Issued: February 27, 2017 Effective: March 29, 2017 Issued by: Darrin R. Ives, Vice President 1200 Main, Kansas City, MO 64105

Size: px
Start display at page:

Download "Issued: February 27, 2017 Effective: March 29, 2017 Issued by: Darrin R. Ives, Vice President 1200 Main, Kansas City, MO 64105"

Transcription

1 KCP&L GREATER MISSOURI OPERATIONS COMPANY P.S.C. MO. No. 1 th Revised Sheet No. 117 Canceling P.S.C. MO. No. 1 th Revised Sheet No. 117 NET METERING INTERCONNECTION APPLICATION AGREEMENT ELECTRIC For Missouri Retail Service Area INTERCONNECTION APPLICATION/AGREEMENT FOR NET METERING SYSTEMS WITH CAPACITY OF ONE HUNDRED KILOWATTS (100 kw) OR LESS KCP&L PO Box 1879 Kansas City, MO Attn: Solar Rebates/Net Metering For Customers Applying for Interconnection: If you are interested in applying for interconnection to GMO s electrical system, you should first contact GMO and ask for information related to interconnection of parallel generation equipment to GMO s system and you should understand this information before proceeding with this Application. If you wish to apply for interconnection to GMO s electrical system, please complete sections A, B, C, and D and attach the plans and specifications, including, but not limited to, describing the net metering, parallel generation, and interconnection facilities (hereinafter collectively referred to as the Customer-Generator s System ) and submit them to GMO at the address above. GMO will provide notice of approval or denial within thirty (0) days of receipt by GMO for Customer-Generators of ten kilowatts (10 kw) or less and within ninety (90) days of receipt by GMO for Customer-Generators of greater than ten kilowatts (10 kw). If this Application is denied, you will be provided with the reason(s) for the denial. If this Application is approved and signed by both you and GMO, it shall become a binding contract and shall govern your relationship with GMO. For Customers Who Have Received Approval of Customer-Generator System Plans and Specifications: After receiving approval of your Application, it will be necessary to construct the Customer-Generator System in compliance with the plans and specifications described in the Application, sign and complete sections E and F of this Application, and forward this Application to GMO for review and completion of section G at the address above. Prior to the interconnection of the qualified generation unit to GMO s system, the Customer-Generator will furnish GMO a certification from a qualified professional electrician or engineer that the installation meets the plans and specification described in the application. If a local Authority Having Jurisdiction (AHJ) requires permits or certifications for construction or operation of the qualified generation unit, a Customer-Generator must show the permit number and approval certification to KCP&L prior to interconnection. If the application for interconnection is approved by GMO and the Customer-Generator does not complete the interconnection within one (1) year after receipt of notice of the approval, the approval shall expire and the Customer-Generator shall be responsible for filing a new application. FILED Missouri Public Service Commission JE Issued: February 7, 017 Effective: March 9, 017 Issued by: Darrin R. Ives, Vice President 100 Main, Kansas City, MO 10

2 KCP&L GREATER MISSOURI OPERATIONS COMPANY P.S.C. MO. No. 1 th Revised Sheet No. 118 Canceling P.S.C. MO. No. 1 th Revised Sheet No. 118 NET METERING INTERCONNECTION APPLICATION AGREEMENT ELECTRIC For Missouri Retail Service Area For Customers Who Have Received Approval of Customer-Generator System Plans and Specifications (continued) Within 1 days of when the Customer-Generator completes submission of all required post construction documentation, including sections E and F, other supporting documentation and local AHJ inspection approval (if applicable) to the electric utility, the electric utility will make any inspection of the Customer-Generator s interconnection equipment or system it deems necessary and notify the Customer- Generator: 1. That the net meter has been set and parallel operation by Customer Generator is permitted; or,. That the inspection identified no deficiencies and the net meter installation is pending; or,. That the inspection identified no deficiencies and the timeframe anticipated for the electric utility to complete all required system or service upgrades and install the meter; or,. Of all deficiencies identified during the inspection that need to be corrected by the Customer-Generator before parallel operation will be permitted; or,. Of any other issue(s), requirement(s), or condition(s) impacting the installation of the net meter or the parallel operation of the system. For Customers Who Are Installing Solar Systems: Customer-Generators who are Missouri electric utility retail account holders will receive a solar rebate, if available, based on the capacity stated in the application, or the installed capacity of the Customer-Generator System if it is lower, if the following requirements are met: a. KCP&L must have confirmed the Customer-Generator s system is operational; and, b. Sections H and I of this Application must be completed. The amount of the rebate will be based on the system capacity measured in direct current. The rebate will be based on the schedule below up to a maximum of,000 watts (kw).. $.00 per watt for systems operational on or before June 0, 01; $1.0 per watt for systems operational between July 1, 01 and June 0, 01; $1.00 per watt for systems operational between July 1, 01 and June 0, 01; $0.0 per watt for systems operational between July 1, 01 and June 0, 019; $0. per watt for systems operational between July 1, 019 and June 0, 00; $0.00 per watt for systems operational after June 0, 00. For Customers Who Are Assuming Ownership or Operational Control of an Existing Customer-Generator System: If no changes are being made to the existing Customer-Generator System, complete sections A, D, and F of this Application/Agreement and forward to GMO at the address above. GMO will review the new Application/Agreement and shall approve such, within fifteen (1) days of receipt by GMO if the new Customer- Generator has satisfactorily completed Application/Agreement, and no changes are being proposed to the existing Customer-Generator System. There are no fees or charges for the Customer-Generator who is assuming ownership or operational control of an existing Customer-Generator System if no modifications are being proposed to that System. FILED Missouri Public Service Commission JE Issued: February 7, 017 Effective: March 9, 017 Issued by: Darrin R. Ives, Vice President 100 Main, Kansas City, MO 10

3 Malta Bend 101 Pine St Everett O'Donnell MO 9 maverickodie@yahoo.com Everett O'Donnell X SMA SB 7.7-1SP-US-0 Exterior West Wall of Home 10' of Meter, with a placard of placement Exterior WEst Wall of Home about 10 ft from the meter on the pole, we will have a placard for placement X 00 0

4 KCP&L GREATER MISSOURI OPERATIONS COMPANY P.S.C. MO. No. 1 nd Revised Sheet No Canceling P.S.C. MO. No. 1 1 st Revised Sheet No NET METERING INTERCONNECTION APPLICATION AGREEMENT ELECTRIC For Missouri Retail Service Area C. Installation Information/Hardware and Installation Compliance Company Installing System: Simple Solar Contact Person of Company Installing System: Cathy Bloss Phone Number: Contractor s License No. (if applicable): Approximate Installation Date: 0/0/018 Mailing Address: 1 N Patterson Ave City: Springfield State: MO Zip Code: 80 Daytime Phone: Fax: Cathy@getsimplesolar.com Person or Agency Who Will Inspect/Certify Installation: Dustin Douglas The Customer-Generator s proposed System hardware complies with all applicable National Electrical Safety Code (NESC), National Electrical Code (NEC), Institute of Electrical and Electronics Engineers (IEEE), and Underwriters Laboratories (UL) requirements for electrical equipment and their installation. As applicable to System type, these requirements include, but are not limited to, UL 170, UL 171 and IEEE 17. The proposed installation complies with all applicable local electrical codes and all reasonable safety requirements of GMO. The proposed System has a lockable, visible AC disconnect device, accessible at all times to GMO personnel and switch is located adjacent to the Customer-Generator s electric service meter (except in cases where GMO has approved an alternate location). The System is only required to include one lockable, visible disconnect device, accessible to GMO. If the interconnection equipment is equipped with a visible, lockable, and accessible disconnect, no redundant device is needed to meet this requirement. The Customer-Generator s proposed System has functioning controls to prevent voltage flicker, DC injection, overvoltage, undervoltage, overfrequency, underfrequency, and overcurrent, and to provide for System synchronization to GMO s electrical system. The proposed System does have an anti-islanding function that prevents the generator from continuing to supply power when GMO s electric system is not energized or operating normally. If the proposed System is designed to provide uninterruptible power to critical loads, either through energy storage or back-up generation, the proposed System includes a parallel blocking scheme for this backup source that prevents any backflow of power to GMO s electrical system when the electrical system is not energized or not operating normally. Printed Name (Installer): Dustin Douglas Signed (Installer): Date: 0/1/018 Dustin Douglas FILED Missouri Public Service Commission JE Issued: February 7, 017 Effective: March 9, 017 Issued by: Darrin R. Ives, Vice President 100 Main, Kansas City, MO 10

5 KCP&L GREATER MISSOURI OPERATIONS COMPANY P.S.C. MO. No. 1 rd Revised Sheet No Canceling P.S.C. MO. No. 1 nd Revised Sheet No NET METERING INTERCONNECTION APPLICATION AGREEMENT ELECTRIC For Missouri Retail Service Area D. Additional Terms and Conditions In addition to abiding by the Company s other applicable rules and regulations, the Customer-Generator understands and agrees to the following specific terms and conditions: 1. Operation/Disconnection If it appears to the Company, at any time, in the reasonable exercise of its judgment, that operation of the Customer-Generator s System is adversely affecting safety, power quality, or reliability of the Company s electrical system, the Company may immediately disconnect and lock-out the Customer- Generator s System from the Company s electrical system. The Customer-Generator shall permit the Company s employees and inspectors reasonable access to inspect, test, and examine the Customer-Generator s System.. Liability Liability insurance is not required for Customer-Generators of ten kilowatts (10 kw) or less. For generators greater that ten kilowatts (10 kw), the Customer-Generator agrees to carry no less than one hundred thousand dollars ($100,000) of liability insurance that provides for coverage of all risk of liability for personal injuries (including death) and damage to property arising out of or caused by the operation of the Customer-Generator s System. Insurance may be in the form of an existing policy or an endorsement on an existing policy. Customer-Generators, including those whose systems are ten kilowatts (10 kw) or less, may have legal liabilities not covered under their existing insurance policy in the event the Customer-Generator s negligence or other wrongful conduct causes personal injury (including death), damage to property, or other actions and claims.. Metering and Distribution Costs A Customer-Generator s facility shall be equipped with sufficient metering equipment that can measure the net amount of electrical energy produced or consumed by the Customer-Generator. If the Customer-Generator s existing meter equipment does not meet these requirements or if it is necessary for GMO to install additional distribution equipment to accommodate the Customer- Generator s facility, the Customer-Generator shall reimburse GMO for the costs to purchase and install the necessary additional equipment. At the request of the Customer-Generator, such costs may be initially paid for by GMO, and any amount up to the total costs and a reasonable interest charge may be recovered from the Customer-Generator over the course of up to twelve (1) billing cycles. Any subsequent meter testing, maintenance, or meter equipment change necessitated by the Customer-Generator shall be paid for by the Customer-Generator.. Ownership of Renewable Energy Credits or Renewable Energy Certificates (RECs) RECs created through the generation of electricity by the Customer-Owner are owned by the Customer-Generator however, if the Customer-Generator receives a solar rebate, the Customer- Generator transfers to GMO all rights, title, and interest in and to the RECs associated with the new or expanded solar electric system that qualified the Customer-Generator for the solar rebate for a period of ten (10) years from the date the electric utility confirms the solar electric system was installed and operational. FILED Missouri Public Service Commission JE Issued: February 7, 017 Effective: March 9, 017 Issued by: Darrin R. Ives, Vice President 100 Main, Kansas City, MO 10

6 KCP&L GREATER MISSOURI OPERATIONS COMPANY P.S.C. MO. No. 1 nd Revised Sheet No Canceling P.S.C. MO. No. 1 1 st Revised Sheet No NET METERING INTERCONNECTION APPLICATION AGREEMENT ELECTRIC For Missouri Retail Service Area D. Additional Terms and Conditions (continued). Energy Pricing and Billing The net electric energy delivered to the Customer-Generator shall be billed in accordance with the Utility s Applicable Rate Schedules. The value of the net electric energy delivered by the Customer- Generator to GMO shall be credited in accordance with the net metering rate schedule(s). The Customer-Generator shall be responsible for all other bill components charged to similarly situated customers. Net electrical energy measurement shall be calculated in the following manner: (a) For a Customer-Generator, a retail electric supplier shall measure the net electrical energy produced or consumed during the billing period in accordance with normal metering practices for customers in the same rate class, either by employing a single, bidirectional meter that measures the amount of electrical energy produced and consumed, or by employing multiple meters that separately measure the Customer-Generator s consumption and production of electricity; (b) If the electricity supplied by the supplier exceeds the electricity generated by the Customer- Generator during a billing period, the Customer-Generator shall be billed for the net electricity supplied by the supplier in accordance with normal practices for customers in the same rate class; (c) If the electricity generated by the Customer-Generator exceeds the electricity supplied by the supplier during a billing period, the Customer-Generator shall be billed for the appropriate customer charges as specified by the applicable Customer-Generator rate schedule for that billing period and shall be credited an amount for the excess kilowatt-hours generated during the billing period at the net metering rate identified in GMO s tariff filed at the Public Service Commission, with this credit applied to the following billing period; and (d) Any credits granted by this subsection shall expire without any compensation at the earlier of either twelve (1) months after their issuance, or when the Customer-Generator disconnects service or terminates the net metering relationship with the supplier.. Terms and Termination Rights This Agreement becomes effective when signed by both the Customer-Generator and GMO, and shall continue in effect until terminated. After fulfillment of any applicable initial tariff or rate schedule term, the Customer-Generator may terminate this Agreement at any time by giving GMO at least thirty (0) days prior written notice. In such event, the Customer-Generator shall, no later than the date of termination of Agreement, completely disconnect the Customer-Generator s System from parallel operation with GMO s system. Either party may terminate this Agreement by giving the other party at least thirty (0) days prior written notice that the other party is in default of any of the terms and conditions of this Agreement, so long as the notice specifies the basis for termination, and there is an opportunity to cure the default. This Agreement may also be terminated at any time by mutual agreement of the Customer-Generator and GMO. This agreement may also be terminated, by approval of the commission, if there is a change in statute that is determined to be applicable to this contract and necessitates its termination. FILED Missouri Public Service Commission JE Issued: February 7, 017 Effective: March 9, 017 Issued by: Darrin R. Ives, Vice President 100 Main, Kansas City, MO 10

7 KCP&L GREATER MISSOURI OPERATIONS COMPANY P.S.C. MO. No. 1 rd Revised Sheet No Canceling P.S.C. MO. No. 1 nd Revised Sheet No NET METERING INTERCONNECTION APPLICATION AGREEMENT ELECTRIC For Missouri Retail Service Area D. Additional Terms and Conditions (continued) 7. Transfer of Ownership If operational control of the Customer-Generator s System transfers to any other party than the Customer-Generator, a new Application/Agreement must be completed by the person or persons taking over operational control of the existing Customer-Generator System. GMO shall be notified no less than thirty (0) days before the Customer-Generator anticipates transfer of operational control of the Customer-Generator s System. The person or persons taking over operational control of Customer-Generator s System must file a new Application/Agreement, and must receive authorization from GMO, before the existing Customer-Generator System can remain interconnected with GMO s electrical system. The new Application/Agreement will only need to be completed to the extent necessary to affirm that the new person or persons having operational control of the existing Customer-Generator System completely understand the provisions of this Application/Agreement and agree to them. If no changes are being made to the Customer-Generator s System, completing sections A, D, and F of this Application/Agreement will satisfy this requirement. If no changes are being proposed to the Customer-Generator System, GMO will assess no charges or fees for this transfer. GMO will review the new Application/Agreement and shall approve such, within fifteen (1) days if the new Customer-Generator has satisfactorily completed the Application/Agreement, and no changes are being proposed to the existing Customer-Generator System. GMO will then complete section G and forward a copy of the completed Application/Agreement back to the new Customer- Generator, thereby notifying the new Customer-Generator that the new Customer-Generator is authorized to operate the existing Customer-Generator System in parallel with GMO s electrical system. If any changes are planned to be made to the existing Customer-Generator System that in any way may degrade or significantly alter that System s output characteristics, then the Customer- Generator shall submit to GMO a new Application/Agreement for the entire Customer-Generator System and all portions of the Application/Agreement must be completed. 8. Dispute Resolution If any disagreements between the Customer-Generator and GMO arise that cannot be resolved through normal negotiations between them, the disagreements may be brought to the Missouri Public Service Commission by either party, through an informal or formal complaint. Procedures for filing and processing these complaints are described in CSR The complaint procedures described in CSR apply only to retail electric power suppliers to the extent that they are regulated by the Missouri Public Service Commission. FILED Missouri Public Service Commission JE Issued: February 7, 017 Effective: March 9, 017 Issued by: Darrin R. Ives, Vice President 100 Main, Kansas City, MO 10

8

9 9 Jinko JKM9P X X

10 KCP&L GREATER MISSOURI OPERATIONS COMPANY P.S.C. MO. No. 1 rd Revised Sheet No Canceling P.S.C. MO. No. 1 nd Revised Sheet No NET METERING INTERCONNECTION APPLICATION AGREEMENT ELECTRIC For Missouri Retail Service Area H. Solar System Data (For Solar Installations only) (continued) Solar system must be permanently installed on the applicant s premises for a valid application Required documents to receive solar rebate to be attached OR provided before GMO authorizes the rebate payment: Copies of detail receipts/invoices with purchase date circled Copies of detail spec sheets on each component Copies of proof of warranty sheet (minimum of 10 year warranty) Photo(s) of completed system Completed Taxpayer Information Form Customer Affidavit I. Solar Rebate Declaration (For Solar Installations only) I understand that the complete terms and conditions of the solar rebate program are included in GMO s Rules and Regulations, Section 9.18 Solar Photovoltaic Rebate Program. I understand that this program has a limited budget, and that application will be accepted on a first-come, first-served basis, while funds are available. It is possible that I may be notified I have been placed on a waiting list for the next year s rebate program if funds run out for the current year. This program may be modified or discontinued at any time without notice from GMO. I understand that the solar system must be permanently installed and remain in place on premises for a minimum of 10 years and the system shall be situated in a location where a minimum of eighty-five percent (8%) of the solar resource is available to the solar system. I understand the equipment must be new when installed, commercially available, and carry a minimum 10 year warranty. I understand a rebate may be available from KCP&L in the amount of: $.00 per watt for systems operational on or before June 0, 01; $1.0 per watt for systems operational between July 1, 01 and June 0, 01; $1.00 per watt for systems operational between July 1, 01 and June 0, 01; $0.0 per watt for systems operational between July 1, 01 and June 0, 019; $0. per watt for systems operational between July 1, 019 and June 0, 00; $0.00 per watt for systems operational after June 0, 00. I understand an electric utility may, through its tariff, require applications for solar rebates to be submitted up to one hundred eighty-two (18) days prior to the applicable June 0 operational date for the solar rebate. I understand that a maximum of kilowatts of new or expanded system capacity will be eligible for a rebate. FILED Missouri Public Service Commission JE Issued: February 7, 017 Effective: March 9, 017 Issued by: Darrin R. Ives, Vice President 100 Main, Kansas City, MO 10

11 PINE ST 1 A B GENERAL NOTES PROJECT NOTES: 1.1. THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE (NEC) ARTICLE 90, ALL MANUFACTURERS S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION S (AHJ) APPLICABLE CODES GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS INTEGRATED WITH THE INVERTER IN ACCORDANCE WITH [NEC 90.(A)] 1.1. THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION 1.1. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 90. (B)] 1.1. ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY [NEC 90.] & [NEC 90.0] PV MODULES:UL 170 CERTIFIED, NFPA 70 CLASS C FIRE INVERTER(S):UL 171 CERTIFIED, IEEE 17, 99, 19 COMBINER BOX(S):UL 170 OR UL 171 ACCESSORY 1..1 SCOPE OF WORK: 1.. PRIME IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME WILL BE RESPONSIBLE FOR COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT WORK INCLUDES: 1.. PV ROOF ATTACHMENTS - ECOFASTEN GF1, S!PROTEA BRACKET 1.. PV RACKING SYSTEM INSTALLATION - IRONRIDGE XR PV MODULE AND INVERTER INSTALLATION - JINKO SOLAR JKM9P-7 / (1) SMA SB 7.7-1SP-US-0 (0V) 1.. PV EQUIPMENT GROUNDING 1.. PV SYSTEM WIRING TO A ROOF-MOUNTED SOLA DECK JUNCTION BOX 1..7 PV INSTALLING SYSTEM MONITORING EQUIPMENT 1..8 PV LOAD CENTERS (IF NEC.) 1..9 PV METERING (IF NEC.) PV DISCONNECTS PV GROUNDING ELECTRODE & BONDING TO (E) GEC 1..1 PV FINAL COMMISSIONING 1..1 (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV NEW PV SYSTEM: 9.0 kwp MAILTA BEND, MO 9 01 AERIAL PHOTO NOT TO SCALE SHEET LIST TABLE SHEET NUMBER PROJECT INFORMATION OWNER NAME: SHEET TITLE T-001 COVER PAGE G-001 NOTES A-101 SITE PLAN A-10 ELECTRICAL PLAN A-10 SOLAR ATTACHMENT PLAN E-01 LINE DIAGRAM E-0 DESIGN TABLES E-0 PLACARDS S-01 ASSEMBLY DETAILS S-0 ASSEMBLY DETAILS R-001 RESOURCE DOCUMENT R-00 RESOURCE DOCUMENT R-00 RESOURCE DOCUMENT R-00 RESOURCE DOCUMENT R-00 RESOURCE DOCUMENT R-00 RESOURCE DOCUMENT O`DONNELL PROJECT MANAGER NAME: DUSTIN DOUGLAS PHONE: NAME: PHONE: PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 PERMISSION FROM IS IN NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 AUTHORITIES HAVING JURISDICTION BUILDING: SALINE COUNTY ZONING: SALINE COUNTY UTILITY: KCP&L SCOPE OF WORK SYSTEM SIZE: STC: x 9 = 9.0 kw PTC: x 8.8 = 8.0 kw DC () JINKO SOLAR JKM9P-7 (1) SMA SB 7.7-1SP-US-0 (0V) ATTACHMENT TYPE: ECOFASTEN GF1, S!PROTEA BRACKET MSP UPGRADE: NO 0 PLAT MAP NOT TO SCALE DESIGN SPECIFICATIONS OCCUPANCY: II CONSTRUCTION: SINGLE-FAMILY ZONING: RESIDENTIAL GROUND SNOW LOAD: 0 PSF WIND EXPOSURE: C WIND SPEED: 11 MPH APPLICABLE CODES & STANDARDS BUILDING: IBC 01 IRC 01 ELECTRICAL: NEC 011 FIRE: IFC 01 W N S E COVER PAGE DATE: T (SHEET 1)

12 1 A B.1.1 SITE NOTES.1. A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS..1. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS AN UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES..1. THE SOLAR PV INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS..1. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION [NEC 110.].1. ALTERNATE POWER SOURCE PLACARD SHALL BE PLASTIC, ENGRAVED IN A CONTRASTING COLOR TO THE PLAQUE. THIS PLAQUE WILL BE ATTACHED USING AN APPROVED METHOD. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE NEC..1.7 THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE BETWEEN THE GROUNDING ELECTRODE AND THE PANEL (OR INVERTER) IF SMALLER THAN # AWG COPPER WIRE PER NEC 0-B. THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR SPLICES OR JOINTS AT BUSBARS WITHIN LISTED EQUIPMENT PER [NEC 0.C.].1.8 ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SHALL SERVE TO PROTECT THE BUILDING OR STRUCTURE..1.9 RIGID CONDUIT (AND/OR NIPPLES) MUST HAVE A PULL BUSHING TO PROTECT WIRES BOLTED CONNECTION REQUIRED IN DC DISCONNECTS ON THE WHITE GROUNDED CONDUCTOR (USE POLARIS BLOCK OR NEUTRAL BAR).1.11 ANY CONNECTION ABOVE LIVE PARTS MUST BE WATERTIGHT. REDUCING WASHERS DISALLOWED ABOVE LIVE PARTS, MEYERS HUBS RECOMMENDED..1 SOLAR.. MODULE CERTIFICATIONS WILL INCLUDE UL170, IEC1, IEC IF APPLICABLE, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE MARKED GROUNDING LUOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS... AS INDICATED BY DESIGN, OTHER NRTL LISTED MODULE GROUNDING DEVICES MAY BE USED IN PLACE OF STANDARD GROUNDING LUGS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ... CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS... CONDUIT POINT OF PENETRATION FROM EXTERIOR TO INTERIOR TO BE INSTALLED AND SEALED WITH A SUITABLE SEALING COMPOUND...7 DC WIRING LIMITED TO MODULE FOOTPRINT W/ ENPHASE AC SYSTEM...8 WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS...9 MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC UNLESS NOT AVAILABLE...10 ALL INVERTERS, MOTOR GENERATORS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AC PHOTOVOLTAIC MODULES, SOURCE CIRCUIT COMBINERS, AND CHARGE CONTROLLERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 90. (D)...11 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE...1 EQUIPMENT LOCATIONS.. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY [NEC 110.]... EQUIPMENT INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY [NEC 90.1 (A)-(B)] AND [NEC TABLE 10.1 (B)()(C)]... ADDITIONAL AC DISCONNECTS SHALL BE PROVIDED WHERE THE INVERTER IS NOT ADJACENT TO THE UTILITY AC DISCONNECT, OR NOT WITHIN SIGHT OF THE UTILITY AC DISCONNECT... ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES... ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE...1 WIRING & CONDUIT NOTES.. ALL CONDUIT SIZES AND TYPES, SHALL BE LISTED FOR ITS PURPOSE AND APPROVED FOR THE SITE APPLICATIONS.. ALL PV CABLES AND HOMERUN WIRES BE #10AWG *USE-, PV WIRE, OR PROPRIETARY SOLAR CABLING SPECIFIED BY MFR, OR EQUIVALENT; ROUTED TO SOURCE CIRCUIT COMBINER BOXES AS REQUIRED.. ALL CONDUCTORS AND OCPD SIZES AND TYPES SPECIFIED ACCORDING TO [NEC 90.8 (A)(1) & (B)(1)], [NEC 0] [NEC 90.7] FOR MULTIPLE CONDUCTORS.. ALL PV DC CONDUCTORS IN CONDUIT EXPOSED TO SUNLIGHT SHALL BE DERATED ACCORDING TO [NEC TABLE 10.1 (B)()(C)] BLACK ONLY**.. EXPOSED ROOF PV DC CONDUCTORS SHALL BE USE-, 90 C RATED, WET AND UV RESISTANT, AND UL LISTED RATED FOR 00V, UV RATED SPIRAL WRAP SHALL BE USED TO PROTECT WIRE FROM SHARP EDGES..7 PHASE AND NEUTRAL CONDUCTORS SHALL BE DUAL RATED THHN/THWN- INSULATED, 90 C RATED, WET AND UV RESISTANT, RATED FOR 00V PER NEC 008 OR 1000V PER NEC WIRE DELTA CONNECTED SYSTEMS HAVE THE PHASE WITH THE HIGHER VOLTAGE TO GROUND MARKED ORANGE OR IDENTIFIED BY OTHER EFFECTIVE MEANS..9 ALL SOURCE CIRCUITS SHALL HAVE INDIVIDUAL SOURCE CIRCUIT PROTECTION..10 VOLTAGE DROP LIMITED TO % FOR DC CIRCUITS AND 1% FOR AC CIRCUITS..11 NEGATIVE GROUNDED SYSTEMS DC CONDUCTORS SHALL BE COLOR CODED AS FOLLOWS: DC POSITIVE - RED (OR MARKED RED), DC NEGATIVE - GREY (OR MARKED GREY)..1 POSITIVE GROUNDED SYSTEMS DC CONDUCTORS COLOR CODED: DC POSITIVE - GREY (OR MARKED GREY), DC NEGATIVE - BLACK (OR MARKED BLACK)..1 AC CONDUCTORS >AWG COLOR CODED OR MARKED: PHASE A OR L1- BLACK, PHASE B OR L- RED, PHASE C OR L- BLUE, NEUTRAL- WHITE/GRAY *USE- IS NOT INDOOR RATED BUT PV CABLE IS RATED THWN/THWN- AND MAY BE USED INSIDE **USE- IS AVAILABLE AS UV WHITE..1 STRUCTURAL NOTES:.. RACKING SYSTEM & PV ARRAY SHALL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL... ROOF MOUNTED STANDARD RAIL REQUIRES ONE THERMAL EXPANSION GAP FOR EVERY RUN OF RAIL GREATER THAN 0'... ARRAY SHALL BE A MIN. HEIGHT OF " ABOVE THE COMPOSITION ROOF... JUNCTION BOX SHALL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS... ROOFTOP PENETRATIONS PERTAINING TO SOLAR RACKING WILL BE COMPLETED AND SEALED W/ APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED...7 ALL PV RELATED RACKING ATTACHMENTS WILL BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. O.C. FINAL ATTACHMENT LOCATIONS MAY BE ADJUSTED IN THE FIELD AS NECESSARY...8 ALL PV RELATED RACKING ATTACHMENTS SHALL BE STAGGERED BY ROW AMONGST THE ROOF FRAMING MEMBERS...1 GROUNDING NOTES.. A GROUNDING ELECTRODE SYSTEM IN ACCORDANCE WITH [NEC 90-7] AND [NEC 0-0] THROUGH [NEC 0 0-1] SHALL BE PROVIDED. PER NEC, GROUNDING ELECTRODE SYSTEM OF EXISTING BUILDING MAY BE USED AND BONDED TO AT THE SERVICE ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, OR IS ONLY METALLIC WATER PIPING, A SUPPLEMENTAL GROUNDING ELECTRODE WILL BE USED AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8 FT GROUND ROD WITH ACORN CLAMP... GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN #8 AWG AND NO GREATER THAN # AWG COPPER AND BONDED TO THE EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE SYSTEM... PV SYSTEM SHALL BE GROUNDED IN ACCORDANCE TO [NEC 0.1], [NEC TABLE 0.1], AND ALL METAL PARTS OR MODULE FRAMES ACCORDING TO [NEC 90.]... MODULE SOURCE CIRCUITS SHALL BE GROUNDED IN ACCORDANCE TO [NEC 90.]... THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDED CONDUCTOR TO ANOTHER MODULE...7 EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTIONS POINTS IDENTIFIED IN THE MANUFACTURER'S INSTALLATION INSTRUCTIONS...8 ENCLOSURES SHALL BE PROPERLY PREPARED WITH REMOVAL OF PAINT/FINISH AS APPROPRIATE WHEN GROUNDING EQUIPMENT WITH TERMINATION GROUNDING LUGS...9 GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR DIRECT BURIAL...10 GROUNDING AND BONDING CONDUCTORS SHALL BE COPPER, SOLID OR STRANDED, AND BARE WHEN EXPOSED...11 EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZE ACCORDING TO [NEC 90.] AND BE A MINIMUM OF #10AWG WHEN NOT EXPOSED TO DAMAGE (#AWG SHALL BE USED WHEN EXPOSED TO DAMAGE)...1 GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLOR CODED GREEN (OR MARKED GREEN IF # AWG OR LARGER)..1 ALL CONDUIT BETWEEN THE UTILITY AC DISCONNECT AND THE POINT OF CONNECTION SHALL HAVE GROUNDED BUSHINGS AT BOTH ENDS...1 AC SYSTEM GEC SIZED ACCORDING TO [NEC 90.7], [NEC TABLE 0.], DC SYSTEM GEC SIZED ACCORDING TO [NEC 0.1], MINIMUM #8AWG WHEN INSULATED, #AWG WHEN EXPOSED TO DAMAGE...1 EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES, EQUIPMENTS, AND CONDUCTOR ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH 0.1 OR 0.1(A) REGARDLESS OF VOLTAGE..7.1 INTERCONNECTION NOTES.7. PV DEDICATED BACKFEED BREAKERS MUST BE LOCATED AT THE OPPOSITE END OF THE BUS FROM THE MAIN SERVICE BREAKER OR TRANSFORMER INPUT FEEDER IN ACCORDANCE WITH [NEC 90.(B)(7)].7. SUM OF BREAKER RATINGS SUPPLYING THE BUS MAY NOT EXCEED 10% OF THE THE BUSBAR RATING PER [NEC 90.(B)()] AND/OR [NEC 70.1(D)(1)..7. GROUND FAULT PROTECTION IN ACCORDANCE WITH [NEC 1.9] & [NEC 0.9] ALL EQUIPMENT TO BE RATED FOR BACKFEEDING..7. SUPPLY SIDE INTERCONNECTION ACCORDING TO [NEC 90.(A)] AND/OR [NEC 70.1(A)] WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH [NEC 0.(B)].7. MICROINVERTER BRANCHES SHALL BE CONNECTED TO A SINGLE BREAKER OCPD IN ACCORDANCE WITH [NEC 110.(B)]..8.1 DISCONNECT NOTES.8. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING LIVE ARE CONNECTED TO THE TERMINALS MARKED LINE SIDE (TYPICALLY THE UPPER TERMINALS).8. AC DISCONNECT MUST BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH.8. DC CURRENT CONDUCTORS ARE TO REMAIN OUTSIDE OF BUILDING PRIOR TO EITHER A FUSEABLE SOURCE CIRCUIT COMBINER BOX OR A LOAD-BREAK DISCONNECTING DEVICE PERMISSION FROM IS IN NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 DATE: CHECKED BY: NOTES M.M. G (SHEET )

13 1 A B GENERAL NOTES 1. FIELD VERIFY ALL MEASUREMENTS. ITEMS BELOW MAY NOT BE ON THIS PAGE N SALINE HWY PROPERTY LINE PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 1'-8" PERMISSION FROM IS IN PINE ST POLE MOUNTED UTILITY METER POLE MOUNTED SERVICE DISCONNECT 8'-11" AREA OF WORK NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 ENTRANCE AC DISCONNECT INVERTER 0'-0" SITE PLAN 1'-10" SITE PLAN 01 1/" = 1'-0" 0 1'-1" '-" N W E S DATE: A (SHEET )

14 1 A B GENERAL NOTES 1. FIELD VERIFY ALL MEASUREMENTS. ITEMS BELOW MAY NOT BE ON THIS PAGE EXTERIOR PV EQUIPMENT (E) (1) POLE MOUNTED UTILITY METER (E) (1) POLE MOUNTED SERVICE DISCONNECT ARRAY kw [x10] (N) MODULES TILT: 0 DEGREES ROOF PITCH: 7:1 AZIMUTH: 180 DEGREES A B C MODULE STRINGING MODULE STRINGING MODULE STRINGING (N) (1) SOLA DECK A A A A A A A A A A CONDUIT PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 PERMISSION FROM IS IN INTERIOR PV EQUIPMENT (E) (1) MAIN ELECTRICAL PANEL EXTERIOR PV EQUIPMENT (N) (1) AC DISCONNECT (N) (1) INVERTER NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 CONDUIT IN TRENCH FEET LENGTH MIN 18 INCHES DEEP ARRAY -.90 kw [x] (N) MODULES TILT: 0 DEGREES ROOF PITCH: 7:1 AZIMUTH: 180 DEGREES B B B B B B B B B B B (N) (1) JUNCTION BOX C C C C C C C C C C C ELECTRICAL PLAN 01 1/1" = 1' 0 8' 1' 77.01" 9.0" MODULE: JINKO SOLAR JKM9P-7 9 WATTS W N S E ELECTRICAL PLAN DATE: A (SHEET )

15 1 A B GENERAL NOTES 1. FIELD VERIFY ALL MEASUREMENTS. ITEMS BELOW MAY NOT BE ON THIS PAGE 1'-" ROOF TRUSSSES CORRUGATED METAL RIBS FLUSH MOUNT SOLAR MODULES ATTACHED TO ROOF SURFACE (SEE SHEET S-01 FOR MOUNTING DETAILS) ROOF MATERIAL IS 1 LAYER ASPHALT SHINGLE PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 PERMISSION FROM IS IN NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 FLUSH MOUNT SOLAR MODULES ATTACHED TO ROOF SURFACE (SEE SHEET S-0 FOR MOUNTING DETAILS) ROOF MATERIAL IS CORRUGATED METAL SOLAR ATTACHMENT PLAN 01 /" = 1' 0 '-" 10'-8" 77.01" 9.0" MODULE: JINKO SOLAR JKM9P-7 9 WATTS '-" W N S E SOLAR ATTACHMENT PLAN DATE: A (SHEET )

16 1 CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS CURRENT-CARRYING CONDUCTORS ID TYPICAL CONDUCTOR CONDUIT OCPD EGC TEMP. CORR. FACTOR CONDUIT FILL FACTOR CONT. CURRENT MAX. CURRENT (1%) BASE AMP. DERATED AMP. TERM. TEMP. RATING TERMINAL VOLTAGE DROP IN CONDUIT AWG PV WIRE, COPPER FREE AIR N/A AWG BARE, COPPER 0.71 (7.7 C) A 1.99A A 9.0A 7 C 0A 0.11% AWG THWN-, COPPER 0.7" DIA EMT N/A 10 AWG THWN-, COPPER 0.71 (7.7 C) A 1.99A 0A 8.A 7 C A 0.11% AWG THWN-, COPPER 0.7" DIA EMT, PVC-0 N/A 10 AWG THWN-, COPPER 0.71 (7.7 C) A 1.99A 0A.7A 7 C A 0.18% AWG THWN-, COPPER 0.7" DIA EMT 0A 8 AWG THWN-, COPPER 0.91 (.7 C) 1 A 0A A 0.0A 7 C 0A 0.08% 0 1 AWG THWN-, COPPER 0.7" DIA EMT N/A AWG THWN-, COPPER 0.91 (.7 C) 1 A 0A 7A 8.A 7 C A 0.0% A A B MODULE STRINGING TO UTILITY GRID (OH) B C MODULE STRINGING MODULE STRINGING A B C JINKO SOLAR JKM9P-7 01 JUNCTION BOX 0 SMA SB 7.7-1SP-US-0 (0V) G L N G L1 0 AC DISCONNECT 0A G EQUIPMENT ABOVE LINE IS (N) NEW 0 L1 L EQUIPMENT BELOW LINE IS (E) EXISTING UNLESS OTHERWISE NOTED. SERVICE DISCONNECT 0/10 V 1Ø, W MAIN BUSS: 00A MAIN SERVICE PANEL 0/10 V 1Ø, W MAIN BUSS: A MAX BREAKER SIZE: ( A x 1. ) - 00 A = 70 A N L L1 TAP (E) MAIN 00A N N L N L1 G TO (E) LOADS (E) UTILITY METER N G GROUND ROD (E) GROUNDING ELECTRODE PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 PERMISSION FROM IS IN NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 LINE DIAGRAM 01 0 DATE: CHECKED BY: M.M. SOLA DECK E (SHEET )

17 1 A B SYSTEM SUMMARY MPPT #1 MPPT # MPPT # MODULES IN SERIES ARRAY VMP 8V 0.8V 0.8V ARRAY IMP 8.0A 8.0A 8.0A ARRAY VOC V 97.V 97.V ARRAY MAX VOC 1.7V.9V.9V ARRAY ISC 8.9A 8.9A 8.9A ARRAY STC POWER 9,0W ARRAY PTC POWER 8,0W MAX AC CURRENT A MAX AC POWER 7,80W DERATED (CEC) AC POWER 7,80W DESIGN TEMPERATURES ASHRAE EXTREME LOW -.7 C (-1. F), SOURCE: WHITEMAN AFB (8.7 ; -9. ) ASHRAE % HIGH.7 C (9. F), SOURCE: WHITEMAN AFB (8.7 ; -9. ) MODULES REF. QTY. MAKE AND MODEL PMAX PTC ISC IMP VOC VMP TEMP. COEFF. OF VOC FUSE RATING P1- JINKO JKM9P-7 9W 8.8W 8.9A 8.0A.V.8V -0.1V/ C (-0.7%/ C) 1A REF. QTY. MAKE AND MODEL AC VOLTAGE GROUND INVERTERS OCPD RATING RATED POWER MAX OUTPUT CURRENT BILL OF MATERIALS CATEGORY MAKE MODEL NUMBER REF QTY UNIT QTY/UNIT DESCRIPTION MODULE JINKO JKM9P-7 PM1- PIECES 1 JINKO JKM9P-7 9W 7 CELLS, POLYCRYSTALLINE SILICON INVERTER SMA SB 7.7-1SP-US-0 (0V) I1 1 PIECE 1 SMA SB 7.7-1SP-US-0 (0V) 780W INVERTER DISCONNECT SQUARE D DNRB SW1 1 PIECE 1 SQUARE D DNRB, -POLE, 0A, 0VAC OR EQUIVALENT WIRING GEN-10-AWG-PV-WIRE-CU WR1 70 FEET 1 10 AWG PV WIRE, COPPER (POSITIVE AND NEGATIVE) WIRING GEN--AWG-BARE-CU WR1 1 FEET 1 AWG BARE, COPPER (GROUND) WIRING GEN-10-AWG-THWN--CU-RD WR- 100 FEET 1 10 AWG THWN-, COPPER, RED (POSITIVE) WIRING GEN-10-AWG-THWN--CU-BLK WR- 100 FEET 1 10 AWG THWN-, COPPER, BLACK (NEGATIVE) WIRING GEN-10-AWG-THWN--CU-GR WR- 100 FEET 1 10 AWG THWN-, COPPER, GREEN (GROUND) WIRING GEN-8-AWG-THWN--CU-RD WR 10 FEET 1 8 AWG THWN-, COPPER, RED (LINE 1) WIRING GEN-8-AWG-THWN--CU-BLK WR 10 FEET 1 8 AWG THWN-, COPPER, BLACK (LINE ) WIRING GEN-8-AWG-THWN--CU-WH WR 10 FEET 1 8 AWG THWN-, COPPER, WHITE (NEUTRAL) WIRING GEN-8-AWG-THWN--CU-GR WR 10 FEET 1 8 AWG THWN-, COPPER, GREEN (GROUND) WIRING GEN--AWG-THWN--CU-RD WR 10 FEET 1 AWG THWN-, COPPER, RED (LINE 1) WIRING GEN--AWG-THWN--CU-BLK WR 10 FEET 1 AWG THWN-, COPPER, BLACK (LINE ) WIRING GEN--AWG-THWN--CU-WH WR 10 FEET 1 AWG THWN-, COPPER, WHITE (NEUTRAL) WIRING GEN--AWG-THWN--CU-GR WR 10 FEET 1 AWG THWN-, COPPER, GREEN (GROUND) WIREWAY GEN-PVC-0-0,7" DIA WW FEET 1 PVC-0 CONDUIT, 0.7'' DIA WIREWAY GEN-EMT-0,7" DIA WW- 90 FEET 1 EMT CONDUIT, 0.7'' DIA OCPD GENERIC MANUFACTURER GEN-FU-0A-0VAC F1- PIECES 1 FUSE, 0A, 0VAC TRANSITION BOX GENERIC MANUFACTURER GEN-AWB-TB--X JB1 1 PIECE 1 TRANSITION/PASS-THROUGH BOX, WITH TERMINAL BLOCKS TRANSITION BOX SOLADECK 078-R-ER JB1 1 PIECE 1 SOLADECK 078-1, INPUTS, OR EQUIVALENT MAX INPUT CURRENT MAX INPUT VOLTAGE CEC WEIGHTED EFFICIENCY I1 1 SMA SB 7.7-1SP-US-0 (0V) 0V FLOATING 0A 780W A X18A 00V 97.0% DISCONNECTS REF. QTY. MAKE AND MODEL RATED CURRENT MAX RATED VOLTAGE SW1 1 SQUARE D DNRB OR EQUIV. 0A 0VAC OCPDS REF. QTY. RATED CURRENT MAX VOLTAGE F1-0A 0VAC PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 PERMISSION FROM IS IN NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 DESIGN TABLES DATE: E-0.00 (SHEET 7)

18 1 A B!CAUTION! POWER TO THIS BUILDING IS ALSO SUPPLIED FROM ROOF MOUNTED SOLAR ARRAYS WITH SAFETY DISCONNECTS AS SHOWN: BACK! WARNING! ELECTRIC SHOCK HAZARD. THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED. LABEL 1 AT EACH JUNCTION, COMBINER, DISCONNECT AND DEVICE WHERE ENERGIZED UNGROUNDED CONDUCTORS MAY BE EXPOSED DURING SERVICE [NEC 90.(F)] PHOTOVOLTAIC AC DISCONNECT OPERATING CURRENT: A AC OPERATING VOLTAGE: 0 V AC LABEL AT POINT OF INTERCONNECTION, MARKED AT DISCONNECTING MEANS [NEC 90.]! WARNING! ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS. TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION. LABEL AT EACH DISCONNECTING MEANS FOR PHOTOVOLTAIC EQUIPMENT [NEC 90.17]! WARNING! DUAL POWER SOURCES. SECOND SOURCE IS PV SYSTEM OPERATING CURRENT: OPERATING VOLTAGE: MAX SHORT CURRENT: MAX VOLTAGE:! CAUTION! 8.0 A DC 0.8 V DC 8.9 A DC.9 V DC LABEL AT EACH DC DISCONNECTING MEANS [NEC 90.] PHOTOVOLTAIC SYSTEM CIRCUIT IS BACKFED LABEL LABEL AT POINT OF INTERCONNECTION; LABEL, SUCH AS LABEL OR LABEL MUST IDENTIFY PHOTOVOLTAIC SYSTEM [NEC 70.1(D)()] DIRECTORY PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM DISCONNECTING MEANS IF NOT IN THE SAME LOCATION [NEC 90.(B)] WHERE THE INVERTERS ARE REMOTELY LOCATED FROM EACH OTHER, A DIRECTORY IN ACCORDANCE WITH SHALL BE INSTALLED AT EACH DC PV SYSTEM DISCONNECTING MEANS, AT EACH AC DISCONNECTING MEANS, AND AT THE MAIN SERVICE DISCONNECTING MEANS SHOWING THE LOCATION OF ALL AC AND DC PV SYSTEM DISCONNECTING MEANS IN THE BUILDING. [NEC 90.(H)] N E W PV ARRAY S MAIN DISTRIBUTION UTILITY DISCONNECT FRONT POLE MOUNTED SERVICE DISCONNECT PV ARRAY PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 PERMISSION FROM IS IN NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 INTERACTIVE PHOTOVOLTAIC SYSTEM CONNECTED PHOTOVOLTAIC DC DISCONNECT INTERACTIVE PHOTOVOLTAIC SYSTEM CONNECTED PHOTOVOLTAIC SYSTEM DISCONNECT LOCATED WEST SIDE OF THE HOUSE LABEL 7 AT UTILITY METER [NEC 90.(B)] WARNING: PHOTOVOLTAIC POWER SOURCE LABEL 9 AT EXPOSED RACEWAYS, CABLE TRAYS, AND OTHER WIRING METHODS; SPACED AT MAXIMUM 10 FT SECTION OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS. [NEC 90.1(E)] LETTERS AT LEAST /8 INCH; WHITE ON RED BACKGROUND; REFLECTIVE [IFC ] LABEL 8 AT EACH DC DISCONNECTING MEANS [NEC 90.1(C)()] PHOTOVOLTAIC AC DISCONNECT LABEL 10 AT EACH AC DISCONNECTING MEANS [NEC 90.1(C)()] PLAQUE! WARNING! INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE LABEL 11 AT POINT OF INTERCONNECTION OVERCURRENT DEVICE [NEC 70.1(D)(7)] LABELING NOTES: 1.1 LABELING REQUIREMENTS BASED ON THE 011 NATIONAL ELECTRICAL CODE, INTERNATIONAL FIRE CODE 0.11, OSHA STANDARD , ANSI Z. 1. MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 1. LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. 1. LABELS TO BE A MINIMUM LETTER HEIGHT OF /8 AND PERMANENTLY AFFIXED. PLACARDS DATE: E-0.00 (SHEET 8)

19 A B 1 8 D S-01 7 D S-01 0 GENERAL NOTES 1. FIELD VERIFY ALL MEASUREMENTS D1 RACKING DETAIL (TRANSVERSE) NOT TO SCALE ROOF SLOPE D RACKING DETAIL (LONGITUDINAL) NOT TO SCALE SHEET KEYNOTES 1. ROOF MATERIAL: ASPHALT SHINGLE. ROOF STRUCTURE: TRUSS. ATTACHMENT TYPE: ECOFASTEN GF1. MODULE MANUFACTURER: JINKO SOLAR. MODULE MODEL: JKM9P-7. MODULE LENGTH: IN. 7. MODULE WIDTH: 9.0 IN. 8. MODULE WEIGHT: 9. LBS. 9. SEE SHEET A-10 FOR DIMENSION(S) 10. MIN. FIRE OFFSET: NO FIRE CODE ENFORCED 11. TRUSS SPACING: IN. O.C. 1. TRUSS SIZE: X NOMINAL 1. LAG BOLT DIAMETER: /1 IN. 1. LAG BOLT EMBEDMENT: IN. 1. TOTAL # OF ATTACHMENTS: 1. TOTAL AREA: SQ. FT. 17. TOTAL WEIGHT:.8 LBS. 18. WEIGHT PER ATTACHMENT: 8. LBS. 19. DISTRIBUTED LOAD:.98 PSF. 0. MAX. HORIZONTAL STANDOFF: 8 IN. 1. MAX. VERTICAL STANDOFF: LANDSCAPE: IN., PORTRAIT: IN.. STANDOFF STAGGERING: YES. RAIL MANUFACTURER (OR EQUIV.): IRONRIDGE. RAIL MODEL (OR EQUIVALENT): XR10. RAIL WEIGHT: 0. PLF.. MAX. TRUSS SPAN: 0 FT. 7. MODULE CLEARANCE: IN. MIN., IN. MAX. PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 PERMISSION FROM IS IN NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 D 7 RACKING DETAIL (TOP) NOT TO SCALE D DETAIL (TRANSVERSE) NOT TO SCALE D DETAIL (LONGITUDINAL) NOT TO SCALE ASSEMBLY DETAILS DATE: S (SHEET 9)

20 A B 1 8 D S-01 7 D S-01 0 GENERAL NOTES 1. FIELD VERIFY ALL MEASUREMENTS D1 RACKING DETAIL (TRANSVERSE) NOT TO SCALE ROOF SLOPE D RACKING DETAIL (LONGITUDINAL) NOT TO SCALE SHEET KEYNOTES 1. ROOF MATERIAL: CORRUGATED METAL. ROOF STRUCTURE: TRUSS. ATTACHMENT TYPE: S!PROTEA BRACKET. MODULE MANUFACTURER: JINKO SOLAR. MODULE MODEL: JKM9P-7. MODULE LENGTH: IN. 7. MODULE WIDTH: 9.0 IN. 8. MODULE WEIGHT: 9. LBS. 9. SEE SHEET A-10 FOR DIMENSION(S) 10. MIN. FIRE OFFSET: NO FIRE CODE ENFORCED 11. TRUSS SPACING: IN. O.C. 1. TRUSS SIZE: X NOMINAL 1. LAG BOLT DIAMETER: /1 IN. 1. LAG BOLT EMBEDMENT: IN. 1. TOTAL # OF ATTACHMENTS: 1. TOTAL AREA: 9. SQ. FT. 17. TOTAL WEIGHT: 171. LBS. 18. WEIGHT PER ATTACHMENT:. LBS. 19. DISTRIBUTED LOAD:.98 PSF. 0. MAX. HORIZONTAL STANDOFF: 8 IN. 1. MAX. VERTICAL STANDOFF: LANDSCAPE: IN., PORTRAIT: IN.. STANDOFF STAGGERING: YES. RAIL MANUFACTURER (OR EQUIV.): IRONRIDGE. RAIL MODEL (OR EQUIVALENT): XR10. RAIL WEIGHT: 0. PLF.. MAX. TRUSS SPAN: 0 FT. 7. MODULE CLEARANCE: IN. MIN., IN. MAX. PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 PERMISSION FROM IS IN NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 D 7 RACKING DETAIL (TOP) NOT TO SCALE D DETAIL (TRANSVERSE) NOT TO SCALE D DETAIL (LONGITUDINAL) NOT TO SCALE ASSEMBLY DETAILS DATE: S-0.00 (SHEET 10)

21 A B 1 PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 PERMISSION FROM IS IN NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 RESOURCE DOCUMENT DATE: R (SHEET 11 )

22 A B 1 PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 PERMISSION FROM IS IN NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 RESOURCE DOCUMENT DATE: R (SHEET 1)

23 A B 1 PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 PERMISSION FROM IS IN NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 RESOURCE DOCUMENT DATE: R (SHEET 1)

24 A B 1 PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 PERMISSION FROM IS IN NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 RESOURCE DOCUMENT DATE: R (SHEET 1)

25 A B 1 PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 PERMISSION FROM IS IN NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 RESOURCE DOCUMENT DATE: R (SHEET 1)

26 A B 1 PHONE: ADDRESS: 1 N PATTERSON AVE SPRINGFIELD,MISSOURI 80 PERMISSION FROM IS IN NEW PV SYSTEM: 9.0 kwp MALTA BEND, MO 9 RESOURCE DOCUMENT DATE: R (SHEET 1)

MISSOURI SERVICE AREA

MISSOURI SERVICE AREA MO.P.S.C. SCHEDULE NO. 6 1st Revised SHEET NO. 171.5 CANCELLING MO.P.S.C. SCHEDULE NO. 6 Original SHEET NO. 171.5 INTERCONNECTION APPLICATION/AGREEMENT FOR NET METERING SYSTEMS WITH CAPACITY OF 100 kw

More information

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23 P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23 Canceling P.S.C. Mo. No. 5 Sec. 4 Original Sheet No. 23 PURPOSE: The purpose of this Rider SR is to implement the solar rebate established through 393.1030

More information

2016 Photovoltaic Solar System Plan Review List

2016 Photovoltaic Solar System Plan Review List Building Division 555 Santa Clara Street Vallejo CA 94590 707.648.4374 2016 Photovoltaic Solar System Plan Review List GENERAL PROJECT INFORMATION PLAN CHECK NO DATE JOB ADDRESS CITY ZIP REVIEWED BY PHONE

More information

Solar PV Standard Electrical Plan

Solar PV Standard Electrical Plan *** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Permit Number: SCOPE: Standard plan for installation of solar PV systems utilizing 2 wire

More information

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

More information

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL Photovoltaic (PV) Residential Page 1 of 10 Revision Date: 07/18/2018 INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL INSPECTION CODE: 703 SCOPE: RESIDENTIAL APPLICABLE CODES: 2016 CBC, CRC, CPC,

More information

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility Processed Date Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility Customer s Printed Name Installation Street Address Account Number Please note: Columbia Water & Light

More information

Solar PV Standard Electric Plan

Solar PV Standard Electric Plan *** Provide this document to the inspector along with ALL system installation instructions *** SCOPE: Standard plan for the installation of microinverter solar PV systems, not exceeding a total AC output

More information

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings TOOLKIT DOCUMENT #4 Solar Standard Plan Simplified Microinverter and M Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters or Modules

More information

Solar Power Installation Application

Solar Power Installation Application Solar Power Installation Application This Form must be filled out and submitted to Logan City Light and Power Department and given authorization to proceed PRIOR to installing a solar system. Also, please

More information

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings TOOLKIT DOCUMENT #4 Your City logo here Solar Standard Plan Simplified Microinverter and M Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters

More information

STREAMLINED SOLAR CHECKLIST Owner Name:

STREAMLINED SOLAR CHECKLIST Owner Name: STREAMLINED SOLAR CHECKLIST Owner Name: Address: DEPARTMENT OF PUBLIC WORKS AND PLANNING ALAN WEAVER, DIRECTOR This checklist must be completed by the contractor or an authorized agent of the contractor

More information

Photovoltaic Solar Plan Review

Photovoltaic Solar Plan Review PAIGE B. VAUGHAN, CBO Director of Building and Safety Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail:lbutler@comptoncity.org Building & Safety Department Photovoltaic Solar Plan Review Plan Check

More information

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings TOOLKIT DOCUMENT #4 Your City logo here Solar Standard Plan Simplified Microinverter and M Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Rocky Mountain Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system

More information

Solar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings County of Santa Barbara Your City logo here Solar Standard Plan Simplified Microinverter and M Systems for Oneand Two-Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to

More information

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings SCOPE: Use this plan ONLY for utility-interactive central/string inverter systems not exceeding a total combined system ac inverter output rating of 10kW on the roof of a one- or two-family dwelling or

More information

White River Electric Association, Inc. Net Metering Information & Service Requirements

White River Electric Association, Inc. Net Metering Information & Service Requirements White River Electric Association, Inc. Net Metering Information & Service Requirements What is Net Metering? Net Metering is an electric policy and service for consumers who own and utilize renewable energy

More information

Green Building Technology

Green Building Technology Green Building Technology Renewable Energy Sources and Design/Specification Guidelines Presented by: Kurt Uhlir & Brian Kustwin Why Renewables? Reduction of SO 2 and NOX along with greenhouse gases such

More information

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff.

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff. JERSEY CENTRAL POWER & LIGHT UNIFORM TECHNICAL AND PROCEDURAL INTERCONNECTION REQUIREMENTS FOR NET METERING FACILITIES FOR INVERTER BASED WIND AND PHOTOVOLTAIC SYSTEMS OF 100 kw OR SMALLER for Atlantic

More information

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Table of Contents Chapter 1. Purpose and scope. Pg 3 Chapter 2. Application

More information

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION SAMPLE ORDINANCE 3/5/2012 Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION Section 1: Applicable Service Territory Net metering and electrical system interconnection is available on a first-come,

More information

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW) City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems

More information

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly. SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS (ELEC) This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS XXV. NET METERING A. Applicability and Availability 1. The terms Net Metering Service, Demand Charge-based Time-of- Use Tariff, Net Metering Customer, Customer, Time-of-Use Customer, Time-of-Use Tier,

More information

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING Third Revised Sheet 55a Cancels Second Revised Sheet 55a A. ELIGIBLE CUSTOMER-GENERATOR RULE NO. 17 NET ENERGY METERING Net energy metering is available to eligible customer-generators, defined as, permanent

More information

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings Your City logo here Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for utility-interactive central/string inverter systems

More information

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings PV TOOLKIT DOCUMENT #3 Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for utility-interactive central/string inverter systems

More information

ENGINEERING SPECIFICATION

ENGINEERING SPECIFICATION December 206 ENGINEERING SPECIFICATION No. of 6 DATE: 2-9-6 CATEGORY SUBJECT TABLE OF CONTENTS. Overview... 2 2. General Requirements for Service... 3 3. Definitions... 3 4. Abbreviations... 5 5. References

More information

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems COUNTY OF SANTA CRUZ PLANNING DEPARTMENT 701 OCEAN STREET, 4 th FLOOR, SANTA CRUZ, CA 95060 (831) 454-2580 FAX: (831) 454-2131 TDD: (831) 454-2123 KATHLEEN MOLLOY PREVISICH, PLANNING DIRECTOR Photovoltaic

More information

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities New Ulm Public Utilities Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities INDEX Document Review and History... 2 Definitions... 3 Overview... 3 Application

More information

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power 40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power WHO SHOULD FILE THIS APPLICATION: Anyone expressing interest to install generation which will interconnect

More information

CHAPTER 10 ELECTRICAL. Notes:

CHAPTER 10 ELECTRICAL. Notes: CHAPTER 10 ELECTRICAL 1001.0 General Requirements. Electrical wiring and equipment shall comply with the requirements of NFPA 70, National Electrical Code (NEC), or local ordinances. 1002.0 Solar Photovoltaic

More information

MISSOURI SERVICE AREA

MISSOURI SERVICE AREA MO.P.S.C. SCHEDULE NO. 6 4th Revised SHEET NO. 88 CANCELLING MO.P.S.C. SCHEDULE NO. 6 3rd Revised SHEET NO. 88 PURPOSE SOLAR REBATE The purpose of this Rider SR is to implement the solar rebate established

More information

COVER VICINITY MAP SCOPE OF WORK ELECTRICAL NOTES GOVERNING CODES SHEET INDEX

COVER VICINITY MAP SCOPE OF WORK ELECTRICAL NOTES GOVERNING CODES SHEET INDEX SCOPE OF WORK TO INSTALL A SOLAR PHOTOVOLTAIC (PV) SYSTEM THE POWER ENERATED BY THE PV SYSTEM WILL BE INTERCONNECTED WITH THE UTILITY RID THROUH THE EXISTIN ELECTRICAL SERVICE EQUIPMENT. THE PV SYSTEM

More information

RGS PV-000. Sheet List

RGS PV-000. Sheet List 007 ANSI Full Bleed B (.00 X 7.00 Inches) 07-0-08 Scope of Work: Energy shall install a 6.600 kw Grid-tied Photovoltaic ("PV") System totaling () Silfab SLA 00 M Modules with () Enphase Energy M0-60-LL-S

More information

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program As part of our commitment to support renewable energy, Kissimmee Utility Authority

More information

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _ Application for Operation of & Net Metering for Member-Owned Generation -------------- OWNER/APPLICANT INFORMATION Name: Mailing Address: City: County: State: Zip Code: _ Phone Number: Email Address:.Representative:

More information

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE 2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE PAGE 1 OF 5 This Reference provides a very comprehensive list of aspects of a solar PV installation that could be reviewed, clarifying

More information

Roof Top Solar Permit Document 1 Submittal Requirements Bulletin. Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Roof Top Solar Permit Document 1 Submittal Requirements Bulletin. Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings Roof Top Solar Permit Document 1 Submittal Requirements Bulletin Small Town with a Big Backyard! Solar Photovoltaic Installations 10 kw or Less in One and TwoFamily Dwellings This information bulletin

More information

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV. Perspectives on PV Microinverters and AC PV Modules Are Different Beasts by John Wiles Microinverters and AC PV modules are becoming very common in residential and small commercial PV systems. See photos

More information

Municipality Generator Interconnection Application Single Meter Application Part I

Municipality Generator Interconnection Application Single Meter Application Part I Municipality Generator Interconnection Application Single Meter Application Part I New Application Revised Application A single customer interconnecting to a single meter at a single premise makes a new

More information

Louisville Gas and Electric Company

Louisville Gas and Electric Company P.S.C. Electric No. 11, Original Sheet No. 57 APPLICABLE In all territory served. AVAILABILITY OF SERVICE Available to any customer-generator who owns and operates a generating facility located on Customer

More information

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016 DISTRIBUTED GENERATION CHAPTER 5 500. SCOPE This chapter includes distributed or customer-owned generation connected in parallel and operating with Alliant Energy s electric distribution system. For all

More information

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST The following checklist is an outline of the general requirements found in the 2005 National Electrical Code (NEC) Article 690 for Photovoltaic

More information

XXX RESIDENCE : XXX kw DC GROUND MOUNTED PHOTOVOLTAIC SYSTEM

XXX RESIDENCE : XXX kw DC GROUND MOUNTED PHOTOVOLTAIC SYSTEM EQUIPMENT SUMMARY 36 NO'S - LG 335N1C-A5 335W MODULE 01 NO'S - OUTBACK RADIAN GS8048A INVERTER XXX RESIDENCE : XXX 12.06 kw DC GROUND MOUNTED PHOTOVOLTAIC SYSTEM SHEET INDEX T-01 COVER SHEET G-01 GENERAL

More information

Net Metering Service. Customer Information Package

Net Metering Service. Customer Information Package Net Metering Service Customer Information Package March 20, 2017 Net Metering - The means of measuring the difference between the electricity supplied by an electric utility and the electricity generated

More information

CITY OF LANCASTER SPV TOOLKIT DOCUMENT #1

CITY OF LANCASTER SPV TOOLKIT DOCUMENT #1 CITY OF LANCASTER SPV TOOLKIT DOCUMENT #1 Submittal Requirements Bulletin Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings This information bulletin is published to guide

More information

Applicant and Site Information Job Address: Permit #:

Applicant and Site Information Job Address: Permit #: TOOLKIT DOCUENT #4 Planning and Building Services Solar Standard Plan Simplified icroinverter and Systems (One- and Two-Family Dwellings) SCOPE: Use this plan ONLY for systems using utility-interactive

More information

Washoe County PLAN SUBMITTAL

Washoe County PLAN SUBMITTAL Washoe County PLAN SUBMITTAL Washoe County PLAN SUBMITTAL Solar Photo Voltaic Systems Electrical Generation Systems December 2013 Washoe County Permits Plus Zone 1001 East Ninth Street PO Box 11130 Reno,

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT This Net Metering and Interconnection Agreement ( Agreement ) is made and entered into as of this day of, 2018, by the City of Santa

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC

Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC NJCE Market Manager HW Construction Department Wayne, NJ Robert A. Menist Contents Site inspections with attention on Labeling

More information

Mike Holt s Illustrated Guide to SOLAR PV SYSTEMS

Mike Holt s Illustrated Guide to SOLAR PV SYSTEMS Mike Holt s Illustrated Guide to Directory, Identification, Label, Marking, Plaque, and Sign Requirements for SOLAR PV SYSTEMS Extracted From Mike Holt s Illustrated Guide to Understanding NEC Requirements

More information

Net +Plus Connection Code

Net +Plus Connection Code Net +Plus Connection Code LANKA ELECTRICITY COMPANY (PRIVATE) LIMITED 1.0 BACKGROUND The existing Net Metering Concept launched in the year 2010 noticed an exponential growth in the recent year and at

More information

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER RS-N SECOND REVISED SHEET NO. 8.2.1 CANCELLING FIRST SHEET NO. 8.2.1 NAME OF UTILITY CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER DEFINITION Net Metering means calculating

More information

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT INTERCONNECTION AGREEMENT FOR SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION THIS AGREEMENT MUST ACCOMPANY

More information

SAMPLE PERMIT APPLICATION PACKAGE

SAMPLE PERMIT APPLICATION PACKAGE 2013 Lennox Industries Inc. Dallas, Texas, USA SOLAR - KIT / ACCESSORIES 507154-01 3/2013 Supersedes 506555-01 LITHO U.S.A. SAMPLE PERMIT APPLICATION PACKAGE SUNSOURCE HOME ENERGY SYSTEM SAMPLE PERMIT

More information

City of Manhattan Beach Community Development

City of Manhattan Beach Community Development City of Manhattan Beach Community Development Phone: (310) 802-5500 FAX: (310) 802-5501 TDD: (310) 546-3501 Photovoltaic Solar Panel Plan Check Guidelines Updated: 12-20-16 ORDINANCE NO. 15-0022 MBMC 9.06

More information

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board Policy Description: In an effort to ensure fair treatment of all of its customers,

More information

The following permits are required to install a solar PV system with a maximum power output of 10 kw or less:

The following permits are required to install a solar PV system with a maximum power output of 10 kw or less: Effective Date January 1, 2017 Form 1 Submittal Requirements Bulletin This information bulletin is published to guide applicants through a streamlined permitting process for solar photovoltaic (PV) projects

More information

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST The following checklist is an outline of the general requirements found in the 1999 National Electrical Code (NEC) Article 690 for Photovoltaic (PV) Power

More information

2. Fire Department Inspections are required and available by appointment on Tuesdays and Wednesdays. See item number four for fees.

2. Fire Department Inspections are required and available by appointment on Tuesdays and Wednesdays. See item number four for fees. Instructions 1. Fire Department Over the counter Plan checks are optional for solar systems complying with 2015 California Solar permitting guidebook. Although they are optional, they are highly recommended

More information

24. SOLAR INCENTIVE PROGRAM II

24. SOLAR INCENTIVE PROGRAM II 24. SOLAR INCENTIVE PROGRAM II A. General California Senate Bill 1 requires publicly owned utilities that sell electricity at the retail level, to adopt, implement, and fund a solar incentive program for

More information

33'-10"± ROOF #1 (2) SUNPOWER SPR E C-AC MICROINVERTER MODULES ROOF #2 (13) SUNPOWER SPR E C-AC MICROINVERTER MODULES 78'-9"± 25'-5"

33'-10± ROOF #1 (2) SUNPOWER SPR E C-AC MICROINVERTER MODULES ROOF #2 (13) SUNPOWER SPR E C-AC MICROINVERTER MODULES 78'-9± 25'-5 PROJECT : 15 x 327 SUNPOWER SPR E20-327-C-AC MICROINVERTER MODULES ROOF MOUNTED SOLAR PHOTOVOLTAIC MODULES SYSTEM SIZE: 4.90 kw DC STC ARRAY AREA #1: 35.08 SQ FT. ARRAY AREA #2: 228.02 SQ FT. SUMMARY 15

More information

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS TABLE OF CONTENTS Purpose and Scope...2 Authority...2 Applicability... 2 Intent.. 2 Maximum Connected Generation Allowed. 2 Definitions.

More information

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES 10-100 KILOWATTS IN THE STATE OF NEW JERSEY January 1, 2005 Rockland Electric Company 390 West Route 59 Spring Valley,

More information

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number: Please print the following information. Interconnect Customer Information Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone

More information

Heber Light & Power Electric Service Rule No. 14 NET METERING SERVICE

Heber Light & Power Electric Service Rule No. 14 NET METERING SERVICE Heber Light & Power Electric Service Rule No. 14 NET METERING SERVICE 1. Overview The Company offers Residential and Small General Service Customers net metering service that allows the Customer to use

More information

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018.

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018. SUMMARY This bulletin introduces a new PG&E program that allows the installation of an electric meter socket adapter that will accept a wired connection directly from a residential customer s Photo Voltaic

More information

Load Side PV Connections

Load Side PV Connections Perspectives on PV Load Side PV Connections 705.12(D) in the 2014 NEC by John Wiles Through the exceptional efforts of the members of NFPA NEC Code-Making Panel 4 working with the proposals and comments

More information

SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY

SERVICE CLASSIFICATION CEF COMMUNITY ENERGY FACILITY P.S.C. Del. No. 8 - Electric Original Leaf No. 95a SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY A Community Energy Facility (CEF) consists of one or more generators located in Company s service

More information

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources Ordinance No. Exhibit A ----------------------------------------- City of, Kansas Electric Department Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources -------------------------------------

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to

More information

Submittal Requirements Bulletin Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Submittal Requirements Bulletin Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings TOOKIT DOCUMENT #1 Submittal Requirements Bulletin Solar Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings This information bulletin is published to guide applicants through a streamlined

More information

SCHEDULE 84 CUSTOMER ENERGY PRODUCTION NET METERING SERVICE

SCHEDULE 84 CUSTOMER ENERGY PRODUCTION NET METERING SERVICE Idaho Power Company Fourth Revised Sheet No. 84-1 I.P.U.C. No. 29, Tariff No. 101 Third Revised Sheet No. 84-1 AVAILABILITY Issued per Order No. 34046 June 1, 2018 Service under this schedule is available

More information

Code Compliance. Perspectives on PV. Back to the Grid, Designing PV Systems for

Code Compliance. Perspectives on PV. Back to the Grid, Designing PV Systems for Perspectives on PV A series of articles on photovoltaic (PV) power systems and the National Electrical Code by John Wiles Back to the Grid, Designing PV Systems for Code Compliance 20 IAEI NEWS January.February

More information

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources Ordinance No. 743 Exhibit A City of Washington, Kansas Electric Department Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources Page 1 of 7 1. INTRODUCTION The provisions of this

More information

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620 Policy Bulletin No. 25 Net Metering Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620 Interconnection Standards For Residential Net Energy Metering With Electric

More information

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No. P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No. 39 PURPOSE: The purpose of the Solar Subscription Pilot Rider (Program) is to provide a limited number of

More information

City of Manhattan Beach Community Development

City of Manhattan Beach Community Development City of Manhattan Beach Community Development Phone: (310) 802-5500 FAX: (310) 802-5501 TDD: (310) 546-3501 Photovoltaic Solar Panel Plan Check Guidelines Updated: 10-01-15 ORDINANCE NO. 15-0022 MBMC 9.06

More information

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS For residential and commercial systems, the combined generation

More information

Solar Rooftop Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings

Solar Rooftop Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings Solar Rooftop Photovoltaic Installations 10 kw or Less in One- and Two-Family Dwellings This information bulletin is published to guide applicants through a streamlined permitting process for rooftop solar

More information

Supply-Side PV Connections

Supply-Side PV Connections Perspectives on PV Supply-Side PV Connections by John Wiles Plan reviewers and inspectors throughout the country are seeing increasing numbers of supply-side connected utility interactive photovoltaic

More information

Definitions. Scope. Customer Generation Interconnection Requirements

Definitions. Scope. Customer Generation Interconnection Requirements Updated 02/1 Page 1 Scope The purpose of this document is to describe Idaho Power s requirements for the installation and testing of Customer Generation acilities that are interconnected with Idaho Power

More information

Louisiana Net Metering Service. Customer Information Package

Louisiana Net Metering Service. Customer Information Package Louisiana Net Metering Service Customer Information Package August 1, 2013 Net Metering - The means of measuring the difference between the electricity supplied by an electric utility and the electricity

More information

Noble County Rural Electric Membership Corporation

Noble County Rural Electric Membership Corporation Albion, Indiana Page 1 of 5 SCHEDULE NB-1 RESIDENTIAL NET BILLING I. AVAILABILITY This Net Billing Rate is available to any residential member in good standing of Noble REMC (Noble) who owns and operates

More information

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDG 50 kw FOREWARD Requirements for Parallel Operations for Customers with Generation Not Exceeding 50 kw is intended to be used

More information

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

9. Non-Residential Services (Commercial, Industrial, and Agricultural) Section 9 2016 Electric Service Requirements, 3rd Edition Section 9 Non-Residential Services Directory Page 9.1 General Requirements 68 9.2 Direct-Connect Metering, Single Installations 69 9.3 Direct-Connect

More information

Questions from the AHJ To Fuse or Not to Fuse?

Questions from the AHJ To Fuse or Not to Fuse? Questions from the AHJ To Fuse or Not to Fuse? by John Wiles Nearly everyone agrees that the National Electrical Code gets better with every edition. However, new technologies like photovoltaic (PV) power

More information

Oncor Application for Interconnection of Distributed Generation

Oncor Application for Interconnection of Distributed Generation Oncor Application for Interconnection of Distributed Generation Certified Systems (12/7/2017) What is a certified system? A certified system is one that meets the requirements of UL-1741 Utility Interactive

More information

JEA Distributed Generation Policy Effective April 1, 2018

JEA Distributed Generation Policy Effective April 1, 2018 Summary This JEA Distributed Generation Policy is intended to facilitate generation from customer-owned renewable and non-renewable energy generation systems interconnecting to the JEA electric grid. The

More information

Expedited Permitting Process for Electric Vehicle Charging Stations

Expedited Permitting Process for Electric Vehicle Charging Stations Expedited Permitting Process for Electric Vehicle Charging Stations BPC-062 Purpose: This document provides all of the needed links to forms and checklists necessary to utilize Permit Sonoma s Expedited

More information

Interconnection Process for Generation Systems

Interconnection Process for Generation Systems Interconnection Process for Generation Systems I. INTRODUCTION...1 II. GENERAL INFORMATION...2 A. Definitions...2 B. Nodak Electric Cooperative, Inc. Generation Interconnection Contacts...3 C. Engineering

More information

PHOTOVOLTAIC SYSTEMS

PHOTOVOLTAIC SYSTEMS PV WORKSHEET STANDARD STRING ARRAY Solar photovoltaic (PV) systems have widely gained acceptance as an alternative energy source. Installations range from small arrays supplying bus stop luminaires to

More information

Residential Photovoltaic (PV) Packet

Residential Photovoltaic (PV) Packet Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 (916) 774-5332 Fax (916) 774-5394 Residential Photovoltaic (PV) Packet The Roseville Municipal Code

More information

COMMUNITY SOLAR PROGRAM

COMMUNITY SOLAR PROGRAM Original Sheet No. D-22.00 COMMUNITY SOLAR PROGRAM The Cooperative's generation and transmission Cooperative ("G&T") has created a standing offer for 10 MW ofrenewable energy, produced by solar and wind

More information

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT INTRODUCTION Lathrop Irrigation District has created a policy to allow safe connection

More information