Route located on two parallel roadways in which one direction runs on one road and one direction on the other road. Both routes are at street level.

Size: px
Start display at page:

Download "Route located on two parallel roadways in which one direction runs on one road and one direction on the other road. Both routes are at street level."

Transcription

1 Resource Glossary EAST LINK Light Rail Illustrative Glossary Terms At-grade couplet Route located on two parallel roadways in which one direction runs on one road and one direction on the other road. Both routes are at street level. At-grade/Surface Route located at street level. Bored Tunnel Excavation of a tunnel or underground passage by way of a large drilling machine. When a tunnel is bored, surface disturbance is typically limited to stations and portals. Commuter rail Also known as Sounder in the Central Puget Sound region. A form of daily long distance travel by rail mostly during peak commuting hours. Tracks are usually shared with freight or long-distance passenger trains (Amtrak) and are run by either electric or diesel power (diesel in our region). Typically there is one station in each town or city.

2 Elevated/Aerial Structure Structure that is raised above the ground; a bridge. Column/Pier A column or pier provides structural support to an elevated structure. (Tukwila elevated track) Grade-separated Separation of transportation facilities, such as streets and rail lines, in order to eliminate potential conflicts for right-of-way travel. Guideway Trackway of an exclusive rail facility dedicated to the conveyance of train vehicles.

3 Mezzanine An intermediate floor between main floors of a building. In an elevated train station, the mezzanine would allow for the connection of two loading platforms without the need for crossing railroad tracks and could include ticket dispensing machines, information kiosks and rest areas. Operations and Maintenance (O&M) Facility Facility designed for the storage and maintenance of transit vehicles. An O & M facility for light rail operations for East Link may be 10 to 20 acres in size and include tracks for outside storage and a building for maintenance and cleaning of vehicles, as well as tracks leading to and from the facility to the main line. Overhead catenary system (OCS) System of overhead contact wires that supplies electrical power to a light rail car. Platform Can be located on either side of rail tracks or between them. Customers use platforms to enter or disembark trains. Platforms may have ticket vending machines, maps and schedules available.

4 113TH AVE SE 123RD AVE SE NE S E A T T L E 112TH AVE NE 112TH AVE NE WAY SE BOREN AVE E MADISON ST 23RD AVE NE 12TH ST NE 6TH ST AVE NE NE 8TH ST H AVE NE Lake Washington E CHERRY ST International District/ Chinatown Station E YESLER WAY MAIN ST BELLEVUE 108TH AVE SE S JACKSON ST Segment A 23RD AVE S A1 1ST AVE S 4TH AVE S AIRPORT WAY S 72ND AVE SE 76TH AVE SE LUTHER Mercer Island Park & Ride BURBANK PARK Segment A S SPOKANE ST RAINIER AVE S BEACON AVE S M L KING JR WAY S LAKE WASHINGTON BLVD W MERCER WAY 78TH AVE SE SE 40TH ST M E R C E R I S L A N D SE 36TH ST E MERCER WAY To Sea-Tac Airport ISLAND CREST WY P EN_TB SEA_Scoping_Report/Maps/Routes_For_EIS/Segment_A_Alt_DEIS_ gr Retained cut A trench; the retention of an excavated area or land by way of a reinforced or stabilized wall in order to create space for a road, structure or train tracks. Segment A I-90: from the International District/Chinatown Station in Seattle across Mercer Island to the east side of Lake Washington. 104TH AVE SE B1 BELLEVUE WAY SE SE 6TH ST B2-A 108TH AVE SE B2-A Mercer Slough West 112TH AVE SE B2-E Wilburton Park & Ride SE B2-E Slough Mercer East 8TH ST MERCER SLOUGH NATURE PARK 118TH AVE SE Kelsey LAKE Creek HILLS CONNECTOR RD BELLEVUE WAY NE NE 12TH ST NE 10TH ST NE 8TH ST NE 6TH ST 106TH AVE 108TH AVE NE Bellevue Transit Center 110TH AVE NE 116TH AVE NE NE 12TH ST Lake Bellevue NE 8TH ST BELLEVUE WAY SE C1-T C2-T NE 4TH ST NE 4TH ST Lake Washington SE 25TH ST B E A U X A R T S Segment A 106TH AVE SE B1 B2-A B2-E B1 B2-A South Bellevue Park & Ride P EN_TB SEA_Scoping_Report/Maps/Routes_For_EIS/Segment_B_Alts_DEIS_ gr Adjacent Segment Route Profile A B Segment Limit At-Grade City Limits Elevated Proposed Station 108TH AVE SE SE 34TH ST B2-E Mercer Slough East Mile MERCER SLOUGH NATURE PARK MERCER SLOUGH NATURE PARK Source: King County (2006) modified by CH2M HILL Exhibit: Alternatives to be Evaluated in the DEIS East Link Project South Bellevue: from the east side of Lake Washington through South Bellevue to SE 6th Street in Bellevue. C1-T C2-T BELLEVUE WAY NE NE 2ND ST MAIN ST SE 6TH ST 108TH AVE NE C2-T Adjacent Segment Tunnel B C Segment Limit Retained Cut C Mile to be Evaluated in the DEIS City Limits At-Grade East Link Project Proposed Station Elevated Downtown Bellevue: from SE 6th Street through downtown Bellevue to the east side of I-405. Sturtevant Creek C2-T C2-T P EN_TB SEA_Scoping_Report/Maps/Routes_For_EIS/Segment_C_Alts_DEIS_ gr Source: King Country (2006) Route Profile Exhibit: Alternatives 114TH AVE NE 116TH AVE NE

5 130TH AVE NE RD 134TH AVE NE NE 40TH ST Valley Creek Segment E R E D M O N D 520 Overlake Transit Center OLD REDMOND E1 154TH AVE NE Samamish River E4 ") NE 83RD ST Redmond Park & Ride LEARY WAY NE 164TH AVE NE Bear Creek 166TH AVE NE R E D M O N D E2 E1 E4 BEAR CREEK PKWY NE 80TH ST NE REDMOND WAY RD AVONDALE NE Bear Creek NE 76TH S 116TH AVE NE NE 16TH ST 120TH NE AVE 520 West Tributary NORTHUP WAY Goff Creek NE 20TH ST NE 24TH ST Sears Creek 148TH AVE NE 151ST AVE NE " 152ND AVE NE Overlake Park & Ride 156TH AVE NE 152ND AVE NE E1 E2 E4 E2 E1 E4 NE 12TH ST of Kelsey Creek 124TH AVE NE 132ND AVE NE 136TH PL NE NE BELLEVUE - REDMOND RD Kelsey Creek 140TH AVE NE Kelsey Creek WEST LAKE SAMMAMISH Sammamish River PARKWAY NE MARYMOOR PARK P EN_TB SEA_Scoping_Report/Maps/Routes_For_EIS/Segment_D_Alts_DEIS_ gr Source: King County (2006) Bel-Red Corridor: from NE 12th Street and 116th Avenue NE to the Overlake Transit Center TH AVE NE NE 51ST ST Lake Sammamis Segment E NE 40TH ST 172ND AVE NE Overlake Transit Center P EN_TB SEA_Scoping_Report/Maps/Routes_For_EIS/Segment_E_Alts_DEIS_ gr Source: King County ( Segment E Redmond: from north of the Overlake Transit Center to downtown Redmond. Staging Area A temporary site used for the storing and staging of construction equipment and material. (Beacon Hill Station) Subway An underground railway.

6 Tunnel Portal Exiting or entry way of a tunnel. Textual Glossary Terms Alignment Route or path of the train. Boardings Number of individuals boarding or getting on a train. If you took one train to and from a destination, you would make two (2) boardings during your round-trip. Catenary Overhead contact wire that supplies electrical power to a light rail car. Conceptual engineering Initial design steps in a project. Generally taken to represent a 5-10% level of design. Corridor Generalized travel or transportation path. The area on either side of a transportation facility. Cut-and-cover construction Method for constructing tunnels, underground stations or other underground facilities close to the surface by excavating from above and then covering the opening with a permanent lid. Density Number of units in a given area. For example, 100 residential units per acre may be considered a very densely developed acre of land.

7 Environmental Impact Statement (EIS) Public document that discloses and evaluates the potential environmental impacts of a proposed project. The EIS may be subject to State or Federal requirements. Final design Preceding actual construction, this final step of engineering design moves the project to the 100% design, ready for construction. GMA Growth Management Act. Adopted by the State of Washington to manage projected growth in a coordinated and planned fashion and direct growth to designated areas based on an area s ability to support said growth. Grade Grade or steepness of a natural or man-made incline or hill. HCT High Capacity Transit. A form of public mass transit systems capable of moving large numbers of passengers along a dedicated right-of-way. Light Rail Light rail is an electric railway powered by an overhead power source. Light rail is versatile and flexible enough to run at street level, through tunnels, or in elevated right-of-way, depending on individual routes. level boarding Station boarding from a platform that is at the same level as the low floor of the train car or bus. Used so those in wheelchairs and strollers are easily and quickly accommodated (no steps needed) and to speed loading. Low-level platforms Station platforms that are typically 14 inches high. Mitigation Specific actions required and taken to reduce the scale, size or extent of an identified impact resulting from the implementation of a major construction project. One seat ride Trip that can be completed without transferring vehicles. Preliminary engineering Advances a design to the 30% design level and further develops the details for the project before final design commences. Profile/vertical alignment Determines whether an alignment is a tunnel, elevated structure or on surface level.

8 R8A The preferred alternative adapted by I-90 Two-Way Transit and HOV project. This alternative provides HOV lanes in two existing outer roadways of the I-90 floating bridge creating two-way, all-day HOV lanes for transit and carpools. Regional Transportation Investment District/RTID Entity created by the Washington State Legislature and charged with developing a transportation package to be submitted to voters in the fall of 2007 for improving significant highways and bridges in Snohomish, King or Pierce Counties. RTID is coordinating its work with Sound Transit, which will submit a companion transit proposal to voters. Ridership Number of passengers who ride public transport systems. Right-of-way Easement or strip of land dedicated to public transportation uses and facilities. Roads & Transit Partnership Joint effort by Sound Transit and the Regional Transportation Investment District (RTID) to create the first-ever integrated set of highway, bridge and transit improvements for Snohomish, King and Pierce counties. Route Systematically assigned line or course of travel for a specific area or territory. Sound Transit Board of Directors 18-member appointed governing body of the Central Puget Sound Regional Transit Authority (Sound Transit). The Board establishes policy, provides direction, and performs oversight. Sound Transit is governed by an 18-member Board of Directors; 17 members are local elected officials, and the 18th member is the Washington State Department of Transportation Secretary. Local elected officials include mayors, city council members, county executives, and county council members from within the Sound Transit District. Currently, the Sound Transit Board includes three members from Snohomish County, ten from King County, four from Pierce County, and the State Transportation Department secretary. The Board of Directors are: John W. Ladenburg, Executive, Pierce County Connie Marshall, Councilmember, City of Bellevue, Mark G. Olson VP, City of Everett Council Julie Anderson, Councilmember, City of Tacoma, Mary-Alyce Burleigh, Councilmember, City of Kirkland Fred Butler, Deputy Council President, City of Issaquah Dow Constantine, Councilmember, King County Council David Enslow, Mayor, City of Sumner Doug MacDonald, Secretary, WSDOT Richard L. Marin, Councilmember, City of Edmonds Richard J. McIver, Councilmember, City of Seattle Greg Nickels, Mayor, City of Seattle Julia Patterson, Council Vice Chair, King County Council Larry Phillips, Councilmember, King County Council Aaron Reardon, County Executive, Snohomish County Ron Sims, County Executive, King County Claudia Thomas, Mayor, City of Lakewood Peter von Reichbauer, Councilmember, King County Council

9 Straddle Bent On an elevated structure, straddle bent is a bridge structure that straddles both sides of the street. Used when elevated light rail makes a turn. ST2 Sound Transit 2. The second phase of regional transit investments for the Central Puget Sound. Traffic signal pre-emption Ability to over-ride traffic signals in order to give priority to approaching vehicles, such as emergency vehicles. Also used in light rail systems operating at surface level. Traffic signal priority Allows specially equipped buses or trains to communicate with an approaching traffic signal and ask it to hold the green light for a bus or train. A transponder installed on the bus or train sends a signal to a controller on the traffic light. Transition structure Structure or ramp designed to transition trains from an at-grade facility to an elevated facility. Trips (are one way) Recorded one-way travel via public or private vehicle from the origin of the trip to a destination. Urban Design Concerns the arrangement, appearance and functionality of towns, cities and urban open spaces. WSDOT Washington State Department of Transportation.

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project Chapter 3 Transportation Environment and Consequences 3. Introduction This chapter summarizes the characteristics of the transportation system in the East Link Project vicinity and discusses potential

More information

2.1 Introduction. Chapter 2 Alternatives Considered

2.1 Introduction. Chapter 2 Alternatives Considered Chapter 2 Alternatives Considered 2.1 Introduction This chapter describes the alternatives and how they were developed for study in this Final Environmental Impact Statement (EIS). The 2008 Draft EIS evaluated

More information

2.1 Introduction. Chapter 2 Alternatives Considered

2.1 Introduction. Chapter 2 Alternatives Considered Chapter 2 Alternatives Considered 2.1 Introduction This chapter describes the alternatives and how they were developed for study in this Environmental Impact Statement (EIS). The alternatives described

More information

EAST LINK PROJECT. Environmental Scoping Information Report. Seattle to Bellevue to Redmond. September 2006

EAST LINK PROJECT. Environmental Scoping Information Report. Seattle to Bellevue to Redmond. September 2006 SCOPING EAST LINK PROJECT Environmental Scoping Information Report Seattle to Bellevue to Redmond September 2006 CENTRAL PUGET SOUND REGIONAL TRANSIT AUTHORITY TABLE OF CONTENTS Introduction... 2 What

More information

RTID Travel Demand Modeling: Assumptions and Method of Analysis

RTID Travel Demand Modeling: Assumptions and Method of Analysis RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel

More information

Seattle & North King County. - I Bus Connections (CHOR~E. U_Oistnct7 \( The Regional Transit Authority ... 8RegiOna, Transit Authority ~...

Seattle & North King County. - I Bus Connections (CHOR~E. U_Oistnct7 \( The Regional Transit Authority ... 8RegiOna, Transit Authority ~... -- Regional Transit Service Proposal '::::~..- Seattle & North King County!:l l:l - ~ The Regional Transit Authority is planning a regional transit system for King, Pierce and Snohomish counties. Seattle

More information

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016 2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)

More information

6.1 Performance in Meeting Project Goals and Objectives

6.1 Performance in Meeting Project Goals and Objectives Chapter 6 Alternatives Evaluation This chapter evaluates how East Link would meet the project Purpose and Need, and analyzes the benefits, environmental impacts, and cost-effectiveness of the project as

More information

A Better Transit Plan

A Better Transit Plan A Better Transit Plan for East King County Proposed by the Eastside Transportation Association September 15, 008 A Better Transit Plan Eastside cities and elected officials do not appear cognizant of the

More information

WHO IS SOUND TRANSIT?

WHO IS SOUND TRANSIT? WHO IS SOUND TRANSIT? We plan, build and operate regional transit systems and services to improve mobility in urban areas of King, Pierce and Snohomish counties. Link light rail Currently, Link light rail

More information

Central Puget Sound Regional Transit Authority. Sound Transit Transit Development Plan Annual Report

Central Puget Sound Regional Transit Authority. Sound Transit Transit Development Plan Annual Report Central Puget Sound Regional Transit Authority Sound Transit Transit Development Plan 2008-2013 2007 Annual Report Date of Public Hearing: March 13, 2008 TABLE OF CONTENTS INTRODUCTION... 2 I: ORGANIZATION...

More information

Sound Transit 2 Making Connections The Regional Transit System Plan for Central Puget Sound

Sound Transit 2 Making Connections The Regional Transit System Plan for Central Puget Sound Sound Transit 2 Making Connections The Regional Transit System Plan for Central Puget Sound Sound Transit 2: Making Connections 1 Table of contents ST2 Introduction... 4 ST2: The Future... 6 The ST2 Plan..............................................

More information

Federal Way Link Extension

Federal Way Link Extension Federal Way Link Extension Draft EIS Summary Route & station alternatives and impacts Link Light Rail System Map Lynnwood Mountlake Terrace Lynnwood Link Extension Shoreline 14th Northgate 40 Northgate

More information

PROPOSAL OF HIGH CAPACITY URBANAUT PUGET SOUND REGIONAL MONORAIL MASTERPLAN WASHINGTON STATE, USA

PROPOSAL OF HIGH CAPACITY URBANAUT PUGET SOUND REGIONAL MONORAIL MASTERPLAN WASHINGTON STATE, USA PROPOSAL OF HIGH CAPACITY URBANAUT PUGET SOUND REGIONAL MONORAIL MASTERPLAN WASHINGTON STATE, USA Not to be copied in part without reference to author Urbanaut Company Inc. Monorail Tel: 425 434-6570 Fax:

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

MOTION NO. M Identifying a Sound Transit 3 Candidate Project List for Development of a Sound Transit 3 System Plan and Directing Further Study

MOTION NO. M Identifying a Sound Transit 3 Candidate Project List for Development of a Sound Transit 3 System Plan and Directing Further Study MOTION NO. M2015-80 Identifying a Sound Transit 3 Candidate Project List for Development of a Sound Transit 3 System Plan and Directing Further Study MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Board

More information

HIGH CAPACITY TRANSIT CORRIDOR STUDY UTILITIES TRANSPORTATION ECOSYSTEMS DEMOGRAPHICS TECHNICAL MEMORANDUM 12/20/2013 7/17/2014 DRAFT

HIGH CAPACITY TRANSIT CORRIDOR STUDY UTILITIES TRANSPORTATION ECOSYSTEMS DEMOGRAPHICS TECHNICAL MEMORANDUM 12/20/2013 7/17/2014 DRAFT HIGH CAPACITY TRANSIT CORRIDOR STUDY FEDERAL WAY TO TACOMA REPORT LEVEL 2 OPTIONS EVALUATION 12/20/2013 7/17/2014 DRAFT CULTURAL, VISUAL UTILITIES TRANSPORTATION PROPERTY PARKS NOISE LAND HAZARDOUS ECOSYSTEMS

More information

City of Bellevue East Link Light Rail B7/C9T to NE 2nd Portal (B7 Revised) Alternative RP03 Interim Analysis Report

City of Bellevue East Link Light Rail B7/C9T to NE 2nd Portal (B7 Revised) Alternative RP03 Interim Analysis Report East Link Light Rail B7/C9T to NE nd Portal (B7 Revised) Alternative RP3 Interim Analysis Report 538/RP3 Review Draft 3 May Arup North America Ltd 43 Columbia Street Suite Seattle WA 984 United States

More information

Sound Transit East Link: Bus/LRT System Integration Study

Sound Transit East Link: Bus/LRT System Integration Study Sound Transit East Link: Bus/LRT System Integration Study Prepared For: Sound Transit King County Metro Mercer Island WSDOT Prepared By: CH2M HILL July, 2014 1 SOUND TRANSIT EAST LINK: BUS/LRT SYSTEMES

More information

Attachment E3 Vibration Technical Memorandum

Attachment E3 Vibration Technical Memorandum Attachment E3 Technical Memorandum 77 South Bedford Street Burlington, MA 01803 T 781.229.0707 F 781.229.7939 E jross@hmmh.com W www.hmmh.com TECHNICAL MEMORANDUM To: Alisa Swank, CH2M HILL Jodi Ketelsen,

More information

Sound Transit 3. Appendix C: Benefits, Costs, Revenues, Capacity, Reliability, and Performance Characteristics

Sound Transit 3. Appendix C: Benefits, Costs, Revenues, Capacity, Reliability, and Performance Characteristics Sound Transit 3 Appendix C: Benefits, Costs, Revenues, Capacity, Reliability, and Performance Characteristics Table of contents Introduction... 4 Background... 5 Benefits of ST3 investments in the regional

More information

29 April Sound Transit 3 Draft Plan. Dear Sound Transit Boardmember:

29 April Sound Transit 3 Draft Plan. Dear Sound Transit Boardmember: 29 April 2016 Re: Sound Transit 3 Draft Plan Dear Sound Transit Boardmember: Thank you for the opportunity to comment on the Sound Transit 3 Draft Plan. Sierra Club supports transportation policies that

More information

1.0 Purpose and Need for Federal Way Link Extension

1.0 Purpose and Need for Federal Way Link Extension 1.0 Purpose and Need for Federal Way Link Extension The Central Puget Sound Regional Transit Authority (Sound Transit) is proposing the Federal Way Link Extension (FWLE) to expand the regional light rail

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

Chapter 4 : THEME 2. Transportation

Chapter 4 : THEME 2. Transportation Chapter 4 : THEME 2 Strengthen connections to keep the Central Area easy to reach and get around 55 Figure 4.2.1 Promote region-wide transit investments. Metra commuter rail provides service to the east,

More information

Summary. S.1 Lynnwood Link Extension

Summary. S.1 Lynnwood Link Extension Summary S.1 The Central uget Sound Regional Transit Authority (Sound Transit) is proposing to build and operate the, which would expand the regional light rail system from Seattle to Lynnwood, Washington.

More information

Link LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion

Link LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion Project Number SYS-LRT Subareas All Primary Mode Impacted Link Facility Type Link Service Version Number 4.0 Date Last Modified 7/24/2008 Project Locator Map Short Project Description Construct new light

More information

Level 2 Alternatives Screening Report

Level 2 Alternatives Screening Report FEDERAL WAY TRANSIT EXTENSION Level 2 Alternatives Screening Report CENTRAL PUGET SOUND REGIONAL TRANSIT AUTHORITY Table of Contents 1.0 Executive Summary 1.1 Purpose of This Report. 1 1 1.2 Purpose and

More information

Organization. SDOT Date and Commute Seattle. Dave Sowers, Deputy Program Administrator

Organization. SDOT Date and Commute Seattle. Dave Sowers, Deputy Program Administrator Organization SDOT Date and Commute Seattle Dave Sowers, Deputy Program Administrator October 22, 2018 TODAY S FOCUS The big picture #Realign99 closure/opening the tunnel Removal, decommissioning, surface

More information

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars. Sound Transit Phase 2 South Corridor LRT Design Report: SR 99 and I-5 Alignment Scenarios (S 200 th Street to Tacoma Dome Station) Tacoma Link Extension to West Tacoma Prepared for: Sound Transit Prepared

More information

3.0 Transportation Environment and Consequences

3.0 Transportation Environment and Consequences 3.0 Transportation Environment and Consequences 3.1 Summary This chapter describes the characteristics of the transportation system in the FWLE vicinity and discusses potential impacts and mitigation measures

More information

Leadership NC. November 8, 2018

Leadership NC. November 8, 2018 v Leadership NC November 8, 2018 Planning for our region s growth The Triangle is one of the fastestgrowing regions in the nation. More than 2 million people are already part of the equation, and the

More information

Transit Development Plan and 2013 Annual Report

Transit Development Plan and 2013 Annual Report Transit Development Plan 2014-2019 and 2013 Annual Report Public Hearing Held: October 2, 2014 Operations and Administration Committee Referral to Board: October 2, 2014 Board of Directors Approval for

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost.

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost. Policy Note Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost Recommendations 1. Saturate vanpool market before expanding other intercity

More information

Fall 2018 Guide to SERVICE EXPANSION. and FARE CHANGE

Fall 2018 Guide to SERVICE EXPANSION. and FARE CHANGE Fall 2018 Guide to SERVICE EXPANSION and FARE CHANGE Fall 2018 Guide Service Expansion & Fare Change This fall, Community Transit is adding more trips on popular routes, and changing some routes to serve

More information

SUMMARY. North Corridor Transit Project Alternatives Analysis Report S.1 INTRODUCTION. What is the Sound Transit 2 (ST2) Plan?

SUMMARY. North Corridor Transit Project Alternatives Analysis Report S.1 INTRODUCTION. What is the Sound Transit 2 (ST2) Plan? North Corridor Transit roject Alternatives Analysis Report S.1 INTRODUCTION The Central uget Sound Regional Transit Authority (Sound Transit) intends to expand regional transit service in the North Corridor,

More information

4.0 TIER 2 ALTERNATIVES

4.0 TIER 2 ALTERNATIVES 4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation

More information

Evaluation of Joint Operations in the Downtown Seattle Transit Tunnel

Evaluation of Joint Operations in the Downtown Seattle Transit Tunnel Evaluation of Joint Operations in the Downtown Seattle Transit Tunnel Revised 9-17-01 Table of Contents EXECUTIVE SUMMARY... iii 1. INTRODUCTION...1 1.1 Purpose... 1 1.2 Downtown Seattle Transit Tunnel

More information

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY EXECUTIVE SUMMARY The purpose of this report is to document the results of the Tier 1 and Tier 2 Screening of alternatives for the I-20 East Transit Initiative. The two-tier screening process presented

More information

PUBLIC TRANSPORTATION

PUBLIC TRANSPORTATION PUBLIC TRANSPORTATION An Overview of the Industry, Key Federal Programs, and Legislative Processes American Public Transportation Association 1 The Public Transportation Industry: What is "public transportation"?

More information

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017 Elected Officials Briefing North Metro Rail Line Update February 9, 2017 Dave Genova, RTD General Manager and CEO Openings 2016-2017 Flatiron Flyer, Jan. 3, 2016 University of Colorado A Line, April 22,

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

Link Light Rail Operations and Maintenance Satellite Facility

Link Light Rail Operations and Maintenance Satellite Facility September 2015 Link Light Rail Operations and Maintenance Satellite Facility TRANSPORTATION TECHNICAL REPORT Appendix E1 Central Puget Sound Regional Transit Authority Appendix E.1 TABLE OF CONTENTS PROJECT

More information

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project MOTION NO. M2014 64 Preferred Alternative for the Puyallup Station Access Improvement Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 8/14/14 8/28/14 Recommendation

More information

East Link Extension. September 16, Bel-Red Conclusion to Final Design Open House Public Involvement Summary

East Link Extension. September 16, Bel-Red Conclusion to Final Design Open House Public Involvement Summary East Link Extension September 16, 2014 Bel-Red Conclusion to Final Design Open House Public Involvement Summary Table of contents 1 Background 2 Overview 2 Notification 3 Open House Overview 4 Comment

More information

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner Metro Transit Update Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office John Dillery, Senior Transit Planner Metro Transit Service Development May 16, 2013 1 Transit Planning

More information

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit 1. Plan It Calgary the new Municipal Development Plan and Calgary

More information

Proposed Downtown Miami Link

Proposed Downtown Miami Link March 30, 2016 Proposed Downtown Miami Link A PUBLIC PRIVATE PARTNERSHIP Presented to: Secretary Boxold, FDOT Presented by: Jack Stephens, Executive Director, SFRTA March 30, 2016 Downtown Miami Link Costs

More information

Strategies to keep people and goods moving in and through Seattle

Strategies to keep people and goods moving in and through Seattle Strategies to keep people and goods moving in and through Seattle SR 99 Closure and the Seattle Squeeze 2018-2024 DON Information Session Department of Transportation Delridge Community Center November

More information

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Exhibit A Sound Transit Board Resolution R2016-07 Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Access Improvement Project. RESOLUTION NO. R2016-07 Selecting

More information

DART Priorities Overview

DART Priorities Overview City of Dallas Transportation and Trinity River Project Committee DART Priorities Overview Gary C. Thomas President/Executive Director August 10, 2015 City of Dallas Transportation & Trinity River Committee

More information

Sepulveda Pass Corridor Systems Planning Study Update

Sepulveda Pass Corridor Systems Planning Study Update Los Angeles County Metropolitan Transportation Authority Sepulveda Pass Corridor Systems Planning Study Update June 20, 2012 Measure R Transit Corridors One of 12 Measure R Transit Corridors approved by

More information

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections

More information

Central Loop Bus Rapid Transit

Central Loop Bus Rapid Transit Central Loop Bus Rapid Transit Transportation Goals of the Chicago Central Area ACTION Plan, page 2-6 Central Area Plan Improve Transit in Central Area Improve Pedestrian Environment Manage Traffic Circulation

More information

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master

More information

3.0 Transportation Environment and Consequences

3.0 Transportation Environment and Consequences 3.0 Transportation Environment and Consequences 3.1 32BSummary This chapter describes the characteristics of the transportation system in the Federal Way Link Extension (FWLE) vicinity and discusses potential

More information

Tempe Streetcar. March 2, 2016

Tempe Streetcar. March 2, 2016 Tempe Streetcar March 2, 2016 Tempe Profile 40 sq. miles, highest density in state University Town, center of region Imposed growth boundaries (density increase) Mixed use growth/intensifying land use

More information

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016 Elected Officials Briefing North Metro Rail Line Update November 10, 2016 Dave Genova, RTD General Manager and CEO Five lines opening in 2016 Flatiron Flyer, Jan. 3 University of Colorado A Line, April

More information

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012 Station Evaluation Durham-Orange Light Rail Transit Project Spring 2012 Key Ingredients for Station Development Platform Designs UNC Hospitals Station The UNC Hospitals Station Option D would be the westerly

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

Sound Transit Operations July 2016 Service Performance Report. Ridership

Sound Transit Operations July 2016 Service Performance Report. Ridership Ridership Total Boardings by Mode Mode Jul-15 Jul-16 % YTD-15 YTD-16 % ST Express 1,618,779 1,545,852-4.5% 10,803,486 10,774,063-0.3% Sounder 333,000 323,233-2.9% 2,176,914 2,423,058 11.3% Tacoma Link

More information

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS 2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak

More information

7 COMPARATIVE EVALUATION OF ALTERNATIVES

7 COMPARATIVE EVALUATION OF ALTERNATIVES 7 COMPARATIVE EVALUATION OF ALTERNATIVES 7.1 INTRODUCTION This chapter presents the comparative analysis of the four Level 2 build alternatives along with a discussion of the relative performance of the

More information

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) PLEASE SIGN IN

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) PLEASE SIGN IN WELCOME TO OUR PUBLIC OPEN HOUSE EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) Preliminary Planning for a Transit Project Assessment June 15, 17, 18, 23, 24 and 25, 2009 PLEASE SIGN IN Members of the Project

More information

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018 I-405 and SR 522/NE 145th Bus Rapid Transit Elected Leadership Groups Meeting November 30, 2018 Agenda Welcome and Introductions Public Comment BRT Connection in Bothell Common Elements: Bus base, Station

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

THE WAY WE MOVE LRT FOR EVERYONE

THE WAY WE MOVE LRT FOR EVERYONE THE WAY WE MOVE LRT FOR EVERYONE 2 LRT for Everyone LRT FOR EVERYONE Light rail is about more than transit; it s about transforming Edmonton. As the city grows, so do its transportation needs. LRT is an

More information

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, is now called the Valley Line. We are here to present

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

East Link light rail: Bel-Red/Overlake Open House Summary

East Link light rail: Bel-Red/Overlake Open House Summary East Link light rail: Bel-Red/Overlake Open House Summary April 2010 East Link Light Rail Project Overview East Link is Sound Transit s voter-approved project to build light rail between Seattle and the

More information

Transportation Technical Report

Transportation Technical Report Transportation Technical Report Puyallup Station Access Improvements Transportation Technical Report 4 South Jackson Street Seattle, WA 984 2826 February 26 This Page Intentionally Left Blank Puyallup

More information

WAKE TRANSIT PLAN Summer 2018

WAKE TRANSIT PLAN Summer 2018 WAKE TRANSIT PLAN Summer 2018 Planning for growth WAKE COUNTY s population already exceeds ONE MILLION and grows by more than 60 people a day. That s 23,000 people a year or basically another Morrisville.

More information

Southern California - CHSRA

Southern California - CHSRA CALIFORNIA HIGH-SPEED RAIL Michael Gillam, Deputy Program Director Southern California - CHSRA CMAA - Construction Management Association of America July 19, 2012 CALIFORNIA S HIGH-SPEED TRAIN SYSTEM Largest

More information

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] Jackson/Teton Integrated Transportation Plan 2015 Appendix I. Fixed-Guideway Transit Feasibility Jackson/Teton County Integrated Transportation Plan v2

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT)

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) WELCOME TO OUR PUBLIC OPEN HOUSE EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) Preliminary Planning for a Transit Project Assessment Open House Martin Grove Road to Pearson International Airport September

More information

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017 Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017 Background PSRC s 2017 funding: Rural Town Centers and Corridor program Regional FTA competition May - Board released projects

More information

SEPULVEDA PASS CORRIDOR

SEPULVEDA PASS CORRIDOR SEPULVEDA PASS CORRIDOR PUBLIC PRIVATE PARTNERSHIP DELIVERY PRE-DEVELOPMENT AGREEMENT PDA Sepulveda Pass Mobility Issues Most congested highway segment in the U.S. 295,000 vehicles per day (2010) 430,000

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis Transit Coalition September 26, 2012 2 Study Area Pacific Electric Rightof-Way/West Santa Ana Branch (PEROW/ WSAB) extends

More information

Extending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process

Extending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process Extending TRACKS Issue 5 Spring 2014 Preliminary design plan review underway Public comment and approval process in May & June Residents and businesses along the Southwest LRT (METRO Green Line Extension)

More information

Chicago Milwaukee Intercity Passenger Rail Corridor

Chicago Milwaukee Intercity Passenger Rail Corridor Chicago Milwaukee Intercity Passenger Rail Corridor Past, Present, and Future Arun Rao, Passenger Rail Manager Wisconsin Department of Transportation Elliot Ramos, Passenger Rail Engineer Illinois Department

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

East Link Extension. July 8, Mercer Island Final Design Open House Public Involvement Summary

East Link Extension. July 8, Mercer Island Final Design Open House Public Involvement Summary East Link Extension July 8, 2013 Mercer Island Final Design Open House Public Involvement Summary Table of Contents 1 Background 2 Overview 2 Notification 3 Open House Overview 4 Comment Summary 4 Mercer

More information

Central Link Initial Segment and Airport Link Before & After Study. Final Report (Draft)

Central Link Initial Segment and Airport Link Before & After Study. Final Report (Draft) Central Link Initial Segment and Airport Link Before & After Study Final Report (Draft) April 2013 initial segment b&a study final report 2013_04_01 draft.docx (this page left blank intentionally) Table

More information

engineering phase and during the procurement of design build contracts.

engineering phase and during the procurement of design build contracts. CONSIDERATION OF ALTERNATIVES Below-grade trench alignment along Aviation Boulevard, adjacent to LAX south runways. miles. MOS-Century would extend from the Metro Exposition Line to the Aviation/ Century

More information

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington DESIGN DEVIATION NOs. 1 & 2 Horizontal Stopping Sight Distance and Shoulder Width Reduction SR 99 S. Holgate St to S. King St. Viaduct Replacement Stage 2 MP 29.89 TO MP 30.78 XL-3237 PIN-809936D June

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Transit on the New NY Bridge

Transit on the New NY Bridge Transit on the New NY Bridge TZB Cross Section North bridge incorporating 12ft shared use path and space for future bus lane South bridge with space for a future bus lane Gap between the two decks for

More information

Transit Access Study

Transit Access Study West of Hudson Regional Transit Access Study Open House presentation July 20, 2010 1 Agenda Progress To date Summary of Level 2 Alternatives and Screening Service Plans Bus and Rail Operating and Capital

More information

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results Public Meeting Wulf Grote, Director Project Development Rick Pilgrim, Project Manager March 4 & 5, 2008 Today s Agenda Overview of Alternatives

More information

Midtown Corridor Alternatives Analysis Key Issues Memo

Midtown Corridor Alternatives Analysis Key Issues Memo Midtown Corridor Alternatives Analysis Key Issues Memo 1/4/2013 Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 1. Markets... 1 External Markets... 1 Intra-Corridor Travel...

More information

Quarterly Update Meeting

Quarterly Update Meeting Quarterly Update Meeting December 6, 2011 www.dcstreetcar.com / hotline: (855)413-2954 Agenda I. Welcome II. System Overview III. Project Update IV. Upcoming Meetings V. Stay Connected Provided by DC Streetcar

More information

NICTI Alternatives Analysis

NICTI Alternatives Analysis EXECUTIVE SUMMARY Development of Detailed Alternatives Report Prepared for: Northern Illinois Commuter Transportation Initiative City of Rockford, Illinois Prepared by: 222 South Riverside Plaza, Suite

More information

Welcome. Please Sign In

Welcome. Please Sign In Welcome South Bay Bus Rapid Transit (BRT) Draft Environmental Impact Report (DEIR) Public Meeting Please Sign In Please comment in any of the following manners: 1. Submit a comment form 2. Provide verbal

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information