TRANSPORTATION - DISTRICT ONE

Size: px
Start display at page:

Download "TRANSPORTATION - DISTRICT ONE"

Transcription

1 Florida Department of TRANSPORTATION - DISTRICT ONE TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS DISTRICT ONE HEADQUARTERS (BARTOW) SOUTHWEST AREA OFFICE (FORT MYERS)

2 MISSION STATEMENT The Department will provide a safe, interconnected statewide transportation system for Florida's citizens and visitors that ensures the mobility of people and goods, while enhancing economic prosperity and sustaining the quality of our environment. Robin Stublen Communications Specialist District One Headquarters 801 North Broadway P.O. Box 1249 Bartow, FL (863) Zachary Burch Government Affairs & Communications Manager Southwest Area Office Daniels Parkway Fort Myers, Fl (239) Page: 2

3 CURRENTLY REPORTED ACTIVE FUND ACSL BRRP DDR DIH DS PKYI PKYR SA SCOP SL SCED SCWR Advance Construction (SL) State Bridge Repair And Rehab District Dedicated Revenue State In-house Product Support State Primary Highways and PTO Tpk Improvement Tpk Maintenance Reserve STP, Any Area Small County Outreach Program STP, Areas < 200k Page: 3

4 HIGHWAYS FPN: Project/Location: CR 68 (MICCO BLUFF) FROM KISSIMMEE CATTLE CO TO DEAD END WIDEN/RESURFACE EXIST LANES Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: NE 102ND STREET AT US 441 ADD LEFT TURN LANE(S) Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: NE 36TH BLVD FROM US 441 TO DEAD END WIDEN/RESURFACE EXIST LANES Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: CITY TRAFFIC SIGNALS REIMBURSEMENT TRAFFIC SIGNALS Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: SIDEWALKS AT VARIOUS LOCATIONS SIDEWALK Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: TRAFFIC SIGNALS REIMBURSEMENT TRAFFIC SIGNALS Project Length: Begin Mile Post: End Mile Post: CST SCED $1,621,622 CST SCOP $1,019,733 $2,641,355 PE ACSL $45,000 PE SL $100,000 CST SL $357,542 $145,000 $357,542 CST SCOP $1,020,033 CST SCWR $1,621,622 $2,641,655 OPS DDR $24,170 $18,224 $18,771 $19,334 $19,914 $24,170 $18,224 $18,771 $19,334 $19,914 CST DS $3,399 CST SL $314,164 $317,563 OPS DDR $43,508 $37,248 $43,139 $44,434 $45,767 $43,508 $37,248 $43,139 $44,434 $45,767 Page: 4

5 FPN: Project/Location: SE 28TH STREET FROM US 441 TO SE 18TH TERRACE SIDEWALK Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: SR 15 (US 441) FROM S. OF NE 304TH STREET TO OSCEOLA C/L Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: SR 15/700 (US 98/441) AT SE 18TH TERR ROUNDABOUT ROUNDABOUT Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: SR 15/700(US 98/441) FROM SR 78 TO SE 30TH TERRACE Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: SR 710 FROM MP TO MP 5.05 Project Length: Begin Mile Post: End Mile Post: PE SL $145,000 $145,000 PE DIH $10,000 CST DDR $907,257 CST DIH $541,000 CST DS $7,725,321 $10,000 $9,173,578 PE DIH $100,000 ROW DDR $402,123 ROW DIH $52,451 CST DDR $1,761,004 CST DIH $83,250 $100,000 $454,574 $1,844,254 CST ACSL $85,393 CST DDR $391,475 CST SL $1,260,527 $1,737,395 PE DIH $10,000 CST DDR $1,268,489 CST DIH $143,973 $10,000 $1,412,462 Page: 5

6 FPN: Project/Location: SR 710 FROM US 441 TO L-63 CANAL NEW ROAD CONSTRUCTION Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: SR 78 OVER KISSIMMEE RIVER BRIDGE NUMBER BRIDGE-REPAIR/REHABILITATION Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: SR15 (US 441) FROM S OF NE 131ST LN TO S OF NE 224TH ST Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: SR15/SR700 (US 441) FROM S OF NE 224TH ST TO S OF NE 304TH ST Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: US 441 AT CR 724 (240TH STREET) ADD LEFT TURN LANE(S) Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: US 98/SR 700 FROM NW 9TH STREET TO SR 70 DRAINAGE IMPROVEMENTS Project Length: Begin Mile Post: End Mile Post: ROW DDR $1,824,168 $4,667,311 $4,093,931 ROW DIH $137,683 $145,944 $1,961,851 $4,813,255 $4,093,931 CST BRRP $901,988 CST DIH $10,250 $912,238 CST DIH $33,960 CST DS $4,361,288 CST SA $339,608 $4,734,856 CST DDR $3,945,866 CST DIH $32,118 $3,977,984 CST DS $28,873 CST SL $211,588 $240,461 ROW DIH $12,000 ROW DS $1,032,000 CST SL $1,133,072 $1,044,000 $1,133,072 HIGHWAYS TOTAL 2016/ / / / /21 $10,645,950 $9,577,353 $12,967,343 $6,721,277 $4,304,612 Page: 6

7 TURNPIKE FPN: Project/Location: RESURFACE OF TPK MAINLINE FROM MP181.1 TO MP185.0 ( ) Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: RESURFACE OF TPK MAINLINE FROM MP185.0 TO MP188.5 ( ) Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: ROADSIDE IMPROVEMENT FOR TPK MAINLINE FROM MP181.1 TO MP185.0 GUARDRAIL Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: ROADSIDE IMPROVEMENT FOR TPK MAINLINE FROM MP185.0 TO MP188.5 GUARDRAIL Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: THERMOPLASTIC OF TPK MAINLINE FROM MP181.1 TO MP185.0 SIGNING/PAVEMENT MARKINGS Project Length: Begin Mile Post: End Mile Post: FPN: Project/Location: THERMOPLASTIC OF TPK MAINLINE FROM MP185.0 TO MP188.5 SIGNING/PAVEMENT MARKINGS Project Length: Begin Mile Post: End Mile Post: CST PKYR $4,185,600 $4,185,600 CST PKYR $3,763,866 $3,763,866 CST PKYI $1,299,671 $1,299,671 CST PKYI $706,590 $706,590 CST PKYR $168,018 $168,018 CST PKYR $146,362 $146,362 TURNPIKE TOTAL 2016/ / / / /21 $9,955,727 $314,380 Page: 7

8 TOTALS Total Total: $20,601,677 $9,891,733 $12,967,343 $6,721,277 $4,304,612 $54,486,642 Page: 8

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) DIXIE COUNTY Highways: State Highways 4135211 D2 - DIXIE COUNTY TRAFFIC SIGNAL

More information

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Transportation Planning: Non-System Specific

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Transportation Planning: Non-System Specific FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) LEVY COUNTY Highways: State Highways 4135251 D2-LEVY COUNTY TRAFFIC SIGNAL

More information

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) BAKER COUNTY Highways: Interstate 4386501 I-10 BAKER CO SPRAYFIELD EB REST

More information

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) PUTNAM COUNTY Highways: State Highways 4135331 D2-PUTNAM COUNTY TRAFFIC SIGNAL

More information

MEMORANDUM FPN: State Road: 91 County: Osceola (92)

MEMORANDUM FPN: State Road: 91 County: Osceola (92) Traffic and Revenue Consultant Florida s Turnpike Enterprise Florida Department of Transportation MEMORANDUM Date: October 14, 2013 To: From: Copies: Subject: Tom Neyer, Production Project Manager Emam

More information

Indian River County MPO Transportation Improvement Program FY 2018/19 FY 2022/23

Indian River County MPO Transportation Improvement Program FY 2018/19 FY 2022/23 Indian River County MPO Transportation Improvement Program FY 2018/19 FY 2022/23 Indian River County Metropolitan Planning Organization 1801 27th Street Vero Beach, FL 32960 Approved June 13, 2018 (Amended

More information

Indian River County MPO Transportation Improvement Program FY 2018/19 FY 2022/23

Indian River County MPO Transportation Improvement Program FY 2018/19 FY 2022/23 Indian River County MPO Transportation Improvement Program FY 2018/19 FY 2022/23 Indian River County Metropolitan Planning Organization 1801 27th Street Vero Beach, FL 32960 DRAFT The preparation of this

More information

2007/ /2012 MARION COUNTY TRANSPORTATION IMPROVEMENT PROGRAM

2007/ /2012 MARION COUNTY TRANSPORTATION IMPROVEMENT PROGRAM 2007/2008 2011/2012 MRION COUNTY TRNSPORTTION IMPROVEMENT PRORM MRION COUNTY BORD O COUNTY COMMISSIONERS TIP2007 STN McCLIN, CHIRMN TBLE O CONTENTS Board Members and Staff 2 Summary..3 Phase/unding s...

More information

FY 2016/ /21 Orlando Urban Area Transportation Improvement Program. Adopted July 13, 2016 (Updated February 2017)

FY 2016/ /21 Orlando Urban Area Transportation Improvement Program. Adopted July 13, 2016 (Updated February 2017) FY 2016/17-2020/21 Orlando Urban Area Adopted July 13, 2016 (Updated ) (This page intentionally left blank) FY 2016/17-2020/21 Orlando Urban Area Prepared By MetroPlan Orlando Adopted by the MetroPlan

More information

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS TPO Facility/ Name Prior s Detailed Description TA000100 MDT - DADE / MONROE EXPRESS BUS ROUTE COMMUTER TRANS ASSISTANCE C-6 $12,978 $7,385 4180513, 4409141 Operating assistance of Dade/Monroe Express

More information

December 12, Dear Secretary Foxx:

December 12, Dear Secretary Foxx: Chair Pete White City Councilmember Vice-Chair Jay Adams Mustang Mayor Secretary/Treasurer Matt Dukes Midwest City Mayor association of central oklahoma governments Executive Director John G. Johnson December

More information

FY 2018/ /23 Orlando Urban Area Transportation Improvement Program. Adopted July 11, 2018

FY 2018/ /23 Orlando Urban Area Transportation Improvement Program. Adopted July 11, 2018 FY 2018/19-2022/23 Orlando Urban Area Adopted July 11, 2018 (This page intentionally left blank) FY 2018/19-2023/23 Orlando Urban Area Prepared By MetroPlan Orlando Adopted by the MetroPlan Orlando Board

More information

Florida s Turnpike Enterprise High Tension Median Cable Barrier Pilot Project. William H. Cook, P.E. Florida s Turnpike Assistant Roadway Engineer

Florida s Turnpike Enterprise High Tension Median Cable Barrier Pilot Project. William H. Cook, P.E. Florida s Turnpike Assistant Roadway Engineer Florida s Turnpike Enterprise High Tension Median Cable Barrier Pilot Project William H. Cook, P.E. Florida s Turnpike Assistant Roadway Engineer Florida Turnpike Enterprise Miami (MP 0) to Wildwood (MP

More information

Rural Planning. Highway Projects - CULLMAN COUNTY

Rural Planning. Highway Projects - CULLMAN COUNTY 4/17/2015 ALABAMA DEPARTMENT OF TRANSPORTATION Page - 1 of 9 Length CR-1742 4.770 Highway s - CULLMAN COUNTY RESURFACE CR-1742 FROM SR-74 (US-278) TO SR-67 RESURFACING 100063223 ST-022-888-011- ( ) CONSTRUCTION

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS TPO Facility/ Name Prior s Detailed Description TA11 FTA SECTION 5337 Federal Formula 5-5 $182,250 $123,591 4349801, 4349811, 4368891, 4387361, 4349771, 4349791, 4409221, 4409321 FTA Sec 5337 State of

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

FY Transportation Improvement Program (TIP)

FY Transportation Improvement Program (TIP) FY 2019 2023 Transportation Improvement Program (TIP) Adopted: June 13, 2018 Amended: September 12, 2018 planning for the future transportation needs of the Pensacola FL-AL Urbanized Area For information

More information

BACKGROUND. Dear Mr. Dietrich:

BACKGROUND. Dear Mr. Dietrich: Mr. Bren Dietrich, C.P.A. December 28, 2018 Chief Financial Officer, Florida s Turnpike Enterprise Florida Department of Transportation Florida s Turnpike, Milepost 263 Building 5315, Turkey Lake Service

More information

FY 2017/ /22 Orlando Urban Area Transportation Improvement Program. Adopted July 12, 2017 (Updated November 2017)

FY 2017/ /22 Orlando Urban Area Transportation Improvement Program. Adopted July 12, 2017 (Updated November 2017) FY 2017/18-2021/22 Orlando Urban Area Adopted July 12, 2017 (Updated ) (This page intentionally left blank) FY 2017/18-2021/22 Orlando Urban Area Prepared By MetroPlan Orlando Adopted by the MetroPlan

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Transportation Improvement Program for the Brevard Urban Area. FY 2008 to Adopted July 12, 2007 Amended December 13, 2007

Transportation Improvement Program for the Brevard Urban Area. FY 2008 to Adopted July 12, 2007 Amended December 13, 2007 Transportation Improvement Program for the Brevard Urban Area FY 2008 to 2012 Adopted July 12, 2007 Amended December 13, 2007 25 BREVARD TRANSPORTATION IMPROVEMENT PROGRAM TABLE OF CONTENTS MPO Endorsement...

More information

New Jersey Department of Transportation

New Jersey Department of Transportation Prepared by: New Jersey Department of Transportation October 2013 TABLE OF CONTENTS Page CURRENT STATUS OF STATE HIGHWAY SYSTEM... 1 Description of System... 1 Figure 1: NJ Roadway System, Breakdown By...

More information

NCTCOG CATEGORY 5 RECAP FY 2016

NCTCOG CATEGORY 5 RECAP FY 2016 NCTCOG CATEGORY 5 RECAP FY 2016 A + B = C Total Uncommitted Funds FY 2016 C + D = E E - F = G A B C D E F G FY 15 Carryover 1 FY (includes all adjustments) 2 Total Available Total Obligations and Transfers

More information

Lake Board of County Commissioners. Executive Assistant Leesburg, FL PH: (352)

Lake Board of County Commissioners. Executive Assistant Leesburg, FL PH: (352) CHAIR: Melbourne Mayor Kathy Meehan VICE CHAIR: Lake Commissioner Leslie Campione SECRETARY: Volusia Council Member Deb Denys Councilman Ray Goodgame Mayor Pat Kelley City of Clermont 2118 Saint Ives Court

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

Appendix 3 Traffic Technical Memorandum

Appendix 3 Traffic Technical Memorandum Appendix 3 Traffic Technical Memorandum DRAFT TECHNICAL MEMORANDUM Southport Connector Project Traffic Development Comparison of Future Year Model Results Date: September 10, 2015 Project #:11730.030 To:

More information

Middle Georgia Regional Investment List

Middle Georgia Regional Investment List MGRC 003 Baldwin Kings Road Safety Enhancements $6,579,700 x MGRC 005 Baldwin Log Cabin Road Widening $11,109,500 x MGRC 154 Baldwin Widen & Resurface N. Jefferson St. $6,897,900 x MGRC 155 Baldwin Widen

More information

Five-Year Work Plan FY FY June 29, 2018

Five-Year Work Plan FY FY June 29, 2018 FY 2019 - FY 2023 June 29, 2018 FY 2019 - FY 2023 June 29, 2018 Prepared for: CENTRAL FLORIDA EXPRESSWAY AUTHORITY 4974 ORL Tower Road Orlando, Florida 32807 Prepared by: Dewberry Engineers Inc. General

More information

US 70 Corridor Planning for the Future

US 70 Corridor Planning for the Future New Bern/James City Area - Work Session US 70 Corridor Planning for the Future Brinson Elementary School Thursday, January 31, 2008 Agenda Sign-in, in, View Maps, Talk to Project Team Public Q & A Session

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

Highlands County Board of County Commissioners Preliminary Capital Financial Strategy FY 2014/2015 thru 2023/2024

Highlands County Board of County Commissioners Preliminary Capital Financial Strategy FY 2014/2015 thru 2023/2024 8/18/14 CAPITAL BUDGET SUMMARY CAPITAL BUDGET * Local Option Infrastructure Sales Tax to expire October 31, 219 FY14-15 FY15-16 FY16-17 FY17-18 FY18-19 FY19-2 * FY2-21 FY21-22 FY22-23 FY23-24 AD VALOREM

More information

New Jersey Department of Transportation

New Jersey Department of Transportation Prepared by: New Jersey Department of Transportation September 2013 TABLE OF CONTENTS Page CURRENT STATUS OF STATE HIGHWAY SYSTEM... 1 Description of System... 1 Figure 1: NJ Roadway System, Breakdown

More information

FY 2018/ /23 Orlando Urban Area Transportation Improvement Program. Adopted July 11, 2018 (Updated October 2018)

FY 2018/ /23 Orlando Urban Area Transportation Improvement Program. Adopted July 11, 2018 (Updated October 2018) FY 2018/19-2022/23 Orlando Urban Area Adopted July 11, 2018 (Updated ) (This page intentionally left blank) FY 2018/19-2023/23 Orlando Urban Area Prepared By MetroPlan Orlando Adopted by the MetroPlan

More information

FY 2012 FY 2016 TRANSPORTATION IMPROVEMENT PROGRAM

FY 2012 FY 2016 TRANSPORTATION IMPROVEMENT PROGRAM FY 2012 FY 2016 TRANSPORTATION IMPROVEMENT PROGRAM ADOPTED: AMENDED: Table of Contents Executive Summary (includes "TIP Basics") 5 Year Summary by Code Section A - Aviation (State/Federally ed) Section

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

Expansion Projects Description

Expansion Projects Description Expansion Projects Description The Turnpike expansion program was authorized by the Florida Legislature in 1990 to meet the State s backlog of needed highway facilities. The Legislature set environmental

More information

Public Meeting. SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY

Public Meeting. SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY Public Meeting SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY Neil Schochenmaier, PE Road Design Engineering Supervisor March 16, 2017 Purpose of the Meeting

More information

COMMUNITY ADVISORY COMMITTEE AGENDA

COMMUNITY ADVISORY COMMITTEE AGENDA COMMUNITY ADVISORY COMMITTEE AGENDA May 23, 2018 9:30 A.M. COMMUNITY ADVISORY COMMITTEE MEETING NOTICE DATE: Wednesday, May 23, 2018 LOCATION: TIME: MetroPlan Orlando David L. Grovdahl Board Room 250 S.

More information

Alachua/Bradford TIM Meeting February 14, 2017 Meeting Minutes

Alachua/Bradford TIM Meeting February 14, 2017 Meeting Minutes Alachua/Bradford TIM Meeting February 14, 2017 Meeting Minutes The list of attendees, agenda, and meeting handouts are attached to these meeting minutes. Introductions and TIM Updates provided by Dee Dee

More information

Florida Department of Transportation. Road Ranger Performance Measures 2nd Quarter Report. October 1 to December 31, 2014 Fiscal Year (FY) 2014/2015

Florida Department of Transportation. Road Ranger Performance Measures 2nd Quarter Report. October 1 to December 31, 2014 Fiscal Year (FY) 2014/2015 Florida Department of Transportation Road Ranger Performance Measures 2nd Quarter Report October 1 to December 31, 2014 Fiscal Year (FY) 2014/2015 Prepared by: Florida Department of Transportation Commercial

More information

Corridor Sketch Summary

Corridor Sketch Summary Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

Manatee County Government Proposed Half Cent Infrastructure Sales Tax. Transportation Sidewalks

Manatee County Government Proposed Half Cent Infrastructure Sales Tax. Transportation Sidewalks Transportation Sidewalks Sidewalks Total Transportation (65% of Revenue Per Committee Recommendations) Sidewalks $1,219,575 5.3% $18,293,625 Neighborhood sidewalks and sidewalks to schools To improve pedestrian

More information

Project Status Report

Project Status Report Project Status Report for LATS MPO November 17, 2017 Counties covered in Report: Beaufort & Jasper SCDOT anticipates construction to begin on approximately $206,762,556 in transportation projects between

More information

Clarksville Street Department. Fiscal Year 2018 Budget Presentation

Clarksville Street Department. Fiscal Year 2018 Budget Presentation Clarksville Street Department Fiscal Year 2018 Budget Presentation Clarksville Street Department FY 2018 Proposed Budget 4.2% 42.0% Salaries/Benefits 53.8% Operating Expenses Capital Outlay Clarksville

More information

NCDOT Report on Improving Safety on Secondary Roads

NCDOT Report on Improving Safety on Secondary Roads April 8, 2016 NCDOT Report on Improving Safety on Secondary Roads Kevin Lacy, PE, State Traffic Engineer Overview Crash data and Safety Performance on Secondary Roads Driver Behavior Roadway Environment

More information

LACEY CITY COUNCIL MEETING July 09, 2015

LACEY CITY COUNCIL MEETING July 09, 2015 LACEY CITY COUNCIL MEETING July 09, 2015 SUBJECT: 2016-2021 Six-Year Transportation Improvement Plan and Mitigation List RECOMMENDATION: Adopt Resolution approving the proposed 2016-2021 Six- Year Transportation

More information

Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview

Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview Session 1 Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview Joe Santos, PE, FDOT, State Safety Office October, 23, 2013 Florida Statistics

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

TRAFFIC REGULATION APPROVAL PROCESS

TRAFFIC REGULATION APPROVAL PROCESS Approved: Effective: August 22, 2017 Review: June 21, 2017 Office: Traffic Engineering and Operations Topic No.: 750-010-011-e Department of Transportation PURPOSE TRAFFIC REGULATION APPROVAL PROCESS To

More information

US 10 Corridor Performance

US 10 Corridor Performance Corridor Context The corridor runs northwest 18 miles from I-35W to the edge of Anoka County. The corridor connects the cities of Ramsey, Anoka,, Mounds View, and Blaine. Current Corridor Characteristics

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

Smoothness Specification Update

Smoothness Specification Update Florida Department of TRANSPORTATION Smoothness Specification Update 38 th Annual Asphalt Conference September 9, 2014 Intents Separate Rolling Straightedge from Laser Profiler Create Ride Quality (Smoothness)

More information

Kendall Drive Premium Transit PD&E Study

Kendall Drive Premium Transit PD&E Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study From

More information

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha

More information

CENTRAL FLORIDA EXPRESSWAY AUTHORITY Master Plan Update Board Workshop #2

CENTRAL FLORIDA EXPRESSWAY AUTHORITY Master Plan Update Board Workshop #2 CENTRAL FLORIDA EXPRESSWAY AUTHORITY 2040 Master Plan Update Board Workshop #2 May 14, 2015 Workshop Agenda Introduction Schedule Review Community Outreach Update Transportation Planning and Regional Growth

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

Population Trends. US 12 Corridor Performance

Population Trends. US 12 Corridor Performance Corridor Context The corridor runs over 81 miles from Willmar to the Twins Cities metropolitan area. It connects the Twin Cities and the cities of Montrose, Howard Lake, Cokato, Dassel, Litchfield, Atwater,

More information

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee Why We Are Here: GDOT s Transportation Improvement Act (TIA) Office, the City of Columbus, and the project delivery team are here this evening to display and answer questions concerning the proposed roadway

More information

Florida s Turnpike Enterprise. Incident Management Program for All Levels & Specialty Towing & Roadside Repair (STARR)

Florida s Turnpike Enterprise. Incident Management Program for All Levels & Specialty Towing & Roadside Repair (STARR) Florida s Turnpike Enterprise Incident Management Program for All Levels & Specialty Towing & Roadside Repair (STARR) Florida s Turnpike System Largest Toll System in Florida 460 Centerline Miles 2 Million

More information

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, FFY Section 2A State Prioritized Reliability s Bridge Program/On-System (NHS) Increase the Cost of Holyoke (600936)

More information

South Dallas-Waxahachie Corridor Strategy Meeting. June 2, 2009

South Dallas-Waxahachie Corridor Strategy Meeting. June 2, 2009 South Dallas-Waxahachie Corridor Strategy Meeting June 2, 2009 Project Mission Provide additional transportation choices connecting major activity centers in Dallas County and Ellis County by efficiently

More information

Appendix D. RTP Amendment #2. Traffic on I-25. Image Credit: CDOT

Appendix D. RTP Amendment #2. Traffic on I-25. Image Credit: CDOT Appendix D RTP Amendment #2 Traffic on I-25. Image Credit: CDOT 406 Appendix D: RTP Amendment #2 A. 2040 RTP Amendment: Resolution 407 B. Rationale for Not Redetermining Conformity Adhering to the interagency

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

BOARD SUBMISSION FORM

BOARD SUBMISSION FORM G-4 BOARD SUBMISSION FORM Fort Pierce Utilities Authority Committed to Quality 206 South Sixth Street (34950) PO Box 3191 Fort Pierce, FL 34948-3191 Phone: 772.466.1600 Department: 21 Department of Finance

More information

Local Road Safety Program. Marie B. Walsh, Director Louisiana LTAP January 10, 2011 Louisiana Transportation Conference

Local Road Safety Program. Marie B. Walsh, Director Louisiana LTAP January 10, 2011 Louisiana Transportation Conference Local Road Safety Program Marie B. Walsh, Director Louisiana LTAP January 10, 2011 Louisiana Transportation Conference Local Road Safety Program Addresses the ALL public road inclusion of SAFETEA-LU Primary

More information

Highlands County Board of County Commissioners Adopted Capital Financial Strategy FY 2010/2011 thru 2019/2020

Highlands County Board of County Commissioners Adopted Capital Financial Strategy FY 2010/2011 thru 2019/2020 CFS SUMMARY Updated: 01/18/2011 CATEGORY / PROJECT NAME FY10-11 FY11-12 FY12-13 FY13-14 FY14-15 FY15-16 FY16-17 FY17-18 FY18-19 FY19-20 LOCAL OPTION SALES TAX SUMMARY LOCAL OPTION SALES TAX 6,700,000 6,834,000

More information

FY Regional Surface Transportation Program (RSTP) Allocations *

FY Regional Surface Transportation Program (RSTP) Allocations * FY 2015-2020 Regional Surface Transportation Program (RSTP) Allocations * Cost Previous Actual Other Source Total Allocation Jurisdiction/Project Description UPC Estimate Funding Allocation * Projected

More information

City of University Place

City of University Place City of University Place City Engineering Department Six Year Transportation Improvement Plan Amended November 10, 2008 Resolution No. 604 City of University Place, Washington SIX-YEAR TRANSPORTATION PLAN

More information

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb

More information

Three Year Engineering Factors, SFY 2017 Report: Overhead Costs per Total Construction Costs

Three Year Engineering Factors, SFY 2017 Report: Overhead Costs per Total Construction Costs Three Year Factors, SFY 2017 Report: Overhead Costs per Costs 1/9/2018 Report Key: Projects are group by Work Type 1, and then work types are used to group projects into categories: qry01makekey 12/11/2017

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

Kentucky Highway District 6

Kentucky Highway District 6 Kentucky Highway District 6 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER WILLIAMSON/ MAURY NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 SR-247 (Duplex Road) Widening TIP # 2004-051 Road Widening Spring Hill Williamson Length 3.10 Regional Plan ID 1062-170 Air

More information

TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County. February 26, 2018

TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County. February 26, 2018 TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County February 26, 2018 Agenda Review Committee Purpose Review Project Map Discuss Service Alternatives Capital Costs (Stations, Track,

More information

FFY 2018 Federal Obligated or Grant Projects Bicycle and Pedestrian Freight

FFY 2018 Federal Obligated or Grant Projects Bicycle and Pedestrian Freight Capitol Region 10 0004-0116 CON STPA Old Farms Rd Avon Replace Br 04470 o/ Farmington River 2,000 2,000 0 0 10 0004-0116 CON STPA Old Farms Rd Avon Replace Br 04470 o/ Farmington River 4,263 4,263 0 0

More information

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program New Jersey Turnpike Authority Interchange 6 to 9 Widening Program Tuesday, September 18, 2007 Public Hearings: Time: 5:00 PM - 8:00 PM Wednesday, September 19, 2007 Senior Center 3 Municipal Drive Bordentown,

More information

Five-Year Work Plan FY FY 2020 CENTRAL FLORIDA EXPRESSWAY AUTHORITY. July 9, 2015

Five-Year Work Plan FY FY 2020 CENTRAL FLORIDA EXPRESSWAY AUTHORITY. July 9, 2015 CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY 2016 - FY 2020 July 9, 2015 FY 2016 - FY 2020 July 9, 2015 Prepared for: CENTRAL FLORIDA EXPRESSWAY AUTHORITY 4974 ORL Tower Road Orlando, Florida 32807 Prepared

More information

Florida Department of Transportation. Road Ranger Performance Measures Annual Report. July 1, 2015 to June 30, 2016 Fiscal Year (FY) 2015/2016

Florida Department of Transportation. Road Ranger Performance Measures Annual Report. July 1, 2015 to June 30, 2016 Fiscal Year (FY) 2015/2016 Florida Department of Transportation Road Ranger Performance Measures Annual Report July 1, 2015 to June 30, 2016 Fiscal Year (FY) 2015/2016 Prepared by: Florida Department of Transportation Commercial

More information

PALM BEACH COUNTY FIVE YEAR ROAD PROGRAM - EXHIBIT A

PALM BEACH COUNTY FIVE YEAR ROAD PROGRAM - EXHIBIT A Page 1 of 5 PALM BEACH COUNTY FIVE YEAR ROAD PROGRAM - EXHIBIT A FY 2017 TOTAL BUDGETED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED Local Option Gas Taxes Total 49,679,000 49,679,000 49,679,000

More information

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Guam Transportation Program Project Updates Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Agenda Road Construction Highlights Ongoing Construction Route 17 Rehabilitation and

More information

Proposed FY 2015 Ten Year Capital Plan

Proposed FY 2015 Ten Year Capital Plan Proposed FY 2015 Ten Year Capital Plan FY 2015 Capital Plan Challenges AET is funded through the Highway Program. Current cost estimate for AET is $380 million over the next ten years. Capital Plan spending

More information

Opening Remarks and Introductions Commissioner VanderLey Turnpike Authority Update Christine Girardin Infrastructure Improvements Brian Sanders (OC

Opening Remarks and Introductions Commissioner VanderLey Turnpike Authority Update Christine Girardin Infrastructure Improvements Brian Sanders (OC October 25, 2018 Opening Remarks and Introductions Commissioner VanderLey Turnpike Authority Update Christine Girardin Infrastructure Improvements Brian Sanders (OC Transportation Planning) Traffic Humberto

More information

Columbia County Road Department. Department Presentation June, 2013 By David Hill

Columbia County Road Department. Department Presentation June, 2013 By David Hill Columbia County Road Department Department Presentation June, 2013 By David Hill Columbia County Road Department Presentation: Work Performed Revenues / Expenses Projects Completed / Planned Issues and

More information

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016 2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)

More information

# of Projects STIP Total Other FHWA Target FHWA Total FHWA Target AC Total AC

# of Projects STIP Total Other FHWA Target FHWA Total FHWA Target AC Total AC DISTRICT/ATP 6 Data Input Worksheet STIP 2014 2017 Needed for 10 yr workplan Needed for 10 yr workplan YEAR # of Projects STIP Total Other FHWA Target FHWA Total FHWA FTA State TH DIST C TH Total TH Bond

More information

P3 PROJECT PIPELINE: STATUS - AUGUST 2016

P3 PROJECT PIPELINE: STATUS - AUGUST 2016 FLAGSTAFF FACILITY Swap of current ADOT facilities in Flagstaff for new space in a repurposed Harkins theatre. Construction work on new ADOT facility will begin in fall. Expected move-in date for ADOT

More information

Transportation Improvement Program

Transportation Improvement Program FLAGSTAFF METROPOLITAN PLANNING ORGANIZATION CITY OF FLAGSTAFF COCONINO COUNTY ARIZONA DOT Office: 100 West Birch Avenue Flagstaff, Arizona 86001 Mail: 211 West Aspen Avenue Flagstaff, Arizona 86001 Phone:

More information

Highlands County Board of County Commissioners Preliminary Capital Financial Strategy FY 2014/2015 thru 2023/2024

Highlands County Board of County Commissioners Preliminary Capital Financial Strategy FY 2014/2015 thru 2023/2024 FY 214/215 thru 223/224 8/18/14 CAPITAL B U D G E T SUM M A RY CAPITAL BUDGET * Local Option Infrastructure Sales Tax to expire October 31, 219 FY14-15 FY15-16 FY16-17 FY17-18 FY18-19 FY19-2 * FY2-21 FY21-22

More information

City of Palm Coast 5 Year Capital Improvement Plan

City of Palm Coast 5 Year Capital Improvement Plan CAPITAL PROJECTS FUND FY 16 Budget FY 16 Projected FY 17 FY 18 FY 19 FY 20 FY 21 Prior Year Carry over 4,760,593 4,760,593 3,958,193 470,836 411,836 784,956 831,338 Ad Valorem Taxes 284,600 284,600 141,418

More information

Incentives for Green Fleets

Incentives for Green Fleets Incentives for Green Fleets 2012 Green Vehicle Funding Workshop East Bay Clean Cities Coalition Karen Schkolnick Air Quality Programs Manager Bay Area Air Quality Management District Overview Introduction

More information

Richmond Area MPO Regional Priority Transportation Projects

Richmond Area MPO Regional Priority Transportation Projects Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia

More information

Dear New Clean Cities Stakeholder:

Dear New Clean Cities Stakeholder: Dear New Clean Cities Stakeholder: I am writing to invite you to join the Florida Gold Coast Clean Cities Coalition. We are a voluntary public and private partnership, which is dedicated to reducing the

More information

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PERMIT SKETCHES INDEX OF PERMIT SKETCHES ORLANDO (FEDERAL FUNDS)

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PERMIT SKETCHES INDEX OF PERMIT SKETCHES ORLANDO (FEDERAL FUNDS) 6 7 19 30 31 7 18 5 8 20 29 8 17 9 21 33 9 16 19 20 21 30 L-68A 32 5 29 33 L-37 B L-33 28 WP 3 10 15 22 27 F SW 185 Way 31 32 SW 18 Ave. SW 12 Ave. SW 136 Ave. Canal S.W. 12 Ave. TOLL 25 19 36 18 30 Road

More information

TRANSPORTATION ENGINEERING SERVICES: Street Project Management

TRANSPORTATION ENGINEERING SERVICES: Street Project Management TRANSPORTATION ENGINEERING SERVICES: Street Project Management Mission Statement Street Project Management is a department within the Division of Public Works, Transportation Engineering section. The mission

More information

US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT

US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT April 25, 2012 Tahoe Transportation District (TTD) Tahoe Transportation District (TTD) established 1980 as Bi-State Agency TTD Goals Implement Transportation

More information

CULPEPER DISTRICT TRANSPORTATION UPDATE / FALL 2017

CULPEPER DISTRICT TRANSPORTATION UPDATE / FALL 2017 CULPEPER DISTRICT TRANSPORTATION UPDATE / FALL 17 From the District Engineer: In 17, the Culpeper District successfully delivered several large projects that have been years in the making. In Culpeper

More information