may use various propulsion systems. HRT is NOT recommended for further consideration in Phase 2. HRT HRT has the greatest carrying capacity of all mode technologies considered, but is also the most expensive to construct and operate. The transit ridership demand on Project Connect Corridors does not support the investment in this technology at this time. Page 16 of 41 Doc Control#

21 Mode Project Connect Assessment Aerial gondolas are NOT recommended for further consideration in Phase 2 of Project Connect. Autonomous vehicles will be considered for implementation through Project Connect as technology evolves to support high-capacity transit service. Aerial gondolas were found to be in operation in areas where topography (such as a water crossing or vertical incline) required an alternative to provide connections between destinations. The transportation services are frequently operated by private entities that are responsible for developing the technology. Emerging Technology Advances in autonomous bus and rail vehicle technologies are occurring rapidly. Current technological limitations and safety concerns would likely require operation in a completely separate, dedicated guideway to minimize potential vehicle conflicts. However, autonomous vehicles may offer the opportunity to stream several highcapacity vehicles for high frequency service at a minimal cost for operator staffing. Commuter, Connector, or Circulator Corridors could be operated by autonomous vehicles, if the appropriate dedicated guideway opportunities exist. Page 17 of 41 Doc Control#

22 Table 3-2: Phase 2 Mode (Technology) Assessment Results Screening Criteria Dedicated BRT Streetcar LRT HRT CRT Aerial Gondola Autonomous Vehicles Typical capital cost per mile $15M to $30M $50M to $60M $70M to $90M $150M to $200M $25 M to $35M?? Typical route length 7 to 15 miles 2 to 5 miles 5 to 15 miles 5 to 10 miles 15 to 30 miles Under 2 to 3 miles? O&M cost per revenue hour $90 to $160 $80 to $120 $150 to $360 $260 to $360 $400 to $600?? Typical weekday ridership 5,000 to 10,000 5,000 to 15,000 10,000 to 30,000 over 20,000 5,000 to 20,000 3,000 to 6,000? Past FTA CIG funding? Yes Yes Yes Yes Yes No No Time to implement (years) Relative economic development potential Average travel speed (mph) 5 to 6 6 to 8 8 to to 15 8 to 10?? $$ $$ $$$ $$$ $$$?? 20 to to to to to 50 5 to to 35 Recommended Markets (Limited) Page 18 of 41 Doc Control#

23 3.2 Connector Corridor Screening While there are three travel markets (Commuter, Connector, Circulator) that are being studied as part of Project Connect, only the Connector Corridors were screened during Phase 2. The Commuter Corridors (IH 35, Red Line, Green Line) were not subject to the Phase 2 Connector Corridor screening. The potential range of mode and guideway solutions is limited due to the existing conditions of the rail (Red and Green Lines) and interstate highway (IH 35) corridors. They will not likely be eligible for traditional FTA CIG funding opportunities due to a sub-optimal balance of cost and ridership when compared to CIG evaluation criteria thresholds, and will move towards implementation as non-cig funding is available. The exception may be the Red Line, which may be eligible to receive FTA Core Capacity capital funding as its ridership increases. The Phase 1 priority Circulator Corridors (Downtown, Red River, South Congress) were aggregated into a single Downtown Circulator corridor, with an expanded project area to cover the preliminary limits and boundaries identified in Phase 1. Project Connect was intended to support the detailed definition and evaluation of Corridors that may be competitive for CIG funding. The results of the Phase 1 initial screening indicated that it is unlikely that all 12 Connector Corridors recommended for study in Phase 2 would meet FTA funding eligibility thresholds. Consequently, a Connector Corridor screening process was defined to help prioritize the 12 Phase 2 Connector Corridors for Phase 2 detailed definition and evaluation. The Phase 2 Connector Corridors that do not serve the greatest number of riders or appear competitive for federal funding opportunities will remain in the long range high-capacity transit plan for future consideration. The CIG program is the primary mechanism by which major transit capital improvements are funded. This program, which typically awards up to 50 percent of capital funding for projects costing more than $300 million, and 70 percent of capital funding for projects costing up to $300 million, is extremely competitive. FTA uses pre-defined criteria calculated from pre-defined data sources as a means to determine which projects are likely to be the most effective use of federal money. This standardized evaluation process ensures that projects from across the country are competing on an equal playing field. While performance against FTA CIG criteria was an important element of deciding which Phase 1 Connector Corridors to advance for detailed definition and evaluation in Phase 2, community priorities must be acknowledged and incorporated into the Phase 2 initial screening. This Connector Corridor screening process was tailored to use a simplified set of proxy metrics to mimic likely performance against FTA CIG criteria and address community feedback to use more recent data and answer questions about equity and affordability. The FTA CIG criteria rely on data that are calculated within a half-mile of proposed station areas. While the screening was designed with FTA CIG criteria and thresholds in mind, the absence of defined station locations at this point in the Project Connect process meant that data outputs from the screening would not be comparable against the CIG scoring thresholds (which are based on station area, rather than corridor-level) calculations. The project team defined a series of proxy thresholds to estimate the potential performance of the Phase 2 Connector Corridors against the FTA CIG criteria. Therefore, for the purposes of this screening, data within a half-mile of Corridor areas were used instead. This approach: Utilizes existing data (from the Phase 1 analysis) Page 19 of 41 Doc Control#

24 Expedites data collection and processing for the detailed Phase 2 evaluation phase (when station locations will be identified and the same data points will be necessary for the half-mile area around stations) Positions selected Corridors for FTA CIG application(s) Addresses local concerns and issues (housing affordability, service equity, maximize ridership) The Phase 2 Connector Corridor initial screening criteria, including methodologies and data sources, are described in Sections through and are shown on Figure 3-2. Details of the thresholds and evaluation results are in Section 3.2. Figure 3-2: Phase 2 Connector Corridor Screening Criteria Corridor Ridership Income-Rent Balance Zero-Car Household Employment Population Density Current Corridor Ridership The current corridor ridership criterion was used to identify Phase 2 Connector Corridors that met a minimum ridership threshold to justify a high-capacity transit solution. Current ridership can be an effective proxy to estimate future ridership demand for a high-capacity transit investment. Methodology The current Corridor ridership estimates were calculated during Phase 1. The total number of boardings and alightings for each stop or station along the Connector Corridors was averaged to calculate the average daily weekday boarding. The average daily weekday boardings were then summed for all stops or stations along each Corridor to generate a measure of total ridership activity. The threshold for this criterion was set at 5,000, which is higher than the 3,000 rider threshold established by FTA. The Phase 2 Connector Corridor screening was performed at the corridor rather than station area level. The higher threshold reflects the comparatively larger geography used for this screening. Data Sources Phase 1 Corridor evaluation Income-Rent Balance The income-rent balance criterion was used as a proxy to determine general housing affordability by calculating rent as a percentage of household income. The federal government defines households spending 30 percent or more of their income on rent as cost-burdened. Corridors with high percentages of cost-burdened households have less income for other expenses, including transportation, which makes them more likely to use transit (versus owning a car). Additionally, the FTA CIG evaluation process awards higher scores to projects that serve transit-dependent populations and that have station Page 20 of 41 Doc Control#

25 areas with a high proportion of legally-binding affordable housing units. The income-rent balance criterion was used as a proxy to address the issues related to affordable housing in a particular Corridor. Methodology United States Census American Community Survey (ACS) data were used to identify households spending 30 percent or more of their income on rent. The data were clipped to a half-mile buffer around each Corridor. The density of households within a half-mile buffer of the corridor that are spending 30 percent or more of their income on rent was calculated using the following formula: Percentage = (Total households spending 30 percent of their Income on rent/total households)*100 It was assumed for purposes of clipping the data to the Corridor buffer that density was evenly distributed within the Census block group. The final Corridor percentage was calculated using the percentage of each block group that fell within a Corridor. This method mitigates over-representation of the block groups that are partially included in the Corridor buffer. A threshold of 50 percent of total households was used to evaluate each Corridor. Data Sources ACS (2014) Zero-Car Households The zero-car household criterion was used to identify households without access to a vehicle, which is a proxy for transit-dependent riders, as defined by FTA. FTA provides extra points in its ridership evaluation guidelines for zero-car households. Zero-car households tend to rely on transit to meet their daily mobility needs (which drives system ridership and expands residents access to opportunity), so sensitivity to the location of these households can result in a more equitable distribution of transit capital investment. Methodology ACS data were used to identify zero-car households; the data were clipped to a half-mile buffer around each Corridor. It was assumed for purposes of clipping the data to the Corridor buffer that the number of zero-car households was evenly distributed within the Census block group. The final Corridor total was calculated using the percentage of each block group that fell within a Corridor. This method mitigates over-representation of the block groups that are partially included in the Corridor buffer. The threshold considered while evaluating this criterion was 1,500 households within the Corridor, based on the Project Connect team s professional judgement. Data Sources ACS (2014) Corridor Employment Higher levels of employment within Corridors generally correspond to higher ridership; this is also a key rating factor used by FTA when evaluating projects for CIG funding. Page 21 of 41 Doc Control#

26 Methodology CAMPO s 2015 projections (based on CAMPO s 2010 Regional Model) were used to identify the number of jobs; the data were clipped to a half-mile buffer around each Corridor. It was assumed for purposes of clipping the data to the Corridor buffer that jobs were evenly distributed within the traffic analysis zone (TAZ). The final Corridor total was calculated using the percentage of each TAZ that fell within a Corridor. This method mitigates over-representation of the TAZs that are partially included in the Corridor buffer. A threshold of 50,000 was set. This is used as a proxy for the 70,000 suggested by FTA in their policy guideline for evaluating a project for the CIG program. Data Sources Number of jobs reported for 2015 obtained from CAMPO in August Corridor Population Density High population density within Corridors generally corresponds to higher ridership; this is also a key rating factor used by FTA when evaluating projects for CIG funding. Methodology CAMPO s 2015 projections (based on CAMPO s 2010 Regional Model) were used to identify the number of residents; the data were clipped to a half-mile buffer around each Corridor. Population density was calculated using the following formula: Population density = Existing population with a corridor/area (square mile) of the Corridor It was assumed for purposes of clipping the data to the Corridor buffer that density was evenly distributed within the TAZ. The final Corridor percentage was calculated using the percentage of each TAZ that fell within a Corridor. This method mitigates over-representation of the TAZs that are partially included in the Corridor buffer. Based on the population density within each Corridor, a threshold of 5,000 people per square mile was used as a proxy for the 5,760 people/square mile threshold used by the FTA CIG program. Data Sources Population counts reported for 2015 obtained from CAMPO in August Local Project Coordination This criterion identifies the percentage of overlap between Mobility Bond Corridors (CoA) and the Tier 1 Corridors (Project Connect). This criterion helps to identify opportunities for collaboration on similar mobility improvement initiatives being conducted by different agencies on Connector Corridors in Austin. Local Project Coordination was not factored into the final screening recommendations for Connector Corridors, however, as both initiatives are still in the process of defining the final scope of potentially overlapping projects. Page 22 of 41 Doc Control#

27 Methodology The percentage of overlap between Mobility Bond Corridors and the Tier 1 Corridors was calculated using the following formula: Percentage of overlap = (length of mobility bond shared with Tier 1/length of the Tier 1 corridor) Data Sources 2016 mobility bond data obtained from the City of Austin Downtown Segment (#99) When comparing initial Phase 2 screening results, it was observed that a direct connection to the employment and activity centers in the downtown Austin core significantly impacted the performance of Connector Corridors. When comparing the independent utility of Phase 2 Connector Corridors, the Phase 1 boundaries of the S. Lamar, MLK Jr., Manor/Dean Keeton, Congress, and Riverside Corridors did not connect to the downtown Central Business District (CBD) area. However, they all terminated within a half-mile of the CBD and major destinations. If any of these corridors were recommended by Project Connect for implementation, they would be designed to provide a direct connection to the downtown core. To avoid negatively skewing the performance of these five corridors based on Phase 1 boundaries that do not include access to the downtown core, a new corridor-segment extension (segment #99) connecting the CBD area (between W. Cesar Chavez and W. MLK Jr.) was created (see Figure 3-3). The analysis assumed any high capacity transit corridor would logically tie into the Guadalupe-Lavaca transit priority spine and connect the Corridors directly to the downtown core; therefore, the demographic and development information calculated within a half-mile of segment #99 were added (or aggregated) to the data generated for the five Phase 1 Connector Corridors. A direct connection to downtown Austin was not assumed for the Airport, Oltorf, Pleasant Valley, or 45 th / Burnet Corridors, as these Corridors do not terminate within a half-mile of the CBD. Page 23 of 41 Doc Control#

28 Figure 3-3: Downtown Austin Connector Corridor Segment # Connector Corridor Screening Results Phase 1 Connector Corridors were evaluated against the five proxy screening metrics representing FTA CIG evaluation criteria and public feedback regarding affordability/equity (see Table 3-3). A point-based scale was used to represent the Corridor s performance in meeting the proxy thresholds established by the project team. Points Investment Corridor Performance 1 Corridor exceeds metric threshold 0.5 Corridor approaches metric threshold 0 Corridor does not exceed metric threshold The cumulative points for each Connector Corridor ranged from 1 to the maximum score of 5. Based on this distribution, the project team identified six Competitive Corridors scoring between 4 and 5 points, showing high potential to qualify for CIG funding opportunities: S. Lamar N. Lamar/Guadalupe MLK Jr. Highland/Red River/Trinity Manor/Dean Keeton Riverside Page 24 of 41 Doc Control#

29 Additionally, the Congress and 7 th /Lake Austin corridors scored between 3.5 and 4 points, showing that they may also have potential to qualify, and were considered as Competitive Corridors. All eight Competitive Corridors will be considered in the Phase 2 development of detailed alternative solutions. The remaining four corridors (Airport, Oltorf, Pleasant Valley, and 45 th /Burnet) will remain in the Project Connect long-range system plan as Illustrative Corridors for consideration during future plan updates or should additional funding become available. To identify potential opportunities for coordinating capital improvements with CMTA s partner agency, City of Austin, Table 3-3 also includes the length of the connector corridor (by percentage) that overlaps with the limits of proposed roadway improvements funded by the 2016 Austin Mobility Bond. Page 25 of 41 Doc Control#

30 Table 3-3: Phase 2 Connector Corridor Screening Results FTA (CIG) Medium: N/A N/A N/A 70,000 5,760 Project Connect Threshold: 5,000 1,500 50% 50,000 5,000 ID Investment Corridor Name Existing + Downtown Ridership Pts Zero-Car Households (2014 ACS) Pts % HH with rent over 30% of HH income Pts CAMPO year 2015 Employment Pts CAMPO year 2015 Population Density Pts Mobility Bond % overlap Overall Score Level 1? 3 7th/Lake Austin 4, , % 1 76, , % 3.5 Maybe 7 Airport Blvd 1, , % 1 26, , % 2.5 No 10 Congress 10, , % 0 97, , % 4 Maybe 11 S Lamar 9, , % 1 94, , % 4.5 Yes 12 N Lamar/Guadalupe 17, , % 1 126, , % 5 Yes 13 MLK Jr. 9, , % 1 121, , % 4.5 Yes 14 Oltorf 3, , % 1 10, , % 2.5 No 15 Pleasant Valley 3, , % 1 9, , % 3 No 16 Highland/Red River/ Trinity 7, , % 1 111, , % 4.5 Yes 17 Manor/Dean Keeton 16, , % 1 108, , % 5 Yes 18 Riverside 10, , % 1 103, , % 5 Yes 19 45th/Burnet 1, , % , , % 1 No Page 26 of 41 Doc Control#

31 4. Phase 2 Enhancement Project Screening Methodology Enhancement Projects represent various service (operational), infrastructure and technology components that support the existing MetroRail, MetroRapid, MetroExpress, and Mobility Hub highcapacity transit services. Service (Operational) Infrastructure Technology The Phase 2 Enhancement Project screening methodology included two primary objectives: System compatibility assessment of all Phase 2 Enhancement Projects that may be adjacent to (or overlapping with) other programmed capital projects and may require further coordination Gap analysis of public input received through Phase 1 survey responses to update the scope of Phase 1 Enhancement Project recommendations and identify additional Enhancement Projects to support the existing MetroRail, MetroRapid, MetroExpress, and Mobility Hubs Table 4-1 lists the Enhancement Projects recommended for advancement as a result of the Phase 1 evaluation and approved by the CMTA Board of Directors. MetroRail ML 1 ML 2 ML 4 MetroRapid MD 5 MD 6 MD 8 MD 9 Table 4-1: Phase 1 Enhancement Project Recommendations Rail Station Capacity Projects Passing Sidings Highland Station Relocation Enhancement Project S 1st St Bridge Transit priority treatments Guadalupe St (southbound)/lavaca St (northbound) - Extend existing Transit Priority Lanes W. MLK Jr Blvd (Guadalupe/Lavaca) - Intersection upgrades Guadalupe St (southbound)/lavaca St (northbound) - Activate Transit Signal Priority MD 10 N. Lamar Blvd (Crestview) - Intersection upgrades and traffic signal improvements MetroExpress ME 2 ME 7 W. 5th St & W. Cesar Chavez (Mopac to Guadalupe) transit priority treatments US 183 North - Express Lane operations Mobility Hubs MH 1 W 4th St (Downtown MetroRail Station) MH 2 MH 3 MH 4 W 4th St (Republic Square) W 4th Street Crestview Page 27 of 41 Doc Control#

32 MH 6 MH 7 MH 8 MH 9 MH 10 Enhancement Project Tech Ridge Park n Ride Lakeline Station Howard Park n Ride North Lamar Transit Center Westgate Transit Center 4.1 Enhancement Project Gap Analysis Overview The public survey conducted during Phase 1 allowed members of the community to provide feedback on the perceived challenges of using existing high-capacity transit services (MetroRail, MetroRapid, MetroExpress, or Mobility Hub). Responders provided comments on specific stations of the existing services and general remarks related to an overall high-capacity transit service type. All public comments received during the Phase 1 process were analyzed and matched to a potential Enhancement Project, if possible. Comments that did not directly associate to a Phase 1 Enhancement Project were categorized by service type (MetroRail, MetroRapid, MetroExpress, or Mobility Hub), and linked with a specific station for inclusion in the gap analysis process. This process was designed to filter miscellaneous comments and to sort them into smaller subgroups to establish data trends. Generally, there were three types of comments: Comments that were related to a specified Phase 1 Enhancement Project, including those that recommended an improvement that was addressed by the Phase 1 project description Comments that were related to an existing high-capacity transit service type, but were systemwide and could not be correlated to a specific location or Phase 1 Enhancement Project Comments that did not relate to Phase 1 Enhancement Projects or existing high-capacity transit services Figure 4-1 shows the summary of Phase 1 survey responses factored into the gap analysis. The majority of comments identified constraints or challenges to the high-capacity transit accessibility, connecting facilities and/or ride quality (A-C-R). To use this public input to inform the development and definition of Phase 2 alternatives, the project team developed categories of S-I-T enhancements to track trends in potential solutions. Page 28 of 41 Doc Control#

33 Figure 4-1: Enhancement Project Gap Analysis Summary Phase 1 Survey Results The station locations most frequently identified by responders are shown in Table 4-2 (by Access, Connect, Ride issues) and Table 4-3 (by S-I-T solutions). Howard Station received the highest number of responses (84). Kramer Station, North Lamar Transit Center, and Crestview Station each received approximately 50 responses. Of the priority locations with the most responses, all had related Enhancement Projects, with the exception of MLK Jr. (Red Line), Plaza Saltillo (Red Line), Chinatown (801), and Oak Hill Park n Ride (MetroExpress). Chinatown and Oak Hill received a number of comments related to bicycle and pedestrian access, insufficient station amenities, and last-mile connectivity. These issues will continue to be addressed during the remainder of Phase 2. Full discussion of Phase 1 survey results and recommendations are documented within the Phase 1 Enhancement Project Survey Results memorandum (August 2017). Note that while the majority of the MetroRapid and MetroRail Enhancement Projects proposed in Phase 1 were operational improvements (i.e., travel time, capacity, reliability), several individual stations were identified as potential Mobility Hubs. As the public survey allowed users to provide feedback on issues Page 29 of 41 Doc Control#

34 with existing high-capacity transit stations, a high number of Mobility Hubs and several specific stations moved forward into Phase 2. Table 4-2: Most A-C-R Responses (by Location) Location # of Selections % of Total (1,599) * Howard (Red Line, Park & Ride) * Kramer (Red Line) * North Lamar Transit Center (801, Park & Ride) * Crestview (801, Red Line) * Lakeline (Red Line, Park & Ride) MLK Jr. (Red Line) * Southpark Meadows (801, Park & Ride) * Domain (803) * Republic Square (801, 803) * Downtown (Red Line) * Tech Ridge (801, Park & Ride) Plaza Saltillo (Red Line) Chinatown (801) Oak Hill (Park & Ride) *UT West Mall (801, 803) *Westgate (803) *Austin History Center (801, 803) *Highland (Red Line) *Rundberg (801) *South Congress Transit Center (801, Park & Ride) *UT Dean Keeton (801, 803) Total * Phase 1 Enhancement Project location Table 4-3: Most S-I-T Responses (by Location) Location # of Selections % of Total (1,088) *Howard (Red Line, Park & Ride) *Kramer (Red Line) *North Lamar Transit Center (801, Park & Ride) *Crestview (801, Red Line) MLK Jr. (Red Line) *Lakeline (Red Line, Park & Ride) *Republic Square (801, 803) *UT West Mall (801, 803) Austin History Center (801, 803) Page 30 of 41 Doc Control#

35 Location # of Selections % of Total (1,088) *Domain (803) *Downtown (Red Line) Chinatown (801) Capitol (801, 803) Westgate (803) *Rundberg (801) *South Congress Transit Center (801, Park & Ride) Total * Phase 1 Enhancement Project location Of the responders who did not identify a specific station for improvement, the majority identified issues for improvement regarding the MetroRail service. Many of these comments were related to operating frequency and hours of service. Frequency related comments were assumed to relate to Project ML 2 (Passing Sidings). MetroRapid also had a significant number of non-location-specific comments (121), many of which were related to redesigned station canopies and additional benches at stops. MetroExpress comments typically called for improved park and ride facilities, regional expansion of the service, and improved frequency. The breakdown of non-location-specific responses by each service type is shown in Table 4-4 and Table 4-5. Table 4-4: Most A-C-R Comments (Non-Location-Specific, by Service Type) No Location Specified # of Selections % of Total (1,599) MetroRail MetroRapid MetroExpress No location or service type specified Mobility Hubs Total non-location-specific Table 4-5: Most S-I-T Comments (Non-Location-Specific, by Service Type) No Location Specified # of Selections % of Total (1,088) MetroRail MetroRapid MetroExpress No location or service type specified Mobility Hubs Total non-location-specific Enhancement Project Gap Analysis Recommendations The Phase 1 survey results provided valuable insight into gaps in identifying the Phase 1 Enhancement Projects related to the A-C-R qualities of the existing high-capacity transit services. After prioritizing the Page 31 of 41 Doc Control#

36 locations with the highest response in the Phase 1 survey, modifications were made to the list of Phase 1 Enhancement Projects: For the locations not considered in the Phase 1 evaluation, new Enhancement Projects were created based on the S-I-T categories most commonly identified. New systemwide projects were added for MetroRail and MetroRapid services based on the most non-location-based S-I-T responses. The proposed scope of those enhancements was refined to address the identified priority issues using survey feedback on locations aligned with Phase 1 Enhancement Projects. Improvements, such as pedestrian and bicycle safety, first/last mile circulation, and a greater frequency of service, were prominent themes and have been added to the list of Phase 1 Enhancement Project improvements. The refinements and new Enhancement Projects recommended for detailed definition and evaluation in Phase 2 are shown in Table 4-6. Table 4-6: Enhancement Project Gap Analysis Recommendations Enhancement Project Phase 1 --Tier 1 Project (Y/N) Gap Analysis Recommendations MetroRail (Systemwide) -- Extend service area, hours of operation, and increase frequency Plaza Saltillo station N Pedestrian and bicycle safety and accessibility MLK Jr. station N Improve first/last mile circulation and multimodal connections Pedestrian and bicycle safety and accessibility Howard park n ride (MH 8) Y Additional park and ride facilities Kramer station (MH 16) Y Additional park and ride facilities Lakeline station (MH 7) Y Additional park and ride facilities MetroRapid (Systemwide) -- Extend transit priority lanes, where possible Chinatown station N Pedestrian and bicycle safety and accessibility Potential station relocation Capitol station N Westgate station N Realign service to new Westgate Transit Center UT West Mall and Dean Keaton stations Rundberg (MH 21) MetroExpress (systemwide) -- Mobility Hubs (systemwide) -- Oak Hill (Park and Ride) N Y N Expand MetroExpress service and develop a regional park and ride system Placemaking for TNCs and policy for integrating them at Mobility Hubs Fixed route transit service modifications to serve hubs Improve first/last mile circulation and multimodal connections Page 32 of 41 Doc Control#

37 Enhancement Project Crestview (MH 4) Phase 1 --Tier 1 Project (Y/N) Y Gap Analysis Recommendations Additional park and ride facilities Explore adjacent Transit Oriented Development opportunities The Domain (MH 5, 23) Y Additional park and ride facilities Republic Square (MH 2) Y Improve first/last mile circulation and multimodal connections Tech Ridge Park n Ride (MH 6) Y Additional park n ride facilities Improvements to service frequency and site operations *Note: Howard and Lakeline park and ride expansions were in the construction phase at the time of the survey. 4.2 Enhancement Project Phase 2 Initial Screening Results The results of the Phase 2 initial screening process resulted in identification of additional service, infrastructure, and technology enhancement needs to the Phase 1 recommendations, and new gap analysis projects to address community concerns at existing high-capacity transit station locations. Figure 4-2 through Figure 4-5 show the complete list of projects that were analyzed in Phase 2 projects that were a result of Phase 1 and projects that moved forward due to the gap analysis process - and a map of their locations. Page 33 of 41 Doc Control#

38 Project Connect 1/16/2018 Figure 4-2: Phase 2 MetroExpress Enhancement Projects Page 34 of 41 Doc Control#

39 Figure 4-3: Phase 2 MetroRail Enhancement Projects Page 35 of 41 Doc Control#

40 Project Connect 1/16/2018 Figure 4-4: Phase 2 MetroRapid Enhancement Projects Page 36 of 41 Doc Control#

41 Project Connect 1/16/2018 Figure 4-5: Phase 2 Mobility Hubs Enhancement Projects Page 37 of 41 Doc Control#

42 5. Next Steps: Phase 2 Detailed Definition of Alternatives The priority Investment Corridors and Enhancement Projects identified by this Phase 2 initial screening process will require further refinement in order to begin selecting LPAs at the conclusion of Phase 2 and into Phase 3. Investment Corridors: Specific potential high-capacity transit solutions (alternatives) for the priority Commuter, Connector, and Circulator corridors will be defined during the remainder of Phase 2. The alternatives will be defined by alignment (routing), dedicated guideway, mode (vehicle technology), and service operating options to support the evaluation of costs, benefits, and community support. Enhancement Projects: The priority Enhancement Projects identified at the conclusion of Phase 1 will be defined during the remainder of Phase 2 by combining S-I-T components to best address issues related to A-C-R. 5.1 Partner Projects and Initiatives CMTA understands that the successful development and operation of a regional high-capacity transit system will require cooperation and participation from many regional partners. While Phase 1 identified potential Project and Corridors based on recommendations / definitions from previously adopted transportation plans and studies, it did not reflect ongoing planning processes, policy directives and capital programs that may inform and influence the development of Alternative solutions going forward in Phase 2. Table 5-1 identifies ongoing transportation studies and initiatives that may affect the Alternatives defined during the remainder of Phase 2. These concurrent initiatives may be independent of CMTA or undertaken in cooperation with other regional transportation authorities. Austin Strategic Mobility Plan Table 5-1: Regional Transportation Partners and Coordinated Planning Initiatives Study/Planning Initiative Participating Agency(ies) City of Austin 2016 Mobility Bond Program City of Austin Transit Priority Working Group Code Next All Ages and Abilities Active Transportation Plan Regional Express Bus / Park and Ride Program Travis County Transportation Plan Mobility 35 CAMPO Region Transportation Improvement Plan (TIP) Austin Downtown Parking Strategy City of Austin City of Austin City of Austin CTRMA Travis County TxDOT CAMPO Downtown Austin Alliance The project team understands that coordination with these complementary efforts will help move Project Connect recommendations towards implementation, so will continue to work with Project Connect partner agencies throughout Phase 2 and beyond. Page 38 of 41 Doc Control#

43 5.2 Investment Corridor Alignment and Logical Termini Options When developing the detailed definitions of Connector Corridors, selecting the potential alignments and end of line (terminus) stations is a priority. Understanding the existing conditions of the roadways and ability to support dedicated transit guideway investment is critical to developing implementable alternatives. Phase 1 Connector Corridor alignments were limited to the study Focus Area, which is bounded by US 183, MoPac and SH 71/Ben White Boulevard. However, the final alignment of the proposed Alternatives may extend beyond these boundaries to reach the areas of employment and/or residential concentration that are able to support high-capacity transit service. Specific routing options for Connector Corridors, that use parallel streets in areas with constrained conditions, may also be considered and carried forward through the selection of LPAs and Preliminary Engineering. The Phase 2 termini of some Connector Corridors may be designed to also allow future expansion in more than one direction (branches serving eastern and/or western destinations from a north/south alignment). Potential end points (termini) and/or branch alignment options for priority Connector Corridors will be considered based on: Concentrations of population and employment outside of the study Focus Area Major intersections that may support transit oriented development (TOD) opportunities or a large park-and-ride facility Accessibility to connecting arterials or highways and connectivity to Mobility Hubs Existing terminal point of transit services operating along the Corridor Table 5-2 and Figure 5-1 illustrate the Phase 2 Priority and Illustrative Connector Corridors and potential alignment extensions and terminal stations for consideration in the Phase 2 detailed definition of alternatives. Corridor Name Priority (Y/N) Table 5-2: Potential Phase 2 Connector Corridor Extension Options Phase 1 Phase 2 From To Extension Option 1 Extension Option 2 7th/Lake Austin Y Red Bud Tr US Congress Y Riverside Dr S Lamar Y Riverside Dr US 290/SH 71 US 290/SH 71 Slaughter Ln (S Park Meadows) FM 1826/ACC Pinnacle (via US 290 W) -- Slaughter Ln (via Manchaca) N Lamar/ Howard Dr Esperanza Crossing Y Riverside Dr US 183 Guadalupe (Tech Ridge) (The Domain) MLK Jr. Y Guadalupe St US 183 Decker Lane -- Highland/Red River / Trinity Y East 4 th St ACC Highland Mall North Airport Parmer (via Dessau/Cameron) Page 39 of 41 Doc Control#

44 Corridor Name Manor/ Dean Keeton Priority (Y/N) Phase 1 Phase 2 From To Extension Option 1 Extension Option 2 Y Guadalupe St US 183 Center Delco Center Travis County Expo (via Loyola) Austin Bergstrom Int l Airport (ABIA) -- Riverside Y S 1 st St SH 71 Airport N N Lamar Blvd US 183 Oltorf N S Lamar Blvd S Pleasant Valley Rd Pleasant Valley N Airport Blvd E Oltorf St Austin Bergstrom Int l Airport (ABIA) William Cannon at Salt Springs 45th/Burnet N Guadalupe St US 183 The Domain -- - Multiple routing options available -- Page 40 of 41 Doc Control#

45 Figure 5-1: Phase 2 Connector Corridors and Possible Extensions Page 41 of 41 Doc Control#

Green Line Long-Term Investments

Green Line Long-Term Investments Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail MetroExpress Connectors Circulators Project Connect

More information

A Transit Plan for the Future. Draft Network Plan

A Transit Plan for the Future. Draft Network Plan A Transit Plan for the Future Draft Network Plan Project Overview and Status Completed Market Analysis and Service Evaluation. Developed Plan Framework and Guiding Principles. Developed a draft Five Year

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program

More information

Needs and Community Characteristics

Needs and Community Characteristics Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by

More information

CEDAR AVENUE TRANSITWAY Implementation Plan Update

CEDAR AVENUE TRANSITWAY Implementation Plan Update CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,

More information

Proposed Program of Interrelated Projects

Proposed Program of Interrelated Projects DALLAS AREA RAPID TRANSIT Proposed Program of Interrelated Projects Federal Transit Administration Capital Investment Program Summer 204 INTRODUCTION The current federal transportation bill, Moving Ahead

More information

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

Draft Results and Open House

Draft Results and Open House Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi

More information

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY

More information

TEXAS CITY PARK & RIDE RIDERSHIP ANALYSIS

TEXAS CITY PARK & RIDE RIDERSHIP ANALYSIS TEXAS CITY PARK & RIDE RIDERSHIP ANALYSIS This document reviews the methodologies and tools used to calculate the projected ridership and parking space needs from the proposed Texas City Park & Ride to

More information

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master

More information

The Engineering Department recommends Council receive this report for information.

The Engineering Department recommends Council receive this report for information. CORPORATE REPORT NO: R161 COUNCIL DATE: July 23, 2018 REGULAR COUNCIL TO: Mayor & Council DATE: July 19, 2018 FROM: General Manager, Engineering FILE: 8740-01 SUBJECT: Surrey Long-Range Rapid Transit Vision

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018 UTA Transportation Equity Study and Staff Analysis Board Workshop January 6, 2018 1 Executive Summary UTA ranks DART 6 th out of top 20 Transit Agencies in the country for ridership. UTA Study confirms

More information

Overview of Transit Funding and Planning in the PACTS Region

Overview of Transit Funding and Planning in the PACTS Region Overview of Transit Funding and Planning in the PACTS Region Presentation to PACTS Transit Committee and Federal Transit Administration Representatives February 8, 2018 Transit Agencies Agency Communities

More information

Draft Results and Recommendations

Draft Results and Recommendations Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System

More information

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014 Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and

More information

MetroExpress Improvements

MetroExpress Improvements Improvements Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail Commuters Connectors Circulators Project

More information

TRAVEL DEMAND FORECASTS

TRAVEL DEMAND FORECASTS Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) TRAVEL DEMAND FORECASTS A. Introduction 1. The purpose of the travel demand forecasts is to assess the impact of the project components

More information

Tier 2 Screening and Selection522. of the Short List Alternatives KISSIMMEE CORRIDOR. Downtown CRA. US 192 Alternatives Analysis

Tier 2 Screening and Selection522. of the Short List Alternatives KISSIMMEE CORRIDOR. Downtown CRA. US 192 Alternatives Analysis LAKE COUNTY ORANGE COUNTY Ticket and Transportation Center Walt Disney / Reedy Creek Improvement District CR 535 John Young Parkway 441 17 92 Florida s Turnpike VE 92 mee Hall JOHN YOUNG PKY 192 OAK ST

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS Michigan / Grand River Avenue TECHNICAL MEMORANDUM #18 From: URS Consultant Team To: CATA Project Staff and Technical Committee Topic:

More information

I-26 Fixed Guideway Alternatives Analysis

I-26 Fixed Guideway Alternatives Analysis I-26 Fixed Guideway Alternatives Analysis Steering & Technical Advisory Committees Joint Meeting January 15, 2016 @ 10:00 AM SC/TAC Meeting Winter 2016 Agenda I. Welcome & Introductions II. III. Project

More information

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014 Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing July 24, 2014 Project Description The Central City Line is a High Performance Transit project that will extend from Browne

More information

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration Legislative Committee on Urban Growth and Infrastructure Carolyn Flowers CEO Charlotte Area Transit System March 23, 2010 Charlotte Region

More information

Leadership NC. November 8, 2018

Leadership NC. November 8, 2018 v Leadership NC November 8, 2018 Planning for our region s growth The Triangle is one of the fastestgrowing regions in the nation. More than 2 million people are already part of the equation, and the

More information

4 COSTS AND OPERATIONS

4 COSTS AND OPERATIONS 4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this

More information

Draft Enhancement Project and Investment Corridor

Draft Enhancement Project and Investment Corridor January 2017 Draft Enhancement Project and Investment Corridor Identification Methodology This page intentionally left blank TABLE OF REVISIONS Document: Draft Enhancement Project and Investment Corridor

More information

Downtown Transit Connector. Making Transit Work for Rhode Island

Downtown Transit Connector. Making Transit Work for Rhode Island Downtown Transit Connector Making Transit Work for Rhode Island 3.17.17 Project Evolution Transit 2020 (Stakeholders identify need for better transit) Providence Core Connector Study (Streetcar project

More information

DRAFT Evaluation Scores. Transit

DRAFT Evaluation Scores. Transit DRAFT Evaluation s The criteria for evaluating applications for new funding commitments are used to measure how well they advance the six goals identified for the MTP. Through transportation: Reduce per

More information

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study Northeast Corridor Alternatives Analysis Public Involvement Round 2 Input on Alternatives for Further Study Feb. 7-9, 2012 Agenda Review project background Progress summary Recommended alternatives for

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

Public Meeting. March 21, 2013 Mimosa Elementary School

Public Meeting. March 21, 2013 Mimosa Elementary School Public Meeting March 21, 2013 Mimosa Elementary School Today s Meeting Purpose 2 Where We Are The Process What We ve Heard and Findings Transit Technologies Station Types Break-out Session Where We Are

More information

Regional Transit Extension Studies. Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013

Regional Transit Extension Studies. Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013 Regional Transit Extension Studies Hampton Roads Transportation Planning Organization Passenger Rail Task Force Meeting December 17, 2013 Topics Virginia Beach Transit Extension Study (VBTES) Naval Station

More information

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside Los Angeles County Metropolitan Transportation Authority November 2012 Connecting the San Fernando Valley and the Westside Interstate 405 Sepulveda Pass THIS PAGE INTENTIONALLY LEFT BLANK Sepulveda Pass

More information

Travel Forecasting Methodology

Travel Forecasting Methodology Travel Forecasting Methodology Introduction This technical memorandum documents the travel demand forecasting methodology used for the SH7 BRT Study. This memorandum includes discussion of the following:

More information

Making Mobility Better, Together

Making Mobility Better, Together Making Mobility Better, Together Austin Transportation Department Gordon Derr, P.E., for Robert J. Spillar, P.E Director, Austin Transportation Department 1 AUSTIN TRANSPORTATION DEPARTMENT Our Mission

More information

4.0 TIER 2 ALTERNATIVES

4.0 TIER 2 ALTERNATIVES 4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation

More information

Metro Reimagined. Project Overview October 2017

Metro Reimagined. Project Overview October 2017 Metro Reimagined Project Overview October 2017 Reimagining Metro Transit Continuing our Commitment to: Provide mobility based on existing and future needs Value the role of personal mobility in the quality

More information

KANSAS CITY STREETCAR

KANSAS CITY STREETCAR KANSAS CITY STREETCAR KAREN CLAWSON MID-AMERICA REGIONAL COUNCIL KANSAS CITY STREETCAR Regional Context Alternatives Analysis Kansas City Streetcar Project KANSAS CITY REGION KANSAS CITY REGION KANSAS

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Early Scoping Meeting for Alternatives Analysis (AA) May 17, 2011 Introduction Key players Local lead agency: Metro Federal lead agency:

More information

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] Jackson/Teton Integrated Transportation Plan 2015 Appendix I. Fixed-Guideway Transit Feasibility Jackson/Teton County Integrated Transportation Plan v2

More information

Metropolitan Council Budget Overview SFY

Metropolitan Council Budget Overview SFY Metropolitan Council Budget Overview SFY 2016-2017 H T t ti C itt House Transportation Committee February 4, 2015 Transit connects us to the places that matter Transportation Needs Grow as the Region Grows

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

The Case for. Business. investment. in Public Transportation

The Case for. Business. investment. in Public Transportation The Case for Business investment in Public Transportation Introduction Public transportation is an enterprise with expenditure of $55 billion in the United States. There has been a steady growth trend

More information

August 2, 2010 Public Meeting

August 2, 2010 Public Meeting Public Meeting LYMMO Expansion Alternatives Analysis Study Purpose of study is to provide a fresh look at potential LYMMO expansion, following Federal Transit Administration (FTA) Alternatives Analysis

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

Rapid Transit and Land-Use Integration a Reality

Rapid Transit and Land-Use Integration a Reality City of Charlotte Rapid Transit and Land-Use Integration a Reality Transportation Oversight Committee Carolyn Flowers CEO Charlotte Area Transit System April 29, 2010 Charlotte Region Statistics Mecklenburg

More information

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation

More information

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit

More information

Average Weekday Ridership for the Guadalupe- Lamar Light Rail Minimum Operable Segment by Andrew Mayer

Average Weekday Ridership for the Guadalupe- Lamar Light Rail Minimum Operable Segment by Andrew Mayer Average Weekday Ridership for the Guadalupe- Lamar Light Rail Minimum Operable Segment by Andrew Mayer 7/12/2016 DRAFT rev04b Purpose This study develops average weekday ridership estimates for four light

More information

6/11/2018. June 7, Item #1 CITIZENS PARTICIPATION

6/11/2018. June 7, Item #1 CITIZENS PARTICIPATION June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017 US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master

More information

Feasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study

Feasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study Feasibility Study Community Meeting March, 2017 1 Agenda 1. Welcome / Introductions 2. Background / Meeting Purpose 3. Progress to Date Options Evaluated Capital/Operating Costs Ridership 4. Financial

More information

RTSP Phase II Update

RTSP Phase II Update Washington Metropolitan Area Transit Authority RTSP Phase II Update Presentation to the Technical Advisory Group July 18, 2013 Meeting 1 Presentation Outline RTSP Integration with Momentum RTSP Process

More information

I-26 Fixed Guideway Alternatives Analysis

I-26 Fixed Guideway Alternatives Analysis I-26 Fixed Guideway Alternatives Analysis Public Meetings: North Charleston, January 25, 2016 Charleston: January 26, 2016 Summerville: January 28, 2016 Agenda I. Project Update II. III. IV. Screen Two

More information

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost.

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost. Policy Note Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost Recommendations 1. Saturate vanpool market before expanding other intercity

More information

Transportation Demand Management Element

Transportation Demand Management Element Transportation Demand Management Element Over the years, our reliance on the private automobile as our primary mode of transportation has grown substantially. Our dependence on the automobile is evidenced

More information

10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION

10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION October 6, 2016 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 WELCOME 2 Item #4 TRAC ROADWAY RECOMMENDATIONS UPDATE Item #4 Completed Jurisdiction Presentations Boulder City August

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014 Midtown Corridor Alternatives Analysis Policy Advisory Committee Meeting February 12, 2014 Today s Agenda Introductions Outreach efforts and survey results Other updates since last meeting Evaluation results

More information

2/1/2018. February 1, Item #1 CITIZENS PARTICIPATION

2/1/2018. February 1, Item #1 CITIZENS PARTICIPATION February 1, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

Executive Summary October 2013

Executive Summary October 2013 Executive Summary October 2013 Table of Contents Introduction... 1 Rider Transit and Regional Connectivity... 1 Plan Overview... 2 Network Overview... 2 Outreach... 3 Rider Performance... 4 Findings...

More information

The Preferred Alternative: a Vision for Growth on the Northeast Corridor

The Preferred Alternative: a Vision for Growth on the Northeast Corridor A Long-Term Vision is Needed The Preferred Alternative: a Vision for Growth on the Northeast Corridor The Federal Railroad Administration (FRA) has released the Tier 1 Final Environmental Impact Statement

More information

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Green Line LRT: Beltline Recommendation Frequently Asked Questions Green Line LRT: Beltline Recommendation Frequently Asked Questions June 2017 Quick Facts Administration has evaluated several alignment options that would connect the Green Line in the Beltline to Victoria

More information

Appendix H: Tier 2 Evaluation Methodology and Results February 2017

Appendix H: Tier 2 Evaluation Methodology and Results February 2017 Appendix H: Tier 2 Evaluation Methodology and Results February 2017 Table of Contents Overview... 1 Community Transit Priorities... 1 Tier 2 Evaluation Methodology... 2 Evaluation Corridors... 2 Modal

More information

ConnectGreaterWashington: Can the Region Grow Differently?

ConnectGreaterWashington: Can the Region Grow Differently? Washington Metropolitan Area Transit Authority ConnectGreaterWashington: Can the Region Grow Differently? Transportation Planning Board (TPB) Travel Forecasting Subcommittee July 17, 2015 1 Alternatives

More information

Frequent Service Network Proposal

Frequent Service Network Proposal Frequent Service Network Proposal Presented to Capital Metro Operations, Safety and Planning Committee January 12, 2015 1 capmetro.org Ten Actions to Grow Transit Grow Transit First and Last Mile Frequent

More information

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES TRANSIT GRADE: C- WHAT YOU SHOULD KNOW ABOUT TRANSIT FACILITIES California needs robust, flexible and reliable transit systems to reduce peak congestion on our highways, provide options for citizens who

More information

SEPULVEDA PASS CORRIDOR

SEPULVEDA PASS CORRIDOR SEPULVEDA PASS CORRIDOR PUBLIC PRIVATE PARTNERSHIP DELIVERY PRE-DEVELOPMENT AGREEMENT PDA Sepulveda Pass Mobility Issues Most congested highway segment in the U.S. 295,000 vehicles per day (2010) 430,000

More information

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA Project Development & Environment Study Broward County Intermodal Center And People Mover AASHTO Value Engineering Conference Presentation September 1, 2009 San Diego, CA Background P D & E Study Regional

More information

Light Rail Proposal. June 15, 2016 Presentation to Mayor Steve Adler

Light Rail Proposal. June 15, 2016 Presentation to Mayor Steve Adler Light Rail Proposal June 15, 2016 Presentation to Mayor Steve Adler Central Austin CDC Public Education Reach Citywide reach with posting privileges to 18,000 DL accounts Active ATXRail leadership in 27

More information

Kenosha-Racine-Milwaukee (KRM)

Kenosha-Racine-Milwaukee (KRM) Kenosha-Racine-Milwaukee (KRM) Commuter Rail #147925 November 6, 2009 1 Guidance of KRM Commuter Rail Studies Intergovernmental Partnership Technical Steering Committee Temporary and Limited Authority

More information

DART Priorities Overview

DART Priorities Overview City of Dallas Transportation and Trinity River Project Committee DART Priorities Overview Gary C. Thomas President/Executive Director August 10, 2015 City of Dallas Transportation & Trinity River Committee

More information

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps PEACHTREE CORRIDOR PARTNERSHIP Current Status & Next Steps PEACHTREE CORRIDOR PARTNERSHIP Why Peachtree? Why Now? I. THE CONTEXT High Level View of Phasing Discussion Potential Ridership Segment 3 Ease

More information

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY EXECUTIVE SUMMARY The purpose of this report is to document the results of the Tier 1 and Tier 2 Screening of alternatives for the I-20 East Transit Initiative. The two-tier screening process presented

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

West Broadway Transit Study. Community Advisory Committee September 17, 2015

West Broadway Transit Study. Community Advisory Committee September 17, 2015 West Broadway Transit Study Community Advisory Committee September 17, 2015 Introductions Community Engagement Summer Outreach Fall Outreach Technical Analysis Process Update Alternatives Review Economic

More information

METRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only

METRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only METRONext Vision & Moving Forward Plans Board Workshop December 11, 2018 Disclaimer This presentation is being provided solely for discussion purposes by the Board of Directors of the Metropolitan Transit

More information

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis High Speed Intercity Passenger Rail Technical Appendix Prepared by HDR August 5, 2010 The Boston South Station HSIPR Expansion Project

More information

The Screening and Selection of Regionally Significant Projects

The Screening and Selection of Regionally Significant Projects The Screening and Selection of Regionally Significant Projects UTC 2018 Seminar Series March 15, 2018 Claire Bozic Martin Menninger ON TO 2050 CMAP is the Region s MPO, seven county region Land use and

More information

CITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan

CITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan Date: Wednesday, June 24, 2014 Location: Ann Arbor District Library Attendees: 40 citizen attendees Ann Arbor Station Environmental Review Public Meeting Meeting Notes Meeting #2 The second public meeting

More information

Parking Management Element

Parking Management Element Parking Management Element The State Transportation Planning Rule, adopted in 1991, requires that the Metropolitan Planning Organization (MPO) area implement, through its member jurisdictions, a parking

More information

Mass Transit in Charlotte and San Antonio. Keith T. Parker, AICP

Mass Transit in Charlotte and San Antonio. Keith T. Parker, AICP Mass Transit in Charlotte and San Antonio Keith T. Parker, AICP President/CEO Presentation Overview Charlotte Agency and Customer Profile San Antonio Agency and Customer Profile Attracting New Customers

More information

TIER TWO SCREENING REPORT

TIER TWO SCREENING REPORT TIER TWO SCREENING REPORT November 2012 Parsons Brinckerhoff DRAFT November 2012 1 Parsons Brinckerhoff DRAFT November 2012-2 TABLE OF CONTENTS Table of Contents...3 List of Tables...4 List of Figures...5

More information

2030 Multimodal Transportation Study

2030 Multimodal Transportation Study 2030 Multimodal Transportation Study City of Jacksonville Planning and Development Department Prepared by Ghyabi & Associates April 29,2010 Introduction Presentation Components 1. Study Basis 2. Study

More information

RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation Trust

RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation Trust May 24, 2018 Oklahoma Department of Environmental Quality Air Quality Division P.O. Box 1677 Oklahoma City, OK 73101-1677 RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation

More information

Sales and Use Transportation Tax Implementation Plan

Sales and Use Transportation Tax Implementation Plan Sales and Use Transportation Tax Implementation Plan Transportation is more than just a way of getting from here to there. Reliable, safe transportation is necessary for commerce, economic development,

More information

Executive Summary. Phase 2 Evaluation Report. Introduction

Executive Summary. Phase 2 Evaluation Report. Introduction , Executive Summary Executive Summary Introduction TransLink and the Province of British Columbia sponsored a multi-phase study to evaluate alternatives for rapid transit service in the Broadway corridor

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Travel Time Savings Memorandum

Travel Time Savings Memorandum 04-05-2018 TABLE OF CONTENTS 1 Background 3 Methodology 3 Inputs and Calculation 3 Assumptions 4 Light Rail Transit (LRT) Travel Times 5 Auto Travel Times 5 Bus Travel Times 6 Findings 7 Generalized Cost

More information

Tempe Streetcar. March 2, 2016

Tempe Streetcar. March 2, 2016 Tempe Streetcar March 2, 2016 Tempe Profile 40 sq. miles, highest density in state University Town, center of region Imposed growth boundaries (density increase) Mixed use growth/intensifying land use

More information

Rocky Mountain. Corridor Input Team. Alternatives Overview. TEMS, Inc. / Quandel Consultants, LLC TEMS, Inc. / Quandel Consultants, LLC

Rocky Mountain. Corridor Input Team. Alternatives Overview. TEMS, Inc. / Quandel Consultants, LLC TEMS, Inc. / Quandel Consultants, LLC Rocky Mountain Rail Authority (RMRA) Corridor Input Team Meeting #2 Alternatives Overview December 2008 TEMS, Inc. / Quandel Consultants, LLC 0 Agenda Introductions Study Overview Alternatives Overview

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

Tier 3 Screening and Selection. of the Recommended Alternative KISSIMMEE CORRIDOR. June Downtown CRA. US 192 Alternatives Analysis

Tier 3 Screening and Selection. of the Recommended Alternative KISSIMMEE CORRIDOR. June Downtown CRA. US 192 Alternatives Analysis LAKE COUNTY ORANGE COUNTY Ticket and Transportation Center Walt Disney / Reedy Creek Improvement District CR 535 John Young Parkway 441 17 92 Florida s Turnpike VE 92 mee Hall JOHN YOUNG PKY 192 OAK ST

More information

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1 Snelling Bus Rapid Transit May 13, 2013 Technical Advisory Committee Meeting #1 1 Today s meeting TAC Introductions Project Overview Arterial BRT Concept Background Snelling Corridor Plan, Funding & Schedule

More information