1 THE INSTITUTE OF MARINE ENGINEERS 80 Coleman Street, London EC2R 5BJ Telephone: Fax: PREPRINT subject to revision BEYOND ELECTRIC SHIP Cdr J M Newell, RN and Cdr S S Young, RN Ministry of Defence To be read at 1730 on Tuesday 24 October 2000 Contributions to the discussion by correspondence are welcome In accordance with the terms and conditions of the Copyright, Designs and Patents Act, 1988, the written consent of the publisher must be obtained before publishing more than a reasonable abstract 2000 THE INSTITUTE OF MARINE ENGINEERS Papers presented or published reflect the views of the individuals who prepared them and, unless indicated expressly in the text, do not necessarily represent the views of The Institute of Marine Engineers. Whilst every effort has been made to ensure that the information in this publication is accurate The Institute of Marine Engineers makes no representation or warranty, express or implied, as to the accuracy, completeness or correctness of such information. The Institute of Marine Engineers accepts no responsibility whatsoever for any loss, damage or other liability arising from any use of this publication or the information which it contains.

2 IMarE paper 24 Oct 00 Beyond Electric Ship Commander J M Newell Royal Navy Electrical Power Distribution and Propulsion Systems, Marine Electrical Systems IPT, Ministry of Defence, Foxhill, Bath, BA1 5AB, United Kingdom Commander S S Young Royal Navy Electric Ship Programme Manager, Future Surface Combatant IPT, Defence Procurement Agency, Ministry of Defence, Abbey Wood, Bristol, BS34 8JH, United Kingdom Biographies Commander John Newell joined the Royal Navy as an Artificer Apprentice in 1976 and joined BRNC Dartmouth on promotion in On completion of his degree at RNEC Manadon and initial training as a marine engineer he served as the Deputy Marine Engineer Officer in HMS SIRIUS. He subsequently took a MSc in Electrical Marine Engineering and served in the MoD as the project officer for Pollution Control equipment. He then served as the Marine Engineer Officer in HMS BOXER before undertaking the French Staff Course in Paris. On return to the UK he spent 15 months with the Joint Planning Staff (precursor to the Permanent Joint Headquarters - PJHQ) before becoming one of the appointers. He was promoted to Commander in 1997 and was appointed as the head of the Electrical Power Distribution and Propulsion Systems specialist group within the Ship Support Agency in March Commander Newell joins HMS ALBION as Senior Naval Officer and Marine Engineer Officer in January Commander Stuart Young joined the Royal Navy in 1977 and completed undergraduate and post-graduate training at the Royal Naval Engineering College in Plymouth. He has undertaken a number of appointments at sea, including Marine Engineer Officer of HMS NORFOLK, the Royal Navy s first CODLAG frigate. Shore appointments have included project officer for the procurement of Warship Machinery Operator and Maintainer Trainers, lecturer at the Royal Naval Engineering College and the Marine Engineering Liaison Officer with the United States Navy, based in Washington DC. He is currently the Electric Ship Programme Manager within the UK s Defence Procurement Agency. 1. Introduction The use of a common power system for both propulsion and ship s services is now standard commercial practice for the cruise market and specialised shipping and is termed Integrated Full Electric Propulsion (IFEP). Efficient operation is obtained through the use of the minimum number of prime movers which are necessary to meet the required load, all running near their optimum efficiency, selected from a relatively large number of smaller units. Partial Integrated Electric Propulsion has been employed with considerable success in the Single Role Mine-Hunters. The first of this class, HMS SANDOWN, entered service in Partial Integrated Electric Propulsion was also selected for the Type 23 in a CODLAG configuration. The first of class, HMS NORFOLK, was commissioned in The first full IFEP ships for the Royal Navy will be the Auxiliary

3 Oiler (AO) and the Landing Platform Dock (Replacement) (LPD(R)). The first AO is due to enter service in 2002 and the first LPD(R), HMS ALBION, is due to enter service in These platforms follow the accepted Royal Navy practice of maintaining a minimum of two generators running at all times. In the All Electric Ship (AES) concept fewer but more highly rated prime movers are fitted to reduce Unit Production Cost (UPC). In order to restore the fuel savings conceded by the reduced efficiency obtained from these fewer, larger prime movers operating away from their optimum operating point, it is proposed that the AES should run fuel efficient and power dense gas turbines under a regime of Minimum Generator Operation (MGO). This will often be with only one prime mover operational in Single Generator Operation (SGO) mode. This brings significant gains in both fuel consumption and maintenance costs due to the minimised engine running hours and hence Through Life Cost (TLC) reductions. With only one generator running, limited energy storage to provide electrical power for some essential services will be required. The AES concept also proposes widespread electrification of auxiliaries and gives the opportunity to use upgradeable and flexible layouts. The Marine Engineering Development Programme (MEDP) continues to be the means of delivering the Marine Engineering Development Strategy (MEDS) for future RN warships. Although some developments will be available for the Type 45 Destroyer, the MEDP is primarily focused on delivering de-risked technologies for the Future Surface Combatant (FSC), Future Aircraft Carrier (CVF) and Future Attack Submarine (FASM). The implementation of the MEDS is now moving from the Development Phase, which produced the Electric Ship system concepts, to the De-risking Phase. This phase aims to demonstrate the advantages of the Electric Ship concept and provide sufficient de-risking to allow future warship prime contractors to include Electric Ship technologies in their designs without demanding significant financial contingency to carry residual technical risk. This paper looks at the development phase, the derisking phase and considers future issues key to the success of the Electric Ship. TECHNOLOGY REVIEW 2. LPD(R) and AO Propulsion Systems As a result of a TLC study comparing diesel mechanical and diesel electrical solutions for the LPD(R), the option of diesel electric was chosen for HMS ALBION and HMS BULWARK (Figure 1). The diesel electric option proved slightly more expensive to procure, but significantly cheaper in terms of TLC. The TLC assessment took account of fuel consumption, oil consumption, spare parts and operating hours. Other design factors which influenced the choice of diesel electric include operational flexibility, equipment redundancy, maintenance flexibility, spares, efficient operation and reduced emissions.

4 Figure 1. LPD(R). HMS Bulwark/HMS Albion Power & Propulsion System

5 Figure 2. LPD(R) power system. The LPD(R) power system configuration, illustrated in Figure 2, is a basic IFEP system with the power conversion between the propulsion system and the ship services system achieved using a transformer. The propulsion motors are each variable speed AC synchronous machines driving fixed pitch propellers. Each propulsion motor is controlled through a synchrodrive converter. Similar equipment is used in the AO, albeit in a single shaft configuration. 3. Type 45 Propulsion System The Prime Contract Office (PCO) for the Type 45 has recently selected an Integrated Electric Propulsion (IEP) system for this class. The system is likely to be based on similar technology to the Advanced Induction Motor (AIM) and associated converter built by Alstom for the US Navy s Integrated Power System shore based test site in Philadelphia. The architecture (Figure 3) has a mix of large Gas Turbine Alternators (GTA) and Diesel Generators as prime movers but is otherwise similar to that of the LPD(R).

6 Figure 3 Type 45 power system

7 4. Future Options for IFEP Future developments of an IFEP architecture and equipment are not constrained in the same manner as the LPD(R) or Type 45 design. In systems of the future we can look at optimising the architectures both technically and in terms of UPC and TLC. There is the opportunity to review technology developments which are currently progressing. In particular, it may become possible to take advantage of the devices and converter topologies emerging from the power electronic revolution. Distribution System Propulsion system Link AC AC DC DC AC DC Tree Ring Tree Ring VVVF FVF VV FV RC SC TX F VVVF = Variable Voltage Variable Frequency VV = Variable Voltage RC = Rotating Conversion TX = Transformer FVFF = Fixed Voltage Frequency Fixed FV = Fixed Voltage SC = Static Conversion Table 1. Potential IFEP options. Under an IFEP architecture there are several options which can be employed for the propulsion system architecture, the ship s services system and the link between them. Table 1 indicates the many options which could be applied to the modern warship IFEP system and which are being investigated by MoD. It should be noted that for each of the options identified the prime mover can either be operated in variable speed or fixed speed modes. With this level of installed power the propulsion bus will be based on a high voltage system in order to minimise the fault currents. 5. Prime Movers 5.1 Gas Turbines Gas Turbines have been selected as the future prime mover primarily because of their high

8 power to weight ratio. In addition there is also a significant reduction in the amount of routine maintenance required when compared with diesel generators. The other significant factor is the low emissions. Figure 4 indicates that there could potentially be three different size gas turbines. Figure 4. Basic IFEP architecture. 5.2 Fuel Cells Fuel cells can be used as a prime mover in an Integrated Full Electric Propulsion (IFEP) system providing DC electrical power output, and are being developed as a replacement for diesel generators and gas turbine alternators. The fuel cell stack operates by utilising electrochemical reactions between an oxidant (air) and a fuel (hydrogen), with two electrodes separated by a membrane. The voltage of the fuel cell output can be controlled by a converter and it is therefore able to connect to any point in the ship service or propulsion distribution system. The fuel cell stack is modular, and very compatible with all the benefits of IFEP. It has the additional advantages of zero noxious emissions, and low thermal and acoustic signatures. In the short term the fuel cell system is required to use marine diesel fuel. Diesel fuel will require reforming within the fuel cell stack, or using an external process, to produce a hydrogen rich gas which the fuel cell stack is capable of processing. The reformer will clearly add both size, weight and complexity to the fuel cell system. In the longer term technologies such as the Solid Oxide Fuel Cell (SOFC) are contenders, which are more forgiving of impurities and can use a fuel available world-wide, either methanol or gasoline. 6. Propulsion Motors For IFEP to be adopted in fighting vessels of 6000 tonnes in displacement or less there is

9 a requirement for a compact, power dense, rugged electrical machine to be utilised for the propulsion motor. For the full benefits of electric propulsion to be realised the machine should also be efficient, particularly at part load, as warships and submarines spend much of their time at low speed. In order to achieve suitable compact designs rare earth permanent magnet materials may be required. 6.1 Permanent Magnet Propulsion Motors The machine topologies available are deemed to be those based on radial, axial and transverse flux designs. In 1997, the Transverse Flux Motor was selected for development by the MoD as it was considered to be the optimum machine configuration to meet the high efficiency and power density requirements and a contract for a Technology Demonstrator Programme (TDP) was awarded to Rolls-Royce. The aim of the TDP is to produce designs for propulsion motors in the range 16 to 24 MW which have been validated through the design, build and test of a reduced scale representative machine (Figure 5) displaying identical electro-mechanical characteristics. Rolls-Royce are teamed with ALSTOM Drives and Controls, who are supplying the power electronics expertise, and the Defence Evaluation and Research Agency (DERA), who are providing a test facility. Figure 5. Reduced scale representative machine. 6.2 Advanced Induction Motors Alstom Drives & Controls have developed a family of Advanced Induction Motors (AIM) based on a Pulse Width Modulated (PWM) converter fed AIM rated at 19MW,

10 150 rpm, supplied for testing as part of the Integrated Power System programme for the USA (Figure 6). This motor was manufactured to US Military Specifications and had related requirements for shock, noise & vibration and EMC/EMI. Alstom s AIM development has been underway for some 12 years with the first machine for a steel mill delivered in Figure 6. Advanced Induction Motor. 6.3 Podded Drives Podded drives offer greater propulsion efficiency and increased space within the hull by moving the propulsion motor outside the ship s hull and placing it in a pod suspended underneath the hull as shown in Figure 7. Podded drives are also capable of azimuthing, improving ship manoeuvrability. Indeed, podded drives have been widely adopted by the cruise ship community for these reasons. The motors being manufactured now are as large as 19.5 MW, and could provide the total propulsion power. The suitability of podded drives for warships, including their noise and shock characteristics are currently being investigated. Podded drives prescribe an IFEP system.

11 Figure 7. Podded drive. 7. Single Generator Operation The adoption of SGO to change prime mover utilisation from the customary Royal Navy practice of running a minimum of two generators to a single running generator does not mean that in the event of the on load generator failing that there is a total loss of power. Classes currently in service already have a level of energy storage for CCI and some other equipment. It is perhaps the additional requirements which need to be addressed, in particular what duration of energy storage is required and whether Energy Storage should be provided for: Propulsion and essential services; Propulsion only; Essential services only; CCI only (24 volts maintained); as today. Energy storage for propulsion may not actually be a requirement. Current classes such as the Type 22 frigate and Type 42 Destroyer often operate just one shaft on passage with the other shaft trailing. If the propulsion engine trips then it will take in the order of two minutes to start and select another engine. These issues will be fully investigated at the Electric Ship Technology Demonstrator as discussed later. SGO would be used during operations in benign conditions, for example on patrol in a low threat environment and of course only applies at lower powers; once the power requirement rises beyond the output of one of the two main GTAs a second generator will

12 be required. Depending on the final hull form and displacement of the Future Surface Combatant (due to replace the Type 23 from 2012 onwards) this is likely to be in the range of knots. A second generator would be started when in restricted waters, during Replenishment at Sea or if the operational threat increased. Perhaps the term SGO is inaccurate. The on-load generator will always be in-parallel with one or more energy storage devices and thus this concept of operation presents probably less risk of loss of power supplies to services considered essential than current systems. Selection of a second generator would be determined by the Command but will include any occasion when the likely power or speed requirement exceeds the power available from the ride-through energy source and the speed of response in starting a second prime mover (2 minutes) is unacceptable. Thus Special Sea Dutymen (SSD) would not in itself be a criteria for two or more engines. For future platforms the decision which needs to be taken early in the design process is which services the energy storage will back-up and for how long. 8. Energy Storage Options The technologies being assessed for energy storage include flywheels such as the URENCO device shown in Figure 8, electro-chemical batteries (both conventional and advanced), regenerative fuel cells (otherwise known as redox flow cells or Regenesys), Superconducting Magnetic Energy Storage (SMES) and Supercapacitors.

13 Figure 8. URENCO flywheel. Regenerative fuel cells (Regenesys TM by Innogy) store or release electrical energy by means of a reversible electrochemical reaction between two salt solutions (the electrolytes). The reaction occurs within an electrochemical cell. The cell has two compartments, one for each electrolyte, physically separated by an ion-exchange membrane. In contrast to most types of battery system, the electrolytes flow into and out of the cells and are transformed electrochemically inside the cells. The power is therefore determined by the size of the cell but the endurance is determined by the size of the two electrolyte tanks (Figure 9). Figure 9. Regenesys TM by Innogy. The concept of providing uninterrupted power supplies already exists for Command, Control and Indication (CCI) equipment and navigation and emergency lighting. It is currently provided by Uninterruptable Power Supplies (UPS) either embedded in the parent system or more usually through the battery backed 24 volt transformer rectifier units. In future power systems this could be in the form of Distributed Energy Storage (DES) in each zone providing enhanced survivability to many more key systems and equipment. 9. The Zonal Concept The concept of dividing future classes of ship into zones to maximise survivability also

14 extends to the power system. Each zone would be autonomous and include ventilation systems, cooling systems, power distribution and other services which could be affected by damage to another part of the ship. At least two supplies would be provided for all essential loads. Current classes, using split generation and distribution, rely on the provision of normal and alternative supplies via Automatic Change-Over Switches (ACOS) to essential services to ensure a suitable level of survivability. In future classes this could be taken a step further by incorporating energy storage from independent sources to key weapon systems and sensors. It requires an instantaneous changeover of supply (no break) and is currently provided by UPS embedded in the parent systems but in the future would be supported by energy storage embedded in each zone, providing power to essential services until power is restored to the zonal distribution point. The duration of this energy storage could be as little as 100ms, the time to clear a fault on the distribution system, or longer, say 10 minutes. 10. Electrical Standards and Training Since the inception of Engineering Branch Development (EBD) there has been a gradual but significant reduction in electrical standards, particularly in the appreciation of electrical safety. This may have three primary root causes; the first is the dilution of electrical expertise with the demise of the old specialist Electrical Artificer (MEA(L)). The second is the lack of in-depth, coherent training for the new MEA(EL), where the training has remained biased towards the mechanical aspects of the training curricula. This has not been helped, perhaps unknowingly, by the third cause, which is the lack of numbers of suitably electrically trained Marine Engineer Officers. IFEP systems at sea may require voltages up to 13.8 kv to minimise fault levels and it is therefore essential that all Marine Engineering personnel are trained in safe working practices for these voltages. The Electrical Artificers of the near future must be fully trained to carry out maintenance and defect rectification on Medium Voltage (MV) systems. This will mean a considerable increase in the electrical content of all training. Training will also need to be given to non-technical personnel to ensure everybody is aware of the dangers of these higher voltages. 11. The All Electric Ship The AES concept goes beyond an IFEP system in that it proposes widespread electrification of auxiliaries and gives the opportunity to use upgradeable and flexible layouts. It will include a low risk, cost effective and comprehensive Platform Management System that has a standardised Human-Computer Interface and remains supportable for its entire service life and the goal to be an Environmentally Sound Ship. The goals of the Environmentally Sound Ship work are: freedom of operation in MARPOL special and restricted areas; unrestricted littoral operations; port independence; minimum onboard storage of waste and reduced manpower whilst reducing cost of ownership and port reception costs. Work is also underway to investigate the potential

15 for replacing the current traditional systems used in steering gear, fin stabilisers and submarine control surfaces with compact, power-dense actuators. These may be either an electric drive or aerospace derived devices. The aerospace derived actuators are significantly smaller than the current steering gear systems, have the required ARM attributes and, potentially have significantly lower acquisition and support costs than existing systems. Studies have been carried out to investigate the possible advantages of electric valve actuators in ship and submarine systems. These actuators offer the potential to simplify system architectures at a comparable cost to the alternatives. MoD in conjunction with DERA are working on all aspects of upper deck machinery to ensure the systematic integration of upper deck machinery into future surface ship designs. ELECTRIC SHIP CONCEPT - IMPLEMENTATION AND BEYOND 12. Electric Ship Technology Demonstrator The principal means by which the Electric Ship concept will be implemented is through the Electric Ship Technology Demonstrator (ES TD), a contract for which was placed with Alstom Power Conversion Limited in July The ES TD takes current state-ofart equipment and integrates them in an IFEP system which is representative of a generic system for a frigate or destroyer sized ship. An outline of the system is given in Figure 10.

16 Figure 10. The ES TD System Particular points to note include: The WR21 GTA providing the main power source for the system. A 20MW Advanced Induction Motor driving a four-quadrant load enabling full operation throughout the ahead and astern modes. Dual solid-state link converters between the MV and LV systems. A Regenesys bulk energy storage device to investigate further the concept of single generator operation. An LV distribution system which will enable comparison of both AC and DC ring mains to inform future system selection. A zonal power supply unit incorporating flywheel energy storage devices. The aims of the ES TD are: To de-risk the IFEP concept and address system integration issues so that it becomes and attractive option for future warship propulsion systems without attracting an undue risk premium from the prime contractor. To provide technology pull-through by informing the baseline designs for future warship projects. To understand and demonstrate operation under normal, fault and extreme operating conditions. To validate equipment and system models and so reduce the requirement for shore testing of future ship-specific systems. To generate Integrated Logistic Support (ILS) data to inform future warship development. To understand and address signature issues. To support the production of technical requirements for future IFEP systems. The ES TD is a co-operative programme with France. It will be sited at the Alstom Research Centre at Whetstone near Leicester. Testing is due to commence in Spring 2002 with final trials complete by the end of Testing is timed to meet the requirements of the FSC, CVF and FASM projects in the UK and the Composante Fregate in France. 13. Constraints and Pressures on Marine Engineering Development The development and demonstration programmes already described, culminating in the Electric Ship Technology Demonstrator, provide a firm foundation for the incorporation of Electric Ship technologies in future warships. However, there remains a constant impetus to reduce ownership costs whilst boosting operational capabilities. We therefore need to look how the Electric Ship concept will evolve in the future. Before a strategy for further development can be formulated it is important to understand the constraints and pressures that impact on future marine engineering systems. These constraints and

17 pressures fall into 3 broad categories: External Pressures. The external pressures are those that factors that are difficult to control or influence, such as industrial base capabilities. Management. The management issues are those pressures and constraints that the personnel managing the acquisition process can influence by means of adapting their business processes. Technical. Technical constraints can normally be overcome by the development of appropriate technical solutions 13.1 EXTERNAL CONSTRAINTS The capabilities of the available industrial base impose the main external constraints on marine engineering development. The sectors of industry of most relevance are commercial shipping, power generation, controls, and transport (e.g. aero gas turbines, rail traction diesels). The Royal Navy on its own provides too small a market to influence industry s machinery development investment, and so attempts to move faster than industry, or in a different direction, would lead to large costs. It also becomes an increasingly expensive experience to be left supporting obsolescent technology. Therefore, it is essential that the Navy must keep pace with developments in industry. Furthermore, a strong industrial base that will support the new technology through its service life should underpin any changes to marine engineering practice MANAGEMENT PRESSURES The purpose of the acquisition process is to deliver the required military capability on time and within budget. A fundamental activity in managing this process is the identification and reduction of the associated risks. Experience has shown that warship prime contractors will have to, of necessity, take significant risks with the warship combat systems and so have a natural tendency to be risk adverse for the marine engineering aspects of the project. This will potentially lead to stagnation in marine engineering development and, crucially, fail to take advantage of the performance and cost benefits that can be realised from technological advances. The Acquisition Management System underpins the Ministry of Defences Smart Procurement Initiative and defines the new procurement cycle, known as CADMID: Concept (leading to Initial Gate approval) Assessment (leading to Main Gate approval) Development Manufacture In-Service Disposal One of the objectives of the CADMID cycle is:

18 To assist the reduction of risk during the Concept and Assessment stages so that, at Main Gate, there is a high level of confidence that project target time, whole-life cost, annual cost of ownership and performance will be achieved. In practical terms, this means that marine engineering development needs to take place to deliver results progressively throughout the Concept and Assessment stages. Consequently, the warship prime contractor will have sufficient information to enable him to make wise choices that will meet the Users Requirements, minimise the subsequent whole-life costs and contain the risks that the MOD will bear to an acceptable level. Marine engineering development is therefore a de-risking process that demonstrates the capability of particular technologies rather than developing ship ready, production equipment. Technology Demonstration Programmes (TDP), as exemplified by the ESTD, normally carry out this de-risking process TECHNICAL CHALLENGES The technical challenges in marine engineering that require appropriate technical solutions are: The requirement to identify and implement open architecture systems that are flexible in concept, capable of utilising a variety of different equipment solutions and are adaptable for technology insertion. The development of system architectures and equipment solutions that will minimise the impact of marine engineering on warship design and operation. The development of system architectures that will support cost-effective incremental acquisition of additional equipment for combat systems in the future. The use of COTS equipment wherever possible with navalisation as necessary, for example to meet requirements of marine environment, shock and naval signatures. Commonality of system architectures and equipment solutions across all classes of major surface ships, submarines and minor war vessels wherever feasible. Compliance with the Royal Navy policy for environmentally sound warships. 14. Technology Drivers 14.1 The Defence Task and Operating Environment Since the end of the Cold War the tasks that our ships can be expected to perform have become broader and more diverse in nature. However, power projection and the requirement to respond quickly to developing crises are common themes. This means that ships need to be able to deploy long distances at relatively high speeds to reach an area of operations and, when there, to operate long periods, perhaps at slow speed, with little or no support. Speed, economy, reliability and availability are therefore major attributes which are likely to be expressed as requirements in very demanding terms for all future

19 major warships and auxiliaries 14.2 Manpower The structure of the Navy remains under constant review and as a result long term trends on manpower levels, associated skills and training are difficult to predict with certainty. Manpower levels are almost certain to continue to fall and it is unlikely that automation of Marine Engineering systems will be a significant driver in determining manpower levels. Maintenance requirements will also continue to fall. Manpower levels will therefore be driven by external factors, such as retaining sufficient flexibility to support the myriad of tasks, like disaster relief, that a warship can be called upon to perform. The Damage Control and Firefighting requirement will also be a major driver, despite predicted technological advances in these areas Equipment and Technology Many of the trends in technology have been discussed in the first part of this paper. These trends are, however, being driven by commercial forces and large industrial markets. Even the United States Navy, the World s largest, is too small a customer to influence these trends significantly. The Royal Navy will therefore be driven more and more by developments in commercial technology and the adaptation of these to meet the, often unique, naval requirement. This does not mean that we can relax. The CADMID life-cycle can be very long for a major warship project, frequently exceeding 50 years from conception to disposal of the last ship of the class. A heightened awareness of commercially developed technologies is therefore required, combined with the good judgement needed to select successful technologies which will continue to be supported by industry throughout the life of the warship. To achieve this state-of-the-art technologies will need to be selected for new projects and associated risks taken in order to avoid early obsolescence and unsupportable systems. This has to be balanced against the need to increase commonality and reduce diversification in order to control support costs. Adaptation and development of commercial technologies will also be required to enable successful operation in the naval environment. Shock and signature aspects are prime examples where the naval requirement often exceeds the commercial requirement. Installation of commercially derived equipment may also necessitate increased system redundancy with its associated cost impact. All this means that naval marine engineering development must be highly focused and needs to be managed by a technically competent and forward looking organisation, taking into account industrial trends and its applicability to the naval requirement. This requires significantly more effort than being simply an intelligent customer Operating Costs

20 The drive to reduce operating costs will continue. The introduction of the IFEP architecture and operating philosophy together with advanced cycle gas turbines gives a step reduction in operating costs. Further improvements will be much more difficult to achieve and will be incremental in nature, depending, once again, on evolution, rather than revolution, in marine engineering development. Critical to this evolution is the establishment of the Integrated Full Electric Propulsion system as the core open system architecture into which new technologies can be introduced. These new technologies will need to show continuing incremental improvements in efficiency whilst reducing the maintenance requirement. Improving availability is also important. Greater availability acts as a force multiplier enabling fewer ships to meet the operational requirement. These requirements are not unique to Navies - they are also fully applicable throughout the commercial world. The Royal Navy will therefore benefit from following commercial trends in these areas Environmental Current efforts are focused on reducing or eliminating the impact that a warship has on its environment during its operation. In simple terms this means controlling all its overboard emissions, whether solid, liquid or gaseous. In the future a warship will have to have minimal environmental impact during its full life-cycle, including build, operation, maintenance and disposal. This is far more difficult to achieve, involving a myriad a different organisations. However, legislation will mean that we have no choice but to address the issues Signatures Warships emit a wide range of signatures, including acoustic, infra red, magnetic, electromagnetic, wake and atmospheric effects. Future efforts may not only try to minimise signatures but will also address control of signatures to the extent that a warship will be able to mimic faithfully the characteristics of another vessel. Future smart weapon systems could be confused by the presence of a cruise liner type target when the missile or mine was expecting a high-stealth target. The marine engineering systems largely dictate the signature of a warship and therefore significant investment will be required to be able to control as well as minimise their characteristics Fuels Predicted trends for the availability and cost of fossil fuels are highly inconsistent and it is impossible to derive definitive figures. However, it can be said with reasonable confidence that ships being designed now for service between 2010 and 2040 are likely to experience increasing fuel costs through-out their life. Beyond 2040, fuel will become scarce, with prices increasing dramatically. This next-but-one generation of ships will therefore need

21 to find an alternative to traditional fossil fuels. No predictions are made here as to what this alternative could be. However, timescales are such that the problem needs to be addressed now, taking fully into account what is likely to happen commercially. 15. The Future Marine Engineering Development Strategy The introduction of electric propulsion into LPD(R) and Type 45 Destroyer can be considered to be a major step change in marine engineering development. Although not all the benefits associated with electric propulsion will be realised in these classes these ships will see significant reductions in whole-life costs. Future warship systems will evolve from these ships so the scope for large reductions in operations and support costs are reduced. Nevertheless, further development of the electric ship concept has the potential to provide appreciable benefits and the following areas will probably need to be addressed through the next iteration of the Marine Engineering Development Strategy: a. Military Effectiveness. To provide cost-effective marine engineering developments that will improve military effectiveness, particularly more adaptability, reduced signatures and increased survivability. b. Optimal Design. To provide flexible system architectures thus reducing the constraints imposed on ship design and operation by marine engineering systems. c. Technology Insertion. To identify and develop marine engineering equipment suitable for technology insertion into current and future classes of warship. d. Incremental Acquisition. To identify and develop system architectures that are suitable for supporting cost-effective incremental acquisition of additional equipment for combat systems in the future. e. Manpower. To provide reliable and efficient automated systems at a level appropriate to manning levels. Marine engineering technologies are an enabler to reduce the manpower required onboard Royal Navy ships. The limiting factor is now naval policy that will staff ships above the level necessary to operate and maintain marine engineering systems under all conditions. f. Environmental Impact. Means of complying with environmental legislation will be identified and developed to ensure that Royal Navy policy on environmentally sound warship design is implemented. World-wide industrial and commercial developments will be exploited to the maximum extent possible and only when these cannot meet naval requirements will the development of specific equipment or system concepts be funded. In some cases the requirement of the Navy may predate an anticipated commercial market prospect and participation in a joint or shared development will be the appropriate course of action.

22 Marine engineering development is to be undertaken in accordance with the Acquisition Management System. Further opportunities for collaboration and partnership will be sought whenever a common requirement is identified. 16. Conclusions The concept of the Electric Ship, as envisaged over the last five years, is now here. IFEP architectures are now successfully in service in commercial ships and about to enter service in a number of Royal Navy vessels. The concept will be further refined in the T45, with another step forward taking place with the Future Surface Combatant. The technologies supporting the Electric Ship concept continue to move forward and further incremental advances in efficiency and operational effectiveness are expected. The challenges facing navies during the next century are developing. Whole life costs and manpower levels will continue to be driven down whilst operational capabilities must improve to meet the new defence tasks. Environmental legislation will become ever more stringent and commercial trends will dictate the equipment that navies procure to a greater extent than ever before. Finally, and perhaps most significantly, we are starting to see the end of fossil fuels. The outline strategy proposed in this paper builds on what has already been achieved and forms a firm foundation for meeting the many challenges which we are now facing. References Energy Storage Requirements for Integrated Full Electric Propulsion (IFEP) Warships - RRA Issue 02 dated March The views expressed are those of the author and do not necessarily represent those of the Ministry of Defence or HM Government Controller, Her Majesty s Stationery Office London 2000 British Crown Copyright 2000/MoD Published with the permission of the Controller of Her Britannic Majesty s Stationery Office

MT30. Powering the world s future fleets

MT30. Powering the world s future fleets MT30 Powering the world s future fleets 2008 marked the entry into service for the MT30 powering the US Navy s first Littoral Combat Ship, USS Freedom. The propulsion system features twin MT30 engines

More information

Feasibility of Electric Propulsion for Semi-submersible Heavy Lift Vessels

Feasibility of Electric Propulsion for Semi-submersible Heavy Lift Vessels Feasibility of Electric Propulsion for Semi-submersible Heavy Lift Vessels K Kokkila, ABB Marine & Cranes, Finland SUMMARY Some of the semi-submersible heavy lift vessels have special requirements that

More information

Electric Propulsion and Power Generation for ships Indian perspective. By R S. Mahajan Larsen & Toubro

Electric Propulsion and Power Generation for ships Indian perspective. By R S. Mahajan Larsen & Toubro Electric Propulsion and Power Generation for ships Indian perspective By R S. Mahajan Flow of presentation Introduction Direct drive, geared drive and electric propulsion Integrated Electric Propulsion

More information

A New Generation of Naval Propulsion Systems. David Bricknell CEng MRINA BSc Hons, Vice President Systems, Naval Rolls-Royce Marine

A New Generation of Naval Propulsion Systems. David Bricknell CEng MRINA BSc Hons, Vice President Systems, Naval Rolls-Royce Marine A New Generation of Naval Propulsion Systems David Bricknell CEng MRINA BSc Hons, Vice President Systems, Naval Rolls-Royce Marine Synopsis The 21 st century brings a renewed interest by a number of countries

More information

neuron An efficient European cooperation scheme

neuron An efficient European cooperation scheme DIRECTION GÉNÉRALE INTERNATIONALE January, 2012 neuron An efficient European cooperation scheme I - INTRODUCTION 2 II - AIM OF THE neuron PROGRAMME 3 III - PROGRAMME ORGANISATION 4 IV - AN EFFICIENT EUROPEAN

More information

The WR-21 Intercooled Recuperated Gas Turbine Engine Integration Into Future Warships

The WR-21 Intercooled Recuperated Gas Turbine Engine Integration Into Future Warships Proceedings of the International Gas Turbine Congress 2003 Tokyo November 2-7, 2003 IGTC2003Tokyo OS-203 The WR-21 Intercooled Recuperated Gas Turbine Engine Integration Into Future Warships Commander

More information

SUMMARY OF THE IMPACT ASSESSMENT

SUMMARY OF THE IMPACT ASSESSMENT COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 13.11.2008 SEC(2008) 2861 COMMISSION STAFF WORKING DOCUMT Accompanying document to the Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL

More information

SPEY SMlC GAS TURBINES

SPEY SMlC GAS TURBINES SPEY SMlC GAS TURBINES IN H.M.S. 'BRAVE' LIEUTENANT-COMMANDER R. W. PARRY, B. SC., C.ENG., M.I.MEcH.E., R.N. AND COMMANDER R. A. DOXSEY, M.Sc., C.ENG., M.I.MEcH.E., R.N. (Sea Systems Con trollerate) ABSTRACT

More information

Project Spartan. An Innovative Light Frigate Design for General Purpose Frigate (GPFF)

Project Spartan. An Innovative Light Frigate Design for General Purpose Frigate (GPFF) Project Spartan An Innovative Light Frigate Design for General Purpose Frigate (GPFF) The 2015 Strategic Defence and Security Review (SDSR) announced that the Royal Navy is looking to procure five light

More information

Effective Systems Engineering and Project Management Integration. Angela Tuffley, RedBay Consulting

Effective Systems Engineering and Project Management Integration. Angela Tuffley, RedBay Consulting Effective Systems Engineering and Project Management Integration Angela Tuffley, RedBay Consulting Introduction The Schedule Compliance Risk Assessment Methodology (SCRAM): Minimally disruptive, independent

More information

characteristics, including the ability to turn through 180 degrees for an increase in backing thrust.

characteristics, including the ability to turn through 180 degrees for an increase in backing thrust. 6 Turning CRP Azipod gives a boost to point marine propulsion efficiency Tomi Veikonheimo, Matti Turtiainen Almost as old as the invention of the screw propeller itself, the concept of contra-rotating

More information

Power Converter Products. For Naval, Aviation and Land Applications

Power Converter Products. For Naval, Aviation and Land Applications Power Converter Products For Naval, Aviation and Land Applications Power Converter Products for Naval, Aviation and Land Applications Naval Today, advanced electronic power supply equipment supports critical

More information

Emergi-Lite Experts in central power supply systems

Emergi-Lite Experts in central power supply systems EMERGI-LITE EXPERTS IN CENTRAL POWER SUPPLY SYSTEMS 77 Emergi-Lite Experts in central power supply systems When choosing a partner for emergency lighting, you need a supplier capable of delivering a solution

More information

By Edmund Hughes, Technical Officer, Marine Environment Division, IMO

By Edmund Hughes, Technical Officer, Marine Environment Division, IMO A new chapter for MARPOL Annex VI requirements for technical and operational measures to improve the energy efficiency of international shipping By Edmund Hughes, Technical Officer, Marine Environment

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED BUDGET ACTIVITY: 3 PROGRAM ELEMENT: 6358N PROGRAM ELEMENT TITLE: Surface Ship & Submarine COST: (Dollars in Thousands) PROJECT NUMBER & FY 1999 TITLE ACTUAL FY 2 FY 21 FY 22 FY 23 FY 24 FY 25 TO COMPLETE

More information

Restoring the Fleet: Naval Procurement and the National Shipbuilding Strategy Introduction National Shipbuilding Strategy

Restoring the Fleet: Naval Procurement and the National Shipbuilding Strategy Introduction National Shipbuilding Strategy HOUSE OF COMMONS DEFENCE SELECT COMMITTEE Restoring the Fleet: Naval Procurement and the National Shipbuilding Strategy Conclusions and recommendations Introduction 1.As an island nation, the importance

More information

Microgrid solutions Delivering resilient power anywhere at any time

Microgrid solutions Delivering resilient power anywhere at any time Microgrid solutions Delivering resilient power anywhere at any time 2 3 Innovative and flexible solutions for today s energy challenges The global energy and grid transformation is creating multiple challenges

More information

PHASE 4 OVERLANDER PROTECTED MOBILITY VEHICLE LIGHT

PHASE 4 OVERLANDER PROTECTED MOBILITY VEHICLE LIGHT 226 DEFENCE CAPABILITY PLAN 2011 PUBLIC VERSION PROJECT NUMBER Overlander Protected Mobility Vehicle Light Overlander Medium and Heavy Tactical Training Vehicles LAND 121 Background Overlander is a multi-phased

More information

UNCLASSIFIED: Distribution Statement A. Approved for public release.

UNCLASSIFIED: Distribution Statement A. Approved for public release. April 2014 - Version 1.1 : Distribution Statement A. Approved for public release. INTRODUCTION TARDEC the U.S. Army s Tank Automotive Research, Development and Engineering Center provides engineering and

More information

Energy Storage Commonality Military vs. Commercial Trucks

Energy Storage Commonality Military vs. Commercial Trucks DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Energy Storage Commonality Military vs. Commercial Trucks Joseph K Heuvers, PE Energy Storage Team Ground Vehicle Power

More information

Offshore Application of the Flywheel Energy Storage. Final report

Offshore Application of the Flywheel Energy Storage. Final report Page of Offshore Application of the Flywheel Energy Storage Page 2 of TABLE OF CONTENTS. Executive summary... 2 2. Objective... 3 3. Background... 3 4. Project overview:... 4 4. The challenge... 4 4.2

More information

Guidelines for Modernizing Existing Electrical Switchgear in LV and MV Networks

Guidelines for Modernizing Existing Electrical Switchgear in LV and MV Networks Guidelines for Modernizing Existing Electrical Switchgear in LV and MV Networks by Georges Barbarin Executive summary Aging electrical switchgear infrastructure is a threat to the reliability of power

More information

GIBRALTAR ERDF OPERATIONAL PROGRAMME POST ADOPTION STATEMENT

GIBRALTAR ERDF OPERATIONAL PROGRAMME POST ADOPTION STATEMENT Intended for Government of Gibraltar Document type Report Date January 2015 GIBRALTAR ERDF OPERATIONAL PROGRAMME 2014-2020 POST ADOPTION STATEMENT GIBRALTAR ERDF OPERATIONAL PROGRAMME 2014-2020 POST ADOPTION

More information

Technology enablers for a fast military ship

Technology enablers for a fast military ship Technology enablers for a fast military ship Cdr P A Erskine, MA, MSc, MCGI RN 1 Defence Procurement Agency, MoD, UK Lt Cdr M T W Bolton, BEng, MSc, CEng, MIMechE, MIMarEST, RN 2 Defence Procurement Agency,

More information

Medium voltage drive for single or multimotor applications, 3 27 MW

Medium voltage drive for single or multimotor applications, 3 27 MW MV Drives, ATD, October 2009 ACS 6000 Medium voltage drive for single or multimotor applications, 3 27 MW September 19, 2012 Slide 1 Features and benefits Modular drive for single or multi-motor applications,

More information

Fuel Cell Application in a New Configured Aircraft PUBLISHABLE REPORT

Fuel Cell Application in a New Configured Aircraft PUBLISHABLE REPORT Fuel Cell Application in a New Configured Aircraft PUBLISHABLE REPORT Document Reference CELINA Publishable Report Contract Nr. AST4-CT-2005-516126 Version/Date Version 1.3 January 2009 Issued by Airbus

More information

Brochure. Synchronous generators for steam and gas turbines Proven generators reliable power

Brochure. Synchronous generators for steam and gas turbines Proven generators reliable power Brochure Synchronous generators for steam and gas turbines Proven generators reliable power We provide motors, generators and mechanical power transmission products, services and expertise to save energy

More information

THE ROYAL SOCIETY FOR THE PREVENTION OF ACCIDENTS RoSPA RESPONSE TO THE DRIVING STANDARDS AGENCY CONSULTATION PAPER

THE ROYAL SOCIETY FOR THE PREVENTION OF ACCIDENTS RoSPA RESPONSE TO THE DRIVING STANDARDS AGENCY CONSULTATION PAPER RoSPA RESPONSE TO THE DRIVING STANDARDS AGENCY CONSULTATION PAPER DRIVER CERTIFICATE OF PROFESSIONAL COMPETENCE 8 FEBRUARY 2006 DRIVER CERTIFICATE OF PROFESSIONAL COMPETENCE This is the response of the

More information

POLLUTION PREVENTION AND RESPONSE. Application of more than one engine operational profile ("multi-map") under the NOx Technical Code 2008

POLLUTION PREVENTION AND RESPONSE. Application of more than one engine operational profile (multi-map) under the NOx Technical Code 2008 E MARINE ENVIRONMENT PROTECTION COMMITTEE 71st session Agenda item 9 MEPC 71/INF.21 27 April 2017 ENGLISH ONLY POLLUTION PREVENTION AND RESPONSE Application of more than one engine operational profile

More information

Modular Standardized Electrical and Control Solutions for Fast Track Projects

Modular Standardized Electrical and Control Solutions for Fast Track Projects Modular Standardized Electrical and Control Solutions for Supporting fast track projects ABB is the leading supplier of electrical and control equipment for power plants. The company offers a comprehensive

More information

Emergi-Lite EMEX central power supply solutions

Emergi-Lite EMEX central power supply solutions Emergi-Lite EMEX central power supply solutions Reliable central back up power Available for AC/AC and AC/DC power supply systems Exceptional overload performance Entire modular build for quick and simple

More information

ABB life cycle services Uninterruptible power supplies

ABB life cycle services Uninterruptible power supplies ABB life cycle services Uninterruptible power supplies 2 ABB Life cycle brochure UPS service portfolio Life cycle services for uninterruptible power supplies As your service partner, ABB guarantees you

More information

UNINTENDED CONSEQUENCE OF THE ELECTRIC VEHICLE REVOLUTION

UNINTENDED CONSEQUENCE OF THE ELECTRIC VEHICLE REVOLUTION UNINTENDED CONSEQUENCE OF THE ELECTRIC VEHICLE REVOLUTION By Tom Grahamslaw and Paul Marsh THROUGH THE NEWS AND MEDIA, ROAD USERS ARE BECOMING MORE AWARE THAT WE ARE NOW SEEING A TRANSITION FROM THE TRADITIONAL

More information

ITD Systems Core Partners Wave 04

ITD Systems Core Partners Wave 04 ITD Systems Core Partners Wave 04 JTI-CS2-2016-CPW04-SYS Innovation Takes Off Not legally binding Network Solutions for future cockpit communications General Information Key information Topic: Networking

More information

fincantieri / marine systems and components Controllable and Fixed Pitch Propellers

fincantieri / marine systems and components Controllable and Fixed Pitch Propellers fincantieri / marine systems and components Controllable and Fixed Pitch Propellers Propellers System The largest shipbuilding group in the Mediterranean area, Fincantieri has more than fifty years of

More information

The Military Perspective on Power & Energy

The Military Perspective on Power & Energy The Military Perspective on Power & Energy Kevin Pointon & Robert Reeve Defence Science & Technology Laboratory Dstl s Role in MoD An agency of MoD Dstl provides technical advice on research programme

More information

Electrification Products United Kingdom. Buildings & Infrastructure Enhanced energy efficiency & performance

Electrification Products United Kingdom. Buildings & Infrastructure Enhanced energy efficiency & performance Electrification Products United Kingdom Buildings & Infrastructure Enhanced energy efficiency & performance About ABB Let s write the future together ABB is a pioneering technology leader that works closely

More information

For a good and. safe voyage

For a good and. safe voyage Strong in service The workplace Where enormous equipment impresses us every day. Where exceptional knowledge, advanced technologies and hard work come together. This is the place where we want to be.

More information

Compatibility Between Electric Trains and Electrification Systems

Compatibility Between Electric Trains and Electrification Systems Compatibility Between Electric Trains and Electrification Systems Synopsis Process for managing change that affects the compatibility between electric trains and electrification systems Submitted by Signatures

More information

Into the Future with E-Mobility

Into the Future with E-Mobility Into the Future with E-Mobility ZF products for hybrid and electric vehicles 2 Content 3 01 Electric Mobility 04 Electric Mobility A Megatrend with Potential 02 03 Drive Systems Products 09 10 11 12 13

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 214 Navy DATE: April 213 COST ($ in Millions) Years FY 212 FY 213 # Base OCO ## FY 215 FY 216 FY 217 FY 218 To Program Element 72.343 17.721 29.897 27.154-27.154

More information

Respecting the Rules Better Road Safety Enforcement in the European Union. ACEA s Response

Respecting the Rules Better Road Safety Enforcement in the European Union. ACEA s Response Respecting the Rules Better Road Safety Enforcement in the European Union Commission s Consultation Paper of 6 November 2006 1 ACEA s Response December 2006 1. Introduction ACEA (European Automobile Manufacturers

More information

SAIREC Panel Discussion

SAIREC Panel Discussion Text SAIREC Panel Discussion Cape Town 04-Oct-2015 Unlocking Grid Capacity for the Energy Mix Proposed in the IRP Cape Town International Convention Centre Sunday, 04 October 2015, 11:30 for 13:00 Highlights

More information

A hosting solution that is flexible and fitted

A hosting solution that is flexible and fitted A hosting solution that is flexible and fitted Case Study Vodafone Cloud and Hosting delivers flexibility and reliability to wholesale company Keller & Kalmbach. The future is exciting. The cloud that

More information

EDS: AN EUROPEAN STUDY FOR NEW DEVELOPMENTS IN AUTOMOTIVE TECHNOLOGY TO REDUCE POLLUTION

EDS: AN EUROPEAN STUDY FOR NEW DEVELOPMENTS IN AUTOMOTIVE TECHNOLOGY TO REDUCE POLLUTION EDS: AN EUROPEAN STUDY FOR NEW DEVELOPMENTS IN AUTOMOTIVE TECHNOLOGY TO REDUCE POLLUTION Prof. Dr. Ir. G. Maggetto Ir. P. Van den Bossche Vrije Universiteit Brussel Brussels, Belgium Abstract The study

More information

Reference Number PDS 18 - (RIC Standard: EP SP)

Reference Number PDS 18 - (RIC Standard: EP SP) Discipline Engineering Standard - NSW Category Electrical Title Reference Number PDS 18 - (RIC Standard: EP 06 00 00 01 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Jan 05 Standards

More information

TECHNICAL WHITE PAPER

TECHNICAL WHITE PAPER TECHNICAL WHITE PAPER Chargers Integral to PHEV Success 1. ABSTRACT... 2 2. PLUG-IN HYBRIDS DEFINED... 2 3. PLUG-IN HYBRIDS GAIN MOMENTUM... 2 4. EARLY DELTA-Q SUPPORT FOR PHEV DEVELOPMENT... 2 5. PLUG-IN

More information

Functional Decomposition of a Medium Voltage DC Integrated Power System

Functional Decomposition of a Medium Voltage DC Integrated Power System Functional Decomposition of a Medium Voltage DC Integrated Power System ASNE SYMPOSIUM 2008 SHIPBUILDING IN SUPPORT OF THE GLOBAL WAR ON TERRORISM April 14-17, 2008 Mississippi Coast Coliseum Convention

More information

IMO NOISE FROM COMMERCIAL SHIPPING AND ITS ADVERSE IMPACTS ON MARINE LIFE. Reducing underwater noise pollution from large commercial vessels

IMO NOISE FROM COMMERCIAL SHIPPING AND ITS ADVERSE IMPACTS ON MARINE LIFE. Reducing underwater noise pollution from large commercial vessels INTERNATIONAL MARITIME ORGANIZATION E IMO MARINE ENVIRONMENT PROTECTION COMMITTEE 59th session Agenda item 19 MEPC 59/19/1 6 May 2009 Original: ENGLISH NOISE FROM COMMERCIAL SHIPPING AND ITS ADVERSE IMPACTS

More information

Cooperative Research Centre for Advanced Automotive Technology

Cooperative Research Centre for Advanced Automotive Technology Cooperative Research Centre for Advanced Automotive Technology Sustainable Vehicle Technologies - Outcomes from Automotive Australia 2020 Technology Roadmap Barry Comben 5 October 2010 What is Technology

More information

The Future of Automotive and Industrial Lubricants

The Future of Automotive and Industrial Lubricants The Future of Automotive and Industrial Lubricants Ian Shannon General Manager, Automotive Lubricants Technology Definitions & Cautionary Note The companies in which Royal Dutch Shell plc directly and

More information

GEAR 2030 Working Group 1 Project Team 2 'Zero emission vehicles' DRAFT RECOMMENDATIONS

GEAR 2030 Working Group 1 Project Team 2 'Zero emission vehicles' DRAFT RECOMMENDATIONS GEAR 2030 Working Group 1 Project Team 2 'Zero emission vehicles' DRAFT RECOMMENDATIONS Introduction The EU Member States have committed to reducing greenhouse gas emissions by 80-95% by 2050 with an intermediate

More information

The cost-effective delivery of an armoured vehicle capability

The cost-effective delivery of an armoured vehicle capability Report by the Comptroller and Auditor General HC 1029 SesSIon 2010 2012 20 May 2011 Ministry of Defence The cost-effective delivery of an armoured vehicle capability 4 Summary The cost-effective delivery

More information

FIRST OF THE FRENCH BARRACUDA SUBMARINES IS READY FOR LAUNCH

FIRST OF THE FRENCH BARRACUDA SUBMARINES IS READY FOR LAUNCH aut. Maksymilian Dura 20.05.2016 FIRST OF THE FRENCH BARRACUDA SUBMARINES IS READY FOR LAUNCH The hull, of the first French Barracuda-class submarine, has been moved to the ramp which is going to be used

More information

Design Criteria and Practices for the Electric Warship

Design Criteria and Practices for the Electric Warship Dr. Norbert Doerry Design Criteria and Practices for the Electric Warship ABSTRACT NAVSEA T9300-AF-PRO-020 is the U.S. Navy s design practices and criteria manual for design of surface ship electrical

More information

Readily Achievable EEDI Requirements for 2020

Readily Achievable EEDI Requirements for 2020 Readily Achievable EEDI Requirements for 2020 Readily Achievable EEDI Requirements for 2020 This report is prepared by: CE Delft Delft, CE Delft, June 2016 Publication code: 16.7J33.57 Maritime transport

More information

2020 Sulphur Cap. Challenges and Opportunities. Delivering Maritime Solutions.

2020 Sulphur Cap. Challenges and Opportunities. Delivering Maritime Solutions. 2020 Sulphur Cap Challenges and Opportunities Delivering Maritime Solutions www.wallem.com About the Wallem Group Wallem Group is a maritime services company with headquarters in Hong Kong and an established

More information

Retrofitting unlocks potential

Retrofitting unlocks potential 54 ABB REVIEW SERVICE AND RELIABILITY SERVICE AND RELIABILITY Retrofitting unlocks potential A modern approach to life cycle optimization for ABB s drives delivers immediate performance improvement and

More information

Review of the Technical Specifications for the BCFS Intermediate Class Ferry and the provisions of the BC Ferry Commission Order 13-01

Review of the Technical Specifications for the BCFS Intermediate Class Ferry and the provisions of the BC Ferry Commission Order 13-01 BC Ferry Commission First Floor, 1312 Blanshard Street P.O. Box 9279 Victoria, British Columbia V8W 3S2 3GA Marine Ltd 505-827 Fairfield Road Victoria British Columbia V8V 5B2 Review of the Technical Specifications

More information

HIGH VOLTAGE vs. LOW VOLTAGE: POTENTIAL IN MILITARY SYSTEMS

HIGH VOLTAGE vs. LOW VOLTAGE: POTENTIAL IN MILITARY SYSTEMS 2013 NDIA GROUND VEHICLE SYSTEMS ENGINEERING AND TECHNOLOGY SYMPOSIUM POWER AND MOBILITY (P&M) MINI-SYMPOSIUM AUGUST 21-22, 2013 TROY, MICHIGAN HIGH VOLTAGE vs. LOW VOLTAGE: POTENTIAL IN MILITARY SYSTEMS

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: December 16, 2009 SUBJECT: CANADIAN CONTENT BUS PROCUREMENTS ACTION ITEM RECOMMENDATION It is recommended that the Commission

More information

HDT-RMCS DIESEL MILITARY MOTORCYCLE

HDT-RMCS DIESEL MILITARY MOTORCYCLE HDT-RMCS DIESEL MILITARY MOTORCYCLE Introduction The programme by the Royal Military College of Science [RMCS] and Hayes Diversified Technologies [HDT] to design and develop a diesel motorcycle was undertaken

More information

2018 ANSYS, Inc. ANSYS.COM

2018 ANSYS, Inc. ANSYS.COM Dramatic innovations in electrical systems are underway to increase the energy efficiency of the millions of industrial motors that power fans, pumps and compressors used around the globe. The targeted

More information

HARAS High Availability Redundant Actuation Systems

HARAS High Availability Redundant Actuation Systems HARAS High Availability Redundant Actuation Systems Project Partners: Triumph Integrated Systems (Lead), NEMA Ltd., Kugel Motion Project details: The Highly Available Redundant Actuation Systems (HARAS)

More information

Improving predictive maintenance with oil condition monitoring.

Improving predictive maintenance with oil condition monitoring. Improving predictive maintenance with oil condition monitoring. Contents 1. Introduction 2. The Big Five 3. Pros and cons 4. The perfect match? 5. Two is better than one 6. Gearboxes, for example 7. What

More information

CITY OF MINNEAPOLIS GREEN FLEET POLICY

CITY OF MINNEAPOLIS GREEN FLEET POLICY CITY OF MINNEAPOLIS GREEN FLEET POLICY TABLE OF CONTENTS I. Introduction Purpose & Objectives Oversight: The Green Fleet Team II. Establishing a Baseline for Inventory III. Implementation Strategies Optimize

More information

Pioneering MTU C&I diesel engines for U.S. EPA Tier 4

Pioneering MTU C&I diesel engines for U.S. EPA Tier 4 Technical Background Article Contact: Mirko Gutemann Phone: +49 7541 90-4741 E-mail: mirko.gutemann@tognum.com Pioneering MTU C&I diesel engines for U.S. EPA Tier 4 For more than 100 years, diesel engines

More information

Reviewed: DD Month University Code of Practice for Electrical Safety. PART B - Design and Construction of Electrical Equipment within the University

Reviewed: DD Month University Code of Practice for Electrical Safety. PART B - Design and Construction of Electrical Equipment within the University Safety Office Reviewed: 17 July 2012 Reviewed: DD Month University Code of Practice for Electrical Safety PART B - Design and Construction of Electrical Equipment within the University The purpose of this

More information

SMART DIGITAL GRIDS: AT THE HEART OF THE ENERGY TRANSITION

SMART DIGITAL GRIDS: AT THE HEART OF THE ENERGY TRANSITION SMART DIGITAL GRIDS: AT THE HEART OF THE ENERGY TRANSITION SMART DIGITAL GRIDS For many years the European Union has been committed to the reduction of carbon dioxide emissions and the increase of the

More information

Measuring equipment for the development of efficient drive trains using sensor telemetry in the 200 C range

Measuring equipment for the development of efficient drive trains using sensor telemetry in the 200 C range News Measuring equipment for the development of efficient drive trains using sensor telemetry in the 200 C range Whether on the test stand or on the road MANNER Sensortelemetrie, the expert for contactless

More information

Low and medium voltage service. Power Care Customer Support Agreements

Low and medium voltage service. Power Care Customer Support Agreements Low and medium voltage service Power Care Customer Support Agreements Power Care Power Care is the best, most convenient and guaranteed way of ensuring electrification system availability and reliability.

More information

WLTP. The Impact on Tax and Car Design

WLTP. The Impact on Tax and Car Design WLTP The Impact on Tax and Car Design Worldwide Harmonized Light Vehicle Testing Procedure (WLTP) The impact on tax and car design The Worldwide Harmonized Light Vehicle Testing Procedure (WLTP) is set

More information

Design Considerations for a Reference MVDC Power System

Design Considerations for a Reference MVDC Power System Design Considerations for a Reference MVDC Power System Chesapeake Section Meeting February 22, 2017 Tysons Corner, VA Dr. Norbert Doerry Dr. John Amy 8/11/2015 Approved for Public Release 1 Setting the

More information

committee report General Permitted Development Order SPT response to consultation

committee report General Permitted Development Order SPT response to consultation committee report General Permitted Development Order SPT response to consultation Committee Strategy and Programmes Date of meeting 24 June 2011 Date of report 1 June 2011 Report by Assistant Chief Executive

More information

Propulsion of 46,000-50,000 dwt. Handymax Tanker

Propulsion of 46,000-50,000 dwt. Handymax Tanker Propulsion of 46,-, dwt Handymax Tanker Content Introduction... EEDI and Major Ship and Main Engine Parameters...6 Energy Efficiency Design Index (EEDI)...6 Major propeller and engine parameters...7 46,-,

More information

Response of the Road Haulage Association to Transport for London s Consultation. Changes to the Ultra Low Emission Zone and Low Emission Zone.

Response of the Road Haulage Association to Transport for London s Consultation. Changes to the Ultra Low Emission Zone and Low Emission Zone. Response of the Road Haulage Association to Transport for London s Consultation Changes to the Ultra Low Emission Zone and Low Emission Zone. Summary 27 Feb 2018 1. The London Mayor is consulting on changing

More information

All over the world our clients are secure in the knowledge they are protected... PENMAN PROTECTED TM

All over the world our clients are secure in the knowledge they are protected... PENMAN PROTECTED TM All over the world our clients are secure in the knowledge they are protected... OVER 150 YEARS PENMAN Penman has been in business since 1859, evolving from a family business to become part of a UK PLC,

More information

The oil fields in the NCS are located in the North Sea, Norwegian Sea, and Barents Sea.

The oil fields in the NCS are located in the North Sea, Norwegian Sea, and Barents Sea. A.2 Norway Volumes of Associated Gas Flared on Norwegian Continental Shelf Norway is a major oil producer, and its oil fields are located offshore in the Norwegian Continental Shelf (NCS). 81 In 2002,

More information

The brain of the engine

The brain of the engine The brain of the engine Words: Dr. Jens Kohler Pictures: MTU electonic control unit The brain of a modern engine is the electronic control unit. It monitors and controls all the key functions of the engine

More information

B kv T&D GAS INSULATED SWITCHGEAR

B kv T&D GAS INSULATED SWITCHGEAR GAS INSULATED SWITCHGEAR B 105 170 300 kv The increasing demand for electrical power in cities and industrial centers necessitates the installation of a compact and efficient distribution and transmission

More information

Traction Systems GC01DTR01_C 08/2013. Ingeteam Traction

Traction Systems GC01DTR01_C 08/2013. Ingeteam Traction Traction Systems GC01DTR01_C 08/2013 Ingeteam Traction traction@ingeteam.com Vehicle control unit (VCU) Human machine interface (HMI) Traction converter Auxiliary converter INGETEAM Traction designs and

More information

When Grids Get Smart - ABB s Vision for the Power System of the Future

When Grids Get Smart - ABB s Vision for the Power System of the Future When Grids Get Smart - ABB s Vision for the Power System of the Future When Grids Get Smart ABB s Vision for the Power System of the Future There is a convergence occurring between the business realities

More information

Overview of Helicopter HUMS Research in DSTO Air Vehicles Division

Overview of Helicopter HUMS Research in DSTO Air Vehicles Division AIAC-12 Twelfth Australian International Aerospace Congress Overview of Helicopter HUMS Research in DSTO Air Vehicles Division Dr Ken Anderson 1 Chief Air Vehicles Division DSTO Australia Abstract: This

More information

About TECO-Westinghouse

About TECO-Westinghouse About TECO-Westinghouse Th e TECO-WESTINGHOUSE l e g ac y o f i n n ovat i o n a n d q ua l i t y in the design and production of electric motors and generators for the marine industry spans more than

More information

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design Presented at the 2018 Transmission and Substation Design and Operation Symposium Revision presented at the

More information

Propulsion of 30,000 dwt. Handysize Bulk Carrier

Propulsion of 30,000 dwt. Handysize Bulk Carrier Propulsion of 3, dwt Handysize Bulk Carrier Content Introduction...5 EEDI and Major Ship and Main Engine Parameters...6 Energy Efficiency Design Index (EEDI)...6 Major propeller and engine parameters...7

More information

VEDECOM. Institute for Energy Transition. Presentation

VEDECOM. Institute for Energy Transition. Presentation VEDECOM Institute for Energy Transition Presentation version 30/01/2017 TABLE OF CONTENTS 2 1. A research ecosystem unparalleled in France 2. PFA NFI - VEDECOM 3. Corporate film 4. Aim and vision of VEDECOM

More information

How do we make city buses cleaner and more comfortable?

How do we make city buses cleaner and more comfortable? How do we make city buses cleaner and more comfortable? With the intelligent and leading edge ELFA hybrid drive system Answers for industry. Economical, ecological and efficient: The intelligent response

More information

INCREASING electrical network interconnection is

INCREASING electrical network interconnection is Analysis and Quantification of the Benefits of Interconnected Distribution System Operation Steven M. Blair, Campbell D. Booth, Paul Turner, and Victoria Turnham Abstract In the UK, the Capacity to Customers

More information

Propeller Blade Bearings for Aircraft Open Rotor Engine

Propeller Blade Bearings for Aircraft Open Rotor Engine NTN TECHNICAL REVIEW No.84(2016) [ New Product ] Guillaume LEFORT* The Propeller Blade Bearings for Open Rotor Engine SAGE2 were developed by NTN-SNR in the frame of the Clean Sky aerospace programme.

More information

Mandate to CEN on the revision of EN 590 to increase the concentration of FAME and FAEE to 10% v/v

Mandate to CEN on the revision of EN 590 to increase the concentration of FAME and FAEE to 10% v/v EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT DIRECTORATE D - New and Renewable Energy Sources, Energy Efficiency & Innovation Innovation and technological development in energy Biofuels

More information

TWO TECHNOLOGIES, ONE SOLUTION

TWO TECHNOLOGIES, ONE SOLUTION TWO TECHNOLOGIES, ONE SOLUTION two technologies, one solution The smart transformer has arrived, combining two proven technologies in one revolutionary package. To save you more. The Bowers Intellivolt

More information

Cost Benefit Analysis of Faster Transmission System Protection Systems

Cost Benefit Analysis of Faster Transmission System Protection Systems Cost Benefit Analysis of Faster Transmission System Protection Systems Presented at the 71st Annual Conference for Protective Engineers Brian Ehsani, Black & Veatch Jason Hulme, Black & Veatch Abstract

More information

Optimising battery energy storage systems operation

Optimising battery energy storage systems operation Optimising battery energy storage systems operation 02/26/2015-5.17 pm Network management Renewables Smart Grids Storage Grid-tied battery energy storage systems (BESS) are promising smart grid solutions

More information

The Electrification of the Vehicle and the Urban Transport System

The Electrification of the Vehicle and the Urban Transport System The Electrification of the Vehicle Recommendations on key R&D by the European Automotive Manufacturers July 2009 Index 1. PURPOSE OF THIS DOCUMENT... 2 2. INTRODUCTION/VISION... 2 3. NEED FOR AN INTEGRATED,

More information

An overview of Directive (EU) 2015/2193 from the Power Generation business perspective

An overview of Directive (EU) 2015/2193 from the Power Generation business perspective Our energy working for you. TM Power topic #EMERPT-6194-EN Technical information from Cummins Power Generation Medium Combustion Plants Directive White Paper By Pedro Ponte, Project Application Engineer

More information

Future of Defence. Shipbuilding In India. P75 Make in India

Future of Defence. Shipbuilding In India. P75 Make in India Future of Defence Shipbuilding In India P75 Make in India Table of Contents 1. Introduction 2. Successful know-how transfer for submarine building 3. Indian Industrial Eco-System 4. Note on future of defence

More information

Hybrid Architectures for Automated Transmission Systems

Hybrid Architectures for Automated Transmission Systems 1 / 5 Hybrid Architectures for Automated Transmission Systems - add-on and integrated solutions - Dierk REITZ, Uwe WAGNER, Reinhard BERGER LuK GmbH & Co. ohg Bussmatten 2, 77815 Bühl, Germany (E-Mail:

More information

White paper: Pneumatics or electrics important criteria when choosing technology

White paper: Pneumatics or electrics important criteria when choosing technology White paper: Pneumatics or electrics important criteria when choosing technology The requirements for modern production plants are becoming increasingly complex. It is therefore essential that the drive

More information

All-Energy 2016, Glasgow. Contributing funding partners:

All-Energy 2016, Glasgow. Contributing funding partners: Can storage help reduce the cost of a future UK electricity system? Results from a project on opportunities from the deployment of energy storage, contributed to by government, industry & academic partners

More information