1 MBTA Key Bus Route Improvement Program Community Meeting Route 57 - Boston January 31, 2011 Boston Arts Academy, 174 Ipswich St., Boston Agenda Welcome and introductions Safety briefing/accommodations Key Bus Route Program overview Existing conditions Route 57 Preliminary recommendations Next Steps Discussion 2
2 Introduction 15 Key Bus Routes $10 million funding 3 Key Bus Route Goals Reliability less bus bunching Faster service fewer delays, less stops, shorter trip times Improved accessibility for seniors and persons with disabilities Passenger amenities shelters, benches, signage, trash barrels 4
3 Route 57: Overview Watertown Yard / Oak Sq to Kenmore Sta Via Newton Cnr, Brighton Ctr, Union Sq & Packard s Cnr. BU, Agganis Arena, Fenway Park, St. Elizabeth s Medical Center 5.7 miles long Run Time Varies by Time of Day (approx min) Connects to: Green Line & 17 Bus Routes KBR 66, 71 Route 57: Overview MBTA s 5 th Busiest Route Over 11,500 daily boardings Peak Hour Headways Every 6-10 minutes On-Time Performance 71% weekdays Source: MBTA s 2008 Biennial Service Plan 86 stops 44 Inbound (to Kenmore) 42 Outbound (to Watertown)
4 Typical Conditions - Bus stop length too short Typical Conditions - Poorly located boarding area
5 Typical Conditions - Proximity of bus stops Signage 10
6 Bus Stop Spacing Ideal spacing is 4-7 stops per mile (every 750-1,320 ft) (4-6 minutes walking distance) Route 57 has stops as close as 330 ft 11 Factors for Improving Stop Locations Ridership customer boardings and alightings Proximity to schools, medical centers etc Distance to adjacent stops Reducing traffic congestion Parking impacts Potential to add amenities shelters, benches etc. 12
7 Bus Stop Consolidation Benefits Shortens bus trip times Improves service reliability Minimizes stop & go experience Provides additional parking spaces Ability to provide better stop amenities 13 Good bus stop locations: Sufficient length to pull to the curb Clear boarding/alighting area Not blocking crosswalks or driveways Proper Spacing Considerate of adjacent traffic 14 1/19/2011
8 Improved Accessibility Legal Mandate All bus doors must open at curb Deter cars from parking in stops Providing accessible curb access requires longer bus stops Bus Stops must meet Current Guidelines for 40 buses Leading the Nation in Transportation Excellence 15 Farside 60ft Nearside 80ft Required Bus Stop Lengths 40 bus 16 Midblock (or after left hand turn) 100ft
9 Add Pavement Markings Improved Passenger Comfort & Convenience Install shelters where possible Weather protection, seating, comfort New street furniture Shelters, benches, trash barrels 18
10 New Bus Shelters 19 Rest on a New Bench 20
11 Example : Before & After Bus Stop Improvements Proposed Proposed with Amenities Improving Customer Information 22
12 Clear Customer Information Sign upgrades Schedules at stops Maps on buses Neighborhood maps Next bus countdown system 23 Reliability Issues 24
13 Improving Reliability 25 1/19/2011 Traffic Signal Improvements
14 Preliminary Recommendations 27 Tremont Tip Top Remove stops to improve bus stop spacing and due to insufficient bus stop length
15 Washington Fairbanks St Consolidate with Montfern Ave to nearside of Oak Square Ave. 977 Proposed Washington Brock St Lengthen stop. Add trash receptacle
16 Washington Foster St IB Relocate farside. Add bench & trash receptacle. 917 Proposed 31 Washington Market St & Leicester St. Consolidate at Market St farside. Add shared right turn/bus lane in former Market St stop location Proposed
17 Washington Waldo Ter Relocate to farside. Add bench (with abutter permission) & trash receptacle Proposed Cambridge Warren St IB Remove stop to improve bus stop spacing. 34 February 1, 2011 Leading the Nation in Transportation Excellence
18 Cambridge Eleanor St & Dustin St. Remove stop due to low ridership and to improve bus stop spacing Cambridge Gordon St IB Relocate stop back from intersection. 924 Proposed 36
19 Brighton Linden St & Harvard Ave. Remove stops to improve bus stop spacing Packards Corner Consolidate inbound stops and remove outbound stop to improve spacing and provide amenities proposed
20 Comm Agganis Way Remove stop to improve bus stop spacing and poorly located bus stop Comm Pleasant St IB Consolidate with St Paul to improve bus stop spacing and provide a safer bus stop location. Add shelter, bench, & trash receptacle. 934 Proposed
21 Comm Armory St Remove stop due to low ridership and proximity of next stop 955 Summary of Preliminary Recommendations Add shelters, benches, trash receptacles Stops lengthened for accessibility Stops relocated Stops consolidated Current Stop Plan 44 IB/ 42 OB Proposed Stop Plan 30 IB/ 29 OB Investigating traffic signal improvements Sidewalk improvements/curb extensions 42 1/19/2011
22 Public Outreach 43 44
23 Comments and Next Steps Project Updates at Mail to Operations and Service Development, 45 High St, Boston, MA to Next community meeting Route 66: February 2, 6:30 PM Brookline Town Hall, 333 Washington St. Discussion 45 Community Meeting Dates 46
24 Discussion These are PRELIMINARY RECOMMENDATIONS We want to hear from you! 48
MBTA Key Bus Route Improvement Program. Community Meeting Route 66 Allston/Brighton
MBTA Key Bus Route Improvement Program Community Meeting Route 66 Allston/Brighton January 19, 2011 Honan-Allston Library 300 North Harvard Street Agenda Welcome and introductions Safety briefing/accommodations
More informationMBTA Key Bus Route. Community Meeting Route 1 - Boston
MBTA Key Bus Route Improvement Program Community Meeting Route 1 - Boston United South End Settlement Agenda Welcome and introductions Safety briefing/accommodations Key Bus Route Program overview Existing
More informationMBTA Key Bus Route Improvement Program. Community Meeting Routes 15, 22, & 28. June 28, 2012 Dudley Library
MBTA Key Bus Route Improvement Program Community Meeting Routes 15, 22, & 28 June 28, 2012 Dudley Library Agenda Welcome and introductions Safety briefing/accommodations Key Bus Route Program overview
More informationKEY BUS ROUTE IMPROVEMENT PROJECT ROUTE 23 AGENDA
KEY BUS ROUTE IMPROVEMENT PROJECT ROUTE 23 December 9, 2009 Codman Tech 450 Washington Street AGENDA Introduction Key Bus Routes Program Route 23 Challenges Proposed Improvement Plan Next Steps Question
More informationIMPROVEMENT CONCEPTS
IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic
More information5. OPPORTUNITIES AND NEXT STEPS
5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours
More informationHDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009
HDR Engineering HART North / South BRT Corridor PD&E Tampa Bay Applications Group Meeting May 14, 2009 1 Agenda Update on Project Development and Environment (PD&E) Study Project Overview System Branding
More informationBackground Information about the Metrobus 29 Lines Study
Background Information about the Metrobus 29 Lines Study Questions Overview of Existing Service Q. Why is the study being conducted? A. The 29 Lines provide an important connection between Annandale and
More informationChicago Transit Authority Service Standards and Policies
Chicago Transit Authority Service Standards and Policies Overview and Objectives The Chicago Transit Authority (CTA) has revised its Service Standards and Policies in accordance with Federal Transit Administration
More information48 th and Chicago D Line Stop - September 13 th, 2018 Open House Materials
48 th and Chicago D Line Stop - September 13 th, 2018 Open House Materials Page 1: Table of Contents Page 2-3: Metro Transit Postcard: sent to station area Page 4-10: E-Newsletters Page 11-16: Meeting
More information2.0 Development Driveways. Movin Out June 2017
Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.
More informationGreater Cleveland Regional Transit Authority. Bus Stop Design Guidelines
Greater Cleveland Regional Transit Authority Bus Stop Design Guidelines Contents Purpose... I Bus Stop Design & Location... 1 Bus Stop Planning... 1 Bus Stop Safety & Consolidation... 1 As Needed Basis...
More informationKing County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.
King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...
More informationArterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014
Arterial Bus Rapid Transit System Policy Oversight Committee April 7, 2014 1 Meeting Agenda Welcome and Introductions A Line - Project Status Shelter and Pylon Development Arterial BRT Branding Update
More informationVan Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015
Van Ness Transit Corridor Improvement Project Engineering, Maintenance and Safety Committee March 25, 2015 Project Need 16,000 daily passenger boardings within the project corridor Average bus speed 8
More informationTroost Corridor Transit Study
Troost Corridor Transit Study May 23, 2007 Kansas City Area Transportation Authority Agenda Welcome Troost Corridor Planning Study Public participation What is MAX? Survey of Troost Riders Proposed Transit
More informationWhere will. BRT run? BRT will serve 20 stations along the line, connecting to bus routes and serving major destinations. How often will service run?
Where will 32 65 87 223 Rosedale Transit Center 225 227 264 801 ROSEVILLE 65 Snelling & County Road B BRT run? Snelling & Roselawn FALCON HEIGHTS BRT will serve 20 stations along the line, connecting to
More informationDraft Station Plan. Tuesday, November 17th
Draft Station Plan Comments on this draft plan can be submitted to brtprojects@metrotransit.org. The public is also invited to attend upcoming open houses to provide input and learn more about the C Line
More informationI-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018
I-405 and SR 522/NE 145th Bus Rapid Transit Elected Leadership Groups Meeting November 30, 2018 Agenda Welcome and Introductions Public Comment BRT Connection in Bothell Common Elements: Bus base, Station
More informationNortheast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study
Northeast Corridor Alternatives Analysis Public Involvement Round 2 Input on Alternatives for Further Study Feb. 7-9, 2012 Agenda Review project background Progress summary Recommended alternatives for
More informationCTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016
CTfastrak Expansion Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 Today s Agenda Phase I Update 2016 Service Plan Implementation Schedule & Cost Update Phase II Services Timeline Market Analysis
More informationAppendix D. West Corridor. Mobility Problems and Proposed Solutions. Existing Co n d i t i o n s
Appendix D Mobility Problems and Proposed Solutions : Background Existing Co n d i t i o n s This corridor extends west from Massachusetts Avenue in Boston to the towns of Leicester and Paxton, west of
More informationHelp shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary
Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County
More informationDetailed Definition of Alternatives
West Broadway Transit Study Detailed Definition of Alternatives 9/4/2015 DRAFT Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 2040 No-Build Alternative... 1 Build Alternatives...
More informationAddress Land Use Approximate GSF
M E M O R A N D U M To: Kara Brewton, From: Nelson\Nygaard Date: March 26, 2014 Subject: Brookline Place Shared Parking Analysis- Final Memo This memorandum presents a comparative analysis of expected
More informationState Avenue Corridor Bus Rapid Transit (BRT)
State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!
More informationCROSSING RAIL PROJECT (P4) RAIL
GRAND CROSSING RAIL PROJECT (P4) Community Advisory Group October 10, 2012 1:30 pm Grand Crossing Park Field House 7655 S. Ingleside Avenue, Chicago GRAND CROSSING RAIL PROJECT (P4) Community Advisory
More informationUpdate on Bus Stop Enhancements
Customer Service and Operations Committee Board Information Item III-A February 2, 2012 Update on Bus Stop Enhancements Page 3 of 15 Washington Metropolitan Area Transit Authority Board Action/Information
More informationBUS STOP DESIGN & PLANNING GUIDE
BUS STOP DESIGN & PLANNING GUIDE Prepared by the Operations and Planning Departments 2011 PURPOSE OF GUIDE The design of passenger waiting areas plays a significant role in a person s decision of whether
More informationSan Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors
Transportation Committee November 17, 2016 Agenda Item No. 5, Update on the San Rafael Transit Center Relocation San Rafael Transit Center Relocation Study Update 11/17/16 Golden Gate Bridge, Highway &
More informationBus Stop Optimization Study
Bus Stop Optimization Study Executive Summary February 2015 Prepared by: Passero Associates 242 West Main Street, Suite 100 Rochester, NY 14614 Office: 585 325 1000 Fax: 585 325 1691 In association with:
More informationPublic Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development
Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation
More informationA Transit Plan for the Future. Draft Network Plan
A Transit Plan for the Future Draft Network Plan Project Overview and Status Completed Market Analysis and Service Evaluation. Developed Plan Framework and Guiding Principles. Developed a draft Five Year
More informationPedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University
Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University Shift: The City of London s Rapid Transit Proposal Shift: The City of London s Rapid Transit Proposal
More informationVIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016
MANASSAS PARK STATION PARKING EXPANSION Site Evaluation & Recommendation October 18, 2016 1 INFORMATION ITEM Project Overview Parking Demand Site Evaluation VRE Recommended Preferred Alternative Next Steps
More informationD Line Station Plan: Table of Contents
Final Station Plan This document identifies D Line station locations for approval by the Metropolitan Council in summer 2018. It is a final revision of the D Line Station Plan previously published for
More informationTRAIN, BUS & TRANSIT
TRAIN, BUS & TRANSIT Input Metra 1 Metra does not want to add parking because of space; maxed out on number of cars per train. Developments on Rt. 59 will affect. 2 Should do studies regarding what the
More informationMOBILITY AND ACCESSIBILITY IN OUR COMMUNITY
MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY MOBILITY AND ACCESSIBILITY BACKGROUND Mobility and Accessibility Working Committee Broad representation Transit, Transportation, Planning and Development, Facility
More informationEast Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St
East Bay Bus Rapid Transit Project 1 AC Transit at a Glance EAST BAY AREA S LARGEST PUBLIC TRANSIT PROVIDER RIDERSHIP Daily (weekday) 178,851* Annual 54,987,132 Paratransit (daily) 1,994 ** * Includes
More informationMTA New York City Transit Service Guidelines Manual
MTA New York City Transit Service Guidelines Manual Thomas F. Prendergast, President Robert Bergen, Executive Vice President Division of Operations Planning Peter G. Cafiero, Chief August 2010 Table of
More informationUS 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017
US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master
More informationDraft Results and Open House
Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi
More informationI-26 Fixed Guideway Alternatives Analysis
I-26 Fixed Guideway Alternatives Analysis Public Meetings: North Charleston, January 25, 2016 Charleston: January 26, 2016 Summerville: January 28, 2016 Agenda I. Project Update II. III. IV. Screen Two
More informationGODURHAM PROGRESS REPORT
GODURHAM PROGRESS REPORT OVERVIEW OPERATIONS & PERFORMANCE With the service enhancements, total revenue hours increased In 2016, GoDurham connected 5.9 million passengers to jobs, education and health
More informationWaco Rapid Transit Corridor (RTC) Feasibility Study
Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM
More informationFixing the Line s Canarsie Tunnel. Manhattan CB6 11/5/2018
Fixing the Line s Canarsie Tunnel Manhattan CB6 11/5/2018 Interborough Bus Service 80+ buses in the peak hour in the peak direction over the Williamsburg Bridge Projected to carry 17% of riders 1 Bus Priority
More informationService Quality: Higher Ridership: Very Affordable: Image:
Over the past decade, much attention has been placed on the development of Bus Rapid Transit (BRT) systems. These systems provide rail-like service, but with buses, and are typically less expensive to
More informationAttachment D Environmental Justice and Outreach
Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income
More informationCentral Park Drives Traffic Management Overview
Central Park Drives Traffic Management Overview Spring 2015 New York City Department of Transportation Existing Traffic Management From Labor Day thru Last Day of NYC Public School: 8-10 AM weekdays (Southbound)
More informationA Plan to Connect Baltimore
A Plan to Connect Baltimore What is BaltimoreLink? Improve service quality and reliability Maximize access to high-frequency transit Strengthen connections between the MTA s bus and rail routes Align the
More informationThe Latest on Joint Development Policy Guidance
Panelists The Latest on Joint Development Policy Guidance Moderator: Jonathan Davis Deputy General Manager and Chief Financial Officer Massachusetts Bay Transportation Authority James Blakesley, Attorney-Advisor,
More informationRecommended Station Plan
Recommended Station Plan Comments on this recommended D Line Station Plan can be submitted to dline@metrotransit.org through June 8, 2018. This document identifies D Line station locations recommended
More informationOrange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019
Orange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019 1 Measure M Transit Projects in San Fernando Valley 2 1 2 Measure M Transit Projects Schedule Project
More information1 On Time Performance
MEMORANDUM: US 29 Travel Time & OTP To: From: Joana Conklin, Montgomery County DOT James A. Bunch, SWAI Subject: US 29 Travel Time and On Time Performance Analysis Date: This memorandum documents the US
More informationTraffic Impact Study Speedway Gas Station Redevelopment
Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...
More informationSouth Lexington Transportation Study Lexington, Massachusetts
South Lexington Transportation Study Lexington, Massachusetts Preliminary Findings and Options for Consideration Businesses Meeting 10/10/13 Town of Lexington Engineering and Planning Departments Meeting
More informationEUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT
EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING
More informationMetro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner
Metro Transit Update Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office John Dillery, Senior Transit Planner Metro Transit Service Development May 16, 2013 1 Transit Planning
More informationService Planning Open House
Service Planning Open House Presentation to Community RTA Board Room July 17, 2018 575 EYES See Something, Text Something Transit App RTA CLE Mobile Ticketing Bus Stop Consolidation/Safety Improvement
More informationKendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study
Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What
More informationDraft Results and Recommendations
Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System
More informationNEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis
Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle
More informationKendall Drive Premium Transit PD&E Study
Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study From
More informationCommunity Outreach Meetings
Community Outreach Meetings BCT At A Glance 410 square miles service area More than 41.5 million annual trips 327 fixed-route buses 44 bus routes 78 Community Buses in 19 Municipalities BCT At A Glance
More informationWest Broadway Reconstruction/LRT Design. March 19, 2015
West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian
More informationStoughton Center Parking
Stoughton Center Parking Existing Conditions and Observations October 4, 2017 Agenda Introduction Metropolitan Area Planning Council Project Team Parking Studies Background Scope of Work Study Area Survey
More informationExisting Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements
Existing Conditions Belmont Circle Bourne, MA Speakers Pam Haznar, MassDOT Ed Hollingshead, Fay Spofford & Thorndike Heather Ostertog, Fay, Spofford & Thorndike Goals for Group Local Knowledge Work through
More informationPace Bus Depot Location Analysis
Pace Bus Depot Location Analysis Key Notes 1. Options refer to conceptual sketches prepared by Kimley Horn. 2. The depot is assumed to accommodate Pace routes as they currently exist: 17 routes on the
More information2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS
2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak
More informationI-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING
I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING DECEMBER 8, 2015 JACKSON MANN COMMUNITY CENTER Meeting Agenda Welcome & Introductions Introduce Concept 3K West Station
More informationMarch Government Center Station
March 2014 Government Center Station Green Reconstruction Line / Blue Project Line Option for Green Construction Line / Blue Staging Line February 12, 2010 Project Purpose Accessibility Last Key Station
More informationSnelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1
Snelling Bus Rapid Transit May 13, 2013 Technical Advisory Committee Meeting #1 1 Today s meeting TAC Introductions Project Overview Arterial BRT Concept Background Snelling Corridor Plan, Funding & Schedule
More informationEssex Junction Train Station Access and Scoping Study Presentation of Transportation Alternatives
Essex Junction Train Station Access and Scoping Study Presentation of Transportation Alternatives Village of Essex Junction Chittenden County Regional Planning Commission RSG, Inc. Scott & Partners Architectural
More informationPROPOSED TRAFFIC RESOLUTION
Reference Number: TR 52-18 Location: Frobisher Street and Severn Street - Island Bay Proposal: Information: To provide two new bus stop locations on Frobisher Street, and change the time restriction on
More informationAppendix G Traffic and Parking Report
Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project
More informationRail~Volution 2005 Hal Ryan Johnson, AICP, Bus Rapid Transit Project Manager Utah Transit Authority September 7, 2005
Rail~Volution 2005 Hal Ryan Johnson, AICP, Bus Rapid Transit Project Manager Utah Transit Authority September 7, 2005 Public Transit District Utah Transit Authority Linear Geographic Area - 130 miles by
More informationMBTA DEPARTMENT OF SYSTEM-WIDE ACCESSIBILITY FIXED ROUTE REPORT December, 2011
MBTA DEPARTMENT OF SYSTEM-WIDE ACCESSIBILITY FIXED ROUTE REPORT December, 2011 Accessibility Improvements at the 10 Park Plaza Bus Stop At the request of AACT, MBTA Operations is pursuing ways to improve
More informationMadison BRT Transit Corridor Study Proposed BRT Operations Plans
Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is
More informationBUS STOP LOCATION AND TRANSIT AMENITIES DEVELOPMENT GUIDELINES
BUS STOP LOCATION AND TRANSIT AMENITIES DEVELOPMENT GUIDELINES Most Recent Revision: _07/10/16_ Formally Adopted by Valley Regional Transit s Board of Directors on: _07/10/16_ Disclaimer The purpose of
More informationMETRO Orange Line BRT American Boulevard Station Options
METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN
More informationAgenda. Preliminary Station Footprint High Speed Train Station in the City of Millbrae
Agenda Preliminary Station Footprint High Speed Train Station in the City of Millbrae Open House 7:00 7:30 Presentation 7:30 8:00 Community Question/Answer 8:00 9:00 Adjourn 2 Preliminary Station Footprint
More informationVIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017
MANASSAS PARK STATION PARKING EXPANSION Public Meeting June 20, 2017 1 AGENDA Project Status Schematic Design Circulation Traffic Analysis Proposed Garage Location Next Steps Cost Estimate 2 PROJECT PHASES
More informationSERVICE DESIGN GUIDELINES
VTA TRANSIT SUSTAINABILITY POLICY: APPENDIX A SERVICE DESIGN GUIDELINES Adopted February 2007 COMMUNITYBUS LOCALBUS EXPRESSBUS BUSRAPIDTRANSIT LIGHTRAILTRANSIT STATIONAREAS S A N T A C L A R A Valley Transportation
More informationIncrease Rail Service to the Mid City Green Line Stations
Washington Metropolitan Area Transit Authority Increase Rail Service to the Mid City Green Line Stations P D E C Presented to the Board of Directors: Planning and Development Committee by Planning, Development,
More informationWELCOME TO BLUE HILL AVENUE STATION PUBLIC MEETING October 5, 2016
WELCOME TO BLUE HILL AVENUE STATION PUBLIC MEETING October 5, 2016 MBTA / MATTAPAN COMMUNITY MEETING: 15 September 2014 Public Libra 5:30 PM BLUE HILL AVENUE & CUMMINS HIGHWAY Introduction Project Status
More informationAPPENDIX B Traffic Analysis
APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,
More informationRevised Report. Traffic Study for Safeway Fuel Center at Washington Square Shopping Center. In The City of Petaluma.
Revised Report Traffic Study for Safeway Fuel Center at Washington Square Shopping Center In The Pleasanton Fresno Sacramento Santa Rosa TJKM www.tjkm.com Revised Report Traffic Study for Safeway Fuel
More informationSTH 60 Northern Reliever Route Feasibility Study Report
#233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development
More informationTransportation Sustainability Program
Transportation Sustainability Program Photo: Sergio Ruiz San Francisco 2016 Roads and public transit nearing capacity Increase in cycling and walking despite less than ideal conditions 2 San Francisco
More informationI-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager
I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results Public Meeting Wulf Grote, Director Project Development Rick Pilgrim, Project Manager March 4 & 5, 2008 Today s Agenda Overview of Alternatives
More informationTPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County. February 26, 2018
TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County February 26, 2018 Agenda Review Committee Purpose Review Project Map Discuss Service Alternatives Capital Costs (Stations, Track,
More informationClifton Corridor Transit Initiative. Briefing to Medlock Area Neighborhood Association (MANA) February 15, 2016
Clifton Corridor Transit Initiative Briefing to Medlock Area Neighborhood Association (MANA) February 15, 2016 Neighborhood Concerns and Requests Provide a general overview and background of the project
More informationGreen Line opens June 14
Winter 2014 Green Line opens June 14 To-do list for METRO Green Line s grand opening Yours: Study safety tips at www.centralcorridor.org/safety Learn about planned Metro Transit bus service changes on
More informationAnalysis of Radial and Trunk Feeder Transit System Configurations in Downtown Charlottesville
Analysis of Radial and Trunk Feeder Transit System Configurations in Downtown Charlottesville 1. Introduction During the stakeholder input sessions of Charlottesville Area Transit s (CAT) Transit Development
More informationProposed Downtown Denver Circulator/Distributor
Proposed Downtown Denver Circulator/Distributor A FasTracks Service Plan March 2010 Rev Jan 2011 1 Table of Contents 1 Introduction... 4 2 Background... 6 3 Alignment... 7 4 Transit Priority (Delay Reduction)...
More informationSPACE COAST AREA TRANSIT BUS STOP ACCESSIBILITY STUDY. Final Report
SPACE COAST AREA TRANSIT BUS STOP ACCESSIBILITY STUDY Final Report November 28, 2018 (This page intentionally left blank) Space Coast TPO Final Report Bus Stop Accessibility Study TABLE OF CONTENTS Inventory
More informationSH 249 IN GRIMES COUNTY. Open House April 3, 2014
SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss
More informationPulse Overview. Future Pulse Lines
Pulse Overview Pace s new rapid transit network, Pulse, will provide enhanced express bus service to commuters using the latest technology and streamlined route design. Pulse is designed to provide fast,
More informationValley Metro Overview. ITE/IMSA Spring Conference March 6, 2014
Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and
More informationMetro Transit Arterial Transitway Corridors Study
Metro Transit Arterial Transitway Corridors Study Technical Memorandum #3 Corridor Mode Development 2/1/2012 Prepared by the SRF Consulting Group Team Table of Contents Introduction... 1 Concept Plans...
More information