COBB COUNTY DEPARTMENT OF TRANSPORTATION
|
|
- Owen Stevenson
- 5 years ago
- Views:
Transcription
1
2 OBB OUNTY EPTMENT OF TRANPORTATION PROJET ERIPTION I-75 at Third Army Road Interchange P.I. No ; obb, Bartow, and Paulding ounties March 28, 2013 The proposed project would construct a new, limited access roadway from existing abbs Bridge Road in Paulding ounty, through obb and Bartow counties, to a new interchange with I-75 (see Project Location Map). The proposed new interchange with I-75 would be located approximately halfway between the I-75 bridges over Joe tella rive on the north side and the I-75 bridges over Lake Allatoona on the south side. The new, limited access roadway would consist of two to three lanes in each direction with a 24-foot, raised median, and would be parallel to and just north of existing Third Army Road, and would be grade-separated over Old Georgia 293/North Main treet. The new roadway would tie into U /obb Parkway via a new, gradeseparated intersection, with interchange-type ramps provided to and from U /obb Parkway. Between U /obb Parkway and I-75, the length of the proposed new road would be approximately 0.86 mile. To the west of U, the proposed project would also include the relocation of abbs Bridge Road/Black Acre Trail beginning at the Paulding/Bartow ounty line through to tie into the new grade-separated intersection at U /obb Parkway. The existing Third Army Road would remain to facilitate local access to the existing residential properties in the area. Two alternatives are currently under consideration for the alignment of the proposed new location roadway and the location of the tie-in at U /obb Parkway: Under Alternative A, the new location roadway would run parallel to and north of existing Third Army Road, and would tie into U /obb Parkway approximately halfway between the intersections of U /obb Parkway with Kelli lark Road and existing Third Army Road. Rutledge Road would be relocated to the north to intersect with the new location roadway and to form a new intersection with Kelli lark Road at U /obb Parkway. Under Alternative B, the new location roadway would tie into U /obb Parkway at the approximate location of the existing Third Army Road/Black Acre Trail intersection with U /obb Parkway. As such, existing Third Army Road would be relocated north, passing underneath the new location road, to intersect with U /obb Parkway approximately 650 feet north of its existing intersection. Mcoy Road would tie into the relocated existing Third Army Road. In addition, the proposed project would require improvements to side roads in the area including: The widening of U /obb Parkway to six lanes between the new Third Army Road and R 92 (north section), for approximately 1.5 miles; A realignment of Rutledge rive; Intersection improvements at the intersections of U /obb Parkway with edarcrest Road and with R 92; and Improvements to the Kelli lark ourt intersection.
3 ATE-75 INTERT 2 IA RG EO G 93. U. LA JOE L TE R ANTOWN R INTERTATE-75 R ER LV R LE R R T E Bartow ounty IR I I R BR ABB KELLI LK T IR R ORGIA 293 RUT Mc O Y R P PE LOO PKWY R AWT HWY R WO RN OR A TR E R VE A LL GO HR HUR EY A U.. OBB Paulding ounty HOR OGLET E TOWNE R U. HWY. 92. Project Location Map - Alternative A Interstate 75 at Third Army Road Interchange GOT Project No. HPP (322) P.I. No Bartow, obb and Paulding ounties, Georgia Proposed Project Location
4 ATE-75 INTERT 2 IA RG EO G 93. U. JOE LLA TE R ANTOWN R INTERTATE-75 R IR R ER LV I I I R BR M YR ABB KELLI LK T ORGIA 293 T RE Bartow ounty R O G LE RUT Mc E R Y R P PE LOO PKWY R AWT HWY R WO RN OR A TR E R VE A LL GO HR HUR EY A U.. OBB Paulding ounty HOR OGLET E TOWNE R U. HWY. 92. Project Location Map - Alternative B Interstate 75 at Third Army Road Interchange GOT Project No. HPP (322) P.I. No Bartow, obb and Paulding ounties, Georgia Proposed Project Location
5 OBB OUNTY EPTMENT OF TRANPORTATION Public Information Open House omment ard I-75 at Third Army Road Interchange P.I. No ; obb, Bartow, and Paulding ounties March 28, 2013 Please print responses. Name Address o you support the project? For Against onditional Uncommitted Which alternative did you prefer? Alternative A Alternative B omments How did you hear about this meeting? Website Newspaper igns Word of Mouth Was the location of the meeting convenient for you to attend? Yes No If no, please suggest a general location that is more convenient to your community. Was the time of the meeting convenient for you to attend? Yes No If no, please suggest a time frame that is more convenient for you. Were your questions answered by the obb OT personnel? Yes No Please share your suggestions on improving the way obb OT conducts public meetings. Mail To: Mr. Michael ates, P.E., Project Manager epartment of Transportation 1890 ounty ervices Parkway, Marietta, GA Please return form by April 11, 2013.
Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee
Why We Are Here: GDOT s Transportation Improvement Act (TIA) Office, the City of Columbus, and the project delivery team are here this evening to display and answer questions concerning the proposed roadway
More informationPublic Information Workshop
Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)
More informationClearlake Road (State Road 501) Project Development & Environment (PD&E) Study
Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project
More informationSH 249 IN GRIMES COUNTY. Open House April 3, 2014
SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss
More informationPUBLIC INFRASTRUCTURE PROJECTS
PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING
More informationUS 81 Bypass of Chickasha Environmental Assessment Public Meeting
US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments
More informationTurnpike Mitigation Program Application
Ohio Department of Transportation & Ohio Turnpike and Infrastructure Commission Turnpike Mitigation Program Application Please note the following eligibility criteria: 1) Projects must be sponsored by
More informationSTH 60 Northern Reliever Route Feasibility Study Report
#233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development
More informationRolling Road (Route 638) Widening Project
Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public
More informationNew Jersey Turnpike Authority Interchange 6 to 9 Widening Program
New Jersey Turnpike Authority Interchange 6 to 9 Widening Program Tuesday, September 18, 2007 Public Hearings: Time: 5:00 PM - 8:00 PM Wednesday, September 19, 2007 Senior Center 3 Municipal Drive Bordentown,
More informationBusiness Advisory Committee. July 7, 2015
Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS
More informationIH 35 FEASIBILITY STUDY
IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE
More informationEXISTING PAVEMENT EVALUATION Howell Ferry Road Duluth, Gwinnett County, Georgia. WILLMER ENGINEERING INC. Willmer Project No
EXISTING PAVEMENT EVALUATION WILLMER ENGINEERING INC. Prepared For Clark Patterson Lee Suwanee, Georgia Prepared By WILLMER ENGINEERING INC. 3772 Pleasantdale Road Suite 165 Atlanta, Georgia 30340-4270
More informationPERFORMANCE ACTIVITY 603 SIGNS
PERFORMANCE ACTIVITY 603 SIGNS WORK DESCRIPTION 3 WORK DESCRIPTION 4 WORK DESCRIPTION 6 New Install Maintenance / Replace Temporary 603 SIGNS ACTIVITY DESCRIPTION Install new signs and maintain and replace
More informationI-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019
I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate
More informationSummary of the Alcoa Highway Redevelopment Project
Appendix B Summary of the Alcoa Highway Redevelopment Project By Marcia Finfer, October 2009 The Timberlake community, along with numerous other concerned citizen groups (including the Lakemoor Hills community)
More informationWelcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In -
Highway Gap New London to Paynesville Welcome Highway Gap New London to Paynesville Open House - Please Sign In - There is no formal presentation, but representatives are available to answer your questions.
More informationAppendix B- Memorandums
Appendix - Memorandums MEMORADUM To Tom Percival, FDOT Joe erenis, OOEA Mark allahan, H2MHill Gary Skaff, PS&J From Luis Diaz, HT Josiah anet, HT c Subject Impacts to Mount Dora Traffic Due to Wekiva Parkway
More information747 ACRES LAND FOR SALE
747 ACRES LAND FOR SALE 3400 NORTH PONY EXPRESS PARKWAY, EAGLE MOUNTAIN, UTAH 84005 Salt Lake Count y Lehi 73 Sar atoga Spring s Eagle Mountain Blvd g Eagle Mountain Eagle Mountain Blvd Pony Express Pkwy
More informationI-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange
I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet
More informationTransportation Improvement Program (TIP) Candidate Project List for Public Review
2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit
More informationSTATE LOOP 195 PUBLIC MEETING. Footer Text
STATE LOOP 195 PUBLIC MEETING STATE LOOP 195 From FM 755 to 1 mile west of Loma Blanca Rd Public Meeting Agenda Welcome & Introductions Octavio Saenz TxDOT Public Information Officer Technical Overview
More informationNORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 April 19, 2018 NHHIP OVERVIEW NHHIP divided into 3 Segments: Segment 1: I-45: Beltway 8 to I-610 (9 mi) 45 Segment 2: I-45: I-610 to I-10 (3
More informationEXCEPTION TO STANDARDS REPORT
EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationProposed Project I 35 Improvements from SH 195 to I 10
I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four
More informationTECHNICAL MEMORANDUM. Part A: Introduction
TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,
More informationThis corridor section will carry commuter trains from Wilsonville to Portland and Portland to Longview/Kelso.
Alignment is double tracked for 80 mph commuter trains, 110 mph CHSR speeds between Bridgeport OR and 78 th Street in Vancouver WA. New alignment for freight trains will allow speeds up to 40 mph over
More informationPURCHASE OPPORTUNITY. The following pages include general proximity map, a close proximity map, aerial map, and surveys of the individual parcels.
Kurt D. Cooper Associate Broker Coldwell Banker Commercial Metro Brokers 3575 Piedmont Road, Suite 950 Atlanta, GA 30305 678.320.4800 Office 404.861.1300 Mobile 404.495.8960 Fax PURCHASE OPPORTUNITY We
More informationIMPROVEMENT CONCEPTS
IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic
More informationSC Highway 41 Existing Conditions
SC Highway 41 Existing Conditions Existing Typical Cross Section purposes only and does not replace the required NEPA process necessary for alignment The NEPA process is anticipated to begin in the next
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationMarch 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming
COORDINATION WITH VDOT DISTRICTS TO DELIVER IMPLEMENTABLE IMPROVEMENT PROJECTS March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming PRESENTATION OUTLINE What
More informationW&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)
W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE
More informationHarlem Avenue between 63 rd and 65 th
Harlem Avenue between 63 rd and 65 th Community Advisory Group Meeting #3 December 1, 2017 Bedford Park Public Library 1 Meeting Agenda 1. Welcome/Introductions (3 mins) 2. Project Overview and Re-Cap
More informationProposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA
Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be
More informationMajor Widening/New Roadway
Revised Evaluation s Major Widening/New Roadway This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds Committee meeting. The information
More informationWelcome. Please Sign In
Welcome South Bay Bus Rapid Transit (BRT) Draft Environmental Impact Report (DEIR) Public Meeting Please Sign In Please comment in any of the following manners: 1. Submit a comment form 2. Provide verbal
More informationEXECUTIVE SUMMARY Lube Stop 980 E Waterloo Rd. Akron OH
Commercial Real Estate ROBERT WILSON Principal / Licensed Broker www.crestgrp.com 458 Saunders Ave. # 100 Akron OH 44319-2248 PH 330-644-3200 Fax 866.867.5336 E-Mail RWilson@Crestgrp.com EXECUTIVE SUMMARY
More informationChallenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007
EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component
More informationHighway 23 New London Access & Safety Assessment. Public Open House #2 October 3, :00 to 7:00 PM
Public Open House #2 October 3, 2017 5:00 to 7:00 PM Highway 9 OVERVIEW OF ASSESSMENT Assessment Limits Highway 23 from County Road 40 to North Shore Dr Purpose: Identify opportunities to reduce serious
More informationTRAFFIC PARKING ANALYSIS
TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationLacey Gateway Residential Phase 1
Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West
More information2.0 Development Driveways. Movin Out June 2017
Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.
More informationCY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build
1 2013 Planned s System Route UPC Category Locality Project Description 395 98836 Bridge Arlington Clean/Re-Paint 7 Bridges I-395 Corridor Arlington/Alexandria 4/9/2013 $ 3.45 HOT Lanes Bicycle/Pedestrian
More informationSAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018
SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018 The Wednesday, March 21, 2018, meeting of the St. Charles County Road Board was called to order at 4:30 p.m. in Room 542 of the Administration
More informationProject Working Group Meeting #5
September 17, 2013 Project Working Group Meeting #5 1 September 17, 2013 www.i-80will.com Meeting Purpose Project update Discuss Range of Alternatives Discuss next steps 2 September 17, 2013 www.i-80will.com
More information5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS
5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS The Transportation Services Committee recommends the adoption of the recommendations contained in the following report
More informationBrent Spence Bridge Design Exceptions - Alternative I
s - Alternative I ITERCHAGE umber Existing Reason(s) For Potential Impact(s) to Eliminate s Potential Mitigation Solutions CURVE O. 5 PI Sta. 24+98.87 Y 1 57 mph (60) 526' (570') 44 mph The line of sight
More informationAppendix F. Local Project Costs
Appendix F Local Project Costs Appendix F contains several project lists to help demonstrate how fiscal constraint was established and provide additional information on highway and transit program costs.
More informationMO 370 Interchange Ramp at Salt River Road - Phase 1
MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00
More informationS.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016
635 S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program Transportation and Trinity River Project Committee May 23, 2016 Project Scope Increase safety by removing the existing
More informationExtending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process
Extending TRACKS Issue 5 Spring 2014 Preliminary design plan review underway Public comment and approval process in May & June Residents and businesses along the Southwest LRT (METRO Green Line Extension)
More informationFSITE. November 3, Hillsborough County Aviation Authority
FSITE November 3, 2015 FY2016 Passenger Projection Tampa International Airport is projected to handle 18,871,526 passengers in FY2016, a 2.7% increase over FY2015. 21 Passengers (Millions) 20 19 19.3 18.7
More informationRequest for Design Exception (#1) S.M. Wright Phase IIB
Request for Design Exception (#1) S.M. Wright Phase IIB County: Dallas CSJ s: 0092-01-059, 0092-14-088 Project Limits: From Pennsylvania Avenue to North of Al Lipscomb Way Date: June 28, 2016 Proposed
More information# TO: FROM: PREPARED BY: DATE: SUBJECT:
Agenda Item # TO: Metropolitan Planning Commissioners FROM: Jeff Welch, MPC Interim Executive Director PREPARED BY: Dave Hill, MPC Deputy Director DATE: March 12, 2015 SUBJECT: Knox County Zoning Ordinance
More informationUS 67 WIDENING PROJECT
US 67 WIDENING PROJECT From Belt Line Rd. to I-20 History & Background The US 67 improvements from Belt Line Rd to I-20 were originally part of TxDOT s Southern Gateway project, studied as part of the
More informationMid-East RPO P5.0 Scores: Division Needs Local Input Point Assignment - TAC Amended on October 8, 2018
Mid-East RPO P5. Scores: Local Point Assignment - TAC Amended on October 8, 218 SPOT ID Mode TIP Project Category Route / Name From / Cross To / Cross Description Specific Improvement Type Cost to NCDOT
More informationBlack Diamond Business Park
1544 Fording Island Road Hilton Head Island, SC 29926 843.837.4460 naicarolinacharter.com Executive Summary PROPERTY OVERVIEW Excellent commercial redevelopment opportunity in Bluffton fronting Highway
More informationPlan Check Policies and Guidelines
VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.
More informationPublic Works. Capital Projects FY
Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1
More informationBullhead City, AZ. Topock, Lake Havasu, Parker, Vidal Jct, Needles, AVI- 205 miles. Full day ride. Take Laughlin Ranch Blvd to Bullhead Pkwy
Bullhead City, AZ to Bullhead Area Chamber of Commerce Topock, Lake Havasu, Parker, Vidal Jct, Needles, AVI- 205 miles. Full day ride Drive 205 miles, 4 h 3 min Map data 2015 Google 10 mi Bullhead City,
More informationAPPENDIX H. Transportation Impact Study
APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett
More informationDelaware County Engineer s Office
Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying
More informationGEORGIA DEPARTMENT OF TRANSPORTATION
GEORGIA DEPARTMENT OF TRANSPORTATION Statewide Truck Lanes Needs Identification Study SR 21 CORRIDOR NEEDS ANALYSIS PREPARED FOR Georgia Department of Transportation Office of Planning #2 Capitol Square
More informationCrestmont Development Update 2017 AGM
Crestmont Development Update 2017 AGM West Crestmont West Crestmont Will be built in phases finally reaching about 524 residential units. Rough grading for phases 9 & 10 already underway. First show home
More informationFinal Series of Public Meetings
Final Series of Public Meetings Public Meeting Locations City Date Jasper Monday, September 26 Livingston Tuesday, September 27 Huntsville Wednesday, September 28 Bryan Thursday, September 29 Eldorado
More informationChapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR
Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR 9.0 RECOMMENDED LOCALLY PREFERRED ALTERNATIVE AND ALTERNATIVES FOR EVALUATION IN DRAFT SEIS/SEIR
More informationWELLINGTON, NEW ZEALAND. PURSUANT to Section 152 of the Land Transport Act I, Harry James Duynhoven, Minister for Transport Safety,
WELLINGTON, NEW ZEALAND PURSUANT to Section 152 of the Land Transport Act 1998 I, Harry James Duynhoven, Minister for Transport Safety, HEREBY make the following ordinary Rule: Land Transport Rule: Setting
More informationDulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee September 17, 2013 1 On March 19, 2013 the Fairfax County Board of Supervisors asked FCDOT staff
More informationMAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina
Public Meeting & Open House July 23, 2013 Project Roadway Limits From: FM 1957 To: FM 471 MAP OR PHOTO Counties Bexar & Medina 1 I. Project History II. III. IV. Project Overview Project Alternatives Response
More informationWest Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017
West Santa Ana Branch Transit Corridor Informational Briefing Gateway Cities Service Council April 13, 2017 Project Study Area 98 square miles 20 individual cities plus unincorporated LA County 1.2 million
More informationSKIFFES CREEK CONNECTOR STUDY
SKIFFES CREEK CONNECTOR STUDY ALTERNATIVES ANALYSIS TECHNICAL REPORT JUNE 2018 SKIFFES CREEK CONNECTOR STUDY Alternatives Analysis Technical Report James City County Project Number: 0060047627, P101, R201,
More informationWOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing
WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: 424009-3 Public Hearing May 9, 2013 This Public Hearing is being held in accordance with the Federal-aid
More informationBullhead City, AZ. Topock, London Bridge, Lake Havasu, Yuma, Ogilby, Ripley, Needles. 437 miles. Two or three day ride
Bullhead City, AZ to Bullhead City, AZ Topock, London Bridge, Lake Havasu, Yuma, Ogilby, Ripley, Needles. 437 miles. Two or three day ride Drive 437 miles, 7 h 56 min Map data 2015 Google, INEGI 20 mi
More informationFOR LEASE. 900 NORTH GREENFIELD PARKWAY Garner, North Carolina CONTACT: Jackson Rives
FOR LEASE 900 NORTH Garner, North Carolina 900 NORTH 29,501 SF AVAILABLE 900 NORTH Norfolk Southern Railroad KEY Duke Realty Building Proposed Building Non-Duke Realty Building 45 Trailer Spaces 1300 220'
More informationChevy Chase Lake. Preliminary Plan # B TRAFFIC STATEMENT. Prepared for: Chevy Chase Land Company & Bozzuto Development Company
Chevy Chase Lake Preliminary Plan # 12002020B TRAFFIC STATEMENT Prepared for: Chevy Chase Land Company & Bozzuto Development Company Montgomery County, Maryland Prepared by: SSSTS Consulting (410) 718-8660
More informationTRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site
TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734
More informationThe Narragansett Electric Company. d/b/a National Grid (Interstate Reliability Project) RIPUC Dkt. No Testimony of. David M. Campilii, P.E.
(Interstate Reliability Project) RIPUC Dkt. No. 0 Testimony of David M. Campilii, P.E. November, 0 -v RIPUC Dkt. No. 0 PREFILED TESTIMONY OF DAVID M. CAMPILII 0 0 INTRODUCTION Q. Please state your name
More informationBOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension
Date of Meeting: July 20, 2017 # 6 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Design Endorsement for Sterling Boulevard Extension
More informationInterstate 85 Widening Traffic Analysis Report
I-85 Widening Project MM80 MM96 Spartanburg and Cherokee Counties Submitted to: South Carolina Department of Transportation Prepared By: STV Incorporated 140 Stoneridge Drive, Suite 450 Columbia, SC 29210
More informationAgenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan
Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.
More informationCommittee Report. Transportation Committee. Business Item No
Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope
More informationIC Chapter 5. Heavy Duty Highways and Extra Heavy Duty Highways
IC 9-20-5 Chapter 5. Heavy Duty Highways and Extra Heavy Duty Highways IC 9-20-5-1 Establishment and designation of heavy duty and extra heavy duty highways; removal of designation; publication of map
More informationTransportation Committee Revised Project Scope and Cost Estimate. November 23, 2015
Transportation Committee Revised Project Scope and Cost Estimate November 23, 2015 1 Today s Topics Revised Project Scope Revised Cost Estimate Municipal Approval Action 2 3 Revised Project Scope Project
More informationParking & Transportation Guide
Parking & Transportation Guide At The UCCU Center Utah Valley University and Utah Transit Authority [UTA] have partnered in Fall of 2018 to improve access to UVU Campus and to relieve stress on transportation
More informationUS 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT
US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT April 25, 2012 Tahoe Transportation District (TTD) Tahoe Transportation District (TTD) established 1980 as Bi-State Agency TTD Goals Implement Transportation
More informationSTAFF REPORT # CHANGE OF ZONING
STAFF REPORT #17-2000-0007 CHANGE OF ZONING PLANNING COMMISSION MEETING DATE: November 16, 2017 (Applicant Provided Materials / Traffic Study = Blue) 1. APPLICATION: A public hearing for an application
More informationCity of Houston Fondren Road Paving and Drainage
City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial
More informationPlainfield, Indiana Speed Limit Study
March 21 st, 2017 Prepared on behalf of: Town of Plainfield Building and Engineering Department 206 W. Main Street Plainfield, IN 46168 (317) 839-2561 Prepared by: Thomas S. Vandenberg, PE, PTOE Matthew
More informationRTID Travel Demand Modeling: Assumptions and Method of Analysis
RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel
More informationOver-Dimensional Vehicle Restriction Study for US 129 in TN
Over-Dimensional Vehicle Restriction Study for US 129 in TN July 30,2015 TDOT Region 1 US 129 Location Map US 129 Topography and Scenery Operational and Safety Study August 2014, US129 Operational and
More informationUS 70 Corridor Planning for the Future
New Bern/James City Area - Work Session US 70 Corridor Planning for the Future Brinson Elementary School Thursday, January 31, 2008 Agenda Sign-in, in, View Maps, Talk to Project Team Public Q & A Session
More informationBrigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction
Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will
More informationTraffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)
Associates Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508) 885-5121 Ms. Teri Ford, Associate 800 Boylston Street, Suite 1570 Boston, MA July
More informationPARKING. Passenger vehicles and vans must park in the regular daily parking lot and pay the daily rate.
Exhibitors will have complimentary parking during the first 4 days of move-in (Nov. 8-11) and moveout (after 4pm, Nov. 16 through 12pm, Nov. 18). The last day of move-in (Nov. 12) and show days (Nov. 13-16)
More informationStation Evaluation. Durham-Orange Light Rail Transit Project Spring 2012
Station Evaluation Durham-Orange Light Rail Transit Project Spring 2012 Key Ingredients for Station Development Platform Designs UNC Hospitals Station The UNC Hospitals Station Option D would be the westerly
More informationAPPENDIX C. Existing Utilities
APPENDIX C Existing Utilities THIS PAGE INTENTIONALLY BLANK Existing Utilities Numerous utilities exist within the project area, including natural gas, sewer, water, electric, communications, and street
More informationTable of Contents PRIME INDUSTRIAL LAND. Arrowhead Drive /- acres Carson City, Nevada. For Sale $3.95 / SF
Arrowhead Dr., Carson City, NV Table of Contents Property Description...2 Lot Information...3 Lot Area Maps...4 Parcel Map...5 Powerline Map...6 Site Vicinity...7 Water & Sewer Lines...8 Test Pit Location...9
More information