Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

Size: px
Start display at page:

Download "Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017"

Transcription

1 Net Metering Revision: 1 Revised: November 7, 2017 Net Metering Page 1 of 5

2 1 Net Metering This Application and Agreement is considered complete when it provides all applicable and correct information required and is signed below. Additional information to evaluate the Application may be required. 1.1 Processing Fee A non-refundable processing fee of $100 (25kW or less) or $500 (over 25kW) must accompany this Application. 1.2 Additional Documentation This application and agreement should be accompanied by the follow documents: One Line Diagram, including: o Energy Source o Inverter(s) o Disconnect switch o Production meter o Service/Net Meter o Connection to Service Panel Site Map Photovoltaic Panel Specification sheet (if applicable) Inverter specification sheet (if applicable) Turbine specification sheet (if applicable) IEEE 1547 or UL 1741 Certification 1.3 Interconnection and Net Meter Customer Information Account Number: Name: Service Address: Mailing Address: Telephone: Cellular: Address: Net Metering Page 2 of 5

3 1.4 Installer Information Company Name: Contact Person: Address: Telephone: Cellular: Address: 1.5 Generation Facility Information Energy Source (e.g. Solar, Wind, Hydro, Fuel Cell): Rated Output: kw Volts Amps Is the system: Single Phase Three Phase Does the system have battery back up? Yes No Does the system have a backup generator? Yes No Proposed Installation Date 1.6 Inverter Information (if applicable) Nameplate Ratings: kw Volts: Amps Number of Inverters: UL 1741 Listed Inverters? Yes No 1.7 Photovoltaic Panel Information (if applicable) Nameplate Ratings: W Volts: Amps Number of Modules: Modules made in Washington? Yes No 1.8 Other Generation (e.g. Wind, Hydro, Fuel Cell, Bio-Gas) Information (if applicable) Nameplate Ratings: kw Volts: Amps Operating Power Factor Net Metering Page 3 of 5

4 1.9 Interconnection Customer Signature I certify that the information provided above is complete and correct to the best of my knowledge. I agree to the terms and conditions of the Interconnection Standards Revision 1 set forth by the. I agree to the terms and conditions of the Net Metering Standards Revision 1 set forth by the Public Utility District #1 of Lewis County. I agree to allow the to disclose personal information about my participation in the Washington State Renewable Energy Cost Recovery program to the Washington State University s Energy Extension Program. I agree to allow the to disclose certain information about my generation facilities to the installer of my system Signatures By signing below the Customer-Generator certify, to the best of their knowledge, the information provided above is true and correct. In Witness Whereof, the Parties have caused this Application and Agreement to be executed by their duly authorized representatives as the date below. This final Application and Agreement is effective as of the last date set forth below. Customer-Generator: Signature: Print Name: Title: Date Signed: Net Metering Page 4 of 5

5 2 Customer Checklist for Utility Interconnection PUBLIC UTILITY DISTRICT NO.1 OF LEWIS COUNTY Submit the Application and Agreement for Interconnection and Net Metering to the Public Utility District #1 of Lewis County (Utility). Send application to Public Utility District No. 1 of Lewis County o to netmetering@lcpud.org o Mail to P.O. Box 330, Chehalis WA Receive written design approval from the Utility Pay application fee and production meter fee (if applicable) Get an electrical permit from Washington State L&I ( ). Follow the National Electric Code (NEC) as required. Complete the installation. Get inspections from a state electrical inspector Notify the Utility that the installation has passed inspection. Get inspection from the Utility Utility installs new bi-directional meter and/or production meter (if applicable). Start generating power Net Metering Page 5 of 5

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION SAMPLE ORDINANCE 3/5/2012 Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION Section 1: Applicable Service Territory Net metering and electrical system interconnection is available on a first-come,

More information

Municipality Generator Interconnection Application Single Meter Application Part I

Municipality Generator Interconnection Application Single Meter Application Part I Municipality Generator Interconnection Application Single Meter Application Part I New Application Revised Application A single customer interconnecting to a single meter at a single premise makes a new

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Rocky Mountain Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system

More information

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Table of Contents Chapter 1. Purpose and scope. Pg 3 Chapter 2. Application

More information

NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM. Utility: Duke Energy Progress

NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM. Utility: Duke Energy Progress NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM ATTACHMENT 2 Utility: Duke Energy Progress Designated Utility Contact: Attention: Customer Owned Generation Mail Code ST13A E-Mail Address: Customerownedgeneration@duke-energy.com

More information

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less) Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less) Interconnection Customer Contact Information Name Alternative Contact Information (if different

More information

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering NHEC supports the development of member-sited renewable energy generation and storage facilities (referred to herein as an interconnection

More information

Louisiana Net Metering Service. Customer Information Package

Louisiana Net Metering Service. Customer Information Package Louisiana Net Metering Service Customer Information Package August 1, 2013 Net Metering - The means of measuring the difference between the electricity supplied by an electric utility and the electricity

More information

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _ Application for Operation of & Net Metering for Member-Owned Generation -------------- OWNER/APPLICANT INFORMATION Name: Mailing Address: City: County: State: Zip Code: _ Phone Number: Email Address:.Representative:

More information

London Hydro Connection Checklist

London Hydro Connection Checklist London Hydro Connection Checklist Applicants should be aware not to incur expenses prior to London Hydro approving the connection of the facility to the grid. Payment of Connection Fee: $1000 plus HST

More information

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power 40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power WHO SHOULD FILE THIS APPLICATION: Anyone expressing interest to install generation which will interconnect

More information

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620 Policy Bulletin No. 25 Net Metering Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620 Interconnection Standards For Residential Net Energy Metering With Electric

More information

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

Eligible Renewable Generation (ERG) Application INSTRUCTIONS INSTRUCTIONS THIS DOCUMENT CONTAINS: ERG Application INSTRUCTIONS ERG Application INFORMATION ERG Application FORM ERG Application CHECKLIST Please read the INSTRUCTIONS and INFORMATION before completing

More information

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kva to 10 MVA or less)

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kva to 10 MVA or less) Section 466.APPENIX C Levels 2 to 4 Application Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kva to 10 MVA or less) Interconnection Customer Contact Information

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to

More information

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS For residential and commercial systems, the combined generation

More information

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING Third Revised Sheet 55a Cancels Second Revised Sheet 55a A. ELIGIBLE CUSTOMER-GENERATOR RULE NO. 17 NET ENERGY METERING Net energy metering is available to eligible customer-generators, defined as, permanent

More information

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less) Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less) Interconnection Customer Contact Information Name: Address: Alternative Contact Information

More information

Form C Renewable Energy Micro-Generation Connection Application Distribution System

Form C Renewable Energy Micro-Generation Connection Application Distribution System Form C Renewable Energy Micro-Generation Connection Application Distribution System (Micro-Generation Facilities 10 kw total nameplate capacity) This form is applicable to single or multiple generating

More information

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less) Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less) Interconnection Customer Contact Information Name: Address: City: Telephone (aytime):

More information

NET METERING APPLICATION

NET METERING APPLICATION NET METERING APPLICATION This form must be filled out completely and submitted to the City of Geneva Electric Division before a customer s renewable energy facility can be interconnected with City s distribution

More information

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board Policy Description: In an effort to ensure fair treatment of all of its customers,

More information

NEW HAMPSHIRE ELECTRIC COOPERATIVE S (NHEC) ABOVE THE CAP NET METERING INTERCONNECTION APPLICATION INFORMATION

NEW HAMPSHIRE ELECTRIC COOPERATIVE S (NHEC) ABOVE THE CAP NET METERING INTERCONNECTION APPLICATION INFORMATION NEW HAMPSHIRE ELECTRIC COOPERATIVE S (NHEC) ABOVE THE CAP NET METERING INTERCONNECTION APPLICATION INFORMATION Dear NHEC Member: Thank you for inquiring about New Hampshire Electric Cooperative s Net Metering

More information

Duke Energy Carolinas North Carolina Interconnection Request Checklist

Duke Energy Carolinas North Carolina Interconnection Request Checklist Duke Energy Carolinas North Carolina Interconnection Request Checklist The North Carolina Utilities Commission issued North Carolina Interconnection Procedures, Forms, And Agreements For State-Jurisdictional

More information

Solar Power Installation Application

Solar Power Installation Application Solar Power Installation Application This Form must be filled out and submitted to Logan City Light and Power Department and given authorization to proceed PRIOR to installing a solar system. Also, please

More information

TILLAMOOK PEOPLE S UTILITY DISTRICT

TILLAMOOK PEOPLE S UTILITY DISTRICT TILLAMOOK PEOPLE S UTILITY DISTRICT DISTRIBUTION INTERCONNECTION PROCEDURE Inverter Based Generators 25 kw and Smaller This document contains the interconnection requirements for inverter based generators,

More information

Net Metering Program

Net Metering Program Net Metering Program Chapter 1 Purpose and Scope. The purpose of this chapter is to establish rules for determining the terms and conditions governing the interconnection of electric generation facilities

More information

MCCOOK PUBLIC POWER DISTRICT McCook, Nebraska BOARD POLICY NUMBER 488

MCCOOK PUBLIC POWER DISTRICT McCook, Nebraska BOARD POLICY NUMBER 488 MCCOOK PUBLIC POWER DISTRICT McCook, Nebraska BOARD POLICY NUMBER 488 SUBJECT Renewable Generator Net Metering Interconnect Policy OBJECTIVE To set forth a policy for the interconnection and net metering

More information

PSNH INTERCONNECTION REQUEST

PSNH INTERCONNECTION REQUEST PSNH INTERCONNECTION REQUEST Send the completed Interconnection Request and required attachments to: Public Service of New Hampshire Attn: Michael Motta, Senior Engineer Supplemental Energy Sources P.

More information

Renewable Net Metering Program Appendix ESD APX 001 1

Renewable Net Metering Program Appendix ESD APX 001 1 CITY OF ST.GEORGE Energy Services Department (SGESD) Renewable Net Metering Program Appendix Document No. Effective Date 10/15/2005 Revision No. 1.0 Review Date 02/18/2016 Review Cycle Annually Creation

More information

Net Metering Service. Customer Information Package

Net Metering Service. Customer Information Package Net Metering Service Customer Information Package March 20, 2017 Net Metering - The means of measuring the difference between the electricity supplied by an electric utility and the electricity generated

More information

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number: Please print the following information. Interconnect Customer Information Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone

More information

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Table of Contents 1. Introduction... 1 2. Purpose... 1 3. Customer Eligibility...

More information

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655) - (SMUD FORM 2655) A. Applicability: This Generating Facility Interconnection Application (Application) shall be used to request the interconnection of a Generating Facility to Sacramento Municipal Utility

More information

Louisville Gas and Electric Company

Louisville Gas and Electric Company P.S.C. Electric No. 11, Original Sheet No. 57 APPLICABLE In all territory served. AVAILABILITY OF SERVICE Available to any customer-generator who owns and operates a generating facility located on Customer

More information

Legal Name of the Customer (or, if an individual, individual's name): Name: Contact Person: Mailing Address: Physical Address: City: State: Zip Code:

Legal Name of the Customer (or, if an individual, individual's name): Name: Contact Person: Mailing Address: Physical Address: City: State: Zip Code: Generating Facility Level 2 or 3 Interconnection Review (For Generating Facilities with Electric Nameplate Capacities no Larger than 20 MW) Instructions An Interconnection Customer who requests a Utah

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS XXV. NET METERING A. Applicability and Availability 1. The terms Net Metering Service, Demand Charge-based Time-of- Use Tariff, Net Metering Customer, Customer, Time-of-Use Customer, Time-of-Use Tier,

More information

WOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM. Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less)

WOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM. Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less) WOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less) Issued and Effective: April 3, 2008 Agreement Between And

More information

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility Processed Date Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility Customer s Printed Name Installation Street Address Account Number Please note: Columbia Water & Light

More information

Instructions for Completing Oncor s Interconnection Application For Solar PV Projects

Instructions for Completing Oncor s Interconnection Application For Solar PV Projects Instructions for Completing Oncor s Interconnection Application For Solar PV Projects Program Year 2009 Take a Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company s commitment

More information

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Table of Contents 1. Introduction... 1 2. Purpose... 1 3. Customer Eligibility...

More information

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section 7-207.1 and 7-207.2 APPLICABILITY The Public Service Commission of Maryland ( Commission

More information

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Consumer Guidelines for Electric Power Generator Installation and Interconnection Consumer Guidelines for Electric Power Generator Installation and Interconnection Habersham EMC seeks to provide its members and patrons with the best electric service possible, and at the lowest cost

More information

REVISION NO.: 7 EFFECTIVE: 07/07/16

REVISION NO.: 7 EFFECTIVE: 07/07/16 SOLAR PROGRAM INTERCONNECTION PROCESS OVERVIEW FOR RESIDENTIAL AND SMALL GENERAL SERVICE REVISION NO.: 7 EFFECTIVE: 07/07/16 Required Steps for ED3 s Solar Program Interconnection Process for Residential

More information

NET METER REQUEST FORM

NET METER REQUEST FORM Form No. 3651 02/17 NET METER REQUEST FORM In order to receive a Net Meter, please provide the information requested below, sign and return only this coversheet by mail to the address below. NorthWestern

More information

Micro-Generation Connection Application For Connection of Micro-Generation Facilities of 10 kw

Micro-Generation Connection Application For Connection of Micro-Generation Facilities of 10 kw This form is applicable to individual or multiple generating units at the Customer s facility with total nameplate rating of 10 kw or less. Your generation facility must generate electricity from a renewable

More information

RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES

RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES Last Revised Date: October 15, 2015 Contents Chapter 1 - Purpose and Scope 2 Chapter 2 - Application of Rules 2 Chapter 3 - Definitions

More information

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23 P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23 Canceling P.S.C. Mo. No. 5 Sec. 4 Original Sheet No. 23 PURPOSE: The purpose of this Rider SR is to implement the solar rebate established through 393.1030

More information

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT This Net Metering and Interconnection Agreement ( Agreement ) is made and entered into as of this day of, 2018, by the City of Santa

More information

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff.

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff. JERSEY CENTRAL POWER & LIGHT UNIFORM TECHNICAL AND PROCEDURAL INTERCONNECTION REQUIREMENTS FOR NET METERING FACILITIES FOR INVERTER BASED WIND AND PHOTOVOLTAIC SYSTEMS OF 100 kw OR SMALLER for Atlantic

More information

Delaware Electric Cooperative Generator Interconnection Application Long Form (For Use with Generators Greater than 25 kw)

Delaware Electric Cooperative Generator Interconnection Application Long Form (For Use with Generators Greater than 25 kw) Generator Interconnection Application Long Form (For Use with Generators Greater than 25 kw) An applicant (Generator Owner) makes application to Delaware Electric Cooperative to install an operate a generating

More information

ELECTRICAL DISTRICT # 2

ELECTRICAL DISTRICT # 2 ELECTRICAL DISTRICT # 2 SOLAR ELECTRICAL APPLICATION AND AGREEMENT INSTRUCTIONS This is the application for residential or commercial solar installations. Complete the form and include a quote and full

More information

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program As part of our commitment to support renewable energy, Kissimmee Utility Authority

More information

Distributed Generation Interconnection Policy

Distributed Generation Interconnection Policy Distributed Generation Interconnection Policy 1 Introduction Carroll Electric Membership Corporation Distributed Generation Interconnection Policy Carroll Electric Membership Corporation (herein after

More information

Renewable Energy System - Electricity System Connection Application Form

Renewable Energy System - Electricity System Connection Application Form Renewable Energy System - Electricity System Connection Application Form If you would like assistance completing this form, please email renewables@horizonpower.com.au This is an application to connect

More information

Please Refer to Attached Sample Form

Please Refer to Attached Sample Form Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 32105-E Cancelling Revised Cal. P.U.C. Sheet No. 28313-E Electric Sample Form No. 62-0686 Application for Service

More information

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT INTERCONNECTION AGREEMENT FOR SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION THIS AGREEMENT MUST ACCOMPANY

More information

Your Friendly and Caring Member Cooperative. Consumer Guidelines for Electric Power Generator Installation and Interconnection

Your Friendly and Caring Member Cooperative. Consumer Guidelines for Electric Power Generator Installation and Interconnection Your Friendly and Caring Member Cooperative Consumer Guidelines for Electric Power Generator Installation and Interconnection Your electric cooperative seeks to provide its members and patrons with the

More information

ARKANSAS PUBLIC SERVICE COMMISSION NET-METERING RULES

ARKANSAS PUBLIC SERVICE COMMISSION NET-METERING RULES ARKANSAS PUBLIC SERVICE COMMISSION NET-METERING RULES Last Revised: August 16, 2017 Order No. 14 Docket No. 16-027-R Effective: 09-15-2017 NET-METERING RULES ADMINISTRATIVE HISTORY Docket Date Order No.

More information

Section 6. Generation Interconnection

Section 6. Generation Interconnection Table of Contents Section 6 Generation Interconnection A. Customer-Owned Generation... 6-3 B. Net Metered Generation... 6-4 C. Standby Generation Connections to the District's System... 6-6 D. Closed Transition

More information

Connecting your home or small business generation

Connecting your home or small business generation Connecting your home or small business generation For connections 10kW or less March 2018 2 Contents Introduction to small distributed generation systems 3 Congestion management and safety 6 Application

More information

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT INTRODUCTION Lathrop Irrigation District has created a policy to allow safe connection

More information

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less IMPORTANT NOTES: Customers may not operate their Generating Facility while interconnected to the PG&E system until they receive written permission from PG&E. For a non-exporting Generating Facility, RES-BCT

More information

Please Refer to Attached Sample Form

Please Refer to Attached Sample Form Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 32104-E Cancelling Revised Cal. P.U.C. Sheet No. 28312-E Electric Sample Form No. 62-0685 Application for Service

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

Application for Service Residential Subdivision / Development

Application for Service Residential Subdivision / Development Application for Service Residential Subdivision / Development Please complete this application and submit the completed form and attachments to PG&E Application for Service at P.O. Box 24047 Fresno CA

More information

CATEGORY 2 GENERATOR INTERCONNECTION APPLICATION

CATEGORY 2 GENERATOR INTERCONNECTION APPLICATION CATEGORY 2 GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 20 KW BUT LESS THAN OR EQUAL TO 150 KW Also Serves as Application for Category 2 Net Metering

More information

GENERATOR INTERCONNECTION APPLICATION

GENERATOR INTERCONNECTION APPLICATION GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 150 KW BUT LESS THAN OR EQUAL TO 550 KW Also Serves as Application for Category 3 Net Metering (Note:

More information

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY Virtual Net Metering Application Effective November 18, 2016 This application form addresses virtual net

More information

New Hampshire Electric Cooperative s (NHEC) Above the Cap Interconnection (Net Metering) Application Instructions

New Hampshire Electric Cooperative s (NHEC) Above the Cap Interconnection (Net Metering) Application Instructions Dear NHEC Member: New Hampshire Electric Cooperative s (NHEC) Above the Cap Interconnection (Net Metering) Application Instructions Thank you for inquiring about New Hampshire Electric Cooperative s Interconnection

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER RS-N SECOND REVISED SHEET NO. 8.2.1 CANCELLING FIRST SHEET NO. 8.2.1 NAME OF UTILITY CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER DEFINITION Net Metering means calculating

More information

Sample Application for Certificate of Public Convenience and Necessity from NC Solar Center

Sample Application for Certificate of Public Convenience and Necessity from NC Solar Center Sample Application for Certificate of Public Convenience and Necessity from NC Solar Center February 9, 2007 Chief Clerk North Carolina Utilities Commission 4325 Mail Services Center Raleigh, NC 27699-4325

More information

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements. A. General This Customer-Owned Generation Standards for Customer-Owned Grid Connected Electric Generating Systems sets forth the requirements and conditions for interconnected non-utility-owned electric

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to

More information

City Title. . Is System Owner interested in being contacted about energy efficiency opportunities at this site? Title. City. Site Contact.

City Title.  . Is System Owner interested in being contacted about energy efficiency opportunities at this site? Title. City. Site Contact. To be completed by Solar Electric Design Ally and Project Owner Don't Forget to Include Project Owner and Design Ally Signatures Site Layout Sun Chart Wiring Schematic Program Use Only FastTrack ID Project

More information

Dominion Energy Instructional Guide for Completing Virginia Form NMIN

Dominion Energy Instructional Guide for Completing Virginia Form NMIN Complete Sections 1 through 4, sign the form at the bottom, and submit to Dominion Energy either by scanning and e-mailing to net.metering@dominionenergy.com, or send by US Mail to Dominion Energy, Net

More information

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase PAGE 1 OF 7 USE: Requirements and guidelines for interconnection of single phase customer owned, (DR) Distributed Resource generation source, to NIPSCO s electric system, configured for. LATEST REVISION:

More information

Micro Embedded generation

Micro Embedded generation Application form Micro Embedded generation Application for new connection and supply of an embedded generator (incl. solar, wind & micro-hydro) Please print and complete relevant sections of this form

More information

Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota

Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota P a g e 1 Solar*Rewards Community Engineering Frequently Asked Questions For Garden Operators Minnesota The purpose of this document is to provide Garden Operators further documentation of engineering

More information

GENERATING FACILITY INTERCONNECTION APPLICATION. Part 1 Introduction and Overview

GENERATING FACILITY INTERCONNECTION APPLICATION. Part 1 Introduction and Overview Part 1 Introduction and Overview A. Applicability: This Generating Facility Interconnection Application (Application) is used to request the interconnection of a Generating Facility to Southern California

More information

Application to Amend Net Metering Service under RS Appendix B. Revised RS 1289 Clean and Black-lined

Application to Amend Net Metering Service under RS Appendix B. Revised RS 1289 Clean and Black-lined Application to Amend Net Metering Service under RS 1289 Revised RS 1289 Clean and Black-lined Rate Schedule 1289 Revision 1 Effective: April 20, 2018 Page 6-1 Clean 6. OTHER RATE SCHEDULE 1289 NET METERING

More information

Electric Utility Contact Information Indiana Michigan Power

Electric Utility Contact Information Indiana Michigan Power CATEGORY 2 GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 20 KW BUT LESS THAN OR EQUAL TO 150 KW Also Serves as Application for Category 2 Net Metering

More information

Contents. Solar Select TM Frequently Asked Questions

Contents. Solar Select TM Frequently Asked Questions Solar Select TM Frequently Asked Questions Contents Program Overview and How Solar Select Works... 1 Participation Requirements... 3 Cost and Payment... 4 Solar Production... 5 Development, Equipment,

More information

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDG 50 kw FOREWARD Requirements for Parallel Operations for Customers with Generation Not Exceeding 50 kw is intended to be used

More information

Definitions. Scope. Customer Generation Interconnection Requirements

Definitions. Scope. Customer Generation Interconnection Requirements Updated 02/1 Page 1 Scope The purpose of this document is to describe Idaho Power s requirements for the installation and testing of Customer Generation acilities that are interconnected with Idaho Power

More information

Oncor Application for Interconnection of Distributed Generation

Oncor Application for Interconnection of Distributed Generation Oncor Application for Interconnection of Distributed Generation Certified Systems (12/7/2017) What is a certified system? A certified system is one that meets the requirements of UL-1741 Utility Interactive

More information

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A SUBJECT: Interconnection of and Service to Qualifying Facilities under Public Utility Regulatory Policies Act (PURPA) OBJECTIVE: To provide, through

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Rocky Mountain Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to

More information

APPLICATION Net Energy Metering (NEM2) Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

APPLICATION Net Energy Metering (NEM2) Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less IMPORTANT NOTES: Customers may not operate their Generating Facility while interconnected to the PG&E system until they receive written permission from PG&E. For a non-exporting Generating Facility, RES-BCT

More information

Welcome to a new world of simplicity

Welcome to a new world of simplicity Welcome to a new world of simplicity Mohammed Abdullah Sadeem Personal Fuel Card Application Form 1775 8888 e sadeem@bapco.net CARD APPLICANT DETAILS Name CPR Telephone Mobile Email REQUEST TYPE New card

More information

Public Utilities HILLSBOROUGH COUNTY GREASE HAULER PERMIT APPLICATION

Public Utilities HILLSBOROUGH COUNTY GREASE HAULER PERMIT APPLICATION HILLSBOROUGH COUNTY GREASE HAULER PERMIT APPLICATION In accordance with Hillsborough County Code, Section 120 196, any person, firm or business desirous of collecting, pumping or hauling grease interceptor

More information

BC Hydro Rate Schedule 1289 Revision 1 Effective: April 20, 2018 Page 6-1

BC Hydro Rate Schedule 1289 Revision 1 Effective: April 20, 2018 Page 6-1 Page 6-1 6. OTHER RATE SCHEDULE 1289 NET METERING SERVICE Availability For any Residential Service Customer and for any General Service Customer who: 1. installs a Generating Facility to generate electricity

More information

Overview of State Distributed Generation Interconnection Rules

Overview of State Distributed Generation Interconnection Rules Overview of State Distributed Generation Interconnection Rules Presentation to EPA CHP Webinar Series June 26, 2008 Wayne Shirley Director The Regulatory Assistance Project 50 State Street, Suite 3 Montpelier,

More information

Application for Steam Service

Application for Steam Service Application for Steam Service Welcome! This is your application to Consolidated Edison Company of New York, Inc., for steam service. As a Con Edison steam customer, you agree to pay for the service supplied

More information

White River Electric Association, Inc. Net Metering Information & Service Requirements

White River Electric Association, Inc. Net Metering Information & Service Requirements White River Electric Association, Inc. Net Metering Information & Service Requirements What is Net Metering? Net Metering is an electric policy and service for consumers who own and utilize renewable energy

More information

IGNITION INTERLOCK MANUFACTURER RENEWAL AGREEMENT

IGNITION INTERLOCK MANUFACTURER RENEWAL AGREEMENT TRAFFIC SAFETY DIVISION APPLICATION FOR IGNITION INTERLOCK MANUFACTURER RENEWAL AGREEMENT INSTRUCTIONS FOR COMPLETING THIS APPLICATION PLEASE: complete this application on your computer using the TAB key

More information

Should I Get a Solar Array for my House? The Regulations, Available Equipment, and Benefits Steven Johnson

Should I Get a Solar Array for my House? The Regulations, Available Equipment, and Benefits Steven Johnson Should I Get a Solar Array for my House? The Regulations, Available Equipment, and Benefits Steven Johnson 1 Scope Explore the considerations in the decision to install a PV System on my house Limited

More information