1 DETAILED DEFINITION OF ALTERNATIVES July 2014

2 Table of Contents 1.0 Introduction Detailed Mode Alternatives Detailed Alignment Alternatives Key Physical and Service Elements No Build Alternative Service Plan Stop Spacing Stop Facilities Runningway Transit Vehicles Fare Collection Technology and Customer Information Identity and Branding Maintenance Facility BRT in Mixed Traffic Alternative Service Plan Stop Spacing Stop Facilities Runningway Transit Vehicles Fare Collection Technology and Customer Information Identity and Branding Maintenance Facility BRT in Dedicated Side Lane Alternative Service Plan Stop Spacing Stop Facilities Runningway Transit Vehicles Fare Collection Technology and Customer Information Identity and Branding Maintenance Facility BRT in Dedicated Center Lane Alternative July 2014 ii

3 5.1 Service Plan Stop Spacing Stop Facilities Runningway Transit Vehicles Fare Collection Technology and Customer Information Identity and Branding Maintenance Facility Detailed Evaluation Criteria APPENDICES Appendix A Plan View Diagrams of Runningway Configurations LIST OF FIGURES Figure 1-1: Laker Line Corridor Segments and Potential Stop Locations... 2 Figure 1-2: Laker Line Segment A1 Detail... 3 Figure 1-3: Laker Line Segment A2 Detail... 3 Figure 1-4: Laker Line Segment B Detail... 4 Figure 1-5: Laker Line Segment C Detail... 4 Figure 1-6: Laker Line Segment D1 Detail... 5 Figure 1-7: Laker Line Segment D2 Detail... 5 Figure 2-1: Bus Bays at Rapid Central Station... 7 Figure 2-2: Route 50 Bus Stop with Shelter at GVSU Kirkhof Center... 8 Figure 2-3: Route 50 Bus Stop with Sign Post... 8 Figure 2-4: Rapid 40-Foot Diesel Bus... 9 Figure 2-5: Rapid 40-Foot Hybrid-Electric Bus... 9 Figure 3-1: The Rapid Silver Line BRT Station Figure 3-2: HealthLine BRT Vehicle in Cleveland, OH Figure 3-3: Rapid Silver Line BRT Branding LIST OF TABLES Table 6-1: Detailed Evaluation Criteria July 2014 iii

4 1.0 Introduction This report defines the key physical and service elements of the transit alternatives that advanced through the initial screening of the Laker Line Study and will be evaluated during the detailed evaluation of alternatives project phase. These detailed alternatives are summarized below and discussed in detail in Sections 2 through 5 of this report. 1.1 Detailed Mode Alternatives The detailed mode alternatives include: No Build Alternative BRT in Mixed Traffic BRT in a Dedicated Side Lane BRT in a Dedicated Center Lane 1.2 Detailed Alignment Alternatives Figures 1-1 through 1-7 illustrate the alignment options that were studied during the initial screening phase and recommended for detailed development: Segment A (68th Avenue to Linden Drive) o A1 (residential developments on west side of GVSU Allendale campus through GVSU campus on Campus Drive to Lake Michigan Drive) o A2 (GVSU Allendale Campus along Campus Drive to Lake Michigan Drive) Segment B (Linden Drive to Covell Avenue along Lake Michigan Drive) Segment C (Covell Avenue to Lexington Avenue along Lake Michigan Drive and Fulton Street) Segment D (Lexington Avenue to College Avenue) o D1 (Fulton Street to Bridge Street along Seward or Winter/Summer Avenues; east along Bridge Street to Michigan Street to GVSU CHS or potentially extended to Plymouth Avenue) o D2 (Fulton Street to Monroe Street to Michigan Street to GVSU CHS or potentially extended to Plymouth Avenue) For purposes of the detailed definition and evaluation phase, it is assumed that each mode alternative will maintain consistent runningway operations for the length of the Corridor. For instance the BRT in a Dedicated Side Lane will operate in a dedicated side lane from Segment A through Segment D. During future project phases, mixed traffic and dedicated lane operations may be linked at different points along the Corridor in response to engineering and operational constraints and opportunities. July

5 Figure 1-1: Laker Line Corridor Segments and Potential Stop Locations July

6 Figure 1-2: Laker Line Segment A1 Detail Figure 1-3: Laker Line Segment A2 Detail July

7 Figure 1-4: Laker Line Segment B Detail Figure 1-5: Laker Line Segment C Detail July

8 Figure 1-6: Laker Line Segment D1 Detail Figure 1-7: Laker Line Segment D2 Detail July

9 1.3 Key Physical and Service Elements For purposes of estimating cost and ridership and assessing impacts and benefits, this study defines the Detailed Alternatives based on the categories below. Service plan Stop spacing Stop facilities Transit vehicles Fare collection Technology and customer information Identity and branding Maintenance facility 2.0 No Build Alternative The No Build Alternative is a local bus alternative that assumes no significant changes to existing transit service and facilities in the Laker Line Corridor. For purposes of the Detailed Definition of Alternatives, the No Build Alternative is assumed to be continued operations of existing Route 50 service and all other Corridor routes (7, 9, 11, 12, 13, 14, 15, 18, 19, 37, 48, and 51). 2.1 Service Plan The service plan for the No Build alternative essentially retains what is currently in service in the Corridor, with minimal changes. Route 50 and Route 12 are the primary routes serving the Lake Michigan Drive corridor Route 50 (GVSU Campus Connector) This route is the primary bus route serving the full length of the Corridor, proceeding from the GVSU Allendale Campus via Lake Michigan Drive and West Fulton Street to GVSU Pew Campus, continuing to Central Station. Service characteristics are tailored to GVSU s academic calendar. Fall through Spring provides a high level of service when school is in full swing: o Monday through Thursday service from about 6am to 1am; service frequencies are five to six minutes tapering to 10- to 20-minute service in the evenings. o Friday service is about 6am to 3am with nine- to 10-minute service frequencies tapering to 60 minutes at night. o Saturday service is 7am to 3am at 60-minute service frequencies. o Sunday service is 10:30am to 7:30pm at 100-minute service frequencies. o Friday night, Saturday and Sunday services follow an extended Weekend Connector route which serves student apartments in Allendale and selected trips to GVSU CHS. These markets are served during weekday hours by GVSU-related Routes 37, 48 and 51, described separately. Summer session service provides 20-minute frequencies on weekdays only, with no Weekend Connector service. During breaks (e.g., winter break and spring break), service is provided at 60 minutes Monday through Saturday, and 100 minutes on Sunday, using the Weekend Connector route. For the No Build Alternative, Route 50 will incorporate revised stops to serve a planned park-n-ride at Maynard Avenue, and possibly eliminating the loop behind Walker Fire Station Route 12 (West Fulton) This route proceeds from Standale to Central Station, primarily on Lake Michigan Drive and West Fulton Street. Service frequencies are 30 minutes on weekdays and 60 minutes on Saturday, with no Sunday service. July

10 2.1.3 Campus-Related Connecting Routes Routes 37, 48 and 51 are oriented toward serving GVSU and therefore are tailored to GVSU s school calendar. Route 37 (North Campus Express) and Route 48 (South Campus Express) shuttle students from Kirkhof Center at the Allendale campus to various student-oriented apartment complexes. Route 48 is slightly more frequent at four- to five-minute weekday service, with Route 37 providing six- to seven-minute weekday service during the Fall-Spring period. Friday nights and weekends provide coverage via the Route 50 Weekend Connector service, as well as during breaks. No service is provided during the Summer session. Route 51 (Health Sciences Shuttle) loops between GVSU s Pew Campus and GVSU CHS. Service frequencies are generally four to five minutes on weekdays, with some Route 50 Weekend Connector service Friday evening and Saturday. No service to GVSU CHS is available on Sundays, nor during school breaks. The summer session provides 20 minute service Monday through Saturday Other Connecting Routes. Routes 7, 18 and 9 cross the Corridor. These routes would all retain existing service frequencies and routings. 2.2 Stop Spacing The No Build Alternative assumes no changes to existing stop spacing along the Laker Line Corridor. Currently, Route 50 has stop spacing that varies between a quarter-mile on GVSU s Campus Drive and in downtown Grand Rapids to one mile or more along Lake Michigan Drive. 2.3 Stop Facilities There will be no changes to existing bus stop facilities for the No Build Alternative. Bus stop infrastructure and amenities vary along the Corridor: some Route 50 stops currently have real-time next bus information (Central Station, Figure 2-1) and shelters (Figure 2-3), while others only have sign posts (Figure 2-2). Figure 2-1: Bus Bays at Rapid Central Station July

11 Figure 2-3: Route 50 Bus Stop with Sign Post Figure 2-2: Route 50 Bus Stop with Shelter at GVSU Kirkhof Center 2.4 Runningway The No Build Alternative will operate in mixed traffic along the current Route 50 route between the GVSU Allendale campus, the GVSU Pew Campus, and The Rapid Central Station. July

12 2.5 Transit Vehicles The No Build Alternative will use existing Rapid 40-foot low-floor, diesel or hybrid-electric buses. The Rapid is considering shifting its current bus fleet from diesel to compressed natural gas (CNG) vehicles. While Laker Line vehicle decisions will be refined in subsequent phases of this project, it is assumed that any bus vehicle purchases will be consistent with system wide fleet vehicle decisions. Figure 2-4: Rapid 40-Foot Diesel Bus Figure 2-5: Rapid 40-Foot Hybrid-Electric Bus 2.6 Fare Collection The No Build Alternative will continue the Rapid s current fare collection policy for Route 50: GVSU students, faculty and staff ride for free upon showing the driver a GVSU identification card; all other riders pay full fare using the pay-as-you-board on-board cash and smartcard farebox. 2.7 Technology and Customer Information Technology and customer information systems that exist in the Laker Line Corridor include: Nearest Stops function on The Rapids website uses Google address functionality to pinpoint an address entered into the site on a Google map along with the nine nearest stops to that location. A reference listing for each of the stops is also listed to the left of the map that also provides a stop description, the distance from the entered address to that stop, and the related route(s) to that stop; Next Bus function on The Rapid s website, which allows users to enter a route number or stop ID to find the current position of buses (by direction of the route) as well as next bus status for each stop. Status information is displayed for the current day for each route map. Variable Message Boards with Next Bus Information: The Rapid Central Station has variable message signs at each of the bus bays that display next bus real-time information. The No Build Alternative assumes no modifications to these systems. 2.8 Identity and Branding The No Build Alternative will not include any modifications to the existing identity or branding of Rapid transit service. 2.9 Maintenance Facility This study assumes that the bus fleet for the No Build Alternative would be stored and maintained at the existing Rapid Wealthy Street Operations Center at 333 Wealthy Street SW. This study will not identify and assess potential sites for a new garage. This facility houses the Dispatch Center, 18 vehicle maintenance bays, storage for 164 buses, the primary training room, a lower-level parking garage, as well as the July

13 Operations Division administrative staff. Buses for the under-construction Silver Line BRT will also be stored at this location. 3.0 BRT in Mixed Traffic Alternative The BRT in Mixed Traffic Alternative includes substantial changes to the service plan, vehicles and technology used within the Laker Line Corridor, but like the current Route 50 service and the No Build Alternative will operate in mixed traffic throughout the Corridor. 3.1 Service Plan The Laker Line as proposed primarily follows Route 50, modifying the eastern end to serve the Medical Mile/GVSU CHS corridor rather than Central Station. In addition, a segment option on the western end of the Laker Line potentially extends the route from the GVSU Kirkhof Center along West Campus Drive to 48 th Avenue. Accordingly, Routes 50 and 51 are anticipated to be replaced, and Routes 37 and 48 may potentially be restructured. Route 12 would continue to provide local service along Lake Michigan Avenue and West Fulton Street from Standale Meijer to The Rapid Central Station. The Laker Line vehicle is anticipated to provide more capacity than the standard bus used for current Route 50 operations. This additional capacity allows for future ridership growth, and can be used to mitigate having too-frequent service along the Corridor which can cause bus bunching and schedule irregularities. FTA Small Starts guidelines establish minimum weekday frequencies at 10-minute peak headways and 15- minute off-peak headways, over a minimum 14-hour span. In the case of the Laker Line BRT, where the Corridor has strong student-oriented use, there is particularly robust use when school is in session from Fall through Spring, where the majority of the day has very frequent headways, characteristic of an extended peak period. The summer months have curtailed student activity, so the summer schedule in essence follows an off-peak profile. The proposed service plan detailed below leads to the following comparisons of Corridor service levels in relation to No Build: Similar service levels for weekdays, though improved capacity due to larger vehicles Improved service on Saturdays and Sundays Improved service (all seven days a week) during Summer session Improved service (for most days) during breaks Specifics are provided for each of the Corridor routes Laker Line BRT To respond to the specific demands of GVSU-based ridership, the Laker Line BRT is proposed to operate with differing service characteristics throughout the calendar year. Fall through Spring: o Mondays through Thursdays from 6 am to 1 am, six-minute service frequencies, tapering to 10- to 20-minute headways in the evenings o Fridays from 6 am to 3 am, 10-minute service frequencies tapering to 20- to 60- minutes in evenings and late night/early morning o Saturdays from 7 am to 3 am, 30-minute daytime and 60-minute night/early morning service frequencies o Sundays from 9 am to 8 pm, 60-minute service frequencies July

14 Summer: o Mondays through Fridays from 6am to 11pm, 15-minute frequencies, tapering to 30-minute headways in the evenings o Saturdays from 7am to 9pm, 60-minute frequencies from Standale Meijer to GVSU CHS o Sundays from 9am to 7pm, 60-minute frequencies from Standale Meijer to GVSU CHS Breaks: o Mondays through Fridays from 7am to 9pm, 15-minute frequencies, tapering to 30 to 60- minute headways in the evenings o Saturdays from 7am to 9pm, 60-minute frequencies o Sundays from 9am to 7pm, 60-minute frequencies Route 12 (West Fulton) The route would continue to operate at 30 minutes on weekdays and 60 minutes on Saturday, with no Sunday service Campus-Related Connecting Routes As mentioned previously, Route 51 (Health Sciences Shuttle) can be discontinued as the Laker Line provides the connection to GVSU CHS. Depending on the segment alternative chosen, there are opportunities to redefine this route to ensure that existing locations continue to be served. On the western end of the route, there is a segment option where the Laker Line extends west of Kirkhof Center along West Campus Drive, terminating at 48 th Avenue. This alternative overlaps existing route segments of both Route 37 and Route 48, as both of these loop between Kirkhof Center and adjacent student apartment complexes via West Campus Drive. In this case, Routes 37 and 48 can be reconfigured into a single clockwise perimeter loop using Campus Drive, Pierce Street, 48 th Avenue, and Lake Michigan Drive. Service spans and frequencies would vary according to the school calendar, generally tracking Laker Line services: Fall through Spring: o Mondays through Thursdays from 6 am to 1 am, six-minute service frequencies, tapering to 10- to 20-minute headways in the evenings o Fridays from 6 am to 3 am, 10-minute service frequencies tapering to 20 to 60 minutes in evenings and late night/early morning o Saturdays from 7 am to 3 am, 30-minute daytime and 60-minute night/early morning service frequencies o Sundays from 9 am to 8 pm, 60-minute service frequencies Summer: no service Breaks: o Mondays through Fridays 7 am to 9 pm, 60-minute frequencies o Saturdays 7 am to 9 pm, 60-minute frequencies o Sundays 10 am to 7 pm, 60-minute frequencies If the Laker Line retains Route 50 s current western terminus at Kirkhof Center, Routes 37 and 48 are assumed to continue as currently operated, with minor adjustments to service frequencies to synch with the Laker Line Other Connecting Routes Routes 7, 18 and 9 would all retain existing service frequencies and routings. July

15 3.2 Stop Spacing Route 50 and 51 stop spacing currently varies between a quarter-mile on the Campus Drive and in downtown Grand Rapids to one mile or more along Lake Michigan Drive. The current Routes 50 and 51 include 12 stops between the GVSU Allendale and Pew Campuses, and another seven stops between the Pew and CHS Campuses. A subset of these 19 stops will be included in the BRT in Mixed Traffic Alternative. These stations were selected because of exiting station area densities, existing station ridership activity, and potential for development/redevelopment within the existing station areas. The reduced number of stops will reduce travel times while maintaining system access. The reduction in the number of stops will result in slightly increased stop spacing compared to the No Build Alternative, but spacing will still vary between a quarter-mile and more than one mile along the length of the Corridor. Stops for the BRT in Mixed Traffic Alternative include: 48 th Avenue Kirkhof Center (GVSU Allendale Campus) Mackinac Hall (GVSU Allendale Campus) M-45 / Wilson Avenue (Standale Meijer) M-45 / Cummings Avenue M-45 / Kinney Avenue M-45 / Maynard Avenue M-45 / Covell Avenue Fulton / Garfield (Zoo) Fulton / Straight Pew Campus (Fulton Street /Mount Vernon Avenue) Lake Michigan Drive / Pearl Street o Lake Michigan Drive / Seward Avenue o Monroe Avenue / Louis Street Bridge Street / Michigan Street o Bridge Street / Seward Avenue o Monroe Avenue / DeVos Place Convention Center Michigan Street / Monroe Avenue Michigan Street / Bostwick Avenue CVSU CHS / Lafayette Avenue Additional stops that may be considered during potential future expansions of the Laker Line east along Michigan Street, including: Michigan Street / College Avenue Michigan Street / Diamond Avenue Michigan Street / Fuller Avenue Michigan Street / Plymouth Avenue 3.3 Stop Facilities Upgrades to facilities associated with the BRT in Mixed Traffic Alternative would only be at locations where the BRT in Mixed Traffic Alternative is proposed to stop. All other bus stops in the Corridor would remain as they are today. Each BRT in Mixed Traffic Alternative stop facility would include the following elements: Ticket vending machine with functions similar to those of the Silver Line BRT stations. See Section 3.6 Fare Collection. July

16 Detailed Definition of Alternatives Recognizable shelters similar to the Rapid s Silver Line (see Figure 3-1). They are assumed to be modular to allow variable sizing based on demand. It is also assumed that the scale and level of finish of the shelter would be different for downtown Grand Rapids from the rest of the Corridor. Figure 3-1: The Rapid Silver Line BRT Station Stop platform/curb extensions (other than downtown Grand Rapids) that are generally 70 feet long, which is sufficient to accommodate a 60-foot articulated bus Emergency phone Camera surveillance Sidewalk snowmelt Seating Bike parking (most stations) Level boarding Next Bus arrival Info Route and schedule info Shelter lighting July

17 3.4 Runningway The BRT in Mixed Traffic Alternative would use existing roadways, i.e. generally Lake Michigan Drive, Fulton Street and Michigan Street. In summary, the BRT in Mixed Traffic Alternative would operate as buses do today, loading and unloading passengers on the right-hand side of the transit vehicle and roadway. 3.5 Transit Vehicles The BRT in Mixed Traffic Alternative may use a combination of 60-foot hybrid articulated buses with rightdoor loading and 40-foot standard buses; vehicle deployment decisions will be based on operating data and service planning. The 60-foot hybrid articulated buses would be a new type of transit vehicle in Grand Rapids that would require the creation of a dedicated fleet. Other local bus routes would use standard 40-foot diesel buses (or CNG, as the Rapid s fleet is transitioned over the coming years through scheduled upgrades). Figure 3-2 shows an example of the 60-foot hybrid articulated bus used for the HealthLine in Cleveland, OH. Figure 3-2: HealthLine BRT Vehicle in Cleveland, OH 3.6 Fare Collection The fare collection system for the BRT in Mixed Traffic Alternative will by consistent with the system used for the Silver Line, which will be entirely off-board and will include ticket vending machines, platform validation devices, handheld validation devices, and point-of-sale devices with smartcard personalization capabilities. The system will also accept and process magnetic fare media currently in use on The Rapid s non-brt routes. 3.7 Technology and Customer Information The BRT in Mixed Traffic Alternative would take advantage of technology to improve transit travel, reliability and customer experience. Specifically, it assumes the use of the following features, in addition to those features described in Section 2.7 (No Build Alternative): Next Bus Arrival Variable Message Signs: Each stop will include a variable message sign that shows in real-time when the next bus will be arriving. July

18 Traffic Signal Priority: Every BRT bus will be equipped with technology that allows it to communicate with traffic lights. Each bus will have the ability to lengthen a green light or shorten a red light, allowing for faster travel. Traffic Signal Priority is different than Traffic Signal Preemption, which is utilized by emergency vehicles and actually allows police and fire vehicles to change a traffic signal from red to green. This feature will also be used on The Rapid s Silver Line BRT. 3.8 Identity and Branding The BRT in Mixed Traffic Alternative includes uniquely-branded stops and vehicles, similar in scale although not content as the branding for The Rapid s Silver Line service. While there would be some general variation in scale and finish between the BRT stops in downtown Grand Rapids and the rest of the Laker Line Corridor, it is generally anticipated that each stop would include a highly visible or easily identifiable element, such as the Silver Line image shown in Figure 3-3. The BRT in Mixed Traffic Alternative would also have a unique appearance to distinguish it from other bus service in the Corridor and allow transit patrons to see it from a distance. The BRT vehicles would also be visually distinctive through the use of branded bus wraps, color schemes, and/or logo. Figure 3-3: Rapid Silver Line BRT Branding 3.9 Maintenance Facility The BRT in Mixed Traffic Alternative will likely be maintained at the existing Rapid Wealthy Street Operations Center at 333 Wealthy Street SW, although construction of a light maintenance facility to accommodate Laker Line and Silver Line vehicles will be considered in future project phases. Please refer to Section 2.9 for a full description of the maintenance facility. 4.0 BRT in Dedicated Side Lane Alternative The BRT in Dedicated Side Lane would include the service, vehicular, and technology improvements of the BRT in Mixed Traffic Alternative, but would operate in a curbside lane that is exclusively dedicated to transit service either at peak hour or 24 hours a day, seven days a week. Dedicated lane operations will offer many operational benefits, including reduced travel times and improved service reliability. 4.1 Service Plan The service plan for the BRT in Dedicated Side Lane Alternative would be identical to the service plan described under the BRT in Mixed Traffic Alternative, with the advantage of dedicated lane operations where practicable. Please refer to Section 3.1 for a full description of the proposed service plan. 4.2 Stop Spacing Stop spacing for the BRT in Dedicated Side Lane Alternative will be identical to the stop location and spacing of all BRT alternatives. Please refer to Section 3.2 for a full description of the proposed stop location and spacing. July

19 4.3 Stop Facilities The stop facilities for the BRT in Dedicated Side Lane Alternative will be identical to the stop facilities for all BRT alternatives. Please refer to Section 3.3 for a full description of the proposed stop facilities 4.4 Runningway The runningway for the BRT in Dedicated Side Lane Alternative will be an exclusive dedicated lane (either at peak hour or for 24 hours a day, seven days a week) that operates along the curb of the roadway for the length of the alignment. The lane will not be grade-separated, but will be visually distinctive (through the use of lane markings and posted signage) from general traffic lanes. When operating as an exclusive lane, general vehicular traffic will be able to access the lane for right turns at intersections and access to driveways and parking lots along the length of the alignment. The existing cross-section and lane configuration of the alignment varies along the length of the Corridor, which will impact how dedicated BRT lanes will be designed. Appendix A includes plan view diagrams that illustrate the lane configuration and stop siting of the BRT in Dedicated Side Lane Alternative (and all alternatives under consideration) at selected points along the Corridor. 4.5 Transit Vehicles The transit vehicles for the BRT in Dedicated Side Lane Alternative will be identical to the vehicles for the BRT in Mixed Traffic Alternative. Please refer to Section 3.5 for a full description of the transit vehicles. 4.6 Fare Collection The fare collection system for the BRT in Dedicated Side Lane Alternative will be identical to the fare collection system for all BRT alternatives. Please refer to Section 3.6 for a full description of the fare collection system. 4.7 Technology and Customer Information The technology and customer information included in the BRT in Dedicated Side Lane Alternative will be identical to the technology and customer information included in all BRT alternatives. Please refer to Section 3.7 for a full description of the technology and customer information. 4.8 Identity and Branding The identity and branding of the BRT in Dedicated Side Lane Alternative will be identical to the branding and identity of all BRT alternatives. Please refer to section 3.8 for a full description of the proposed identity and branding. 4.9 Maintenance Facility The maintenance facility for the BRT in Dedicated Side Lane Alternative will be identical to the maintenance facility for all BRT alternatives. Please refer to Section 3.9 for a full description of the maintenance facility. 5.0 BRT in Dedicated Center Lane Alternative Like the BRT in Dedicated Side Lane Alternative, the BRT in Dedicated Center Lane Alternative will operate in a lane that is exclusively dedicated to transit service either at peak hour or 24 hours a day, seven hours a week but the BRT in Dedicated Center Lane Alternative will operate in a center-running (rather than siderunning) lane. 5.1 Service Plan The service plan for the BRT in Dedicated Center Lane Alternative would be identical to the service plan described under the BRT in Mixed Traffic Alternative, with the advantage of dedicated lane operations where practicable. Please refer to Section 3.1 for a full description of the proposed service plan. July

20 5.2 Stop Spacing Stop spacing for the BRT in Dedicated Center Lane Alternative will be identical to the stop location and spacing of all BRT alternatives. Please refer to Section 3.2 for a full description of the proposed stop location and spacing. 5.3 Stop Facilities The stop facilities for the BRT in Dedicated Center Lane Alternative will be identical to the stop facilities for all BRT alternatives. Please refer to Section 3.3 for a full description of the proposed stop facilities. 5.4 Runningway The runningway for the BRT in Dedicated Center Lane Alternative will be an exclusive dedicated lane (either at peak hour or 24 hours a day, seven days a week) that operates along the center of the roadway for the length of the alignment. The lane will not be grade-separated, but will be visually distinctive (through the use of lane markings and posted signage) from general traffic lanes. When operating as an exclusive lane, left turns will be limited to signalized intersections to mitigate any potential conflicts between the transit vehicles and left-turning general traffic. The existing cross-section and lane configuration of the alignment varies along the length of the Corridor, which will impact how dedicated BRT lanes will be designed. Appendix A includes plan view diagrams that illustrate the lane configuration and stop siting of the BRT in Dedicated Center Lane Alternative (and all alternatives under consideration) at selected points along the Corridor. 5.5 Transit Vehicles The transit vehicles for the BRT in Dedicated Center Lane Alternative may be a combination of 60-foot hybrid articulated buses that are either right- or left-door loading, depending on decisions that are made regarding center-platform stop location and layout, and standard 40-foot buses. Design and operational decisions related to right- or left-door loading will be made in future project phases. 5.6 Fare Collection The fare collection system for the BRT in Dedicated Center Lane Alternative will be identical to the fare collection system for all BRT alternatives. Please refer to Section 3.6 for a full description of the fare collection system. 5.7 Technology and Customer Information The technology and customer information included in the BRT in Dedicated Center Lane Alternative will be identical to the technology and customer information included in all BRT alternatives. Please refer to Section 3.7 for a full description of the technology and customer information. 5.8 Identity and Branding The identity and branding of the BRT in Dedicated Center Lane Alternative will be identical to the branding and identity of all BRT alternatives. Please refer to section 3.8 for a full description of the proposed identity and branding. 5.9 Maintenance Facility The maintenance facility for the BRT in Dedicated Center Lane Alternative will be identical to the maintenance facility for all BRT alternatives. Please refer to Section 3.9 for a full description of the maintenance facility. July

21 6.0 Detailed Evaluation Criteria During the next project phase, the Detailed Alternatives described in Sections 2 through 5 of this report will be subject to evaluation against the criteria and sub-criteria in Table 6-1. These criteria, like the criteria used in the initial screening phase of the project, are linked back to the project goals and objectives, as described in the Purpose and Need Statement (available under separate cover) and shown in Table 6-1 below. Table 6-1: Detailed Evaluation Criteria Project Goal Increase the efficiency, attractiveness and utilization of transit for all users Evaluation Criteria and Sub-Criteria Ridership o Total ridership o New Corridor transit trips o Ridership by transit-dependent population Catalyze and support economic development Contribute to regional equity, sustainability and quality of life Enhance connectivity of the corridor to the regional transportation network Station-area population and employment densities o 2010 and 2035 population within half-mile of proposed station locations o 2010 and 2035 employment within half-mile of proposed station locations Station-area development potential Low-income and non-white populations' access to the transit network o Number and percent of station area population living below the poverty line o Number and percent of station area population that is non-white o Number and percent of zero-car households in station areas Safety impacts o Impact on vehicular crash rates Environmental impacts o Change in transportation energy usage o Regional air quality impacts o Cultural resource impacts Connectivity to the transit network o Number of direct transfers to other transit service Bicycle and pedestrian mobility impacts o Impacts on existing bicycle and pedestrian facilities o Compliance with bicycle and pedestrian plans Traffic impacts Parking impacts o Number of on-street spaces removed Right-of-way impacts o Number of curb cuts impacted o Right-of-way acquisition requirements July

22 Project Goal Develop and select an implementable and community-supported project Evaluation Criteria and Sub-Criteria Capital costs Operating and maintenance costs Cost effectiveness Community and stakeholder support A series of methodology memos will be written to explain the process by which certain elements of the alternatives under consideration will be developed (ridership, capital costs, operating and maintenance costs). A series of technical memos will be written to describe the performance of each alternative against the criteria shown in Table 6-1. A summary of these analyses will be compiled into the Detailed Evaluation of Alternatives report, which will be drafted in the next phase of the project. The methodology and technical memos will be included as appendices to the report. The outcome of the Detailed Evaluation of Alternatives phase will be one or more alternatives for refinement in support of the identification of a Locally Preferred Alternative. July

ALIGN THE RAPID S TRANSIT IMPROVEMENT STUDY. Tech Memo #4: Phase 1 Project List. Prepared By:

ALIGN THE RAPID S TRANSIT IMPROVEMENT STUDY. Tech Memo #4: Phase 1 Project List. Prepared By: ALIGN THE RAPID S TRANSIT IMPROVEMENT STUDY Tech Memo #4: Phase 1 Project List Prepared By: & Phase 1 Project List As shown in the chart below, the initial (Phase 1) evaluation will consider investment

More information

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives 3.0 What preliminary alternatives are being evaluated? The alternatives for the East San Fernando Valley Transit Corridor project that were considered for screening include the No Build Alternative, Transportation

More information

Service Quality: Higher Ridership: Very Affordable: Image:

Service Quality: Higher Ridership: Very Affordable: Image: Over the past decade, much attention has been placed on the development of Bus Rapid Transit (BRT) systems. These systems provide rail-like service, but with buses, and are typically less expensive to

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

Needs and Community Characteristics

Needs and Community Characteristics Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017 US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master

More information

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 CTfastrak Expansion Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 Today s Agenda Phase I Update 2016 Service Plan Implementation Schedule & Cost Update Phase II Services Timeline Market Analysis

More information

Chicago Transit Authority Service Standards and Policies

Chicago Transit Authority Service Standards and Policies Chicago Transit Authority Service Standards and Policies Overview and Objectives The Chicago Transit Authority (CTA) has revised its Service Standards and Policies in accordance with Federal Transit Administration

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

Click to edit Master title style

Click to edit Master title style Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment

More information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Madison BRT Transit Corridor Study Proposed BRT Operations Plans Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is

More information

Troost Corridor Transit Study

Troost Corridor Transit Study Troost Corridor Transit Study May 23, 2007 Kansas City Area Transportation Authority Agenda Welcome Troost Corridor Planning Study Public participation What is MAX? Survey of Troost Riders Proposed Transit

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

1.0 Detailed Definition of Alternatives

1.0 Detailed Definition of Alternatives 1.0 Detailed Definition of Alternatives 1.1 Introduction This chapter provides supplemental information on the four alternatives, including both physical and operational characteristics (e.g. service plans)

More information

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS 2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak

More information

Where will. BRT run? BRT will serve 20 stations along the line, connecting to bus routes and serving major destinations. How often will service run?

Where will. BRT run? BRT will serve 20 stations along the line, connecting to bus routes and serving major destinations. How often will service run? Where will 32 65 87 223 Rosedale Transit Center 225 227 264 801 ROSEVILLE 65 Snelling & County Road B BRT run? Snelling & Roselawn FALCON HEIGHTS BRT will serve 20 stations along the line, connecting to

More information

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014 Arterial Bus Rapid Transit System Policy Oversight Committee April 7, 2014 1 Meeting Agenda Welcome and Introductions A Line - Project Status Shelter and Pylon Development Arterial BRT Branding Update

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

State Avenue Corridor Bus Rapid Transit (BRT)

State Avenue Corridor Bus Rapid Transit (BRT) State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!

More information

Attachment D Environmental Justice and Outreach

Attachment D Environmental Justice and Outreach Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

CAMPUS CONNECTOR MONDAY - THURSDAY. bold italicized times denote p.m. Monday - Thursday continued on next page. Effective August 29th, 2016

CAMPUS CONNECTOR MONDAY - THURSDAY. bold italicized times denote p.m. Monday - Thursday continued on next page. Effective August 29th, 2016 50 ( only) CAMPUS CONNECTOR Bayberry North Shuttle & 48 North & South Shuttles 531 539 543 546 549 552 607 601 609 613 616 619 622 637 613 621 625 628 631 634 649 625 633 637 640 643 646 701 637 645 649

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

Figure 2-14: Existing Bus Routing at Irwindale Station

Figure 2-14: Existing Bus Routing at Irwindale Station 494 W oothill Blvd 69 N Irwindale Ave 185 Irwindale E 1st St 3 6 feet igure 2-14: Existing Bus Routing at Irwindale 39 Proposed Bus Route 494 W oothill Blvd Proposed Discontinued Bus Route Proposed New

More information

Table 8-1: Service Frequencies for All Short-List Alternatives by Day of Week and Time of Day Frequency Day of Week Time of Day Time Period

Table 8-1: Service Frequencies for All Short-List Alternatives by Day of Week and Time of Day Frequency Day of Week Time of Day Time Period 8. Operating Plans The following Section presents the operating plans for the Short-List Alternatives. The modern streetcar operating plans are presented for Alternatives 2 and 3, followed by bus rapid

More information

More than $9 Million coming to Central Valley for transportation

More than $9 Million coming to Central Valley for transportation More than $9 Million coming to Central Valley for transportation From free bus service to electric buses Part of overall $97 Million awarded to public transportation projects A total of 152 local public

More information

CEDAR AVENUE TRANSITWAY Implementation Plan Update

CEDAR AVENUE TRANSITWAY Implementation Plan Update CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study Northeast Corridor Alternatives Analysis Public Involvement Round 2 Input on Alternatives for Further Study Feb. 7-9, 2012 Agenda Review project background Progress summary Recommended alternatives for

More information

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars. Sound Transit Phase 2 South Corridor LRT Design Report: SR 99 and I-5 Alignment Scenarios (S 200 th Street to Tacoma Dome Station) Tacoma Link Extension to West Tacoma Prepared for: Sound Transit Prepared

More information

West Broadway Transit Study. Community Advisory Committee September 17, 2015

West Broadway Transit Study. Community Advisory Committee September 17, 2015 West Broadway Transit Study Community Advisory Committee September 17, 2015 Introductions Community Engagement Summer Outreach Fall Outreach Technical Analysis Process Update Alternatives Review Economic

More information

Public Meeting. June 15, :30 7:30 p.m.

Public Meeting. June 15, :30 7:30 p.m. Public Meeting June 15, 2017 5:30 7:30 p.m. Welcome 2015 Naval Station Norfolk Transit Extension Study 2015 Naval Station Norfolk Transit Extension Study 2017 Norfolk Westside Transit Study HRT and the

More information

Midtown Corridor Alternatives Analysis Initial Screening Analysis

Midtown Corridor Alternatives Analysis Initial Screening Analysis Midtown Corridor Alternatives Analysis Initial Screening Analysis 7/24/2013 Prepared by the SRF Consulting Group Team for Table of Contents Purpose... 1 Initial Screening Analysis Methodology... 1 Screening...

More information

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit

More information

Midtown Corridor Alternatives Analysis Key Issues Memo

Midtown Corridor Alternatives Analysis Key Issues Memo Midtown Corridor Alternatives Analysis Key Issues Memo 1/4/2013 Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 1. Markets... 1 External Markets... 1 Intra-Corridor Travel...

More information

Green Line Long-Term Investments

Green Line Long-Term Investments Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail MetroExpress Connectors Circulators Project Connect

More information

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY EXECUTIVE SUMMARY The purpose of this report is to document the results of the Tier 1 and Tier 2 Screening of alternatives for the I-20 East Transit Initiative. The two-tier screening process presented

More information

4.0 TIER 2 ALTERNATIVES

4.0 TIER 2 ALTERNATIVES 4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation

More information

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS Michigan / Grand River Avenue TECHNICAL MEMORANDUM #18 From: URS Consultant Team To: CATA Project Staff and Technical Committee Topic:

More information

Draft Results and Open House

Draft Results and Open House Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014 TBARTA USF to Wesley Chapel Express Bus Service Operating Plan Draft 3/25/2014 March 2014 Table of Contents 1.0 Introduction... 1 2.0 Study Area... 1 3.0 Existing Available Service... 3 4.0 Proposed Service...

More information

Community Advisory Committee. October 5, 2015

Community Advisory Committee. October 5, 2015 Community Advisory Committee October 5, 2015 1 Today s Topics Hennepin County Community Works Update Project Ridership Estimates Technical Issue #4:Golden Valley Rd and Plymouth Ave Stations Technical

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

What IS BRT, Really? Not BRT and RNY

What IS BRT, Really? Not BRT and RNY What IS BRT, Really? 2007 Winter TexITE Meeting Presented by Jeff Arndt, TTI Not BRT and RNY 1 What is Bus Rapid Transit? A flexible, rubber-tired from of rapid transit that combines stations, vehicles,

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

Background Information about the Metrobus 29 Lines Study

Background Information about the Metrobus 29 Lines Study Background Information about the Metrobus 29 Lines Study Questions Overview of Existing Service Q. Why is the study being conducted? A. The 29 Lines provide an important connection between Annandale and

More information

What is the Connector?

What is the Connector? What is the Connector? The Connector is a plan for a high-capacity transit system from northeast to south Ann Arbor, connecting major destinations including downtown, commercial, and residential areas,

More information

Operating & Maintenance Cost Results Report

Operating & Maintenance Cost Results Report Operating & Maintenance Cost Results Report Prepared for: Hennepin County Regional Railroad Authority Prepared by: Connetics Transportation Group Under Contract To: Kimley-Horn and Associates FINAL June

More information

Downtown Transit Connector. Making Transit Work for Rhode Island

Downtown Transit Connector. Making Transit Work for Rhode Island Downtown Transit Connector Making Transit Work for Rhode Island 3.17.17 Project Evolution Transit 2020 (Stakeholders identify need for better transit) Providence Core Connector Study (Streetcar project

More information

DRAFT Evaluation Scores. Transit

DRAFT Evaluation Scores. Transit DRAFT Evaluation s The criteria for evaluating applications for new funding commitments are used to measure how well they advance the six goals identified for the MTP. Through transportation: Reduce per

More information

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018 UTA Transportation Equity Study and Staff Analysis Board Workshop January 6, 2018 1 Executive Summary UTA ranks DART 6 th out of top 20 Transit Agencies in the country for ridership. UTA Study confirms

More information

UC Santa Cruz TAPS 3-Year Fee & Fare Proposal, through

UC Santa Cruz TAPS 3-Year Fee & Fare Proposal, through UC Santa Cruz TAPS 3-Year Fee & Fare Proposal, 2016-17 through 2018-19 Introduction Transportation and Parking Services (TAPS) proposes a three-year series of annual increases to most Parking fees and

More information

Executive Summary. Phase 2 Evaluation Report. Introduction

Executive Summary. Phase 2 Evaluation Report. Introduction , Executive Summary Executive Summary Introduction TransLink and the Province of British Columbia sponsored a multi-phase study to evaluate alternatives for rapid transit service in the Broadway corridor

More information

SERVICE DESIGN GUIDELINES

SERVICE DESIGN GUIDELINES VTA TRANSIT SUSTAINABILITY POLICY: APPENDIX A SERVICE DESIGN GUIDELINES Adopted February 2007 COMMUNITYBUS LOCALBUS EXPRESSBUS BUSRAPIDTRANSIT LIGHTRAILTRANSIT STATIONAREAS S A N T A C L A R A Valley Transportation

More information

PAWG Meeting #3a Tier 1 Evaluation

PAWG Meeting #3a Tier 1 Evaluation PAWG Meeting #3a Tier 1 Evaluation August 2, 2017 LYNX Central Station Open Area 1 Modes Screening 2 Trunk vs Feeder Trunk Modes High peak capacity Direct routes Feeder Modes Routing may be flexible Serve

More information

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle Chapter 7: Travel Demand Analysis Chapter 8 Plan Scenarios LaSalle Community Center. Image Credit: Town of LaSalle 164 Chapter 8: Plan Scenarios Moving Ahead for Progress in the 21 st Century Act (MAP

More information

Smart Green Transportation of LG CNS. Seoul Case

Smart Green Transportation of LG CNS. Seoul Case Smart Green Transportation of LG CNS Seoul Case about Seoul Seoul Was about Seoul about Seoul - 1/22 Economic Growth of Korea Item 1970 2004 Differences Population 5,433,198 10,297,004 2 times Vehicles

More information

Bus Rapid Transit. Jennifer Flynn and Cheryl Thole Senior Research Associates Commuter Choice Workshop January 2012 Tampa, FL

Bus Rapid Transit. Jennifer Flynn and Cheryl Thole Senior Research Associates Commuter Choice Workshop January 2012 Tampa, FL Bus Rapid Transit Jennifer Flynn and Cheryl Thole Senior Research Associates Commuter Choice Workshop January 2012 Tampa, FL What is Bus Rapid Transit? BRT is an enhanced bus system that operates on bus

More information

Maryland Gets to Work

Maryland Gets to Work I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast

More information

Analysis of Radial and Trunk Feeder Transit System Configurations in Downtown Charlottesville

Analysis of Radial and Trunk Feeder Transit System Configurations in Downtown Charlottesville Analysis of Radial and Trunk Feeder Transit System Configurations in Downtown Charlottesville 1. Introduction During the stakeholder input sessions of Charlottesville Area Transit s (CAT) Transit Development

More information

A Transit Plan for the Future. Draft Network Plan

A Transit Plan for the Future. Draft Network Plan A Transit Plan for the Future Draft Network Plan Project Overview and Status Completed Market Analysis and Service Evaluation. Developed Plan Framework and Guiding Principles. Developed a draft Five Year

More information

Mississauga Bus Rapid Transit Preliminary Design Project

Mississauga Bus Rapid Transit Preliminary Design Project Mississauga Bus Rapid Transit Preliminary Design Project PUBLIC INFORMATION CENTRE OCTOBER 2008 WELCOME The Mississauga Bus Rapid Transit (BRT) Project Thank you for attending this Public Information Centre.

More information

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014 Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and

More information

Alternatives Analysis Findings Report

Alternatives Analysis Findings Report 6.0 This chapter presents estimates of the potential capital, operations and maintenance costs associated with the alternatives carried forward for detailed evaluation. The methodology used to develop

More information

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] Jackson/Teton Integrated Transportation Plan 2015 Appendix I. Fixed-Guideway Transit Feasibility Jackson/Teton County Integrated Transportation Plan v2

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

MTA New York City Transit and MTA Bus Company System-wide Service Standards

MTA New York City Transit and MTA Bus Company System-wide Service Standards MTA New York City Transit and MTA Bus Company System-wide Service Standards In accordance with Title VI of the Civil Rights Act of 1964 ( Title VI ), MTA New York City Transit ( NYCT ) 1 and MTA Bus Company

More information

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections

More information

West Broadway Reconstruction/LRT Design. March 19, 2015

West Broadway Reconstruction/LRT Design. March 19, 2015 West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian

More information

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network: We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network: Richmond North of Oxford Street Richmond Row Dundas Street

More information

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254 Introduction The Brigham Young University Institute of Transportation Engineers (BYU ITE) student chapter completed a trip generation

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Commission of the Environment Policy Committee May 22, 2014 Peter Gabancho Project Manager III Capital Programs & Construction SFMTA 1 Conceptual Visual Simulation Center-Running

More information

Appendix C: GAPS ANALYSIS

Appendix C: GAPS ANALYSIS Appendix C: GAPS ANALYSIS Appendix C Gaps Analysis While portions of Salt Lake City are well served by transit, some portions of the city experience a mismatch in the existing transit supply and current

More information

Highway Transitway Corridor Study

Highway Transitway Corridor Study Highway Transitway Corridor Study Technical Memorandum 3: Corridor Concepts and Evaluation Prepared for: Metropolitan Council May 2014 SRF No. 7994 Table of Contents Introduction... 1 Concept Development...

More information

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY

More information

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master

More information

WELCOME. Transit Options Amherst - Buffalo Public Workshops

WELCOME. Transit Options Amherst - Buffalo Public Workshops WELCOME Transit Options Amherst - Buffalo Public Workshops Sponsored by Niagara Frontier Transportation Authority Greater Buffalo Niagara Regional Transportation Council Where do you live? Where do you

More information

Metropolitan Freeway System 2013 Congestion Report

Metropolitan Freeway System 2013 Congestion Report Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...

More information

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University Shift: The City of London s Rapid Transit Proposal Shift: The City of London s Rapid Transit Proposal

More information

2019 New Transit Service Plan

2019 New Transit Service Plan Agenda Item 7.2 2019 New Transit Service Plan Draft Proposal VTA Board of Directors January 2019 Background: Next Network Plan and Today s Plan Early 2016 Transit Choices report and the ridership-coverage

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Early Scoping Meeting for Alternatives Analysis (AA) May 17, 2011 Introduction Key players Local lead agency: Metro Federal lead agency:

More information

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015 Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z145-235 2720 Hillside Drive, Dallas, TX October 27, 2015 Introduction: The Lakehill Preparatory School is located on the northeast

More information

I-26 Fixed Guideway Alternatives Analysis

I-26 Fixed Guideway Alternatives Analysis I-26 Fixed Guideway Alternatives Analysis Public Meetings: North Charleston, January 25, 2016 Charleston: January 26, 2016 Summerville: January 28, 2016 Agenda I. Project Update II. III. IV. Screen Two

More information

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

Service and Operations Planning for Ottawa s New Light Rail Line Pat Scrimgeour

Service and Operations Planning for Ottawa s New Light Rail Line Pat Scrimgeour Service and Operations Planning for Ottawa s New Light Rail Line Pat Scrimgeour Manager, Transit Service Planning and Reporting OC Transpo Ottawa, Ontario Ottawa Light Rail Project 12.5 km, 13 stations

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

CHAPTER 5 CAPITAL ASSETS

CHAPTER 5 CAPITAL ASSETS CHAPTER 5 CAPITAL ASSETS This chapter describes the capital assets of GCTD, including revenue and nonrevenue vehicles, operations facilities, passenger facilities and other assets. VEHICLE REVENUE FLEET

More information

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner Metro Transit Update Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office John Dillery, Senior Transit Planner Metro Transit Service Development May 16, 2013 1 Transit Planning

More information

MTA New York City Transit Service Guidelines Manual

MTA New York City Transit Service Guidelines Manual MTA New York City Transit Service Guidelines Manual Thomas F. Prendergast, President Robert Bergen, Executive Vice President Division of Operations Planning Peter G. Cafiero, Chief August 2010 Table of

More information

Construction Realty Co.

Construction Realty Co. MEMORANDUM TO: FROM : Jeff Pickus Construction Realty Co. Luay R. Aboona, PE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 DATE: May 22, 2014 SUBJECT:

More information

1 On Time Performance

1 On Time Performance MEMORANDUM: US 29 Travel Time & OTP To: From: Joana Conklin, Montgomery County DOT James A. Bunch, SWAI Subject: US 29 Travel Time and On Time Performance Analysis Date: This memorandum documents the US

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

METRO Light Rail Update

METRO Light Rail Update American Society of Highway Engineers METRO Light Rail Update Brian Buchanan Director, Design and Construction October 13, 2009 1 High Capacity Transit System 2 20-Mile Light Rail Line 3 Operations Operations

More information