Glencore Xstrata Westside Story Mine Closure and Rehabilitation. Neil Rae Operations Manager

Size: px
Start display at page:

Download "Glencore Xstrata Westside Story Mine Closure and Rehabilitation. Neil Rae Operations Manager"

Transcription

1 Glencore Xstrata Westside Story Mine Closure and Rehabilitation Neil Rae Operations Manager September 201

2 Glencore - Australian Coal assets

3 Location

4 Site Description Located near Newcastle, North West of Lake Macquarie Mine Life Coaling from 1992 to 2012 Mine type Contract open cut operation Equipment - Truck and Shovel operation with Dozer push Annual ROM Production - <1Mtpa Market Domestic thermal coal Great Northern and Fassifern seams extracted 4

5 Aerial progress photographs

6 Aerial progress photographs

7 Integration of Mining sequence and rehabilitation Key Drivers No Highwalls to be left on site Minimise time between finish of mining and finish of bulk shape South Pit Minimise carbonaceous material on the surface Sequence overburden removal and de-coaling to meet these objectives 7

8 Integration of Mining sequence and rehabilitation Dump progression against East highwall Coaling direction South Pit / Future Final Void Snap shot in Sept

9 Final Void Rehabilitation - Shaping Final Void Shaping - Bulk shaping completed 1 week after coaling completed 9

10 Integration of Mining sequence and rehabilitation Final Void - Mining Completed Feb 2012 (1 x D11 on bulk shape) - Rehab completed April 2012 (1 x D6 rip/contour drains, 1 x 20t digger, 1 x 20t truck) 10

11 Rehabilitation Methodology Bulk shape Spread topsoil Contour drains Spread bulk ameliorants (Gypsum) Rip on contour Gather rocks into mounds Seed Preparation/mixing Seed/Fertiliser broadcasting 11

12 Westside Mine Rationalisation and Mine Closure 12

13 Rehabilitation Status Comments: December 2012 Rehabilitation Haul road width reduction to minimise dirty storm water run-off Bunds removed, drains constructed and revegetated with couch grass

14 Mine Closure activities Conceptual Mine Closure Plan; Annual E & C Broad Brush Risk Assessments/reviews; Pre Feasibility Constraints and Opportunities Analysis; Contamination Assessments; Kepner Tregoe Analysis of indentified land use options for each domain; OCAL Reject Emplacement Strategy; Final Void Management Plan; Closure cost reviews; Mine Closure Consultation Strategy; 14

15 Mine Closure activities (continued) Mine Closure Project Schedule; Site geotechnical analysis including slope stability; Mine Closure Risk Assessment; Final Land Use Strategy; Closure Criteria Development and sign-off; Mine Closure MOP; Westside Closure Project execution plan (Bucket list); Small workforce, redundancies/retention option, re-employment within the industry; Ongoing Land/Water Management and rehabilitation monitoring. 15

16 Mine Closure and Rehabilitation Closure Criteria Development Closure criteria were developed using more than 10 years of biodiversity and rehabilitation monitoring for inclusion in the Mine Closure MOP Each mine closure domain has its own criteria based on proposed final land use Closure criteria were approved by the Department of Resources and Energy. 16

17 Westside Mine Domains 17

18 Signed-off Closure criteria Criteria are broad, straight forward and relatively easy to assess. 18

19 Signed-off Closure criteria 19

20 Signed-off Closure criteria 20

21 Biodiversity monitoring North Pit Rehabilitation Second generation tree seedlings are present More than 75% of trees are healthy and growing No treeless areas greater than 0.5 ha are present Monitoring demonstrates considerable soil profile development 70% of nest boxes in Northern Rehabilitation occupied by native arboreal mammals. 0 native flora species present 2 native fauna species present 21

22 Rehabilitation Sign off The Dept Resources and Energy has provided confirmation that the North Pit Rehabilitation area is progressing satisfactorily towards the agreed closure criteria.

23 Biodiversity monitoring South Pit Rehabilitation High levels of species diversity (over 4 native species present) High level of regeneration and recruitment Over 40 fauna species recorded Three threatened fauna species identified 2

24 Rehabilitation South Pit Rehabilitation, near Dam E - Progression 24

25 Westside Mine - Aerial view June

26 Westside Story Video Westside s Life of Mine Rehabilitation 26

Information Meeting Transfer Station Options. September 30, 2014

Information Meeting Transfer Station Options. September 30, 2014 Information Meeting Transfer Station Options September 30, 2014 Outline of Presentation Why we are looking at changes Background on current Transfer Station Options that were considered need, function

More information

Minto North Access Design

Minto North Access Design Minto North Access Design September 3, 2014 Minto North Access Design September 2, 2014 1 Introduction This document presents an updated plan for creating an access road to the Minto North pit. It shows

More information

Laboratory worker at Goedgevonden Coal Mine

Laboratory worker at Goedgevonden Coal Mine 82 Laboratory worker at Goedgevonden Coal Mine Integrated Annual Report 2013 Operational review ARM Coal 83 ARM Coal F2013 F2012 % change ARM Coal attributable sales volumes (000t) Headline earnings Rm

More information

Quarterly Report to 30 June 2012

Quarterly Report to 30 June 2012 Quarterly Report to 30 June 2012 18 July 2012 Contents Highlights Operations Coal Renewable Energy Coal Projects and Resource Assessment New Developments Health, Safety and Environment Highlights Coal:

More information

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 TODAY WE LL TALK ABOUT Our challenges and how we re meeting them Why we re building this project Our planning process and considerations

More information

Examination of alternative mining methodologies that have the potential to increase productivity at the mine site

Examination of alternative mining methodologies that have the potential to increase productivity at the mine site Examination of alternative mining methodologies that have the potential to increase productivity at the mine site Keith Whitchurch PT SMG Consultants SMG Consultants Who are we? SMGC has been consulting

More information

Eyre Peninsula electricity supply options investigation

Eyre Peninsula electricity supply options investigation 20 November 2017 South Australia s electricity transmission specialist Eyre Peninsula electricity supply options investigation Project Assessment Draft Report Port Lincoln Public Forum electranet.com.au

More information

Garden Well Gold Deposit Diamond Drilling Confirms Gold at Depth Highlights

Garden Well Gold Deposit Diamond Drilling Confirms Gold at Depth Highlights 7 December 2010 ABN 28 009 174 761 www.regisresources.com Manager Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 Level 1, 1

More information

The Grid Link Project. Summary of the Report for the Independent Expert Panel

The Grid Link Project. Summary of the Report for the Independent Expert Panel The Grid Link Project Summary of the Report for the Independent Expert Panel Who are EirGrid - and what do we do? EirGrid is responsible for a safe, secure and reliable supply of electricity: now and in

More information

WIPP Update. Jeffrey Carswell, Deputy Manager. Carlsbad Field Office Office of Environmental Management

WIPP Update. Jeffrey Carswell, Deputy Manager. Carlsbad Field Office Office of Environmental Management WIPP Update Jeffrey Carswell, Deputy Manager Carlsbad Field Office Office of Environmental Management National Council of State Legislators June 27, 2017 www.energy.gov/em 1 WIPP Update WIPP Background

More information

PLEASE NOTE: BATCH TRUCK

PLEASE NOTE: BATCH TRUCK Material Prices Saturday Hours are seasonal: April - September ½ Yard One Yard Crushed Asphalt ¾ minus $15.00 $25.00 Crushed Concrete ¾- minus $15.00 $25.00 Crushed Concrete 1-2 / 2-3 clear $18.00 $30.00

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

PLEASE NOTE: BATCH TRUCK

PLEASE NOTE: BATCH TRUCK Material Prices Portland Sand & Gravel Co. Saturday Hours are seasonal: April - September ½ Yard One Yard Crushed Asphalt ¾ minus $15.00 $25.00 Crushed Concrete ¾- minus $15.00 $25.00 Crushed Concrete

More information

Tank Farm Additional Storage Site Layout

Tank Farm Additional Storage Site Layout MONTREAL TRUDEAU INTERNATIONAL AIRPORT MIFFC Fuel Committee Meeting Montreal Airport Marriott Hotel, June 15, 2017 Tank Farm Additional Storage Site Layout 1 Tank Farm Additional Storage - Construction

More information

Crestmont Development Update 2017 AGM

Crestmont Development Update 2017 AGM Crestmont Development Update 2017 AGM West Crestmont West Crestmont Will be built in phases finally reaching about 524 residential units. Rough grading for phases 9 & 10 already underway. First show home

More information

For personal use only

For personal use only ASX Announcement 12 January 2016 Dark Horse Resources Signs Significant Energy Development MoU with Sunset Power Pty Ltd Highlights Memorandum of Understanding executed with Sunset Power Pty Ltd for the

More information

Montour No. 10 (Bob Ciminel 2012)

Montour No. 10 (Bob Ciminel 2012) Montour No. 10 (Bob Ciminel 2012) As we continue eastward from Montour No. 4, we reach Library Junction at Mile post 35.08. The west leg of the wye takes us onto the Library Branch. After crossing Library

More information

MacKellar EPSA Capability Statement

MacKellar EPSA Capability Statement MacKellar EPSA Capability Statement The Capability Statement of MacKellar EPSA Pty Ltd. Privately owned and operated contract mining and earthmoving company, with a focus of supplying flexible, yet reliable

More information

Powering Sydney s Future

Powering Sydney s Future Powering Sydney s Future Frequently Asked Questions December 2017 Project background Q: Why is this project needed? A: Inner Sydney is one of the most critical parts of the NSW electricity network. However,

More information

CURRENT PROJECTS TO INCREASE COAL PRODUCTION & UTILIZATION. West Virginia University November 13, 2008 Bart J. Hyita

CURRENT PROJECTS TO INCREASE COAL PRODUCTION & UTILIZATION. West Virginia University November 13, 2008 Bart J. Hyita CURRENT PROJECTS TO INCREASE COAL PRODUCTION & UTILIZATION Poundstone Lecture West Virginia University November 13, 2008 Bart J. Hyita The information contained in this presentation is the property of

More information

Buzwagi - Site Presentation. March 2014

Buzwagi - Site Presentation. March 2014 African Barrick Gold Buzwagi - Site Presentation March 2014 Contents 1. Introduction 1 2. Life of Mine 7 3. Processing Operations 17 4. Cost Improvements 20 5. Summary 27 1 Biography Philbert Rweyemamu

More information

Hutchinson WWTF Solar PV EP4-41

Hutchinson WWTF Solar PV EP4-41 Hutchinson WWTF Solar PV EP4-41 John Paulson Project/Environmental/Regulatory Manager April 12, 2016 Site Preparation Panoramic 2 Site Preparation Aerial 3 Ballast Piers 18 H x 30 D - 410 total 4 5 6 7

More information

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside

Sepulveda Pass Corridor Systems Planning Study Final Compendium Report. Connecting the San Fernando Valley and the Westside Los Angeles County Metropolitan Transportation Authority November 2012 Connecting the San Fernando Valley and the Westside Interstate 405 Sepulveda Pass THIS PAGE INTENTIONALLY LEFT BLANK Sepulveda Pass

More information

Appendix E3. Open Pit Pioneering and Pre-production

Appendix E3. Open Pit Pioneering and Pre-production Appendix E3 Open Pit Pioneering and Pre-production File Note From: George Dermer To: File Date: January 11, 2012 Re: KSM Mitchell Pit Mine Pre-Production and Start-up plan Summary: Pre-Production mining

More information

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES: TransWest Express Transmission Project TABLE OF CONTENTS 7.0 DESIGN OPTIONS... 7-1 7.1 OVERVIEW OF DESIGN OPTIONS... 7-1 7.2 DESIGN OPTIONS PURPOSE AND NEED AND DESIGN CHARACTERISTICS... 7-4 7.2.1 Design

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

SWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING

SWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING SWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 8 NOVEMBER 13 TH TO NOVEMBER 18 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1

More information

Abstract. General N BANDA

Abstract. General N BANDA Abstract General For mining operations, both underground and open cast, there are generally accepted criteria used to arrive at the optimum mining method with which to exploit the ore body economically.

More information

ASX RELEASE. PAK receives drilling permit for Elko Coking coal project. Summary

ASX RELEASE. PAK receives drilling permit for Elko Coking coal project. Summary ASX RELEASE ASX Release Tuesday 24 April 2018 ASX Code PAK About Us Pacific American Coal Limited (the Company) is focused on the production, development and exploration of metallurgical coal assets in

More information

EMGA Mitchell McLennan Pty Limited (EMM) has been engaged to complete quarterly attended noise

EMGA Mitchell McLennan Pty Limited (EMM) has been engaged to complete quarterly attended noise 12 December 2014 Level 5, 21 Bolton Street Newcastle NSW 2300 PO Box 506 Leonard Sharp Environment and Community Liaison Officer Broken Hill Operations Pty Ltd CBH Resources Rasp Mine Newcastle, NSW, 2300

More information

Reed Job Index: September 2010

Reed Job Index: September 2010 Reed Job Index: September 2010 The Reed Job Index tracks the number of new job opportunities and the salaries on offer compared to the previous month and against a baseline of 100 set in December 2009.

More information

DP-5 Machine Operation and Controls:

DP-5 Machine Operation and Controls: DP-5 Machine Operation and Controls: 1. PR 5A : Vehicle Interactions (Levels 7 9) Performance Requirements User Requirements Development Tool (pending) UG Electric UG Diesel Surface Test Configurations

More information

ALL AMERICAN CANAL LINING PROJECT. CM Status as of July 31, 2008

ALL AMERICAN CANAL LINING PROJECT. CM Status as of July 31, 2008 ALL AMERICAN CANAL LINING PROJECT CM Status as of 1 AACLP STATIONS 2 Reach 1A Reach 1B Reach 2 Reach 3 Reach 2 2 SAFETY 3 Monthly Injury/Illness Data KPC 0 Recordable accidents for the month of 1 Recordable

More information

PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES

PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES PRESENTATION BY ENERGY COMMISSION OF GHANA ON TACKLING POWER SYSTEM LOSSES 1 PRESENTATION OUTLINE Generation System Demand Outlook Existing Generation Resources Transmission System National Interconnected

More information

126m strike length vein averaging 42.37g/t gold

126m strike length vein averaging 42.37g/t gold ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 16 th July, 2012 Phase 3: Longitudinal Surface Vein Sampling Extends the Western Limb of Old Pirate Beyond Existing Resource with: 126m strike length vein averaging

More information

Building on success - growing the Pilbara. Greg Lilleyman President, Pilbara Operations

Building on success - growing the Pilbara. Greg Lilleyman President, Pilbara Operations Building on success - growing the Pilbara Greg Lilleyman President, Pilbara Operations 2 Guideline Rio Tinto, in context The Pilbara integrated operations Rio Tinto s major customers: some historical perspective

More information

Northern Line Extension Project

Northern Line Extension Project 1 16 TH OCTOBER 2018 Northern Line Extension Project Suresh Thiagarajan Senior Project Engineer 2 Northern Line Extension Battersea 2020 - part of the wider Northern Line story 3 Contents Project Background

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

NSWRL JUNIOR RUGBY LEAGUE COMPETITIONS. DRAFT Conferences Proposal

NSWRL JUNIOR RUGBY LEAGUE COMPETITIONS. DRAFT Conferences Proposal JUNIOR RUGBY LEAGUE COMPETITIONS DRAFT Conferences Proposal ITEMS 1. CONFERENCE COMPETITIONS. FORMAT AND AGE GROUPS. CALENDAR (PRE AND REGULAR SEASON). RULES AND BYLAWS. JUDICIARY AND CODE OF CONDUCT.

More information

Guidelines for Battery Electric Vehicles in the Underground - Mine Design

Guidelines for Battery Electric Vehicles in the Underground - Mine Design Guidelines for Battery Electric Vehicles in the Underground - Mine Design April 30 th, 2017 Presented By: Alain Richard Cheryl Allen Electrical Engineer Principal Engineer Ventilation BESTECH Vale Ontario

More information

AIRCRAFT HANGAR PINCHGUT LAKE

AIRCRAFT HANGAR PINCHGUT LAKE AIRCRAFT HANGAR PINCHGUT LAKE ABSTRACT Please find enclosed Environmental Assessment submission relating to a proposed Aircraft Hangar at Pinchgut Lake, File 200.20.2707. Calv Swift [Course title] File

More information

City Transfer Stations: Loading Services and Fees

City Transfer Stations: Loading Services and Fees STAFF REPORT ACTION REQUIRED City Transfer Stations: Loading Services and Fees Date: March 24, 2009 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Solid Waste

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 1 AUGUST 13 T H TO AUGUST 18 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

Surface Drilling Equipment. Stephan Kuhn

Surface Drilling Equipment. Stephan Kuhn Surface Drilling Equipment Stephan Kuhn Our Business Pneumatic drill rigs 196-24 September 21, 24 www.atlascopco-group.com 3 Our Business Hydraulic drill rigs 197 24 September 21, 24 www.atlascopco-group.com

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Santa Fe Calvada Mine. Final Closure of a Heap Leach Facility Case Study in Design and Construction of E-cells

Santa Fe Calvada Mine. Final Closure of a Heap Leach Facility Case Study in Design and Construction of E-cells Santa Fe Calvada Mine Final Closure of a Heap Leach Facility Case Study in Design and Construction of E-cells Site Location Location with Surrounding Topography Overall Site Layout Google Earth View History

More information

2017 MAX Program. Red & Blue Line Platform Extension. John Rhone Vice President, Capital Design & Construction June 22, 2017

2017 MAX Program. Red & Blue Line Platform Extension. John Rhone Vice President, Capital Design & Construction June 22, 2017 2017 MAX Program Red & Blue Line Platform Extension John Rhone Vice President, Capital Design & Construction June 22, 2017 Project Goals and Objectives Increase capacity: Move more passengers by 2021 with

More information

Wheatstone Project. Wheatstone Environment Protection Code of Conduct

Wheatstone Project. Wheatstone Environment Protection Code of Conduct Wheatstone Project Wheatstone Environment Protection Code of Conduct Document No: WS0-0000-HES-STD-CVX-000-00001-000 Revision: 4 Revision Date: 30 May 2014 IP Security: Public Chevron Australia Pty Ltd

More information

Bord na Móna Biodiversity Action Plan Updates

Bord na Móna Biodiversity Action Plan Updates Bord na Móna Biodiversity Action Plan 2016-2021 2018 Updates Mark McCorry 14 May 2018 Objective 1 To continue to carry out all works in line with best practice guidelines and relevant legislation across

More information

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue.

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue. January 8, 2017 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: Electric Vehicle Charging Stations New Park Board Locations RECOMMENDATION

More information

NEW GOLD RAINY RIVER MINE APPENDIX I EXCEEDANCE TABLE

NEW GOLD RAINY RIVER MINE APPENDIX I EXCEEDANCE TABLE NEW GOLD RAINY RIVER MINE APPENDIX I EXCEEDANCE TABLE Incident Spill New Gold or Contractor New Gold Spill Origin Mill Operations Date and Time Reported 2018-01-03 Product Spilled Reclaim Water Impact

More information

Presented to Council November 7, :30 p.m. More images

Presented to Council November 7, :30 p.m. More images Presented to Council November 7, 2016 3:30 p.m. More images 1 1. Capital Projects - 25 Year Forecast 2. Public Works 3. Emergency Services 4. Library 5. Community Centre s 6. Parks & Recreation 7. Administration

More information

Appendix E Water Supply Modeling

Appendix E Water Supply Modeling Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over

More information

Company ships gypsum from Flat Bay mine for first time in 28 years

Company ships gypsum from Flat Bay mine for first time in 28 years CBC Company ships gypsum from Flat Bay mine for first time in 28 years Red Moon Resources hopes to expand mining operations over next 2-3 years Lindsay Bird CBC News Posted: Sep 12, 2018 6:00 AM NT Last

More information

Environment and Climate Change Canada Clean Fuel Standard for ISCC Stakeholder Meeting North America

Environment and Climate Change Canada Clean Fuel Standard for ISCC Stakeholder Meeting North America Environment and Climate Change Canada Clean Fuel Standard for ISCC Stakeholder Meeting North America Lorri Thompson, Head Regulatory Development Fuels Section, Oil Gas and Alternative Energy Division December

More information

ATHLETICS AUSTRALIA FACILITIES & EQUIPMENT COMMITTEE RECOMMENDED PROCEDURES FOR OPERATING AND MAINTAINING ATHLETIC FACILITIES

ATHLETICS AUSTRALIA FACILITIES & EQUIPMENT COMMITTEE RECOMMENDED PROCEDURES FOR OPERATING AND MAINTAINING ATHLETIC FACILITIES FE 05/4 ATHLETICS AUSTRALIA FACILITIES & EQUIPMENT COMMITTEE RECOMMENDED PROCEDURES FOR OPERATING AND MAINTAINING ATHLETIC FACILITIES MAINTENANCE Introduction A synthetic surfaced athletic facility is

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

Group 3: Pricing from 1 April 2018 and load management

Group 3: Pricing from 1 April 2018 and load management Group 3: Pricing from 1 April 2018 and load management This document is intended to provide background to Network Tasman s Group 3 pricing, in particular the Regional Coincident Peak Demand (RCPD) price,

More information

Heavy Truck Conflicts at Expressway On-Ramps Part 1

Heavy Truck Conflicts at Expressway On-Ramps Part 1 Heavy Truck Conflicts at Expressway On-Ramps Part 1 Posting Date: 7-Dec-2016; Revised 14-Dec-2016 Figure 1: Every day vast numbers of large and long trucks must enter smoothly into high speed truck traffic

More information

Strategies for Promoting CMM Project Development in India

Strategies for Promoting CMM Project Development in India Strategies for Promoting CMM Project Development in India A.K. Singh CMD, CMPDI Co-Chair, Coal Sub-Committee Methane to Markets Cagliari, Italy 29-30 April,2008 Strategies for Promoting CMM Project Development

More information

Precision Station Stopping Progress Update

Precision Station Stopping Progress Update Washington Metropolitan Area Transit Authority Precision Station Stopping Progress Update Presented to: The Board of Directors; Customer Service, Operations and Safety Committee By PlanninghDevelopmenthEngineeringhConstruction

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 1 AUGUST 20 T H TO AUGUST 25 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

National Treasury Presentation to the Standing Committee on Finance: South African Airways SOC Ltd ( SAA )

National Treasury Presentation to the Standing Committee on Finance: South African Airways SOC Ltd ( SAA ) National Treasury Presentation to the Standing Committee on Finance: South African Airways SOC Ltd ( SAA ) Presenter: National Treasury 18 November 2015 90 day Action Plan In November 2014, the Ministers

More information

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION TOWNSHIP OF UXBRIDGE P/N 05-1993 June 2011 Revised -August 2011 Prepared by: Skelton, Brumwell & Associates Inc. 93 Bell Farm Road, Suite 107 Barrie,

More information

REED Job Index: January 2012 KEY FINDINGS

REED Job Index: January 2012 KEY FINDINGS REED Job Index: uary 2012 The Reed Job Index tracks the number of new job opportunities and the salaries on offer compared to the previous month and against a baseline of 100 set in ember 2009. This monthly

More information

Proposed Dounreay - Mybster 275 kv / 132 kv

Proposed Dounreay - Mybster 275 kv / 132 kv Background Scottish Hydro-Electric Transmission Ltd (SHETL) is proposing a new 275 kilovolt (kv) (1 kilovolt = 1000volts) double circuit overhead line (OHL) between the Dounreay sub station and the new

More information

HERA PROJECT UPDATE. Loading concentrate boxes at the Hera Mine Site

HERA PROJECT UPDATE. Loading concentrate boxes at the Hera Mine Site HERA PROJECT UPDATE ASX: AMI 24 th October 2014 Further high-grade intersections from exploration drilling at the southern end of the Hera deposit Concentrate haulage commenced Process Plant in final stage

More information

Metal Bulletin Conference

Metal Bulletin Conference Sakura Ferroalloys Project Metal Bulletin Conference Singapore, 01 st April 2015 P R E S E N T E D BY: T I A A N VA N A S W EG E N D I R E C TO R A S S M A N G C H A I R M A N S A KU R A F E R R OALLOY

More information

City of Howell - January 2019 Sun Mon Tue Wed Thu Fri Sat 1

City of Howell - January 2019 Sun Mon Tue Wed Thu Fri Sat 1 City of Howell - January 2019 Sun Mon Tue Wed Thu Fri Sat 1 2 3 4 5 New Year s Day No Rubbish Collection 6 7 8 9 10 11 12 Christmas Tree Pick-up Christmas Tree Pick-up 13 14 15 16 17 18 19 /Recycle Christmas

More information

Double- and Relay- Cropping Systems for Oil and Biomass Feedstock Production in the North Central Region

Double- and Relay- Cropping Systems for Oil and Biomass Feedstock Production in the North Central Region North Central Regional SunGrant Center Annual Meeting, Indianapolis, IN Double- and Relay- Cropping Systems for Oil and Biomass Feedstock Production in the North Central Region Marisol Berti 1, B.L. Johnson

More information

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Interconnection Feasibility Study Report GIP-084-FEAS-R2 Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power

More information

Design of a new layout for sublevel caving at depth

Design of a new layout for sublevel caving at depth Caving 2018 Y Potvin and J Jakubec (eds) 2018 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-9-4 https://papers.acg.uwa.edu.au/p/1815_33_quinteiro/ Design of a new layout for sublevel caving

More information

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized General. Project information Country: Borrower: Loan number: Project Implementation Agency

More information

Jatropha Initiative KAKUTE EXPERIENCE Northern Tanzania.

Jatropha Initiative KAKUTE EXPERIENCE Northern Tanzania. Jatropha Initiative KAKUTE EXPERIENCE Northern Tanzania. Background. From year 2000-2004 the main project in Tanzania that was promoting Jatropha curcas for commercial use is ARI-Monduli and ARI- Arumeru

More information

Focus on the engineering & permitting requirements for installing a new fuel facility at the Port of Olympia;

Focus on the engineering & permitting requirements for installing a new fuel facility at the Port of Olympia; Port of Olympia Marine Fueling Station Project Fuel Dock Design Overview KPFF Consulting Engineers April 8, 2015 Fueling Station ti Feasibility Analysis Focus on the engineering & permitting requirements

More information

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min Gas Advisory Board Draft Agenda Meeting No. 1 Location: Parmelia Hilton, Swan B Room 14 Mill Street, Perth WA 6000 Date: 20 December 2011 Time: 11:15am 12:15pm Item Subject Responsible Time 1. WELCOME

More information

Minimization 36 CFR (b)

Minimization 36 CFR (b) Rico West Dolores Roads and Trails (Travel Management) Project Draft Record of Decision, Attachment 6 Travel Rule for Motor Vehicle designations of trails and areas (Minimization ) As described in the

More information

Re: 233 Armstrong Street Residential Condominium Traffic Brief

Re: 233 Armstrong Street Residential Condominium Traffic Brief 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com August 8, 2008 TO3031TOP00 BY E-MAIL: gerry.lalonde@rogers.com Spencedale Properties 7 Cobb Court Ottawa,

More information

Goods Movement Plans. Summary of Needs Assessments. January 21, 2015 GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 6

Goods Movement Plans. Summary of Needs Assessments. January 21, 2015 GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 6 Goods Movement Plans Summary of Needs Assessments January 21, 2015 GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 6 Goods Movement Vision and Goals GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT

More information

MILESTONE SUMMARY REPORT Project funding provided by customers of Xcel Energy through a grant from the Renewable Development Fund

MILESTONE SUMMARY REPORT Project funding provided by customers of Xcel Energy through a grant from the Renewable Development Fund Project Title: Sodium Sulfur Battery Energy Storage Contract Number: RD3-1 Milestone Number: 1 Report Date: May 0, 009 Reporting Period: September 007 April 008 Milestone Description: Milestone 1 - Specifications

More information

PROPOSED HELICOPTER LANDING PAD 85 MILL ROAD LARA

PROPOSED HELICOPTER LANDING PAD 85 MILL ROAD LARA PROPOSED HELICOPTER LANDING PAD 85 MILL ROAD LARA Assessment of Helicopter Noise A report Prepared on behalf of: JamCo Constructions Pty Ltd PO Box 631 Yarraville Victoria 3013 Ref: 11573-3jg March 2015

More information

Ronnie van Eeden. Senior Mining Engineer. Overview

Ronnie van Eeden. Senior Mining Engineer. Overview Senior Mining Engineer Overview is a qualified Mining Engineer with other commercial qualifications. He has 46 years of experience in the coal industry working for mining houses, the smaller coal industry,

More information

The Energy Independence and Security Act (EISA): Proposed Changes to the Renewable Fuel Standard Program (RFS2)

The Energy Independence and Security Act (EISA): Proposed Changes to the Renewable Fuel Standard Program (RFS2) The Energy Independence and Security Act (EISA): Proposed Changes to the Renewable Fuel Standard Program (RFS2) Presentation to the NAS Biofuels Workshop Madison, WI. June 23-24, 2009 1 Agenda Background

More information

Noise Impact Assessment

Noise Impact Assessment Noise Impact Assessment Deer Creek Energy Limited Joslyn North Mine Prepared For Millennium EMS Solutions Prepared By Mr. James Farquharson, CET Mr. Clifford Faszer, P. Eng. Faszer Farquharson & Associates

More information

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada Converting BRT to LRT in the Nation s Capital Ottawa, Canada John Manconi City of Ottawa Ottawa, Canada 1 The Challenge *Mackenzie King Bridge Ottawa, AM peak period 2 The Challenge Ottawa s population

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

A demonstration project for recharge in the Upper San Pedro subwatershed COMMUNITY DEVELOPMENT DEPARTMENT

A demonstration project for recharge in the Upper San Pedro subwatershed COMMUNITY DEVELOPMENT DEPARTMENT A demonstration project for recharge in the Upper San Pedro subwatershed COMMUNITY DEVELOPMENT DEPARTMENT Highway and Floodplain Cochise County Grant Grant amount- up to $1,693,265 over 3 years Components:

More information

WA LABOR Manufacturing Railcars Locally

WA LABOR Manufacturing Railcars Locally WA LABOR Manufacturing Railcars Locally A Fresh Approach for WA WA Labor Policy February 2017 MANUFACTURING Our trains, our jobs. Western Australia s economy should be strong, diverse and maximise our

More information

INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS

INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS Manitoba Infrastructure and Transportation Contract Services Branch 1630-215 Garry Street Winnipeg,

More information

Operations Center FAQs

Operations Center FAQs RICHARDSON INDEPENDENT SCHOOL DISTRICT Where all students learn, grow and succeed Operations Center FAQs Richardson ISD is constructing an operations center on vacant district land between Greenville Avenue

More information

Quarterly Activities Report

Quarterly Activities Report Quarterly Activities Report Three months ended 31 December 2017 31 January 2018 Frontier Diamonds Limited (ASX: FDX) (Frontier or the Company) is pleased to provide an overview of its key activities for

More information

4.0 TIER 2 ALTERNATIVES

4.0 TIER 2 ALTERNATIVES 4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation

More information

For personal use only

For personal use only ACN. 000 317 251 MARKET RELEASE 6 th July 2012 ROCKLANDS COPPER PROJECT (CDU 100%) ROCKLANDS DEVELOPMENT UPDATE ROCKLANDS MINERAL PROCESS PLANT COMPONENTRY ON-TRACK FOR EARLY COMPLETION - PRELIMINARY INSPECTIONS

More information

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT

COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT MINISTRY OF ENERGY AND MINERAL DEVELOPMENT COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT Dr. Stephen Robert Isabalija PERMANENT SECRETARY 13 th -15

More information

Public Information Centre

Public Information Centre Junction Street Wastewater Pumping Station & Forcemain Schedule B Municipal Class Environmental Assessment Study Public Information Centre June 28, 2017. 6:00 to 8:00 pm. The Burlington Performing Arts

More information

Sentinel & Enterprise Mines. Introductory presentation 28 August 2015

Sentinel & Enterprise Mines. Introductory presentation 28 August 2015 Sentinel & Enterprise Mines Introductory presentation 28 August 2015 1 Trident Project location 2 Orientation project layout 3 Sentinel - Zambia s newest Cu mine Updated resource published March 2012:

More information

Recommended Vision for the Downtown Rapid Transit Network

Recommended Vision for the Downtown Rapid Transit Network Recommended Vision for the Downtown Rapid Transit Network April 2008 Presentation Overview Context Transit options Assessment of options Recommended network Building the network 2 1 Rapid Our Vision Reliable

More information

STAFF REPORT. To: Planning Commission Meeting date: April 12, 2017 Item: UN Prepared by: Robert Eastman

STAFF REPORT. To: Planning Commission Meeting date: April 12, 2017 Item: UN Prepared by: Robert Eastman # 5 ) UN-15-17 LA SIERRA AUTO SALES SPECIAL USE PERMIT VEHICLE SALES PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: April 12, 2017 Item: UN-15-17 Prepared by: Robert Eastman GENERAL

More information

11 October 12, 2011 Public Hearing APPLICANT:

11 October 12, 2011 Public Hearing APPLICANT: 11 October 12, 2011 Public Hearing APPLICANT: CARING TRANSITIONS PROPERTY OWNER: HARDEE REALTY CORPORATION REQUEST: Conditional Use Permit (motor vehicle rental) STAFF PLANNER: Leslie Bonilla ADDRESS /

More information

Corus Group plc. Investor Visit Scunthorpe Works. 28 June 2005

Corus Group plc. Investor Visit Scunthorpe Works. 28 June 2005 Corus Group plc Investor Visit Scunthorpe Works 28 June 2005 Andrew Page Managing Director, Corus Construction & Industrial 1 Itinerary 10.05am 10.50am 11.10am 11.45am 12.10pm 12.50pm 13.40pm 15.00pm Presentation

More information