1 APTA Sustainability Workshop BART: The Next 40 Years July 29, 2013
2 Overview 1. Regional Context 2. Sustainability at BART Reinvestment Environmental Management System BART Metro Stations 3. Summary 1
3 Regional Context 2
4 BART Background System Facts Elected Board of Directors nine districts 3 Counties: - Alameda, Contra Costa & San Francisco - Also serve San Mateo 104 total miles 5 lines 44 stations 46,000 parking spaces ~400,000 weekday riders Farebox recovery: 71% 3
5 Sustainability Challenge Promote Livability Renew and Clean Transit 4
6 BART Connects the Region 5
7 Current Travel Markets 2/3 of BART trips to/from Market Street stations East Bay Weekday Trips by Sub-Area 48%: Transbay 28%: intra-west Bay 24%: intra-east Bay Transbay West Bay 6
8 FY04 FY13 (Q3) Record BART Ridership: Avg. 6% annual growth over 2 years 420,000 Average Weekday Ridership Up nearly 100,000 trips since SFO Extension Opened 400, , , , , , ,000 J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 7
9 Projected Weekday Ridership 8
10 More Riders, More Crowding 9
11 BART Station Entries & Exits Nov. 15, 2012 (15 minute increments) Station Capacity is a Peak Period Embarcadero Issue at Embarcadero & Montgomery Montgomery Powell 0 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 MT EM PL CC 19th BK 16th 12th 24th MA BP ED PH WC FM DC FV EN GP RR WP MB LM CN SL UC 10
12 Optimize Ridership Expand travel markets where BART has ample capacity reverse commute regional sub-centers off-peak 11
13 Oakland a regional destination Opportunities Walkable grid Supportive zoning Sustainable transportation: o 3 downtown BART stations o AC Transit o Capitol Corridor Challenges Safety (perception + reality) Market demand Small parcels Last mile connectivity 12
14 Sustainability at BART Reinvestment 13
15 Critical Reinvestment Needs After 40 years, reinvestment and upgrades are vital 10 year need of $6 billion Big 3 investments: Fleet of the Future: 1,000 Rail Cars Train Control System Modernization Hayward Maintenance Complex Other key investments: State of Good Repair Capacity Stations 14
16 Regional Impacts of Not Reinvesting? UC Berkeley / Bay Area Council study If performance declines, what are the consequences for ridership and for the region? Need to reinvest $500+ M / annually Failure to reinvest - net regional economic loss: $22-33 Billion 15
17 Without Increased Investments, Condition of Assets Will Decline Good 31% Fair 35% Poor 34% Good 1% Fair 35% Poor 64% Today: 34 % of BART assets are rated Poor" and will cost $6 Billion to Fix In 10 Years: 64 % of BART assets will be rated Poor and will cost $12.4 Billion to Fix The longer we wait the higher the risk and expense 16
18 BART Is Already Reinvesting New seats Demonstration stations with upgraded signage, lighting, landscaping and station entrances Switch gears and track replacement. 17
19 BART Board Actions Feb Extended CPI-based fare increase program bi-annually through Dedicated towards Big 3 capital priorities: Fleet of the Future: Rail Cars Hayward Maintenance Complex Train Control Modernization Generates estimated $325 M over 8 year program. 18
20 BART Board Actions Feb Demand-based parking program expanded to East Bay. Dedicated toward critical station investments: Access Rehabilitation Modernization Generates an additional $10 M annually. Need exceeds resources. 19
21 Building the Fleet of the Future Extensive public outreach Improved customer experience Quieter (interior + exterior) Modern seating styles Better quality, automated communications Exterior color-coded destinations signs Car # Total Current Fleet (100%) Awarded 410 $1.4 B Total w/ Option 775 $2.6 B Total Need ( ) 1,000 $3.3 B 20
22 Synergies: Fleet of the Future State of Good Repair Replace aging fleet 30+ years average age Oldest fleet in country Already refurbished once Capacity 3-doors reduce dwell time More room for luggage, strollers, wheelchairs, and bikes Sustainability 5% more efficient (per spec.) Improved customer experience 21
23 Sustainability at BART Environmental Management System 22
24 Environmental Management System Photo Courtesy of European Commission, 23
25 CY07 BART Greenhouse Gas Emissions Inventory Sources Uses 24
26 Gridley, CA Solar Facility 25
27 Climate Change Adaptation Sea Level Rise Inundation Scenarios in 2050 Oakland Coliseum Traction Power Substation Sea Level Rise Inundation Scenarios in yr FEMA floodplain 26
28 Sustainability at BART BART Metro 27
29 California Climate Policy Framework AB32 CA Global Warming Solutions Act (2006) 1990 emissions levels by 2020 Executive Order #S-3-05 (2005) 80% below 1990 emissions by 2050 SB375 Sustainable Communities Strategy (2008) Regional GHG Emission Targets for Autos / Light Trucks 28
30 MTC / ABAG Plan Bay Area (2040) Regional Sustainability Four Counties Job Growth 665,000 new jobs Nearly 50% near BART Household Growth 400,000 new households Over 40% near BART Note: For four BART served counties: Alameda, Contra Costa, San Francisco, and San Mateo. 29
31 Metro Core and Metro Commute Metro Core 2025 Station Half-Mile Radius Employment Population 30
32 BART: The Next 40 Years BART Metro: Proposed Capital Projects Blue: Phase 1 Red: Phase 2 31
33 Sustainability at BART Stations 32
34 Functional Nodes to Places 33
35 Evolve to a Network of Great Places Pleasant Hill / Contra Costa Centre BART Dupont Circle, Washington, DC 34
36 BART Station Activity In Planning Montgomery Daly City West Oakland Lake Merritt 19 th St. / Oakland Coliseum North Concord/Martinez Dublin/Pleasanton (south) Ready for Development Solicitation Lake Merritt Hayward Bay Fair Union City In Development Negotiations Glen Park Coliseum Approved Development Richmond (II) Fruitvale (II) MacArthur South Hayward Completed Richmond (I) Fruitvale (I) Ashby (east) Hercules (I) El Cerrito del Norte El Cerrito Plaza Concord Millbrae Pittsburg / Bay Point Hercules (II) West Dublin/ Pleasanton San Leandro Walnut Creek Castro Valley (part) Hayward (part) Pleasant Hill Dublin/ Pleasanton (north) January 23,
37 Bicycle Access from Home to BART 5.5% 5.0% 4.8% 4.5% 4.2% 4.0% 3.5% 3.0% 3.1% 4.1% 2.5% 2.0% 1.5% 2.5% 2.5% 2.3% How did you travel between home and BART today? Source: BART Customer Satisfaction Surveys
38 Bike Parking at BART 5,300 Spaces and Expanding 3,300 rack spaces (paid area very popular) 750 in five Bike Stations 700 shared use BikeLink lockers 500 keyed lockers Bike Parking Capital Program Adding 2,000+ secure* parking spaces at 18 most popular biking stations over next couple years *secure = racks inside paid area, electronic lockers, bike stations 37
39 Bikes on BART Peak Pilot Series of pilot programs to test feasibility of allowing bikes on all trains at all times August 2012 Fridays March 2013 Full Work Week Five Month Extended Trial (currently in progress) Collaborative planning and evaluation Staff, Bike Coalitions, Accessibility and Bicycle Task Force, Board (final decision maker) More info on this program contact: 38
40 Summary 39
41 Finding the Right Balance 40 40
42 Vision for Next 40 Years BART reinvestment critical to attain vision: 1,000 rail cars, new train control, Hayward Maintenance State of Good Repair Capacity enhancements Support sustainable growth Better integrate BART into communities Create great places near BART stations Regional coordination 41
43 Questions? 42
Transit in Bay Area Blueprint
Rail~Volution 2010 Click to edit Master title style Transit in Bay Area Blueprint October 21, 2010 0 Bottom Line State-of-Good Repair essential for reliable transit service large funding shortfalls BART
More informationUCLA Lake Arrowhead Conference. October 18, 2010
BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1
More informationUCLA Lake Arrowhead Conference. October 18, 2010
BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1
More informationUCLA Lake Arrowhead Conference. October 18, 2010
BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1
More informationBART s Transbay Core Capacity Project
BART s Transbay Core Capacity Project Duncan Watry, Principal Planner Bay Area Rapid Transit Oakland, CA dwatry@bart.gov Donald Emerson, Principal Consultant WSP Parsons Brinckerhoff San Francisco, CA
More informationA Transit Plan for the Future. Draft Network Plan
A Transit Plan for the Future Draft Network Plan Project Overview and Status Completed Market Analysis and Service Evaluation. Developed Plan Framework and Guiding Principles. Developed a draft Five Year
More informationREPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES
TRANSIT GRADE: C- WHAT YOU SHOULD KNOW ABOUT TRANSIT FACILITIES California needs robust, flexible and reliable transit systems to reduce peak congestion on our highways, provide options for citizens who
More informationLeveraging Land Use Changes through Transportation Funding
Leveraging Land Use Changes through Transportation Funding Railvolution 2005 September 10, 2005 James Corless Senior Planner What is the MTC region? 9 7 101 26 San Francisco Bay Area counties Million people;
More informationA CASE STUDY FOR: BART
TCRP PROJECT H-52 Decision-Making Toolbox to Plan and Manage Park-and-Ride Facilities for Public Transportation A CASE STUDY FOR: BART BAY AREA RAPID TRANSIT OAKLAND, CA JULY 15, 2016 Prepared for: Transit
More informationSan Francisco Transportation Plan Update
San Francisco Transportation Plan Update SPUR August 1, 2011 www.sfcta.org/movesmartsf twitter.com/sanfranciscota www.facebook.com/movesmartsf How does the RTP relate to the SFTP? Regional Transportation
More informationEMU Procurement Seats/Standees/Bikes/Bathroom
EMU Procurement Seats/Standees/Bikes/Bathroom LPMG May 28, 2015 Purpose Seats / standees / bikes / bathroom balance Develop framework for Draft EMU RFP Feedback on car configuration and range of increased
More informationBalancing the Transportation Needs of a Growing City
Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program
More informationGoods Movement Plans. Summary of Needs Assessments. January 21, 2015 GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 6
Goods Movement Plans Summary of Needs Assessments January 21, 2015 GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 6 Goods Movement Vision and Goals GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT
More informationThe City of Toronto s Transportation Strategy July 2007
The City of Toronto s Transportation Strategy July 2007 Presentation Outline Transportation Statistics Transportation Building Blocks Toronto s Official Plan Transportation and City Building Vision Projects
More informationSustainability SFMTA Path to Platinum
Sustainability SFMTA Path to Platinum Ed Reiskin San Francisco Municipal Transportation Agency, Director of Transportation San Francisco, CA Timothy Papandreou Deputy Director Strategic Planning & Policy
More informationParking & TOD around BART Stations. Jessica ter Schure November 1, 2009 Rail~Volution 2009 Boston, Massachusetts
Parking & TOD around BART Stations Jessica ter Schure November 1, 2009 Rail~Volution 2009 Boston, Massachusetts Outline Background Replacement Parking Policy South Hayward BART MacArthur BART Parking Privatization
More informationPreliminary Alternatives Analysis Caltrain Modernization & High Speed Train Projects City of Millbrae
Preliminary Alternatives Analysis Caltrain Modernization & High Speed Train Projects City of Millbrae Dominic Spaethling Regional Program Manager Bethany Williams Public Involvement Manager, HNTB April
More informationPG&E s Energy Landscape. Gregg Lemler, vice president, electric transmission i-pcgrid Workshop March 28 30, 2018
PG&E s Energy Landscape Gregg Lemler, vice president, electric transmission i-pcgrid Workshop March 28 30, 2018 Implications Drivers The energy landscape is changing Policy Changes Market Trends Business
More informationTransportation Sustainability Program
Transportation Sustainability Program Photo: Sergio Ruiz San Francisco is a popular place to work, live and visit, straining the existing transportation network Roads and transit vehicles nearing capacity
More informationSpeaker Information Tweet about this presentation #TransitGIS
Making the Case for Transit: the Transit Competitiveness Index Title William E. Walter, GISP Speaker Information Tweet about this presentation #TransitGIS Understanding Conditions in Each Travel Market
More informationClick to edit Master title style
Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment
More informationPeninsula Corridor Electrification Project Cost / Schedule Update
Peninsula Corridor Electrification Project Cost / Schedule Update LPMG Meeting November 20, 2014 Context Caltrain/high-speed rail blended system - Primarily 2 track system - Minimize impacts - Shared system
More informationCaltrain Modernization EMU Procurement
Caltrain Modernization EMU Procurement Boarding Height CAC Meeting May 20, 2015 Context 2 1 Riders (Boardings) Average Weekday Ridership Since 2004 143% increase 60,000 55,000 50,000 45,000 40,000 35,000
More informationSAN FRANCISCO TO SAN JOSE PROJECT UPDATE
SAN FRANCISCO TO SAN JOSE PROJECT UPDATE San Francisco County Transportation Authority Tuesday, April 25, 2017 Ben Tripousis, Northern California Regional Director HIGH-SPEED RAIL: Connecting California
More informationRailyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY
Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY RAB Citizen Working Group Meeting, August 1 st 2016 CITIZEN WORKING GROUP (CWG)
More informationPolicy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost.
Policy Note Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost Recommendations 1. Saturate vanpool market before expanding other intercity
More informationValley Metro Overview. ITE/IMSA Spring Conference March 6, 2014
Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and
More informationCaltrain Downtown Extension Study Ridership Forecast Summary
Caltrain Downtown Extension Study Ridership Forecast Summary presented to Transbay Joint Powers Authority presented by Cambridge Systematics date: March 12, 2009 Transportation leadership you can trust.
More informationSan Francisco Mobility, Access & Pricing Study
San Francisco Mobility, Access & Pricing Study SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY Summer Workshops 2010 Downtown Growth Projections + 24,000 hsg units + 107,000 jobs +184,000 auto trips +88,000
More informationBART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010
BART Silicon Valley Berryessa Extension Project Community Update October 27, 2010 1 Agenda Welcome and Introductions Program and Project Background Project Status Project and Station Details Current and
More informationRecommended Vision for the Downtown Rapid Transit Network
Recommended Vision for the Downtown Rapid Transit Network April 2008 Presentation Overview Context Transit options Assessment of options Recommended network Building the network 2 1 Rapid Our Vision Reliable
More informationStrategic Plan Performance Metrics & Targets
San Francisco Municipal Transportation Agency Strategic Plan Performance Metrics & Targets Fiscal Year 2019 Fiscal Year 2020 April 3, 2018 SAFETY Goal 1: Create a safer transportation experience for everyone.
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS
More informationUTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018
UTA Transportation Equity Study and Staff Analysis Board Workshop January 6, 2018 1 Executive Summary UTA ranks DART 6 th out of top 20 Transit Agencies in the country for ridership. UTA Study confirms
More informationBi-County Transitway/ Bethesda Station Access Demand Analysis
Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction
More informationTransit and Job Growth: Lessons for SB 375. Jed Kolko Public Policy Institute of California
Transit and Job Growth: Lessons for SB 375 Jed Kolko Public Policy Institute of California Outline Approaches to reducing VMT The land use transportation connection California s experience with transit-oriented
More informationThe Future of Transportation on the Caltrain Corridor
The Future of Transportation on the Caltrain Corridor 11.30.16 1 2 Today What is happening Vision Recommendations What is costs How to pay for it 3 The Caltrain Corridor is home to the world s innovation
More informationTransportation Sustainability Program
Transportation Sustainability Program Photo: Sergio Ruiz A Comprehensive Approach to Growing Sustainably Public Investment and Strategies for Existing and Future Population Underway Transit capital and
More informationTransportation Electrification: Reducing Emissions, Driving Innovation. August 2017
Transportation Electrification: Reducing Emissions, Driving Innovation August 2017 CA raising the bar in environmental policy and action Senate Bill 350 (DeLeon, 2015) established broad and ambitious clean
More informationEVALUATION OF MTC S CLIMATE PROGRAM. May 7, 2015 TRB Sustainability for Transportation
EVALUATION OF MTC S CLIMATE PROGRAM May 7, 2015 TRB Sustainability for Transportation Metropolitan Transportation Commission Created by the California Legislature in 1970 Jurisdiction includes all 9 Bay
More informationElectric Multiple Unit Procurement Update
Electric Multiple Unit Procurement Update Public Meetings September 2014 Caltrain Today 2 1 Key Facts Diesel commuter rail system SF to SJ area 77 mile corridor, 32 stations 92 trains / weekday Ridership:
More informationSan Francisco Transportation Plan
San Francisco Transportation Plan Overview and Findings to Date November 13, 2012 www.sfcta.org/movesmartsf twitter.com/sanfranciscota www.facebook.com/movesmartsf Purpose of the SFTP San Francisco s long-range
More informationNortheast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study
Northeast Corridor Alternatives Analysis Public Involvement Round 2 Input on Alternatives for Further Study Feb. 7-9, 2012 Agenda Review project background Progress summary Recommended alternatives for
More informationMass Transit in Charlotte and San Antonio. Keith T. Parker, AICP
Mass Transit in Charlotte and San Antonio Keith T. Parker, AICP President/CEO Presentation Overview Charlotte Agency and Customer Profile San Antonio Agency and Customer Profile Attracting New Customers
More informationRail alignment and benefits (rab) study
Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study June 5, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create
More informationEast Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St
East Bay Bus Rapid Transit Project 1 AC Transit at a Glance EAST BAY AREA S LARGEST PUBLIC TRANSIT PROVIDER RIDERSHIP Daily (weekday) 178,851* Annual 54,987,132 Paratransit (daily) 1,994 ** * Includes
More informationQUALITY OF LIFE EXECUTIVE SUMMARY REPORT I O N S TAT I O N
QUALITY OF LIFE EXECUTIVE SUMMARY REPORT UN I O N S TAT I O N T R AV E L by TR A I N Published September 2017 2015 PROGRESS MAP This document reports FasTracks progress through 2015 BACKGROUND RTD The
More informationTransportation Sustainability Program
Transportation Sustainability Program Photo: Sergio Ruiz San Francisco 2016 Roads and public transit nearing capacity Increase in cycling and walking despite less than ideal conditions 2 San Francisco
More informationTransportation Demand Management January 25, 2017 Waterfront Plan Transportation Working Group. Date & Location
Transportation Demand Management January 25, 2017 Waterfront Plan Transportation Working Group Date & Location TDM Opportunities: Port Uses Visitor-serving uses Port tenants Future development Many TDM
More informationCaltrain Business Plan. Project Update July 2018 through January 2019
Caltrain Business Plan JANUARY 2019 Project Update July 2018 through January 2019 2 Business Plan Overview Business Plan Overview A Vision for Growth Crafting Scenarios Looking Beyond the Tracks Outreach
More informationCharlotte-Mecklenburg Region Rapid Transit and Land-Use Integration
Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration Legislative Committee on Urban Growth and Infrastructure Carolyn Flowers CEO Charlotte Area Transit System March 23, 2010 Charlotte Region
More informationBerkeley Lab - Innovative Fleet Ideas, Goal Performance & Challenges
Berkeley Lab - Innovative Fleet Ideas, Goal Performance & Challenges June 19, 2013 Blair Horst, PE, CEM Sustainability Coordinator / Energy Manager LBNL Happy Juneteenth!! Juneteenth: observed on June
More informationProposed FY2015 Budget and Fare Increase
Washington Metropolitan Area Transit Authority Proposed FY2015 Budget and Fare Increase Riders Advisory Council January 8, 2014 1 Washington Metropolitan Area Transit Authority What will riders see from
More informationFeasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study
Feasibility Study Community Meeting March, 2017 1 Agenda 1. Welcome / Introductions 2. Background / Meeting Purpose 3. Progress to Date Options Evaluated Capital/Operating Costs Ridership 4. Financial
More informationSTRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016
STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit
More informationIdeas + Action for a Better City learn more at SPUR.org. tweet about this #DisruptiveTransportation
Ideas + Action for a Better City learn more at SPUR.org tweet about this event: @SPUR_Urbanist #DisruptiveTransportation TNCs & AVs The Future Is Uncertain The Future Is Uncertain U.S. Dept of Transportation
More informationCITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6
2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY
More informationProposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1
Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation
More informationPlanning for Sustainability: Electric Vehicles
Planning for Sustainability: Electric Vehicles NYSMPO Conference June 23, 2015 Jennifer Ceponis Sr Transportation Planner Clean Communities Coordinator Clean Cities Mission To advance the energy, economic,
More informationMore than $9 Million coming to Central Valley for transportation
More than $9 Million coming to Central Valley for transportation From free bus service to electric buses Part of overall $97 Million awarded to public transportation projects A total of 152 local public
More informationThe Engineering Department recommends Council receive this report for information.
CORPORATE REPORT NO: R161 COUNCIL DATE: July 23, 2018 REGULAR COUNCIL TO: Mayor & Council DATE: July 19, 2018 FROM: General Manager, Engineering FILE: 8740-01 SUBJECT: Surrey Long-Range Rapid Transit Vision
More informationTransitioning to Integrated Sustainable Multi-mobility. A Model Climate Action Strategy
Transitioning to Integrated Sustainable Multi-mobility A Model Climate Action Strategy 8 03 2009 Timothy Papandreou Assistant Deputy Director Planning & Development SFMTA-Municipal Transportation Agency
More informationDowntown Transit Connector. Making Transit Work for Rhode Island
Downtown Transit Connector Making Transit Work for Rhode Island 3.17.17 Project Evolution Transit 2020 (Stakeholders identify need for better transit) Providence Core Connector Study (Streetcar project
More informationKeeping Seattle Moving Seattle City Council February 2013
Keeping Seattle Moving Seattle City Council February 2013 Seattle City Council February 2013 1 Mobility Challenges Ahead Viaduct mitigation expires June 2014 Potential system-wide service cuts begin in
More informationCONNECTING AND TRANSFORMING CALIFORNIA
CONNECTING AND TRANSFORMING CALIFORNIA High-Speed Rail Local Policy Maker Group (LPMG) San Carlos, CA January 28, 2016 INTRODUCTIONS 1 STATEWIDE OVERVIEW CONNECTING CALIFORNIA Phase I:» 520 Miles» San
More informationSmart City/Smart Mobility Strategy. Hans Larsen, Fremont Public Works Director May 2, 2018
Smart City/Smart Mobility Strategy Hans Larsen, Fremont Public Works Director May 2, 2018 About Fremont 230,000 Population; 4 th Largest City in Bay Area About Fremont #1 Happiest Place to Live in America
More informationUS 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017
US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master
More informationThis letter provides SPUR s comments on the Draft Supplemental Environmental Impact Statement/ Subsequent Environmental Impact Report.
Tom Fitzwater, Environmental Planning Manager VTA Environmental Programs & Resources Management 3331 North First Street, Building B-2 San Jose, CA 95134 March 6, 2017 Submitted Electronically Re: VTA s
More informationAPPLICATION OF A PARCEL-BASED SUSTAINABILITY TOOL TO ANALYZE GHG EMISSIONS
APPLICATION OF A PARCEL-BASED SUSTAINABILITY TOOL TO ANALYZE GHG EMISSIONS Jung Seo, Hsi-Hwa Hu, Frank Wen, Simon Choi, Cheol-Ho Lee Research & Analysis Southern California Association of Governments 2012
More informationHelp shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary
Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County
More informationExecutive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1
Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line
More informationEnd-of-Year Performance Report FY Community Relations Committee December 5, 2018
End-of-Year Performance Report FY 2018 Community Relations Committee December 5, 2018 Annual Summary Shuttles Ridership All Modes Performance Statistics Highlights All Modes Initiatives 2 Bus Ridership
More informationACEforward. BART Connectivity Alternatives Preliminary Forecasts and Costs Altamont Regional Rail Working Group July 13, 2016
ACEforward ACEforward BART Connectivity Alternatives Preliminary Forecasts and Costs Altamont Regional Rail Working Group July 13, 2016 ACEforward Project Goals Tri-Valley BART Connection Union City BART
More informationTRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury
TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury Open House Presentation January 19, 2012 Study Objectives Quantify the need for transit service in BWG Determine transit service priorities based
More informationACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010
ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010 Presentation Outline Context t of Mississauga i City Centre Implementing Paid Parking and TDM
More informationDraft Results and Open House
Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi
More informationWaco Rapid Transit Corridor (RTC) Feasibility Study
Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM
More informationCustomer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan
Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan Page 72 of 96 Washington Metropolitan Area Transit Authority Board Action/Information Summary
More informationRail alignment and benefits (rab) study
Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study May 22, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create
More informationCaltrain Business Plan
Caltrain Business Plan FEBRUARY 2019 LPMG February 28, 2019 Caltrain Business Plan Project Update 2 3 What is the Caltrain Business Plan? What Why Addresses the future potential of the railroad over the
More informationClimate Change. November 29, 2018 Growth Management Policy Board
Climate Change November 29, 2018 Growth Management Policy Board VISION 2050 and Climate Change 1. Climate Background Paper: Background information Regional inventory Emission reduction efforts Potential
More informationThe Northeast Corridor Master Plan Amtrak s Next Generation High-Speed Rail and Northeastern Maryland
The Northeast Corridor Master Plan Amtrak s Next Generation High-Speed Rail and Northeastern Maryland Chesapeake Science & Security Corridor Regional Rail Committee Meeting October 20, 2010 Drew Galloway
More informationSuccessful Passenger Rail in the State of California
Successful Passenger Rail in the State of California Texas Transportation Forum Austin, Texas Eugene K. Skoropowski, Managing Director Capitol Corridor Joint Powers Authority (CCJPA) Oakland, California
More informationKANSAS CITY STREETCAR
KANSAS CITY STREETCAR KAREN CLAWSON MID-AMERICA REGIONAL COUNCIL KANSAS CITY STREETCAR Regional Context Alternatives Analysis Kansas City Streetcar Project KANSAS CITY REGION KANSAS CITY REGION KANSAS
More informationKey Findings. February 2009 Caltrain Annual Passenger Counts
Key Findings February 2009 Caltrain Annual Passenger Counts The 2009 annual Caltrain passenger counts, which were conducted starting in late-january and were complete by mid-february, followed the same
More informationL. A. Metro s Parking Management Program Principles Applied. October 17, 2011 Rail-Volution, Washington D.C.
Los Angeles County Metropolitan Transportation Authority L. A. Metro s Parking Management Program Principles Applied October 17, 2011 Rail-Volution, Washington D.C. What is Parking Management? Various
More informationRestoration of Historic Streetcar Services in Downtown Los Angeles
Restoration of Historic Streetcar Services in Downtown Los Angeles Early Scoping Meeting for Alternatives Analysis (AA) May 17, 2011 Introduction Key players Local lead agency: Metro Federal lead agency:
More informationHigh Speed Rail Conference
High Speed Rail Conference Denver, October 23, 2012 FAST START PROJECT FOR PENINSULA HIGH-SPEED RAIL Kern Jacobson InfraConsult LLC Objective Evaluate incremental approach to expedite high-speed rail to
More informationState of California Transit and Intercity Passenger Rail Program. Caltrain Grant Application Overview January 2018
State of California Transit and Intercity Passenger Rail Program Caltrain Grant Application Overview January 2018 TIRCP Program Overview The TIRCP provides grants from the Greenhouse Gas Reduction Fund
More informationElectric Multiple Unit Procurement Update
Electric Multiple Unit Procurement Update Board of Directors August 7, 2014 Context* * The proposed project is not yet approved pending environmental clearance. 2 1 Status April 2014 - JPB update on EMU
More informationMay 23, 2011 APTA Bus & Paratransit Conference. Metro ExpressLanes
May 23, 2011 APTA Bus & Paratransit Conference Metro ExpressLanes Program Overview > Conversion of HOV lanes to HOT lanes on I-10 and I-110 > Multi-modal Integrated Corridor Emphasis > 1 of 6 Nationwide
More informationSound Transit Operations July 2016 Service Performance Report. Ridership
Ridership Total Boardings by Mode Mode Jul-15 Jul-16 % YTD-15 YTD-16 % ST Express 1,618,779 1,545,852-4.5% 10,803,486 10,774,063-0.3% Sounder 333,000 323,233-2.9% 2,176,914 2,423,058 11.3% Tacoma Link
More informationHillsborough County MPO Transit Study. Transit Concept for 2050 October 17, 2007
Hillsborough County MPO Transit Study Transit Concept for 2050 October 17, 2007 Transit Technologies Technologies Considered Bus Light Rail Commuter Rail Bus Standard or articulated high-capacity vehicles
More informationStaff Contact: Carlos de Melo, Community Development Director, (650)
Meeting Date: April 10, 2018 STAFF REPORT Agency: City of Belmont Staff Contact: Carlos de Melo, Community Development Director, (650) 595-7440 cdemelo@belmont.gov Agenda Title: Agenda Action(s): Caltrain
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: COMMUNITY BUS SERVICES ACTION ITEM RECOMMENDATION It is recommended that the Board not approve any routing
More informationThe Future of Rail in Maryland. Kevin B. Quinn, Jr. Administrator
The Future of Rail in Maryland Kevin B. Quinn, Jr. Administrator The Future of Rail in Maryland Rolling Stock Metro Railcar Replacement Under the project, MDOT MTA is replacing the metro fleet with 78
More informationFREQUENTLY ASKED QUESTIONS
FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program
More information2019 New Transit Service Plan
Agenda Item 7.2 2019 New Transit Service Plan Draft Proposal VTA Board of Directors January 2019 Background: Next Network Plan and Today s Plan Early 2016 Transit Choices report and the ridership-coverage
More informationMiami Streetcar Efficient Transportation. A Discussion on Future Transportation Opportunities
Miami Streetcar Efficient Transportation A Discussion on Future Transportation Opportunities Discussion Item City Commission Meeting September 29 th, 2014 Miami Streetcar has been supported through the
More informationDRAFT TREASURE ISLAND TRAVEL DEMAND MODELING & ANALYSIS DOCUMENTATION MEMORANDUM
DRAFT TREASURE ISLAND TRAVEL DEMAND MODELING & ANALYSIS DOCUMENTATION MEMORANDUM PREPARED FOR: PREPARED B Y: JULY 21, 2016 1 Table of Contents Table of Contents... 2 Table of Figures... 3 Table of Tables...
More information