Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.13 TRANSPORTATION / TRAFFIC

Size: px
Start display at page:

Download "Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.13 TRANSPORTATION / TRAFFIC"

Transcription

1 3.13 TRANSPORTATION / TRAFFIC As a result of the analysis undertaken in the Initial Study for the Los Angeles Mission College Facilities Master Plan, the (LACCD) determined that the proposed project may result in environmental impacts to transportation and traffic. 1 Therefore, this issue is being carried forward for detailed analysis in this EIR. This analysis was undertaken to identify opportunities to avoid, reduce, or otherwise mitigate potential significant impacts to transportation and traffic, as well as to identify potential alternatives. The analysis of transportation and traffic includes a description of the regulatory framework that guides the decision-making process, existing conditions of the proposed project area, thresholds for determining if the proposed project would result in significant impacts, anticipated impacts (direct, indirect, and cumulative), mitigation measures, and level of significance after mitigation. The potential for impacts to transportation and traffic at the proposed project site was evaluated in accordance with the methodologies and information provided by Appendix G of the State of California Environmental Quality Act (CEQA) Guidelines Setting Regulatory Setting The circulation and transportation system in the project area, including streets and public transit, is governed by regulations and requirements of the state, the County, and local plans and requirements. Regional The Congestion Management Program (CMP) for the County of Los Angeles (County) is a state-mandated program that was enacted by state legislature with the passage of Proposition 111 in The program is intended to address the impact of local growth on the regional transportation system. As required by the 2002 CMP for the County, a Traffic Impact Assessment (TIA) has been prepared for the proposed project to determine the potential impacts to designated monitoring locations on the CMP highway system. The hallmark of the CMP program is that it is intended to address the impact of local growth on the regional transportation system July Los Angeles Mission College Facilities Master Plan Initial Study. Prepared by: URS Corporation, 915 Wilshire Blvd., Suite 700, Los Angeles, CA California Code of Regulations, Title 24, Division 6, Chapter 3, Sections Available at

2 Local The Transportation Element of the City of Los Angeles, Sylmar Community Plan includes the following policies and goals related to traffic and transportation and circulation. Maximize the efficiency of the community's transportation system by integrating various transit modes such as vehicle, commuter rail, bus, bicycle, and local shuttle bus while minimizing any adverse impacts. Need for an efficient regional transportation system. The residents of Sylmar need a coordinated local circulation/transportation service to connect the main business, service, employment, educational, medical and recreational centers within the community. There is a need to change the behavior of commuters to decrease traffic congestion and improve the environment and overall quality of life. There is a need for the preservation, maintenance, and management of streets, highways, and freeways network in the community (and throughout the San Fernando Valley). Need to provide adequate funding for transportation management and for the efficient operation of the transportation network. 3 Goal 10 of the Sylmar Community Plan is to construct a system of highways, freeways, and streets that provide a circulation system which supports existing, approved, and planned land uses while maintaining a desired level of service (LOS) at all intersections. Objective 10-1, which supports Goal 10, is to comply with citywide performance standards for acceptable levels of service and insure that necessary road access and street improvements are provided to accommodate traffic generated by all new development. Policies in place to meet Objective 10-1 include maintaining a satisfactory LOS for streets and highways that should not exceed LOS D for Major Highways, Secondary Highways, and Collector Streets and if existing levels of service are LOS E or LOS F on a portion of a highway or collector street, then the level of service for future growth should be maintained at LOS E (Policy ); requiring new development projects be designed to minimize disturbance to existing flow with proper ingress and egress to parking (Policy10-1.2); requiring Highways and Street dedications be developed in accordance with standards and criteria contained in the Highways and Freeways Element of the General Plan and the City s Standard Street Dimensions, except where environmental issues and planning practices warrant alternate standards consistent with capacity requirements (Policy ); and discouraging non-residential traffic flow for streets designed to serve residential areas only by the use of traffic control measures (Policy ). Objective 10-2, which also supports Goal 10, is to ensure that the location, intensity, and timing of development is consistent with the provision of adequate transportation 3 City of Los Angeles Sylmar Community Plan. Available at:

3 infrastructure utilizing the City s streets and highways standards. Policy , which is in place to meet Objective 10-2, requires that driveway access points onto major and secondary highways, arterials, and collector streets be limited in number and be located to insure the smooth and safe flow of vehicles and bicycles. Goal 11 of the Sylmar Community Plan is to develop a public transit system that improves mobility with convenient alternatives to automobiles. Objective 11-1, which supports Goal 11, is to encourage improved local and express bus service through the Sylmar community, and encourage park-and-ride facilities to interface with freeways, high occupancy vehicle (HOV) facilities, and rail facilities. Policies in place to meet Objective 11-1 include coordinating with the Metropolitan Transit Authority (MTA) to improve local bus service to and within the Sylmar area (Policy ), 4 and encouraging the provision of safe, attractive, and clearly identifiable transit stops with user friendly design amenities (Policy ). Goal 13 of the Sylmar Community Plan encourages alternative modes of transportation to the use of single occupant vehicles in order to reduce vehicular trips. 5 Objective 13-1, which supports Goal 13, is to pursue transportation management strategies that can maximize average trip length, and reduce the number of vehicle trips. Policies in place to meet Objective 13-1 include encouraging non-residential development to provide employee incentives for utilizing alternatives to the automobile (Policy ); and requiring that proposals for major new non-residential development projects include submission of a Transportation Demand Management Plan to the City (Policy ). Goal 14 of the Sylmar Community Plan is to provide a well maintained, safe, efficient freeway, highway, and street network. Objective 14-1 which supports Goal 14 seeks to integrate Sylmar s signalized intersections with the City s Automated Traffic Surveillance and Control (ATSAC) system by the year Policy which is in place to meet Objective 14-1 recommends installation of ATSAC equipment at certain intersections by 2010, including three intersections within the project study area: Hubbard Street/ Glenoaks Boulevard, Hubbard Street/Foothill Boulevard and Maclay Avenue/Foothill Boulevard. Goal 15 of the Sylmar Community Plan is to provide a system of safe, efficient, and attractive bicycle, pedestrian, and equestrian routes. Objective 15-1 which supports Goal 15 is to promote an adequate system of safe bikeways for commuter, school, and recreational use. Policies in place to meet Objective 15-1 include planning for and encouraging funding and construction of bicycle routes connecting residential 4 The implementation programs for this policy include recommended bus transit improvements, including improvements to Line 234, which serves the proposed project. The Sylmar Community Plan recommends rerouting Line 234 in the San Fernando/Sylmar area to Sylmar Transit Center via Truman Street and Hubbard Street. 5 The focus of Goal 12 and its supporting policies is the coordinated integration of development around transit stations. The proposed project is not located near an existing or proposed transit station, therefore Transportation Goal 12 is not presented in this section

4 neighborhoods to schools, open space areas, and employment centers (Policy ); and identifying bicycle routes along major and secondary arterials in the community (Policy ). Objective 15-2 which also supports Goal 15 is to promote pedestrian-oriented mobility and the utilization of the bicycle for commuter, school, recreational use, economic use, economic activity, and access to transit facilities. Policy which is in place to meet Objective 15-2 is to encourage the safe utilization of easements and/or rights-of-way along flood control channels, public utilities, railroad rights-of-way, and streets wherever possible for the use of bicycles and/or pedestrians. Goal 16 of the Sylmar Community Plan is to provide a sufficient system of well designed and convenient on-street parking and off-street parking facilities throughout the Plan area. Objective 16-1 which supports Goal 16 is to provide parking in appropriate locations in accord with City-wide standards and community needs. Policy which is in place to meet Objective 16-1 is to consolidate parking, where appropriate, to eliminate the number of ingress and egress points onto arterials Environmental Setting Analysis Methodology The traffic analyses prepared for this study were performed in accordance with City of Los Angeles Department of Transportation (LADOT) Guidelines for Traffic Impact Analysis Reports, the California Environmental Quality Act (CEQA) project review process, and the Los Angeles County Congestion Management Program (CMP) requirements. Detailed information on intersection analysis methodologies, standards, and thresholds are discussed in the following sections. The following scenarios were analyzed as a part of this study: Existing Conditions utilized to establish the current level or existing baseline of traffic operations within the study area. Future Year (2010 & 2015) Base Conditions with Ambient Growth and Cumulative Projects establishes a future baseline scenario against which traffic generated by the Master Plan project was compared. Future Year (2010 & 2015) Base with Project Conditions represents future base traffic conditions with the addition of projected trip generation associated with the Master Plan project. Level of Service Descriptions Level of Service (LOS) is an indicator of operating conditions on a roadway or at an intersection and is defined in categories ranging from A to F. These categories can be viewed much like school grades, with A representing the best traffic flow conditions and F representing poor conditions. LOS A indicates free-flowing traffic and LOS F indicates substantial congestion with stop-and-go traffic and long delays at intersections. Table provides definitions of level of service for signalized intersections using the Transportation Research Board Critical Movement Analysis (CMA), Circular

5 Planning Method methodology. CMA is a method which determines the volume to capacity (V/C) ratio on a critical lane bases and LOS associated with each V/C ratio at a signalized intersection. Table Level of Service Descriptions Level of Service Description of Operation Range of V/C Ratios A Describes primarily free-flow conditions at average travel speeds. Vehicles are seldom impeded in their ability to maneuver in the traffic stream. Delays at intersection are minimal. B Represents reasonably unimpeded operations at average travel speed. The ability to maneuver in the traffic stream is slightly restricted and delays are not bothersome. C Represents stable operations, however, ability to change lanes and maneuver may be more restricted than LOS B and longer queues are experienced at intersections D Congestion occurs and a small change in volume increases delays substantially. E Severe congestion occurs with extensive delays and low travel speeds occur. F Characterizes arterial flow at extremely low speeds and intersection congestion occurs with high delays and traffic queuing. >

6 Peak Hour Intersection Level of Service Standards and Thresholds This section presents the methodologies used to perform peak hour intersection capacity analysis, including both signalized and unsignalized intersections. Signalized Intersection Analysis The analysis of signalized intersections utilized the analysis procedure as outlined in the City of Los Angeles Department of Transportation (LADOT) Guidelines for Traffic Impact Analysis Reports. This procedure is known as Transportation Research Board Critical Movement Analysis (CMA), Circular 212 Planning Method methodology and defines LOS in terms of Volume-to-Capacity (V/C) ratio. This technique uses 1,600 vehicles per hour per lane (VPHPL) and 2880 (VPHPL) for dual left turn lanes as the maximum saturation volume of intersections. The LOS criteria used for this technique was earlier described in Table The computerized analysis of intersection operations was performed utilizing Traffix 7.6 traffic analysis software (Dowling Associates, 2003). Unsignalized Intersection Analysis Unsignalized intersections, including two-way and all-way stop controlled intersections were analyzed using the 2000 Highway Capacity Manual (Section 10) unsignalized intersection analysis methodology. The LOS for a two-way stop controlled (TWSC) intersection is determined by the computed or measured control delay and is defined for each minor movement. Table summarizes the Level of Service criteria for unsignalized intersections. Table Level of Service Criteria for Stop Controlled Unsignalized Intersections Average Control Delay (sec/veh) Level of Service (LOS) <10 A >10 and <15 B >15 and <25 C >25 and <35 D >35 and <50 E >50 F Source: 2000 Highway Capacity Manual, TRB Special Report 209 The County of Los Angeles considers LOS D or better during the AM and PM peak hours to be the maximum acceptable intersection LOS. This is consistent with the approach outlined in the Los Angeles County CMP

7 Circulation System Roadway System Los Angeles Mission College Facilities Master Plan This section describes key roadways segments and intersections, existing daily roadway and peak hour intersection traffic volume information and LOS analysis results for existing conditions. Several regionally and locally significant roadways traverse the study area. Each of the key roadways, as well as associated study intersections within the study area is discussed below. The roadway network in the project area lies diagonally from the northwest to southeast. For clarity, this document will refer to roadways that run parallel to the I-210 as east-west and roadways that run perpendicular to the I-210 as north-south. The LAMC campus is directly bounded by Hubbard Street to the north, Eldridge Avenue to the southwest, El Cariso Golf Course to the northeast, and El Cariso Regional Park to the northwest. Beyond these boundaries are single-family low density residential neighborhoods. North-South Facilities Polk Street This is a north/south-oriented facility located to the west of the project site classified as a Major Highway Class II from Eldridge Avenue south by the City of Los Angeles. This is a four-lane roadway with a full interchange with I-210 one and a half miles from the college. North of the I-210 it provides access to neighborhoods northwest of the project site. The posted speed limit is 35 mph. Hubbard Street This is a north/south-oriented facility providing primary access to the project site. It also provides access to the driveway on the northwest side of the campus. Hubbard is classified as a Major Highway Class II from Eldridge Avenue south and provides primary access to neighborhoods in the project area. This is a four-lane roadway with a full interchange with I-210 three-quarters of a mile from the LAMC campus. The posted speed limit is 40 mph. Maclay Street This is a north/south-oriented facility east of the project site. Maclay is designated as a Secondary from Eldridge Avenue south by the City of Los Angeles and provides access to neighborhoods south of the project site. This is a two-lane roadway up to the approach with the I-210 where it transitions to four lanes. It has a full interchange with I-210 one and a half miles from the college. The posted speed limit is 30 mph

8 Maclay Avenue/Gavina Avenue (Private Road) This roadway is located directly east of the project site. When Maclay Avenue crosses the Pacoima Wash it becomes a private road for the residential community it serves. To the north it transitions to Gavina Avenue. After crossing the wash again it returns to a public facility. The roadway has a posted speed limit of 35 mph. Several of the communities it serves are gated. Harding Street This is a north/south-oriented facility east of the project site. This roadway is designated as a Collector from Maclay Avenue to Fenton Avenue. This is a two-lane roadway with a post speed limit of 25 mph. East-West Facilities I-210 This is an east/west freeway that traverses the Los Angeles metropolitan area from San Bernardino County to the east and terminating at I-5 to the west. There are three full freeway interchanges to the west and southwest of the project site at Polk Street (1.5 miles), Hubbard Street (.75 miles), and Maclay Street (1.5 miles). In the project vicinity, three eastbound and three westbound lanes are provided. The most direct access to the project site is provided by Hubbard Street. Foothill Boulevard This is an east/west oriented facility to the south of the project site that runs parallel to the I-210 classified as a Major Highway Class II by the City of Los Angeles. This roadway provides primary east-west local access to retail businesses in the project area. This is a four-lane facility with a posted speed limit of 40 mph. Gladstone Avenue This is an east-west local roadway serving local neighborhoods south of the project site classified as a Collector by the City of Los Angeles. The roadway provides two lanes and runs parallel to the I-210 on its north side providing access to neighborhoods in the area. The posted speed limit is 35 mph. Fenton Avenue This is a two-lane east/west oriented local street north of Gladstone Avenue and southwest from the project site. The roadway is classified as a Collector by the City of Los Angeles, serves residential neighborhoods in the project area and has a posted speed limit of 25 mph

9 Eldridge Avenue This roadway provides direct access to the project site and the main driveway on the south side of campus. The roadway is an east/west oriented local street with four lanes and a posted speed limit of 35 mph. The roadway is classified as a Secondary by the City of Los Angeles and provides access to neighborhoods east and west of the project site. Neighborhood Roadway Segments Neighborhood roadway segments, including Gridley Street, Harding Street, and Fenton Avenue, are analyzed later in this chapter. Site Access Access to the College is currently provided by a main entrance driveway at the intersection of Eldridge Avenue and Pasha Street on the southwest corner of the campus property. Current construction of a parking garage at this location has eliminated the two entrance lanes of the driveway. Access is restricted to the exit lanes, which have been modified for two-way traffic. This driveway currently provides access to two staff parking lots. A secondary driveway exists on Hubbard Street at Lexicon Avenue. This is currently used for on-street parallel parking for staff and faculty and for service and delivery access. It also provides access to a small parking lot behind the Collaborative Studies building. Existing Parking Conditions On-Site Current on-site parking is restricted to the two staff only parking lots on the southwest side of campus and parking along the northwest access road on the northeast side of campus. Parking structure A is currently under construction on the southwest side of campus and will provide 1,200 spaces when completed. Off-Site Off-site parking is located in several areas around the campus, primarily on local roadways. A field study conducted on July 24 th and 25 th indicated that almost all users of the campus are currently utilizing parallel parking along Eldridge Avenue which fronts the school. This type of parking is available on both sides of the street and is most heavily utilized directly adjacent to the campus between Hubbard Street and Cranston Street. Previous studies performed while the school was in session verify this usage pattern. In addition, a satellite parking lot is located between Hubbard Street and Sayre Street along the eastside of the I-210. This temporary lot provides 567 parking spaces and shuttle service to the campus throughout the day. This lot will be used until completion of parking structure A

10 Additionally, previous studies have shown that students use the parking lot for the El Cariso County Golf Course that is northeast of the campus. The parking structure A construction should diminish use of this lot and planned future parking discussed below will provide adequate parking for the current needs of the campus which should draw users of the college away from the Golf Course and neighborhoods and closer to campus. Future Parking Conditions A phased parking program would be designed to accommodate approximately 2,400 parking stalls in parking structures and surface parking areas by For each element of the proposed project, sufficient parking would be constructed to accommodate any existing parking spaces displaced by construction, and sufficient additional parking would also be constructed to accommodate the parking demand generated by the construction of the proposed project element. Table summarizes the Master Plan Parking by construction phases. Table Cumulative Master Plan Parking by Phase Under LAMC Campus Harding Street Site Existing Construction Phase I Phase II Phase I Phase II Parking Structures - 1,200 1, (370) Surface Parking 788 a (-154) (-118) On-Street Parking 128 b 187 c (-59) Total (by Phase) 916 1,776 1,622 1, a Includes 221 parking spaces on the LAMC Campus and 567 parking spaces at the Sayre Street parking lot. The use of the Sayre Street parking lot will be discontinued once construction of Parking Structure A is completed. b Existing parallel parking c Proposed angled parking Note: Numbers within parenthesis (in Italics) show increase or decrease in the number of parking spaces between phases. On-Site A 1,200-car parking structure is currently under construction at the southern end of the main campus. Under the Project plan, off site land could be used to accommodate a portion of the Master Plan program. Addition below grade parking would be provided for the associated program and additional parking could be added to serve the main campus with a shuttle providing access. Parking Structure B2 which will be located above the Plant Facilities Building will consist of three levels of parking and will have 370 total parking spaces

11 In addition to this the college is pursuing the immediate implementation (Fall 2006) of on-street angled parking (44% increase over existing parallel parking) on Eldridge Avenue along the school property and on-site angled parking adjacent to Eldridge Ave (58 new spaces) in Spring Another temporary lot will be built in 2007 behind Parking Structure A with a capacity of 70 vehicles. In addition, the existing staff parking lot will be expanded. This will result in approximately 1,700 spaces being provided in These parking lots will utilize existing driveways and provide additional off-street parking for users of the campus. Off-Site The college is developing plans to restripe Eldridge Avenue to implement angled parking on the east side (college side) of the street between Hubbard Avenue and Harding Street. Currently there is unrestricted parallel parking along both sides of this section of Eldridge Avenue. By implementing angled parking along the north side of Eldridge Avenue, the total on-street parking capacity will increase by approximately 44%. This will provide users of the college with a free parking alternative and will encourage users to park on the east side of Eldridge Avenue and will reduce demand for parking spaces in the adjacent neighborhoods and at the Golf Course. Parking Structure B1 is also proposed to be constructed during this third phase of campus construction. This parking structure will be underground and will be located on the south parcel of the Harding Street Site. This facility will be 2 levels and will have 550 parking spaces. Total Future Parking To provide adequate parking to accommodate projected growth the college will construct a total of approximately 2,400 parking spaces by This includes Parking Structures A, B1, and B2 discussed in the previous sections. Existing Public Transit The Metropolitan Transportation Authority (MTA) serves the college directly with two bus lines, lines 234 and 634, with a stop at the corner of Hubbard Street and Eldridge Avenue adjacent to the campus. Route 234 is marked by a route sign on a pole. Route 634 has a route sign attached to a utility pole. A bench and trash receptacle is also provided. When transfer opportunities are considered, much of the Los Angeles metropolitan area is within reach via the bus routes readily available near the college. When rail is considered, regional trips become possible. Transit and rail routes in the immediate vicinity of the college are described below

12 MTA Line 234 Line 234 provides service from Sherman Oaks in the south to the line s northern terminus that is a loop along the western edge of the LAMC campus on Sayre Street, Eldridge Avenue, Hubbard Street, and Simshaw Avenue. Weekday service is provided from approximately 5:00 a.m. to 7:30 p.m. with headways ranging from 15 minutes, to one hour. Weekend and holiday service is provided with approximately one-hour headways between 6:00 a.m. and 7:30 p.m. MTA Line 634 Line 634 provides service from the Metrolink commuter rail station approximately 2.4 miles from the campus. Service is direct along Hubbard Street. Metrolink The Southern California Regional Rail Association (SCCRA) operates the Metrolink train service throughout the greater Los Angeles basin. The nearest Metrolink line, the Antelope Valley line, operates out of downtown Los Angeles running north-south and parallel to the I-5 freeway with stops in the City of Glendale, Burbank, and Sun Valley. Users of Metrolink alighting in Sylmar could transfer to MTA Line 634 for access to the college. Existing Pedestrian Facilities Pedestrian facilities, including sidewalks, wheelchair ramps, crosswalks, and pedestrian call buttons at intersections are present throughout the study area. Table provides an inventory of pedestrian facilities at signalized intersections near the project site: Table Signalized Pedestrian Crossing Locations No. 1 Intersection Hubbard Street / Eldridge Avenue Leg of Intersection North South East West Crossing Direction Westbound Eastbound Westbound Eastbound Northbound Southbound Northbound Southbound Pedestrian Push Button Type Pedestrian Indicator Type ADA Compliant Ramps None Incandescent Yes None Incandescent Yes None Incandescent Yes None Incandescent Yes

13 Existing Bicycle Facilities Los Angeles Mission College Facilities Master Plan The College provides bicycle racks for users to secure their bicycles while using the College. There are no other bicycle facilities, lanes, or routes in the study area. Existing Public School Sites There are several public schools located in the neighborhoods surrounding Mission College that attract pedestrian traffic: Hubbard Elementary School Northwest of Mission College on Hubbard Street between Kismet Avenue and Fenton Avenue. Harding Street Elementary School Southeast of Mission College at Harding Street and Fenton Avenue. Olive View School Northwest of Mission College on Polk Street south of Fenton Avenue. Foothill Baptist Church & Schools Northwest of Mission College at Herron Avenue and Wheeler Avenue. L A Lutheran High School North of Mission College at Eldridge Avenue and Sayre Street. Of these schools Harding Street Elementary School is the only one directly affected by the Project. This is due to students who are using Fenton Avenue, Harding Street, and Gridley Street as a path to travel to and from the College. These roadway segments are analyzed later in this chapter and mitigations are proposed to divert College traffic away from these streets Study Intersections In consultation with college staff and comments received during the Notice of Preparation process, the 28 key study area intersections shown on Table have been identified for analysis in the traffic study. The existing intersection geometrics are shown in Appendix A of Appendix E of this EIR. Existing Study Intersection Volumes Traffic data collected for the Mission College Draft EIR traffic analysis included eight (8) 24-hour roadway counts conducted during the week of September 12-14th. Additionally, twenty-eight (28) AM and PM peak hour study intersection counts were conducted on September 12-14th

14 Table Study Intersections Intersection Jurisdiction 1 Polk Street / Glenoaks Boulevard City of Los Angeles 2 Polk Street / I-210 EB Ramp Caltrans 3 Polk Street / I-210 WB Ramp Caltrans 4 Polk Street / Gladstone Avenue [1] City of Los Angeles 5 Polk Street / Eldridge Avenue [1] City of Los Angeles 6 Sayre Street / Gladstone Avenue [1] City of Los Angeles 7 Sayre Street / Eldridge Avenue [1] City of Los Angeles 8 Hubbard Street / Glenoaks Boulevard City of Los Angeles 9 Hubbard Street / Foothill Boulevard City of Los Angeles 10 Hubbard Street / I-210 EB Ramp Caltrans 11 Hubbard Street / I-210 WB Ramp Caltrans 12 Hubbard Street / Gladstone Avenue City of Los Angeles 13 Hubbard Street / Fenton Avenue City of Los Angeles 14 Hubbard Street / Eldridge Avenue City of Los Angeles 15 Hubbard Street / Lexicon Avenue [1] City of Los Angeles 16 Hubbard Street / Garrick Avenue [1] City of Los Angeles 17 Hubbard Street / Shablow Avenue [1] City of Los Angeles 18 Rajah Street/ Gavina Avenue [1] City of Los Angeles 19 Tibbetts Street / Gavina Avenue [1] City of Los Angeles 20 Pasha Street / Eldridge Avenue [1] City of Los Angeles 21 Harding Street / Fenton Avenue [1] City of Los Angeles 22 Harding Street / Eldridge Avenue [1] City of Los Angeles 23 Maclay Avenue / Glenoaks Boulevard City of Los Angeles 24 Maclay Avenue / Foothill Boulevard City of Los Angeles 25 Maclay Avenue / I-210 EB Ramp Caltrans 26 Maclay Avenue / I-210 WB Ramp Caltrans 27 Maclay Avenue / Gladstone Avenue [1] City of Los Angeles 28 Maclay Avenue / Fenton Avenue [1] City of Los Angeles For analysis purposes, AM peak hour data were collected during the 7-9 a.m. peak hours and the p.m. peak hour data during the 4-6 p.m. peak hours. These peak hours are the standard adjacent street traffic peak hours used in the ITE Trip Generation Manual and the majority of traffic analyses documentations. Figure shows existing AM/PM peak hour traffic volumes for the key study area intersections. The counts are provided in Appendix B of Appendix E of this EIR

15 Figure Existing AM/PM Peak Hour Traffic Volumes

16 Existing Level of Service Analysis LOS analyses under existing conditions were conducted using the methodologies described above. The intersection LOS results are discussed below. Intersection Analysis Table displays intersection LOS for the key study area intersections under Existing Conditions. All intersections are signalized unless otherwise noted. The detailed LOS calculation worksheets for Existing Conditions are provided in Appendix C of Appendix E of this EIR. Table Peak Hour Intersection Level of Service Results for Existing Conditions # Intersection AM Peak Hour PM Peak Hour LOS V/C LOS V/C 1 Polk Street / Glenoaks Boulevard B B Polk Street / I-210 EB Ramp E A Polk Street / I-210 WB Ramp C A Polk Street / Gladstone Avenue [1] C 18.3 sec B 12.5 sec 5 Polk Street / Eldridge Avenue [1] B 10.8 sec A 9 sec 6 Sayre Street / Gladstone Avenue [1] C 16.9 sec C 18.3 sec 7 Sayre Street / Eldridge Avenue [1] B 12.3 sec B 11.9 sec 8 Hubbard Street / Glenoaks Boulevard B C Hubbard Street / Foothill Boulevard D F Hubbard Street / I-210 EB Ramp D C Hubbard Street / I-210 WB Ramp D C Hubbard Street / Gladstone Avenue C A Hubbard Street / Fenton Avenue B A Hubbard Street / Eldridge Avenue C B Hubbard Street / Lexicon Avenue [1] C 15.2 sec C 18.9 sec 16 Hubbard Street / Garrick Avenue [1] B 12.7 sec B 12.4 sec 17 Hubbard Street / Shablow Avenue [1] A 8.2 sec A 8 sec 18 Rajah Street/ Gavina Avenue [1] A 9.2 sec A 9.6 sec 19 Tibbetts Street / Gavina Avenue [1] A 7.4 sec A 7.5 sec 20 Pasha Street / Eldridge Avenue [1] A 9.1 sec B 10.8 sec 21 Harding Street / Fenton Avenue [1] A 8.5 sec A 7.8 sec 22 Harding Street / Eldridge Avenue [1] A 7.6 sec A 8.5 sec 23 Maclay Avenue / Glenoaks Boulevard C B Maclay Avenue / Foothill Boulevard D F Maclay Avenue / I-210 EB Ramp E C Maclay Avenue / I-210 WB Ramp C C Maclay Avenue / Gladstone Avenue [1] F 75.5 sec F 53.5 sec 28 Maclay Avenue / Fenton Avenue [1] B 14.6 sec D 30.7 sec

17 As shown in Table , all but five (5) of the study area intersections are currently operating at acceptable LOS D or better under Existing conditions. The following five (5) intersections were forecast to be operating at unacceptable LOS E or F: Polk Street / I-210 EB Ramp (LOS E AM) Hubbard Street / Foothill Boulevard (LOS F PM) Maclay Avenue / Foothill Boulevard (LOS F PM) Maclay Avenue / I-210 EB Ramp (LOS E AM) Maclay Avenue / Gladstone Avenue (LOS F AM, LOS F PM) Roadway Segment Analysis Table summarized the three 24-hour traffic counts conducted on eight (8) study roadway segments. Table Study Roadway Segments Existing Daily Volumes Roadway Segment East or Northbound West or Southbound Total Daily Volume Eldridge Avenue West of Hubbard Street 4,459 4,281 8,740 Eldridge Avenue East of Pasha Street 3,274 3,045 6,319 Eldridge Avenue East of Gridley Street 1,847 2,442 4,289 Harding Street North of Eldridge Avenue 878 1,092 1,970 Maclay Avenue South of Harding Street 3,872 3,439 7,311 Maclay Avenue North of Gladstone Avenue 5,802 5,348 11,150 Hubbard Street North of Gladstone Avenue 12,683 14,237 26,920 Polk Street North of Gladstone Avenue 5,722 6,756 12,478 College Traffic Diverting Through Neighborhoods Using the volumes in Table above the amount of traffic diverting through neighborhoods from Eldridge Avenue and Maclay Avenues can be determined. First, by subtracting the eastbound volumes on Eldridge Avenue east of Pasha Street from the eastbound volumes on Eldridge Avenue east of Gridley Street we can determine how many vehicles turned from Eldridge Avenue south onto Gridley Street. On Eldridge Avenue east of Pasha Street the eastbound volume was 3,274 per day. On Eldridge Avenue east of Gridley Street the eastbound volume was 1,847 per day. From this we can deduct that 1,427 vehicles turned from Eldridge Avenue onto Gridley in a 24- hour period

18 Second, by subtracting the eastbound volumes on Eldridge Avenue east of Gridley Street from the northbound volumes north of Eldridge Avenue on Harding Street we can determine how many vehicles turned from Eldridge Avenue south onto Harding Street. On Eldridge Avenue east of Gridley Street the eastbound volume was 1,847 per day. On Harding Street north of Eldridge Avenue the northbound volume was 878 per day. From this we can deduct that 969 vehicles turned from Eldridge Avenue south onto Harding Street in a 24hr period. Third, by subtracting the northbound volumes on Maclay Street north of Gladstone Avenue from the northbound volumes on Maclay Street South of Harding Street we can determine how many vehicles turned from Maclay Avenue west onto Fenton Avenue. On Maclay Street north of Gladstone Avenue the northbound volume was 5,802 per day. On Maclay Street South of Harding Street the northbound volume was 3,872 per day. From this we can deduct that 1,930 vehicles turned from Maclay Avenue west onto Fenton Avenue in a 24hr period. Residents also raised concerns about students traveling from Maclay Avenue, up Gavina Avenue, and around to Hubbard Avenue to reach the school. The direct route from Maclay Avenue to Eldridge Avenue is 1.5 miles. To drive up Maclay Avenue to Gavina Avenue and around to Hubbard Avenue to reach the school is 3.6 miles. There is direct access to the College via Maclay Avenue, Hubbard Avenue, and Polk Street via Eldridge Avenue. There is no logical reason students would travel 2.1 miles further to reach the school. There is also no empirical evidence supporting this claim. Due to these facts the impacts are less than significant and no further analysis or mitigation is warranted. In summary, from these volumes we can see that there are a significant number of vehicles using the Fenton/Harding neighborhood for travel in the study area. 1,427 vehicles turned from eastbound Eldridge Avenue south onto Gridley in a 24-hour period indicating students are using this path. While 1,930 vehicles turned from northbound Maclay Avenue west onto Fenton Avenue in a 24-hour period, this is the main access route for a large residential neighborhood and therefore less certainty is gained from this number in ascertaining how many students are using this path. 969 vehicles turned from eastbound Eldridge Avenue south onto Harding Street in a 24-hour period indicating that students are using this path. This number in particular is a good indicator that students are using this path in their travel to and from the school. Based on this information the number of students using the neighborhoods as a route to and from the College is significant. It should be noted that all of the studied roadways are functioning at an acceptable LOS. Several strategies the College will be implementing to ensure that College generated traffic does not utilize neighborhood streets in the future are discussed in mitigation measure T-17 later in this chapter

19 Sayre Satellite Parking Lot Utilization Analysis Table summarizes the Sayre satellite parking lot count volumes. An intersection turning movement count was performed on the west driveway to catalog student in and out movements during the peak hours. In addition, a 24hr machine count was used on the east driveway to catalog total in and out that captures inbound shuttle bus trips and outbound students. Table Sayre Satellite Parking Lot Utilization Location Time Period In Out Total West Driveway AM Peak Period PM Peak Period East Driveway 24hr count From these counts we can see that very few vehicles are utilizing this parking lot. These trips were not removed and reassigned on the network due to the low volumes and complexity with removing and reassigning these trips to the network to reflect conditions when the parking garage is open Significance Thresholds Under the California Environmental Quality Act (CEQA) Guidelines, Appendix G, a project would cause a significant impact to Transportation and Traffic, if it would: a) Cause an increase in traffic, which is substantial in relation to the existing traffic load and capacity of the street system (i.e. result in a substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections). b) Exceed, either individually or cumulatively, a level of service standard established by the county congestion management agency for designated roads and highways. c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks. d) Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment). e) Result in inadequate emergency access. f) Result in inadequate parking capacity. g) Conflict with adopted policies, plans or programs supporting alternative transportation (e.g., bus system)

20 Determination of Significant Impacts A project is considered to have an individually significant impact on the operation of an intersection if the project related increase in Volume to Capacity (V/C) ratio equals or exceeds the following thresholds shown in Table Table Significant Impact Thresholds for Intersections Intersections Pre-project LOS V/C Project V/C Increase C to or more D to or more E/F or more or more Source: City of Los Angeles Department of Transportation (LADOT) Guidelines for Traffic Impact Analysis Reports A project is considered to have an individually significant impact on the operation of a local residential street if the project related increase in average daily traffic (ADT) volumes exceeds the following thresholds shown in Table Table Significant Impact Thresholds for Roadways Projected ADT with Project (Final ADT) Project-Related Increase in ADT 0 to percent or more of final ADT 1,000 or more 12 percent or more of final ADT 2,000 or more 10 Percent or more of final ADT 3,000 or more 8 percent or more of final ADT Source: City of Los Angeles Department of Transportation (LADOT) Guidelines for Traffic Impact Analysis Reports Environmental Impact Analysis Trip Generation A forecast of the expected traffic volumes to be generated from the site was calculated based upon information contained in the Institute of Transportation Engineers (ITE) publication Trip Generation 7 th Edition and projected college enrollment. Tables and provide a summary of trip generation for 2010 and The following information was used to determine future trip generation with Master Plan Implementation:

21 Current enrollment (Fall 2006) Projected future year (2015) enrollment based on Master Plan Implementation Master Plan Gross Square Footage (gsf) Maximum Student Population Spring 2006 enrollment data provided by the College indicates that at its highest peak, maximum student population during the spring 2006 semester, at any given time or day did not exceed 1,392 students. This peak occurred on Wednesday between 7:00 p.m. and 7:30 p.m. This data was calculated by tracking the starting class time and ending class time for each student. A formula was then used to generate a running total, i.e., the total number of students on campus at any given time. Figure shows the total student population by time and day. It shows that the total student population never exceeded 1,400 students at any given time on any day. By using the very conservative total number of students enrolled for the semester (7,526) as the figure by which trip generation (traffic generated by the College) was calculated, the traffic analysis is projecting the worst case scenario. College Peak Periods vs. Adjacent Street Peak Periods The data mentioned above and shown in the Figure also shows that the peak use of the College, i.e., when the highest numbers of students are on campus, does not correlate with the normal peak period of traffic in the AM but does correlate with the normal peak period of traffic in the PM. For traffic analysis purposes, the AM peak hours are from 7-9 a.m. and the p.m. peak hours are from 4-6 p.m.. These peak hours are the standard adjacent street traffic peak hours used in the ITE Trip Generation Manual and the majority of all traffic analyses documentations. The graph shows that the AM peak of the College begins at 9:00 a.m., when the peak of the adjacent street traffic is ending. The graph also shows that the College has two peaks after 12:00 p.m., one from 3:30 to 6:00 p.m. and one from 7:00 to 9:00 p.m. The first peak does correlate with the peak of the adjacent street traffic. The second more severe peak does not. For traffic analysis purposes, the PM peak period is always used as the worst case scenario. The college afternoon peak correlates with the PM peak of the adjacent street traffic. This shows that this traffic analysis is accurately reflecting the traffic conditions in the study area

22 Table Project Trip Generation TOTAL PROJECT TRIP GENERATION AM Peak Hour Trip Rates PM Peak Hour Trip Rates Land Use (ITE Code) ADT Rate In Out Total In Out Total Community College (ITE 540) Quantity Description Daily Trips AM Peak Hour Trips PM Peak Hour Trips In Out Total In Out Total Base Year Enrollment - Fall ,526 Students 9, Future Year Enrollment ,969 Students 15,563 1, , ,556 Net Trip Generation (Projected Future - Current) 5,443 Students 6, SITE SPECIFIC PROJECT TRIP GENERATION AM Peak Hour Trip Rates PM Peak Hour Trip Rates Land Use (ITE Code) ADT Rate In Out Total In Out Total Community College (ITE 540) Quantity Description Daily Trips AM Peak Hour Trips PM Peak Hour Trips Main Campus Trip Generation 3,427 Students 4, AM Peak Hour Trip Rates PM Peak Hour Trip Rates ADT Rate In Out Total In Out Total Harding Street Campus Trip Generation Quantity Description Daily Trips AM Peak Hour Trips PM Peak Hour Trips 88,000 Square Feet 2, TOTAL TRIP GENERATION 6,

23 Table Project Trip Generation TOTAL PROJECT TRIP GENERATION AM Peak Hour Trip Rates PM Peak Hour Trip Rates Land Use (ITE Code) ADT Rate In Out Total In Out Total Community College (ITE 540) Quantity Description Daily Trips AM Peak Hour Trips PM Peak Hour Trips In Out Total In Out Total Base Year Enrollment - FALL ,526 Students 9, Future Year Enrollment ,000 Students 18,000 1, , ,800 Net Trip Generation (Projected Future - Current) 7,474 Students 8, SITE SPECIFIC TRIP GENERATION AM Peak Hour Trip Rates PM Peak Hour Trip Rates Land Use (ITE Code) ADT Rate In Out Total In Out Total Community College (ITE 540) Quantity Description Daily Trips AM Peak Hour Trips PM Peak Hour Trips Main Campus Trip Generation 4,771 Students 5, AM Peak Hour Trip Rates PM Peak Hour Trip Rates ADT Rate In Out Total In Out Total Harding Street Campus Trip Generation Quantity Description Daily Trips AM Peak Hour Trips PM Peak Hour Trips 118,000 Square Feet 3, TOTAL TRIP GENERATION 8,

24 Figure Mission College Maximum Student Population Mission College Total Student Population by Day Number of Students :30-6:59 7:30-7:59 8:30-8:59 9:30-9:59 10:30-10:59 11:30-11:59 12:30-12:59 1:30-1:59 2:30-2:59 3:30-3:59 4:30-4:59 5:30-5:59 6:30-6:59 7:30-7:59 8:30-8:59 9:30-9:59 10:30-10:59 Monday Total Student Population Tuesday Total Student Population Wednesday Total Student Population Thursday Total Student Population Time

25 Project Trip Distribution Los Angeles Mission College Facilities Master Plan Consistent with current college trip distribution patterns, future Master Plan generated trips were assigned to the surrounding local and regional roadway system using residential zip code information provided by the college. The College provided zip code information for each student enrolled in the fall 2006 semester. Using this information, land use patterns, and the roadway and freeway networks; a percentage of students traveling on study area arterials and freeways were determined. Figure , shows the trip distribution assignment used in the traffic analysis Project Trip Assignment Based upon the project site location in relation to the surrounding roadway system, peak hour trips were assigned to the adjacent roadway network based upon the percentages developed in the previous section. Figure shows the AM and PM peak project trip assignment at the project study intersections for Future (2010) Traffic Conditions This section provides an analysis of Future Year 2010 traffic conditions both with and without the proposed College Master Plan project. The traffic analysis conducted includes the following scenarios: Future (2010) Base Traffic Conditions With Ambient Growth Plus Cumulative Projects (No Project) Future (2010) Traffic Conditions With Ambient Growth Plus Cumulative Projects Plus Master Plan Implementation (With Project) Future (2010) Base Traffic Conditions Based on discussions with LADOT, the nature of the study area, and consistent with the traffic growth assumptions from similar traffic studies within the study area; an ambient traffic growth rate of one percent per year was used to develop future baseline conditions from existing traffic data. Under Future (2010) Base conditions, it was assumed that all planned and funded roadway and intersection improvements would have been implemented by Year These improvements include all traffic mitigations from other development projects and have been incorporated into the Future (2010) base network. The Future (2010) Base intersection geometric configurations are shown in Appendix A of Appendix E of this EIR. Figure shows the Future (2010) Base traffic volume. Future (2010) Base Cumulative Projects Table shows a list of cumulative projects that were included in the traffic analysis. Due to the long-term horizon year (Year 2010) of the Project Master Plan implementation and the nature of the projects it is assumed that all of the projects would completed prior

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC This Section summarizes the information provided in the Traffic Study for the Santa Monica College Bundy Campus Master Plan (Traffic Study),

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING 1. INTRODUCTION This section is based on the technical report Traffic Impact Study Health Sciences Campus Project, City of Los Angeles,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

TRANSPORTATION 1. INTRODUCTION 2. METHODOLOGY

TRANSPORTATION 1. INTRODUCTION 2. METHODOLOGY IV.K TRANSPORTATION 1. INTRODUCTION This section provides an analysis of potential impacts associated with traffic, parking, and access. The analysis provides an overview of existing traffic conditions

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

Appendix G Traffic and Parking Report

Appendix G Traffic and Parking Report Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

4.7 Construction Surface Transportation

4.7 Construction Surface Transportation 4.7 Construction Surface Transportation 4.7.1 Introduction The traffic analysis presented in this section addresses the construction traffic impacts specific to the proposed Project. The construction traffic

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

5.9 TRANSPORTATION AND TRAFFIC

5.9 TRANSPORTATION AND TRAFFIC 5.9 TRANSPORTATION AND TRAFFIC This section evaluates transportation- and traffic-related impacts that have the potential to result from the construction and operation of the Project. Information and analysis

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

3.8 TRANSPORTATION, CIRCULATION AND PARKING

3.8 TRANSPORTATION, CIRCULATION AND PARKING 3.8 TRANSPORTATION, CIRCULATION AND PARKING This section provides an overview of traffic, circulation and parking impacts and evaluates the construction and operational impacts associated with the Proposed

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways.

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways. 4.2 TRAFFIC AND CIRCULATION This section presents the key assumptions, methods, and results of analysis for the transportation and circulation impacts of the proposed project. This section is based on

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC INTRODUCTION The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Section 5.8 Transportation and Traffic

Section 5.8 Transportation and Traffic Section 5.8 Transportation and Traffic 5.8 TRANSPORTATION AND TRAFFIC Generous This Section is based on the Topgolf Specific Plan Traffic Impact Analysis (RK Engineering Group, Inc., October 31, 2016);

More information

Draft Report: West Berkeley Bowl Project

Draft Report: West Berkeley Bowl Project Draft Report: West Berkeley Bowl Project July 2004 Prepared for: The City of Berkeley 1031-1925 F EHR & PEERS TRANSPORTATION CONSULTANTS 3685 Mt. Diablo Blvd. #301 Lafayette, CA 94549 925-284-3200 Fax:

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC INTRODUCTION This section of the (Draft EIR) addresses the subject of traffic and transportation with respect to the proposed (Project or

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

700 University Avenue Mixed-Use Development. Traffic Impact Analysis

700 University Avenue Mixed-Use Development. Traffic Impact Analysis 700 University Avenue Mixed-Use Development Traffic Impact Analysis January 20, 2006 Prepared by 700 UNIVERSITY AVENUE MIXED- USE DEVELOPMENT TRAFFIC IMPACT STUDY Table of Contents 1.0 Executive Summary...

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM To: From: Date: Subject: Jerry Flores - AECOM Brian A. Marchetti, AICP September 9, 5 DRAFT Traffic Study LABOE Channel 5 Studio Relocation

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

TRANSPORTATION 1. INTRODUCTION

TRANSPORTATION 1. INTRODUCTION IV.F TRANSPORTATION 1. INTRODUCTION This section evaluates potential impacts associated with Project-related traffic, circulation, and access. The analysis summarizes the findings of the traffic study

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Appendix 5. Haymeadow Interim Traffic Analysis

Appendix 5. Haymeadow Interim Traffic Analysis Appendix 5 Haymeadow Interim Traffic Analysis 20 MEMORANDUM To: From: Rick Pylman Gary Brooks Bill Fox Date: September 15, 2016 Project: Subject: Haymeadow Evaluation of interim access configuration Currently

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization DRAFT REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 110 Parsippany, NJ 07054 862.207.5900

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

4.7 Construction Surface Transportation

4.7 Construction Surface Transportation 4.7.1 Introduction The traffic analysis presented in this section addresses the construction traffic impacts specific to the proposed Project. The construction traffic impacts were analyzed for both the

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

4.12 TRAFFIC AND CIRCULATION Introduction

4.12 TRAFFIC AND CIRCULATION Introduction 4.12 TRAFFIC AND CIRCULATION 4.12.1 Introduction This section of the EIR describes the existing transportation and traffic conditions on roadways surrounding the project area, and analyzes the potential

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS

IV. ENVIRONMENTAL IMPACT ANALYSIS IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND CIRCULATION This section presents the findings of the traffic study for the proposed project prepared by Crain & Associates of Southern California

More information

ENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION AND CIRCULATION 1. INTRODUCTION

ENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION AND CIRCULATION 1. INTRODUCTION IV. ENVIRONMENTAL IMPACT ANALYSIS 1. INTRODUCTION This section is based on a traffic and parking impact study that was prepared for the proposed CSMC West Tower Project by Linscott, Law & Greenspan, Engineers,

More information

Appendix E TRAFFIC IMPACT ANALYSIS

Appendix E TRAFFIC IMPACT ANALYSIS Appendix E TRAFFIC IMPACT ANALYSIS HENRY MAYO NEWHALL MEMORIAL HOSPITAL MASTER PLAN Traffic Impact Analysis MAY 2008 HENRY MAYO NEWHALL MEMORIAL HOSPITAL MASTER PLAN TRAFFIC IMPACT ANALYSIS Prepared by:

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information