Toll Plazas at the Bosphorus Bridge
|
|
- Jesse Lynch
- 6 years ago
- Views:
Transcription
1 6th International Congress on Advances in Civil Engineering, 6-8 October 4 Bogazici University, Istanbul, Turkey Toll Plazas at the Bosphorus Bridge K.S. Öüt stanbul Technical University, Civil Engineering Faculty, Department of Transportation, stanbul, Turkey Abstract The Bosphorus Bridge plays an important role in stanbul traffic. It has three lanes at each direction and about 9, vehicles cross the bridge daily. There are tollbooths at the Asian site. In this study, the arrival and the service time to the plazas are examined at the context of the queueing process. The data are gathered during the peak-hour period for 9 min. The statistical analysis of the observed tollbooths shows that the average vehicle headway is 8.48 sec, whereas the service time is 8.6 sec. The average queue length changes from 6 to 3 vehicles between 7:-8: and from 9 to vehicles between 8:-8:3. Introduction Toll facilities include freeway sections and toll plazas integrated within the system. Toll plazas can be considered interrupted flow facilities, and therefore the toll facility cannot be evaluated as a normal freeway segment. Furthermore, the toll plazas cannot be evaluated as signalized intersection because of their unique characteristics. Woo and Hoel (99) examined toll plazas at Virginia Richmond Petersburg Turnpike where the service times at the toll plazas ranged from.87 to 4.88 sec for trucks and from. to.47 sec for automobiles. The capacity of a general booth is found to range from 6 to 7 passenger cars per hour. Since then, several studies have been made for manually operated (Al-Deek et al. 997), electronic (Al-Deek et al, 996), and the level of service of the toll plazas (Lin and Su, 994),(Klodzinski, ),( Klodzinski and Al-Deek, ). Despite these studies, there is no serious studies for the departure and the arrival of the toll plazas in Turkey. In this study, the arrival, the service time and the queue formation at the manually operated tollbooths on the Bosphorus Bridge are examined.
2 Study Area and Survey The Bosphorus Bridge (BB), built in 973, is the first bridge which ties the Asian and European continents in stanbul. In 988 the second bridge, named Fatih Sultan Mehmet Bridge, was constructed for Asia-Europe crossing. Since then, the BB has only been used by city traffic, which means the crossing of the lorries, TIRs or intercity buses is not allowed. The BB is on the O freeway, which has x3 characteristic. During the morning peak hours (6:-:), an extra lane is opened on the opposite traffic flow section for the Asia- Europe crossing, consequently four lanes are operated along this direction. Similarly, during the evening peak hours (7:-:), an extra lane is used for the Europe-Asia crossing, this time again on the opposite traffic section (Fig. ). Europe Site Asia Site Europe Site Asia Site Europe Site Asia Site (a) (b) (c) Fig. : Traffic flows on the BB during (a) morning peak, (b) evening peak, (c) off-peak On the BB, there are tollbooths, which are placed at the Asian side and used only by Europe-Asia crossers. Vehicles in the Asia-Europe direction do not make toll payments. During the survey, of the tollbooths were operated with manual toll payment, and 4 others (tollbooth-8, 9, and ) had the Electronic Toll Collection System (ETCS). ETCS fitted vehicles do not stop to pay the toll provided that, they have a specific kit for the automatic passage. In this study, the arrivals and the service at tollbooth-, and 3 were recorded by using two handy cams on 8 th May,, a Thursday, between The location of tollbooths can be seen in Fig.. From these records, the headway and the service time were measured. For the booth- and booth-, these data were measured during 9 min. However, for the toll booth-3 as the queue behind the booth- interrupted the vision, only 46-minute measurement was taken into account for the statistical analysis.
3 Fig. : The location of the toll plazas on the BB Arrival At the beginning of the survey, there were queues behind all observed tollbooths. The arrival time of each vehicle to the end of the queue was measured and the duration between two arrivals, which is called as headway, was calculated. The duration of measurements, the number of arrived vehicles, the average and the standard deviation of the headway are given for each tollbooth separately in Table. Table : The observation of the headway at each tollbooth Duration Arrived Headway (sec) Location (min) vehicles Average Standard dev. Booth Booth Booth Total 6, In the traffic engineering, the distribution of the arrival to a channel is considered as Poisson distribution (May, 99). If the Poisson distribution is accepted for the arrival, then the headway distribution is negative exponential distribution: t P (t) = exp t () where, t is the headway, t is the average headway and P(t) is the probability distribution function of t. 3
4 In order to determine the distribution of the vehicle headway for booth- and booth- separately, the χ (chi-square) test is used. As the observation time was short for toll booth- 3, the distribution of the arrival was not determined. According to the χ test, at the level of significance. and the degree of freedom 9, the vehicle headway for toll booth- and booth- do not have negative exponential distribution. The χ test statistics are calculated as 49.9, and 9.6 for toll booth- and respectively. Secondly, the shifted negative exponential distribution is examined at the arrival distribution. Shifted negative exponential distribution is (Bayazıt, 996): t α P (x) = exp () t α where, α is the shifting factor. At the shifted negative exponential distribution, the probability of headway being less than or equal to shifting factor (α) is zero. The hypothesis, that the shifted negative exponential distribution fits the data sets, is accepted by using the χ test, when α is selected as.7 for the booth- and.4 for the booth. The χ test statistics are calculated as 7.4, and 3 for toll booth- and respectively. The number of headway less or equal to.7 is 8 for the booth-, and the number of headway less or equal to.4 is 36 for the booth-. The histograms of the headway with -sec interval for each booth and the shifted negative exponential model for toll booth- are given in Fig. 3 separately Frequency 6 7 Booth- Booth- Booth-3 Model , 4,-,,-,,-,,-,,-3, 3,-3, 3,-4, 4,-4, 4,-,,-,,-6, Headway (sec) Fig. 3: The histograms of the headway for 3 toll booths Service Time The service time does not only consist of the toll collecting time. It starts when a vehicle enters the tollbooth, and includes the money-giving duration by driver to the toll clerk and 4
5 the clerk returning the bill and giving the sign to allow the car to pass the booth. Service time ends when the next vehicle enters this tollbooth. As the service time includes the duration of the entrance of the next vehicle to the booth, there must be a queue behind toll booth during service time measurement. Otherwise, the service time would be longer than its real value. During the observation, the queue was always present behind of the each toll booth. The duration of measurement, the number of vehicles, the average and the standard deviation of the service time are presented for each booth in Table. Table : The observation of the service time at each tollbooth Location Duration Arrived Service time (sec) (min) vehicles Average Standard dev. Booth Booth Booth Total 6, The average service time of three booths was 8.6 sec during observation; however, this value varied according to the vehicle type. To determine this variation, the vehicles are grouped into 4 categories, such as motorcycle, car, van or small truck, and public transportation bus. Trucks and intercity buses are not allowed on the BB. The number of the vehicle type passing through the observed booth is shown in Tables 3. Table 3: The distribution of the vehicle types at the tollbooths Location Motorcycle Car Van Bus Total Booth Booth Booth Total ,73 As the toll are collected manually, the service time does not only vary for the vehicle type but also for the toll clerks. The service times of the three booths according to vehicle types are given in Table 4. For instance, the service time of cars was about 8 sec. at the booth- and booth-3; however, it was 9.34 sec. at the booth-. Table 4: The service time of the vehicle types at the tollbooths Location Motorcycle Car Van Bus Booth Booth Booth Average In the traffic engineering, the distribution of the service time is considered as negative exponential distribution (May, 99). The statistical analysis of the service time data of the tollbooth-, and 3 separately shown that, their distributions are not negative exponential
6 or shifted negative exponential. The most important reason of this result is the variation at the vehicle type. Exemplify, at the tollbooth-, 6% of vehicles was motorcycles, 4% was cars, 8% was vans, 4% was buses and the service time of each vehicle type was different. The histograms of service time with -sec interval could be seen in Fig. 4 for each booth separately Frequency 8 Booth- Booth- Booth Service Time (sec) Fig. 4: The histograms of the service time at the tollbooths Queueing at the Toll Plazas At a toll booth, if - the arrival rate expressed as vehicle per hour (λ) fits to the Poisson distribution, - the departure rate expressed as vehicle per hour (µ) fits to the negative exponential distribution, - λ < µ the queueing properties are determined by formulas (May, 99). However, in this study, the arrival rate is bigger than the departure rate and the departure distribution is not negative exponential distribution. As a result, the analysis of the formed queue at the BB plazas would not be true if the present formulation (May, 99) was used. The change of queue length at each booth is calculated by using cumulative vehicles time series of the arrivals and departures. In Fig., the arrival and the departure time series of the booth- are given. At the beginning of the survey, -vehicle-length queue was observed behind the booth. 6
7 6 Numbe r of cumulative ve hicle Time (sec) Arrival Departure Fig. : The time series of the arrival and departures at the tollbooth- between 7:-8:3 In Fig., the arrival and departure represent the headway and the service time respectively. The changes of the queue length time series are given in Fig. 6-8 for three tollbooth-,, and 3. The average queue length was vehicles at the tollbooth- (for 9 min), 4 vehicles at the tollbooth- (for 9 min) and 6 vehicles at the tollbooth-3 (for 46 min) during the observation. The average waiting time for one vehicle, without the service time, is calculated as 4 sec. at the booth-, 4 sec. at the booth- and sec. at the booth-3. Between 7:-7:46, the average queue lengths are 3, 9, and 6 vehicles, and average waiting times are 4, 7, and sec for tollbooth-, and 3 respectively. The reason of the extra delay at the booth- is the public buses. The bus stop is located m after the toll plazas, thus bus drivers usually prefer the booth-. During the observation, 9% of the public buses used the booth-. For the tollbooth- after 8: and for the tollbooth- after 7:3 queue length becomes much longer. The changes of the average queue length are given in Table for three tollbooths for -min interval. After 8:, the average queue length is about vehicles at the booth- and booth-. The daily traffic flow surveys show that between 8:-:, the flow on the BB in the Europe-Asia direction is at the capacity level, which means the queue at the toll plazas. 7
8 3 lenght of queue (vehicle) 7: 7: 7:3 7:4 8: 8: 8:3 Time Fig. 6: The change of the queue length at the tollbooth- 3 lenght of queue (vehicle) 7: 7: 7:3 7:4 8: 8: 8:3 Time Fig. 7: The change of the queue length at the tollbooth - 8
9 leng ht of queue (vehicle) 7: 7: 7:3 7:4 Time Fig. 8: The change of the queue length at the tollbooth-3 Table : The change of the average queue length at the tollbooths 7:-7: 7:-7:3 7:3-7:4 7:4-8: 8:-8: 8:-8:3 Booth Booth Booth Conclusion In this study, three tollbooths with manual toll collection on the Bosphorus Bridge in Istanbul are examined. The observation time at toll booth- and booth- is between 7: and 8:3; however, due to the queue formation behind the tollbooth- and prevented complete vision, the tollbooth-3 was examined only between 7: and 7:46. The public transport buses, which cross the BB, usually prefer booth- and booth- because of the bus stop location. The average headway of vehicles arrival is measured as follows: 9.9 sec with an 8.3 sec standard deviation, where the arrival rate is 39 veh/hr at the tollbooth-; 7.89 sec with a.97 sec standard deviation, where the arrival rate is 46 veh/hr at the tollbooth-; 8.4 sec with a 6. sec standard deviation, where the arrival rate is 47 veh/hr at the tollbooth-3. 9
10 The headway distribution is determined as shifted negative exponential distribution with α =.7 for tollbooth- and with α =.4 tollbooth-. The average service time at tollbooths is measured as follows: 9.34 sec with a.4 sec standard deviation and 386 veh/hr the departure rate at the tollbooth-; 8. sec with a 4.7 sec standard deviation and 444 veh/hr the departure rate at the tollbooth-; 8.3 sec with a 4.6 sec standard deviation and 4 veh/hr the departure rate at the tollbooth-3. The average service times were 4.69, 7.9, and 6.79 sec. for motorcycles, 9.33, 8. and 8. sec. for cars, 8.7, 8. and 9.3 sec. for vans,.9, 8.7 and 3. sec. for buses at tollbooths, and3 respectively. The service times at the booth- and booth- do not fit the negative or shifted negative exponential distribution. The average queue length and the waiting time between 7:-8:3 were vehicles and 4 sec. for tollbooth- and 4 vehicles and 4 sec. for tollbooth-. The average queue length becomes longer after 8:, with about vehicles for booth- and booth-. As the service time changed at each tollbooth, the average waiting time was 8 sec. and 6 sec. for the booth- and booth- respectively between 8:-8:3. References Al-Deek, E. A. Radwan, H., A. Mohammed and J. G. Klodzinski, (996). Evaluating the Improvements in Traffic Operations at Real-Life Toll Booth with Electronic Toll Collection, ITS Journal, pp.-3. Al-Deek, H., A. Mohammed and E. A. Radwan, (997). Operational Benefits of Electronic Toll Collection: Case Study, Transportation Engineering Journal, ASCE, pp Bayazıt, M., (996). naat Mühendisliinde Olasılık Yöntemleri, TÜ Matbaası, stanbul. Klodzinski, J., (). Methodology for Evaluating the Level of Service of Toll Booths on a Toll Road Facility, Presented at International Bridge, Tunnel and Turnpike Association Technology Committee Workshop, Washington D.C. Klodzinski, J., and Al-Deek, E. A. (). New Methodology for Defining Level of Service at Toll Plazas, Transportation Engineering Journal, ASCE, pp Lin F.B. and Su C.W, (994). Level-of-Service Analysis of toll plazas on Freeway Main Lanes, Transportation Engineering Journal, ASCE, pp May, A., (99). Traffic Flow Fundamentals, Prentice Hall, New Jersey. Woo, T. H. and Hoel, L. A., (99). Toll Booth Capacity and Level of Service, Transportation Research Record 3, pp. 9-7.
Operation. in the. time required by a. of tolll plazas. obtained as low as second. operator s personal. values. .com)
Service Time Prediction Models for Manual Toll Booth Operation under Mixed Traffic Conditions Yogeshwar V. Navandar 1, Ashish Dhamani iya 2, D. A. Patel 3 1 Research Scholar, Dept. of Civil Engineering,
More informationResearch Article / Araştırma Makalesi DETERMINATION MINIBUSES STOP DELAY IN ISTANBUL
Sigma J Eng & Nat Sci 7 (1), 16, 97- Publications Prepared for Transist, 8th International İstanbul Transport Congress Transist, 8. Uluslararası İstanbul Ulaşım Kongresi için Hazırlanan Yayınlar Research
More informationEffect of Police Control on U-turn Saturation Flow at Different Median Widths
Effect of Police Control on U-turn Saturation Flow at Different Widths Thakonlaphat JENJIWATTANAKUL 1 and Kazushi SANO 2 1 Graduate Student, Dept. of Civil and Environmental Eng., Nagaoka University of
More informationEffects of Three-Wheeler Parks near Intersections
Journal of Engineering and Technology of the Open University of Sri Lanka (JET-OUSL), Vol., No., 04 Effects of Three-Wheeler Parks near Intersections U. A. Gopallawa and K. S. Weerasekera * Department
More informationEngineering Dept. Highways & Transportation Engineering
The University College of Applied Sciences UCAS Engineering Dept. Highways & Transportation Engineering (BENG 4326) Instructors: Dr. Y. R. Sarraj Chapter 4 Traffic Engineering Studies Reference: Traffic
More informationLevel of Service Analysis for Urban Public Transportation of Dumlupinar University Evliya Celebi Campus in Kutahya, Turkey
15 th International Conference on Environmental Science and Technology Rhodes, Greece, 31 August to 2 September 2017 Level of Analysis for Urban Public Transportation of Dumlupinar University Evliya Celebi
More informationAre Roundabout Environmentally Friendly? An Evaluation for Uniform Approach Demands
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Are Roundabout Environmentally Friendly? An Evaluation for Uniform Approach Demands Meredith Jackson Charles E. Via, Jr. Department of
More informationPERFORMANCE OF VEHICLE ACTUATED CONTROL UNDER MIXED TRAFFIC CONDITIONS
PERFORMANCE OF VEHICLE ACTUATED CONTROL UNDER MIXED TRAFFIC CONDITIONS Budi Yulianto 1 Abstract: It is generally accepted that a fully Vehicle Actuated control (VA) is almost always the most efficient
More informationPublic transport traffic management systems simulation in Craiova city
Public transport traffic management systems simulation in Craiova city Ilie Dumitru Assoc Prof, University of Craiova, Faculty of Mechanics, Romania Dumitru Nicolae Prof, University of Craiova, Faculty
More informationIf a customer arrives and finds both servers busy, there is a 25% probability that he departs without entering the queue.
If a customer arrives and finds both servers busy, there is a 25% probability that he departs without entering the queue. Dennis L. Bricker Dept of Mechanical & Industrial Engineering The University of
More informationAnalyzing Crash Risk Using Automatic Traffic Recorder Speed Data
Analyzing Crash Risk Using Automatic Traffic Recorder Speed Data Thomas B. Stout Center for Transportation Research and Education Iowa State University 2901 S. Loop Drive Ames, IA 50010 stouttom@iastate.edu
More informationR.M.N.T. Sirisoma a Doug Morgan b S.C. Wirasinghe a
R.M.N.T. Sirisoma a Doug Morgan b S.C. Wirasinghe a a Dept. of Civil Engineering, Schulich School of Engineering, University of Calgary b Calgary Transit, Calgary, Canada Introduction Study Area Availability
More informationARE DIAMONDS LRT S BEST FRIEND? AT-GRADE LRT CROSSING AT A DIAMOND INTERCHANGE
ARE DIAMONDS LRT S BEST FRIEND? AT-GRADE LRT CROSSING AT A DIAMOND INTERCHANGE NATE LARSON HDR SEATTLE, WA ABHISHEK DAYAL VALLEY METRO PHOENIX, AZ ITE WESTERN DISTRICT ANNUAL MEETING JULY 16, 2013 Presentation
More informationElectronic Assembly Process - Part 1
Technology Forge Version 1.0 Arena Tutorial 3 Electronic Assembly Process - Part 1 2009 Mark Polczynski All rights reserved Arena Tutorial 3 - Electronic Assembly Process - 1 1 Tutorial Objectives: Create
More informationOpen Access Delay Measurement of Manually Controlled Intersection Using GPS
Send Orders for Reprints to reprints@benthamscience.net 13 The Open Civil Engineering Journal, 214, 8, 13-135 Open Access Delay Measurement of Manually Controlled Intersection Using GPS S. Nithya *,1,
More informationA Design Idea of American Highway Toll Station
A Design Idea of American Highway Toll Station Yong Yang Department of Electronics and Communication Engineering, North China Electric Power University (Baoding), No. 619, Yonghua North Street, Baoding
More informationCollision Types of Motorcycle Accident and Countermeasures
Proceedings of the 2 nd World Congress on Civil, Structural, and Environmental Engineering (CSEE 17) Barcelona, Spain April 2 4, 2017 Paper No. ICTE 115 ISSN: 2371-5294 DOI: 10.11159/icte17.115 Collision
More informationSelçuk ÖĞÜT Introductionn. of travel time. This study aims to. District (CBD) and higher their fare with cash. 1
Investigating the Factors Affecting Bus Dwell Time, Case Study: Ardabil, Iran Mehdi Mohammadi 1, Mazdak Sadeghpour 2, Amir Bagheri 3, Kemal Selçuk ÖĞÜT 4 1&3 Department of Geography, University of Mohaghegh
More informationToll Plaza Capacity and Level of Service
TRANSPORTATION RESEARCH RECORD 120 119 Toll Plaza Capacity and Level of Service T. HucH Woo AND LESTER A. HoEL A methodology for evaluating the capacity of a toll plaza was developed, and level-of-service
More informationDISTRIBUTION AND CHARACTERISTICS OF CRASHES AT DIFFERENT LOCATIONS WITHIN WORK ZONES IN VIRGINIA
DISTRIBUTION AND CHARACTERISTICS OF CRASHES AT DIFFERENT LOCATIONS WITHIN WORK ZONES IN VIRGINIA Nicholas J. Garber Professor and Chairman Department of Civil Engineering University of Virginia Charlottesville,
More informationRoundabout Modeling in CORSIM. Aaron Elias August 18 th, 2009
Roundabout Modeling in CORSIM Aaron Elias August 18 th, 2009 Objective To determine the best method of roundabout implementation in CORSIM and make recommendations for its improvement based on comparisons
More informationPUBLICATION NEW TRENDS IN ELEVATORING SOLUTIONS FOR MEDIUM TO MEDIUM-HIGH BUILDINGS TO IMPROVE FLEXIBILITY
PUBLICATION NEW TRENDS IN ELEVATORING SOLUTIONS FOR MEDIUM TO MEDIUM-HIGH BUILDINGS TO IMPROVE FLEXIBILITY Johannes de Jong E-mail: johannes.de.jong@kone.com Marja-Liisa Siikonen E-mail: marja-liisa.siikonen@kone.com
More informationThe purpose of this lab is to explore the timing and termination of a phase for the cross street approach of an isolated intersection.
1 The purpose of this lab is to explore the timing and termination of a phase for the cross street approach of an isolated intersection. Two learning objectives for this lab. We will proceed over the remainder
More informationProject 2: Traffic and Queuing (updated 28 Feb 2006)
Project 2: Traffic and Queuing (updated 28 Feb 2006) The Evergreen Point Bridge (Figure 1) on SR-520 is ranked the 9 th worst commuter hot spot in the U.S. (AAA, 2005). This floating bridge supports the
More informationExamining the load peaks in high-speed railway transport
Examining the load peaks in high-speed railway transport Yigit Fidansoy, M.Sc. Technische Universität Darmstadt, Germany fidansoy@verkehr.tu-darmstadt.de Paper prepared for DEMAND Centre Conference, Lancaster,
More informationUse of Fuzzy Optimization and Linear Goal Programming Approaches in Urban Bus Lines Organization
Use of Fuzzy Optimization and Linear Goal Programming Approaches in Urban Bus Lines Organization Yetis Sazi Murat 1 Nurcan Uludag 2 1 Pamukkale University, Faculty of Engineering, Denizli, Turkey ysmurat@pau.edu.tr
More informationEstimation of Vehicle Queue Lengths Based on Driveway Access Design
Estimation of Vehicle Queue Lengths Based on Driveway Access Design! Prof. Jaisung Choi!! The University of Seoul Sept 26 2014 International Conference on Access Management Access management & I One of
More informationBAC and Fatal Crash Risk
BAC and Fatal Crash Risk David F. Preusser PRG, Inc. 7100 Main Street Trumbull, Connecticut Keywords Alcohol, risk, crash Abstract Induced exposure, a technique whereby not-at-fault driver crash involvements
More informationINTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 5, No 2, 2014
INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 5, No 2, 2014 Copyright by the authors - Licensee IPA- Under Creative Commons license 3.0 Research article ISSN 0976 4399 The impacts of
More informationAssignment # 6: Arena - Spotless Wash - Basic Model
Assignment # 6: Arena - Spotless Wash - Basic Model Point: 3 Due Date: Wednesday February 23rd, 2:pm An IE major, which we will refer to him as Oliver Tambo (in honor of South Africa's National Hero Oliver
More informationAn Approach to Simulate the Speed of Non-Motorized Vehicles With Respect to Various Parameters
IOSR Journal of Engineering (IOSRJEN) ISSN (e): -, ISSN (p): 8-89 Vol., Issue (Jan ), V PP 9-8 www.iosrjen.org An Approach to Simulate the Speed of Non-Motoried Vehicles With Respect to Various Parameters
More informationEFFECT OF MOTORCYCLES TRAVEL BEHAVIOUR ON SATURATION FLOW RATES AT SIGNALIZED INTERSECTIONS IN MALAYSIA
EFFECT OF MOTORCYCLES TRAVEL BEHAVIOUR ON SATURATION FLOW RATES AT SIGNALIZED INTERSECTIONS IN MALAYSIA Leong Lee Vien, Universiti Sains Malaysia, Malaysia Wan Hashim Wan Ibrahim, Universiti Sarawak Malaysia,
More informationEXTENDING PRT CAPABILITIES
EXTENDING PRT CAPABILITIES Prof. Ingmar J. Andreasson* * Director, KTH Centre for Traffic Research and LogistikCentrum AB. Teknikringen 72, SE-100 44 Stockholm Sweden, Ph +46 705 877724; ingmar@logistikcentrum.se
More informationIntersection Design: Switch Point
Intersection Design: Switch Point W. R. BELLIS Director, Division of Research and Evaluation, New Jersey State Highway Department 'AN intersection of two crossroads in which vehicles do not stop or deviate
More informationMichigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS
TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS Michigan / Grand River Avenue TECHNICAL MEMORANDUM #18 From: URS Consultant Team To: CATA Project Staff and Technical Committee Topic:
More informationCOST ANALYSIS FOR BRIDGE AND CULVERT. Essam A. Mostafa
Seventh International Water Technology Conference IWTC7 Cairo 1-3 April 2003 357 COST ANALYSIS FOR BRIDGE AND CULVERT Essam A. Mostafa Associate Professor, Irrigation & Hydraulics Department, Faculty of
More information2.1 Outline of Person Trip Survey
Trip Characteristics 2.1 Outline of Person Trip Survey 2.1.1 Outline of the Survey The Person Trip survey was carried out from 2006 to 2007 as a part of the Istanbul Transportation Master Plan undertaken
More information9. Downtown Transit Plan
CORRADINO 9. Downtown Transit Plan KAT Transit Development Plan As part of the planning process for the TDP, an examination of downtown transit operations was conducted. The Downtown Transit Plan 1 is
More informationTraffic Operations with Connected and Automated Vehicles
Traffic Operations with Connected and Automated Vehicles Xianfeng (Terry) Yang Assistant Professor Department of Civil, Construction, and Environmental Engineering San Diego State University (619) 594-1934;
More informationIMAGE PROCESSING ANALYSIS OF MOTORCYCLE ORIENTED MIXED TRAFFIC FLOW IN VIETNAM
IMAGE PROCESSING ANALYSIS OF MOTORCYCLE ORIENTED MIXED TRAFFIC FLOW IN VIETNAM Nobuyuki MATSUHASHI Graduate Student Dept. of Info. Engineering and Logistics Tokyo University of Marine Science and Technology
More informationAnalysis of Radial and Trunk Feeder Transit System Configurations in Downtown Charlottesville
Analysis of Radial and Trunk Feeder Transit System Configurations in Downtown Charlottesville 1. Introduction During the stakeholder input sessions of Charlottesville Area Transit s (CAT) Transit Development
More information4th Asian Academic Society International Conference (AASIC) 2016 SCI-OR-002
SCI-OR-002 ROAD ACCIDENTS CHARACTERISTICS ANALYSIS USING MINOR STATISTICS TEST (CASE STUDY: RAMA SETIA ROAD, BANDA ACEH) Rahmat Lazuardi, Sugiarto Civil Engineering Department, Syiah Kuala University,
More informationIDENTIFYING CAUSAL FACTORS OF TRAFFIC ACCIDENTS IN SRI LANKA
IDENTIFYING CAUSAL FACTORS OF TRAFFIC ACCIDENTS IN SRI LANKA Amal S. Kumarage 1, C.R. Abeygoonawardena 2, and Ravindra Wijesundera 3 ABSTRACT INTRODUCTION The Traffic Police in Sri Lanka has maintained
More informationSample size determination and estimation of ships traffic stream parameters
Scientific Journals Maritime University of Szczecin Zeszyty Naukowe Akademia Morska w Szczecinie 212, 32(14) z. 2 pp. 157 161 212, 32(14) z. 2 s. 157 161 Sample size determination and estimation of ships
More informationEvaluation of Renton Ramp Meters on I-405
Evaluation of Renton Ramp Meters on I-405 From the SE 8 th St. Interchange in Bellevue to the SR 167 Interchange in Renton January 2000 By Hien Trinh Edited by Jason Gibbens Northwest Region Traffic Systems
More informationEvaluation of Dynamic Weight Threshold Algorithm for WIM Operations using Simulation
Evaluation of Dynamic Weight Threshold Algorithm for WIM Operations using Simulation Zhongren Gu and Lee D. Han Department of Civil & Environmental Engineering THE UNIVERSITY OF TENNESSEE ABSTRACT In the
More information1. Introduction. Vahid Navadad 1+
2012 International Conference on Traffic and Transportation Engineering (ICTTE 2012) IPCSIT vol. 26 (2012) (2012) IACSIT Press, Singapore A Model of Bus Assignment with Reducing Waiting Time of the Passengers
More informationCAPTURING THE SENSITIVITY OF TRANSIT BUS EMISSIONS TO CONGESTION, GRADE, PASSENGER LOADING, AND FUELS
CAPTURING THE SENSITIVITY OF TRANSIT BUS EMISSIONS TO CONGESTION, GRADE, PASSENGER LOADING, AND FUELS Ahsan Alam and Marianne Hatzopoulou, McGill University, Canada Introduction Transit is considered as
More informationChapter 6. CEE 320 Anne Goodchild. Spring 2008 CEE 320
Chapter 6 Freeway Level of Service Anne Goodchild Definitions Level of Service (LOS) Chief measure of quality of service Describes operational conditions within a traffic stream. Does not include safety
More informationImpact of Different Bus Stop Designs on Bus Operating Time Components
Impact of Different Bus Stop Designs on Bus Operating Time Components Xiaodong Liu, Yao Yang, Meng Meng, Andreas Rau TUM CREATE Ltd., Singapore Abstract The design of bus stops significantly affects bus
More information2016 Congestion Report
2016 Congestion Report Metropolitan Freeway System May 2017 2016 Congestion Report 1 Table of Contents Purpose and Need...3 Introduction...3 Methodology...4 2016 Results...5 Explanation of Percentage Miles
More informationAn Evaluation on the Compliance to Safety Helmet Usage among Motorcyclists in Batu Pahat, Johor
An Evaluation on the Compliance to Safety Helmet Usage among Motorcyclists in Batu Pahat, Johor K. Ambak 1, *, H. Hashim 2, I. Yusoff 3 and B. David 4 1,2,3,4 Faculty of Civil and Environmental Engineering,
More informationRunning Vehicle Emission Factors of Passenger Cars in Makassar, Indonesia
Running Vehicle Emission Factors of Passenger Cars in Makassar, Indonesia Sumarni Hamid ALY a, Muhammad Isran RAMLI b a,b Civil Engineering Department, Engineering Faculty, Hasanuddin University, Makassar,
More informationLevel of Service Classification for Urban Heterogeneous Traffic: A Case Study of Kanapur Metropolis
Level of Service Classification for Urban Heterogeneous Traffic: A Case Study of Kanapur Metropolis B.R. MARWAH Professor, Department of Civil Engineering, I.I.T. Kanpur BHUVANESH SINGH Professional Research
More informationA COMPARATIVE STUDY OF EFFECT OF MOTORCYCLE VOLUME ON CAPACITY OF FOUR LANE URBAN ROADS IN INDIA AND THAILAND
A COMPARATIVE STUDY OF EFFECT OF MOTORCYCLE VOLUME ON CAPACITY OF FOUR LANE URBAN ROADS IN INDIA AND THAILAND Sanjeev SINHA * Associate Professor Department of Civil Engineering National Institute of Technology
More informationJCE 4600 Basic Freeway Segments
JCE 4600 Basic Freeway Segments HCM Applications What is a Freeway? divided highway with full control of access two or more lanes for the exclusive use of traffic in each direction no signalized or stop-controlled
More informationIstanbul METROBUS BRT. Adapted from Presentations by World Resources Institute/EMBARQ s Sibel Koyluoglu and Dario Hidalgo
Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ s Sibel Koyluoglu and Dario Hidalgo Historic Istanbul Modern Istanbul Istanbul Among World s most historic and rapidly
More informationIs there an alternative solution?
From Manned Toll Collection to All Electronic Tolling Is there an alternative solution? Alexis ZASS President of the managing board - GEA 1 Toll collection operations on bridges, tunnels, or for town access
More informationComparison of Live Load Effects for the Design of Bridges
J. Environ. Treat. Tech. ISSN: 2309-1185 Journal weblink: http://www.jett.dormaj.com Comparison of Live Load Effects for the Design of Bridges I. Shahid 1, S. H. Farooq 1, A.K. Noman 2, A. Arshad 3 1-Associate
More informationCOMPARISON OF FREE FLOW SPEED ESTIMATION MODELS
COMPARISON OF FREE FLOW SPEED ESTIMATION MODELS Usman Tasiu Abdurrahman 1, Othman Che Puan 2* Muttaka Na iya Ibrahim 3 1,2,3 Faculty of Civil Engineering, Universiti Teknologi Malaysia, 81310 Skudai, Johor,
More informationIntegrated macroscopic traffic flow and emission model based on METANET and VT-micro
Delft University of Technology Delft Center for Systems and Control Technical report 09-017 Integrated macroscopic traffic flow and emission model based on METANET and VT-micro S.K. Zegeye, B. De Schutter,
More informationEFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS
EFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS Graduate of Polytechnic School of Tunisia, 200. Completed a master degree in 200 in applied math to computer
More informationPost 50 km/h Implementation Driver Speed Compliance Western Australian Experience in Perth Metropolitan Area
Post 50 km/h Implementation Driver Speed Compliance Western Australian Experience in Perth Metropolitan Area Brian Kidd 1 (Presenter); Tony Radalj 1 1 Main Roads WA Biography Brian joined Main Roads in
More informationDepartment of Civil Engineering (Transportation Engineering), Birla Vishvakarma Mahavidyalay Engineering College, Vallabh Vidyanagar, Gujarat, India
International Journal of Current Engineering and Technology E-ISSN 2277 416, P-ISSN 2347 5161 216 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijcet Research Article Application
More informationTransportation Discipline Report
MUKILTEO MULTIMODAL PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT Transportation Discipline Report Prepared for: June 2013 Transportation Discipline Report Mukilteo Multimodal Project Final Environmental
More informationPembina Emerson Border Crossing Interim Measures Microsimulation
Pembina Emerson Border Crossing Interim Measures Microsimulation Final Report December 2013 Prepared for: North Dakota Department of Transportation Prepared by: Advanced Traffic Analysis Center Upper Great
More informationEFFECT OF WORK ZONE LENGTH AND SPEED DIFFERENCE BETWEEN VEHICLE TYPES ON DELAY-BASED PASSENGER CAR EQUIVALENTS IN WORK ZONES
EFFECT OF WORK ZONE LENGTH AND SPEED DIFFERENCE BETWEEN VEHICLE TYPES ON DELAY-BASED PASSENGER CAR EQUIVALENTS IN WORK ZONES Madhav V. Chitturi (Corresponding author) Graduate Student, Department of Civil
More informationCapital Metro Downtown Multimodal Station
Capital Metro Downtown Multimodal Station Stakeholder Briefing December 11, 2015 Agenda 1 2 3 4 5 Project Summary Downtown Station Concept Evaluation 4 th Street Traffic Analysis 5 th Street Traffic Analysis
More informationIntroduction and Background Study Purpose
Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.
More informationCVO. Submitted to Kentucky Transportation Center University of Kentucky Lexington, Kentucky
CVO Advantage I-75 Mainline Automated Clearance System Part 4 of 5: Individual Evaluation Report Prepared for The Advantage I-75 Evaluation Task Force Submitted to Kentucky Transportation Center University
More informationMetropolitan Freeway System 2013 Congestion Report
Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...
More informationPARKING DEMAND AND SUPPLY ANALYSIS OF DIFFERENT THREE WHEELER VEHICLES IN KHULNA
Proceedings of the 3 rd International Conference on Civil Engineering for Sustainable Development (ICCESD 2016), 12~14 February 2016, KUET, Khulna, Bangladesh (ISBN: 978-984-34-0265-3) PARKING DEMAND AND
More informationOn-street European Standard Parking Award
On-street European Standard Parking Award The European Standard Parking Award Parking in Europe Off-street Europe 2013 26,1 M parking spaces Since 2007 more tan 300 ESPA Awards On-street 14,7 M parking
More informationReliability of Hybrid Vehicle System
Reliability of Hybrid Vehicle System 2004 Toyota Prius hybrid vehicle Department of Industrial and Manufacturing Systems Engineering Iowa State University December 13, 2016 1 Hybrid Vehicles 2 Motivation
More informationElectric Vehicles Coordinated vs Uncoordinated Charging Impacts on Distribution Systems Performance
Electric Vehicles Coordinated vs Uncoordinated Charging Impacts on Distribution Systems Performance Ahmed R. Abul'Wafa 1, Aboul Fotouh El Garably 2, and Wael Abdelfattah 2 1 Faculty of Engineering, Ain
More informationKing County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.
King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...
More informationMillgrove Evacuation Study
IBM Research Technical Report: Millgrove Evacuation Study May 4, 3 Anton Beloglazov, Juerg von Kaenel, Jan Richter, Kent Steer and Ziyuan Wang In alphabetical order. Australia Limited 3 ABN 79 4 733 Copyright
More informationFleet Penetration of Automated Vehicles: A Microsimulation Analysis
Fleet Penetration of Automated Vehicles: A Microsimulation Analysis Corresponding Author: Elliot Huang, P.E. Co-Authors: David Stanek, P.E. Allen Wang 2017 ITE Western District Annual Meeting San Diego,
More informationOperational Test of AHS Applied to a High-Capacity Transit Corridor, The Lincoln Tunnel XBL.
Operational Test of AHS Applied to a High-Capacity Transit Corridor, The Lincoln Tunnel XBL. Professor Alain Kornhauser Princeton University Professor Lou Pignataro NJIT Executive Summary Background It
More informationREPEATABILITY OF CPX TYRE/ROAD NOISE MEASUREMENTS. Gillian Adams, Frits Kamst and Stephen Pugh ASK Consulting Engineers, Brisbane, Australia
ICSV14 Cairns Australia 9-12 July, 2007 REPEATABILITY OF CPX TYRE/ROAD NOISE MEASUREMENTS Gillian Adams, Frits Kamst and Stephen Pugh ASK Consulting Engineers, Brisbane, Australia frits@askce.com ABSTRACT
More informationThe Comparative Evaluation of the Cost of Traveling and Environment on the Expressway Route vs. the Ground Level Road in Bangkok
Rev. Integr. Bus. Econ. Res. Vol 5(NRRU) 74 The Comparative Evaluation of the Cost of Traveling and Environment on the Expressway Route vs. the Ground Level Road in Bangkok Nirun Kongritti* Environmental
More informationAPPENDIX C ROADWAY BEFORE-AND-AFTER STUDY
APPENDIX C ROADWAY BEFORE-AND-AFTER STUDY The benefits to pedestrians and bus patrons are numerous when a bus bay is replaced with a bus bulb. Buses should operate more efficiently at the stop when not
More informationFollow this and additional works at: https://digitalcommons.usu.edu/mathsci_stures
Utah State University DigitalCommons@USU Mathematics and Statistics Student Research and Class Projects Mathematics and Statistics Student Works 2016 Car Crash Conundrum Mohammad Sadra Sharifi Utah State
More informationA Gap-Based Approach to the Left Turn Signal Warrant. Jeremy R. Chapman, PhD, PE, PTOE Senior Traffic Engineer American Structurepoint, Inc.
A Gap-Based Approach to the Left Turn Signal Warrant Jeremy R. Chapman, PhD, PE, PTOE Senior Traffic Engineer American Structurepoint, Inc. March 5, 2019 - The problem: Existing signalized intersection
More informationWritten Exam Public Transport + Answers
Faculty of Engineering Technology Written Exam Public Transport + Written Exam Public Transport (195421200-1A) Teacher van Zuilekom Course code 195421200 Date and time 7-11-2011, 8:45-12:15 Location OH116
More informationINTRODUCING ELECTRONIC TOLL COLLECTION SYSTEM: A CASE STUDY FOR MEGHNA BRIDGE
INTRODUCING ELECTRONIC TOLL COLLECTION SYSTEM: A CASE STUDY FOR MEGHNA BRIDGE BY SABIHA SULTANA A thesis submitted to the Department of Civil Engineering Of BANGLADESH UNIVERSITY OF ENGINEERING AND TECHNOLOGY,
More informationاجزا ء سیست م اهی ح م ل و نق ل http://mnooriamiri.professora.ir Road users-drivers, pedestrians, bicyclists, passengers Vehicles- private and commercial Streets and highways Traffic control devices The
More information7. Author(s) Shan Bao, Michael J. Flannagan, James R. Sayer, Mitsuhiro Uchida 9. Performing Organization Name and Address
1. Report No. UMTRI-2011-48 4. Title and Subtitle The Effect of Headlamp Vertical Aim on Performance of a Lane Tracking System 7. Author(s) Shan Bao, Michael J. Flannagan, James R. Sayer, Mitsuhiro Uchida
More informationTHE ACCELERATION OF LIGHT VEHICLES
THE ACCELERATION OF LIGHT VEHICLES CJ BESTER AND GF GROBLER Department of Civil Engineering, University of Stellenbosch, Private Bag X1, MATIELAND 7602 Tel: 021 808 4377, Fax: 021 808 4440 Email: cjb4@sun.ac.za
More informationSmart Traffic Control System At Toll Booths
nternational Journal of Electronics Engineering Research. SSN 0975-6450 Volume 9, Number 10 (2017) pp. 1465-1473 Research ndia Publications http://www.ripublication.com Smart Traffic Control System At
More informationVARIABLE SPEED LIMITS SIGNS: EFFECTS ON SPEED AND SPEED VARIATION IN WORK ZONES
VARIABLE SPEED LIMITS SIGNS: EFFECTS ON SPEED AND SPEED VARIATION IN WORK ZONES by Thomas McMurtry Planner/GIS Technician InterPlan Co. Inc. 7719 South Main Street Midvale, UT 84607 Phone: 1-801-307-3400,
More informationElectric Vehicle Battery Swapping Stations, Calculating Batteries and Chargers to Satisfy Demand
Electric Vehicle Battery Swapping Stations, Calculating Batteries and s to Satisfy Demand IÑAKI GRAU UNDA 1, PANAGIOTIS PAPADOPOULOS, SPYROS SKARVELIS-KAZAKOS 2, LIANA CIPCIGAN 1, NICK JENKINS 1 1 School
More informationTable 8-1: Service Frequencies for All Short-List Alternatives by Day of Week and Time of Day Frequency Day of Week Time of Day Time Period
8. Operating Plans The following Section presents the operating plans for the Short-List Alternatives. The modern streetcar operating plans are presented for Alternatives 2 and 3, followed by bus rapid
More informationA TRANSPORT SYSTEM FOR MELBOURNE S EAST THAT WON T TAKE DECADES TO BUILD
A TRANSPORT SYSTEM FOR THAT WON T TAKE DECADES TO BUILD If you live in Melbourne s East, from Box Hill to Croydon, Eltham to Ferntree Gully, you know that congestion on our roads is getting worse. You
More informationPublic Transportation Problems and Solutions in the Historical Center of Quito
TRANSPORTATION RESEARCH RECORD 1266 205 Public Transportation Problems and Solutions in the Historical Center of Quito JACOB GREENSTEIN, Lours BERGER, AND AMIRAM STRULOV Quito, the capital of Ecuador,
More informationEvaluation Tol Gates Study in Karang Tengah of Toll road (Jakarta Tangerang, West Java, Indonesia)
Evaluation Tol Gates Study in Karang Tengah of Toll road (Jakarta Tangerang, West Java, Indonesia) Dr. Ir. Nunung Widyaningsih PG. Dipl. Eng., Mercu Buana University, Jakarta, Indonesia Abstract: The increase
More informationIntegrated Risk Management Framework for Improving the Safety of Hazardous Materials Transportation by Rail
Integrated Risk Management Framework for Improving the Safety of Hazardous Materials Transportation by Rail Xiang Liu, Mohd Rapik Saat, Christopher P.L. Barkan Rail Transportation and Engineering Center
More informationThe role of rail in a transport system to limit the impact of global warming
The role of rail in a transport system to limit the impact of global warming 26 November 213 Gerard Drew, Beyond Zero Emissions Tilo Schumann, German Aerospace Centre (DLR) Overview CONTEXT Character of
More informationESTIMATING CAPACITY OF HIGH VOLUME BUS RAPID TRANSIT STATIONS
ESTIMATING CAPACITY OF HIGH VOLUME BUS RAPID TRANSIT STATIONS Jack M. Reilly, Ph.D. Professor of Practice, Department of Civil and Environmental Engineering, Rensselaer Polytechnic Institute 110 8th Street,
More informationDesign and Implementation of an Automatic Power Supply from Four Different Source Using Microcontroller
International Journal of Electrical and Electronic Science 2017; 4(5): 40-46 http://www.aascit.org/journal/ijees ISSN: 2375-2998 Design and Implementation of an Automatic Power Supply from Four Different
More information