Issue Summary Sec # Response Change to Draft Reqs

Size: px
Start display at page:

Download "Issue Summary Sec # Response Change to Draft Reqs"

Transcription

1 Draft Directives 017 and 060 (released April 2018) Stakeholder Feedback and AER Response On April 24, 2018, the AER released, for public comment, draft Directives 017 and 060 to implement the Alberta government's Climate Leadership Plan objective of a 45% reduction in methane emissions from upstream oil and gas operations. During the public comment period, the AER received feedback from over 350 respondents, including industry, environmental nongovernment organizations, municipalities, investment firms, technology and emission control companies, research associations, and individual citizens. An overview of respondents can be found at the end of this table. The AER considered and reviewed in detail each comment received. Many of the comments raised similar issues or concerns. What follows is a summary of the issues and concerns raised and responses, as well as changes made to the draft requirements. Unless otherwise noted, the section numbers refer to Directive 060. Issue Summary Sec # Response Change to Draft Reqs GENERAL Many respondents supported reducing methane emissions by 45 per cent. Various comments were also in support of the draft directives, particularly of the approach taken, the distinction between new and existing facilities, pneumatic limits, the inclusion of enclosed combustors, the flexibility to adopt new technologies or innovative approaches to fugitive emissions detection, the fleet average for cold heavy oil production (CHOPs), and seeking equivalency with the federal government so that methane emissions are regulated provincially rather than federally. Some comments recommended two regulatory reviews one prior to December 31, 2020, and the second prior to December 31, The comprehensive review is planned for no later than December 31, 2022, which is when most of the research projects will be completed and we will have sufficient reported emissions data to update our model. Prior to the review, we will meet annually with stakeholders to identify data gaps and to review reported data and research outcomes. As the requirements will only come into effect January 1, 2020, a December 31, 2020, review date would not allow sufficient time for data gathering and analysis in order to conduct a meaningful review. While there was broad support for the proposed regulatory review period, concerns were expressed about the process for regulatory review; in particular how transparent it would be. 1.8 The regulatory review process provides for an annual review of performance and other available data and also provides for multistakeholder consultation with the opportunity for stakeholders to make recommendations. Some respondents felt that the in-effect date for new sites would encourage operators to build more facilities or install equipment before January 1, 2022, so that they will be categorized as existing facilities and subject to less stringent requirements. A facility built before January 1, 2022, would still have to retrofit to meet the requirements that apply January 1, It would be more cost-effective to design facilities to meet the requirements instead of undertaking costly retrofits on existing facilities. Although the requirements for new facilities and equipment are generally more stringent than those for existing facilities and equipment, this difference allows us to meet the 45% reduction target while being cost effective. Page 1

2 Some comments were in support of the distinction between new and existing facilities and equipment. Others felt that this distinction was not justified and could undermine the methane reduction outcome. The distinction between new and existing facilities optimises the overall cost effectiveness of these requirements. Less-stringent retrofit requirements are applied to existing facilities, and more stringent design standards are applied to new facilities, which reduces the costs of complying with the requirements. Reducing the stringency of requirements that apply to existing facilities will not compromise the emissions reduction target because older facilities will be decommissioned and replaced with new facilities that are subject to more stringent requirements. Some respondents asked that "new facility" and "existing facility" be defined based on licensing date. The AER considered defining new and existing facility by licence date, but because the licence date is fixed, such a change would not capture expansions, relocations, and modifications. Basing requirements on first receipt or on production, installation, modification, and relocation as appropriate means that the requirements will still apply even as facilities change. Some respondents asked the AER to further clarify the scope of the regulations. Of particular interest was what midstream assets are in scope. D060 applies to all upstream petroleum industry wells and facilities. The proposed requirements apply to AER regulated upstream oil, gas, and bitumen wells; oil and gas facilities; gas plants; pipeline installations; storage facilities; and tank terminals (e.g., production and injection wells, batteries, and central processing facilities within thermal in situ oil sands schemes) The proposed requirements do not apply to AER-regulated facilities that are not related to oil, gas, or bitumen production (such as coal, shallow water wells, brine wells, NEB-regulated facilities, midstream meter stations, or midstream pipelines); oil sands mining schemes; processing plants for removing bitumen from oil sands at mines, including upgraders; refineries; rail-car loading facilities; downstream distribution pipelines; and downstream facilities. Page 2

3 Comments were received that the number of different in-effect dates in the draft requirements was confusing and needed to be simplified Commenters said that there are many important dates associated with these requirements and asked the AER to provide a "Table of Important Dates." To give operators enough time to comply with requirements, Directive 060 will be released before the directive in-effect date of January 1, Directive requirements such as the FEMP, the MRRCP, reporting requirements, the overall vent gas limit, and the new fuel flare and vent definitions take effect on January 1, 2020, with two exceptions: requirements for new equipment or facilities (January 1, 2022) and requirements for existing equipment and facilities (January 1, 2023). The AER has released a timeline with the final requirements. What is the in-effect date for the overall vent gas (OVG) limit? 8.3 The in-effect date for the OVG limit is the in-effect date for the requirements: January 1, Please note that s specifies exclusions in effect until January 1, The Directive 060 effective date has been changed to January Table 4 was updated to reflect this change of date. 8.1 (1) date deleted (1) date deleted date deleted (3) date deleted (1) date deleted (1) date deleted. Concerns were expressed that the requirements were developed without input from environmental and health groups The Government of Alberta directed the AER to develop the draft methane requirements using input from multiple stakeholder groups, including representatives of industry, environmental nongovernmental organizations, research organizations, Alberta Energy, and the Alberta Climate Change Office. The Government of Alberta's Climate Change Advisory Panel also engaged Albertans to recommend a plan for action. For more information please visit The AER received a number of comments that were editorial in nature. Some comments were received requesting defined terms, like "site" be capitalized in the directives. A number of comments described early action that companies have taken to reduce their methane emissions in advance of the methane requirements coming into force. They asked that the AER take these actions into account when designing the requirements. Some comments asked why the AER didn't align their definition of non-routine venting with the federal definition. A number of comments were received asking the AER to define "duty holder," not only in section 8, but also in the definitions. AER directives follow the AER style guide. The editorial comments were reviewed and, where appropriate, the AER made the necessary edits. AER directives follow the long-established norms of standard English and the AER style guide, including avoiding unnecessary capitalization. The AER supports early action that has been taken to reduce venting and took this into account in its modelling and regulatory design. Companies that have taken early action to reduce venting will see a reduction in compliance costs where they have already met the limits specified in the requirements. The definition of nonroutine venting is not standardized across jurisdictions. The AER has maintained its existing definition of nonroutine venting, which is meant to prevent extensive venting that can pose risks to safety and the environment. 8 For ease of reference, the definition of "duty holder" in section 8 has been added to appendix 2. Added the definition of "duty holder" from section 8 to appendix 2 Page 3

4 Comments were received about the importance of the AER's compliance assurance procedures being transparent. We will use a variety of tools, such as data analysis, data audits, facility inspections, and regional surveys, to ensure that operators comply with the requirements. Dealing with noncompliances will be in accordance with Manual 013: Compliance and Enforcement Program and may include enforcement tools ranging from warnings and administrative penalties to orders imposing conditions and prosecution. Comments about the regulatory approach in the draft requirements included supporting the approach, advocating for more prescriptive or equipment-specific requirements, and advocating for more company-specific targets that would provide flexibility for operators to determine how reductions would be made. The AER's regulatory approach is a hybrid of prescriptive and outcome-based regulation. It was developed through a multistakeholder approach that allowed us to use the collective knowledge of a diverse range of people, including experts from industry, environmental nongovernmental organizations, research organizations, Alberta Energy, and the Alberta Climate Change Office. Multistakeholder committees provided technical input and advice in development of various regulatory approaches. We evaluated the different regulatory approaches using the following criteria: 1) Cost effective : targets sources, operators, and activities that maximize emission reductions at the lowest cost. 2) Adaptive : enables the AER and operators to accommodate technical innovation, operational constraints, socioeconomic contexts, and policy changes. 3) Operationally feasible : integrates with operators existing business models and processes. 4) Transparent and credible : demonstrates that performance objectives are met and governments are satisfied with the quality and rigour of requirements. In addition to the methane reduction requirements, the AER has measurement, monitoring, and reporting requirements that allow the AER to enforce and demonstrate industry-wide performance. A number of comments were received on Directive 017 and Directive 060 that were out of scope for the methane reduction requirements. These comments were collected for consideration in future updates to these directives. Page 4

5 RETROFITS AND COMPLIANCE Respondents commented that there should be fines for under-reporting methane emissions. The AER uses a variety of enforcement tools ranging from warnings and administrative penalties to orders imposing conditions and prosecutions, depending on the nature of the noncompliance. Some respondents highlighted the need for the AER to audit operator submissions to verify accuracy. Some respondents requested more detail about how the AER will assess for compliance with the requirements in section 8 and how noncompliances will be treated. The AER is using multiple tools, including audits, to assess and verify the accuracy of operator submissions. The AER will test each submission for compliance using the OneStop system. Further investigation and verification will involve data audits, regional sweeps, and field inspections. Responses to noncompliances will be based on several criteria, including the magnitude of the infraction and the operator history as outlined in the AER's Manual 013: Compliance and Enforcement and its Integrated Compliance Assurance Framework. Some respondents underlined that the AER needs to be able to verify the volume of reported emissions. The AER will use the monthly reported Petrinex data and the annual data reported in OneStop to automatically assess against the requirements to determine which facilities may be out of compliance and identify candidates for audit verification. The AER will also be randomly auditing reported data to verify accuracy. Some respondents recommended that enforcement mechanisms be expressly addressed in the regulations and noted that enforcement efficacy increases with prescriptive requirements. Some comments were critical of the crude bitumen fleet average (CBFA) approach; specifically the AER's ability to enforce compliance with this requirement. Compliance assurance was a key consideration when designing the methane reduction requirements. The AER has a number of enforcement mechanisms available to it under various different enactments that specfically address noncompliance with AER requirements. 8.5 The AER will enforce compliance of the crude bitumen fleet average by using monthly reported emissions to verify that operators are compliant. The AER has also increased how frequently operators must test gas-oil ratios for all facilities under the CBFA to address the fluctuating nature of CHOPS venting and to impose stricter testing requirements on lower-venting facilities. Some respondents requested more detail about how the AER will assess for compliance with the Methane Reduction Retrofit Compliance Plan (MRRCP). 8.1 The AER will audit MRRCPs for adherence with the requirements in section 8.1. The MRRCP will be used as a tool to ensure that operators are positioned to meet the requirements. The quality of MRRCPs will be used to develop risk profiles for data audits and to determine priority areas for regional sweeps. Some respondents requested that the text in section 8.1 make it clear that no update to the MRRCP will be required after 2023 when all retrofits and replacements should be complete. 8.1 The AER has revised section 8.1 to make this clear. Section 8.1(3) now indicates that the MRRCP must be updated annually until January 1, Page 5

6 Some respondents did not agree with the requirement to include the resources and budget to execute the MRRCP because it is proprietary and resource allocation is not necessarily correlated to compliance outcomes. 8.1 All information the AER receives is a matter of public record. The AER does not, however, intend to publish individual MRRCPs. Some respondents asked if the MRRCP will be submitted to the AER or if they will they remain with the duty holder. 8.1 Operators do not have to submit the MRRCP to the AER. However, the AER will begin auditing the plans on January 1, 2020, and operators must make the plan available to the AER upon request as of this date. Some respondents indicated that the June 1, 2019, deadline for the MRRCP does not leave enough time to gather information to outline the resources, budget, and schedule that will ensure compliance with the requirements of section The AER has extended the deadline to January 1, 2020, to give operators time to collect data and prepare meaningful documents. Changed the MRRCP deadline to January 1, MEASUREMENT, MONITORING, AND REPORTING A number of comments were received that methane emissions from the upstream oil and gas industry are significantly higher than what is currently reported. The AER acknowledges that there is a degree of uncertainty with current methane emission estimates in Alberta. Consequently, we included comprehensive measurement, monitoring, and reporting (MMR) requirements to enhance the coverage of reported methane emissions. The new MMR system will be used to ensure that reported emissions are consistent with facility and production type to increase accuracy. Comments were received regarding the need for strong, standardized measurement and reporting, along with further studies to reduce this uncertainty and improve the accuracy of methane emissions reporting. There were requests for transparency in the data collected on methane emissions. Specifically, some commenters would like publicly available data on a per site basis to determine if a site is in compliance. Others asked for industry performance information for benchmarking against other operators. Currently, National Inventory Report emissions for Alberta are based on reported information that is supplemented with estimates. New measurement monitoring and reporting requirements in Directives 060 and 017 will improve emissions estimates to reduce uncertainty and improve accuracy. Ongoing research and development projects to update and refine emission factors will also improve the quality of reported data. (See The AER will make methane emissions data available publicly, which may be in a similar format to the pipeline performance and water use performance reports available on the AER website. Concern was raised that where a transfer of ownership of a facility takes place late in a year, the records from the previous operator may not be transferred or be incomplete. 8.2 Holding the operator of record at the end of the calendar year responsible for reporting and record keeping is consistent with other AER directives. The OneStop system will retain annual methane emissions reports, keeping a record of previously submitted data. Page 6

7 Some respondents felt strongly that the measurement, monitoring, and reporting system needed to be improved by including detailed reporting by source venting category, the function and bleed rate of pneumatic devices, and taxation level reporting results, and by adjusting the economic calculations for vent gas conservation at heavy oil facilities. They also suggested the measurement, monitoring, and reporting system be continuously improved. Annual vented methane emissions will be reported in OneStop by equipment source. Record-keeping requirements for pneumatic devices have been expanded to include device type, and bleed rate can be determined from device make and model. Emissions will be reported in OneStop at the Facility ID level and can be verified using Petrinex reported data. Adjusting the economic calculations for vent gas is out of the scope of the methane project but has been noted. The AER will continue to update and improve the measurement, monitoring, and reporting system as methane requirements are implemented. Changed section 8.11 to address reporting. Some respondents were unclear whether emissions from pneumatic devices that are exempted from requirements to maintain safe operating conditions or to achieve a necessary response time should be included in the calculation for the OVG limit. 8.3 & Prior to 2023, the OVG limit excludes emissions from equipment sources (pneumatic instruments and pumps, compressors, and glycol dehydrators). After 2023, all vent gas from pneumatic instruments and pumps should be included in the OVG limit. For both before and after 2023, all equipment categories are reported in the VENT code in Petrinex. This is clarified in the measurement, monitoring, and reporting manual. Some respondents said that 3.75 per cent of raw gas receipts in any year of operation is not sufficient, and many plants will be noncompliant when the new flare definition, with acid gas and dilution gas volumes included, takes effect. Comments were made that the methane requirements only use source level or "bottom-up" emissions quantification and reporting and asked if the requirements could accommodate atmospheric or "top-down" quantification methods and reporting. 5.2 The AER based the percentage of raw gas receipts per operating year on a sample set of data that indicated that 3.75 per cent will not significantly increase noncompliance. Acid gas volumes are excluded and a mechanism for their exclusion is being developed. Current top-down quantification methods are not able to distinguish whether a methane source is an upstream oil and gas source or a source outside the AER's regulatory mandate. The AER's quantification and reporting methodologies are aligned with other international standards that rely on bottom-up quantification. The AER supports new emission quantification methods and has put provisions in the fugitive emissions requirements for alternative fugitive monitoring programs so more top-down measurement and monitoring approaches for fugitive emissions can be applied when feasible. A comment was received that the compressor power rating should be included as one of the items in the annual methane emissions report 8.11 The AER has added to the record-keeping requirements. It is not a required reporting field. The compressor seal power rating has been added as a record keeping requirement in 8.11(1)(k)(ii) A number of comments were received that the definition of Facility ID in appendix 2 should not cross-reference the definition of Facility ID in Directive 047. For ease of reference, the Facility ID definition from Directive 047 has been added to appendix 2. Added definition of Facility ID to appendix 2 Page 7

8 Comments asked that the AER reinforce the use of ABCS codes by specifically stating in the Facility ID definition that ABCS codes are included. Directive 060 uses the Facility ID from Directive 047 for consistency. The measurement, monitoring, and reporting manual clarifies the use of ABCS codes. A number of comments expressed the need for changes to gas-to-oil ratio (GOR) test procedures to improve the accuracy and quality of reporting from cold heavy oil production with sand (CHOPS) operations. D060 s.8.5 & D017 s The AER is studying GOR testing procedures to inform any future regulatory changes needed to improve reporting. Commenters asked whether both volume and mass limits must be met for the DVG and OVG where limits are expressed by volume and mass. Some comments expressed a preference for direct emissions measurement rather that estimation methods. 8.3 & 8.4 A duty holder has the option to meet either the mass or the volume limit. 8.2 Both estimation and metering are forms of measurement. The AER requirements use estimation or metering depending on what is appropriate to balance accuracy and cost. The AER is also conducting studies to improve emission factors and testing methods. A number of comments were received requesting a measurement, monitoring, and reporting manual and expressing interest in participating in the manual's development. 8.2, 8.6 & 8.11 The AER has published the measurement, monitoring, and reporting manual to provide guidance for methane emissions estimation and reporting. Quantification methodologies and sample calculations for each source will be included. The manual was developed with input from consultants and other subject-matter experts. A commenter asked whether nonroutine venting is to be reported into OneStop. If so, more time will be needed for implementation. 8.3 Duty holders do not need to report nonroutine venting in OneStop. However, these volumes are included in Petrinex reporting. A commenter noted that there are no reporting requirements for the OVG limit in D This information is captured through monthly reporting in Petrinex. Some commenters asked whether the records are required to be kept onsite No, the records do not have to be stored onsite. Any records requested by the AER must be submitted within 30 days of the request. A number of comments asked whether the operator physically operating the plant on December 31 or any active operator who operated the facility at some point during the year is responsible for methane emissions reporting. Commenters asked that industry be given the flexibility to report to the well level (UWI) rather than in aggregate at the Reporting Facility ID level (ABBT battery level). 8.2 The AER updated the directive to clearly define "operator of record" and made it clear that the operator of record as of December 31 is responsible for methane emissions reporting for that year. 8.2 Reporting venting and fugitive emissions at the UWI level is included in Petrinex but will not be possible in the OneStop reporting system. In section 8.2, "operator" is changed to "operator of record." In appendix 2, a definition for "operator of record" was added. A comment was received that a template is needed for the annual methane emissions report. 8.2 The OneStop reporting system provides a template for the annual methane emissions report. A commenter asked for the in-effect date for DVG reporting The DVG must be reported as part of the annual methane emissions report. The first annual methane emissions reporting is due June 1, 2020, for the 2019 reporting year. Page 8

9 Some comments indicated that it would be challenging to complete an inventory, particularly for the 2018 reporting year, and asked that compliance assurance be less stringent on inventories, particularly in the first years The AER expects compliance with all requirements and does not adjust how stringently they are enforced. Given the current in-effect dates, operators should have sufficient time to complete the inventories required to comply with requirements. A number of comments wanted more simplified measurement, monitoring, and reporting, while other comments requested more detailed measurement, monitoring, and reporting. 8.2 In developing its measurement, monitoring, and reporting requirements, the AER carefully considered what information would be needed for compliance assurance and performance measurement. Only essential information was included in the measurement, monitoring, and reporting requirements. A number of comments requested clarification of the record-keeping in-effect dates for various equipment-specific requirements To complete the annual methane emissions report, operators must have up-todate records. A commenter noted that when multiple facility codes could apply to a single site, the AER should provide guidance as to which facility code to select. As required in Directive 017, duty holders need to clearly delineate their sites and assets to reporting Facility IDs. More guidance is provided in the measurement, monitoring, and reporting manual. Several commenters asked for clarity on the definition of site. They felt that it is not clear if it refers to a geographical location, a Facility ID, a UWI, or something else. They asked what happens if a facility is noncompliant with a limit at a Facility ID level, but compliant on a geographic basis. Site is defined in. To enforce compliance, the AER will identify high risk sites by utilizing risk rules and will determine non-compliances through the investigation of high risk submissions at the Facility ID level. A commenter asked how the AER plans to manage electronic reporting. 8.2 Within OneStop, the AER is developing a new reporting system to accept methane emissions information by source as well as other defined attributes that support compliance and performance management. Training and more information on OneStop will be made available. VENTING Comments were made about how the new limits in section 8 work with the timelines and limits for combined conservation, flaring, and venting in section 2. Some commenters asked that the source-specific exceptions to the OVG limit end on January 1, 2022, instead of on January 1, The limits and timelines in section 2 remain in effect. However, venting may not exceed the limits in section 8 when calculating the combined flared and vented volumes. This has been made clear in section The source-specific exception date was set to provide industry with sufficient time to work out operational issues associated with installing new equipment. Page 9

10 Comments were received that venting from in situ facilities should not be covered by the requirements because in situ facilities are already subject to limits and restrictions through AER scheme approvals, facility licences, and EPEA approvals. They also noted that the only significant venting from these facilities would result from upset conditions (which occur infrequently at in situ facilities) that could result in venting a volume of gas that exceeds the limits. 8.3 All sites and facilities must be designed and operated to comply with the venting requirements in Directive 060. Section 8.5 of the directive states that thermal in situ schemes and operations are '... excluded from the vent gas limits for crude bitumen batteries. Upset conditions are not exempt from the venting requirements in Directive 060 because they can be routed to control devices. Please note that in situ facilities that are over the volumetric limit in an upset condition may still be under the mass limit because OVG may be stated in both volumetric and mass terms. A commenter pointed out that operators could exceed a vent-gas volume limit but not exceed the associated vent-gas mass of methane limit when there are low concentrations of methane in the vent gas stream. The significance of this noncompliance risk should be highlighted in Directive 060 to help reduce false noncompliances and the associated administrative burden to both the regulator and industry. A comment requested that the AER allow for a special exception for vent-gas capture and use via catadyne heaters. While they are not as efficient as the Directive 060 requirements, catadyne heaters are a cost-effective methane abatement tool. Some commenters felt that a maximum vent rate should apply to all sites that are using the crude bitumen fleet average (CBFA) to impose an upper threshold on any single site's venting. Several comments noted that operations in the Peace River area are excluded from the CBFA. They argue that operators in the area have made significant efforts to reduce emissions and odours in this area and fairness demands that these efforts be included in the CBFA. 8.3 Operators have the option to provide methane emissions in mass rather than volume and to use the actual methane composition when reporting volumes. 8.7 Catadyne heaters are not considered a control device under Directive 060. Vent gas directed to a catadyne heater should be reported as fuel gas. 8.5 The OVG limit acts as an upper threshold for venting at all sites, including those using the CBFA. 8.5 Directive 084 is an area-based regulation dealing specifically with odour issues, whereas Directive 060 is province-wide and addresses methane emissions. The inclusion of Directive 084 areas into the CBFA could allow for greater venting in areas outside of the Peace River area. Additionally, only a small number of companies operate in the Peace River area and AER modelling indicates that operators with sites excluded because of the Directive 084 exclusion would not bear an undue burden as compared to other companies. Several commenters felt that the CBFA will allow operators of crude-bitumen sites to increase emissions. A comment was received that the CBFA should be used for all sites, not just for crude bitumen batteries, for consistency and to not unduly harm natural gas and conventional light oil production. The comment argues that it is inequitable for one segment of the industry to have different rules. 8.5 The CBFA requires operators to reduce emissions while still providing flexibility to address the limit as they determine. 8.5 Emissions from crude bitumen sites come primarily from venting, which allows the AER to monitor these sites more closely and ensure that the fleet average is met. Emissions from other site types are more varied and do not lend themselves as readily to a fleet average approach. Page 10

11 Several comments asked that the AER clarify how fleets are to be grouped. 8.5 As indicated in section 8.5 (1), the fleet average is calculated based on the venting from all crude bitumen batteries of a duty holder that reported production or venting in a month. A comment asked that in cases where there are multiple licences at a single site, does each licence have an OVG limit? 8.3 No. Multiple licences at a single site do not increase the single OVG limit at a site. The OVG limit is a site limit, not a Facility ID limit. A comment asked that when there is a reference to controlled liquid hydrocarbon tanks, is there a size limitation or is it intended to encompass any hydrocarbon tank (including small diesel storage and large crude oil tanks)? A comment was made that "venting," as shown in figure 10, does not include all types of venting. Table 5 Figure 10 The reference to controlled liquid hydrocarbon tanks is meant to encompass any hydrocarbon tank with emissions being routed to a control device such as a flare or a vapour recovery unit (VRU). It is not typical for a diesel storage tank to be routed to flare or VRU. Figure 10 is not a requirement and is only included to add clarity. Fundamentally, if an activity is regulated under Directive 060 and methane is emitted to atmosphere, it is subject to the requirements of Directive 060. A commenter felt that the statement, "the AER recommends that duty holders eliminate all routing venting," is vague and potentially provides scope for the AER to require the elimination of all routine venting. 8.0 This is a recommendation, not a requirement. A commenter felt that there should be a requirement that duty holders have a plan in place for existing facilities to meet the defined vent gas (DVG) limit associated with that facility. 8.4 We encourage operators to have a plan in place to meet the DVG limit, but we do not require one because it is up to operators to determine control or process changes that are needed to meet compliance when the DVG limit comes into force. The AER is focussing our planning efforts on equipment retrofit and replacement requirements because these require longer lead times for procurement and installation. We received some comments that the DVG limit is too low and will overshoot the 45% reduction target, putting an undue burden on the Alberta oil and gas industry. Others felt that the DVG limit was too high and should be lowered to ensure that the reduction target is met. 8.4 Vent gas limits were determined on a portfolio basis. This means that some vent gas sources may reduce methane venting by more than the overall 45% target and some sources may reduce methane venting by less than the target so long as the overall 45% reduction target is reached. The source reductions are determined by several factors, including cost, reporting complexity, and certainty of reductions. A commenter asked why vent gas from pneumatic devices, compressor seals, and glycol dehydrators were excluded from the DVG limit. 8.4 They are excluded because limits specific to these types of equipment are in place (see section 8.6). Page 11

12 Several comments noted that section 8.3 ends with, "the duty holder must comply with the vent gas limits specified below," but that no list of limits was provided. Some commenters asked the AER to provide scenario-based examples to help illustrate the difference between OVG limit and DVG limit applications. 8.3 The AER has revised this text to aid in clarity. The various vent gas limits are located in the Equipment-Specific Vent Gas Limits section (section 8.6). 8.3 The measurement, monitoring, and reporting manual has a sample calculation outlining the difference between the OVG limit and the DVG limit. Updated text in 8.3 1) to clarify where the vent gas limits can be found Some comments noted that DVG and "other routine sources" appear to be the same thing and asked the AER to add DVG to figure 10 to make this clear. A commenter noted that vent limits will be applied on a monthly basis and that, as the AER is currently enforcing vent limits on a three-month rolling average, suggested that this practice continue. They note that sites that routinely exceed vent limits will need to be addressed in either case. Figure 10 Figure 10 is for illustrative purposes only and does not include limits. Routine and nonroutine are defined terms and not limits per se. DVG is the name of the limit associated with some (but not all) of the items covered by the "routine" definition. 8.3 The AER does not enforce vent limits on a three-month rolling average basis. The AER is using a monthly limit to increase certainty that the methane reduction targets are met. Several commenters recommended that due to normal fluctuations in operating conditions, the compliance enforcement of the CBFA be done on a three-month rolling average vent rate, not on a one-month vent rate. This would accommodate normal operational fluctuations, particularly around start-up and interventions In the case of crude bitumen facilities, the fleet-average approach provides flexibility for fluctuations in normal operating conditions; therefore, additional flexibility is not required. A three-month rolling average approach would limit the AER's ability to meet the reduction target. Comments were received stating that the OVG limit would allow existing sites to vent vast amounts of gas from tanks and other equipment with little constraint and that an approach to venting that allows those emissions to increase is more lax than in other jurisdictions and is not credible. 8.3 The OVG limit acts as a ceiling on all venting both routine and nonroutine and is in line with existing limits on venting. In addition to the OVG limit, there are additional vent-gas specific limits that will further reduce venting from tanks and other equipment. Taken together, these requirements will reduce venting and help achieve the methane reduction target. A commenter noted that OVG limit is applied regardless of facility size and operation type and argued that it should be increased for larger facilities. 8.3 Larger facilities typically have controls in place to limit venting. The AER has consistently applied a 500 m 3 /month venting limit to all facilities. A large number of comments were received asking for more clarity or suggesting changes to table 4. Table 4 Table 4 is intended to be used as a summary and the requirements are contained in the sections that follow and has been updated to improve clarity. Table 4 has been updated to improve clarity. PNEUMATICS Some respondents were unclear if the vent rate or actuation requirements for instruments installed before January 1, 2022, apply to the 10% of venting instruments allowed if installed after January 1, In the final requirements, the language has been changed to make it clear that the vent rate and actuation requirements apply to both instruments installed before January 1, 2022, and to those installed after. Updated text in Page 12

13 Some respondents highlighted that the 10% set aside for venting pneumatics requires operators to retain an inventory of instruments on an ongoing basis, which increases administrative burden Duty holders only need to inventory as many instruments as required to support the calculation of any venting instruments up to 10%. Additionally, operators are only required to maintain an inventory of instruments, not create a new one every year. Some respondents indicated that time-based actuation requirements should account for production variations or recharge run times The AER understands that the actuation frequency of level controllers operating at well sites is related to production and well recharge. Level controllers can be installed in multiple different configurations and not only at wells. The AER has clarified that actuation frequency should be measured under normal operating conditions. Reworded to clarify that actuation frequency is to be measured during normal operating conditions Some respondents indicated that removing exemptions and applying vent-rate requirements for devices installed before January 1, 2023, would be a clearer approach The approach selected by the AER is intended to optimize flexibility for operators and expand emissions-reduction coverage in low abatement cost source categories. Moving to vent-rate-based device requirements would require stricter requirements in other source categories to compensate for a loss in reductions. Some respondents asked that an economic threshold be applied for retrofits that may be uneconomic at some sites The AER considered a variety of approaches to address economic considerations; however, these would be administratively burdensome and would increase the overall cost of regulation. The Government of Alberta (GoA) has offset credit programs in place to ease the economic burden of pneumatic requirements. Some respondents asked why propane-driven pneumatic devices were exempted from the requirements Propane-driven pneumatic devices are now included in the requirements. The AER does not want to incentivize operators to install propane-driven pneumatic devices, which still emit gas, over nonemitting technologies. Removed exception for propanedriven pneumatic devices in section Some respondents were concerned that they would be required to annually inventory their sites to update their pneumatic inventory to meet the recordkeeping requirements in 8.11(1)(c). Some respondents requested that additional wording be added to suggest that operators go beyond the requirements and use no-bleed pneumatic solutions wherever possible The AER reviewed the wording in 8.11 to ensure that it is clear that operators do not need to visit each site on an annual basis to inventory pneumatics so long as an accurate inventory is maintained Section 8 includes a statement recommending duty-holders to eliminate all routine venting. The definition of low-vent alternative was deleted and the language has been updated to not exclude non-emitting technologies as acceptable alternatives. "Annual" has been removed from the reference to "inventories" in section 8.11 (1) (c) Low-vent alternative deleted Some respondents asked what requirements apply to chemical injection pumps for sites constructed before Chemical injection pumps for sites constructed before 2022 are covered under the OVG limit beyond Some respondents requested that safety exemptions be expanded to include devices installed after The AER reviewed the wording in to ensure that it is clear that safety and response time exemptions are applicable for devices installed after Updated sections Page 13

14 Some respondents suggested that the wording in section 8.6.1(4)(a) and (b) more explicitly state that low/no-vent alternatives, or controls, are acceptable options to allow for more flexibility (4) The AER has removed the reference to low-vent alternative and added language to clarify that zero-venting options will apply. Updated 8.6. to use actuation frequency rather than "low vent." Also, deleted "low-vent alternative" from appendix 2. COMPRESSORS One commenter noted that mandating compressor packing vent metering with an uncertainty requirement that lines up with Directive 017 section is too stringent at 5% single-point uncertainty (especially for such a low-flow-rate gas stream). A comment was made that the costs to reduce emissions from compressors may outweigh the benefits and that the AER should consider exempting them In section 8.6.2(2), the maximum single-point test uncertainty has been specified at +/- 10% based on an AER testing study for flows over 0.1 m 3 /hr with no stringency for flows below that volume Compressors are a material source of emissions in the upstream oil and gas industry. Measurement activities and costs to reduce emissions from compressors can be coordinated with fugitive-emissions surveys or routine maintenance activities. Additionally, to reduce costs, the AER has included a fleet average for reciprocating compressor venting to give operators the freedom to determine where to incur costs. Changed compressor seal testing uncertainty in section (2) Some commenters asked the AER to define "fleet." The reciprocating compressor seal fleet is expressly defined in section as the duty holder s reciprocating compressors that are rated 75 kw or more, pressurized for more than 450 hours per calendar year, and either a) were installed before January 1, 2022, or b) were installed on or after January 1, 2022, and have fewer than four throws Changed ) to define RCS fleet. A commenter asked the AER to provide clarity on compressor "pressurized hours" and asked whether the AER would allow the use of "unit operating hours" as a proxy. The directive uses the term "throw," which appears to equate to "cylinder." A commenter asked if the AER would consider replacing "throw" with "cylinder" for consistency with the federal requirements We expect pressurized hours to align with operating hours. In cases where they don't align, operators are expected to track pressurized hours The AER considered replacing throw with cylinder ; however, as defined in the directive, a throw contains the entire rod packing seal system and not just the cylinder. The term "throw" is more inclusive of the potential vent sources that need to be considered. Commenters asked how a "deactivated throw" should be addressed in the fleet average calculation. Some commenters noted that vent gas control systems for reciprocating compressors may cause backpressure to the crankcase and result in methane venting. And they asked for exceptions for certain makes and models where this will be an issue Throws that are not pressurized (e.g., a deactivated throw) have no weight in the fleet average (time pressurized = 0) The AER has updated the requirements so that operators are not required to tie-in and control compressor crankcase vents. The exception can be found in section Changed the reciprocating compressor seal description in section Page 14

15 A commenter noted that many reciprocating compressors between 0.75 and 1 MW are being used in the upstream oil and gas sector in Alberta and that the provincial requirements for these compressors are much less stringent than the federal requirements The AER requirements capture compressors that are rated higher than 75 kw (0.75 MW) and operate for more than 450 hours per calendar year. The AER acknowledges that the federal reciprocating compressor requirements are different; however, the overall approach of these regulations achieves Alberta's methane reduction target. Some respondents disagreed with the compressor fleet-average approach, arguing that it is essentially unenforceable. They argue that emissions-monitoring technologies have not advanced sufficiently and are not cost-effective enough for it to be possible for the AER to monitor each site individually. This would leave the proposed regulatory methodology open to abuse. They concluded that because the AER can in no way confirm that individual facilities are complying with the proposed regulations, the fleet-average approach should be avoided The measurement, monitoring, and reporting requirements, particularly those for compressors, enable the AER to effectively enforce compressor seal venting requirements under a fleet average approach. Compressor seal venting is well defined and practical to quantify. Managing compressor seals as a fleet will allow operators to best allocate capital and effort. Unit-specific vent-rate limits were deemed too restrictive and did not account for the different variables in managing compressor-seal maintenance. A commenter asked the AER to provide the duration of the compressor seal test The AER considered adding a time requirement but given the wide range of flows and various measurement devices a minimum time was not practical and could cause confusion. The AER deems the measurement sufficiently accurate if the uncertainty and back pressure requirements are met regardless of the amount of time used for the test. One reader asked the AER to indicate what flow meters would be fit-for-purpose for compressor seal vent tests as compressor seals typically vent at very low flow rates and are subject to backpressure issues. One commenter asked the AER to consider a "step down" program, for duty holders who are able to demonstrate that they have an effective program in place to detect compressor-seal leaks, that would move the annual testing requirement to once every two years. An example of an effective program could be monitoring the compressor temperature on a daily basis. Temperatures above normal would result in a packing change-out The AER updated the measurement device criteria in section to address backpressure issues and low vent rates The AER is not considering a performance-based compressor-seal testing frequency program at this time. Annual testing can be aligned with regular service intervals, fugitive emissions surveys, or ongoing monitoring/ preventative maintenance. Compressor seal emissions vary by make, model, process conditions, and service. Due to the variance introduced by these factors, seal testing is the most appropriate way to estimate emissions from compressors. Section (2) updated to specify test parameters. Commenters asked why the AER is requiring that all testing points be accessible and clearly identified prior to January 1, 2020? Testing points need to be clearly identified and accessible on January 1, 2020 to provide consistent measurements and allow for safe and accessible measurements. This timing aligns with the compressor-testing requirements. Page 15

Evaluating Stakeholder Engagement

Evaluating Stakeholder Engagement Evaluating Stakeholder Engagement Peace River October 17, 2014 Stakeholder Engagement: The Panel recognizes that although significant stakeholder engagement initiatives have occurred, these efforts were

More information

Stakeholder Section Issue Possible Solution or Recommendation Rationale to Support Solution or Recommendation Category AER Response Section 3.

Stakeholder Section Issue Possible Solution or Recommendation Rationale to Support Solution or Recommendation Category AER Response Section 3. Directive 084: Requirements for Hydrocarbon Emission Controls and Gas Conservation in the Peace River Area Stakeholder Feedback and AER Response February 2017 Section numbers referenced in the Section

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Integrated Compliance Assurance Framework February 12, 2016 Q1. What are the Integrated Compliance Assurance Framework and Manual 013: Compliance and Enforcement Program? A1.

More information

Joint Operating Procedures for First Nations Consultation on Energy Resource Activities

Joint Operating Procedures for First Nations Consultation on Energy Resource Activities Joint Operating Procedures for First Nations Consultation on Energy Resource Activities October 31, 2018 Contents Revision History... iv Definitions of Key Terms... v 1 Background... 1 2 Roles and Responsibilities...

More information

18/10/2018. Mr Peter Adams General Manager, Wholesale Markets Australian Energy Regulator. By

18/10/2018. Mr Peter Adams General Manager, Wholesale Markets Australian Energy Regulator. By ABN 70 250 995 390 180 Thomas Street, Sydney PO Box A1000 Sydney South NSW 1235 Australia T (02) 9284 3000 F (02) 9284 3456 18/10/2018 Mr Peter Adams General Manager, Wholesale Markets Australian Energy

More information

Inactive Well Compliance Program (IWCP)

Inactive Well Compliance Program (IWCP) Inactive Well Compliance Program (IWCP) Year Two Final Report In addition to Bulletin 2014-19, Alberta Energy Regulator (AER) July 2017 The Alberta Energy Regulator s (AER) Inactive Well Compliance Program

More information

Appendix C SIP Creditable Incentive-Based Emission Reductions Moderate Area Plan for the 2012 PM2.5 Standard

Appendix C SIP Creditable Incentive-Based Emission Reductions Moderate Area Plan for the 2012 PM2.5 Standard Appendix C SIP Creditable Incentive-Based Emission Reductions This page intentionally blank. Appendix C: SIP Creditable Incentive-Based Emission Reductions Appendix C: SIP Creditable Incentive-Based Emission

More information

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1 Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide Version 1.1 October 21, 2016 1 Table of Contents: A. Application Processing Pages 3-4 B. Operational Modes Associated

More information

2018 AER Social Research Report

2018 AER Social Research Report 2018 AER Social Research Report Executive Summary June 2018 2018 AER Social Research Report Executive Summary June 2018 Published by Alberta Energy Regulator Suite 1000, 250 5 Street SW Calgary, Alberta

More information

June Safety Measurement System Changes

June Safety Measurement System Changes June 2012 Safety Measurement System Changes The Federal Motor Carrier Safety Administration s (FMCSA) Safety Measurement System (SMS) quantifies the on-road safety performance and compliance history of

More information

Emissions Legislation

Emissions Legislation Emissions Legislation Potential Impact of the Medium Combustion Plant Directive 1 SAACKE Presentation All rights reserved by SAACKE Combustion Services Ltd, UK and SAACKE GmbH, Bremen The formation of

More information

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013) RULE 9610 STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013) 1.0 Purpose The purpose of this rule is to provide an administrative mechanism

More information

Submission to the IESO re: RDGI Fund Virtual Net Metering Investigation Topic

Submission to the IESO re: RDGI Fund Virtual Net Metering Investigation Topic 1. Introduction The Canadian Solar Industries Association (CanSIA) is a national trade association that represents the solar energy industry throughout Canada. CanSIA s vision is for solar energy to be

More information

Net Metering Policy Framework. July 2015

Net Metering Policy Framework. July 2015 Net Metering Policy Framework July 2015 Table of Contents 1.0 BACKGROUND... 2 2.0 POLICY OBJECTIVE... 2 3.1 Eligibility... 3 3.1.1 Renewable Generation... 3 3.1.2 Customer Class... 3 3.1.3 Size of Generation...

More information

Part 3 Agreement Programs for 2017 and Greenhouse Gas Reduction (Renewable and Low Carbon Fuel Requirements) Act

Part 3 Agreement Programs for 2017 and Greenhouse Gas Reduction (Renewable and Low Carbon Fuel Requirements) Act Part 3 Agreement Programs for 2017 and 2018 Greenhouse Gas Reduction (Renewable and Low Carbon Fuel Requirements) Act Ministry of Energy, Mines and Petroleum Resources Government of British Columbia August

More information

Comhairle Cathrach Chorcaí Cork City Council

Comhairle Cathrach Chorcaí Cork City Council Transportation Division City Hall Cork Response to the Consultation Paper on the ESBN Electric Vehicle Pilot & Associated Assets Reference CER/16/286 Introduction welcomes the opportunity to respond to

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT DRAFT STAFF REPORT Draft Amendments to Rule 4621 (Gasoline Transfer into Stationary Storage Containers, Delivery Vessels, and Bulk Plants) and Rule 4622 (Gasoline Transfer into Motor Vehicle Fuel Tanks)

More information

The oil fields in the NCS are located in the North Sea, Norwegian Sea, and Barents Sea.

The oil fields in the NCS are located in the North Sea, Norwegian Sea, and Barents Sea. A.2 Norway Volumes of Associated Gas Flared on Norwegian Continental Shelf Norway is a major oil producer, and its oil fields are located offshore in the Norwegian Continental Shelf (NCS). 81 In 2002,

More information

CITY OF MINNEAPOLIS GREEN FLEET POLICY

CITY OF MINNEAPOLIS GREEN FLEET POLICY CITY OF MINNEAPOLIS GREEN FLEET POLICY TABLE OF CONTENTS I. Introduction Purpose & Objectives Oversight: The Green Fleet Team II. Establishing a Baseline for Inventory III. Implementation Strategies Optimize

More information

DISCUSSION DOCUMENT. New standards for off-road small spark-ignition engines under consideration

DISCUSSION DOCUMENT. New standards for off-road small spark-ignition engines under consideration DISCUSSION DOCUMENT New standards for off-road small spark-ignition engines under consideration Background The Off-Road Small Spark-Ignition Engine Emission Regulations (hereinafter referred to as the

More information

RE: Regulatory Proposal under the Condominium Act, 1998 (17-MGCS021)

RE: Regulatory Proposal under the Condominium Act, 1998 (17-MGCS021) Ministry of Government & Consumer Services January 2 nd, 2018 56 Wellesley St. W, 6 th Floor Toronto, ON M7A 1C1 RE: Regulatory Proposal under the Condominium Act, 1998 (17-MGCS021) This letter is submitted

More information

Vehicle Replacement Policy - Toronto Police Service

Vehicle Replacement Policy - Toronto Police Service STAFF REPORT June 21, 2000 To: From: Subject: Policy and Finance Committee Chairman, Toronto Police Services Board and City Auditor Vehicle Replacement Policy - Toronto Police Service Purpose: The purpose

More information

Implementation Plan PRC Transmission Relay Loadability Project Phase II Relay Loadability

Implementation Plan PRC Transmission Relay Loadability Project Phase II Relay Loadability Implementation Plan PRC-023-3 Transmission Relay Loadability Project 2010-13.2 Phase II Relay Loadability Requested Approvals PRC-023-3 Transmission Relay Loadability Requested Retirements PRC-023-2 Transmission

More information

Addressing ambiguity in how electricity industry legislation applies to secondary networks

Addressing ambiguity in how electricity industry legislation applies to secondary networks In Confidence Office of the Minister of Energy and Resources Chair, Cabinet Business Committee Addressing ambiguity in how electricity industry legislation applies to secondary networks Proposal 1 This

More information

Multi-Sector Air Pollutants Regulations (MSAPR) May 2017

Multi-Sector Air Pollutants Regulations (MSAPR) May 2017 Multi-Sector Air Pollutants Regulations (MSAPR) May 2017 Purpose The Multi-Sector Air Pollutants Regulations (MSAPR) came into force on June 17, 2016 This presentation will provide an overview of: MSAPR

More information

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES Chair Cabinet Economic Growth and Infrastructure Committee Office of the Minister of Transport Office of the Minister of Energy and Resources PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

More information

Final Report. LED Streetlights Market Assessment Study

Final Report. LED Streetlights Market Assessment Study Final Report LED Streetlights Market Assessment Study October 16, 2015 Final Report LED Streetlights Market Assessment Study October 16, 2015 Funded By: Prepared By: Research Into Action, Inc. www.researchintoaction.com

More information

DRAFT April 9, STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date])

DRAFT April 9, STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date]) RULE 9610 STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date]) 1.0 Purpose The purpose of this rule is to provide an administrative mechanism

More information

Well Pad Operations. Pennsylvania s GP-5A for Sources at Unconventional Natural Gas Well Sites

Well Pad Operations. Pennsylvania s GP-5A for Sources at Unconventional Natural Gas Well Sites Comparison of Pennsylvania Requirements, EPA Rules, and CSSD Requirements for Methane & VOC Emission Reduction for the Oil & Gas Industry Effective August 8, 2018 Air Quality Permit Category No 38 Exemption

More information

INTRODUCTION. June 15, Mark D. Marini, Secretary Massachusetts Department of Public Utilities One South Station Boston, MA 02110

INTRODUCTION. June 15, Mark D. Marini, Secretary Massachusetts Department of Public Utilities One South Station Boston, MA 02110 June 15, 2016 Mark D. Marini, Secretary Massachusetts Department of Public Utilities One South Station Boston, MA 02110 Re: D.P.U. 16-64 Investigation of the Department of Public Utilities, on its own

More information

POLLUTION PREVENTION AND RESPONSE. Application of more than one engine operational profile ("multi-map") under the NOx Technical Code 2008

POLLUTION PREVENTION AND RESPONSE. Application of more than one engine operational profile (multi-map) under the NOx Technical Code 2008 E MARINE ENVIRONMENT PROTECTION COMMITTEE 71st session Agenda item 9 MEPC 71/INF.21 27 April 2017 ENGLISH ONLY POLLUTION PREVENTION AND RESPONSE Application of more than one engine operational profile

More information

2015 AER Survey of Albertans and Stakeholders. Executive Summary

2015 AER Survey of Albertans and Stakeholders. Executive Summary 2015 AER Survey of Albertans and Stakeholders Executive Summary 2015 AER Survey of Albertans: Executive Summary July 2015 Published by Alberta Energy Regulator Suite 1000, 250 5 Street SW Calgary, Alberta

More information

Introduction to General Requirements for CORSIA. Tetsuya Tanaka Chief, Climate Change Section - Environment ICAO Secretariat

Introduction to General Requirements for CORSIA. Tetsuya Tanaka Chief, Climate Change Section - Environment ICAO Secretariat Introduction to General Requirements for CORSIA Tetsuya Tanaka Chief, Climate Change Section - Environment ICAO Secretariat Time to prepare for CORSIA Implementation Standards and Recommended Practices

More information

Department of Legislative Services

Department of Legislative Services Department of Legislative Services Maryland General Assembly 2006 Session HB 38 FISCAL AND POLICY NOTE House Bill 38 (Delegate Hubbard) Health and Government Operations Procurement - Diesel-Powered Nonroad

More information

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min Gas Advisory Board Draft Agenda Meeting No. 1 Location: Parmelia Hilton, Swan B Room 14 Mill Street, Perth WA 6000 Date: 20 December 2011 Time: 11:15am 12:15pm Item Subject Responsible Time 1. WELCOME

More information

Transit Vehicle (Trolley) Technology Review

Transit Vehicle (Trolley) Technology Review Transit Vehicle (Trolley) Technology Review Recommendation: 1. That the trolley system be phased out in 2009 and 2010. 2. That the purchase of 47 new hybrid buses to be received in 2010 be approved with

More information

Diesel Rules Compliance Update. Presented by Sean Edgar, Project Manager

Diesel Rules Compliance Update. Presented by Sean Edgar, Project Manager Diesel Rules Compliance Update Presented by Sean Edgar, Project Manager www.cleanfleets.net December 7, 2011 Goals for Today The Final Offroad and Onroad Rules How to Report and know what the Rules require

More information

CONTACT: Rasto Brezny Executive Director Manufacturers of Emission Controls Association 2200 Wilson Boulevard Suite 310 Arlington, VA Tel.

CONTACT: Rasto Brezny Executive Director Manufacturers of Emission Controls Association 2200 Wilson Boulevard Suite 310 Arlington, VA Tel. WRITTEN COMMENTS OF THE MANUFACTURERS OF EMISSION CONTROLS ASSOCIATION ON CALIFORNIA AIR RESOURCES BOARD S PROPOSED AMENDMENTS TO CALIFORNIA EMISSION CONTROL SYSTEM WARRANTY REGULATIONS AND MAINTENANCE

More information

Toyota Motor North America, Inc. Grant of Petition for Temporary Exemption from an Electrical Safety Requirement of FMVSS No. 305

Toyota Motor North America, Inc. Grant of Petition for Temporary Exemption from an Electrical Safety Requirement of FMVSS No. 305 This document is scheduled to be published in the Federal Register on 01/02/2015 and available online at http://federalregister.gov/a/2014-30749, and on FDsys.gov DEPARTMENT OF TRANSPORTATION National

More information

Recharge Kick-off Meeting Recharge Activity Review Process for

Recharge Kick-off Meeting Recharge Activity Review Process for Recharge Kick-off Meeting Debra Fry Executive Director, Operating Budget and Recharge Review Gabriella Hato Manager, Recharge Review Sarah Hislen Analyst, Recharge Review Charet Wynn Analyst, Recharge

More information

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources Ordinance No. Exhibit A ----------------------------------------- City of, Kansas Electric Department Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources -------------------------------------

More information

New Ultra Low Sulfur Diesel fuel and new engines and vehicles with advanced emissions control systems offer significant air quality improvement.

New Ultra Low Sulfur Diesel fuel and new engines and vehicles with advanced emissions control systems offer significant air quality improvement. New Ultra Low Sulfur Diesel fuel and new engines and vehicles with advanced emissions control systems offer significant air quality improvement. The U.S. Environmental Protection Agency (EPA) has issued

More information

January 24, Re: Small Refiner Exemptions. Dear Administrator Pruitt:

January 24, Re: Small Refiner Exemptions. Dear Administrator Pruitt: January 24, 2018 The Honorable Scott Pruitt Administrator U.S. Environmental Protection Agency 1200 Pennsylvania Avenue, N.W., 1101A Washington, DC 20460 Re: Small Refiner Exemptions Dear Administrator

More information

B. Approval of the Statement of Proceedings/Minutes for the meeting of October 24, 2017.

B. Approval of the Statement of Proceedings/Minutes for the meeting of October 24, 2017. COUNTY OF SAN DIEGO AIR POLLUTION CONTROL BOARD REGULAR MEETING MEETING AGENDA WEDNESDAY, NOVEMBER 15, 2017, 9:00 AM BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY SAN DIEGO, CA 92101 A. Roll

More information

DEPARTMENT OF TRANSPORTATION. Agency Information Collection Activities; Approval of a New Information

DEPARTMENT OF TRANSPORTATION. Agency Information Collection Activities; Approval of a New Information This document is scheduled to be published in the Federal Register on 03/21/2017 and available online at https://federalregister.gov/d/2017-05523, and on FDsys.gov DEPARTMENT OF TRANSPORTATION [4910-EX-P]

More information

Proposed Amended Rule 1469 Hexavalent Chromium Emissions from Chromium Electroplating and Chromic Acid Anodizing Operations

Proposed Amended Rule 1469 Hexavalent Chromium Emissions from Chromium Electroplating and Chromic Acid Anodizing Operations Proposed Amended Rule 1469 Hexavalent Chromium Emissions from Chromium Electroplating and Chromic Acid Anodizing Operations South Coast AQMD February 27, 2018 Overview of Proposed Revisions of PAR 1469

More information

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014 Solar and Smart Meter Update 1 April 2014 to 30 June 2014 Released July 2014 2 CONTENTS 1. Solar and Smart Meter Cases... 3 2. SMART METER UPDATE... 4 2.1. EWOV Smart Meter Cases Increase by 36%... 4 2.2.

More information

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)*

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Australian Capital Territory Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Disallowable instrument DI2016 189 made under the Utilities Technical Regulation

More information

RE: Case No. U-17826, Commission s own motion: Gas safety standards

RE: Case No. U-17826, Commission s own motion: Gas safety standards Alida D. Sandberg Director, Engineering Services One Energy Plaza, WCB 1850 Detroit, Michigan 48226 Executive Secretary Michigan Public Service Commission PO Box 30221 Lansing, Michigan 48909 RE: Case

More information

General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38. Citizens Advisory Council Meeting March 19, 2013

General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38. Citizens Advisory Council Meeting March 19, 2013 General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38 Citizens Advisory Council Meeting March 19, 2013 Headings : White Text 40 pt. Calibri GP-5 General Information

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Directive 040 General December 2016 Q1. How do I apply for exemptions to Directive 040 test requirements? A1. Contact the AER Well Test Group by email at welltest-helpline@aer.ca

More information

DEVELOPMENT OF DRAFT GUIDELINES FOR CONSISTENT IMPLEMENTATION OF REGULATION OF MARPOL ANNEX VI

DEVELOPMENT OF DRAFT GUIDELINES FOR CONSISTENT IMPLEMENTATION OF REGULATION OF MARPOL ANNEX VI E INTERSESSIONAL MEETING ON CONSISTENT IMPLEMENTATION OF REGULATION 14.1.3 OF MARPOL ANNEX VI Agenda item 2 25 May 2018 ENGLISH ONLY DEVELOPMENT OF DRAFT GUIDELINES FOR CONSISTENT IMPLEMENTATION OF REGULATION

More information

California Greenhouse Gas Vehicle and Fuel Programs

California Greenhouse Gas Vehicle and Fuel Programs NCSL Advisory Council on Energy California Greenhouse Gas Vehicle and Fuel Programs Charles M. Shulock California Air Resources Board November 28, 2007 Overview AB 32 basics GHG tailpipe standards Low

More information

ST. VINCENT AND THE GRENADINES

ST. VINCENT AND THE GRENADINES ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N POL 022 FUEL OIL CONSUMPTION DATA COLLECTION SYSTEM Amendments to MARPOL Annex VI, MEPC.278(70) TO: APPLICABLE TO: EFFECTIVE AS FROM: SHIPOWNERS,

More information

Embedded Battery Research Summary

Embedded Battery Research Summary Embedded Battery Research Summary A report commissioned by Call2Recycle, Inc. Research conducted by Kelleher Environmental OVERVIEW In September 2017, Call2Recycle engaged Kelleher Environmental to carry

More information

Sunoco, Inc Market Street LL Philadelphia, PA June 29, 2006

Sunoco, Inc Market Street LL Philadelphia, PA June 29, 2006 ORIGINAL : 2532 Sunoco, Inc. 1735 Market Street LL Philadelphia, PA 19103-7583 June 29, 2006 Environmental Quality Board Rachel Carson State Office Building 400 Market St. - 15 th floor Harrisburg, PA

More information

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) RULE 69. ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) (a) APPLICABILITY (1) Except as provided in Section (b) or otherwise specified

More information

Future Funding The sustainability of current transport revenue tools model and report November 2014

Future Funding The sustainability of current transport revenue tools model and report November 2014 Future Funding The sustainability of current transport revenue tools model and report November 214 Ensuring our transport system helps New Zealand thrive Future Funding: The sustainability of current transport

More information

The Modernized Green Commercial Vehicle Program

The Modernized Green Commercial Vehicle Program The Modernized Green Commercial Vehicle Program 1 Government Commitment Ontario s Climate Change Strategy set the long term vision for meeting GHG pollution reduction targets of 15% below 1990 levels in

More information

Submission re: Proposed Enhancement s to Ontario Net Metering Framework. 2. Enhancements to Ontario Net Metering Framework

Submission re: Proposed Enhancement s to Ontario Net Metering Framework. 2. Enhancements to Ontario Net Metering Framework 1. Introduction The Canadian Solar Industries Association (CanSIA) is a national trade association that represents the solar energy industry throughout Canada. CanSIA s vision is for solar energy to be

More information

Review of the SMAQMD s Construction Mitigation Program Enhanced Exhaust Control Practices February 28, 2018, DRAFT for Outreach

Review of the SMAQMD s Construction Mitigation Program Enhanced Exhaust Control Practices February 28, 2018, DRAFT for Outreach ABSTRACT The California Environmental Quality Act (CEQA) review process requires projects to mitigate their significant impacts. The Sacramento Metropolitan Air Quality Management District (SMAQMD or District)

More information

CONSULTATION DOCUMENT

CONSULTATION DOCUMENT EUROPEAN COMMISSION Brussels, 31.5.2017 C(2017) 3815 final CONSULTATION DOCUMENT First phase consultation of the Social Partners under Article 154 of TFEU on a possible revision of the Road Transport Working

More information

AIR POLLUTION AND ENERGY EFFICIENCY. Update on the proposal for "A transparent and reliable hull and propeller performance standard"

AIR POLLUTION AND ENERGY EFFICIENCY. Update on the proposal for A transparent and reliable hull and propeller performance standard E MARINE ENVIRONMENT PROTECTION COMMITTEE 64th session Agenda item 4 MEPC 64/INF.23 27 July 2012 ENGLISH ONLY AIR POLLUTION AND ENERGY EFFICIENCY Update on the proposal for "A transparent and reliable

More information

Emission Trading Scheme (ETS)

Emission Trading Scheme (ETS) Emission Trading Scheme (ETS) Customer Presentation October 2009 Rev. 5 Overview What is ETS? How does ETS work? Who is affected by ETS? What does this mean for Operators? What tools are available to Operators?

More information

Please note: This guideline has been updated according to the BPP extension requirements.

Please note: This guideline has been updated according to the BPP extension requirements. Life Cycle Emission Assessment Guideline Please note: The following guideline may be updated from time to time. If there is a discrepancy between this guideline and the grant agreement, the terms of the

More information

New West Partnership Deliverables July 2011/2012 Reporting

New West Partnership Deliverables July 2011/2012 Reporting Area 1 - Vehicle Weights and Dimensions Steering Axle Weight Limits July 2011 Changes to vehicle design and It is Alberta s position, jointly agreed upon by other New West additional required equipment

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: September 27, 2012 SUBJECT: NOTICE OF AWARD PROCUREMENT AUTHORIZATION - ARTICULATED BUSES INFORMATION ITEM RECOMMENDATION

More information

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION. Quality of petrol and diesel fuel used for road transport in the European Union

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION. Quality of petrol and diesel fuel used for road transport in the European Union COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 2.3.2005 COM(2005) 69 final REPORT FROM THE COMMISSION Quality of petrol and diesel fuel used for road transport in the European Union Second annual report

More information

GIBRALTAR ERDF OPERATIONAL PROGRAMME POST ADOPTION STATEMENT

GIBRALTAR ERDF OPERATIONAL PROGRAMME POST ADOPTION STATEMENT Intended for Government of Gibraltar Document type Report Date January 2015 GIBRALTAR ERDF OPERATIONAL PROGRAMME 2014-2020 POST ADOPTION STATEMENT GIBRALTAR ERDF OPERATIONAL PROGRAMME 2014-2020 POST ADOPTION

More information

EXECUTIVE SUMMARY. Introduction

EXECUTIVE SUMMARY. Introduction EXECUTIVE SUMMARY Introduction The purpose of this study is to ensure that the Village, in cooperation and coordination with the Downtown Management Corporation (DMC), is using best practices as they plan

More information

RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE

RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE PREVENTION OF POLLUTION FROM SHIPS, 1973, AS MODIFIED

More information

Tendering Public Charging Infrastructure for Electric Vehicles

Tendering Public Charging Infrastructure for Electric Vehicles European Best Practices: Tendering Public Charging Infrastructure for Electric Vehicles Best Value Procurement in the city of Arnhem Authors: Peter Swart, Arnhem City Roos van der Ploeg, MA legal & EV

More information

FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING ENERGY EFFICIENCY OF INTERNATIONAL SHIPPING

FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING ENERGY EFFICIENCY OF INTERNATIONAL SHIPPING E MARINE ENVIRONMENT PROTECTION COMMITTEE 67th session Agenda item 5 MEPC 67/5 1 August 2014 Original: ENGLISH FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING ENERGY EFFICIENCY OF INTERNATIONAL

More information

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL Consumer Goods and EU Satellite navigation programmes Automotive industry Brussels, 08 April 2010 ENTR.F1/KS D(2010) European feed back to

More information

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2.

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2. Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft 2012-11-29 Proposed New ISO Rules Section 502.5 Version 2.0 Generating Unit Technical Requirements

More information

Environment and Climate Change Canada Clean Fuel Standard for ISCC Stakeholder Meeting North America

Environment and Climate Change Canada Clean Fuel Standard for ISCC Stakeholder Meeting North America Environment and Climate Change Canada Clean Fuel Standard for ISCC Stakeholder Meeting North America Lorri Thompson, Head Regulatory Development Fuels Section, Oil Gas and Alternative Energy Division December

More information

Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping

Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping IBIA/BMS United A glimpse into the future of shipping 30 May 2018, Athens, Greece

More information

ULTRA LOW EMISSIONS ZONE CONSULTATION LONDON COUNCILS RESPONSE

ULTRA LOW EMISSIONS ZONE CONSULTATION LONDON COUNCILS RESPONSE Ultra Low Emissions Zone Consultation Contact: Jennifer Sibley Direct line: 020 7934 9829 Email: jennifer.sibley@londoncouncils.gov.uk Date: 16 January 2014 Dear Sir/Madam, ULTRA LOW EMISSIONS ZONE CONSULTATION

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT DATE: 3/1/10, updated 5/5/10 TO: Interested Parties SUBJECT: Frequently asked questions regarding compliance with Rule 4320, Advanced Emission Reduction

More information

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016 Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016 Fitchburg Gas and Electric Light Company d/b/a Unitil ( Unitil or the Company ) indicated in the 2016-2018 Energy Efficiency

More information

Certification Memorandum. Approved Model List Changes

Certification Memorandum. Approved Model List Changes Certification Memorandum Approved Model List Changes EASA CM No.: CM 21.A-E Issue 01 issued 15 August 2018 Regulatory requirement(s): 21.A.57, 21.A.61, 21.A.62, 21.A.91, 21.A.93, 21.A.97, 21.A.114, 21.A.117,

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

Issue 23 draft for Nuvve

Issue 23 draft for Nuvve Issue 23 draft for Nuvve Contents Introduction... 1 Issue Framing:... 2 Key Questions / Considerations... 2 Key Questions... 2 Key Considerations for IOUs:... 3 Background Knowledge... 4 Additional Details:...

More information

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State PLEASE NOTE: Legislative Information cannot perform research, provide legal advice, or interpret Maine law. For legal assistance, please contact a qualified attorney. Emergency preamble. Whereas, acts

More information

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX RULE 413 - STATIONARY GAS TURBINES Adopted 04-06-95 (Amended 05-01-97, 03-24-05) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION - EMERGENCY STANDBY UNITS 111 EXEMPTION - REMOVAL FROM SERVICE

More information

Final Administrative Decision

Final Administrative Decision Final Administrative Decision Date: August 30, 2018 By: David Martin, Director of Planning and Community Development Subject: Shared Mobility Device Pilot Program Operator Selection and Device Allocation

More information

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources Ordinance No. 743 Exhibit A City of Washington, Kansas Electric Department Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources Page 1 of 7 1. INTRODUCTION The provisions of this

More information

Canada s Passenger Automobile and Light Truck Greenhouse Gas Emission Regulations for Model Years

Canada s Passenger Automobile and Light Truck Greenhouse Gas Emission Regulations for Model Years Informal document No.. WP.29-153 153-1313 (153rd WP.29, 8-11 March 2011, agenda item 6.) Canada s Passenger Automobile and Light Truck Greenhouse Gas Emission Regulations for Model Years 2011-2016 Briefing

More information

EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR CHANGES

EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR CHANGES EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR The EU Toy Directive was revised in order to take into account the new technological developments and increasing child safety requirements.

More information

By Edmund Hughes, Technical Officer, Marine Environment Division, IMO

By Edmund Hughes, Technical Officer, Marine Environment Division, IMO A new chapter for MARPOL Annex VI requirements for technical and operational measures to improve the energy efficiency of international shipping By Edmund Hughes, Technical Officer, Marine Environment

More information

RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES. January 10, 2011 Presentation to Arvada City Council

RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES. January 10, 2011 Presentation to Arvada City Council RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES January 10, 2011 Presentation to Arvada City Council CONSULTANT TEAM LBA Associates MSW Consultants Denver based recycling and waste management consultant

More information

EVSE Permitting and Inspection Best Practices

EVSE Permitting and Inspection Best Practices EVSE Permitting and Inspection Best Practices The Permitting and Inspection Process for Plug-in Electric Vehicle Charging EVITP EV Community Readiness Seminar [Photo Courtesy: General Electric] This report

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

Requirements for Alteration Design Registration Based on Fitness-for-Service

Requirements for Alteration Design Registration Based on Fitness-for-Service the pressure equipment safety authority Requirements for Based on Fitness-for-Service AB 535 Edition 1, Revision 0 - Issued 2018-06-27 Table of Contents FOREWORD... ii 1.0 INTRODUCTION... 1 2.0 DEFINITIONS

More information

Toronto Parking Authority Fleet Vehicle Replacement

Toronto Parking Authority Fleet Vehicle Replacement PA12.5 REPORT FOR ACTION Toronto Parking Authority Fleet Vehicle Replacement - 2018 Date: June 8, 2018 To: Board of Directors, Toronto Parking Authority From: Acting President, Toronto Parking Authority

More information

ANNEX 3. RESOLUTION MEPC.278(70) (Adopted on 28 October 2016)

ANNEX 3. RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) Annex 3, page 1 ANNEX 3 RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE PREVENTION OF POLLUTION FROM SHIPS,

More information

Questions/Comments During Workshop

Questions/Comments During Workshop Potential Changes to the PERP Regulation and Portable Engine ATCM September 13, 2016 Fresno California Environmental Protection Agency Air Resources Board Questions/Comments During Workshop We want as

More information

March 11, Public Docket A U.S. Environmental Protection Agency Room M-1500, Waterside Mall 401 M Street, SW Washington, DC 20460

March 11, Public Docket A U.S. Environmental Protection Agency Room M-1500, Waterside Mall 401 M Street, SW Washington, DC 20460 March 11, 1999 Public Docket A-97-50 U.S. Environmental Protection Agency Room M-1500, Waterside Mall 401 M Street, SW Washington, DC 20460 To Whom It May Concern: The State and Territorial Air Pollution

More information

Frequently Asked Questions Directive 079: Surface Development in Proximity to Abandoned Wells

Frequently Asked Questions Directive 079: Surface Development in Proximity to Abandoned Wells Frequently Asked Questions Directive 079: Surface Development in Proximity to Abandoned Wells July 2018 General Q1. How can I determine if a well is abandoned? A1. A third party can see if it is abandoned

More information