1 CHAPTER 8 Future Table of Contents Overview / Summary Current Planning Work Efforts... 2 Bus Transit... 7 Paratransit Service Future Rail Options Transit and Land Use Policies Transit Service Role in Adaptation to Peak Oil Conditions Other High Capacity Transit Considerations Long Range Consideration of Small Cities in Olmsted County Overview / Summary This Chapter is a combination of planning work recommendations, summary of current and near term transit planning studies, and key ROCOG long range transit focus areas. ROCOG understands that upcoming and future study initiatives coming out of the Rochester Comprehensive Plan Update and the Destination Medical Center Plan development will shape this Chapter in the next 2045 Long Range Plan, if not in an earlier amendment to this 2040 Reaffirmation. In addition, this Chapter recognizes the importance of the 2010 Rochester Downtown Master Plan (RDMP) and its Mobility Plan. ROCOG and ROCOG staff are involved in these studies as well as other studies noted in this Chapter, since all of these studies contribute to long range transit planning in the Rochester and Olmsted County region. The ROCOG area s urban and regional transit system today is organized around urban and regional fixed route and urban demand responsive bus service. In the future it is anticipated this service will be expanded and enhanced, and possibly supplemented with a higher capacity transit service in a selected number of key corridors/subareas where high levels of future traffic congestion and travel demand are forecasted. This will likely include a Circulator type of the service serving the Rochester CBD as a component of the Rochester Destination Medical Center (DMC) initiative. 8-1 P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

2 Service considerations and new system design concepts that will need to be considered to address continued urban growth over the horizon time frame of this Plan include: o Regular Fixed Route Expansion (lengthening outward) o Increased headways of regular route service o Cross-town routes to supplement the current Hub and Spoke network o Additional Express Routes o Expansion of regional commuter bus service o Adding multi-use permanent park n ride sites o Analysis of, and implementation of downtown circulator service o Close integration of surface and structured parking downtown with transit connections o Bus Stop/Station development in new or existing residential/commercial mixed use developments DMC Plan Current Planning Work Efforts An economic development program proposed by the Mayo Clinic in 2012 known as the Destination Medical Center (DMC) promises the prospect of $3.5 billion dollars in investment by the Mayo Clinic in Rochester over the next years, along with an anticipated $2.5 billion expected in private investment in supporting land use and activities to serve the Mayo Clinic and its patients. The Minnesota State Legislature approved legislation that would provide for up to $585 million in public investment to support the DMC initiative, contributed from the State of Minnesota, Rochester and Olmsted County. The State Legislature established a Destination Medical Center Corporation (DMCC), which is charged along with the city of Rochester in managing the planning and expenditure of the $585 million in public investment. The Mayo Clinic describes the DMC as a major economic development initiative that will drive significant new job growth and tax base for future generations. The DMC will significantly increase and accelerate the demand for private development and public infrastructure in the Greater Rochester market. The target of the DMC is to grow the employment base by some 35,000 40,000 jobs and to double the visitation from the Mayo Clinic patients/companions, business travelers, convention/event goers and other visitors to the City, and particularly the downtown core. 8-2 P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

3 As part of the tenants of the legislation, the DMCC has created an agency called the Economic Development Agency (EDA). The EDA and EDA s consultants will work closely with the City Planning Department and City Administration to coordinate the DMC Development Plan implementation with the City s Comprehensive Plan s components and Regional Transportation Planning studies in general. With the advent of Rochester s Destination Medical Center initiative passed into law, there is continued focus on future transit service to and within the greater downtown area. This includes possible modern streetcar service serving trips within the Rochester downtown area, along with greater development of park and ride service, and promotion of a park once system of parking sites and transit connecitons. Previously, a 2010 plan called the Rochester Downtown Master Plan (RDMP) proposed very similar initiatives. As of the Spring of 2015, a DMC Plan will have been produced by a team of national consultants and adopted by the DMCC Board and the City Council of Rochester. Rochester Comprehensive Plan Update Beginning in early 2014, the Consolidated Planning Department of the City of Rochester began a major update the Rochester comprehensive plan. This plan update will consist of two main elements: 1) Updating of various comprehensive plan elements with a primary focus on Future Land Use, Capital Facilities, Affordable Housing needs and options, and the management of environmental and cultural resources. Further analysis will include the ability of the city to meet future financial needs in a fiscally sustainable manner, considering the ongoing costs of existing infrastructure and services while absorbing the short and long term costs of new growth. 2) Development of a Long Term Transit Framework Plan. Examples of elements are: Compatibility of future transit services with a Downtown/DMC District circulator. The feasibility and service characteristics of high capacity arterial transit service to serve the travel demand generated by the Downtown/DMC District. The feasibility and service characteristics of high capacity arterial transit service to serve key Activity Centers along corridors where adequate density exists or could be developed to support such service. 8-3 P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

4 Evaluate the need or extent to which fixed route bus service should transition from a Hub & Spoke to a grid network to interface with any alternative transit systems or serve increasing travel demand in lieu of other high capacity transit options. In general, explore Long Term Transit System alternatives to help reach the goal established in the Rochester Downtown Master Plan that calls for reducing the share of downtown travel demand by Single Occupant Vehicle travel from a current level of 70-75% to 50% over 25 years. The plan s work schedule is shown in Figure 8-1. Figure 8-1 The rationale for an aggressive mode share split goal of 50% single occupant vehicle travel into downtown (rather than 70%) is that the significant downtown growth anticipated under the RDMP and DMC initiatives will, if travel mode shares remain unchanged, necessitate the need for significant investment in terms of land in non-productive parking facilities. In addition, this future traffic will significantly increase congestion on downtown streets, impacting not only motorists but leading to a significant impact on the pedestrian environment in downtown Rochester. Transit Development Plan The objective of this Rochester Public Transit lead consultant study is to develop an updated Rochester Transit Development Plan. The study will begin in the Spring of It will include a variety of evaluation and recommendations of program goals and objectives, operations/service design, capital improvements, funding, management structure, marketing, and related policy issues. The study will address internal and external factors influencing the use of public transit, including parking supply and policy, fares, schedules, route design, amenities, marketing, land use, etc. The plan shall include a 5 year short range element and a longer 10 year element. 8-4 P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

5 Southeast Minnesota Travel Study In January, 2015 MnDOT contracted with a national consulting firm to conduct a Travel Behavior Study in Southeast Minnesota. The consultant will assess travel corridors within and between the 11 counties in the MnDOT District 6 region to identify areas that should be considered for more/new transit services, vanpools, subscription buses, ridesharing, volunteer transportation, and other multimodal services. The study will look at strategies to improve travel options to major employers such as the Mayo Clinic, as well as to schools and universities. It will also look at potential new links for people traveling in the region for shopping, recreation, medical appointments, and other services. The study will also examine short-term alternatives for travel to and from the Twin Cities. The study schedule is shown in Figure 8 2. It s important to note that study coordination will occur between this Southeast Minnesota Travel Study and the Transit Framework Study component of the Rochester Comp Plan Update. Figure P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

6 ROCOG Support of Area Implementation Studies DMC implementation planning recommendations along with Rochester Comp Plan work will at some point need to have recommendations incorporated into a ROCOG Plan. Depending on timing, after these planning studies are completed, and with local commitment to proceed with new transit alternatives, either the 2040 Affirmed Long Range Plan could be amended to include new information, or the new information could be included in the 2045 update. Local implementing agencies and the DMC (EDA) staff understand that projects intending to use federal funds rely on their inclusion in the ROCOG Long Range Plan. Figure 8-3 depicts a number of planning studies now underway that will likely result in planned transportation improvements that will need to show in the next ROCOG 2045 Plan. Figure P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

7 Bus Transit The bus transit mode is planned to be at the forefront of expanded transportation options to address future travel demand both for trips within Rochester, and for trips from Olmsted County and surrounding Counties into downtown Rochester. This overall expansion directive is consistent within several current and future transportation plans: Rochester Downtown Mobility Study (2010) Current and previous ROCOG Long Range Plan (2010 & 2015) DMC Master Plan (2015) 2006 RPT Transit Development Plan (and is expected to carry over into the new update completed in 2016) Rochester Comp Plan Update (2016) By way of back ground information on current Rochester transit services, the following is taken from a recent Rochester Public Transit (RPT) document: The City of Rochester through the Transit and Parking Division of the Public Works Department provides for the overall administration and oversight of the transit program. The Transit and Parking Division provides for the planning, policy, procurement and marketing of public transit services. The City owns the transit equipment with day-to-day operations contracted for with two operators. The 2015 budget is $7.6 million for combined fixed route and paratransit services. The transit system served over 1.7 million passengers in (This includes over 40,000 paratransit riders.) Ridership increased by 41.7% between 2003 and The City s population grew from 88,338 in 2003 to 108,179 in 2013, an increase of 22.5%. Historically management has emphasized program revenues, and saw a farebox return in 2013 of 34% and 21% respectively on the regular route and dial-a-ride systems. Transit operations are funded with local, state and federal dollars. The city is a direct recipient of Federal Transit Administration (FTA) Section 5307 funds. The FY 2014 FTA apportionment totaled $1,964,143. The State of Minnesota requires 50% of the apportionment to be dedicated to operations. While the State formula appears generous, the State has had to limit annual increases in total expenses. Consequently, in recent years the City of Rochester has dedicated almost 100% of its annual FTA apportionment to operations. Regular route operations are provided under contract by First Transit, Inc. The service is provided under a 54-month contract. The current contract runs through December 31, The company provides day to day operations including drivers, maintenance and garaging, dispatch, and customer contact. 8-7 P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

8 The city owns a fleet of 45 buses; all are wheelchair-accessible, low-floor design. The City awarded a five-year contract for buses with Gillig Corporation in June The first seven of those buses were delivered in October The City has completed a feasibility study for the deployment of compressed natural gas (CNG) buses and is seeking capital funds to build a CNG fueling station. ZIPS Dial-A-Ride provides ADA paratransit service. The operation is contracted at a per vehicle hour rate with R&S Transport. The current 5-year contract (2-year base, plus 3 optional extensions at City s prerogative) was awarded in The operator provides day to day operations including drivers, maintenance and garaging, dispatching and customer contact. Local Fixed Route Service The current Rochester Public Transit fixed route system is shown in Figure 8 4 along with a Transit Dependency Index as developed for the current Rochester Comp Plan work. Fixed route service covers parts of Rochester where residential land use is dense enough and commercial/job sites are strong enough to warrant service. The service is hub and spoke in that routes center service on the transfer point downtown. This promotes work-centered trip making since Mayo is the largest trip generator in the city. Figure 8-4 Transit trip making will increase as the combination of households and employment increases, or in other words, the expectations from the Destination Medical Center initiative. A major focus of the Rochester Comp Plan update also is to analyze future land use scenarios where transit use is attractive as a mode choice. 8-8 P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

9 Figures 8-5 and 8-6 below provide a look at the current local fixed route service demand and demand for future transit service. (Graphics are taken from DMC Plan transportation planning section). It s important to note that future transit demand correlates with population growth and continued concentration of jobs in downtown Rochester, or as it is coming to be termed, the DMC District. Figure 8-5 Figure 8-6 The Rochester Comprehensive Plan update will include a major element called the Transit Framework Plan. This report will contain guidance and recommendations to help to implement transit improvements for increased use of transit from Rochester neighborhoods into the downtown work, higher education, and retail/commercial center. The Comp Plan should be completed in early An early look at a couple of analyses are shown in the two maps below, Figure 8-7 and 8-8. These maps represent current employment and commercial corridors. Later in the comp planning similar corridors will be examined for each land use scenario studied, and ultimately for the final land use plan. 8-9 P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

10 Figure 8-7 Figure 8-8 Express Route Service Rochester Public Transit currently provides peak hour express route service from 5 locations. This service is in addition to regular fixed route service. There is every expectation that express service locations will expand in the future to meet demand and will likely eventually include permanent transfer hub - park & ride lots. Express peak hour service is now, and will continue to be, an attractive transit option as the urban geography continues to extend into the 5-8 miles range from the Downtown area. The principal feature of express service is that boardings/deboardings occur only at the park and ride sites, thereby greatly reducing the ride time on the bus and helps service compete with auto travel time. Express route service tends to serve two principal rider types: the person residing in Rochester who drives/walks/bikes to the site to make the bus trip into downtown to work, and the rider residing outside of Rochester who makes a regular auto commute to the park and ride site and then buses the remaining part of the trip. Downtown parking costs or lack of availability motivate most of the express ridership P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

11 Figures 8-9 and 8-10 give an indication of typical range of draw from Rochester residential to existing park and ride sites in Rochester. As new park and ride sites are introduced over time, increased geographic areas of Rochester will be served. Figure 8-9 Figure 8-10 Figure 8-11 provides a conceptual look at an illustration of approaches that could be used to serve Rochester neighborhoods and dwelling units a mile or two outside of Rochester. The concept includes the combination of park and ride sites and express service to downtown. Figure 8-11 These are not actual routes or park ride sites included in this Plan or any other. Because the Rochester City Lines commuter service originates at park and ride (and walk and ride) sites in small cities in SE Minnesota, it s assumed that that sub-market is already addressed P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

12 The Transit Development Plan update beginning in early summer of 2015 will include work to identify locations for permanent Park and Ride locations for consideration by local elected officials. This work will be coordinated with the Transit Framework study analysis being done as part of the Rochester Comp Plan update during the same time frame. Proposals to site permanent Park and Ride facilities should be using criteria including: o Permanent hub/transfer locations should be mixed use with high density residential and commercial on or near the site. o Ample future-oriented parking should be available for park & ride and bike & ride service. o The primary hub and transfer location will continue to be the Downtown area. o Secondary hubs could also provide potential interface with regular fixed route service and any potential urban or commuter rail system or Bus Rapid Transit service over time. Figure 8-12 shows an example of a Park & Ride site with surface parking. Bike parking is included inside the building. Figure 8-12 Regional Commuter Bus Service The current bus commuter service from surrounding southeast Minnesota cities into Downtown Rochester has a long history with many routes now in place. Commuter bus service meets a need primarily for workers not wanting to drive into downtown Rochester daily from surrounding SE Minnesota cities. Current service is provided by a private carrier (Rochester City Lines) and is oriented toward the Rochester CBD with secondary service to the St. Marys Hospital campus. All small cities in Olmsted County are served along with many other cities outside of the county. Due to Mayo Clinic subsidy of employee rides, service is successful without public subsidy. ROCOG supports this current service and the need for increasing service over the coming years P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

13 Figure 8-13 Figure 8 13 helps to illustrate why efforts like regional commuter service is vital for Rochester economic health. This graphic is taken from the Rochester Transit Framework study work underway in 2015, just one of several studies concentrating on long term transit solutions to a continued dependence on regional commuters filling jobs in Rochester, particularly jobs in the parking-challenged downtown area. Commuter trip demand to downtown Rochester is expected to continue growing, which will require a downtown site expansion to accommodate more bus vehicles in downtown Rochester during the peak hours for boarding/deboarding. Parking/storing the buses during the day both currently and in the future will be examined during the development of Transit Components of both DMC Planning and the City of Rochester Comp Plan work. This planning work will also be coordinated with the Rochester Transit Development Plan work beginning in 2015 which will also review the current and future downtown hub, layover, and rider transferring demand for the RPT system, along with commuter bus parking. The prediction is that ridership will grow significantly for long range commuting into Rochester. This is based on: a) Mayo will continue to subsidize the trip cost. b) Higher future private vehicle fuel costs will drive more non-mayo riders to the service. The DMC initiative will produce a variety of new jobs in the downtown district; many of those will be taken by out of town commuters. c) Future new employee parking will be limited in the CBD per the City of Rochester s recommendations in the Downtown Master Plan and confirmed in the DMC 2015 Plan P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

14 Figure 8-14 helps to illustrate the commuting patterns into Rochester based on Census data. Commuters parking downtown significantly affect downtown congestion and intersection turning Figure 8-14 movements during the work peak hours. This is being addressed mainly in the DMC planning work in coordination with city planning staff. Single numbers are for Township only. Double numbers are for the Township and small city located therein. Figure 8-15 below provides the most recent commuter current ridership estimates and future ridership projections. This information is taken from consultant work done as part of Rochester Comp Plan and DMC planning P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

15 Figure 8-15 The US DOT considers Rochester to be included in a southern Minnesota megaregion for commuter, commercial and institutional services trip-making purposes. Local research confirms that there are trips made to/from the Rochester urban area daily of significant distance, and will continue into the future as long as there are relatively affordable fuel sources available P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

16 Paratransit Service Rochester, Olmsted County, and ROCOG have long supported paratransit services within the ROCOG study area. The expectation is that the future will call for increased paratransit services due to the aging of the Baby Boomers, and as current life spans continue to grow in general. The Zumbro Independent Passenger Service (ZIPS) is the local Americans with Disabilities Act (ADA) complementary paratransit service for the Greater Rochester area. The service is managed by the staff of Rochester Public Transit. It offers an alternative mobility option for those who are unable to use the fixed-route system. The operation is contracted at a per vehicle hourly rate with R&S Transport of Rochester. The contracted operator provides drivers, vehicle maintenance and storage, dispatching, and customer service. Future ZIPS Service Figure 8-16 The current ZIPS service boundaries may not necessarily need to be adjusted due to shifts in future urban/suburban residential growth patterns over the next years. A focus of the current Rochester Comp Plan work will be land use scenario planning to find methods to contain urban growth with less sprawl over time. The current service covers the four townships of Cascade, Marion, Haverhill and Rochester (Figure 8-17). Service provided is compatible with fixed route services and will provide availability to future city residents P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

17 Note that all RPT fixed route buses now have wheelchair lifts, and all future ones will also. This does help to reduce some of the demand for the more expensive ZIPS services. Figure 8-17 Future Rail Options Support of Connection to Future Midwest High Speed Rail System Support for a connection of Olmsted County to any future designated Midwest High Speed rail system carries over from the previous ROCOG Plan. The 2008 session of the Minnesota Legislature mandated that Mn/DOT prepare and submit a Comprehensive Statewide Freight and Passenger Rail Plan. This Plan was completed in February of The plan provides the guidance for rail initiatives and investments in the state and is now included in the State Transportation Plan. This rail plan is required to make state projects eligible for any possible federal funding. The Rochester connection to the Twin Cities was noted for further analysis. ROCOG supports a fast passenger rail connection to the upper Midwest main corridor that 8-17 P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

18 would connect Chicago/Milwaukee to the Twin Cities. The latest proposed route map from the Midwest High Speed Rail Association is shown in Figure The sidebar provides further information about the Association. Figure 8-18 Support of Zip Rail ROCOG supports the current Tier I EIS planning process for a current free-standing Zip Rail service between the Twin Cities and Rochester. The overall study schedule is depicted in Figure This includes work for both Tier I and Tier II planning/engineering work. By way of background, below are some of the characteristics of an expected Zip Rail high speed service (taken from the Zip Rail web site): The Rochester - Twin Cities Rail Corridor, or Zip Rail, is an approximately 100-mile corridor located between Rochester and the Minneapolis/St. Paul Metropolitan Area. The corridor includes Olmsted, Dodge, Goodhue, Rice, Dakota, Ramsey and Hennepin counties. The rail corridor is planned to connect Rochester with existing and/or 8-18 P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

19 proposed transportation facilities in Minneapolis/St. Paul and is consistent with an eventual high speed passenger rail regional connection between the Twin Cities and Chicago. Zip Rail offers a different type of service than commuter rail or existing rail service: True high speed rail - speeds of up to mph Dedicated track - no slow downs due to freight rail competition Time and cost competitive with air and vehicle travel Potential for future connections to other cities and states As a true high-speed passenger rail service, Zip Rail offers the potential of reduced public financial support once initial capital costs are covered: Faster speeds generate higher ridership, which equals a higher return on investment Speeds and service times maximize ridership potential (i.e. full trains) which generates higher ticket/operating revenues Figure P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

20 The Tier I study is predicted to be completed by the end of calendar year The current set of alternatives for the corridor selection is shown in figures 8 20 and Figure 8-20 Figure 8-21 It is also important to note that MnDOT is completing its Minnesota State Rail Plan and has references within this document to the Zip Rail initiative. See Chapter 9, page 15. Modern Street Cars Recent Study History: The 2010 Downtown Rochester Mobility Study, as a component of the Rochester Downtown Master Plan, had set the stage for a further high capacity transit study in the Rochester downtown, particularly in the analysis of a circulator type system. This concept was further advanced in the Draft Destination Medical Center (DMC) Master Plan issued in January, In this concept plan, circulator routes were somewhat more defined along with some level of initial support for a modern streetcar as an appropriate mode. The DMC Master Plan recommended a formal federalized planning/engineering study of such a circulator as one of the first steps in the Master Plan implementation P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

21 At this point in time, it is recognized that neither the mode, nor the routes have yet to be defined or approved. And little work has been done to date on review of possible alternatives for a downtown circulator board/commission, or funding mechanisms. Information provided herein is for information purposes only. Both the 2010 Rochester Downtown Master Plan and the 2015 DMC Master Plan recognize a few important planning emphasis areas that are pertinent to possible modern streetcar consideration: Rochester Downtown (CBD) has limited portals for vehicle traffic in and out access. Future parking will be primarily located around the perimeter of the Downtown, with new parking in the heart of downtown planned mostly for Mayo patients/visitors. Transit service from Rochester neighborhoods and commuter service into Rochester will need to increase to meet future travel demand into Downtown. A community policy of park once is forming; by parking once downtown trip-makers will need transit (such as streetcar) to make trips to/from parking and other downtown trip generators. The overall outcome in planning these types of transit services would be to create options for mobility that would allow individuals to choose alternative modes for daily trips, thereby reducing their vehicular miles of travel and transportation energy costs. Value to the City and downtown employers would be less need for parking spaces. The creation of more travel options should also provide individuals with the ability to lead healthier and more active lifestyles, building on the efforts of Rochester Active Living and other community initiatives. It should also be pointed out that past experience in U.S. cities show that there is a latent travel demand for urban rail transit that will not appear for bus transit. In other words, people will ride urban rail transit for a variety of urban trips even though bus transit service could have provided the same service. Modern Street Car Characteristics: Street cars and trolley service have changed over the many decades since they were previously popular in this country. They are now narrower, often with 2 seats on one side and one seat on the other. The types of streetcars now being used can be categorized as: vintage, replica, and modern. One of the chief advantages of the service is the minimal loss of on street parking and driving lanes, since the rails are usually in the streets themselves, unless service is designed for dedicated transit lanes P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

22 Streetcar service is somewhat similar to that of light-rail service, but with lower ridership capacity, and more frequent stops because they use passenger stops similar to bus transit rather than transit stations. And unlike light rail, they do not operate within their own right of way off the streets. Typical characteristics of modern street car service are: minimal construction impacts the service blends into neighborhoods service supports a walking-oriented environment can have routes that operate both on street at times, then in dedicated street lanes cars can run on single or double tracks are powered by overhead electric wires running speeds are 15 to 30mph passenger loading from sidewalks or simple platforms vehicle capacity: from 35 to 75 typical route length: 1 to 5 miles normally are single car operation Modern street cars are most often used in a downtown-circulator type of setting. For example, modern street car trip purposes in Rochester might replace short car trips or long walking trips made by people who rode fixed route or commuter transit to work, downtown residents, UMR students & staff, hotel patrons, and people visiting Mayo Clinic who have either parked for the day, or taken a hotel/motel shuttle to the Mayo campus. In general, people from out of town and others who do not usually use transit, should be able to follow the maps of streetcar routes easily enough. Modern Street Car & DMC Planning: ROCOG supports and plans to have staff and Board member participation of the federalized study of a downtown circulator as one of the first implementation steps of the Destination Medical Center Corporation. ROCOG also recognizes its eventual role in approving a preferred alternative if study/planning reaches that point. An excerpt from the 2015 Draft DMC Master Plan is provided below for initial understanding of the circulator concept. Also included is a graphic of a streetcar or circulator route concept (Figure 8-22) P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

23 CREATE A PARK-ONCE DOWNTOWN ENVIRONMENT CONNECTED BY A FREQUENT DOWNTOWN CIRCULATOR A goal of the (DMC) plan is to create a park-once environment linked to a frequent downtown transit circulator that provides workers, residents, and visitors opportunity to park in or on the periphery of downtown and to move about without their car. Operating frequently and over long hours, the circulator provides mobility for people who are moving about downtown and connects remote parkers to their vehicles with frequent transit that operates into the late evening hours. Development of new downtown parking ramps, peripheral parking facilities, and the downtown circulator will be phased. Early phases of the plan will focus on creating new parking supply to support increased visitation and private development. Figure 8-22 The plan envisions phased development of the circulator with the east-west (initial phase) connecting Saint Marys Place to a redevelopment area south of the Government Center and the North-South segment (latter phase) connecting the SE terminus to Discovery Square and Central Station. Circulator project phasing would be coordinated with three large parking reservoirs developed on the west end, southeast, and north end of the transit line. This strategy will help to eliminate the need for as many as 6,000 to 8,000 parking stalls in the downtown core, freeing land for tax-producing, developable space. Enhanced branding for the park-once system, parking wayfinding for drivers and pedestrians, and incorporation of real-time parking information are all elements of the parking system that will be added to increase efficiency and enhance the visitor experience P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

24 Transit and Land Use Policies Land Use policies can guide development of the urban area to build more density, both in residential and in work sites. This can make for an overall more successful transit system, and by creating cost efficiencies can allow for more service to more parts of the city. This can lead to increased fixed route transit in neighborhoods either in span of service (hours of day in operation) or increased headways. Land use policies will be analyzed with community leaders during the update of the Rochester Comp Plan update, and during the implementation of the DMC Plan. This will make land use planning with a transit focus an important community discussion over the next couple of year. The blue and gold areas shown in Figure 8-23 depict land that is already committed in General Development Plans to be developed in the urban service area over the next 1-15 years. This is essentially considered the trend scenario based on historical growth as an early input to the Rochester Comp Plan update. Any future urban land use plan should be served with fixed route transit service, the ZIPS paratransit alternative service, and higher capacity transit as shown to be justified. This should be accomplished with combinations of route extensions and route modifications in order to accommodate the longer trips in from the outer areas, including expansion of express service. Future strategies coming from the Rochester Comp Figure 8-23 Plan s Transit Framework Study will show the importance of expanding fixed route services to newly developing parts of the city in a coordinated fashion, so that the overall system is growing into a planned future service design. The intent is for near term and mid-term service improvements to be able to blend into long term service concepts P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

25 Transit Oriented Development Major transit investments often support node economic development using Transit Oriented Development (TOD) approaches. Transit Oriented Development is characterized by a mixeduse, high density, and pedestrian friendly environment around transit stations or hubs. TODs attract and produce transit ridership through development and redevelopment, and normally have shared and reduced parking demands. In some instances, park & ride lots or parking structures are integrated into the sites to better serve transit demand. This sort of land use planning will be analyzed in the Comp Plan Update and promoted as an integral factor in transit planning work. Such work has already been introduced as part of the DMC Plan Development for the Rochester downtown area. Figure 8-24, as an example (from Anywhere, USA ), shows high density development radiating out along short corridors in several directions from TOD type intersections. Figure 8-24 Transit Service Role in Adaptation to Peak Oil Conditions Figure 8-25 All transit service planning should be developed with the understanding that permanent reductions in oil and petro-energy will greatly affect modern auto travel over time. At some point in the future, urban transit travel will rise significantly as a travel mode for routine/regular trip-making (i.e. work & school). Figure 8-25 illustrates current expert assumptions on timing of the planet s peak oil condition P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

26 This eventuality will affect several transit sub-markets in the ROCOG study area: 1) City of Rochester routine daily trip-making such as to work downtown 2) Retired persons trip making as energy costs become less affordable 3) Trip-making for teenagers as multiple car households shrink over time 4) Surrounding small towns making trips into Rochester for a variety of trip purposes 5) Long distance work trips from SE Minnesota into Rochester for work, school, and medical reasons Other High Capacity Transit Considerations As discussed in Chapter One and earlier in this Chapter, there are several studies in mid or early phases of work that will help to lay out future transit options for Rochester, Olmsted County, and surrounding counties. Therefore, not all transit solutions can be assumed to be out of the realm of possibilities in the ROCOG planning area. Information below discusses other long range planning considerations being considered and may possibility be further explored in the next 2045 ROCOG Plan update as more prominent options or recommendations. Since the last Long Range Plan adoption, the City of Rochester took the action of preserving right of way for a future general transportation use corridor as shown in Figure An example of a future use of this corridor would be for off-street transit with the principle destination of the Rochester downtown area. The type of transit could range from local route buses, BRT, or light rail. The tool used was an official map to preserve a part of a corridor north of the C & W railroad tracks. The graphic illustrates how the full corridor might look if the current railroad N-S tracks might be used for converted transit use sometime in the future. Figure P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

27 Bus Rapid Transit (BRT) Bus Rapid Transit buses have features that differ from regular line-haul fixed route buses. BRT rubber wheeled vehicles looks and feels much like a railcar. They can operate either on streets without major modifications, or in a separate busway, or can switch from one to another over the course of a route. Like a rail system, BRT service can often have permanent stations, services, and amenities. BRT vehicles are low floor design making them easy to board, and often have several doors for faster boarding / deboarding. Features generally associated with a BRT system include signal priority at intersections, queue jump lanes, and off board fare collection. Vehicles are often fueled with low emission hybrid electric or compressed natural gas. Other features include: - Wide seats with extra legroom for a comfortable ride. - Standing room for riders who prefer to stand for shorter trips. - Seating for 48 passengers and overall capacity up to 80 riders. - Electronic automatic stop announcements. - Wheelchair boarding at the second door, and bicycle boarding at the third door directly onto onboard bike racks. BRT service usually includes more station-like boarding/deboarding facilities, which can be built to accommodate several buses simultaneously. Stations are several blocks apart to consolidate passenger/bus interaction and keep overall schedules more competitive with the auto. Operation of buses is usually at closer headways than light rail train service. Land use intensity along BRT corridors needs to be considerably higher than typical urban corridors service by local bus service P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

28 Long Range Consideration of Small Cities in Olmsted County Currently, with the exception of Stewartville, small cities in Olmsted County have only peak hour bus commuter service to Rochester available during the work week. Stewartville provides additional transit service administered by the city with a contract provider. Over time, some level of transit planning should be directed toward the needs of non-peak service for surrounding communities. Currently, as of early 2015, there are two transit studies underway that will examine this potential need. Two current studies are: - Southeast Minnesota Travel Behavior Study, with emphasis on transit service proposals to meet unmet demand or offer alternative service. - Rochester Comp Plan Update that will include a Transit Framework Component that will analyze commuter trips into Rochester, including from small cities and surrounding parts of the county into Rochester. There may be a look at longer distance express service into the Rochester downtown in the two studies listed above, or in the update of the Rochester Transit Development Plan beginning work in mid Figure 8-27 suggests that a 15 mile range out from the Rochester Central Business District would seem reasonable as a guide for a future examination of extended express service, especially with the history of Mayo employees living outside of Rochester. In looking further at conceptual planning for small cities, Figure 8-28 illustrates how potential small city Neighborhood Circulator/Feeder Service areas could be developed and integrated with express service at outlying transit hubs. Figure P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

29 Figure 8-28 Circulator/Feeder Service could be studied more closely if some type of regional transit authority is proposed, or energy prices create increased transit demand, which could occur during the 30 year planning horizon of this Plan. One of the features of this type of service is that persons living in a small city could also use the circulator service to make trips within the city itself. Current Small City Transit Status Stewartville: Stewartville currently administers the Heartland Transit Service: a small urban dial-a-ride service under contract with a private bus company. Service is provided with one vehicle and an annual ridership of about 12,000 riders. Commuter bus service is also provided from Stewartville to Rochester downtown by Rochester City Lines, which is a peak hour, commuter-oriented service. Byron Currently, commuter bus service is provided from Byron to Rochester downtown by Rochester City Lines, which is a peak hour, commuter-oriented service. When the population of Byron reaches 5,000 the city will become eligible for operating and capital financial assistance from the Federal Transit Administration just as Stewartville is now P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

30 Pine Island and Oronoco Pine Island, Oronoco and the future Elk Run development may have a need for local bus circulator service long term that would feed trips into a park & ride site with express service into Rochester. Pine Island will also become eligible for FTA assistance at some point in the future when its population reaches 5,000, which could happen at the point where the Elk Run residential part of its initiative begins to be built out. Other Olmsted County Small Cities The Eyota-Dover-St. Charles corridor along with Chatfield will continue to benefit from private bus commuter service to the Rochester CBD. By joining together, some level of non-peak express service could also be feasible, though with local operating support needed P a g e REAFFIRMATION OF ROCOG 2040 LONG RANGE PLAN

ROCHESTER, MINNESOTA

ROCHESTER, MINNESOTA ROCHESTER, MINNESOTA Rochester Public Works TRANSIT AND PARKING DIVISION Transit and Parking Manager Tony Knauer tknauer@rochestermn.gov SERVICE ATTITUDE CONSISTENCY - TEAMWORK ROCHESTER TRANSIT & PARKING

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program

More information

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections

More information

A Transit Plan for the Future. Draft Network Plan

A Transit Plan for the Future. Draft Network Plan A Transit Plan for the Future Draft Network Plan Project Overview and Status Completed Market Analysis and Service Evaluation. Developed Plan Framework and Guiding Principles. Developed a draft Five Year

More information

Parking Management Element

Parking Management Element Parking Management Element The State Transportation Planning Rule, adopted in 1991, requires that the Metropolitan Planning Organization (MPO) area implement, through its member jurisdictions, a parking

More information

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost.

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost. Policy Note Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost Recommendations 1. Saturate vanpool market before expanding other intercity

More information

CEDAR AVENUE TRANSITWAY Implementation Plan Update

CEDAR AVENUE TRANSITWAY Implementation Plan Update CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,

More information

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury Open House Presentation January 19, 2012 Study Objectives Quantify the need for transit service in BWG Determine transit service priorities based

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration Legislative Committee on Urban Growth and Infrastructure Carolyn Flowers CEO Charlotte Area Transit System March 23, 2010 Charlotte Region

More information

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

Transportation Demand Management Element

Transportation Demand Management Element Transportation Demand Management Element Over the years, our reliance on the private automobile as our primary mode of transportation has grown substantially. Our dependence on the automobile is evidenced

More information

Sales and Use Transportation Tax Implementation Plan

Sales and Use Transportation Tax Implementation Plan Sales and Use Transportation Tax Implementation Plan Transportation is more than just a way of getting from here to there. Reliable, safe transportation is necessary for commerce, economic development,

More information

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017 US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master

More information

Feasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study

Feasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study Feasibility Study Community Meeting March, 2017 1 Agenda 1. Welcome / Introductions 2. Background / Meeting Purpose 3. Progress to Date Options Evaluated Capital/Operating Costs Ridership 4. Financial

More information

Metropolitan Council Budget Overview SFY

Metropolitan Council Budget Overview SFY Metropolitan Council Budget Overview SFY 2016-2017 H T t ti C itt House Transportation Committee February 4, 2015 Transit connects us to the places that matter Transportation Needs Grow as the Region Grows

More information

Service Quality: Higher Ridership: Very Affordable: Image:

Service Quality: Higher Ridership: Very Affordable: Image: Over the past decade, much attention has been placed on the development of Bus Rapid Transit (BRT) systems. These systems provide rail-like service, but with buses, and are typically less expensive to

More information

Click to edit Master title style

Click to edit Master title style Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment

More information

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation

More information

Downtown Transit Connector. Making Transit Work for Rhode Island

Downtown Transit Connector. Making Transit Work for Rhode Island Downtown Transit Connector Making Transit Work for Rhode Island 3.17.17 Project Evolution Transit 2020 (Stakeholders identify need for better transit) Providence Core Connector Study (Streetcar project

More information

Rapid Transit and Land-Use Integration a Reality

Rapid Transit and Land-Use Integration a Reality City of Charlotte Rapid Transit and Land-Use Integration a Reality Transportation Oversight Committee Carolyn Flowers CEO Charlotte Area Transit System April 29, 2010 Charlotte Region Statistics Mecklenburg

More information

Tempe Streetcar. March 2, 2016

Tempe Streetcar. March 2, 2016 Tempe Streetcar March 2, 2016 Tempe Profile 40 sq. miles, highest density in state University Town, center of region Imposed growth boundaries (density increase) Mixed use growth/intensifying land use

More information

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS 2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak

More information

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit

More information

Proposed Program of Interrelated Projects

Proposed Program of Interrelated Projects DALLAS AREA RAPID TRANSIT Proposed Program of Interrelated Projects Federal Transit Administration Capital Investment Program Summer 204 INTRODUCTION The current federal transportation bill, Moving Ahead

More information

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report Office of Transportation Bureau of Traffic Management 1997 Downtown Parking Meter District Rate Report Introduction The City operates approximately 5,600 parking meters in the core area of downtown. 1

More information

MARTA s blueprint for the future. COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018

MARTA s blueprint for the future. COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018 MARTA s blueprint for the future COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018 TODAY S AGENDA About MARTA Economic development/local impact More MARTA Atlanta program Program summary/timeline

More information

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT V03 APTA Multimodal Operations Planning Workshop August 2016 Green Line LRT 2 Presentation Outline Past Present Future 3 16/03/2016 RouteAhead Update 4 4 16/03/2016 RouteAhead Update 5 5 16/03/2016 6 6

More information

Green Line LRT: Beltline Segment Update April 19, 2017

Green Line LRT: Beltline Segment Update April 19, 2017 Green Line LRT: Beltline Segment Update April 19, 2017 Quick Facts On April 11, 2017, City Council approved Administration s recommendation for the Green Line to be underground in the Beltline from 2 Street

More information

CORE AREA SPECIFIC PLAN

CORE AREA SPECIFIC PLAN only four (A, B, D, and F) extend past Eighth Street to the north, and only Richards Boulevard leaves the Core Area to the south. This street pattern, compounded by the fact that Richards Boulevard is

More information

KANSAS CITY STREETCAR

KANSAS CITY STREETCAR KANSAS CITY STREETCAR KAREN CLAWSON MID-AMERICA REGIONAL COUNCIL KANSAS CITY STREETCAR Regional Context Alternatives Analysis Kansas City Streetcar Project KANSAS CITY REGION KANSAS CITY REGION KANSAS

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014 Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and

More information

PUBLIC TRANSPORTATION

PUBLIC TRANSPORTATION PUBLIC TRANSPORTATION PROJECT TITLE U-MED DISTRICT MULTI-MODAL IMPROVEMENTS- PHASE II Transit Vehicles and Upgrades MUNICIPALITY OF ANCHORAGE Capital Improvement Program PROJECT LIST BY DEPARTMENT Public

More information

Leadership NC. November 8, 2018

Leadership NC. November 8, 2018 v Leadership NC November 8, 2018 Planning for our region s growth The Triangle is one of the fastestgrowing regions in the nation. More than 2 million people are already part of the equation, and the

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

The City of Toronto s Transportation Strategy July 2007

The City of Toronto s Transportation Strategy July 2007 The City of Toronto s Transportation Strategy July 2007 Presentation Outline Transportation Statistics Transportation Building Blocks Toronto s Official Plan Transportation and City Building Vision Projects

More information

The Engineering Department recommends Council receive this report for information.

The Engineering Department recommends Council receive this report for information. CORPORATE REPORT NO: R161 COUNCIL DATE: July 23, 2018 REGULAR COUNCIL TO: Mayor & Council DATE: July 19, 2018 FROM: General Manager, Engineering FILE: 8740-01 SUBJECT: Surrey Long-Range Rapid Transit Vision

More information

Charlotte Area Transit System: Moving Forward John Lewis CATS Chief Executive Officer

Charlotte Area Transit System: Moving Forward John Lewis CATS Chief Executive Officer Charlotte Area Transit System: Moving Forward John Lewis CATS Chief Executive Officer House Select Committee March 2018 1 Charlotte Long-Term Growth Management Strategy Centers, Corridors and Wedges Five

More information

Public Meeting. June 15, :30 7:30 p.m.

Public Meeting. June 15, :30 7:30 p.m. Public Meeting June 15, 2017 5:30 7:30 p.m. Welcome 2015 Naval Station Norfolk Transit Extension Study 2015 Naval Station Norfolk Transit Extension Study 2017 Norfolk Westside Transit Study HRT and the

More information

SUPPORTING TOD IN METRO CHICAGO

SUPPORTING TOD IN METRO CHICAGO www.rtachicago.org SUPPORTING TOD IN METRO CHICAGO Tuesdays at APA November 18, 2014 OVERVIEW OF RTA 2 11/18/2014 Tuesdays at APA: Supporting TOD in Metro Chicago RTA Region 8.5 million people 3,700 square

More information

Mass Transit in Charlotte and San Antonio. Keith T. Parker, AICP

Mass Transit in Charlotte and San Antonio. Keith T. Parker, AICP Mass Transit in Charlotte and San Antonio Keith T. Parker, AICP President/CEO Presentation Overview Charlotte Agency and Customer Profile San Antonio Agency and Customer Profile Attracting New Customers

More information

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Green Line LRT: Beltline Recommendation Frequently Asked Questions Green Line LRT: Beltline Recommendation Frequently Asked Questions June 2017 Quick Facts Administration has evaluated several alignment options that would connect the Green Line in the Beltline to Victoria

More information

The Case for. Business. investment. in Public Transportation

The Case for. Business. investment. in Public Transportation The Case for Business investment in Public Transportation Introduction Public transportation is an enterprise with expenditure of $55 billion in the United States. There has been a steady growth trend

More information

Address Land Use Approximate GSF

Address Land Use Approximate GSF M E M O R A N D U M To: Kara Brewton, From: Nelson\Nygaard Date: March 26, 2014 Subject: Brookline Place Shared Parking Analysis- Final Memo This memorandum presents a comparative analysis of expected

More information

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps PEACHTREE CORRIDOR PARTNERSHIP Current Status & Next Steps PEACHTREE CORRIDOR PARTNERSHIP Why Peachtree? Why Now? I. THE CONTEXT High Level View of Phasing Discussion Potential Ridership Segment 3 Ease

More information

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives 3.0 What preliminary alternatives are being evaluated? The alternatives for the East San Fernando Valley Transit Corridor project that were considered for screening include the No Build Alternative, Transportation

More information

I-35W Past, Present, and Future: METRO Orange Line

I-35W Past, Present, and Future: METRO Orange Line I-35W Past, Present, and Future: METRO Orange Line 2018 State Public Transportation Partnerships Conference Charles Carlson Director, BRT Projects Metro Transit Charles.Carlson@metrotransit.org Metro Transit:

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

Midtown Corridor Alternatives Analysis Key Issues Memo

Midtown Corridor Alternatives Analysis Key Issues Memo Midtown Corridor Alternatives Analysis Key Issues Memo 1/4/2013 Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 1. Markets... 1 External Markets... 1 Intra-Corridor Travel...

More information

2030 Multimodal Transportation Study

2030 Multimodal Transportation Study 2030 Multimodal Transportation Study City of Jacksonville Planning and Development Department Prepared by Ghyabi & Associates April 29,2010 Introduction Presentation Components 1. Study Basis 2. Study

More information

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1 Snelling Bus Rapid Transit May 13, 2013 Technical Advisory Committee Meeting #1 1 Today s meeting TAC Introductions Project Overview Arterial BRT Concept Background Snelling Corridor Plan, Funding & Schedule

More information

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle Chapter 7: Travel Demand Analysis Chapter 8 Plan Scenarios LaSalle Community Center. Image Credit: Town of LaSalle 164 Chapter 8: Plan Scenarios Moving Ahead for Progress in the 21 st Century Act (MAP

More information

Needs and Community Characteristics

Needs and Community Characteristics Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by

More information

Vanpooling and Transit Agencies. Module 3: Benefits to Incorporating Vanpools. into a Transit Agency s Services

Vanpooling and Transit Agencies. Module 3: Benefits to Incorporating Vanpools. into a Transit Agency s Services Vanpooling and Transit Agencies Module 3: Benefits to Incorporating Vanpools into a Transit Agency s Services A common theme we heard among the reasons why the transit agencies described in Module 2 began

More information

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study Northeast Corridor Alternatives Analysis Public Involvement Round 2 Input on Alternatives for Further Study Feb. 7-9, 2012 Agenda Review project background Progress summary Recommended alternatives for

More information

What We Heard Report - Metro Line NW LRT

What We Heard Report - Metro Line NW LRT What We Heard Report - Metro Line NW LRT by Metro Line NW LRT Project Team LRT Projects City of Edmonton April 11, 2018 Project / Initiative Background Name Date Location Metro Line Northwest Light Rail

More information

Public Meeting. March 21, 2013 Mimosa Elementary School

Public Meeting. March 21, 2013 Mimosa Elementary School Public Meeting March 21, 2013 Mimosa Elementary School Today s Meeting Purpose 2 Where We Are The Process What We ve Heard and Findings Transit Technologies Station Types Break-out Session Where We Are

More information

Chapter 4 : THEME 2. Transportation

Chapter 4 : THEME 2. Transportation Chapter 4 : THEME 2 Strengthen connections to keep the Central Area easy to reach and get around 55 Figure 4.2.1 Promote region-wide transit investments. Metra commuter rail provides service to the east,

More information

Denver Car Share Program 2017 Program Summary

Denver Car Share Program 2017 Program Summary Denver Car Share Program 2017 Program Summary Prepared for: Prepared by: Project Manager: Malinda Reese, PE Apex Design Reference No. P170271, Task Order #3 January 2018 Table of Contents 1. Introduction...

More information

Strategic Plan

Strategic Plan 2005-2015 Strategic Plan SUMMARY OF THE REVISED PLAN IN 2011 A decade focused on developing mass transit in the Outaouais A updated vision of mass transit in the region The STO is embracing the future

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today's session will provide you with information about Administration's recommendation for connecting the Green Line in the Beltline to Victoria Park and Inglewood/Ramsay

More information

West Broadway Transit Study. Community Advisory Committee September 17, 2015

West Broadway Transit Study. Community Advisory Committee September 17, 2015 West Broadway Transit Study Community Advisory Committee September 17, 2015 Introductions Community Engagement Summer Outreach Fall Outreach Technical Analysis Process Update Alternatives Review Economic

More information

Metro Reimagined. Project Overview October 2017

Metro Reimagined. Project Overview October 2017 Metro Reimagined Project Overview October 2017 Reimagining Metro Transit Continuing our Commitment to: Provide mobility based on existing and future needs Value the role of personal mobility in the quality

More information

Draft Results and Open House

Draft Results and Open House Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi

More information

Sean P. McBride, Executive Director Kalamazoo Metro Transit. Presentation to Michigan Transportation Planning Association July 13, 2016

Sean P. McBride, Executive Director Kalamazoo Metro Transit. Presentation to Michigan Transportation Planning Association July 13, 2016 Sean P. McBride, Executive Director Kalamazoo Metro Transit Presentation to Michigan Transportation Planning Association July 13, 2016 Metro Transit in Kalamazoo County Square Miles = 132 Urbanized Population:

More information

Building Equitable Sustainable Transit OPEN HOUSE

Building Equitable Sustainable Transit OPEN HOUSE Building Equitable Sustainable Transit OPEN HOUSE Getting Around In Southeast Michigan Southeast Michigan Is Spread Out More Than Ever Before 1970 2010 POPULATION 35% 16% JOBS SE MICHIGAN DETROIT 42% 9%

More information

DRAFT Evaluation Scores. Transit

DRAFT Evaluation Scores. Transit DRAFT Evaluation s The criteria for evaluating applications for new funding commitments are used to measure how well they advance the six goals identified for the MTP. Through transportation: Reduce per

More information

DRAFT Subject to modifications

DRAFT Subject to modifications TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M DRAFT To: Council Members AGENDA ITEM 7A From: Date: Subject: Staff September 17, 2010 Council Meeting High Speed Rail Update Introduction The

More information

Draft Results and Recommendations

Draft Results and Recommendations Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System

More information

2018 Long Range Development Plan Update Community Advisory Group- February 21, 2018

2018 Long Range Development Plan Update Community Advisory Group- February 21, 2018 Transportation @ UC San Diego 2018 Long Range Development Plan Update Community Advisory Group- February 21, 2018 Agenda UC San Diego Transportation Services Organizational Overview Current State Parking,

More information

PUBLIC TRANSPORTATION

PUBLIC TRANSPORTATION PUBLIC TRANSPORTATION An Overview of the Industry, Key Federal Programs, and Legislative Processes American Public Transportation Association 1 The Public Transportation Industry: What is "public transportation"?

More information

August 2, 2010 Public Meeting

August 2, 2010 Public Meeting Public Meeting LYMMO Expansion Alternatives Analysis Study Purpose of study is to provide a fresh look at potential LYMMO expansion, following Federal Transit Administration (FTA) Alternatives Analysis

More information

COMMUNITY REPORT FISCAL YEAR We are making progress, are you on board? GOLD COAST TRANSIT DISTRICT

COMMUNITY REPORT FISCAL YEAR We are making progress, are you on board? GOLD COAST TRANSIT DISTRICT FISCAL YEAR 178 GOLD COAST TRANSIT DISTRICT COMMUNITY REPORT We are making progress, are you on board? OJAI OXNARD PORT HUENEME VENTURA COUNTY OF VENTURA GENERAL MANAGER S MESSAGE STEVEN P. BROWN DEAR

More information

Operating & Maintenance Cost Results Report

Operating & Maintenance Cost Results Report Operating & Maintenance Cost Results Report Prepared for: Hennepin County Regional Railroad Authority Prepared by: Connetics Transportation Group Under Contract To: Kimley-Horn and Associates FINAL June

More information

Overview of Transit Funding and Planning in the PACTS Region

Overview of Transit Funding and Planning in the PACTS Region Overview of Transit Funding and Planning in the PACTS Region Presentation to PACTS Transit Committee and Federal Transit Administration Representatives February 8, 2018 Transit Agencies Agency Communities

More information

Travel Time Savings Memorandum

Travel Time Savings Memorandum 04-05-2018 TABLE OF CONTENTS 1 Background 3 Methodology 3 Inputs and Calculation 3 Assumptions 4 Light Rail Transit (LRT) Travel Times 5 Auto Travel Times 5 Bus Travel Times 6 Findings 7 Generalized Cost

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

Transportation Sustainability Program

Transportation Sustainability Program Transportation Sustainability Program Photo: Sergio Ruiz San Francisco is a popular place to work, live and visit, straining the existing transportation network Roads and transit vehicles nearing capacity

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Executive Summary October 2013

Executive Summary October 2013 Executive Summary October 2013 Table of Contents Introduction... 1 Rider Transit and Regional Connectivity... 1 Plan Overview... 2 Network Overview... 2 Outreach... 3 Rider Performance... 4 Findings...

More information

Appendix C. Parking Strategies

Appendix C. Parking Strategies Appendix C. Parking Strategies Bremerton Parking Study Introduction & Project Scope Community concerns regarding parking impacts in Downtown Bremerton and the surrounding residential areas have existed

More information

Aren t You Really a Mobility Agency? Why The Vanpool Works for Transit

Aren t You Really a Mobility Agency? Why The Vanpool Works for Transit Aren t You Really a Mobility Agency? Why The Vanpool Works for Transit Presenter: Kevin Coggin, Coast Transit Authority, Gulfport, MS Presenter: Lyn Hellegaard, Missoula Ravalli TMA, Missoula, MT Moderator:

More information

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014 Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing July 24, 2014 Project Description The Central City Line is a High Performance Transit project that will extend from Browne

More information

Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner

Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner Presentation Outline Transit System Facts Economic Challenges in the Truckee Meadows RTC Transit

More information

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014 Midtown Corridor Alternatives Analysis Policy Advisory Committee Meeting February 12, 2014 Today s Agenda Introductions Outreach efforts and survey results Other updates since last meeting Evaluation results

More information

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County

More information

GO Transit s deliverable: the 2020 Service Plan

GO Transit s deliverable: the 2020 Service Plan GO Transit s deliverable: the 2020 Service Plan GO Transit s 2020 Service Plan describes GO s commitment to customers, existing and new, to provide a dramatically expanded interregional transit option

More information

EXECUTIVE SUMMARY. Introduction

EXECUTIVE SUMMARY. Introduction EXECUTIVE SUMMARY Introduction The purpose of this study is to ensure that the Village, in cooperation and coordination with the Downtown Management Corporation (DMC), is using best practices as they plan

More information

Amman Green Policies Projects and Challenges. Prepared by: Eng. Sajeda Alnsour Project coordinator Sept. 20, 2017

Amman Green Policies Projects and Challenges. Prepared by: Eng. Sajeda Alnsour Project coordinator Sept. 20, 2017 Amman Green Policies Projects and Challenges Prepared by: Eng. Sajeda Alnsour Project coordinator Sept. 20, 2017 Amman: Demographics Greater AMMAN Municipality GAM Amman is the capital of Jordan with a

More information

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES TRANSIT GRADE: C- WHAT YOU SHOULD KNOW ABOUT TRANSIT FACILITIES California needs robust, flexible and reliable transit systems to reduce peak congestion on our highways, provide options for citizens who

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: COMMUNITY BUS SERVICES ACTION ITEM RECOMMENDATION It is recommended that the Board not approve any routing

More information

4.0 TIER 2 ALTERNATIVES

4.0 TIER 2 ALTERNATIVES 4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation

More information

PARTIAL PROGRAM OF PROJECTS FFY

PARTIAL PROGRAM OF PROJECTS FFY PARTIAL PROGRAM OF PROJECTS FFY 2016-17 The proposed Partial Program of Projects for FFY 2016-17 is attached. The proposed Partial Program of Projects was introduced at the SCTA Board at its meeting on

More information

5 RAPID TRANSIT NETWORK PLAN PRINCIPLES, METROLINX BUSINESS CASE, AND ALTERNATIVE FINANCE AND PROCUREMENT ANALYSIS UPDATE

5 RAPID TRANSIT NETWORK PLAN PRINCIPLES, METROLINX BUSINESS CASE, AND ALTERNATIVE FINANCE AND PROCUREMENT ANALYSIS UPDATE 5 RAPID TRANSIT NETWORK PLAN PRINCIPLES, METROLINX BUSINESS CASE, AND ALTERNATIVE FINANCE AND PROCUREMENT ANALYSIS UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the

More information