TRANSPORTATION 1. INTRODUCTION

Size: px
Start display at page:

Download "TRANSPORTATION 1. INTRODUCTION"

Transcription

1 IV.F TRANSPORTATION 1. INTRODUCTION This section evaluates potential impacts associated with Project-related traffic, circulation, and access. The analysis summarizes the findings of the traffic study prepared for the Proposed Project by Gibson Transportation Consulting, Inc. (September 2010). A complete copy of the traffic study is included in Appendix IV.F. The analysis in this section provides an overview of existing traffic conditions and circulation patterns in the Project area, including public transit, and evaluates the construction- and operation-related traffic impacts of the proposed Project on future capacities of selected intersections within the study area. Where significant transportation and/or parking impacts are identified, mitigation measures are required to reduce such impacts to less than significant levels. i. Level of Service (LOS) Methodology Level of service (LOS) is a qualitative measure used to describe the traffic flow conditions. LOS categories range from excellent, nearly free-flow traffic at LOS A to stop-and-go conditions at LOS F. LOS D is typically recognized as an acceptable LOS in urban areas, although many urbanized areas operate at LOS E or F. LOS definitions for signalized intersections are provided in Table IV.F-1. As required by the City of Los Angeles Department of Transportation s Traffic Study Policies and Procedures, the LOS for a signalized intersection was determined by the critical movement analysis (CMA) method of intersection capacity calculation. The CMA methodology determines the intersection volume-to-capacity (V/C) ratio and corresponding LOS for the turning movements and intersection characteristics at signalized intersections based on the definitions described in Table IV.F-1. All of the analyzed intersections are controlled by traffic signals. The CalcaDB software package developed by LADOT was used to implement the CMA methodology at the analyzed intersections. City of Los Angeles IV.F-1 Wilshire Boulevard Temple Master Plan Project Draft EIR

2 Table IV.F-1 Level of Service Definitions for Intersections Level of Service Intersection Capacity Utilization Definition A EXCELLENT. No vehicle waits longer than one red light and no approach phase is fully used. B VERY GOOD. An occasional approach phase is fully utilized; many drivers begin to feel somewhat restricted within groups of vehicles. C GOOD. Occasionally drivers may have to wait through more than one red light; backups may develop behind turning vehicles. D FAIR. Delays may be substantial during portions of the rush hours, but enough lower volume periods occur to permit clearing of developing lines, preventing excessive backups. E POOR. Represents the most vehicles intersection approaches can accommodate; may be long lines of waiting vehicles through several signal cycles. F > FAILURE. Backups from nearby locations or on cross streets may restrict or prevent movement of vehicles out of the intersection approaches. Tremendous delays with continuously increasing queue lengths. Source: Gibson Transportation Consulting, Inc., REGULATORY FRAMEWORK a. State Regulations i. Statewide Transportation Improvement Program The Statewide Transportation Improvement Program is a programming document prepared by the California Department of Transportation (Caltrans) whereby program funds are allocated to individual projects and adopted or approved by the California Transportation Commission. The Statewide Transportation Improvement Program is a seven-year capital improvement program of projects on and off the state highway system that are funded with revenues from the State Highway Account, Passenger Rail Bond Fund, and other sources. The purpose is to increase/enhance the capacity, operations, and safety of the transportation system. Projects in the Statewide Transportation Improvement Program may include projects on state highways, local roads, intercity rail, or local rail systems. City of Los Angeles IV.F-2 Wilshire Boulevard Temple Master Plan Project Draft EIR

3 b. Regional and Local Regulations i. Regional Transportation Plan Prepared by the Southern California Association of Governments (SCAG), the Regional Transportation Plan is a planning document that serves as the Transportation Plan required under state and federal law. 1 The Regional Transportation Plan forecasts long-term transportation demands and identifies policies, actions, and funding sources to accommodate these demands. The Regional Transportation Plan contemplates the construction of new transportation facilities, transportation system management strategies, transportation demand management strategies, and land use strategies. The Regional Transportation Improvement Plan, also prepared by SCAG based on the Regional Transportation Plan, lists all regional funded/programmed improvements within the next seven years. The Regional Transportation Plan provides updates to the list of regional funded/programmed improvements in the next improvement cycle. ii. Los Angeles County Congestion Management Program The Congestion Management Program (CMP) was created statewide as a result of Proposition 111 in 1990 and has been implemented locally by the Los Angeles County Metropolitan Transportation Authority (Metro). The CMP for Los Angeles County requires that the traffic impacts of individual development projects of potential regional significance be analyzed. A specific system of arterial roadways plus all freeways comprises the CMP system. A total of 164 intersections are identified for monitoring in Los Angeles County. In accordance with the Congestion Management Program, the following must be included in a traffic impact analysis, at minimum: all CMP-monitoring locations, including monitored freeway on- or off-ramp intersections, where the proposed Project would add 50 or more trips during either the AM or PM weekday peak hours; all arterial segments where the proposed Project would add 50 or more peak-hour trips, if CMP arterial segments are being analyzed instead of intersections; mainline freeway locations where the proposed Project would add 150 or more trips, in either direction, during either the AM or PM weekday peak hours; and any other locations that Caltrans determines relevant and necessary. 2 1 Southern California Association of Governments, 2008 Regional Transportation Plan, May Metropolitan Transit Authority, 2004 Guidelines for CMP Transportation Impact Analysis, July 22, City of Los Angeles IV.F-3 Wilshire Boulevard Temple Master Plan Project Draft EIR

4 iii. Los Angeles Department of Transportation The City of Los Angeles Department of Transportation (LADOT) is responsible for transportation issues within the City of Los Angeles boundaries. The LADOT reviews the transportation/traffic studies prepared for all projects for which the City is the lead agency, in addition to other public agency projects located within, or that may affect, the City. The LADOT internal procedures are described in their Traffic Study Policies and Procedures Manual, May EXISTING CONDITIONS a. Existing Roadway System The study area for this analysis is generally bounded by 6 th Street to the north, Normandie Avenue to the east, Wilshire Boulevard to the south, and Western Avenue to the west. The study area defined for purposes of this analysis includes eight intersections and is illustrated in Figure IV.F-1. i. Freeways Primary regional access to the Project site is provided by US 101 (Hollywood Freeway), which runs generally southeast-northwest in the study area approximately 1.7 miles north of the Project site, and the I-10 (Santa Monica Freeway), which runs east-west approximately 1.75 miles south of the Project site. Access to and from US 101 is available via southbound off-ramps at Melrose Avenue and Western Avenue, northbound on-ramps on Normandie Avenue and Western Avenue, and southbound on-ramps and northbound off-ramps at Melrose Avenue and Santa Monica Boulevard. Access to and from I-10 is available via eastbound and westbound ramps at Western Avenue and Normandie Avenue. The major arterials providing regional and sub-regional access to the Project include Wilshire Boulevard, 6 th Street, Western Avenue, and Normandie Avenue. The following is a brief description of the major streets in the study area: ii. 6 th Street 6 th Street is a designated Secondary Highway that runs east-west immediately to the north of the Project site, with four travel lanes (two in each direction) and dedicated left-turn lanes at intersections. Parking restrictions vary on both sides of the street in the study area. The posted speed limit is 35 miles per hour (mph). City of Los Angeles IV.F-4 Wilshire Boulevard Temple Master Plan Project Draft EIR

5 n NOT TO SCALE SOURCE: GTC August 2010 FIGURE IV.F-1 Study Intersection Locations /10

6 iii. Wilshire Boulevard Wilshire Boulevard is a designated Major Class II highway that runs east-west immediately to the south of the Project site. It provides four to six travel lanes and dedicated left-turn lanes at intersections. It provides both local and regional access to the Project site. Parking restrictions vary on both sides of the street in the study area. The posted speed limit is 35 mph. iv. Western Avenue Western Avenue is a designated Major Class II highway that runs north-south and is located to the west of the Project site. It provides four travel lanes (two in each direction) and dedicated left-turn lanes at intersections. Parking restrictions vary on both sides of the street in the study area. The posted speed limit is 35 mph. v. Normandie Avenue Normandie Avenue is a designated Secondary Highway that runs north-south and is located to the east of the Project site. It provides four travel lanes, two in each direction. Parking restrictions vary on both sides of the street in the study area. The posted speed limit is 35 mph. vi. Roadway Dedications and Improvements Provisions in the Los Angeles Municipal Code (LAMC) require the City to consider half-street dedications and improvements for roadways adjacent to development sites in accordance with adopted standards in the City of Los Angeles Transportation Element of the General Plan. Below is a summary of the standard cross-sections and potential improvements. As discussed above, 6 th Street is identified as a Secondary Highway in the Transportation Element. The standard cross-section for a Secondary Highway is a 70-foot roadway within a 90-foot right-of-way (or a 35-foot half roadway on a 45-foot half right-of-way as measured from the centerline). Review of LADOT as-built plans for 6 th Street show that the City may require roadway widening and dedication adjacent to the Project site to comply with the Secondary Highway half-roadway standard. Harvard Boulevard is identified as a Collector in the Transportation Element. The standard cross-section for a Collector roadway is a 44-foot roadway on a 64-foot right-of-way (or a 22-foot half roadway on a 32-foot half right-of-way as measured from the centerline). Review of LADOT as-built plans and field reviews indicate that the existing roadway and right-of-way widths meet or exceed the Collector City of Los Angeles IV.F-6 Wilshire Boulevard Temple Master Plan Project Draft EIR

7 standards. As such, roadway widths adjacent to the Project site comply with the Collector half-roadway standards. Wilshire Boulevard is identified as a Major Highway Class II in the Transportation Element. The standard cross-section for a Secondary Highway is an 80-foot roadway on a 104-foot right-of-way (or a 40-foot half roadway on a 52-foot half right-of-way as measured from the centerline). Based on a review of the Mid-Wilshire Community Plan and discussions with LADOT, roadway widening along Wilshire Boulevard is precluded. Hobart Boulevard is identified as a Local Street in the Transportation Element. The standard cross-section for a Local Street is a 36-foot roadway on a 60-foot right-of-way (or an 18-foot half roadway on a 30-foot half right-of-way as measured from the centerline). Review of LADOT as-built plans and field reviews indicate that the existing roadway and right-of-way widths exceed the Local Street standards. b. Existing Traffic Volumes and Levels of Service i. Existing Traffic Volumes Intersection turning movement counts for typical weekday morning (7:00 AM to 10:00 AM) and afternoon (4:00 PM to 7:00 PM) commuter peak periods were collected in May The May 2009 manual traffic count data were increased by an annual growth factor of 0.5 percent per year to reflect year 2010 existing traffic volumes. These traffic volumes, illustrated in Figure IV.F-2, represent the existing conditions for the purposes of this analysis. Summary data worksheets of the manual traffic counts at the study intersections are contained in Appendix D of the traffic study provided in Appendix IV.F of this Draft EIR. Local schools were in session when the traffic counts were conducted. In addition, the existing Project site uses (the Temple, office, schools, commercial uses, etc.) were in operation during the traffic counts. ii. Computer Traffic Signal Control The Automated Traffic Surveillance and Control (ATSAC) system represents an advanced system in computer control of traffic signals. ATSAC-controlled traffic signals including real-time adjustment of signal timing plans to reflect changing traffic conditions, identification of unusual traffic conditions caused by incidents, the ability to implement special purpose short-term signal timing changes in response to incidents, and the ability to identify signal equipment malfunctions quickly. LADOT estimates that implementation of this system improves intersection capacity by an average of seven percent. City of Los Angeles IV.F-7 Wilshire Boulevard Temple Master Plan Project Draft EIR

8 n NOT TO SCALE SOURCE: GTC August 2010 FIGURE IV.F-2 Existing (Year 2010) Peak Hour Traffic Volumes /10

9 In addition to ATSAC, the Adaptive Traffic Control System (ATCS) has been tested and implemented along major travel corridors in the City of Los Angeles. ATCS is a computer-based traffic signal control program that provides fully responsive traffic signal control based on real-time traffic conditions. It automatically adjusts and optimizes traffic signal timing in response to current traffic demands on the entire signal network such that the number of stops and the amount of delay is minimized along with improved traffic signal coordination throughout the network. LADOT estimates that implementation of this system improves intersection capacity by an additional 3 percent over those operating under ATSAC alone. All of the analyzed intersections are controlled by the City of Los Angeles ATCS. In accordance with standard LADOT procedures, a capacity increase of 10 percent (0.10 V/C credit) was applied to reflect the benefits of ATCS control at these intersections. iii. Existing Levels of Service The traffic volumes illustrated in Figure IV.F-2, below, were analyzed using the CMA methodology described above to determine the existing operating conditions at the analyzed intersections. The calculation is expressed in a V/C ratio for critical movements where the volumes at the intersection are compared to the capacity of the intersection. Table IV.F-2, below, summarizes the existing weekday morning and afternoon peak hour V/C ratio and the corresponding LOS for each of the analyzed intersections. Detailed LOS worksheets are contained in Appendix E of the traffic study provided in Appendix IV.F of this Draft EIR. The results of this analysis indicate that all of the analyzed study area intersections are currently operating at LOS C or better during both the morning and afternoon peak hours. Therefore, all of the eight study intersections are currently operating at levels of service recognized by the City of Los Angeles as acceptable during morning and afternoon peak periods (i.e., LOS D or better). City of Los Angeles IV.F-9 Wilshire Boulevard Temple Master Plan Project Draft EIR

10 No. Table IV.F-2 Intersection Level of Service Existing Conditions (2010) Intersection AM Peak Hour V/C or Delay LOS PM Peak Hour V/C or Delay LOS 1. Western Avenue & 6 th Street A A 2. Hobart Boulevard & 6 th Street A B 3. Harvard Boulevard & 6 th Street A B 4. Normandie Avenue & 6 th Street A B 5. Western Avenue & Wilshire Boulevard B C 6. Hobart Boulevard & Wilshire Boulevard A A 7. Harvard Boulevard & Wilshire Boulevard A A 8. Normandie Avenue/Irolo Street & Wilshire Boulevard A A Source: Gibson Transportation Consulting, Notes: All intersections operate under the LADOT Adaptive Traffic Control System (ATCS). A credit of 0.10 in V/C ratio was included in the analysis of each intersection. c. Public Transit System Metro provides rail and bus service in the vicinity of the Project site. Figure IV.F-3 illustrates the existing transit service in the study area. Table IV.F-3 summarizes the various transit lines operating in the study area, the type of service (peak vs. off-peak, express vs. local), and frequency of service. i. Rail Metro Purple Line The Metro Purple Line is a heavy rail subway line that travels between Union Station in downtown Los Angeles and the Wilshire/Western Station in Mid-Wilshire. The Metro Purple Line has average headways 3 of 7 minutes during the weekday morning peak hour and 5 minutes during the afternoon peak hour. There are stops at Western Avenue & Wilshire Boulevard as well as at Normandie Avenue and Wilshire Boulevard in the Project site vicinity. 3 Headway is defined as the time lag between two buses traveling the same route in the same direction, which in turn determines the duration of the wait for passengers at given bus stops. City of Los Angeles IV.F-10 Wilshire Boulevard Temple Master Plan Project Draft EIR

11 n NOT TO SCALE SOURCE: GTC August 2010 FIGURE IV.F-3 Existing Transit Routes /10

12 ii. Express Bus Lines Metro Rapid 710 Route 710 is a rapid line that travels from Redondo Beach to Wilshire Center, with average headways of 10 minutes during the weekday morning and afternoon peak hours. This line travels along Wilshire Boulevard in the Project site vicinity. Metro Rapid 720 Route 720 is a rapid line that travels from Santa Monica to Commerce, with average headways of 5 minutes during the weekday morning peak hour and 8 minutes during the weekday afternoon peak hour. This line travels along Wilshire Boulevard in the Project site vicinity. Metro Rapid 757 Route 757 is a rapid line that travels from Hollywood to Hawthorne, with average headways of 13 minutes during the weekday morning peak hour and 10 minutes during the weekday afternoon peak hour. This line travels along Western Avenue in the Project site vicinity. Metro Rapid 920 Route 920 is a rapid line that travels from Santa Monica to Koreatown, with average headways of 15 minutes during the weekday morning peak hour and 8 minutes during the weekday afternoon peak hour. This line travels along Wilshire Boulevard in the Project site vicinity. iii. Local Bus Lines Metro Local 18 Route 18 is a local line that travels from Wilshire Center to Montebello, with average headways of 5 minutes during the weekday morning peak hour and 7 minutes during the weekday afternoon peak hour. This line travels along 6 th Street in the Project site vicinity. Metro Local 20 Route 20 is a local line that travels from Santa Monica to downtown Los Angeles, with average headways of 8 minutes during the weekday morning and afternoon peak hours. This line and travels along Wilshire Boulevard in the Project site vicinity. Metro Local 206 Route 206 is a local line that travels from Athens to Hollywood, with average headways of 11 minutes during the weekday morning peak hour and 7 minutes during the weekday afternoon peak hour. This line travels along Normandie Avenue in the Project site vicinity. Metro Local 207 Route 207 is a local line that travels from Athens to Hollywood, with average headways of 6 minutes during the weekday morning peak hour and 8 minutes during the weekday afternoon peak hour. This line travels along Western Avenue in the Project site vicinity. Metro Local 209 Route 209 is a local line that travels from Athens to Wilshire Center, with average headways of 1 hour during the weekday morning and afternoon peak hours. This line travels along Wilshire Boulevard in the Project site vicinity. City of Los Angeles IV.F-12 Wilshire Boulevard Temple Master Plan Project Draft EIR

13 Table IV.F-3 Existing Transit Service Provider Route Service Area Metro Purple Line Service Type Hours of Operation Koreatown to Union station Rail 4:30 AM - 1:23 AM Metro 710 Redondo Beach to Wilshire Center via Crenshaw Blvd Metro 720 Santa Monica to Commerce via Wilshire Boulevard & Whittier Boulevard Metro 757 Hollywood to Hawthorne via Western Avenue Metro 920 Santa Monica to Koreatown via Wilshire Boulevard Metro 18 Wilshire Center to Montebello via 6 th Street & Whittier Boulevard Metro 20 Santa Monica to Downtown Los Angeles via Wilshire Boulevard Metro 206 Athens to Hollywood via Normandie Avenue Metro 207 Athens to Hollywood via Western Avenue Metro 209 Athens to Wilshire Center via Van Ness Avenue & Arlington Avenue Rapid 5:23 AM - 9:34 PM Rapid 3:35 AM - 2:12 AM Rapid 5:01 AM - 9:30 PM Transitway 6:07 AM - 10:54 AM 3:01 PM - 8:00 PM Approximate Headway AM-PM Peak Hours 7 min - 5 min 10 min - 10 min 5 min - 8 min 13 min - 10 min 15 min - 8 min Local 24 HOURS 5 min - 7 min Local 4:07 AM - 11:01 PM Local 4:51 AM - 1:35 AM Local 4:03 AM - 9:45 PM Local 5:27 AM - 8:56 PM 8 min - 8 min 11 min 7 min 6 min - 8 min 1 hr - 1 hr Source: Gibson Transportation Consulting, IMPACT ANALYSIS a. Project Traffic Volumes The following describes the vehicular trip-generating characteristics of the proposed Project. The methodology used to estimate the trip generation, distribution, and assignment of the traffic generated by the proposed Project is also presented below. City of Los Angeles IV.F-13 Wilshire Boulevard Temple Master Plan Project Draft EIR

14 i. Project Trip Generation The trip generation rates used to estimate the number of trips expected to be generated by the proposed Project came from various sources. Rates for the administrative, office, and existing elementary school components of the project were from ITE Trip Generation, 8 th Edition. Trip generation rates for Camino Nuevo Charter Academy were based on empirical data collected at the Temple School s Westside Campus, which reflected the highest traffic counts in a nine-year data set ( ). Trip generation estimates for the existing Taekwondo school that operates within the commercial office building, which is planned for removal as part of the Project, were based on existing traffic counts conducted at the Project site. As part of the Project, the current Temple facilities would be updated and enhanced to accommodate the evolving needs of the Temple s spiritual, educational, community, and administrative programs. The current Temple operations, activities, and events would continue with the development of the Project, although some uses may be relocated to new, larger or renovated spaces provided on the Project site. The Temple s existing sacred and community spaces (e.g., spaces used for Tikkun Olam, social services, Sunday school) typically generate trips outside of the weekday commuter peak hours. As part of the Project, one sacred space, Factor Chapel, would be removed and its programs/uses relocated to a smaller existing facility on the Project site. For these reasons, existing and future trip generation associated with use of these spaces was not included for purposes of determining trip generation. No credits for the reduction in size of the Factor Chapel facilities (or number of seats) were included in the trip generation forecast, to ensure a conservative analysis. No material increase in the number of staff persons is anticipated. Use of the Temple administration facilities is likely to occur outside of commuter peak hours. However, to provide a conservative analysis, trips during both the morning and afternoon commuter peak hours were assumed. The Project includes a Temple elementary school and expansion of the existing Temple nursery school. The elementary school would have a maximum enrollment of 420 students, a net decrease of 80 students compared to existing conditions. The nursery school would have a maximum enrollment of 216 students, a net increase of 137 students compared to the existing enrollment cap of 79 students; however, the enrollment for the academic year is approximately 70 students. Thus, the trip generation forecast reflects 70 students in the existing Temple Nursery School. The parking structure would provide parking for approximately 500 vehicles, an increase of approximately 397 spaces over existing conditions. City of Los Angeles IV.F-14 Wilshire Boulevard Temple Master Plan Project Draft EIR

15 Construction of the proposed Project is anticipated to occur over an approximately 9-year period, and would allow for the continued operation of the Temple. Development of the proposed Project is intended to be flexible to meet the Temple s evolving needs and would be dependent on available funding. As such, construction phasing is not expected to be concurrent, and gaps between construction and development are expected to occur. Project construction is proposed to be completed by year Due to the proximity of the Project site (within 0.25 mile) to the Metro Purple Line station and the many public transit options available in the vicinity of the Project, a 15 percent transit credit was applied to the existing and proposed non-school related uses (i.e., Temple Administration, General Office, etc.) to reflect those expected to use other modes than personal automobiles to travel to and from the Project site. This transit credit is consistent with the CMP guidelines and LADOT policy. Table IV.F-4, below, provides a summary of the Project trip generation rates and Table IV.F-5, below, provides proposed trip generation estimates for the Project, including the existing land uses and trip generation as well as the proposed Project land uses and trip generation. The net Project trip generation represents the difference between the trips generated by existing on-site development and those generated at Project buildout. The trip generation forecast for the proposed Project was submitted for review and approval by LADOT staff. As indicated in Table IV.F-5, it is estimated that the Project would generate a net total of 825 weekday daily trips, including approximately 138 net new morning peak hour trips (94 inbound, 44 outbound) and 23 net new afternoon peak hour trips (20 inbound, 3 outbound). Table IV.F-4 Proposed Project Trip Generation Rates AM Peak Hour PM Peak Hour ITE Land Use ITE Land Use Rate Daily In Out Total In Out Total Elementary School 520 per Student % 45% % 51% 0.15 Day Care Center per Student % 47% General Office 710 per 1,000 sf % 12% % 83% 1.49 Temple School 2 - per Student % 42% % 29% 0.25 Source: Gibson Transportation Consulting, Inc., The Day Care Center land use was used to represent trips generated by the Nursery School component of the project. ITE does not include Nursery School as a specific land use, but the definition of the Day Care Center land use in the ITE Trip Generation manual is generally synonymous with the definition of a Nursery School, and reads as follows: "A day care center is a facility where care for pre- school age children is provided, normally during the daytime hours. Day care facilities generally include classrooms, offices, eating areas and playgrounds. Some centers also provide after-school care for school-age children. 2 Trip generation rates for the Temple School are based on empirical data collected at the Wilshire Boulevard Temple School's Westside campus. The trip generation rates were based on the highest counts yielded by a 9-year data set ( ). City of Los Angeles IV.F-15 Wilshire Boulevard Temple Master Plan Project Draft EIR

16 Table IV.F-5 Proposed Project Trip Generation Estimates Existing Uses Land Use ITE Land Use Size Daily AM Peak Hour PM Peak Hour In Out Total In Out Total Temple Facilities [e] Temple Administration [f] ,600 sf General Office 6,850 sf Transit Credit on Non-School Uses [i] 710 (37) (5) (1) (6) (1) (4) (5) Taekwondo School [h] - 6,800 sf Elementary School students Nursery School [b] [g] students SUBTOTAL - Existing 1, City of Los Angeles IV.F-16 Wilshire Boulevard Temple Master Plan Project Draft EIR

17 AM Peak Hour PM Peak Hour Land Use ITE Land Use Size Daily In Out Total In Out Total Proposed Temple Facilities [e] Temple Administration [f] ,380 sf Transit Credit on Non-School Uses [i] (92) (11) (2) (13) (2) (10) (12) Nursery School [b] [c] students Temple School [d] students SUBTOTAL - Proposed 1, NET NEW TRIPS Source: Gibson Transportation Consulting, Inc., [a] Source: Trip Generation, 8th Edition, Institute of Transportation Engineers (ITE), [b] The Day Care Center land use was used to represent trips generated by the Nursery School component of the project. ITE does not include Nursery School as a specific land use, but the definition of the Day Care Center land use in the ITE Trip Generation manual is generally synonymous with the definition of a Nursery School, and reads as follows: "A day care center is a facility where care for pre-school age children is provided, normally during the daytime hours. Day care facilities generally include classrooms, offices, eating areas and playgrounds. Some centers also provide after-school care for school-age children. [c] The hours of operation for the proposed Nursery School would be similar to those of the existing school: 8:00 AM to 2:30 PM. Therefore, no afternoon commuter peak hour trips would be generated by the proposed Nursery School. [d] Trip generation rates for the Temple School are based on empirical data collected at the Wilshire Boulevard Temple School's Westside Campus. The trip generation rates were based on the highest counts yielded by a 9-year data set ( ). [e] The Temple's existing sacred and community spaces (e.g., spaces used for Tikkun Olam, or social services, and Sunday School) typically generate trips outside of weekday commuter peak hours, and one sacred space, Factor Chapel, would be removed and a smaller existing facility used instead. For these reasons, existing and future trip generation associated with use of these spaces was not included in this table and no trip credits were assigned for these existing uses. [f] Temple administration facilities are proposed to be enhanced and expanded accommodate more spacious administrative offices, meeting space, conference rooms, common spaces, etc., as opposed to an increased number of staff persons. Use of these facilities may occur outside of commuter peak hours. However, to provide a conservative analysis, trips during both morning and afternoon commuter peak hours were assumed. No material increase in the number of staff persons is envisioned. [g] The Nursery School is currently entitled for a maximum enrollment of 80 students; however, the enrollment for the academic year is approximately 70 students. Therefore, it is conservatively assumed that future base conditions would include 70 students. [h] Based on existing counts, classes held at the Taekwondo School in the on-site office building at 6th Street and Hobart Boulevard typically change over once during the afternoon peak hour, with approximately 25 cars arriving and departing, for a total of 50 trips generated. [i] The project site is located within 0.25 mile of a Metro transit station and Rapid Bus stop. Thus, a 15% transit credit has been applied to the non-school related uses (i.e., Temple Administration, General Office uses) based on LADOT policy. City of Los Angeles IV.F-17 Wilshire Boulevard Temple Master Plan Project Draft EIR

18 ii. Project Trip Distribution Once the number of trips generated by the Project was calculated, the geographic distribution of Project-generated trips was determined. The geographic distribution of trips generated by the Project was developed based on the following considerations: the locations of residential and employment centers; characteristics of the street system serving the Project site; the level of accessibility of the routes to and from the Project site; existing intersection traffic volumes; Project site ingress/egress availability based on the proposed access and circulation scheme; and the locations of existing and proposed parking. The general trip distribution pattern for this study was developed in conjunction with LADOT. The Project traffic distribution is illustrated in Figure IV.F-4. As indicated, the distribution applied for Project traffic is as follows: 20 percent to/from the north 30 percent to/from the south 25 percent to/from the east 25 percent to/from the west Project site access would be provided via an inbound driveway on Hobart Boulevard and an outbound driveway on Harvard Boulevard. Turning movements would be restricted to right-turns only at both driveways. This configuration promotes a clockwise travel pattern around the Project site for arriving and departing vehicles. Traffic approaching the site from 6 th Street would likely travel south on Harvard Boulevard, west on Wilshire Boulevard, and north on Hobart Boulevard in order to enter the Project site, and would make a similar series of turns upon exiting the Project site to return to 6 th Street. The effect of Project-generated traffic on the surrounding intersections would be minimized by the relatively small impact right-turning vehicles have on through traffic. iii. Project Trip Assignment The Project trip generation estimates summarized in Table IV.F-5, above and the distribution pattern illustrated in Figure IV.F-4 were used to assign the movements of Project-generated traffic through the analyzed intersections. Figure IV.F-5 illustrates the Project-generated peak hour traffic volumes at the analyzed intersections during typical weekday morning and afternoon peak hours upon Project buildout. City of Los Angeles IV.F-18 Wilshire Boulevard Temple Master Plan Project Draft EIR

19 b. Future Roadway Improvement Projects i. Wilshire Boulevard Bus Rapid Transit Project The Wilshire Boulevard Bus Rapid Transit (BRT) project includes the conversion of the existing curb lanes running east and west along Wilshire Boulevard into exclusive Bus Rapid Transit lanes during peak periods to facilitate rapid bus transportation connecting west Los Angeles to downtown Los Angeles. The bus lane is anticipated to begin operation in late 2011 or early 2012, prior to the Project buildout year of A number of general improvements are required as part of the BRT project, including the restriping of traffic lanes, converting the existing curb lanes to bus lanes in each direction during peak periods, upgrading the existing transit signal priority system and installation of traffic/transit signage, and pavement markings. The conversion of the curb lanes to bus lanes during the peak hours would reduce the number of through-travel lanes (i.e., automobile capacity on Wilshire Boulevard), which may cause some east-west traffic to switch to parallel streets, such as 6 th Street. Without the BRT project, Wilshire Boulevard currently has three east-west travel lanes in each direction in the Project vicinity. The BRT project would reduce Wilshire Boulevard to two travel lanes in each direction, which effectively reduces capacity by 33 percent. It is anticipated that approximately 15 percent of the east-west through traffic on Wilshire Boulevard would be diverted from Wilshire Boulevard onto other parallel routes. Of this 15 percent, 2.5 percent is estimated to shift to 6 th Street. c. Future Without Project Traffic Volumes Future without Project conditions assume annual increases in traffic throughout the course of Project buildout due to the projected ambient growth in traffic, which reflects increases in traffic due to regional growth and development as well as growth due to traffic generated by new development in the study area. Future without Project conditions also reflect programmed roadway improvement projects, such as the Wilshire Boulevard BRT project, which may result in a shift in existing and future traffic off of Wilshire Boulevard and onto parallel streets. City of Los Angeles IV.F-19 Wilshire Boulevard Temple Master Plan Project Draft EIR

20 n NOT TO SCALE SOURCE: GTC August 2010 FIGURE IV.F-4 Project Trip Distribution /10

21 n NOT TO SCALE SOURCE: GTC August 2010 FIGURE IV.F-5 Project Only Peak Hour Traffic Volumes /10

22 i. Ambient Traffic Growth Existing traffic is expected to increase as a result of regional growth and development. Based on historical trends and standard LADOT methodology, an ambient growth factor of 0.5 percent per year was applied to existing traffic volumes to reflect the effects of regional growth and development by the year The total adjustment applied over the 10-year period from 2010 until full project buildout (year 2020) was therefore five percent. ii. Related Projects Related projects are projects that either are under construction or are planned for development in the Project vicinity and that may contribute to traffic volumes in the study area. For this reason, the analysis of future traffic conditions in the study area has been expanded to include potential traffic generated by related projects. A total of 46 related projects were identified within a 1.5-mile radius of the Project site. The related project locations and descriptions are listed in Table IV.F-6, Related Projects Trip Generation Estimates. Their locations are illustrated in Figure IV.F-6, Locations of Related Projects. Their trip generation rates and trip generation estimates are in Table 6 of the Traffic Study for the Wilshire Boulevard Temple Master Plan provided in Appendix IV.F. Other known developments outside the study area have been determined to be geographically too far from the Project site to add substantially to the cumulative traffic within the study area. The total related projects traffic volumes assigned to the study intersections is illustrated in Figure IV.F-7, Future (Year 2020) Without Project Peak Hour Traffic Volumes. City of Los Angeles IV.F-22 Wilshire Boulevard Temple Master Plan Project Draft EIR

23 Table IV.F-6 Related Projects Trip Generation Estimates Map ID Project Name/Location Laborers Local 300 HQ 2009-CEN W Pico Boulevard Medical Office & Apartments EAF , 2004-CEN Olympic Boulevard Description/Lan d Use ITE Land Use Code Size Net Daily Trips Net AM Peak Hour Trips Net PM Peak Hour Trips In Out Total In Out Total Office General Office 30,300 sf Medical Office Medical/Dental Office 27,720 sf Apartments Apartment 21 du 1, Private Elementary School EAF th Street Private Elementary School Private School (K-8) 90 Students Mixed-Use 2008-CEN W Wilshire Boulevard Condominium Condominium 117 du Restaurant Hotel 287 Rooms High-Turnover Restaurant Hotel Retail Shopping Center 4,419 sf 6, Quality Restaurant 38,047 sf High-Turnover Restaurant 13,707 sf 5. Central LA Middle School # CEN th Street & Vermont Avenue Middle School Middle School 789 Students City of Los Angeles IV.F-23 Wilshire Boulevard Temple Master Plan Project Draft EIR

24 Map ID Project Name/Location Apartments & Retail EAF Melrose Avenue Mixed-Use 2004-CEN S Western Avenue Apartments & Retail EAF Western Avenue Condominiums & Retail EAF Olympic Boulevard Condominiums & Retail EAF Hobart Boulevard Apartments EAF Wilshire Boulevard Private Elementary School Expansion ENV S Manhattan Place Description/Lan d Use ITE Land Use Code Size Apartments Apartment 54 du Net Daily Trips Net AM Peak Hour Trips Net PM Peak Hour Trips In Out Total In Out Total Retail Shopping Center 16,000 sf Apartments Apartment 240 du Retail Shopping Center 49,900 sf 1, Apartments Apartment 63 du Retail Shopping Center 13,500 sf Condominium Condominium 87 du Retail Shopping Center 70,231 sf 2, Condominium Condominium 70 du Retail Shopping Center 8,558 sf Apartments Apartment 91 du Private Elementary School Private School (K-8) 100 Students Medical Office Expansion ENV W 3rd Street Medical Office Medical/Dental Office 24,075 sf City of Los Angeles IV.F-24 Wilshire Boulevard Temple Master Plan Project Draft EIR

25 Map ID Office Project Name/Location ENV , 2005-CEN S Crenshaw Boulevard Mixed-Use 2005-CEN S Arapahoe Street LAUSD - Central Region Elementary School # CEN W Washington Boulevard LAUSD - Central Region Elementary School # CEN W Cordova Street Mixed-Use 2005-CEN W Wilshire Boulevard Mixed-Use 2004-CEN S Western Avenue Mixed-Use Development 2005-CEN W Wilshire Boulevard Description/Lan d Use ITE Land Use Code Size Net Daily Trips Net AM Peak Hour Trips Net PM Peak Hour Trips In Out Total In Out Total Office General Office 17,670 sf Condominium Condominium 60 du Retail Shopping Center 6,000 sf Elementary School Year-Round Elementary School Elementary School Elementary School 875 Students 575 Students Condominium Condominium 378 du Other Shopping Center 8,000 sf 2, Mixed-Use - - 3, Condominium Condominium 118 du Retail Shopping Center 3,000 sf City of Los Angeles IV.F-25 Wilshire Boulevard Temple Master Plan Project Draft EIR

26 Map ID Project Name/Location Mixed-Use Development ENV MN, 2005-CEN W Wilshire Boulevard Shopping Center ENV MN, 2006-CEN W Olympic Boulevard Wilshire Center Project VTT66283, 2009-CEN W Wilshire Boulevard Condominiums TT S Fedora Avenue Mixed-Use 2005-CEN S Hobart Boulevard Condominiums & Retail ENV EA 5663 W Melrose Avenue Description/Lan d Use ITE Land Use Code Size Live/Work Condo Condominium 190 du Net Daily Trips Net AM Peak Hour Trips Net PM Peak Hour Trips In Out Total In Out Total Retail Shopping Center 5,540 sf 1, Shopping Center Shopping Center 109,006 sf 4, Restaurant High-Turnover Restaurant 8,900 sf Condominium Condominium 442 du Retail Shopping Center 42,000 sf Condominium Condominium 38 du Condominium Condominium 242 du Health Club Restaurant High-Turnover Restaurant Health Club Quality Restaurant High-Turnover Restaurant 25,700 sf 26,600 sf Night Club Night Club 9,700 sf Office Retail General Office Shopping Center 4,200 sf 2, ,600 sf 4,400 sf Condominium Condominium 96 du Retail Shopping Center 3,350 sf City of Los Angeles IV.F-26 Wilshire Boulevard Temple Master Plan Project Draft EIR

27 Map ID Project Name/Location HK Town Project (Mixed-Use) 2006-CEN N Western Avenue Mixed-Use ENV MND 3324 W Wilshire Boulevard Medical Office & Retail ENV EA, 2008-CEN W Olympic Boulevard Mixed-Use (68 Assisted-living apartments with retail & commercial space) ENV EA, 2007-CEN W Santa Monica Boulevard Hotel, Condo Hotel, Condos, Retail & Restaurant EAF , 2007-CEN W 6th Street MacArthur Park/Alvarado Metro Project VTT-69213, 2006-CEN W 7th Street Description/Lan d Use ITE Land Use Code Size Shopping Center Shopping Center 40,800 sf Net Daily Trips Net AM Peak Hour Trips Net PM Peak Hour Trips In Out Total In Out Total Supermarket Supermarket 48,000 sf 3, Apartments Apartment 187 du Condominium Condominium 108 du Retail Shopping Center 3,450 sf Medical Office Medical/Dental Office 46,771 sf Retail Shopping Center 5,570 sf 1, Apartments Apartment 68 du Retail Shopping Center 51,674 sf 2, Hotel Hotel 80 Rooms Condo Hotel All Suites Hotel 112 du Condominium Condominium 165 du 2, Restaurant Retail Quality Restaurant Shopping Center 13,000 sf 7,500 sf Apartments Apartment 172 du In Out Total In Out Total Retail Shopping Center 32,800 sf 1, City of Los Angeles IV.F-27 Wilshire Boulevard Temple Master Plan Project Draft EIR

28 Map ID Project Name/Location Description/Lan d Use ITE Land Use Code Size Net Daily Trips Net AM Peak Hour Trips Net PM Peak Hour Trips In Out Total In Out Total Condominiums ENV MN 991 S Arapahoe Street Mixed-Use ENV EA, 2006-CEN S Catalina Street Mixed-Use 2007-CEN W Beverly Boulevard Apartments VTT CN, 2007-CEN S Berendo Street Almond Tree Village 2007-CEN W 3rd Street Gas Station with Mini-Market ENV EA, 2007-CEN W Olympic Boulevard Condos & Retail ENV EA, 2008-CEN S Hoover Street Condominium Condominium 46 du Condominium Condominium 224 du Retail Shopping Center 7,000 sf 1, Apartments Apartment 32 du Retail Shopping Center 5,870 sf Apartments Apartment 150 du Condominium Condominium 147 du Apartments (Senior Housing) Senior Adult Housing - Attached Retail Shopping Center 20,000 sf Gas Station with Mini-Market Gas Station with Convenience Market Condominium Condominium 32 du 261 du 1, ,046 sf Retail Shopping Center 4,500 sf City of Los Angeles IV.F-28 Wilshire Boulevard Temple Master Plan Project Draft EIR

29 Map ID Project Name/Location Description/Lan d Use ITE Land Use Code Size Net Daily Trips Net AM Peak Hour Trips Net PM Peak Hour Trips In Out Total In Out Total 40. LAUSD Central MacArthur Park Elementary School 2008-CEN-4676 Elementary School Elementary School 400 Students W 7th Street LAUSD Central Region Elementary School # CEN-4679 W Council Street & Westmoreland Avenue Apartments 2008-CEN W Leeward Avenue Restaurant ENV EA, 2008-CEN W Olympic Boulevard Wilshire Hoover Shopping Center ENV EA, 2009-CEN W Wilshire Boulevard Mixed-Use 2009-CEN S Catalina Street Elementary School Elementary School 800 Students Apartments Apartment 125 du Restaurant Quality Restaurant 17,033 sf 1, Shopping Center Shopping Center 156,000 sf 4, Condominium Condominium 136 du Restaurant Quality Restaurant 10,998 sf 1, City of Los Angeles IV.F-29 Wilshire Boulevard Temple Master Plan Project Draft EIR

30 Map ID 46. Project Name/Location Affordable Housing and Assisted Living 2009-CEN W 8th Street Description/Lan d Use ITE Land Use Code Size Affordable Housing Apartments (Senior Housing) Apartment 37 du Senior Adult Housing - Attached Net Daily Trips Net AM Peak Hour Trips Net PM Peak Hour Trips In Out Total In Out Total 48 du TOTAL 62,497 1,48 5 2,23 7 3,759 3,0 91 2,20 8 5,353 Source: Gibson Transportation Consulting, Inc., du = dwelling units; sf = square feet; empl. = employees; st = students City of Los Angeles IV.F-30 Wilshire Boulevard Temple Master Plan Project Draft EIR

31 iii. Trip Generation Trip generation estimates for the related projects were calculated using a combination of previous study findings and the trip generation rates contained in the 2008 ITE Trip Generation, 8 th Edition. The related projects are expected to generate approximately 62,497 daily trips on a typical weekday, including 3,759 AM peak hour trips and 5,353 PM peak hour trips. These projections are conservative in that they do not in every case account for either removal of existing uses or the likely use of non-motorized travel modes (transit, walk, bike, etc.). The future (year 2020) traffic volumes at the study intersections without completion of the Project are illustrated in Figure IV.F-. d. Future With Project Traffic Volumes The Project is expected to be completed and occupied by the year Year 2020 peak hour traffic volumes are based on traffic from ambient growth and the construction of a number of projects that are either under construction or planned for development in the Project site vicinity (related projects), as discussed below. These volumes represent the projected future weekday peak hour traffic conditions after completion of the Project in the year 2020 assuming implementation of the Wilshire Boulevard BRT lanes project. These are illustrated in Figure IV.F-8, Future (Year 2020) With Project Peak Hour Traffic Volumes, and shown in Table IV.F The Los Angeles County Metropolitan Transportation Authority (Metro) expects to implement a project to convert the curb lanes in each direction along Wilshire Boulevard into exclusive Bus Rapid Transit (BRT) lanes during peak periods in order to establish a stronger transit connection between downtown Los Angeles and the west side of Los Angeles. City of Los Angeles IV.F-31 Wilshire Boulevard Temple Master Plan Project Draft EIR ENV EIR December 2010

32 n NOT TO SCALE SOURCE: GTC August 2010 FIGURE IV.F-6 Locations of Related Projects /10

33 n NOT TO SCALE SOURCE: GTC August 2010 FIGURE IV.F-7 Future (Year 2020) Without Project Peak Hour Traffic Volumes /10

34 n NOT TO SCALE SOURCE: GTC August 2010 FIGURE IV.F-8 Future (Year 2020) With Project Peak Hour Traffic Volumes /10

35 No. Intersection Table IV.F-7 Future Conditions (2020) Intersection Peak Hour Levels of Service Future without Project Conditions Future with Project Conditions V/C LOS V/C LOS Change in V/C Significant Impact? Peak Hour -> AM PM AM PM AM PM AM PM AM PM AM PM 1. Western Avenue & 6th Street B D B D NO NO 2. Hobart Boulevard & 6th Street A C B C NO NO 3. Harvard Boulevard & 6th Street A B A B NO NO 4. Normandie Avenue & 6th Street B C B C NO NO 5. Western Avenue & Wilshire Boulevard E F E F NO NO 6. Hobart Boulevard & Wilshire Boulevard B D B D NO NO 7. Harvard Boulevard & Wilshire Boulevard A D A D NO NO 8. Normandie Avenue/Irolo Street & Wilshire Boulevard D E D E NO NO Source: Gibson Transportation Consulting, Inc., City of Los Angeles IV.F-35 Wilshire Boulevard Temple Master Plan Project Draft EIR

36 5. SIGNIFICANCE THRESHOLDS Appendix G of the California Environmental Quality Act (CEQA) Guidelines provides sample checklist questions for use in an Initial Study to determine a project s potential for environmental impacts. According to the questions contained in Appendix G under Section XVI, Transportation/Traffic, a project would have a potentially significant impact if it would: XVI.a XVI.b XVI.c XVI.d XVI.e XVI.f Conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system, taking into account all modes of transportation including mass transit and non-motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit; Conflict with an applicable congestion management program, including, but not limited to level of service standards and travel demand measures, or other standards established by the county congestion management agency for designated roads or highways; Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks (addressed in Section VII, Effects Found Not To Be Significant); Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment) (addressed in Section VII, Effects Found Not To Be Significant); Result in inadequate emergency access; or Conflict with adopted policies, plans, or programs regarding public transit, bikeways, or pedestrian facilities, or otherwise substantially decrease the performance or safety of such facilities (addressed in Section VII, Effects Found Not To Be Significant). The following factors are set forth in the LA CEQA Thresholds Guide for consideration on a case-by-case basis in making a determination of significance. Construction Impacts The LA CEQA Thresholds Guide states that the determination of significance shall be made on a case-by-case basis, considering the following factors: TRAF-1 Temporary Traffic Impacts: The length of time for temporary street closures or closures of two or more traffic lanes; The classification of the street (major arterial, state highway) affected; City of Los Angeles IV.F-36 Wilshire Boulevard Temple Master Plan Project Draft EIR

37 The existing traffic levels and Level of Service (LOS) on the affected street segments and intersections; Whether the affected street directly leads to a freeway on- or off-ramp or other state highway; Potential safety issues involved with street or lane closures; and The presence of emergency services (fire, hospital, etc.) located nearby that regularly use the affected street. TRAF-2 Temporary Loss of Access: The length of time of any loss of vehicular or pedestrian access to a parcel fronting the construction area; The availability of alternative vehicular or pedestrian access within one-quarter mile of the lost access; and The type of land uses affected, and related safety, conveniences, and/or economic issues. TRAF-3 Temporary Loss of Bus Stops or Rerouting of Bus Lines: The length of time that an existing bus stop would be unavailable or that existing service would be interrupted; The availability of a nearby location (within one-quarter mile) to which the bus stop or route can be temporarily relocated; The existence of other bus stops or routes with similar routes/destinations within a one-quarter-mile radius of the affected stops or routes; and Whether the interruption would occur on a weekday, weekend, or holiday, and whether the existing bus route typically provides service that/those day(s). TRAF-4 Temporary Loss of On-Street Parking The current utilization of existing on-street parking; The availability of alternative parking locations or public transit options (e.g., bus, train) within one-quarter mile of the Project site; and The length of time that existing parking spaces would be unavailable. City of Los Angeles IV.F-37 Wilshire Boulevard Temple Master Plan Project Draft EIR

38 Intersection Capacity The LA CEQA Thresholds Guide states that a proposed project would normally have a significant impact on intersection capacity if: TRAF-5 Project traffic causes increases in the V/C ratios for given intersection operating conditions, as follows: V/C ratio increase if final LOS is C V/C ratio increase if final LOS is D V/C ratio increase if final LOS is E or F Final LOS is defined as projected future conditions, including the Project, ambient conditions, and related Project growth, but without Project traffic mitigation. These criteria are summarized in Table IV.F-8, LADOT Criteria for Significant Traffic Impacts. Table IV.F-8 LADOT Criteria for Significant Traffic Impacts Final LOS 1 Final CMA Value Project-Related Increase in CMA Value C equal or greater than D > equal to or greater than E, F >0.900 equal to or greater than Final LOS is defined as projected future conditions including Project, ambient conditions, and related Project growth, but without Project traffic mitigation. Based on LADOT criteria, no significant impacts would occur at LOS A or B because there would be sufficient surplus capacity to accommodate large traffic increases with little effect on traffic delays. Access The LA CEQA Thresholds Guide states that a proposed project normally would have a significant project access impact if: TRAF-6 The intersections nearest the project s primary site access were projected to operate at LOS E or F during AM or PM peak hour, under cumulative plus Project conditions. City of Los Angeles IV.F-38 Wilshire Boulevard Temple Master Plan Project Draft EIR

39 Transit System Capacity The LA CEQA Thresholds Guide states that the determination of significance shall be made on a case-by-case basis, considering the following: TRAF-7 The projected number of additional transit passengers expected with implementation of the proposed project and available transit capacity. Parking The LA CEQA Thresholds Guide states that a project normally would have an impact on parking if: TRAF-8 The project provides less parking than needed as determined through an analysis of demand from the Project. For the purposes of this impact analysis, the Project would result in a significant impact if it provides less parking than required under the City of Los Angeles Municipal Code. Bicycle, Pedestrian and Vehicular Safety The determination of significance for the Project s bicycle, pedestrian and vehicular safety impacts shall be made considering the following factor: TRAF-9 If the Project would result in unsafe conditions when considering the amount of pedestrian activity at Project access points, design features, bicycle facilities crossing driveways, and physical conditions of the Project site and surrounding areas. The City s thresholds are inclusive of those provided in Appendix G of the State CEQA Guidelines checklist. In addition, the City s thresholds provide more specific guidance for evaluating impacts. Therefore, the City s thresholds are used in the following analysis. a. Project Design Features Under the proposed Master Plan, all parking would be contained in the proposed Parking District, which occupies the northern third of the Project site. The parking structure would be constructed with three subterranean levels and three above-ground levels and would provide parking for approximately 500 vehicles, an increase of approximately 397 spaces over existing conditions. The structure would include a drive-through drop-off and pick-up lane on the ground level. Cars would enter from Hobart Boulevard and exit to Harvard Boulevard, with vehicular movements limited to right-turn-in from Hobart Boulevard and right-turn-out onto Harvard Boulevard. The parking structure would provide pedestrian access to the Project site from the north, with controlled access to the Project site s internal pedestrian walkway. City of Los Angeles IV.F-39 Wilshire Boulevard Temple Master Plan Project Draft EIR

40 An internal north-south-oriented pedestrian walkway through the center of the Project site would link all proposed facilities. Secure pedestrian entrances to the Project site would be provided from Wilshire Boulevard, between the Sanctuary and new administration and event building, and from 6 th Street via a pedestrian entrance and corridor within the parking structure. Secondary pedestrian access would be provided from Hobart Boulevard and Harvard Boulevard. Nursery and elementary school entrances would be accessible from the internal pedestrian spine. Storefront space along 6 th Street would provide access to Tikkun Olam (i.e., social service) programs housed within the parking structure. Elevators, stairs, and ramps would ensure accessibility throughout the Project site. As shown in Figure IV.F-9, vehicular access to the Project site would be provided via an inbound driveway on Hobart Boulevard and an outbound driveway on Harvard Boulevard. The inbound driveway on Hobart Boulevard would be limited to right-turn ingress only turning movements and the outbound driveway on Harvard Boulevard would be limited to right-turn egress only turning movements. A separate drive aisle is provided within the parking structure to allow nursery and elementary school drop-off and pick-up. b. Project Impacts i. Construction Impacts TRAF-1 Would the Project cause temporary traffic impacts, taking into consideration the following? The length of time for temporary street closures or closures of two or more traffic lanes; The classification of the street (major arterial, state highway) affected; The existing traffic levels and Level of Service (LOS) on the affected street segments and intersections; Whether the affected street directly leads to a freeway on- or off-ramp or other state highway; Potential safety issues involved with street or lane closures; and The presence of emergency services (fire, hospital, etc.) located nearby that regularly use the affected street. City of Los Angeles IV.F-40 Wilshire Boulevard Temple Master Plan Project Draft EIR

41 Hobart Boulevard n NOT TO SCALE Harvard Boulevard NOTE: This is a preliminary, conceptual document, which is subject to change and shall not be deemed to constitute a representation of the final project. SOURCE: GTC September 2010 FIGURE IV.F-9 Vehicular Circulation Plan /10

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC This Section summarizes the information provided in the Traffic Study for the Santa Monica College Bundy Campus Master Plan (Traffic Study),

More information

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC INTRODUCTION The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC INTRODUCTION This section of the (Draft EIR) addresses the subject of traffic and transportation with respect to the proposed (Project or

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site Project Scoping Report Appendix B Project Web Site APPENDIX B Project Web Site WESTSIDE EXTENSION TRANSIT CORRIDOR STUDY February 4, 2008 News and Info of 1 http://metro.net/projects_programs/westside/news_info.htm#topofpage

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

Appendix G Traffic and Parking Report

Appendix G Traffic and Parking Report Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

3.8 TRANSPORTATION, CIRCULATION AND PARKING

3.8 TRANSPORTATION, CIRCULATION AND PARKING 3.8 TRANSPORTATION, CIRCULATION AND PARKING This section provides an overview of traffic, circulation and parking impacts and evaluates the construction and operational impacts associated with the Proposed

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

Section 3.12 Traffic and Transportation

Section 3.12 Traffic and Transportation Section. Traffic and Transportation SECTION SUMMARY This section describes existing ground transportation within the Port and surrounding area associated with implementation of the proposed Project. An

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

TRANSPORTATION 1. INTRODUCTION 2. METHODOLOGY

TRANSPORTATION 1. INTRODUCTION 2. METHODOLOGY IV.K TRANSPORTATION 1. INTRODUCTION This section provides an analysis of potential impacts associated with traffic, parking, and access. The analysis provides an overview of existing traffic conditions

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

Section 5.8 Transportation and Traffic

Section 5.8 Transportation and Traffic Section 5.8 Transportation and Traffic 5.8 TRANSPORTATION AND TRAFFIC Generous This Section is based on the Topgolf Specific Plan Traffic Impact Analysis (RK Engineering Group, Inc., October 31, 2016);

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM To: From: Date: Subject: Jerry Flores - AECOM Brian A. Marchetti, AICP September 9, 5 DRAFT Traffic Study LABOE Channel 5 Studio Relocation

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS I. TRAFFIC / TRANSPORTATION

IV. ENVIRONMENTAL IMPACT ANALYSIS I. TRAFFIC / TRANSPORTATION IV. ENVIRONMENTAL IMPACT ANALYSIS I. TRAFFIC / TRANSPORTATION 1. INTRODUCTION The following section summarizes the information provided in the following traffic studies and collectively referred to as

More information

ENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION AND CIRCULATION 1. INTRODUCTION

ENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION AND CIRCULATION 1. INTRODUCTION IV. ENVIRONMENTAL IMPACT ANALYSIS 1. INTRODUCTION This section is based on a traffic and parking impact study that was prepared for the proposed CSMC West Tower Project by Linscott, Law & Greenspan, Engineers,

More information

4.4 Transportation and Circulation

4.4 Transportation and Circulation 4.4.1 Introduction This section evaluates the potential for construction traffic and operational impacts to result from implementation of the proposed project. This includes the potential for the project

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

V. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION

V. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION V. ENVIRONMENTAL IMPACT ANALYSIS F. TRANSPORTATION/CIRCULATION The following Section presents a summary of the Traffic Study for the Proposed Civic Center/Metlox Development Project in the City of Manhattan

More information

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING 1. INTRODUCTION This section is based on the technical report Traffic Impact Study Health Sciences Campus Project, City of Los Angeles,

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

Service Quality: Higher Ridership: Very Affordable: Image:

Service Quality: Higher Ridership: Very Affordable: Image: Over the past decade, much attention has been placed on the development of Bus Rapid Transit (BRT) systems. These systems provide rail-like service, but with buses, and are typically less expensive to

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Madison BRT Transit Corridor Study Proposed BRT Operations Plans Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

4.1 Traffic, Circulation, and Parking

4.1 Traffic, Circulation, and Parking 4.1 Traffic, This section describes the existing transportation and parking conditions within and adjacent to the project area. A traffic report describing the potential impacts of the proposed project

More information

4.7 Construction Surface Transportation

4.7 Construction Surface Transportation 4.7 Construction Surface Transportation 4.7.1 Introduction The traffic analysis presented in this section addresses the construction traffic impacts specific to the proposed Project. The construction traffic

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

7359 WISCONSIN AVENUE MONTGOMERY COUNTY, MARYLAND

7359 WISCONSIN AVENUE MONTGOMERY COUNTY, MARYLAND 7359 WISCONSIN MONTGOMERY COUNTY, MARYLAND September 1, 2017 7359 Wisconsin Avenue September 2017 7359 WISCONSIN Local Area Transportation Review Montgomery County, Maryland September 1, 2017 Prepared

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization DRAFT REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

YULA Boys High School Expansion

YULA Boys High School Expansion Environmental Review Section City Hall 200 N. Spring Street, Room 750 Los Angeles, CA 90012 RECIRCULATED TRAFFIC/TRANSPORTATION/PARKING CHAPTER WEST LOS ANGELES COMMUNITY PLAN AREA YULA Boys High School

More information

IV. Environmental Impact Analysis J. Traffic, Access, and Parking

IV. Environmental Impact Analysis J. Traffic, Access, and Parking IV. Environmental Impact Analysis J. Traffic, Access, and Parking 1. Introduction This section of the Draft EIR analyzes the proposed Project s potential impacts on traffic, access, and parking. This section

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING 1. INTRODUCTION This section is based on the technical report Traffic Study for the Villa Marina Residential Project, prepared by Kaku

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.13 TRANSPORTATION / TRAFFIC

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.13 TRANSPORTATION / TRAFFIC 3.13 TRANSPORTATION / TRAFFIC As a result of the analysis undertaken in the Initial Study for the Los Angeles Mission College Facilities Master Plan, the (LACCD) determined that the proposed project may

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC The following summarizes the information provided in the traffic report prepared by Fehr & Peers/Kaku Associates entitled, Traffic Study for

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

APPENDIX VMT Evaluation

APPENDIX VMT Evaluation APPENDIX 2.7-2 VMT Evaluation MEMORANDUM To: From: Mr. Jonathan Frankel New Urban West, Incorporated Chris Mendiara LLG, Engineers Date: May 19, 2017 LLG Ref: 3-16-2614 Subject: Villages VMT Evaluation

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2

TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY Purpose of Report and Study Objectives... 2 TABLE OF CONTENTS 1.0 INTRODUCTION AND SUMMARY 1 1.1 Purpose of Report and Study Objectives... 2 1.2 Executive Summary... 3 1.2.1 Site Location and Study Area... 3 1.2.2 Development Description... 3 1.2.3

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

Appendix 5. Haymeadow Interim Traffic Analysis

Appendix 5. Haymeadow Interim Traffic Analysis Appendix 5 Haymeadow Interim Traffic Analysis 20 MEMORANDUM To: From: Rick Pylman Gary Brooks Bill Fox Date: September 15, 2016 Project: Subject: Haymeadow Evaluation of interim access configuration Currently

More information

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Page 1 Introduction The UCLA Institute of Transportation

More information

2030 Multimodal Transportation Study

2030 Multimodal Transportation Study 2030 Multimodal Transportation Study City of Jacksonville Planning and Development Department Prepared by Ghyabi & Associates April 29,2010 Introduction Presentation Components 1. Study Basis 2. Study

More information

Appendix C. Traffic Impact Study

Appendix C. Traffic Impact Study Appendix C Traffic Impact Study TRAFFIC STUDY FOR THE EAGLE ROCK AGGREGATE TERMINAL Prepared by: FEHR & PEERS 201 Santa Monica Blvd. Suite 500 Santa Monica, CA 90401-2213 T. (310) 458-9916 F. (310) 394-7663

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

2.4 Build Alternatives

2.4 Build Alternatives Table 2-1. Future Transit Network Changes between No Build and TSM Alternatives Operator Route Group No. Route ID and Description Peak Headway (min) No Build Off-peak Headway (min) Peak Headway (min) TSM

More information

Traffic Feasibility Study

Traffic Feasibility Study Traffic Feasibility Study Town Center South Robbinsville Township, Mercer County, New Jersey December 19, 2017 Prepared For Robbinsville Township Department of Community Development 2298 Route 33 Robbinsville,

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

TRAFFIC IMPACT ANALYSIS FOR A PROPOSED MIXED USE DEVELOPMENT

TRAFFIC IMPACT ANALYSIS FOR A PROPOSED MIXED USE DEVELOPMENT TRAFFIC IMPACT ANALYSIS FOR A PROPOSED MIXED USE DEVELOPMENT Located at southeast corner of Winnetka Avenue and Prairie Street In the City of Los Angeles Prepared for: Sky Tech Management & Construction

More information

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE

TRAFFIC IMPACT ANALYSIS. for MILTON SQUARE TRAFFIC IMPACT ANALYSIS for MILTON SQUARE US Route 7 Milton, Vermont March 5, 2008 LAMOUREUX & DICKINSON 14 Morse Drive Essex Junction, Vermont 05452 (802) 878-4450 Traffic Impact Assessment EXECUTIVE

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information