1 Coincident Peak Billing Demand Savings using Conservation Rob Ardis, PE COO, Pee Dee Electric Cooperative
2 CVR versus VVO Volt-VAR Optimization main purpose is to reduce generation and fuel requirements by reducing system losses on a large scale 1. Use voltage regulation to start at a lower (compared to tradition) voltage and maintain that level. This reduces kwh and kvarh delivery. 2. Use capacitors to further reduce kvarh delivery requirements. 3. This combination (1 and 2) reduces current in system conductors and, therefore, reduces system losses. 4. Also happens to reduce demand when system is peaking. We use CVR to improve our billing load factor. 1. Starting voltage is set at 126V so that voltage at end of line is still tolerable without regulation (normally). Reduces maintenance costs and system weak points. 2. Reduce this voltage at times of likely peaks to lower demand charges.
3 How We Are Billed 12 individual 60-minute coincident peak demands Everyone on rate is held accountable for their contribution when the system was peaking not necessarily their own peak Calendar Month 20 SC Distribution Cooperatives do not generate
4 Demand Charge History
5 Voltage Regulation If it wasn t cost effective before, might be now Need to analyze technical and man-power requirements Must also consider tolerable voltage ranges
6 Specific to PDEC Leaning more toward feeder regulation Very few downline regulators Targets for load control (130 MW) First day of month Temperature in Florence, SC 6-person team (SCADA from Home) Very few capacitors in system Tilt: Shift from negative to positive
7 Historical Peak Hours
8 5500 System Load versus Florence Temperature
9 Day of the Peak
10 Hour of the Peak
11 Two Basic Types of Loads Constant Power Loads: Motor Driven motors, AC, heat pumps, etc. Fluorescent Lighting Electronic Devices Decrease voltage => Increase current Constant Impedance Loads: Electric Resistance Heating Water Heaters Incandescent Lighting Some office equipment and small machinery Appliances such as oven/range, clothes dryer Power Reduces with Voltage
12 Simplified Calculations Constant Power: P = constant, P=IV (reduce voltage by 3%, current must increase by approximately 3%). No demand savings. Constant impedance: Z = constant, P=IV, Z=V/I (reduce voltage by 3%, current must reduce by 3% => Power reduces by almost 6%). Demand reduction = voltage reduction squared.
13 Typical Winter Morning :00 AM 5:28 AM 5:57 AM 6:26 AM 6:55 AM 7:24 AM 7:52 AM 8:21 AM 8:50 AM 9:19 AM
14 September 8 (3:43-8:00) Real Reactive :00 13:12 14:24 15:36 16:48 18:00 19:12 20:24 21:36 22:48 0:00
15 September 12 (5:44-7:50) Real Reactive :00 13:12 14:24 15:36 16:48 18:00 19:12 20:24 21:36 22:48 0:00
16 September 28 (3:33-7:11) Real Reactive :00 13:12 14:24 15:36 16:48 18:00 19:12 20:24 21:36 22:48 0:00
17 Sample Month Net Savings Estimated Demand Reduced: kw Percent : 2.59% Profit per kwh: 5.3 mills Cost of control per hour: $ Savings during peak: $37,884 Time we were in control: 21 hours Net Savings: $34,412 Last Year: $400k-$500k
18 Perhaps Three Load Models Constant Power demand does not vary with voltage Constant Impedance demand varies in proportion with the square of voltage Constant Current demand varies directly in proportion with voltage
19 What s New? Automating the process with converted water heater switches Our newest AMR meters return voltage readings (5257 current count). Two peaks now production and transmission New daily report from our G&T Using CVR to Reduce Peak Load
20 Using CVR to Reduce Peak Load
21 Questions??? Contact Information: Rob Ardis (843)
Peak Shaving Using Conservation Voltage Reduction
Peak Shaving Using Conservation Rob Ardis, PE COO, Pee Dee Electric Cooperative, How We Are Billed 12 individual 60-minute coincident peak demands Everyone on rate is held accountable for their contribution
More informationConservation Voltage Reduction (CVR) for Electric Distribution Cooperatives
Conservation (CVR) for Electric Distribution Cooperatives Rob Ardis, PE COO, Pee Dee Electric Cooperative Bob Uluski, PE Utility Integration Solutions (UISOL) Volt-VAR Control Not a New Concept Maintain
More informationAnalysis of Impact of Mass Implementation of DER. Richard Fowler Adam Toth, PE Jeff Mueller, PE
Analysis of Impact of Mass Implementation of DER Richard Fowler Adam Toth, PE Jeff Mueller, PE Topics of Discussion Engineering Considerations Results of Study of High Penetration of Solar DG on Various
More informationB-4: Reducing Peak Demand through Distributed Grid Edge Control
B-4: Reducing Peak Demand through Distributed Grid Edge Control Shane Smith UDWI Bloomfield, USA ssmith@udwiremc.com Damien Tholomier Varentec Santa Clara, USA dmtholomier@varentec.com Introduction Utilities
More informationTechnology Roadmap for zzzzzzzzz Grid Automation
IEEE Nashville Chapter Technology Roadmap for zzzzzzzzz Grid Automation November 2010 2010 by R. W. Beck, An SAIC Company. All Rights Reserved. Projected Expenditures 2010-2030 Substation Transmission
More informationGalapagos San Cristobal Wind Project. VOLT/VAR Optimization Report. Prepared by the General Secretariat
Galapagos San Cristobal Wind Project VOLT/VAR Optimization Report Prepared by the General Secretariat May 2015 Foreword The GSEP 2.4 MW Wind Park and its Hybrid control system was commissioned in October
More informationARISEIA Energy Forum APS Residential Rate Design
ARISEIA Energy Forum APS Residential Rate Design A Brief History and What s Next for Arizona? November 7, 2015 Leland Snook Director, Rates and Rate Strategy Arizona Public Service Company Arizona s largest
More informationImpact of Distributed Energy-Efficiency with Solar on SMUD s Peak Load
Impact of Distributed Energy-Efficiency with Solar on SMUD s Peak Load Mike Keesee, Sacramento Municipal Utility District Rob Hammon, ConSol ABSTRACT One of the advertised benefits of distributed solar
More informationMIPSYCON 2014 Can a Grid be Smart without Communications? A Look at an Integrated Volt Var Control (IVVC) Implementation
MIPSYCON 2014 Can a Grid be Smart without Communications? A Look at an Integrated Volt Var Control (IVVC) Implementation David Aldrich Beckwith Electric Company Goals Flatten voltage profile across entire
More informationElectric Rates for Arizona
Electric Rates for Arizona DIXIE ESCALANTE RURAL ELECTRIC ASSOCIATION RESIDENTIAL SERVICE Service made available to residential customers of the Cooperative under this rate schedule shall be single phase
More informationCHOOSE TOSAVE. Take control of your electric bill by choosing the pricing plan that is right for you. Time-of-Use. Peak Demand. Demand Time-of-Use
CHOOSE TOSAVE Take control of your electric bill by choosing the pricing plan that is right for you. Time-of-Use Peak Demand Demand Time-of-Use Basic SHIFT YOUR USAGE AND SAVE Sometimes you can save money
More informationPresented by Eric Englert Puget Sound Energy September 11, 2002
Results from PSE s First Year of Time of Use Program Presented by Eric Englert Puget Sound Energy September 11, 2002 Puget Sound Energy Overview 973,489 Total Electric Customers 908,949 are AMR Capable
More informationIEEE-PES Chicago Chapter Presentation November 11, Smart Grid. Mike Born. Principal Engineer, Capacity Planning
IEEE-PES Chicago Chapter Presentation November 11, 2009 Smart Grid Mike Born Principal Engineer, Capacity Planning Agenda 2 Smart Grid Brief Overview ComEd s Smart Grid Vision and Building Blocks Customer
More informationAttached please find Chart House Energy s final comments on the DG Tariff U I hope this will help to consider a fair and reasonable tariff.
From: To: Cc: Subject: Date: Attachments: Rob Rafson LARA-MPSC-EDOCKETS Baldwin, Julie (LARA); Putnam, Charles (LARA); Talberg, Sally (LARA) Case No. U-18383 final comments Monday, March 26, 2018 3:36:09
More informationTECHNICAL TERMS AND ABBREVIATIONS
THIRD REVISED SHEET NO. 3.1 CANCELS SECOND REVISED SHEET NO. 3.1 TECHNICAL TERMS AND ABBREVIATIONS ALTERNATING CURRENT (A-C): AMPERE: BASE RATES: BRITISH THERMAL UNIT (BTU): CAPACITOR or CAPACITANCE: CAPACITY
More informationLight bulbs are almost burnt out
Light s are almost burnt out Incandescent Compact Fluorescent (CFL) Light Emitting Diodes (LED) The House of Representatives voted last year to withhold funding to enforce part of a 2007 law that increases
More informationY9. GEH2.3: FREEDM Cost Benefit Analysis based on Detailed Utility Circuit Models
Y9. GEH2.3: FREEDM Cost Benefit Analysis based on Detailed Utility Circuit Models Project Leader: Faculty: Students: M. Baran David Lubkeman Lisha Sun, Fanjing Guo I. Project Goals The goal of this task
More informationElectric Rates for Utah
Electric Rates for Utah DIXIE ESCALANTE RURAL ELECTRIC ASSOCIATION BERYL, 84714 RESIDENTIAL SERVICE Service made available to residential members of the Cooperative under this rate schedule shall be single
More informationELECTRICAL FUNDAMENTALS
ELECTRICAL FUNDAMENTALS PLUG OCTOBER 27, 2016 ARINDERPAL MATHARU IDEAWORKS MOHAWK COLLEGE Introduction Goal: To provide you with the Electrical Fundamentals Early 1800s Timeline 21 ST Century Current Current
More informationPhysical Design of a Volt/Var Implementation
1 Physical Design of a Volt/Var Implementation Hydro-Québec Distribution s approach Prepared by Bruno Fazio 2 Subjects Context Volt control Planning Control strategies and exploitation Var control Planning
More informationVolt VAR Control & Optimization. Bob Uluski Quanta Technology Quanta Technology LLC
Volt VAR Control & Optimization Bob Uluski Quanta Technology What is Volt VAR control? Volt VAR control (VVC) is a fundamental operating requirement of all electric distribution systems The prime purpose
More informationELECTRICITY RATES. Rates Effective October 1, 2009
ELECTRICITY RATES FOR COMMERCIAL AND INDUSTRIAL CUSTOMERS Rates Effective October 1, 2009 If you would like information about our services, details about your rights and responsibilities, or a copy of
More informationExhibit SBB-4 Proceeding 16AL-XXXXE Hearing Exhibit 103 Page 1 of 5
12 Months Ended December 31, 2010 Page 1 of 5 No. DERIVATION OF MARGINAL GENERATION CAPACITY COST PER YEAR 1 2 2015 3 Frame 7 CT Overnight Construction Cost (2010 $) $132,691,965 4 5 Transmission Interconnection
More informationCHOOSE TOSAVE. Take control of your electric bill by choosing the pricing plan that is right for you. Time-of-Use. Peak Demand. Demand Time-of-Use
CHOOSE TOSAVE Take control of your electric bill by choosing the pricing plan that is right for you. Time-of-Use Peak Demand Demand Time-of-Use Basic SHIFT YOUR USAGE AND SAVE Sometimes you can save money
More informationElectrical power. Objectives. Assessment. Assessment. Equations. Physics terms 5/27/14
Electrical power Objectives Use the equation for electrical power to solve circuit problems. Understand basic concepts for home electricity usage and wiring. Calculate the power used by electric circuit
More informationELECTRICITY RATES FOR COMMERCIAL AND INDUSTRIAL CUSTOMERS. Rates Effective May 1, 2010
ELECTRICITY RATES FOR COMMERCIAL AND INDUSTRIAL CUSTOMERS Rates Effective May 1, 2010 If you would like information about our services, details about your rights and responsibilities, or a copy of our
More informationChapter 3.1: Electrical System
Part-I: Objective type Questions and Answers Chapter 3.1: Electrical System 1. The heat input required for generating one kilo watt-hour of electrical output is called as. a) Efficiency b) Heat Rate c)
More informationElectricity Rates. For Commercial and Industrial Customers
Electricity Rates For Commercial and Industrial Customers Rates Effective May 1, 2011 If you would like information about our services, details about your rights and responsibilities, or a copy of our
More informationPower Quality. Power Factor Wiring and Service. Background. Introduction. bchydro.com
Power Quality Power Factor Wiring and Service Scope Power factor is a major consideration in efficient building or system operation. It is the measure of how effectively your equipment is converting electric
More informationDistribution System Efficiency Potential & Conservation Voltage Reduction
1 Distribution System Efficiency Potential & Conservation Voltage Reduction Power Committee April 2009 Northwest Power and Conservation Council Energy & Capacity Savings slide 2 Northwest Power and Conservation
More informationTargeted Application of STATCOM Technology in the Distribution Zone
Targeted Application of STATCOM Technology in the Distribution Zone Christopher J. Lee Senior Power Controls Design Engineer Electrical Distribution Division Mitsubishi Electric Power Products Electric
More informationMethodology of Cost Allocation
Methodology of Cost Allocation Robin Kliethermes May 17, 2013 1 Purpose of Cost Allocation Determine whether each class of customers is providing the utility with a reasonable level of revenue necessary
More informationCommunity Solar FAQ. How does the Community Solar program work?
Community Solar FAQ How does the Community Solar program work? As Westar Energy looks forward to the future of energy in Kansas, it is important that we continue to develop programs and renewable energy
More informationBeyond Net Metering Issues for Washington State
Beyond Net Metering Issues for Washington State Washington Solar Summit Bellevue, WA Jim Lazar, RAP Senior Advisor October 13, 207 The Regulatory Assistance Project 50 State Street, Suite 3 Montpelier,
More informationIndianapolis Power & Light Company
1 Smart Grid Deployment Experience Barry Feldman Director, Power Delivery Asset Management Indianapolis Power & Light Company IPL provides electric service to the City of Indianapolis (Marion County) and
More informationConservation Voltage Reduction (CVR) Phillip Anderson P.E. Engineering Project Leader Research, Development & Deployment
Conservation Voltage Reduction (CVR) Phillip Anderson P.E. Engineering Project Leader Research, Development & Deployment Presentation Outline Background Information on CVR CVR Definition Voltage Control
More informationNYCA LOLE Violations (Methods D and E )
Proposals for Cost Allocation of Regulated Reliability Solutions Associated with NYCA LOLE Violations (Methods D and E ) Presented by Jerry Ancona National Grid For Discussion by NYISO Electric System
More informationImpact Evaluation of 2004 Compressed Air Prescriptive Rebates
Impact Evaluation of 2004 Compressed Air Prescriptive Rebates May 15, 2006 Prepared for: National Grid USA Service Company P.O. 0000027684 DMI# 05006.520 Prepared by: DMI 450 Lexington Street Newton, MA
More informationPROMOTION OF COMPACT FLUORESCENT LAMPS IN ARGENTINE HOUSE- HOLDS: IMPACT ON USERS AND ON THE DISTRIBUTION COMPANY
PROMOTION OF COMPACT FLUORESCENT LAMPS IN ARGENTINE HOUSE- HOLDS: IMPACT ON USERS AND ON THE DISTRIBUTION COMPANY G. S. Dutt and C. G. Tanides University of Buenos Aires, Argentina In a study conducted
More information1 Low-voltage Power-factor Correction capacitors KNK APPLICATION DESIGN
APPLICATION The KNK capacitors are used for power - factor correction of inductive consumers (transformers, electric motors, rectifiers) in industrial networks for voltages of up to 660 V. DESIGN Cylindrical
More informationKCP&L GREATER MISSOURI OPERATIONS COMPANY P.S.C. MO. No. 1 1st Revised Sheet No. 149 Canceling P.S.C. MO. No. 1 Original Sheet No.
P.S.C. MO. No. 1 1st Revised Sheet No. 149 Canceling P.S.C. MO. No. 1 Original Sheet No. 149 AVAILABILITY This schedule is available for all general service use, such as combined lighting and power service
More information2-MWh Flow Battery Application by PacifiCorp in Utah Mark T. Kuntz VP Marketing & Business Development
2-MWh Flow Battery Application by PacifiCorp in Utah Mark T. Kuntz VP Marketing & Business Development mkuntz@vrbpower.com California Energy Commission Staff Workshop: Meeting California s Electricity
More informationORDINANCE NO. -'- THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:
182273 ORDINANCE NO. -'- An ordinance approving the rates fixed by the Department of Water and Power of the City of Los Angeles and to be charged for electrical energy distributed and for service supplied
More informationSUMMARY OF TOTAL CURRENT PRICES - ELECTRIC
Electric Summary Sheet No. S-1 HOW A CUSTOMER BILL IS CALCULATED 7 RESIDENTIAL SERVICE For a customer who used 1,000 kwh during one month (assuming 30 days of service). Schedule 7 is referred to on customer
More information2018 Summary of Eastern Massachusetts Electric Rates for Greater Boston Service Area
2018 Summary of Eastern Massachusetts Electric Rates for Greater Boston Service Area Rates Effective: January 1, 2018 The following rates are available to our customers and have been approved by the Massachusetts
More informationIntegrated Volt Var Control (IVVC) Issues for the future
Integrated Volt Var Control (IVVC) Issues for the future Larry Conrad July 26 2010 1 Outline The IVVC opportunity and challenge Billions in benefits available Ability to prove recovery Can we do it Voltage
More informationCOMPANY INTRO. PowerCore Engineering
PowerCore Engineering COMPANY INTRO PowerCore is a Power Distribution System Engineering Company and a turnkey Automated Systems Integrator based in London Ontario. We specialize in Power Systems Engineering
More informationCost Reflective Tariffs
Cost Reflective Tariffs for Large Government,Commercial and Industrial Customers Customer Guide Introduction On September 2016, the Council of Ministers had approved the introduction Cost of Reflective
More informationRenewable Energy. Presented by Sean Flanagan
Renewable Energy Presented by Sean Flanagan Background Flanagan and Sun since 2004 Solar electric (PV) off grid and grid tie, solar thermal, pool heating, solar air heating, small wind turbines, microhydro
More informationTHE PUBLIC SERVICE COMMISSION OF MARYLAND
THE PUBLIC SERVICE COMMISSION OF MARYLAND Report on the Status of Net Energy Metering In the State of Maryland Prepared for the General Assembly of Maryland Pursuant to 7-306(i) of the Public Utilities
More informationAbstract. Background and Study Description
OG&E Smart Study TOGETHER: Technology-Enabled Dynamic Pricing Impact Evaluation Craig Williamson, Global Energy Partners, an EnerNOC Company, Denver, CO Katie Chiccarelli, OG&E, Oklahoma City, OK Abstract
More informationPrice Schedule for the Northpower Electricity Distribution Network
Schedule for the Northpower Electricity Distribution Network Effective 1 April (All prices exclude GST) To be read in conjunction with the Companion Guide for the Northpower Electricity Distribution Schedule
More informationGroup 3: Pricing from 1 April 2018 and load management
Group 3: Pricing from 1 April 2018 and load management This document is intended to provide background to Network Tasman s Group 3 pricing, in particular the Regional Coincident Peak Demand (RCPD) price,
More informationSALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE Effective: April 2015 Billing Cycle AVAILABILITY: The E-27 Price Plan is subject
More informationNEDO s Smart Grid Demonstration Projects in the U. S. JUMPSmartmaui Project in Hawaii
NEDO s Smart Grid Demonstration Projects in the U. S. JUMPSmartmaui Project in Hawaii 1 2 Maui of Hawaii Today High cost of energy is driven by variable oil prices. Hawaii ranks #1 in electric energy costs:
More informationSCE's Experience Distribution Volt/VAR Control:
1 SCE's Experience Distribution Volt/VAR Control: Irvine Smart Grid Demonstration 07/29/2015 Panel Session: Volt/VAR Control in the Era of the Smart Grid Bryan Pham Manager Automation & Communications
More informationCustomers with solar PV units in NSW producing and consuming electricity
Independent Pricing and Regulatory Tribunal FACT SHEET Customers with solar PV units in NSW producing and consuming electricity Based on Solar feed-in tariffs - Setting a fair and reasonable value for
More informationUser Guide. Model Insulation Tester / Megohmmeter
User Guide Model 380260 Insulation Tester / Megohmmeter Introduction Congratulations on your purchase of Extech s Insulation Tester/Megohmmeter. The Model 380260 provides three test ranges plus continuity
More informationESB (Public Electricity Supply) Electricity Tariffs Applying for 5 month period 1 AUG 2008 to 31 DEC 2008
Standing Charge per annum, pro-rated 91.98 0.2520 Unit Rate per kwh 0.1597 Standing Charge per annum, pro-rated 126.29 0.3460 Unit Rate Day per kwh 0.1706 Standing Charge per annum, pro-rated 8.03 0.0220
More informationCustomers with solar PV units in NSW producing and consuming electricity
Independent Pricing and Regulatory Tribunal FACT SHEET Customers with solar PV units in NSW producing and consuming electricity Based on Solar feed-in tariffs - Setting a fair and reasonable value for
More informationSolar Plus: A Holistic Approach to Distributed Solar PV Eric O'Shaughnessy, Kristen Ardani, Dylan Cutler, Robert Margolis
Solar Plus: A Holistic Approach to Distributed Solar PV Eric O'Shaughnessy, Kristen Ardani, Dylan Cutler, Robert Margolis NREL is a national laboratory of the U.S. Department of Energy, Office of Energy
More informationPower Quality Luis Vargas Research Engineer 9/18/2008
Page: 1 of 5 Luis Vargas Research Engineer 9/18/2008 Page: 2 of 5 As we make advances on green technology, we get a better understanding of the efficiencies and deficiencies on how we consume electricity.
More informationPASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.
PSC NO: 12 Electricity Leaf: 4 Rate I Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. Applicable to demand-metered service, street lighting in The City of New
More informationPASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.
PSC NO: 12 Electricity Leaf: 4 Rate I Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. Applicable to demand-metered service, street lighting in The City of New
More informationPASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.
PSC NO: 12 Electricity Leaf: 4 Rate I Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. Applicable to demand-metered service, street lighting in The City of New
More informationELG4125: Flexible AC Transmission Systems (FACTS)
ELG4125: Flexible AC Transmission Systems (FACTS) The philosophy of FACTS is to use power electronics for controlling power flow in a transmission network, thus allowing the transmission line to be loaded
More informationNORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014.
NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service Effective: For bills rendered on and after January 1, 2014. SECTION 1. AVAILABILITY AND APPLICABILITY 1.1 This Rate Schedule
More informationPOWER METER. my2010 (c)
POWER METER ELECTRIC POWER Electric power is the rate at which electric energy is transferred by an electric circuit. The SI unit of power is the watt. When electric current flows in a circuit, it can
More informationFOR COMMERCIAL, INDUSTRIAL AND LIGHTING CUSTOMERS
Electricity Rates FOR COMMERCIAL, INDUSTRIAL AND LIGHTING CUSTOMERS At Puget Sound Energy our goal is to meet your needs as a full service natural gas and electric utility. As the largest energy utility
More informationA Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012
A Guide to the medium General Service Conservation Rate BC Hydro Last Updated: February 24, 2012 Executive summary The way Medium General Service (MGS) accounts pay for electricity is changing. MGS is
More informationEvaluating Losses in Electrical Equipment Focus on Transmission Utilities. CNY Engineering Expo 2016 Syracuse, New York Arthur C. Depoian P.E.
Evaluating Losses in Electrical Equipment Focus on Transmission Utilities CNY Engineering Expo 2016 Syracuse, New York Arthur C. Depoian P.E. Contents Introduction Present Value of ongoing energy costs
More informationGenbright LLC. AEE Technical Round Table 11/15/2017
Genbright LLC AEE Technical Round Table 11/15/2017 About Genbright Founded in 2013, Genbright was created to develop and monetize distributed energy technologies across the power industry including distributed
More informationInfluencing the Portfolio through the Distribution System Case Study- Pullman, WA
July 27, Presented by: Curtis Kirkeby, P.E. Fellow Engineer Avista Utilities Influencing the Portfolio through the Distribution System Case Study- Pullman, WA ARRA Grant Projects Smart Grid Workforce Training
More informationSILICONES GLOBAL SOLUTIONS
SILICONES GLOBAL SOLUTIONS 2016 PROPOSAL FOR INSTALLATION OF A 25% POWER SAVING DEVICE Silicones Global Solutions, Email:info@siliconesgbsolutions.com, Contact: 0302200950/0208163888 1/1/2016 Contents
More informationPV System Impact Guide
PV System Impact Guide NRECA - PV System Impact Guide Foreword This Photovoltaic (PV) System Impact Guide is part of a series of National Rural Electric Cooperative Association (NRECA) guides including
More information2016 ANNUAL CONSERVATION REPORT
2016 ANNUAL CONSERVATION REPORT PREPARED FOR Florida Public Utilities Company 3/6/2017 Table of Contents 1 Introduction... 1 2 Comparison to 2014 s... 2 3 Existing Programs and 2014 s... 4 3.1 Program
More informationIntegrating DER. Thomas Bialek, PhD PE Chief Engineer. Smart Grid & Climate Change Summit October 13, 2015
Integrating DER Thomas Bialek, PhD PE Chief Engineer Smart Grid & Climate Change Summit October 13, 2015 Integration of DER Solar & Electric Vehicle Customers SDG&E s Vision Consistent with State Policy
More informationOklahoma Gas & Electric P.O. Box 321 Oklahoma City, OK, Main Street, Suite 900 Cambridge, MA 02142
Final Report Oklahoma Gas & Electric System Loss Study Submitted to Oklahoma Gas & Electric P.O. Box 321 Oklahoma City, OK, 73101-0321 Submitted by Stone & Webster Management Consultants, Inc. 1 Main Street,
More informationSouthern Company Interconnection Process. Dexter Lewis Research Engineer Research and Technology Management
Southern Company Interconnection Process Dexter Lewis Research Engineer Research and Technology Management Southern Company Outline Southern Company GPC Solar Interconnection Process Application requirements
More informationEffect of DG Installation on Customer Load Shapes
Effect of DG Installation on Customer Load Shapes P R E S E N T E D T O Westar Energy P R E S E N T E D B Y The Brattle Group J u n e 2 3, 2017 Copyright 2017 The Brattle Group, Inc. Characteristics of
More informationGENERATOR INTERCONNECTION APPLICATION
GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 150 KW BUT LESS THAN OR EQUAL TO 550 KW Also Serves as Application for Category 3 Net Metering (Note:
More informationGRID PLANNING BY INTEGRATE CUSTOMER METERS
GRID PLANNING BY INTEGRATE CUSTOMER METERS Niels ANDERSEN Heiko VESTER Tommy Heine BENTSEN SEAS-NVE Denmark SEAS-NVE Denmark SEAS-NVE Denmark na@seas-nve.dk hve@seas-nve.dk thb@seas-nve.dk ABSTRACT The
More informationDemand Response as a Power System Resource
Demand Response as a Power System Resource Richard Cowart Director, Regulatory Assistance Project www. erranet.org Major points today 1. What? What is Demand Response (DR)? 2. Why? Proven values of DR
More informationIf you would like further information, please call or visit our Web site at
COMMON RESIDENTIAL ELECTRIC RATES 2017 The rate you are currently billed under is listed on your bill. Please review this entire guide to determine which rate is best suited for you. You may have made
More informationDemand Charges: A Less Equitable and Less Effective Rate Design Than TOU Energy Rates. Jim Lazar Senior Advisor The Regulatory Assistance Project
May 15, 2018 Demand Charges: A Less Equitable and Less Effective Rate Design Than TOU Energy Rates Jim Lazar Senior Advisor The Regulatory Assistance Project (RAP) Olympia, Washington jlazar@raponline.org
More informationTVA Distributor Retail Rates and Comprehensive Services Program Power Factor Case Studies. Gerald Johns, P.E. Power Utilization Engineer, TVA
TVA Distributor Retail Rates and Comprehensive Services Program Power Factor Case Studies Gerald Johns, P.E. Power Utilization Engineer, TVA 1 TVA Comprehensive Services Power Factor Studies/Recommendations
More informationAgenda. Industry Rate Trends Summary of Financial Targets Cost of Service Information. Valuation of Solar
Agenda Industry Rate Trends Summary of Financial Targets Cost of Service Information Customer charges Residential Demand Charges Time of Use Rates Valuation of Solar Industry Trends Increasing demand charges
More informationPID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation
PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date
More informationEnergy Conservation with Voltage Reduction Fact or Fantasy (Originally Presented at the IEEE 2002 Rural Electric Power Conference)
Energy Conservation with Voltage Reduction Fact or Fantasy (Originally Presented at the IEEE 2002 Rural Electric Power Conference) T.L. Wilson, Senior Member, IEEE PCS UtiliData Spokane, WA 99217 USA Abstract:
More informationMedium Voltage. Power Factor Correction Reactive Compensation Harmonic Filters. Electrical Power Quality Management at its best.
Medium Voltage Power Factor Correction Reactive Compensation Harmonic Filters POWER QUALITY Electrical Power Quality Management at its best. From electricity generation, transmission, thru its distribution
More informationVolume 2 Charts, Formulas, and Other Useful Information
Volume 2 Charts, Formulas, and Other Useful Information Aluminum Conductor Conductor Terminations 61 Compact Aluminum (Conduit Fill Tables) 68-79 Ampacity Dwelling Services 48 1-phase Loads on a 3-phase
More informationMeter Insights for Downtown Store
Meter Insights for Downtown Store Commodity: Analysis Period: Prepared for: Report Date: Electricity 1 December 2013-31 December 2014 Arlington Mills 12 February 2015 Electricity use over the analysis
More informationA direct current (DC) circuit. Alternating Current (AC) Direct Current DC. AC current. L 27 Electricity and Magnetism [4]
L 27 Electricity and Magnetism [4] A direct current (DC) circuit simple electrical circuits direct current DC Alternating current (AC) vs direct current (DC) electric power distribution household electricity
More informationCase Study: Time-Of-Use Tariffs In Florida
Case Study: Time-Of-Use Tariffs In Florida Eduardo Balbis, P.E. Commissioner Florida Public Service Commission USAID/ARE/ECREEE/ERERA/NARUC Integrating Clean Energy Regulation into Evolving Energy Markets
More informationCUSTOMER OWNED SOLAR IN WISCONSIN
CUSTOMER OWNED SOLAR IN WISCONSIN Michael R Moore Sr. Renewable & Product Services Consultant Wisconsin Public Service MREC 2-19-2015 Customer Owned Solar in Wisconsin Historical Perspective Costs Past
More informationDemand and Time of Use Rates. Marty Blake The Prime Group LLC
Demand and Time of Use Rates Marty Blake The Prime Group LLC Factors Affecting Electric Rates Generation plant cost increases Fuel price increases and volatility Carbon and environmental regulations Cost
More information# 1, Bowes Place, Phillip, ACT 2606, Australia. Phone:
ABN: 75 61 61 71 147 HYBRID SOLAR POWER # 1, Bowes Place, Phillip, ACT 2606, Australia. Phone: 1300 131 989. Email: sales@hybridpowersolar.com.au www.hybridpowersolar.com INDEX WELCOME NOTE Page 3 HOW
More informationSolar*Rewards Frequently asked questions system size and customer usage
Solar*Rewards 1. Will a PV system work with my home? 2. Am I eligible to participate in the Solar*Rewards program? 3. What size system should I get? 4. Can a customer at a service location apply for the
More informationTime of Use Rates. The Policy, Economics, Physics
Time of Use Rates The Policy, Economics, Physics Southwest Colorado Archuleta and La Plata Counties Bayfield, Durango, Ignacio, Pagosa Springs 40,000 meters located over 3,050 sq miles 188 Miles Transmission
More informationManaging Energy at Your Small Drinking Water System A Workshop Series for North Carolina Utilities
Managing Energy at Your Small Drinking Water System A Workshop Series for North Carolina Utilities Workshop 1 Tuesday, 11/29/16 Land-of-Sky Regional Council, Asheville, NC Facilitators Dawn Nall (SW EFC)
More information