1

2 There is not a federal policy that establishes maximum cost effectiveness values for NOx RACT. The San Joaquin Valley APCD uses a BARCT threshold of $9, (California Air Resources Board (CARB), Report to the Legislature, Implications of Future Oxides of Nitrogen Controls from Seasonal Sources in the San Joaquin Valley, January 2002, Table 9, Comparison of BARCT Cost Effectiveness Thresholds). Therefore, for the purpose of this evaluation, the ICAPCD will use a RACT cost effectiveness value of $8,000- $10,000/ton of NOx. The cost of control equipment is highly dependent on the size of the unit and the type of control selected. According to the APCD survey, the majority of the boilers that will be impacted by Rule are in the range of MMBtu/hour. Therefore, the cost effectiveness evaluation was conducted for several size boilers ranging from 50 to 200 MMBtu/hour and capacity factors ranging from 10% to 75%. To estimate cost effectiveness, ICAPCD staff obtained capital cost estimates of a low NOx burner with flue gas recirculation system from Jeff Welton and Pete Santner, R.F. MacDonald Company. According to Pete Santner ( message on December 3, 2009), boilers with capacity MMBtu/hr would need to be retrofit with a combination of low-nox burner and flue gas recirculation system in order to reduce NOx emissions to a minimum of 30 ppmv for gaseous fuel-fired units. The total initial cost (capital cost and installation) for a low NOx burner and flue gas recirculation system for boilers 50 to 200 MMBtu/hr ranges from $401,000 to $732,000. The average cost effectiveness ranges from approximately $6,470 to $48,580 per ton of NOx reduced. The high end of the cost effectiveness range is due to low annual heat input of boilers. This evaluation indicates that it is cost effective to retrofit boilers to low-nox burner and flue gas recirculation but only for those units operating under an annual capacity factor above 30%. Therefore, Rule will establish an alternative NOx emission limit of 70 ppmv for those existing emission units with an annual capacity factor of 30% or less. The annual capacity factor is the ratio of the amount of fuel burned by an emission unit in a calendar year to the amount it could have burned if it had operated all year around; in other words, it represents 30% of the potential annual fuel consumption for the emission unit. The ICAPCD staff conducted a survey of the permit database to identify the number of boilers which will need to be retrofitted to comply with the new RACT requirements. Approximately 13 units rated 50 million Btu per hour or greater are operated at three of Imperial County s major source facilities and will be affected by the requirements of Rule The ICAPCD survey indicates that one of the boilers (Unit 4) operated by Imperial Irrigation District at the El Centro Generating Facility and three of the natural gas boilers operated by Spreckels Sugar Company would be out of compliance with the 30 ppmv emission limit with current NOx control technology. Unit 4 is currently equipped with Selective Catalytic Reduction (SCR) and Spreckels Sugar Company has indicated that its natural gas boilers will be retrofitted with Flue Gas Recirculation technology. However, this type of NOx control technology would not be able to reduce NOx emissions to the 30 ppmv limit. Therefore, a 70 ppmv NOx limit would be feasible to achieve with the current and proposed technology for these units. The ICAPCD staff evaluated cost effectiveness for retrofitting the Spreckels Sugar boilers and the El Centro 2 February 23, 2010

3 Generating Facility Unit 4 boiler to meet the 30 ppmv limit, a detailed cost effectiveness evaluation for these boilers is included in Section II.b of this report. This evaluation indicates that due to the seasonal nature of operation of the Spreckels Sugar natural gas boilers and El Centro Generating Unit 4 boiler, the cost for retrofitting these boilers is higher than the recommended cost effectiveness threshold. Therefore, these emission units will be restricted to 70 ppmv NOx and maximum annual capacity factor of 30%. It is important to point out that any new boilers will need to comply with BACT requirements; therefore, these units will be required to install more efficient technology to reduce NOx emission, hence the capital and operational cost will be higher. II. COST EFFECTIVENSS A Low NOx with Flue Gas Recirculation System The cost of retrofitting units to comply with the proposed rule varies with the size of the unit and the type of controls used. ICAPCD staff analyzed the cost effectiveness of Rule based on installing and operating of low-nox burner system and flue gas recirculation because this is the control technology that will most likely be used by local industry to comply with this rule. The cost effectiveness evaluation was conducted for several sizes of units ranging from 50 to 200 MMBru/hour. The potential NOx emission reductions were evaluated using the following assumptions: Baseline emissions are lb/mmbtu 3% O2) Controlled emissions are lb/mmbtu 3% O2) Operating schedule 24 hour/day; 365 days/year 0.10, 0.25, 0.30, 0.50 and 0.75 capacity factors Table 1 provides a summary of NOx emissions reductions for boilers at different capacity factors. Table 1 Potential NOx Emissions Reductions MMBtu/hr Capacity Factor Uncontrolled Emissions Tons/yr Controlled Emissions Tons/yr NOx Reductions Tons/year February 23, 2010

4 To estimate cost effectiveness, ICAPCD staff obtained capital cost estimates of a low NOx burner with flue gas recirculation system from Jeff Welton and Pete Santner, R.F. MacDonald Company. In addition, to estimate cost for installation and operation of the boilers, ICAPCD staff used information provided by the CARB, Report to the Legislature, Implications of Future Oxides of Nitrogen Controls from Seasonal Sources in the San Joaquin Valley, January The method for calculating cost effectiveness on CARB s evaluation assumes a 10% interest rate and useful life for the control equipment of 10 years. Table 2 provides a summary of cost to control NOx emissions for different boiler capacities. Table 2 Cost of NOx Control for Boilers Boiler Capacity, MMBtu/hr NOx emission limit, ppm Capital cost, $ 336K 475K 525K 600K Installation cost, $ 65K 96K 108K 132K Total initial cost, $ 401K 571K 633K 732K Capital cost amortization factor 1 Annual repair and 5K 10K 15K 20K maintenance cost, $ Annual operation cost, $ Annual source test cost, $ 4K 4K 4K 4K Total annual cost, $ 74.7K 108.3K 124.9K 148.2K Table 3 indicates the cost effectiveness for boilers at various capacity factors that are subject to the lb/mmbtu or 30 ppm standard. Table 3 Cost Effectiveness for Boilers 50 to 200 MMBtu/hour Capacity Factor (%) (MMBtu/hr) K 27.98K 22.57K 13.96K 9.31K K 20.24K 16.90K 10.13K 6.76K 1 Uses a 10% interest rate and useful life data from the manufacturers survey, when available. 4 February 23, 2010

5 K 15.57K 13.00K 7.79K 5.19K K 13.86K 11.56K 6.93K 4.62K Average 48.58K 19.41K 16.00K 9.70K 6.47K B Alternative NOx Emission Limit Rule established an alternative NOx emission limit of 70 ppmv for those existing emission units with an annual capacity factor of 30% or less. The annual capacity factor is the ratio of the amount of fuel burned by an emission unit in a calendar year to the amount it could have burned if it had operated all year around; in other words, it represents a 30% of the potential annual fuel consumption for the emission unit. This alternative emission threshold has been established for existing seasonal emission units for which installation of advanced control technology would not have a significant impact in reducing NOx emissions due to irregular operation of the emission unit. Spreckels Sugar Company operates three boilers which are not equipped with any type of NOx controls. The three natural gas boilers were installed in 1977 and will have to comply with Rule RACT requirements. The operation of these boilers is seasonal and therefore retrofitting of the boilers to comply with the 30 3% O2 may not be cost effective. Spreckels Sugar Company has indicated that its natural gas boilers will be retrofitted with Flue Gas Recirculation technology to comply with the 70 3% O2. Table 4 Spreckels Sugar Company Potential NOx Reductions 70 ppm to 30 ppm (Year Average Natural Gas Consumption) Emission Unit (MMBtu/hr) Average Natural Gas Used MMBtu/year NOx Emissions at 70 ppm 3% O2 ( lb/mmbtu) (tpy) NOx Emissions at 30 ppm 3% O2 (0.036 lb/mmbtu) (tpy) Potential NOx Reductions (tpy) CE Boiler , Union Boiler Auxiliary Boiler , , Table 5 Spreckels Sugar Company Cost Effectiveness Evaluation Emission Unit Approximate (MMBtu/hr) Annual Cost for Retrofitting at 30 ppm Cost per Ton of NOx Reductions Based on Potential Reductions Cost Effective (yes/no) CE Boiler K 16.21K No Union Boiler K 99.92K No Auxiliary Boiler K K No 5 February 23, 2010

6 Imperial Irrigation District operates one boiler which is currently equipped with selective catalytic reduction system for NOx control (SCR system). This unit was installed in 1968 without any NOx controls. This boiler has a heat input capacity of MMBtu/hr. In 2000 the boiler was retrofitted with the SCR system to meet the 140 pounds per hour limit of the ICAPCD Rule 400. The operation of this boiler is seasonal by nature and therefore further retrofitting of this boiler to comply with the 30 3% O2 may not be cost effective. Imperial Irrigation District has indicated that it will adjust the operation of its natural gas boiler to comply with the 70 3% O2. The ICAPCD Cost Effectiveness evaluation does not analyze cost effectiveness for Imperial Irrigation District size boiler. The facility provided the estimated capital and installation cost for retrofitting of Unit 4 Boiler to meet the 30 ppmv limit of Rule The ICAPCD staff estimated the cost effectiveness for retrofitting the Unit 4 boiler from 70 ppmv to 30 ppmv. Table 6 presents cost effectiveness evaluation for retrofitting the Unit 4 boiler to 30 ppmv. This evaluation indicates that based on the $8,000-$10,000 threshold established by the ICAPCD for RACT determination, it is not cost effective to require unit 4 to retrofit to 30 ppmv but rather limit operation of this unit at 70 ppmv and 30% capacity factor. Table 6 Cost of NOx Control for Boilers Unit 4 Boiler MMBtu/hr NOx emission limit, ppm 30 Capital and Installation cost, $ 4,250K Capital cost amortization factor 2 Equivalent annual capital cost K of controls 3, $ Annual repair and 5K maintenance cost, $ Annual operation cost, $ 40K Annual source test cost, $ 4K Total annual cost, $ K Average annual emissions reduction, TPY Cost Effectiveness, $/Ton 18.33K Cost Effective? No 2 Uses a 10% interest rate and useful life data from the manufacturers survey, when available. 3 Uses average capital and installation costs. 6 February 23, 2010

COST EFFECTIVENESS EVALUATION. A. Selective Catalytic Reduction System

COST EFFECTIVENESS EVALUATION. A. Selective Catalytic Reduction System was installed with a Selective Catalytic Reduction (SCR) and is able to comply with a NOx emission limit of 9 ppmv when operating with natural gas and 13 ppmv when operating under diesel fuel. In addition,

More information

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX RULE 413 - STATIONARY GAS TURBINES Adopted 04-06-95 (Amended 05-01-97, 03-24-05) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION - EMERGENCY STANDBY UNITS 111 EXEMPTION - REMOVAL FROM SERVICE

More information

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) RULE 69. ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) (a) APPLICABILITY (1) Except as provided in Section (b) or otherwise specified

More information

ICI Boiler NOx & SO 2

ICI Boiler NOx & SO 2 ICI Boiler NOx & SO 2 Control Cost Estimates Andrew M. Bodnarik NH Department of Environmental Services OTC Committee Meeting Modeling/Stationary & Area/Mobile Sources Niagara Falls, NY September 3, 2009

More information

California s Success in Controlling Large Industrial Sources

California s Success in Controlling Large Industrial Sources California s Success in Controlling Large Industrial Sources Endicott House 2006 Symposium Mike Scheible Deputy Executive Officer California Air Resources Board California Environmental Protection Agency

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT DATE: 3/1/10, updated 5/5/10 TO: Interested Parties SUBJECT: Frequently asked questions regarding compliance with Rule 4320, Advanced Emission Reduction

More information

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) 1.0 Purpose The purpose of this rule is to limit emissions

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97

Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97 RULE 425.2 Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97 I. Purpose The purpose of this Rule is to limit oxides of nitrogen (NOx) emissions

More information

BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION

BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION 777 12th Street, Third Floor Sacramento, CA 95814 BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION Category/General Equip Description: Equipment Specific Description: Equipment Size/Rating: DETERMINATION

More information

Regulatory and Permitting Requirements of Stationary Generators In Delaware

Regulatory and Permitting Requirements of Stationary Generators In Delaware Regulatory and Permitting Requirements of Stationary Generators In Delaware Delaware - DNREC Air Quality Management February 7, 2006 Mark A. Prettyman and Guadalupe J. Reynolds Outline Regulation No. 1144

More information

ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS

ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS Revision 2 Page 1 of 7 January 2018 ExxonMobil Production Company, a division of Exxon Mobil Corporation (ExxonMobil

More information

BACT Determination Information

BACT Determination Information DRAFT - ASSIGNED TO S SMAQMD CLEARINGHOUSE CATEGORY: IC ENGINE SPARK - PRIME Size: Small Emitter (PTE < 10 lb/day) DEGASSING - IC ENGINE Determination Number: 173 Determination Date: 3/7/2018 Equipment

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM April 18, 2014 SUBJECT: Cellco Partnership, dba Verizon Wireless 18 Abele Road Bridgeville, PA 15017 Allegheny County Operating Permit No. 0867 TO:

More information

WRAP Oil & Gas: 2002/2005 and 2018 Area Source Controls Evaluation

WRAP Oil & Gas: 2002/2005 and 2018 Area Source Controls Evaluation WRAP Oil & Gas: 2002/2005 and 2018 Area Source Controls Evaluation WRAP SSJF Oil and Gas Work Group Members and Other Interested Parties May 30, 2007 1 WRAP Phase II Project Overview Project is focused

More information

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016)

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.34 NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) A. Purpose and Applicability The purpose of this rule is to reduce emissions of oxides

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted 06-01-95 INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION, EMERGENCY STANDBY 111 EXEMPTION,

More information

San Joaquin Valley Unified Air Pollution Control District

San Joaquin Valley Unified Air Pollution Control District Best Available Control Technology (BACT) Guideline 2.1.1* Last Update 3/17/1997 Soil Remediation Operation - Thermal Oxidizer NOx 1. Natural gas with low NOx burner 2. Water injection (valid only for vapor

More information

Metro and you, building together.

Metro and you, building together. metro.net Metro and you, building together. Compliance Guide to Construction Vehicles and Equipment Off-Road off-road equipment Idling effective June 15, 2008 requirement ARB s regulation, Title 13, CCR,

More information

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT APPENDIX D APPENDIX D REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL NEW JERSEY STATE DEPARTMENT

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM February 2, 2012 SUBJECT: Superior Appalachian Pipeline, LLC Kissick Lane Frazer Township, PA 15084 Allegheny County Installation Permit No. 0837-I001

More information

Review of the SMAQMD s Construction Mitigation Program Enhanced Exhaust Control Practices February 28, 2018, DRAFT for Outreach

Review of the SMAQMD s Construction Mitigation Program Enhanced Exhaust Control Practices February 28, 2018, DRAFT for Outreach ABSTRACT The California Environmental Quality Act (CEQA) review process requires projects to mitigate their significant impacts. The Sacramento Metropolitan Air Quality Management District (SMAQMD or District)

More information

Huntington Power Plant. Notice of Intent. Submitted to the Utah Division of Air Quality And Prepared by

Huntington Power Plant. Notice of Intent. Submitted to the Utah Division of Air Quality And Prepared by Huntington Power Plant Notice of Intent Submitted to the Utah Division of Air Quality And Prepared by 1407 West North Temple Salt Lake City, Utah 84116 April 11, 2008 1.0 Introduction PacifiCorp Energy

More information

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68.

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68. RULE 69.4. STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted 9/27/94; Rev. Effective11/15/00; Rev. Effective 7/30/03) (a) APPLICABILITY (1) Except

More information

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12)

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.15.1 - BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) A. Applicability The provisions of this

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Effective Date: February 18, 2016 Facility Name: Scherer Steam-Electric Generating Plant Facility Address 10986 Highway 87 Juliette, Georgia 31046, Monroe County Mailing

More information

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3.

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3. VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 59 - ELECTRICAL POWER GENERATING EQUIPMENT - OXIDES OF NITROGEN EMISSIONS (Adopted 10/6/69, Revised 5/23/72, 7/18/72, 10/31/72, 8/14/79, 12/7/82, 6/4/91,

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: N-6311-9-1 ISSUANCE DATE: 12/17/2008 LEGAL OWNER OR OPERATOR: FISCALINI FARMS & FISCALINI DAIRY MAILING ADDRESS: 7231 COVERT RD MODESTO, CA 95358 LOCATION: 4848 JACKSON

More information

For NOx RACT 25+ MMBTU

For NOx RACT 25+ MMBTU For NOx RACT 25+ MMBTU 1 - boilers and indirect heat exchangers Today s Presentation feel free to ask questions anytime - 25MMBTU/hr + (burner size) - any fuel - any size facility - non-refinery - without

More information

Alternative Fuels Can Significantly Reduce Costs

Alternative Fuels Can Significantly Reduce Costs 2006 Forum on Energy: Immediate Solutions, Emerging Technologies May 15-17 Appleton, WI Alternative Fuels Can Significantly Reduce Costs Three Case Studies Presented by: David F. Seitz, P.E. Project Director

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT. Appendix A: Comments and Responses June 22, 2011 APPENDIX A

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT. Appendix A: Comments and Responses June 22, 2011 APPENDIX A APPENDIX A Summary of Written Comments on Draft Rule 4702 and District Responses June 22, 2011 A - 1 This page intentionally blank. A - 2 SUMMARY OF SIGNIFICANT COMMENTS FOR DRAFT RULE 4702 DATED SEPTEMBER

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM June 17, 2004 SUBJECT: Review of Application Title V Operating Permit Bellefield Boiler Plant Boundary Street Pittsburgh, PA 15213 RE: Operating Permit

More information

Streamlining Multiple Applicable Requirements

Streamlining Multiple Applicable Requirements Streamlining Multiple Applicable Requirements What is Streamlining? 1. Streamlining is the process of determining one set of requirements to be incorporated into the Title V permit from among multiple

More information

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES TABLE OF CONTENTS ARTICLE 2.0000 AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES Section 2.1400 Nitrogen Oxides 2.1401 Definitions... 214-01 2.1402 Applicability... 214-04 2.1403 Compliance Schedules...

More information

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98)

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) RULE 69.3 STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) (a) APPLICABILITY This rule shall apply to any stationary

More information

SECTION.1400 NITROGEN OXIDES

SECTION.1400 NITROGEN OXIDES SECTION.1400 NITROGEN OXIDES 15A NCAC 02D.1401 DEFINITIONS (a) For the purpose of this Section, the definitions at G.S 143-212 and G.S. 143-213, and 15A NCAC 02D.0101 shall apply, and in addition the following

More information

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Industrial, Commercial and Institutional Boilers at Area Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Federal Regulation NESHAP, 40 CFR 63, Subpart JJJJJJ Proposed rule published

More information

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS RULE 1146.1. EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (a) Definitions 1. ANNUAL HEAT INPUT means the actual amount

More information

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number STATEMENT OF BASIS Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number 701-0013 Introduction On June 30, 2017, the Department received an application to renew the Title V Major Source

More information

Air Quality Impacts of Advance Transit s Fixed Route Bus Service

Air Quality Impacts of Advance Transit s Fixed Route Bus Service Air Quality Impacts of Advance Transit s Fixed Route Bus Service Final Report Prepared by: Upper Valley Lake Sunapee Regional Planning Commission 10 Water Street, Suite 225 Lebanon, NH 03766 Prepared for:

More information

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year.

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year. 1 of 11 8/21/2012 10:19 AM SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1146 - EMISSIONS OF OXIDES OF NITROGEN FROM INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION May 1, 2015 PERMIT TO INSTALL 4-13B ISSUED TO Zoetis LLC LOCATED AT 306 Pitcher Street Kalamazoo, Michigan IN THE COUNTY OF Kalamazoo STATE

More information

PA RACT 2. Reasonably Available Control Technology. Presented by Suzanne Dibert

PA RACT 2. Reasonably Available Control Technology. Presented by Suzanne Dibert PA RACT 2 Reasonably Available Control Technology Presented by Suzanne Dibert Affected Facilities Facilities with potential emissions that exceed 100 tons per year (tpy) for NOx (nitrogen oxide) and 50

More information

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788 Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: 04-13-08700037 Application #: 22788 Date SIP Application Received: August 11, 2014 Date Title V Application

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM August 26, 2014 SUBJECT: Veterans Affairs Medical Center Oakland Facility University Drive C Pittsburgh, PA 15240 Allegheny County Synthetic Minor

More information

Off-Road Large Spark-Ignition (LSI) Equipment Regulation Proposed Amendments Public Workshop

Off-Road Large Spark-Ignition (LSI) Equipment Regulation Proposed Amendments Public Workshop Off-Road Large Spark-Ignition (LSI) Equipment Regulation Proposed Amendments Public Workshop Date and Time June 8, 2015 10:00 am 12:00 pm PDT June 10, 2015 10:00 am 12:00 pm PDT Location Air Resources

More information

The Need to Reduce Marine Shipping Emissions

The Need to Reduce Marine Shipping Emissions The Need to Reduce Marine Shipping Emissions Doug Allard, Director, Santa Barbara County Air Pollution Control District Kathy Patton, Division Manager, Santa Barbara County Air Pollution Control District

More information

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 DRAFT Permit: APC-2004/0721-CONSTRUCTION (NSPS) Two Package Boilers The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 ATTENTION: Andrew Kenner

More information

Full Compliance Evaluation Report Off-Site Report

Full Compliance Evaluation Report Off-Site Report STATE OF NEW HAMPSHIRE DEPARTMENT OF ENVIRONMENTAL SERVICES AIR RESOURCES DIVISION Full Compliance Evaluation Report Off-Site Report CONCORD STEAM CORPORATION 105 ½ PLEASANT STREET CONCORD, NH 03302-1377

More information

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12, 6/23/15)

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12, 6/23/15) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.15.1 - BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12, 6/23/15) A. Applicability The provisions

More information

PERMIT APPLICATION REVIEW SUMMARY FOR FLARE NOS. 1, 5 & 6

PERMIT APPLICATION REVIEW SUMMARY FOR FLARE NOS. 1, 5 & 6 AFS #: 3301700003 Application #: FY05-0210 Date: 7-17-06 Page 1 of 5 APPLICATION & OTHER COMMUNICATION Date Brief Description November 23, 2005 Permit Application for Flares 5 and 6 December 2, 2005 E-mail

More information

RULE 210 AND RULE 213 FEES FOR FISCAL YEAR July 1, 2017

RULE 210 AND RULE 213 FEES FOR FISCAL YEAR July 1, 2017 RULE 210 AND RULE 213 FEES FOR FISCAL YEAR 2017-2018 July 1, 2017 In accordance with the provisions of Santa Barbara County Air Pollution Control District Rule 210.V.C and Rule 213.C, the Air Pollution

More information

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR AIR POLLUTION CONTROL DISTRICT COUNTY OF SAN DIEGO FEDERAL SUBPART ZZZZ NATIONAL EMISSIONS STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES WORKSHOP REPORT

More information

California s Emission Reduction Plan for Ports and International Goods Movement

California s Emission Reduction Plan for Ports and International Goods Movement California s Emission Reduction Plan for Ports and International Goods Movement Alternative Maritime Power Conference Los Angeles Harbor Hotel April 24, 2006 California Environmental Protection Agency

More information

Table 2. NOx Control for Stoker-fired Industrial Boilers (Bituminous or Sub-bituminous Coal) (WDNR 1989) Control Techniques NOx Reduction Percent Commercial Availability and Comments FGR 40 to 45 Available.

More information

Regulatory Impacts of Biogas-fired Internal Combustion Engines

Regulatory Impacts of Biogas-fired Internal Combustion Engines Regulatory Impacts of Biogas-fired Internal Combustion Engines Kit Liang, PE, Malcolm Pirnie Air, Water & Energy: Sustainability for Wastewater Treatment Plants California Water Environment Association

More information

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION SIC Code: 4911 (Energy Production) DATE: 06/17/2005 Page 1 of 6 DATE APPLICATION RECEIVED: March 31, 2004 (Application # FY04-0427) FACILITY DESCRIPTION Pinetree-Bethlehem (the Permittee) operates a 17.1

More information

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

Heavy-Duty Low-NOx and Phase 2 GHG Plans

Heavy-Duty Low-NOx and Phase 2 GHG Plans Heavy-Duty Low-NOx and Phase 2 GHG Plans Michael Carter Assistant Division Chief Mobile Source Control Division NACAA Fall Membership Meeting Seattle, Washington September 25-27, 2017 Outline Heavy-Duty

More information

Texas Oil and Gas Emissions Inventory Improvement Projects

Texas Oil and Gas Emissions Inventory Improvement Projects Texas Oil and Gas Emissions Inventory Improvement Projects Michael Ege, Emissions Inventory Specialist Air Quality Division Texas Commission on Environmental Quality (TCEQ) Environmental Protection Agency

More information

Engineering Analysis

Engineering Analysis Wentworth-Douglass Hospital 789 Central Avenue Facility ID No. 3301700037 Mark Acerra 603-740-2471 Richard Bowen (Denise Daigle) Dover, NH 03820 FY03-0098 Rec. 10/23/02 Revised 4/16/03 Introduction: Engineering

More information

FINAL PERMIT APPLICATION REVIEW SUMMARY

FINAL PERMIT APPLICATION REVIEW SUMMARY FINAL PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053

More information

February 28, Definition of Engines Covered Under the Rule

February 28, Definition of Engines Covered Under the Rule WRITTEN STATEMENT OF THE MANUFACTURERS OF EMISSION CONTROLS ASSOCIATION TO THE OZONE TRANSPORT COMMISSION S SECOND DRAFT MODEL RULE TO CONTROL NOX FROM NATURAL GAS COMPRESSOR FUEL-FIRED PRIME MOVERS February

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 19-18 Page 1 of 49 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit

More information

August 23,

August 23, RULE 411, NO X FROM BOILERS, PROCESS HEATERS AND STEAM GENERATORS Adopted 02-02-95 (Amended 11/7/96, 01/09/97, 7/22/99, 10/27/05, 8/23/07) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION

More information

402 LOSS OF EXEMPTION LOW FUEL USAGE 4032 SOURCE TESTING FREQUENCY 4043 SOURCE TESTING PROTOCOL

402 LOSS OF EXEMPTION LOW FUEL USAGE 4032 SOURCE TESTING FREQUENCY 4043 SOURCE TESTING PROTOCOL Attachment 6: Proposed Rule 419, Underline/Strikeout Version RULE 419 NOx FROM MISCELLANEOUS COMBUSTION UNITS Adopted 07-26-18 (Amended XX-XX-18) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 103 SEVERABILITY

More information

MARINE VESSEL REPOWER APPLICATION

MARINE VESSEL REPOWER APPLICATION CARL MOYER MEMORIAL AIR QUALITY STANDARDS ATTAINMENT PROGRAM MARINE VESSEL REPOWER APPLICATION Revised 08/2016 1 of 10 CARL MOYER RURAL ASSISTANCE PROGRAM Instruction Sheet The California Air Pollution

More information

The World s First Flameless Crude Heater

The World s First Flameless Crude Heater AFRC 2013 Industrial Combustion Symposium Kauai, HI September 23-25, 2013 The World s First Flameless Crude Heater Great Southern Flameless, LLC Presented by Great Southern Flameless, LLC GSF One of the

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks Approved By: Signed Seyed Sadredin Director of Permit Services

More information

~ SWCAA. ~awfxm~ Paul T. Mairose Chief Engineer

~ SWCAA. ~awfxm~ Paul T. Mairose Chief Engineer ~ SWCAA Southwest Clean Air Agency 11815 NE 99th Street, Suite 1294 Vancouver, WA 98682 (360) 574-3058 www.swcleanair.org December 22, 2017 AJ Panter Vancouver School District No. 37 6014 NW Fruit Valley

More information

Facility Name: Anheuser-Busch, LLC City: Cartersville County: Bartow AIRS #:

Facility Name: Anheuser-Busch, LLC City: Cartersville County: Bartow AIRS #: Facility Name: Anheuser-Busch, LLC City: Cartersville County: Bartow AIRS #: 04-13-01500061 Application #: TV-40065 Date Application Received: February 25, 2015 Permit No: 2082-015-0061-V-04-0 Program

More information

San Joaquin Valley AIR POLLUTION CONTROL DISTRICT

San Joaquin Valley AIR POLLUTION CONTROL DISTRICT San Joaquin Valley AIR POLLUTION CONTROL DISTRICT AUG 1 5 2014 Mr. John Haley Aera Energy LLC PO Box 11164 Bakersfield, CA 93389 k or HEALTHY AIR LIVING Re: Final - Authority to Construct / COC (Significant

More information

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053 AFS

More information

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053 AFS

More information

Air Quality Mandates Affecting the Caltrans Fleet Caltrans Division of Equipment Sacramento, CA June, 2009

Air Quality Mandates Affecting the Caltrans Fleet Caltrans Division of Equipment Sacramento, CA June, 2009 Air Quality Mandates Affecting the Caltrans Fleet Caltrans Division of Equipment Sacramento, CA June, 2009 Presentation Overview ARB On Road Mandate ARB Off Road Mandate South Coast AQMD Fleet Rules ARB

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: S-7658-1-0 ISSUANCE DATE: 10/30/2009 LEGAL OWNER OR OPERATOR: ABEC BIDART-STOCKDALE LLC MAILING ADDRESS: C/O CALIFORNIA BIOENERGY LLC 2828 ROUTH STREET SUITE 500 DALLAS,

More information

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013) RULE 9610 STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013) 1.0 Purpose The purpose of this rule is to provide an administrative mechanism

More information

DIESEL PARTICULATE MATTER MITIGATION PLAN FOR THE BNSF RAILROAD SAN DIEGO RAIL YARD

DIESEL PARTICULATE MATTER MITIGATION PLAN FOR THE BNSF RAILROAD SAN DIEGO RAIL YARD ENVIRON International Corporation Draft Report DIESEL PARTICULATE MATTER MITIGATION PLAN FOR THE BNSF RAILROAD SAN DIEGO RAIL YARD Prepared for BNSF Railway 2650 Lou Menk Drive Fort Worth, TX 76131-2830

More information

City of Pacific Grove

City of Pacific Grove Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT HEAVY-DUTY ENGINE PROGRAM AGRICULTURAL PUMP ENGINE COMPONENT ELECTRIC MOTOR NEW PURCHASE OPTION ELIGIBILITY CRITERIA AND APPLICATION GUIDELINES The San

More information

Low NOx Technology Seminar. The Gas Company April 30 th, 2003 Downey,CA. Presentation Overview

Low NOx Technology Seminar. The Gas Company April 30 th, 2003 Downey,CA. Presentation Overview Low NOx Technology Seminar Sponsored by The Gas Company April 30 th, 2003 Downey,CA David Thornock Presentation Overview Who is Overview of the FIR Burner Burner design Demonstrations and Installations

More information

Appendix E Water Supply Modeling

Appendix E Water Supply Modeling Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over

More information

2007 Chevron and John Zink Company, LLC

2007 Chevron and John Zink Company, LLC Session 10 Thursday, December 7, 8:00-9:30 NOx Reduction Implementation Technology Plant-wide NOx Reduction Strategies: Chevron John Zink Experience Ed Shepherd, Chevron (Richmond, CA) Jim Seebold,, retired

More information

VALMET IBMACT & Utility MATS. Boiler Tune-ups

VALMET IBMACT & Utility MATS. Boiler Tune-ups VALMET IBMACT & Utility MATS Boiler Tune-ups Boiler Tune-Ups required by the EPA A boiler tune-up refers to many aspects of improving boiler operations. From an emissions perspective, the term boiler tune-up

More information

IED RELATING TO OIL AND GAS BURNERS FOR INDUSTRIAL USE

IED RELATING TO OIL AND GAS BURNERS FOR INDUSTRIAL USE IED RELATING TO OIL AND GAS BURNERS FOR INDUSTRIAL USE Nigel Webley Group Technical Director Hamworthy Combustion Tel: 01202 662754 E-mail: nwebley@hamworthy-combustion.com Website: www.hamworthy-combustion.com

More information

Appendix K. Final DOC Conditions

Appendix K. Final DOC Conditions Appendix K Final DOC Conditions Puente Power Project 262 MW (net nominal) GE 7HA.01 Combustion Turbine Generator (CTG) The CTG is simultaneously subject to the emission limits, monitoring requirements,

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 7, 2017 PERMIT TO INSTALL ISSUED TO McLaren Flint Hospital

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 7, 2017 PERMIT TO INSTALL ISSUED TO McLaren Flint Hospital MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION September 7, 2017 PERMIT TO INSTALL 55-17 ISSUED TO McLaren Flint Hospital LOCATED AT 401 South Ballenger Highway Flint, Michigan IN THE

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 118-18 Page 1 of 23 PERMIT TO INSTALL Table of Contents COMMON ACRONYMS... 2 POLLUTANT / MEASUREMENT ABBREVIATIONS... 3 GENERAL CONDITIONS... 4 EMISSION UNIT SPECIAL CONDITIONS... 6 EMISSION

More information

San Joaquin Valley Unified Air Pollution Control District

San Joaquin Valley Unified Air Pollution Control District San Joaquin Valley Unified Air Pollution Control District Guidelines for Expedited Application Review (GEAR) Emergency Internal Combustion Engines Approved by: Signed Date: 12/18/97 Seyed Sadredin Revised

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM December 2, 2016 SUBJECT: Bay Valley Foods, LLC 1080 River Avenue Pittsburgh, PA 15212-5995 Allegheny County Title V Operating Permit No. 0079 (renewal)

More information

2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION

2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION 2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION L o s A n g e l e s S e p t e m b e r 1 0 th & 11 th 1 General Considerations of Staff Proposal Achieve zero emission

More information

ON-ROAD HEAVY-DUTY TRUCK APPLICATION

ON-ROAD HEAVY-DUTY TRUCK APPLICATION CARL MOYER MEMORIAL AIR QUALITY STANDARDS ATTAINMENT PROGRAM ON-ROAD HEAVY-DUTY TRUCK APPLICATION Revised 08/2016 1 of 11 CARL MOYER RURAL ASSISTANCE PROGRAM Instruction Sheet The California Air Pollution

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT OFF-ROAD FORKLIFT COMPONENT

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT OFF-ROAD FORKLIFT COMPONENT SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT HEAVY-DUTY ENGINE PROGRAM OFF-ROAD FORKLIFT COMPONENT ELECTRIC FORKLIFT NEW PURCHASE OPTION ELIGIBILITY CRITERIA AND APPLICATION GUIDELINES The San Joaquin

More information

Table 1 Emission Rates for New DG Technologies

Table 1 Emission Rates for New DG Technologies Table 1 Emission Rates for New DG Technologies Uncontrolled 3-way Catalyst SCR Large ATS 1998 1998 1998 Solid Phosphoric Gas-Fired Gas-Fired Uncontrolled Controlled Small Medium Gas Large Simple Cycle

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT FINAL DRAFT STAFF REPORT. Proposed Amendments to Rule 4702 (Internal Combustion Engines)

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT FINAL DRAFT STAFF REPORT. Proposed Amendments to Rule 4702 (Internal Combustion Engines) SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT FINAL DRAFT STAFF REPORT Proposed Amendments to Rule 4702 (Internal Combustion Engines) August 18, 2011 Prepared by: Anna Myers, Senior Air Quality

More information

Facility Name: Georgia-Pacific Consumer Products LP Savannah River Mill City: Rincon County: Effingham AIRS #: Application #: 40890

Facility Name: Georgia-Pacific Consumer Products LP Savannah River Mill City: Rincon County: Effingham AIRS #: Application #: 40890 Facility Name: Georgia-Pacific Consumer Products LP Savannah River Mill City: Rincon County: Effingham AIRS #: 04-13-103-00007 Application #: 40890 Date SIP Application Received: March 7, 2016 Date Title

More information

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants. RULE 2530 FEDERALLY ENFORCEABLE POTENTIAL TO EMIT (Adopted June 15, 1995; Amended April 25, 2002; Amended December 18, 2008, but not in effect until June 10, 2010) 1.0 Purpose The purpose of this rule

More information

Questions/Comments During Workshop

Questions/Comments During Workshop Potential Changes to the PERP Regulation and Portable Engine ATCM September 13, 2016 Fresno California Environmental Protection Agency Air Resources Board Questions/Comments During Workshop We want as

More information

State of New Jersey. General Permit (GP-009A)

State of New Jersey. General Permit (GP-009A) 03/21/2013 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-009A) For Boiler(s) and Indirect Fired Process Heater(s) Each Greater Than or Equal to 10