1 FERC 101 for Environmental Lawyers Linda L. Walsh Hunton & Williams LLP February 11, 2015
2 What is FERC FERC is an independent agency within the Dept. of Energy (DOE) Current Commission: 2
3 3
4 Electricity Regulation Federal Power Act FERC must ensure that rates for transmission and wholesale sales of electricity in interstate commerce are just and reasonable... such Federal regulation, however, to extend only to those matters which are not subject to regulation by the States. 16 U.S.C States regulate: Generator and transmission siting, construction Distribution of electricity Retail sales of electricity Energy Policy Act of 2005 FERC must protect the reliability of the bulk electric system by enforcing mandatory reliability standards Wholesale rates and reliability Both of these key functions are affected by the EPA s Clean Power Plan 4
5 Electricity Basics Driving the turbines---- Thermal Generation Most of the electricity produced in the U.S. comes from thermal generation using heat to drive the turbines that produce electricity. Fuel Sources that heat the steam to drive the turbines Coal Natural gas Nuclear Concentrated solar (uses solar and reflective materials to generate thermal energy) Biomass 5
6 Electricity Basics Non-thermal ways to drive the turbines: Other ways to generate electricity: Wind (variable resource, often located far from load centers) Hydro Photovoltaics directly convert light to electricity (variable resource) 6
7 Different parts of the U.S. Use Different Fuel Mixes to Generate Electricity *Includes generation by agricultural waste, landfill gas recovery, municipal solid waste, wood, geothermal, non-wood waste, wind, and solar. ** Includes generation by tires, batteries, chemicals, hydrogen, pitch, purchased steam, sulfur, and miscellaneous technologies. Sum of components may not add to 100% due to independent rounding. Source: U.S. Department of Energy, Energy Information Administration, Power Plant Operations Report (EIA-923); 2012 final generation data. February by the Edison Electric Institute. All rights reserved. 7
8 Transmission A transmission grid is a network of generating stations, transmission lines, and substations. 1. Electricity is generated and leaves the power plant 2. Its voltage is increased at a step-up substation 3. The energy travels along a transmission line to the area where the power is needed (765, 500, 345, 230 and 138 kv) 4. Once there, the voltage is decreased or stepped-down at another substation 5. A distribution power line carries the electricity 6. Electricity reaches your home or business (69, 26, 13, 4 kv, 120 V, 240 V). Demand for power is called Load How The Grid Works 8
9 Transmission Important Characteristics: Electricity is not typically stored, so supply (generation) must be produced exactly when needed to meet customer demand (load) to avoid system failure (power outage) Three types of power outages: A transient fault is a momentary loss of power typically caused by a temporary fault on a power line. Power is automatically restored once the fault is cleared. A brownout is a drop in voltage in an electrical power supply (e.g., the dimming experienced by lighting when the voltage sags). Brownouts can cause poor performance of equipment or even incorrect operation. A blackout is the total loss of power to an area and is the most severe form of power outage that can occur. Blackouts which result from or result in generators tripping are particularly difficult to recover from quickly. Outages may last from a few minutes to a few weeks. 9
10 Transmission Electricity travels at the speed of light Laws of physics dictate that power flows along path of least resistance; Limited ability to direct power along specific route Utilities must have enough generation capacity to serve their forecasted load plus some extra -- a reserve margin. Different kinds of reserves- some designed to come on line over a period of time, some designed to come on immediately (spinning or load following ). Different kinds of generators for different purposes baseload vs. peaking units Fuel security or Fuel Assurance issue FERC is investigating 10
11 Transmission Operations Pre-1990, all utilities were vertically integrated A single company generated electricity, transmitted it from the plant to load and distributed it to final consumers in a particular service territory There was little or no wholesale competition (independent generators not able to interconnect unless they were a PURPA QF) FERC regulated wholesale sales of power to customers and between companies at cost-based rates Post FERC took action to promote competition in generation and transmission FERC required transmission owners to allow non-affiliated generators to interconnect generators to the grid FERC-regulated utilities required to provide Open Access transmission service (Order No. 888) Wholesale power sellers increasingly using market based rates 11
12 RTOs and ISOs Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs) were created in the late 1990s (FERC Order 2000). RTO/ISO functions include: Manage the operation of a multi-company grid for a single state (ISO) or for a region (RTO) Manage reliability of the transmission grid Operate wholesale power markets (and some other markets) Generators bid power into wholesale markets at market-based rates Least cost generators get dispatched first All generators dispatched get market clearing price bid of last generator dispatched FERC has oversight of these markets Joining an ISO or RTO is voluntary for utilities but it can help with attaining FERC approvals for mergers and market-based rate requests because joining mitigates some market power issues and can increase the relevant geographic market for market power analysis 12
13 RTOs and ISOs (Regional Transmission Organizations and Independent System Operators) U.S.: Canada: New England ISO (ISO NE) Electricity System Operator (IESO) New York ISO (NYISO) Alberta Electric System Operator PJM Interconnection L.L.C. (PJM) MidContintent Independent System Operator, Inc. (MISO) Southwest Power Pool (SPP) For more info: Regional Transmission Organizations, California Independent System Operator, Inc. (CAISO) Order No. 2000, 89 FERC 61,285 (1999) Electric Reliability Council of Texas (ERCOT) 13
14 Electric Reliability FERC has a statutory obligation to ensure the reliable operation of the bulk power system (stems from the aftermath of the 2003 blackout) Energy Policy Act of 2005 (added 215 of the Federal Power Act) requires the creation of a self regulatory electric reliability organization (ERO) that spans North America, subject to FERC oversight in the United States. The North American Electric Reliability Corporation (NERC) is the entity certified as the ERO for the U.S., Canada and the northern portion of Baja California, Mexico. Legislation required the development and enforcement of mandatory reliability standards for the bulk electric system For the past decade, the North American Electric Reliability Corporation (NERC) has been working with industry and government to implement the reliability provisions of the Act. Prior to EPAct 2005, reliability standards were voluntary, not standardized 14
15 Electric Reliability About NERC: Not for profit regulatory authority whose mission is to meet the statutory obligation to ensure the reliability of the bulk power system in North America: Jurisdiction includes users, owners, and operators of the bulk power system 100 kv and higher (e.g., generators, transmission companies, RTOs/ISOs, etc); Develops and enforces the Reliability Standards; imposes penalties for non compliance, subject to FERC approval; Ensures reliability by addressing events and identifiable risks; Annually assesses seasonal and long term reliability and provides assurance to the public, industry, and government for the reliable performance of the bulk power system; (See, e.g., Potential Reliability Impacts of EPA s Proposed Clean Power Plan, 11/5/2014, Monitors the bulk power system through system awareness; Educates, trains, and certifies industry personnel; Promotes learning and continuous improvement of operations and adapts to lessons learned for improved bulk power system reliability; Risk based Approach to focus attention, resources, and actions on issues most important to bulk power system reliability. 15
16 Electric Reliability NERC defines reliability in terms of two functional aspects: Adequacy: The ability of the electricity system to supply the aggregate electrical demand and energy requirements of the end use customers at all times, taking into account scheduled and reasonably expected unscheduled outages of system elements. Operating Reliability: The ability of the Bulk Power System to withstand sudden disturbances, such as electric short circuits or the unanticipated loss of system elements from credible contingencies, while avoiding uncontrolled cascading blackouts or damage to equipment 16
17 NERC Regional Entities FRCC: Florida Reliability Coordinating Council MRO: Midwest Reliability Organization NPCC: Northeast Power Coordinating Council RFC: ReliabilityFirst Corporation SERC: SERC Reliability Corporation SPP: Southwest Power Pool, RE TRE: Texas Reliability Entity WECC: Western Electricity Coordinating Council 17
18 Reliability Reliability Standards cover broad areas: Transmission operations Vegetation management (tree trimming, ROW clearing) Cyber and physical security Communications Emergency preparedness Transmission planning, modeling, data analysis Resource and demand balancing System protection mechanisms Interchange scheduling and coordination Reliability operations Non compliance with the standards could subject a company to significant civil penalties of $1 million/day per violation. Since 2008, NERC has found nearly 6,000 standard violations and imposed millions of dollars in civil penalties for non compliance Standards applicable to all users, owners and operators of the bulk power system (facilities operating at or above 100 kv) 18
19 FERC and EPA FERC Technical Conference Issues Raised by the CPP: Electric reliability issues Retirement of coal plants - Transmission system reliability may be affected by the absence of generators in key locations (e.g., frequency control and voltage support). Reliability Must Run units have been designated in the past (also referred to as back-stop or safety valve options). Changing resource mix will result in less fuel diversity Challenges for transmission operations with integration of large amounts of Variable Energy Resources (VERs): A Variable Energy Resource is a device for the production of electricity that is characterized by an energy source that: (1) is renewable; (2) cannot be stored by the facility owner or operator; and (3) has variability that is beyond the control of the facility owner or operator, e.g., wind, solar thermal and photovoltaic, and hydrokinetic generators. See Integration of Variable Energy Resources Notice of Proposed Rulemaking, 139 FERC 61,246 (2012) Order No
20 FERC and EPA FERC Technical Conference Issues Raised by the CPP continued : New infrastructure needed to support changing resource mix Switch to natural gas requires new gas pipeline infrastructure Long lead time for siting, permitting and construction Will increase rates Increase in certain renewables will require new transmission infrastructure Long lead time for siting, permitting and construction Will increase rates Implications for FERC-administered wholesale electric power markets e.g., moving from a least-cost dispatch model to an emissions-based dispatch model Will require new RTO market rules Also likely to increase rates 20
INTERCONNECTED POWER SYSTEMS POWER GRIDS. Chapter 8
INTERCONNECTED POWER SYSTEMS POWER GRIDS Chapter 8 POWER GRID ADVANTAGES Large Electrical Inertia Maximizes system stability, reliability and security Maintains frequency, voltage and load flows Offers
More informationEnergy Law. July 31, The seminar will begin shortly. Questions for the panel?
Energy Law July 31, 2014 The seminar will begin shortly. Questions for the panel? Email werber@eli.org. For audio, dial 1-857-232-0300 Participant code 11233 1 Speaker: Lopa Parikh Director, Federal Regulatory
More informationWIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool
WIRES University Overview of ISO/RTOs Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool 1 OUR MISSION Helping our members work together to keep the lights on
More informationCompetitive Power Procurement
Competitive Power Procurement Energy Regulatory Partnership Program Abuja, Nigeria September 20-24, 2010 Kirk Megginson Financial Specialist - Regulated Energy Division Michigan Public Service Commission
More informationAccommodating High Levels of Variable Generation. EPRI Managing Complexity for Safety and Reliability September 14-15, 15, 2009
Accommodating High Levels of Variable Generation EPRI Managing Complexity for Safety and Reliability September 14-15, 15, 2009 Agenda About NERC About the Integration of Variable Generation Task Force
More informationKansas Legislature. Briefing for the. March 6, Paul Suskie & Mike Ross
Briefing for the Kansas Legislature March 6, 2013 Paul Suskie & Mike Ross psuskie@spp.org mross@spp.org 501.614.3200 Presentation overview Who we are What we do How we benefit the consumer Industry dynamics
More informationCourse notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing
Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing Ross Baldick Copyright 2018 Ross Baldick www.ece.utexas.edu/~baldick/classes/394v/ee394v.html 1 1 Recent History of
More informationUnderstanding the National Power Grid and How it Impacts Timeframes for Power Restoration
All Hazards Consortium Webinar Series Understanding the National Power Grid and How it Impacts Timeframes for Power Restoration July 30, 2013 Presenter John L. L Shaner Emergency Management Manager NERC
More informationElectric Transmission 101 or Everything You Wanted to Know About the Grid But Were Afraid to Ask. Gerald Deaver Manager Regional Transmission Policy
Electric Transmission 101 or Everything You Wanted to Know About the Grid But Were Afraid to Ask Gerald Deaver Manager Regional Transmission Policy Some Xcel Energy Statistics Transmission Business 19,000
More informationOverview of ISO New England and the New England Wholesale Power Markets
Overview of ISO New England and the New England Wholesale Power Markets Boston Chapter of IEEE PES Technical Meeting June 15, 2010 Stephen J. Rourke Vice President, System Planning About ISO New England
More informationEffects of Smart Grid Technology on the Bulk Power System
Effects of Smart Grid Technology on the Bulk Power System Rana Mukerji Senior Vice President Market Structures New York Independent System Operator Union College 2013 Environmental Science, Policy & Engineering
More informationSPP OVERVIEW. Mike Ross Senior Vice President, Government Affairs and Public Relations
SPP OVERVIEW Mike Ross Senior Vice President, Government Affairs and Public Relations 1 Our Mission Helping our members work together to keep the lights on today and in the future. 2 NORTH AMERICAN INDEPENDENT
More informationNYISO Market Initiatives
NYISO Market Initiatives Robb Pike Director Market Design New York Independent System Operator Ventyx Market Leadership Council Santa Clara, CA April 23, 2012 Topics Roles of the NYISO Smart Grid Integrating
More informationReview of U.S. market reforms for renewable integration, flexibility, and storage
Review of U.S. market reforms for renewable integration, flexibility, and storage Eric Hsieh Director Office of Energy Finance and Incentives Analysis U.S. Department of Energy 14 July 2017 Transformations
More informationManaging California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station
Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station East Asian Alternative Energy Futures Workshop By the Nonproliferation Policy Education Center
More informationD.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES
220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering Credits 18.06:
More informationANNUAL ELECTRIC POWER INDUSTRY REPORT
SCHEDULE 1. IDENTIFICATION SURVEY CONTACTS: Persons to contact with question about this form RESPONSE DUE DATE: Please submit by April 30th following the close of calendar year Contact Title: Jocelyn Gwynn
More informationLegal Considerations Related to Distributed Energy Resources
Legal Considerations Related to Distributed Energy Resources Steve Pincus Associate General Counsel Steve Shparber Counsel Markets & Reliability Committee April 18, 2016 Overview of FERC Jurisdiction FERC
More informationREGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST
REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST MEGAN O REILLY COALITION FOR CLEAN AFFORDABLE ENERGY EPE IRP STAKEHOLDER
More information(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.
D.P.U. 11-10-A 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering
More informationANNUAL ELECTRIC POWER INDUSTRY REPORT
SCHEDULE 1. IDENTIFICATION SURVEY CONTACTS: Persons to contact with question about this form RESPONSE DUE DATE: Please submit by May 16th following the close of calendar year Contact Title: Laina Starnes
More informationXIII Seminario Repsol YPF - Harvard
Federal Energy Regulatory Commission XIII Seminario Repsol YPF - Harvard Electricity Market Reform: The U.S. (FERC) Experience William L. Massey, Commissioner U.S. Federal Energy Regulatory Commission
More informationPowering Our Future: Energy to Build on in Your Township
Powering Our Future: Energy to Build on in Your Township Commissioner John Tuma Minnesota Association of Townships Educational Conference and Annual Meeting November 15-17, 2018 Minnesota Railroad and
More informationIndustry Recommendation Loss of Solar Resources during Transmission Disturbances due to Inverter Settings - II
Loss of Solar Resources during Transmission Disturbances due to Inverter Settings - II Initial Distribution: May 1, 2018 NERC has identified adverse characteristics of inverter-based resource performance
More informationDistributed Generation and the Importance of the Electric Power Grid
Distributed Generation and the Importance of the Electric Power Grid Rick Tempchin Executive Director, Retail Energy Services Edison Electric Institute Edison Electric Institute The Edison Electric Institute
More informationRECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:
DATE: July 16,2007 TO: FROM: SUBJECT: CITY COUNCIL CITY MANAGER CONSIDERATION OF ADOPTION OF NEW FEDERAL STANDARDS RELATING TO ELECTRIC UTILITIES UNDER THE PUBLIC UTILITIES REGULATORY POLICIES ACT AND
More informationBalancing Wind. Embracing the Challenge
Balancing Wind Embracing the Challenge Rana Mukerji Senior Vice President Market Structures New York Independent System Operator Congressional Briefing American Wind Energy Association & the COMPETE Coalition
More informationTRANSMISSION PLANNING CRITERIA
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003-3502 Effective Date: TRANSMISSION PLANNING CRITERIA PURPOSE This specification describes Con Edison s Criteria for assessing
More informationWholesale Power Supply Socorro Electric Cooperative, Inc. Rob Wolaver, P.E. Senior Manager, Energy Resources
Wholesale Power Supply Socorro Electric Cooperative, Inc. Rob Wolaver, P.E. Senior Manager, Energy Resources Outline Tri-State Background Tri-State Generation Mix Power Delivery Wholesale Electricity Markets
More informationAMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA
AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AEP Texas (comprised of its Central and North Divisions
More informationOverview of S.L Competitive Energy Solutions for North Carolina
Overview of S.L. 2017-192 Competitive Energy Solutions for North Carolina JENNIFER MCGINNIS CHRIS SAUNDERS STAFF AT TORNEYS, LEGISLATIVE ANALYSIS DIVISION 1 Overview Product of extensive stakeholder process
More informationAggregation Pooling together customers or electric loads to create a larger buying group for purchasing power.
These definitions are for the purposes of this document only and do not apply to tariff and other documents that may contain different definitions. Aggregation Pooling together customers or electric loads
More informationRegional Grids in the U.S.
Regional Grids in the U.S. USAID/NARUC East Africa Regional Regulatory Partnership 1 st Partnership Exchange October 21, 2014 Dar Es Salaam The Electricity Grid 10/23/2014 Source: National Renewable Energy
More informationMerger of the generator interconnection processes of Valley Electric and the ISO;
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric
More information2. Overview of the North American Electric Power System and Its Reliability Organizations
2. Overview of the North American Electric Power System and Its Reliability Organizations The North American Power Grid Is One Large, Interconnected Machine The North American electricity system is one
More informationMENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members
49.1 INTERCONNECTION OF AND SERVICE TO QUALIFYING FACILITIES UNDER Objective To provide for the interconnection of and service to a Qualifying Facility in keeping with the provisions of the Public Utility
More information12 th International Workshop On Electric Power Control Centers Bedford Springs, Pennsylvania, USA June 2-5, 2013
Ratan Das, Senior Principal Engineer, Distribution Automation, June 5, 2013 Protection & Automation Strategies for Distribution Automation in a Smart Grid 12 th International Workshop On Electric Power
More informationCalifornia s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference
California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference Presented by Edward Randolph Energy Division Director, California Public Utilities
More informationPower Infrastructure. PowerToGrowPHX.com
Power Infrastructure PowerToGrowPHX.com Electricity 101 Key utility terms Power supply and generation mix Overview of the electric power system Federal and State Regulation Electric Ready Site What information
More informationU.S. Power Industry. GE Energy. Sundar Venkataraman Director, GE Energy EA&SE. September 21, 2009 Schenectady, NY
GE Energy U.S. Power Industry September 21, 2009 Schenectady, NY Sundar Venkataraman Director, GE Energy EA&SE 1 Agenda U.S. Power Industry Information Demand Generation Transmission Systems Operations
More informationNet Metering in Illinois. Eric P. Schlaf Senior Economic Analyst Illinois Commerce Commission January 31, 2014
Net Metering in Illinois Eric P. Schlaf Senior Economic Analyst Illinois Commerce Commission January 31, 2014 Topics What is Net Metering Benefits of Net Metering Net Metering in US Net Metering in Illinois
More informationERCOT Overview. Paul Wattles Senior Analyst, Market Design & Development. Solar Energy Industries Association July 11, 2012
ERCOT Overview Paul Wattles Senior Analyst, Market Design & Development Solar Energy Industries Association History of Electric Reliability Council of Texas, Inc. 1941 Utilities band together to aid war
More informationImplications of Alberta s Evolving Electricity Market for Solar
Implications of Alberta s Evolving Electricity Market for Solar Matt Ayres CEO, Market Surveillance Administrator matt.ayres@albertamsa.ca What does the Market Surveillance Administrator do? Investigation
More information162 FERC 61,127 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 35 [Docket Nos. RM ; AD ; Order No.
162 FERC 61,127 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 18 CFR Part 35 [Docket Nos. RM16-23-000; AD16-20-000; Order No. 841] Electric Storage Participation in Markets Operated by
More informationDonna Painter, Executive Consultant February 27, 2013
Donna Painter, Executive Consultant February 27, 2013 Transmission What is it and How has it Evolved Legislation and Regulatory Impacts What is Next for AMEA and Others Transmission System High voltage
More informationELECTRIC TRANSMISSION 101: Operational Characteristics. Wayne Galli, Ph.D., P.E. Executive Vice President Clean Line Energy Partners LLC
ELECTRIC TRANSMISSION 101: Operational Characteristics Wayne Galli, Ph.D., P.E. Executive Vice President Clean Line Energy Partners LLC Objectives Primary objective is to understand how the power system*
More informationPower Systems Fundamentals
Power Systems Fundamentals Yachi Lin Senior Manager, Transmission Planning New York Independent System Operator Market Overview Course September 20, 2017 Rensselaer, NY 2017 New York Independent System
More informationOperating Committee Meeting. Transmission Policy Training
Operating Committee Meeting Fall 2010 New Orleans Transmission Policy Training Arnie Podgorsky Patrick Morand Wright & Talisman, P.C. 1200 G Street N.W., Suite 600 Washington, DC 20005 202.393.1200 podgorsky@wrightlaw.com
More informationElectricity Transmission Infrastructure Development in New England
Electricity Transmission Infrastructure Development in New England NPCC Governmental/Regulatory Affairs Advisory Group Paul G. Afonso March 4, 2008 Transmission Infrastructure is Playing An Increasingly
More informationEASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A
EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A SUBJECT: Interconnection of and Service to Qualifying Facilities under Public Utility Regulatory Policies Act (PURPA) OBJECTIVE: To provide, through
More informationDemand Response - An End-to-End Approach from Markets to Consumers
Demand Response - An End-to-End Approach from Markets to Consumers Rana Mukerji Senior Vice President Market Structures New York Independent System Operator EPRI PDU Sector Council Meeting Boston, MA September
More informationSenate Bill 1547 Ordered by the House February 29 Including Senate Amendments dated February 12 and House Amendments dated February 29
th OREGON LEGISLATIVE ASSEMBLY--0 Regular Session B-Engrossed Senate Bill Ordered by the House February Including Senate Amendments dated February and House Amendments dated February Sponsored by Senator
More informationRunning the Electric Power Grid
Running the Electric Power Grid Your electricity needs never stop, and neither do we. We keep power flowing across New England. Inside Our Control Room Before electricity is delivered to your street, it
More informationMeeting Policy Objectives Transmission: A Path to Compliance
Meeting Policy Objectives Transmission: A Path to Compliance Rich Dewey Executive Vice President New York Independent System Operator NYISO Environmental Advisory Council Troy, NY November 20, 2015 Performance
More informationInterregional Gas/Electric Study Status Update
Interregional Gas/Electric Study Status Update by John P. Buechler NYISO Executive Regulatory Policy Advisor NPCC Governmental/Regulatory Affairs Advisory Group November 27, 2012 Montreal, Canada Overview
More informationImpact of Distributed Energy Resources on Transmission System Reliability
S E P T E M B E R 1 3, 2 0 1 8 W E B I N A R Impact of Distributed Energy Resources on Transmission System Reliability National Council on Electricity Policy (NCEP) Alan McBride D I R E C T O R, T R A
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Grid Resilience in Regional Transmission Organizations and Independent System Operators ) ) ) ) Docket No. AD18-7-000 COMMENTS OF
More informationElectric Power Transmission: Research Needs to Sustain a Critical National Infrastructure
Electric Power Transmission: Research Needs to Sustain a Critical National Infrastructure Robert J. Thomas Cornell University Energy Council s 2003 Federal Energy and Environmental Matters Conference March
More informationDistributed Energy Resources
Distributed Energy Resources WECC Data Subcommittee Rich Hydzik, Avista (ERSWG/DER Subgroup Lead) June 29, 2018 Why Are We Concerned About DER? Concern about changing generation fleet Large coal fired
More informationRetail Electric Rates in Deregulated and Regulated States: 2016 Update
Retail Electric Rates in Deregulated and Regulated States: 2016 Update Retail Electric Rates in Deregulated and Regulated States: 2016 Update The U.S. Department of Energy, Energy Information Administration
More informationDemand Response Opportunities for Electric Vehicle Charging Stations. April 2014
Demand Response Opportunities for Electric Vehicle Charging Stations April 2014 SemaConnect is in the early stages of evaluating demand response opportunities for its commercial plugin electric vehicle
More informationappear before this committee and provide AEP s perspective on the August 14 th outage.
E. Linn Draper, Jr. Chairman, President and Chief Executive Officer American Electric Power Congressional Testimony House Committee on Energy and Commerce Sept. 4, 2003 Mr. Chairman, members of the Committee,
More informationNERC PRC and Its Impact on Stationary Batteries in Substations and Power Generation Plants
1 NERC PRC-005-2 and Its Impact on Stationary Batteries in Substations and Power Generation Plants Chris Searles BAE Batteries USA NERC SDT PRC-005-2 Task Force Chair IEEE Stationary Battery Committee
More informationCommissioner Anne E. Hoskins iiesi Workshop Copenhagen, Denmark May, 2014
Maryland s Competitive Electricity Markets: Where We ve Been and Where We re Going Commissioner Anne E. Hoskins iiesi Workshop Copenhagen, Denmark May, 2014 Where Exactly is Maryland? 2 Agency Overview
More informationGRID INNOVATION CAUCUS CO-CHAIRS
February 16, 2017 GRID INNOVATION CAUCUS CO-CHAIRS REP. JERRY NCNERNEY (D-CA) REP. BOB LATTA (R-OH) 2 WIRES UNIVERSITY Transmission 101: The Fundamentals Of High Voltage Transmission February 16, 2017
More informationSummer Reliability Assessment Report Electric Distribution Companies Perspective
Energy Association of Pennsylvania Summer Reliability Assessment Report Electric Distribution Companies Perspective to the Pennsylvania Public Utility Commission June 9, 2011 Harrisburg, PA Terrance J.
More informationDemand Response as a Power System Resource
Demand Response as a Power System Resource Richard Cowart Director, Regulatory Assistance Project www. erranet.org Major points today 1. What? What is Demand Response (DR)? 2. Why? Proven values of DR
More informationNortheast Blackout 1
Northeast Blackout All fads start in California Courtesy NBC.com To quote the great philosopher Jay Leno, California is a trend-setter. All fads start in California. California had the first blackout,
More informationWest Virginia Energy Plan and Becoming an Electric Generator
West Virginia Energy Plan and Becoming an Electric Generator June 25 th, 2013 Electricity Exports, 2010 2010 EIA Data 1 1 Costs are expressed in terms of net AC power available to the grid for the installed
More informationTRANSMISSION CONTROL AGREEMENT APPENDIX D. Master Definitions Supplement
TRANSMISSION CONTROL AGREEMENT Master Definitions Supplement D-1 AGC (Automatic Generation Control) Generation equipment that automatically responds to signals from the ISO's EMS control in real time to
More informationParticipation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market
Beacon Power Corporation Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market Prepared for: New York Business Issues Committee May 21, 2008 Safe Harbor
More informationThe Commonwealth of Massachusetts
The Commonwealth of Massachusetts DEPARTMENT OF PUBLIC UTILITIES D.P.U. 12-81-A January 18, 2013 Investigation by the Department of Public Utilities on its own Motion Commencing a Rulemaking pursuant to
More informationElectric Transmission Technical and Policy Issues Bruce Biewald National Association of State Utility Consumer Advocates Austin, Texas June 14, 2004
Electric Transmission Technical and Policy Issues Bruce Biewald National Association of State Utility Consumer Advocates Austin, Texas June 14, 2004 22 Pearl Street Cambridge, MA 02139 617.661.3248 bbiewald@synapse-energy.com
More informationCHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.
25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements
More informationFITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM
Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services
More informationClimate Change and the Electric Grid
Climate Change and the Electric Grid Ward Jewell Wichita State University Power Systems Engineering Research Center 2013 Ward Jewell, Wichita State University Electric Power Generation Electric Power Generation
More informationDecision on Merced Irrigation District Transition Agreement
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation
More informationRole of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid
Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid India need regulations for energy storage to implement grid ancillary services
More informationInterconnection and Net Metering Service in Ohio
Interconnection and Net Metering Service in Ohio Partnership between National Association of Regulatory Utility Commissioners and The National Commission for Energy State Regulation of Ukraine June 20,
More informationSmart Grid Provisions in H.R. 6, 110 th Congress
Order Code RL34288 Smart Grid Provisions in H.R. 6, 110 th Congress Updated February 13, 2008 Amy Abel Specialist in Energy Policy Resources, Science, and Industry Division Smart Grid Provisions in H.R.
More informationUtility & Regulatory Reform in the U.S.: The Changing Landscape
Utility & Regulatory Reform in the U.S.: The Changing Landscape Sue Tierney 2018 e21 Forum #1 - Toward a 21 st C. Electric System in Minnesota March 20, 2018 - Minneapolis The landscape of electric utility
More informationELECTRIC TRANSMISSION 101:
ELECTRIC TRANSMISSION 101: How the High-Voltage Grid Works and Who Regulates It July 9, 2013 FACULTY: Wayne Galli, Executive Vice President, Clean Line Energy Jeff Dennis, Director, Division of Policy
More informationWind Energy and Utility Providers
Wind Energy and Utility Providers Regulatory and Operational Issues David Koster, Operations Director Holland Board of Public Works Regulatory and Legislative PURPA (Public Utilities Regulatory Policies
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Coordination of the Scheduling Processes ) Docket No. RM14-2-000 of Interstate Natural Gas Pipelines and ) Public Utilities ) COMMENTS
More informationThe difference of the wholesale electricity market and operational methods in Japan, the United States and Europe
The difference of the wholesale electricity market and operational methods in Japan, the United States and Europe Junichi OGASAWARA The Institute of Energy Economics, Japan Japanese Electricity Market
More informationPGE Sustainability Report Key Metrics FISCAL YEAR 2017
PGE Sustainability Report Key Metrics FISCAL YEAR 2017 Data in this report is from our 2017 fiscal year (Jan. 1, 2017, to Dec. 31, 2017), unless otherwise noted. CORPORATE FACTS 2013 2014 2015 2016 2017
More informationClean Energy Transmission Summit. Stephen Beuning Director Market Operations 1/9/13
Clean Energy Transmission Summit Stephen Beuning Director Market Operations 1/9/13 1 Who We Are Xcel Energy is dedicated to being an environmental leader NSP-Minnesota NSP-Wisconsin 26,000+ MWs of generation
More information78th OREGON LEGISLATIVE ASSEMBLY Regular Session. House Bill 4036
th OREGON LEGISLATIVE ASSEMBLY--0 Regular Session House Bill 0 Introduced and printed pursuant to House Rule.00. Presession filed (at the request of House Interim Committee on Energy and Environment) SUMMARY
More informationIllinois State Report
July 2016 Illinois State Report Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast Gas Pipeline Information 2 Executive Summary (July 2016) Existing Capacity:
More informationGrid Integration Costs: Impact of The IRP Capacity Mix on System Operations
Grid Integration Costs: Impact of The IRP Capacity Mix on System Operations Presenter: Bernard Magoro, System Operator, Transmission Division, Eskom SOC Holdings Date: 05 October 2018 Contents 1. Background
More informationElectricity Trends in Pennsylvania
Electricity Trends in Pennsylvania Energy and How We Pay for it in Pennsylvania: The Next Five Years and Beyond Central Susquehanna Citizen s Coalition April 1, 2010 William Steinhurst www.synapse-energy.com
More informationENERGY STORAGE DEPLOYMENTS IN ONTARIO APPRO NOVEMBER 18, 2014 TORONTO
ENERGY STORAGE DEPLOYMENTS IN ONTARIO APPRO NOVEMBER 18, 2014 TORONTO Cam Carver CEO, Temporal Power Ltd. Corporate Overview Temporal Power, a Ontario based company, is a global leader in the development
More information7/29/2014. Wisconsin Public Utility Institute ENERGY UTILITY BASICS. Wisconsin Public Utility Institute
ENERGY UTILITY BASICS Systems within the Electric Utility Business Generation Transmission Distribution - Consumption RTOs and Markets Ken Copp July 31, 2014 SOURCE Generating Plant Distribution System
More informationRetail Electric Rates in Deregulated and Regulated States: 2010 Update
Retail Electric Rates in Deregulated and Regulated States: 2010 Update Published March 2011 1875 Connecticut Avenue, NW Washington, D.C. 20009-5715 202/467-2900 www.appanet.org Retail Electric Rates in
More informationSPS Planning Criteria and Study Methodology
SPS Planning Criteria and Study Methodology SPS subscribes to the Southwest Power Pool ("SPP") Reliability Criteria, which incorporates compliance with the appropriate North American Electric Reliability
More informationSituation of Power System Flexibility ~ Thermal Power Generation's Effort
年 XX 月禁無断転載 Situation of Power System Flexibility ~ Thermal Power Generation's Effort Junichi Ogasawara Senior Economist, Manager, Electric Power Group, Assistant Director, Electric Power Industry & New
More information21st Century Power Grids: Reliable, Controllable and Resilient
21st Century Power Grids: Reliable, Controllable and Resilient Terry Boston President & CEO PJM Interconnection NAESO February 5, 2014 Greatest Engineering Achievements of the 20 th Century 10. Air Conditioning/
More informationISO on Background. Energy-efficiency forecast. Anne George. Stephen J. Rourke VICE PRESIDENT, SYSTEM PLANNING DECEMBER 12, 2012
DECEMBER 12, 2012 ISO on Background Energy-efficiency forecast Anne George VICE PRESIDENT, EXTERNAL AFFAIRS &CORPORATE COMMUNICATIONS Stephen J. Rourke VICE PRESIDENT, SYSTEM PLANNING Agenda 11:00-11:05
More informationFITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM
Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services
More informationSubmission to the IESO re: RDGI Fund Virtual Net Metering Investigation Topic
1. Introduction The Canadian Solar Industries Association (CanSIA) is a national trade association that represents the solar energy industry throughout Canada. CanSIA s vision is for solar energy to be
More information