1 National Committee Kosovo SEERC October 2017 Istanbul

2

3 CIGRE National Committee KOSOVO The CIGRE National Committee of Kosovo was recognized by the Administrative Council of CIGRE, consulted by correspondence on September 8 th 2017, after considering the request for formal recognition dated August 2 nd 2017, as a National Committee of CIGRE International.

4 An overview of Kosovo s transmission system development

5 KOSTT s Role in the Power System of Kosovo KOSTT J.S.C is the electricity Transmission, System and Market Operator of the Republic of Kosovo, a publicly owned company with 100% of shares owned by the Republic of Kosovo. KOSTT manages the operation, maintenance and development of the electricity transmission system at 400kV, 220kV and 110kV. Transformers connected to the distribution network: 220/35//10 kv and 110/35/10 (20) kv also belong to the transmission system. KOSTT complies with the provisions of the: Grid Codes Electrical Standards Code & Technical Equipment Code Connection Charging Methodology ENTSO-E Operational handbook As a result of the central geographical position, KOSTT, although small in size, represents a very important transmission hub in Southeast Europe

6 Role and Responsibilities KOSTT performs: Real Time Operation Observability of neighboring transmission grids Short (Day Ahead), Medium and Long term Planning\Analysis Provides Transmission services under regulated tariff Provides non-discriminatory third party access to the grid Enhances reliability and balances the system Planning, development and maintenance of network Facilitation and operation of the market 6

7 Licenses for Transmission System Operator and Electricity Market Operator, KOSTT is responsible for: Planning, operation, maintenance and development Efficient, economic and coordinated operation of the transmission system, including cross-border flows Balancing of the system Provision of non-discriminatory access for transmission system users Encouraging efficient competition in electricity generation and supply Encouraging economic efficiency in applying Market Rules and performance of activities in compliance with the Market Rules Management of the final settlement processes

8

9 Kosovo Transmission System interconnected with SEE network

10 Kosovo Power System Main Data Power Balance Kosovo generation capacities-2016 TPP capacities/ available capacities: Kosova B+Kosova A= /1550MW/790 MWav HPPs= 63 MW Total available capacities = 853 MW Electricity Energy Balance Electricity production (2016) TPPs=5736 GWh HPPs= 183 GWh Total electricity production = 5919 GWh Peak Load 2016: 1160 MW + Consumption GWh MW -307 MW GWh Imports during the peak load=571gwh Exports during light load and summer=1064 GWh! Voltage Level 400 kv 220 kv 110 kv OH Lines Length (km) Transformers No. Capacity MVA 400/220 3 x /110 4 x /110 9 x /35 2 x /35/10(20) 1x /10(20) 1x /35/10(20)

11 Investments in Transmission System Investments in Transmission System Investments ,924, Investments in Transmission System/Asset value Asset Value with KOSTT-KEK split-up Investments % 11% 50 projects mil euro 11

12 Main Transmission Investment Projects Reinforcement category: /110 kv substations, - Interconnection line 400kV Kosovo Albania together with LFC project - 12 new 110 kv lines and re-conductor (increase of capacities) - 5 autotransformers and 21 power transformers Load support category /35/10 kv Substations Refurbishment Category - 90% of existing Substations are renewed ( modern equipment's) System Support Category - New SCADA/EMS system/modern telecommunication infrastructure - New measurement systems at interconnection and with other connected parties - 100% new relay protection systems 12

13 Aims /achievements so far Enable security and quality of supply as far as transmission capacity concerned Reduction of power losses Reduction of energy not supplied Fully complaint with GRID CODE and ENTSO-E requirements Support for generation development/extensions in the connections Support for Renewable Energy Integration in Transmission System Support for market development and regional integrations of KOSTT Ensure stable transit flows through KOSTT network for regional power systems needs

14 400 kv Line Kosovo B (KS) Tirana 2 (AL) The line is finished in Jul 2016, 242 km, 2x490mm 2, 95 km Kosovo Territory, 36 M investment of KOSTT The line is still out of operation due to no implementation of Connection Agreement with ENSTO-E During past months the line was switched on, three times for short time only in the alert and emergency condition of neighbouring system i.e. OST, when they requested from KOSTT to prevent cascading effects of overloaded lines. Those activities prove the importance of the line for security of regional transmission network. The line is an important interconnector which supports increase of power transactions in region and security operation of regional transmission network.

SET Plan The 10th Year Anniversary Central European Energy Conference 2017

SET Plan The 10th Year Anniversary Central European Energy Conference 2017 MARKET COUPLING: UKRAINIAN WAY SET Plan The 10th Year Anniversary Central European Energy Conference 2017 UKRENERGO 2 TRANSMISSION COMPANY (state-owned, consists of 8 regional systems) Substations 137

More information

Security of supply II: Electric Transmission System Reliability

Security of supply II: Electric Transmission System Reliability Security of supply II: Electric Transmission System Reliability Jasmina Trhulj Senior Expert for Electricity NARUC Energy Regulatory Partnership Program The Energy Agency of the Republic of Serbia & The

More information

The State of the National Transmission. Key Regulatory Issues and the State of Regulation in Transmission. ss AMAYAK AMIRAGHYAN

The State of the National Transmission. Key Regulatory Issues and the State of Regulation in Transmission. ss AMAYAK AMIRAGHYAN The State of the National Transmission System in the Republic of Armenia: Key Issues and the State of Regulation in Transmission ss AMAYAK AMIRAGHYAN Head of Legal and Licensing i Department t PSRC Republic

More information

DT-PA-001 TRANSMISSION DEVELOPMENT PLAN. ver. 0.2 page 1 of 148. Office: Long-term Planning and Development

DT-PA-001 TRANSMISSION DEVELOPMENT PLAN. ver. 0.2 page 1 of 148. Office: Long-term Planning and Development ver. 0.2 page 1 of 148 2014-2023 ver. 0.2 page 2 of 148 1. INTRODUCTION... 5 1.1. Role of the Transmission System and Market Operator... 7 1.2. Transmission network... 8 1.3. Access to Planning... 10 1.4.

More information

The Development of Adequate Energy Infrastructure in Albania and Alternative Resource Options

The Development of Adequate Energy Infrastructure in Albania and Alternative Resource Options ERE-IURC Partnership E R E The Development of Adequate Energy Infrastructure in Albania and Alternative Resource Options Commissioner Petrit Ahmeti ERE - Albania 17-21 April, 2006 RESTRUCTURING OF ELECTRICITY

More information

TURKISH POWER SYSTEM OVERVIEW AND INTERCONNECTION WITH GEORGIAN POWER SYSTEM TURKISH ELECTRICITY TRANSMISSION CORPORATION (TEIAS)

TURKISH POWER SYSTEM OVERVIEW AND INTERCONNECTION WITH GEORGIAN POWER SYSTEM TURKISH ELECTRICITY TRANSMISSION CORPORATION (TEIAS) TURKISH POWER SYSTEM OVERVIEW AND INTERCONNECTION WITH GEORGIAN POWER SYSTEM TURKISH ELECTRICITY TRANSMISSION CORPORATION (TEIAS) 1 CONTENT MAIN FUNCTIONS OF TEIAS TURKISH POWER SYSTEM OVERVIEW EXISTING

More information

Current Status and Prospects for the Development of the Power Sector of Ukraine Sergey Titenko

Current Status and Prospects for the Development of the Power Sector of Ukraine Sergey Titenko Current Status and Prospects for the Development of the Power Sector of Ukraine Sergey Titenko Chairman of the National Electricity Regulatory Commission of Ukraine Carmel, Indiana, 18-21 October 2010

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

Introduction to Charging: Which Parties Pay Which Charges?

Introduction to Charging: Which Parties Pay Which Charges? Introduction to Charging: Which Parties Pay Which Charges? Information I National Grid Last Updated December 2015 Connection Charging - The cost of sole use assets required to connect to the transmission

More information

Building Collaboration Between East African Nations via Transmission Interconnectors

Building Collaboration Between East African Nations via Transmission Interconnectors Building Collaboration Between East African Nations via Transmission Interconnectors Eng. Christian M.A. Msyani Ag. DEPUTY MANAGING DIRECTOR TRANSMISSION - TANESCO CONTENTS 1. TANESCO - Existing Power

More information

Introducing the Energy Market in Albania. Ermela Hoxha Senior Energy Expert

Introducing the Energy Market in Albania. Ermela Hoxha Senior Energy Expert Introducing the Energy Market in Albania Ermela Hoxha Senior Energy Expert General Overview BUSINESS OPPORTUNITIES Despite having a small size, Albania s emerging economy represents significant opportunities

More information

Transmission Grid Development & Investment Planning on EHV Level in Germany

Transmission Grid Development & Investment Planning on EHV Level in Germany Transmission Grid Development & Investment Planning on EHV Level in Germany February, 27th, 2018 Michael Jesberger 1 Kilometer (km) = 0,602 miles 1 Euro = 1,22 $ (Februry, 8th, 2018) March 2016 TenneT

More information

Opportunities for Export and Trade Development: Electricity Export Expansion to Europe. Joint EFET & DTEK Legal Workshop

Opportunities for Export and Trade Development: Electricity Export Expansion to Europe. Joint EFET & DTEK Legal Workshop Opportunities for Export and Trade Development: Electricity Export Expansion to Europe Joint EFET & DTEK Legal Workshop March 2012 Electricity export: history and nowadays Ukraine provides electricity

More information

Electricity System Operator EAD. Difficulties in Grid Planning & Development

Electricity System Operator EAD. Difficulties in Grid Planning & Development Electricity System Operator EAD Difficulties in Grid Planning & Development The Electricity System Operator EAD is responsible for managing the Bulgarian power system, its parallel operation with other

More information

Electricity industry structure and key players

Electricity industry structure and key players Electricity industry structure and key players Growth in capacity, production and consumption, 2006 2017 Expected demand and addition to generation capacity, 2018 2027 Growth in transmission network and

More information

JSC ELECTRICITY SYSTEM COMMERTIAL OPERATOR ACTIVITY REPORT YEAR 2016

JSC ELECTRICITY SYSTEM COMMERTIAL OPERATOR ACTIVITY REPORT YEAR 2016 JSC ELECTRICITY SYSTEM COMMERTIAL OPERATOR ACTIVITY REPORT YEAR 2016 BALANCING ELECTRICITY TRADE GUARANTEED CAPACITY TRADE ELECTRICITY IMPORT AND EXPORT SUPPORT OF CONSTRUCTION OF NEW HYDRO POWER PLANTS

More information

Net Consumption (GWh)

Net Consumption (GWh) GEORGIAN ENERGY MARKET Over the last 20 years Georgia s power market has evolved from a vertically integrated single buyer utility, to a competitive regional power market model. The Georgian wholesale

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

Electricity industry structure and capacity growth trends

Electricity industry structure and capacity growth trends Electricity industry structure and capacity growth trends Restructuring since 1997 has resulted in the separation of electricity generation from transmission and distribution. However, the sector continues

More information

CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO. Rexhep Shaqiri 1, Bogdanov Dimitar 2.

CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO. Rexhep Shaqiri 1, Bogdanov Dimitar 2. CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO Rexhep Shaqiri 1, Bogdanov Dimitar 2 1 Technical University - Sofia, E-mail: rexhep_shaqiri@hotmail.com). 2 Technical University -

More information

Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report

Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report 260 TO: FROM: SUBJECT: ECAC Members Jamie Asbury, deputy energy manager, Business/Regulatory Five (5) Generator Interconnection

More information

The Electric Power System

The Electric Power System The Electric Power System - Ukraine (ver. 05/11/2015) 1 Basic facts 2 Area: 603 500 km 2 The figure shown includes the area of Crimea (27,000 km 2 ), de facto controlled by Russia, claimed by Ukraine.

More information

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool WIRES University Overview of ISO/RTOs Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool 1 OUR MISSION Helping our members work together to keep the lights on

More information

Da Afghanistan Breshna Sherkat

Da Afghanistan Breshna Sherkat Da Afghanistan Breshna Sherkat DABS PRESENTATION 14 September 2014 DABS Home Office Kabul, Afghanistan www.dabs.af 1 AFGHANISTAN ENERGY SECTOR Afghanistan Energy Infrastructure, generation, transmission

More information

REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST

REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST MEGAN O REILLY COALITION FOR CLEAN AFFORDABLE ENERGY EPE IRP STAKEHOLDER

More information

The SAARC Power Grid Nepal s Perspective

The SAARC Power Grid Nepal s Perspective The SAARC Power Grid Nepal s Perspective Anil Rajbhandary Director, Power Trade Department, NEA Medium Term Vision for Energy Connectivity in the SAARC Region 10 March, 2015; Islamabad Energy Resources

More information

Regional Cooperation Infrastructure Development and Operation. EU Energy Governance. Olaf Ziemann Member of ENTSO-E s System Operations Committee

Regional Cooperation Infrastructure Development and Operation. EU Energy Governance. Olaf Ziemann Member of ENTSO-E s System Operations Committee Regional Cooperation Infrastructure Development and Operation EU Energy Governance 30 April 2014, Berlin Olaf Ziemann Member of ENTSO-E s System Operations Committee About ENTSO-E 41 TSOs from 34 countries

More information

RES integration into energy system

RES integration into energy system RES integration into energy system Konstantin Staschus ENTSO-E, Secretary-General SET-Plan Conference, Bratislava, 2 December 2016 1 WHO IS ENTSO-E? 2 THE POWER SYSTEM IS CHANGING, SO ARE WE Where we were

More information

Electricity Transmission network charging

Electricity Transmission network charging Electricity Transmission network charging An introductory guide January 2018 All users of the GB electricity transmission system pay network charges in some way. Generators pay to use the network to transport

More information

Impact of Distributed Energy Resources on Transmission System Reliability

Impact of Distributed Energy Resources on Transmission System Reliability S E P T E M B E R 1 3, 2 0 1 8 W E B I N A R Impact of Distributed Energy Resources on Transmission System Reliability National Council on Electricity Policy (NCEP) Alan McBride D I R E C T O R, T R A

More information

Renewable Energy Development in the Mediterranean Region Renewable Energy Investments In The Mediterranean And Beyond

Renewable Energy Development in the Mediterranean Region Renewable Energy Investments In The Mediterranean And Beyond Dott. Matteo Codazzi Milano, 30.10.2017 Renewable Energy Development in the Mediterranean Region Renewable Energy Investments In The Mediterranean And Beyond Milano, CESI has a solid track record in RES

More information

Metering Competition within the Australian Regulatory Framework

Metering Competition within the Australian Regulatory Framework Metering Competition within the Australian Regulatory Framework Maria Cugnetto Metering Billing CRM/CIS Conference Barcelona, EUROPE Tuesday 20 September 2005 Cugnetto Consulting 1 Metering Competition

More information

REGIONAL STRATEGY FOR SUSTAINABLE HYDROPOWER IN THE WESTERN BALKANS

REGIONAL STRATEGY FOR SUSTAINABLE HYDROPOWER IN THE WESTERN BALKANS This project is funded by the European Union REGIONAL STRATEGY FOR SUSTAINABLE HYDROPOWER IN THE WESTERN BALKANS On Grid Connection Issues Related with Prospective HPP Projects (Presentation of Background

More information

THE ELECTRICAL POWER SECTOR IN THE REPUBLIC OF BULGARIA

THE ELECTRICAL POWER SECTOR IN THE REPUBLIC OF BULGARIA STATE ENERGY REGULATORY COMMISSION THE ELECTRICAL POWER SECTOR IN THE REPUBLIC OF BULGARIA Sofia, 23-27 September 2002 Control Division It started functioning as of July 2000 Structure: - Electrical Energy

More information

SPP OVERVIEW. Mike Ross Senior Vice President, Government Affairs and Public Relations

SPP OVERVIEW. Mike Ross Senior Vice President, Government Affairs and Public Relations SPP OVERVIEW Mike Ross Senior Vice President, Government Affairs and Public Relations 1 Our Mission Helping our members work together to keep the lights on today and in the future. 2 NORTH AMERICAN INDEPENDENT

More information

European Energy Forum dinner-debate: «Grids of the future and future of the grids»

European Energy Forum dinner-debate: «Grids of the future and future of the grids» European Energy Forum : «Grids of the future and future of the grids» Michel DERDEVET General Secretary and Member of the Board - Enedis DSOs: main features in the EU The variety of distribution system

More information

New Power Market Model. Activities towards market integration in compliance with the New European Legislation

New Power Market Model. Activities towards market integration in compliance with the New European Legislation New Power Market Model. Activities towards market integration in compliance with the New European Legislation 30-31 May 2012, Thessaloniki Content Bulgarian Power System. Basic Statistical Data New Energy

More information

Regional Market Integration

Regional Market Integration Regional Market Integration European TSO go ahead! VI World Forum on Energy Regulation 25-28 May 2015, Istanbul Konstantin Staschus, Ph.D. Secretary-General ENTSO-E Key Messages «In the free market context

More information

Electricity sector overview

Electricity sector overview Electricity sector overview Electricity market structure Snapshot of electricity sector Growth in capacity and production Growth in consumption Growth in transmission line and transformer capacity Institutional

More information

Tallinn. CEO, AS Nordic Energy Link

Tallinn. CEO, AS Nordic Energy Link Estlink connecting power markets Tallinn Indrek Aarna CEO, AS Nordic Energy Link May 9, 2006 Outline Overview of the Baltic Power System Estlink HVDC interconnector Effect of Estlink on security of supply

More information

Introduction to transmission network characteristics - technical features. Slobodan Markovic EKC Athens,

Introduction to transmission network characteristics - technical features. Slobodan Markovic EKC Athens, Introduction to transmission network characteristics - technical features Slobodan Markovic EKC Athens, 06.03.2017 1 MAIN ISSUES The map shows the region that will be included in the network modelling

More information

DG system integration in distribution networks. The transition from passive to active grids

DG system integration in distribution networks. The transition from passive to active grids DG system integration in distribution networks The transition from passive to active grids Agenda IEA ENARD Annex II Trends and drivers Targets for future electricity networks The current status of distribution

More information

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

Updates. Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission and Regional Updates Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission Overview 16,400 circuit-miles of transmission lines 12,685 MW record peak demand

More information

Shkel Photovoltaic Parks in Albania. August 2017

Shkel Photovoltaic Parks in Albania. August 2017 Shkel Photovoltaic Parks in Albania August 2017 Albania Overview Combining advantageous location and government incentives Albania at a glance Location : Located on the Balkan peninsula, Albania belongs

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

Romania Industry structure

Romania Industry structure Country Profiles 2.4.26 Romania 2.4.26.1 Industry structure Romania was among the first few southeast European countries to initiate power sector reforms in the late 1990s as the country negotiated its

More information

PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES

PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES 1 PRESENTATION OUTLINE Generation System Demand Outlook Existing Generation Resources Transmission System National Interconnected

More information

PRESENTATION ON ELECRICITY SUPPLY IN BOTSWANA. Botswana China Business Forum. 31 August 2018

PRESENTATION ON ELECRICITY SUPPLY IN BOTSWANA. Botswana China Business Forum. 31 August 2018 PRESENTATION ON ELECRICITY SUPPLY IN BOTSWANA Botswana China Business Forum 31 August 2018 PRESENTATION PLAN 1. THE ELECTRICITY SUPPLY INDUSTRY IN BOTSWANA 2. ELECTRICITY CONSUMPTION AND SOURCES OF SUPPLY

More information

(1) Current State and Issues of the Electricity Sector in Indonesia

(1) Current State and Issues of the Electricity Sector in Indonesia Japanese ODA Loan Ex-ante Evaluation 1. Name of the Project Country: The Republic of Indonesia Project: Java-Sumatra Interconnection Transmission Line Project (I) Loan Agreement: April 30, 2010 Loan Amount:

More information

LAW OF THE REPUBLIC OF KAZAKHSTAN # 588-II DATED JULY 9, 2004 ON THE ELECTRIC POWER INDUSTRY

LAW OF THE REPUBLIC OF KAZAKHSTAN # 588-II DATED JULY 9, 2004 ON THE ELECTRIC POWER INDUSTRY LAW OF THE REPUBLIC OF KAZAKHSTAN # 588-II DATED JULY 9, 2004 ON THE ELECTRIC POWER INDUSTRY The present Law shall regulate social relations emerging in the process of generation, transmission and usage

More information

Grid Energy Storage: Policies

Grid Energy Storage: Policies Grid Energy Storage: Policies John Martin, P. Eng. Senior Tariff and Special Projects Advisor Alberta Electric System Operator (AESO) IEEE Northern Canada Section PES/IAS Chapter Seminar, 21 Nov 2017,

More information

Renewables from a TSO Perspective. M.BENA, SmartGrids Director, RTE, French TSO Vienna, 18 May 2015

Renewables from a TSO Perspective. M.BENA, SmartGrids Director, RTE, French TSO Vienna, 18 May 2015 Renewables from a TSO Perspective M.BENA, SmartGrids Director, RTE, French TSO Vienna, 18 May 2015 RTE in Europe 8500 employees Owner and Operator of the Assets 100 000 km UHV and HV lines (400 kv -> 63

More information

Mayor s Energy Task Force. Railbelt Transmission November 6 th, 2013

Mayor s Energy Task Force. Railbelt Transmission November 6 th, 2013 Mayor s Energy Task Force Railbelt Transmission November 6 th, 2013 Current Certificated Service Territories 2 3 4 5 Existing Challenges Limited Interconnection Between Regions Transfer Capacity is Stretched

More information

Distributed Solar Policy Case Study: NEVADA

Distributed Solar Policy Case Study: NEVADA Distributed Solar Policy Case Study: NEVADA National Conference of State Legislatures National Association of State Energy Officials September 28, 2017 Angela Dykema Nevada Governor s Office of Energy

More information

Flexible gas markets for variable renewable generation

Flexible gas markets for variable renewable generation Flexible gas markets for variable renewable generation Marion LABATUT EURELECTRIC, Advisor Wholesale markets electricity and gas UNECE TF Brussels, 2 nd December 2015 2030 Framework for Climate and Energy

More information

Brief characteristic of the land plots selected for the construction of facilities, oscillating and transporting capacities of the on-grid solar and

Brief characteristic of the land plots selected for the construction of facilities, oscillating and transporting capacities of the on-grid solar and Brief characteristic of the land plots selected for the construction of facilities, oscillating and transporting capacities of the on-grid solar and wind power plants in Zhyvachiv, Tlumach district, Ivano-Frankivsk

More information

The role of Transmission System Operator in Belgium and in Europe. Vlerick Alumni Event 26 January 2016

The role of Transmission System Operator in Belgium and in Europe. Vlerick Alumni Event 26 January 2016 The role of Transmission System Operator in Belgium and in Europe Vlerick Alumni Event 26 January 2016 Agenda Introduction Infrastructure management Controlling the system Developing the EU Market 1/25/2016

More information

California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference

California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference Presented by Edward Randolph Energy Division Director, California Public Utilities

More information

7 th REGIONAL ENERGY CONFERENCE Konstantin Konstantinov, CEO, IBEX

7 th REGIONAL ENERGY CONFERENCE Konstantin Konstantinov, CEO, IBEX IBEX'S INVOLVEMENT IN MARKET COUPLING BETWEEN THE COUNTRIES IN SEE REGION AND ITS INTEGRATION INTO THE INTERNAL ENERGY MARKET 7 th REGIONAL ENERGY CONFERENCE Konstantin Konstantinov, CEO, IBEX Agenda Integration

More information

The Grid Link Project. Summary of the Report for the Independent Expert Panel

The Grid Link Project. Summary of the Report for the Independent Expert Panel The Grid Link Project Summary of the Report for the Independent Expert Panel Who are EirGrid - and what do we do? EirGrid is responsible for a safe, secure and reliable supply of electricity: now and in

More information

ERCOT Overview. Paul Wattles Senior Analyst, Market Design & Development. Solar Energy Industries Association July 11, 2012

ERCOT Overview. Paul Wattles Senior Analyst, Market Design & Development. Solar Energy Industries Association July 11, 2012 ERCOT Overview Paul Wattles Senior Analyst, Market Design & Development Solar Energy Industries Association History of Electric Reliability Council of Texas, Inc. 1941 Utilities band together to aid war

More information

Energy and Mobility Transition in Metropolitan Areas

Energy and Mobility Transition in Metropolitan Areas Energy and Mobility Transition in Metropolitan Areas GOOD GOVERNANCE FOR ENERGY TRANSITION Uruguay, Montevideo, 05/06 October 2016 Energy and Mobility Transition in Metropolitan Areas Agenda I. INTRODUCTION

More information

Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective

Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective 2 Storage: the DNO perspective Context to the storage boom Smarter Network Storage: What have we achieved?

More information

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY 2011-2020 P+ PowerPlus Engineering A Department of STAR Energy Services, LLC TEN YEAR PLANNING GUIDE 2011-2020 SHASTA LAKE ELECTRIC UTILITY CITY OF

More information

GC108: EU Code: Emergency & Restoration: Black start testing requirement

GC108: EU Code: Emergency & Restoration: Black start testing requirement Stage 01: Modification Proposal Grid Code GC108: EU Code: Emergency & Restoration: Black start testing requirement Purpose of Modification: This modification seeks to align the GB Grid Code with the European

More information

JSC ELECTRICITY SYSTEM COMMERTIAL OPERATOR ACTIVITY REPORT YEAR 2015

JSC ELECTRICITY SYSTEM COMMERTIAL OPERATOR ACTIVITY REPORT YEAR 2015 JSC ELECTRICITY SYSTEM COMMERTIAL OPERATOR ACTIVITY REPORT YEAR 2015 BALANCING ELECTRICITY TRADE GUARANTEED CAPACITY TRADE ELECTRICITY IMPORT AND EXPORT SUPPORT OF CONSTRUCTION OF NEW HYDRO POWER PLANTS

More information

Click to edit Master title style

Click to edit Master title style Challenges in grid planning and market integration moving towards the digital energy shift Trondheim, 28 April 2017 Information Technology and Electrical Engineering the digital energy shift Click to edit

More information

Overview of ISO New England and the New England Wholesale Power Markets

Overview of ISO New England and the New England Wholesale Power Markets Overview of ISO New England and the New England Wholesale Power Markets Boston Chapter of IEEE PES Technical Meeting June 15, 2010 Stephen J. Rourke Vice President, System Planning About ISO New England

More information

The Baltic Sea Regional Power Market Escape from Isolation! Taavi Veskimägi. CEO Elering AS

The Baltic Sea Regional Power Market Escape from Isolation! Taavi Veskimägi. CEO Elering AS The Baltic Sea Regional Power Market Escape from Isolation! Taavi Veskimägi CEO Elering AS 09.06.2015 5500 km HV electricity lines; HVDC connections EstLink 1 and EstLink 2 900 km HP gas pipelines Emergency

More information

Overview of the TIR System and its benefits

Overview of the TIR System and its benefits National TIR Seminar in Republic of Serbia (Belgrade, 13 December 2006) Overview of the TIR System and its benefits Poul Hansen United Nations Economic Commission for Europe UNITED NATIONS OVERVIEW Background

More information

CUSTOMER/ TWIN ARROWS PROJECT

CUSTOMER/ TWIN ARROWS PROJECT A subsidiary of Pinnacle West Capital Corporation CUSTOMER/ TWIN ARROWS PROJECT V1 Facility Study Report APS Contract 52149 Prepared by: Arizona Public Service Company Transmission & Distribution Asset

More information

European technology leadership to address infrastructure bottlenecks

European technology leadership to address infrastructure bottlenecks European technology leadership to address infrastructure bottlenecks Presentation tot&d and Smart Grids Europe 2012 Dr. Volker Wendt, Director Public Affairs Amsterdam, 10 October 2012 Europacable, Boulevard

More information

SMART DIGITAL GRIDS: AT THE HEART OF THE ENERGY TRANSITION

SMART DIGITAL GRIDS: AT THE HEART OF THE ENERGY TRANSITION SMART DIGITAL GRIDS: AT THE HEART OF THE ENERGY TRANSITION SMART DIGITAL GRIDS For many years the European Union has been committed to the reduction of carbon dioxide emissions and the increase of the

More information

Improving the integration of electricity networks: Prospects of the European Network of Transmission System Operators for Electricity (ENTSO-E)

Improving the integration of electricity networks: Prospects of the European Network of Transmission System Operators for Electricity (ENTSO-E) Improving the integration of electricity networks: Prospects of the European Network of Transmission System Operators for Electricity (ENTSO-E) 1. Context: ENTSO-E, 10/20/40 year views, network codes 2.

More information

Karl Elfstadius, ABB Smart Grid Program Mmanager / SMART GRID TAIWAN, Smart Grid Overview. ABB SG_Presentation_V4.

Karl Elfstadius, ABB Smart Grid Program Mmanager / SMART GRID TAIWAN, Smart Grid Overview. ABB SG_Presentation_V4. Karl Elfstadius, ABB Smart Grid Program Mmanager / SMART GRID TAIWAN, 2009-04-08 Smart Grid Overview 2009-03-27 SG_Presentation_V4.ppt 1 Evolution of grid design From traditional to future grids traditional

More information

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS

Appendix 6.7 January 23, 2015 SURPLUS ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS Appendix 6.7 SUR ENERGY PROGRAM PROPOSED TERMS AND CONDITIONS SUR ENERGY PROGRAM INDUSTRIAL LOAD - OPTION 1 TABLE OF CONTENTS Page No. Eligibility...1 Reference Demand...1 Billing...2 Interruptions...3

More information

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State PLEASE NOTE: Legislative Information cannot perform research, provide legal advice, or interpret Maine law. For legal assistance, please contact a qualified attorney. Emergency preamble. Whereas, acts

More information

The Electric Power System

The Electric Power System The Electric Power System - Sweden- Swedish Power System 1 2 Basic facts 2014 Area: 450 295 km 2 Population: 9.6 Million Number of electricity consumers: 5.3 Million Number of TSOs: 1 Number of DSOs: 170

More information

Towards a sustainable market design

Towards a sustainable market design Towards a sustainable market design European Utility Week 2013 Klaas Hommes Amsterdam, 16 October 2013 Content! Introduction: TenneT TSO! Introduction: Dutch RES targets! Criteria ensuring a secure system!

More information

2015 Grid of the Future Symposium

2015 Grid of the Future Symposium 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http ://www.cigre.org 2015 Grid of the Future Symposium Flexibility in Wind Power Interconnection Utilizing Scalable Power Flow Control P. JENNINGS,

More information

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market Beacon Power Corporation Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market Prepared for: New York Business Issues Committee May 21, 2008 Safe Harbor

More information

LITGRID: TOWARDS BALTIC STATES SYNCHRONISATION WITH CONTINENTAL EUROPEAN NETWORKS

LITGRID: TOWARDS BALTIC STATES SYNCHRONISATION WITH CONTINENTAL EUROPEAN NETWORKS LITGRID: TOWARDS BALTIC STATES SYNCHRONISATION WITH CONTINENTAL EUROPEAN NETWORKS Ramūnas Bikulčius, Strategy Department 2018-09-25 Electricity transmission system operator: Maintains stable operation

More information

National Agency for Energy Regulation

National Agency for Energy Regulation National Agency for Energy Regulation Legislation in Energy Sector Institutional Capacity of Energy Sector Wholesale and Retail Market Development Third Party Access to Network Viability and Security of

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation CONNECTION ASSESSMENT & APPROVAL PROCESS ASSESSMENT SUMMARY Applicant: Project: Cardinal Substation Modification of 115kV Substation CAA ID: 2002 EX071 Long Term Forecasts & Assessments Department\ Consistent

More information

Age-dependent & multi-load reliability analysis in transmission systems

Age-dependent & multi-load reliability analysis in transmission systems CIGRE US National Committee 2013 Grid of the Future Symposium October 20-22, 2013 Boston, USA Age-dependent & multi-load reliability analysis in transmission systems Marco Fleckenstein, Prof. Dr. -Ing.

More information

What is Smart Grid? R.W. Beck Inc.

What is Smart Grid? R.W. Beck Inc. ELG4126: Smart Grid The Smart Grid Uses telecommunication and information technologies to improve how electricity travels from power plants to consumers. Allows consumers to interact with the grid. Integrates

More information

RTE International.

RTE International. RTE International www.rte-france.com RTE, the largest power Transmission System Operator in Europe Denmark Netherlands Belgium Poland Germany France Czech republic Slovakia Switzerland Austria Hungary

More information

RENEWABLES INTEGRATION STATUS REPORT

RENEWABLES INTEGRATION STATUS REPORT RENEWABLES INTEGRATION STATUS REPORT NORTHERN IRELAND ELECTRICITY Ltd SYSTEM OPERATOR FOR NORTHERN IRELAND Ltd. June 2015 1. INTRODUCTION The electricity network in Northern Ireland (NI) is facing an unprecedented

More information

2016 Load & Capacity Data Report

2016 Load & Capacity Data Report Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation, accuracy, completeness

More information

GC108: EU Code: Emergency & Restoration: Black start testing requirement

GC108: EU Code: Emergency & Restoration: Black start testing requirement Stage 01: Modification Proposal Grid Code GC108: EU Code: Emergency & Restoration: Black start testing requirement Purpose of Modification: This modification seeks to align the GB Grid Code with the European

More information

MYPD3 tariff restructuring plan use-of-system charges. Brochure

MYPD3 tariff restructuring plan use-of-system charges. Brochure MYPD3 tariff restructuring plan use-of-system charges Brochure November 2012 Use-of-system charges for MYPD3 Page 1 PART 1: ESKOM REVENUE REQUIREMENT Introduction The current Multi-Year Price Determination

More information

The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027)

The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027) The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027) February 2013 Contents I. Introduction 1 II. Status of Electricity Supply and Demand 2 1. Electricity Demand 2 2. Electricity

More information

Climate change drivers for a single and smart EU grid

Climate change drivers for a single and smart EU grid Climate change drivers for a single and smart EU grid Smart and Secure Transmission Grids to Realise US and EU Renewable Energy Potentials Keith Bell University of Strathclyde, Scotland Expected growth

More information

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY Transmission Department Transmission Planning Duke Energy Progress TABLE OF CONTENTS I. SCOPE 3 II. TRANSMISSION PLANNING OBJECTIVES 3 III. TRANSMISSION

More information

Measuring the Smartness of the Electricity Grid

Measuring the Smartness of the Electricity Grid Measuring the Smartness of the Electricity Grid Leen Vandezande Benjamin Dupont Leonardo Meeus Ronnie Belmans Overview Introduction Key Performance Indicators (KPIs): what & why? Benchmarking the Smart

More information

The Electric Power System

The Electric Power System The Electric Power System - Slovenia - Version 1.0 Slovenian Power System 1 Basic facts 2 Area: 20.273 km 2 [http://www.stat.si/] Area: 20.273 km 2 [http://www.stat.si/] Population (31. 12. 2014): 2.062.874

More information

The Role of Electricity Storage on the Grid each location requires different requirements

The Role of Electricity Storage on the Grid each location requires different requirements Functional Requirements for Energy on the Utility Grid EPRI Renewable Council Meeting Bill Steeley Senior Project Manager Dan Rastler Program Manager April 5-6, 2011 The Role of Electricity on the Grid

More information

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013 Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in 2015 Stakeholder Webconference February 28, 2013 Page 2 Merced Irrigation District (Merced) Background Merced Irrigation

More information

The Energy Queensland Group Notice of no non-network options

The Energy Queensland Group Notice of no non-network options The Energy Queensland Group Notice of no non-network options 24 September 2018 MCE Mount Crosby East Establish new substation to replace Mount Crosby Substation (SSMTC) Page 1 of 1 DISCLAIMER While care

More information