1 Swanson School of Engineering Civil and Environmental Engineering Civil and Environmental Engineering DETERMINING THE ENVIRONMENTAL BENEFITS OF ADAPTIVE SIGNAL CONTROL SYSTEMS USING SIMULATION MODELS Xin Wei October 5 th MASITE Annual Meeting King of Prussia, PA 20 Mar 2015

2 Outline Background Methodology Testing Linking Conclusion 2 1/13/2016

3 Background Traffic demand Traffic stops and delay Traffic emissions Climate change and health damage 3 1/13/2016

4 Reduce Traffic Emissions Matters Civil and Environmental Engineering The situation allows of no delay 4 1/13/2016

5 Adaptive Traffic Control Systems 5 1/13/2016

6 How ATCSs work 6 1/13/2016

7 Hypothesis and Objectives Microsimulation develop a methodology to estimate emission reduction benefits by the installation of ATCS tested this methodology to use microsimulation models results of an operating ATCS system to estimate emission levels in a corridor Linking with other models established guidelines for linking emission and dispersion models to estimate emission levels at specific receptors in a corridor. 7 1/13/2016

8 Methodology Select a simulation model Build a Model Synchro Optimized Timing Data Optimizing for TOD Plan Input counting data from ATCS Inputting Data InSync Actual Timing Data Inputting ATCS Timing Calibration and validation based on ATCS s model Calibration Model Calibration and validation in field studies Running Simulation Compare & Evaluate Emission Results Running Simulation Future links to Emission & Dispersion Models 8 1/13/2016

9 Testing Test bed Microsimulation models Time of Day (TOD) Plans InSync Plans Simulation results 9 1/13/2016

10 Test bed: Route 19 corridor (Perry Highway), Wexford, PA 10 1/13/2016

11 Adaptive Traffic Control Systems InSync Adaptive Traffic Control System by Rhythm Engineering Wexford, PA 11 1/13/2016

12 12 1/13/2016

13 Microsimulation Models 13 1/13/2016

14 Time of Day (TOD) Plans Time of day Optimized plan 7:00-8:00 Plan 1 (AM) 8:00-9:00 9:00-10:00 10:00-11:00 11:00-12:00 12:00-13:00 13:00-14:00 14:00-15:00 15:00-16:00 16:00-17:00 17:00-18:00 18:00-19:00 Plan 2 (Mid-Day) Plan 3 (PM) The optimized Plans 1,2 and 3 can be developed in Synchro in such a way that these three traffic performance periods were optimized separately while setting the signal timing for the rest of the hourly network unaltered. 14 1/13/2016

15 InSync Plans /13/2016

16 Aggregation method for ATCS timings The mean green time of each phase was calculated and combined into a timing cycle with all-red and yellow period timing, which was used to define the timing profile required for the representative timing data. 16 1/13/2016

17 Aggregation method results Phase Cycle Length (s) SBL NBT EBT NBL SBT WBT 1 SR19_NASH 7:00-8: SR19_Richard_Reichold 7:00-8: SR19_N_Meadows_Wexford_Plaza 7:00-8: SR19_Brooktree_Brooker 7:00-8: SR19_Wright_Pontiac 7:00-8: SR19_Brown_Rd 7:00-8: SR19_Bonnieview 7:00-8: SR19_NChapel_Manor 7:00-8: /13/2016

18 Synchro/SimTraffic 18 1/13/2016

19 Time Space Diagram of TOD for 7-8 am 19 1/13/2016

20 Time Space Diagram of InSync for 7-8 am 20 1/13/2016

21 Emission results TOD Plans Total Emissions for 12-hour simulation 18:00-19:00 17:00-18:00 16:00-17:00 15:00-16:00 14:00-15:00 13:00-14:00 12:00-13:00 11:00-12:00 10:00-11:00 9:00-10:00 8:00-9:00 7:00-8: TOD HC Emissions TOD CO Emissions TOD NOx Emissions 21 1/13/2016

22 Emission results InSync Plans Total Emissions for 12-hour simulation 18:00-19:00 17:00-18:00 16:00-17:00 15:00-16:00 14:00-15:00 13:00-14:00 12:00-13:00 11:00-12:00 10:00-11:00 9:00-10:00 8:00-9:00 7:00-8: InSync HC Emissions InSync CO Emissions InSync NOx Emissions 22 1/13/2016

23 Comparison of Hydrocarbons (HC) emissions COMPARISON OF HC EMISSIONS % % % % % % 0 7:00-8:00 8:00-9:00 9:00-10:00 10:00-11:00 11:00-12:00 12:00-13:00 13:00-14:00 14:00-15:00 15:00-16:00 16:00-17:00 17:00-18:00 18:00-19:00 TOD HC Emissions InSync HC Emissions Reduction percentage 0.00% 23 1/13/2016

24 Comparison of Carbon Monoxide (CO) emissions COMPARISON OF CO EMISSIONS :00-8:00 8:00-9:00 9:00-10:00 10:00-11:00 11:00-12:00 12:00-13:00 13:00-14:00 14:00-15:00 15:00-16:00 16:00-17:00 17:00-18:00 18:00-19:00 TOD CO Emissions InSync CO Emissions Reduction percentage 7.00% 6.00% 5.00% 4.00% 3.00% 2.00% 1.00% 0.00% 24 1/13/2016

25 Comparison of Nitrogen Oxide (Nox) emissions COMPARISON OF NOx EMISSIONS % % % % % 0 7:00-8:00 8:00-9:00 9:00-10:00 10:00-11:00 11:00-12:00 12:00-13:00 13:00-14:00 14:00-15:00 15:00-16:00 16:00-17:00 17:00-18:00 18:00-19:00 TOD NOx Emissions InSync NOx Emissions Reduction percentage 0.00% 25 1/13/2016

26 SPSS T-Test 26 1/13/2016

27 Paired t-test results For HC emissions, average t = 6.40, and p = 0.037; For CO emissions, average t = 13.12, and p = 0.017; For NOx emissions, average t = 10.11, and p = Although moderate, these improvements, especially NOx emissions, are statistically significant from the SPSS paired t-test analysis. 27 1/13/2016

28 Linking models Microsimulation Models Pollutant level at specific receptor Vehicle trajectory Specific receptors Emission Models Emission Factors Dispersion Models 28 1/13/2016

29 Microsimulation Emissions Modeling Pairings Microsimulation Model AIMSUM INTEGRATION Paramics VISSIM TRANSIMS CORSIM Synchro/SimTraffic Emissions Model Versit+micro VT-Micro CMEM Versit PHEM MOVES TREMOVE COPERT (EEA) ModEM 29 1/13/2016

30 Microsimulation Emissions Dispersion Models traffic parameters meteorological parameters emission factor site position Dispersion Models 30 1/13/2016

31 Conclusion InSync Plans outperforms TOD Plans in environmental performance measures during a twelve hour test period by saving: 5.98% in HC emissions; 4.09% in CO emissions; 9.28% in NOx emissions. 31 1/13/2016

32 FUTURE RESEARCH Modelling Accuracy the calibration and validation of the Synchro model in this research was not determined, there were many assumptions and limitations. Representative Data Accuracy There needs to be other methods that can be applied by modeling the operations for individual cycles and inputting them to microsimulation models. Linking between Microsimulation Models and other Models this research was not sufficient to complete all the integration methods between microsimulation and other emission and dispersion models. 32 1/13/2016

33 Thanks for all you patience! Doubts, Queries & Suggestions 33 1/13/2016

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO: McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: File FROM: Keyur Shah DATE: February

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 5, No 2, 2014

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 5, No 2, 2014 INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 5, No 2, 2014 Copyright by the authors - Licensee IPA- Under Creative Commons license 3.0 Research article ISSN 0976 4399 The impacts of

More information

Modelling LEZ and Demand Management measures in the City of York using Detailed Traffic-Emission Tools

Modelling LEZ and Demand Management measures in the City of York using Detailed Traffic-Emission Tools Institute for Transport Studies FACULTY OF ENVIRONMENT IAPSC Monday 11 th June 2012 Modelling LEZ and Demand Management measures in the City of York using Detailed Traffic-Emission Tools Dr James Tate

More information

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee

Memorandum. 1 Short List Analysis Background. James Hinkamp and Tony Coe, City of Lafayette Steering Committee To Copies James Hinkamp and Tony Coe, City of Lafayette Steering Committee Date August 26, 2016 Reference number 243381 From Mike Iswalt, Vanessa Peers, Will Baumgardner File reference 4-05 Subject Lafayette

More information

Freeway Weaving and Ramp Junction Analysis

Freeway Weaving and Ramp Junction Analysis TEXAS TECH UNIVERSITY Freeway Weaving and Ramp Junction Analysis Along IH 27 at Plainview, TX Hao Xu, Jared A. Squyres, Wesley Kumfer, and Hongchao Liu 7/15/2011 Table of Contents Project Description...

More information

Are Roundabout Environmentally Friendly? An Evaluation for Uniform Approach Demands

Are Roundabout Environmentally Friendly? An Evaluation for Uniform Approach Demands 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Are Roundabout Environmentally Friendly? An Evaluation for Uniform Approach Demands Meredith Jackson Charles E. Via, Jr. Department of

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Project Advisory Committee

Project Advisory Committee Meredith US 3/NH 25 Improvements Transportation Planning Study Project Advisory Committee March 18, 2008 Meredith US 3/NH 25 Improvements Transportation Planning Study Meeting Agenda Welcome Traffic Model

More information

Application of EMME3 and Transportation Tomorrow Survey (TTS) for Estimation of Zonal Time Varying Population Density Distribution in

Application of EMME3 and Transportation Tomorrow Survey (TTS) for Estimation of Zonal Time Varying Population Density Distribution in Application of EMME3 and Transportation Tomorrow Survey (TTS) for Estimation of Zonal Time Varying Population Density Distribution in the Greater Toronto Area Prepared by: Matthew Roorda, Associate Professor

More information

CAPTURING THE SENSITIVITY OF TRANSIT BUS EMISSIONS TO CONGESTION, GRADE, PASSENGER LOADING, AND FUELS

CAPTURING THE SENSITIVITY OF TRANSIT BUS EMISSIONS TO CONGESTION, GRADE, PASSENGER LOADING, AND FUELS CAPTURING THE SENSITIVITY OF TRANSIT BUS EMISSIONS TO CONGESTION, GRADE, PASSENGER LOADING, AND FUELS Ahsan Alam and Marianne Hatzopoulou, McGill University, Canada Introduction Transit is considered as

More information

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (95)823-85 Fax: (95) 823-853 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO TO: FROM: File Mark VanderSluis, Keyur Shah

More information

City of Lafayette Agenda Downtown Congestion Reduction Plan Steering Committee

City of Lafayette Agenda Downtown Congestion Reduction Plan Steering Committee City of Lafayette Agenda Downtown Congestion Reduction Plan Steering Committee Regular Meeting Date: Wednesday, August 31, 2016 Time: 7:00 p.m. Location: Lafayette City Offices Room 265 3675 Mount Diablo

More information

Pembina Emerson Border Crossing Interim Measures Microsimulation

Pembina Emerson Border Crossing Interim Measures Microsimulation Pembina Emerson Border Crossing Interim Measures Microsimulation Final Report December 2013 Prepared for: North Dakota Department of Transportation Prepared by: Advanced Traffic Analysis Center Upper Great

More information

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B

Critical Movement* Delay (sec/veh) Critical Movement* LOS 8 a.m. 9 a.m. B 25.2 C. 3 p.m. 4 p.m. B 17.3 B Memorandum DATE: AUGUST 1, 2013 TO: PAUL TILTON, P.E., SANDWICH DPW DIRECTOR/TOWN ENGINEER FROM: LEV MALAKHOFF, SR. TRANSPORTATION ENGINEER RE: ROUTE 130/QUAKER MEETINGHOUSE ROAD INTERSECTION Paul: Per

More information

CALIBRATING FUEL CONSUMPTION AND EMISSION MODELS FOR MODERN VEHICLES

CALIBRATING FUEL CONSUMPTION AND EMISSION MODELS FOR MODERN VEHICLES CALIBRATING FUEL CONSUMPTION AND EMISSION MODELS FOR MODERN VEHICLES Rahmi Akçelik Robin Smit Mark Besley IPENZ Transportation Group Conference March 2012 sidrasolutions.com sidrasolutions.com/forums youtube.com/sidrasolutions

More information

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th

Ref. No Task 3. April 28, Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th Ref. No. 151-00564 Task 3 April 28, 2015 Mr. Cesar Saleh, P. Eng. VP Planning and Design W.M. Fares Group th 3480 Joseph Howe Drive, 5 Floor HALIFAX NS B3L 4H7 Sent via Email to ceasr.saleh@wmfares.com

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Deriving Background Concentrations of NOx and NO 2 April 2016 Update

Deriving Background Concentrations of NOx and NO 2 April 2016 Update Deriving Background Concentrations of NOx and NO 2 April 2016 Update April 2016 Prepared by: Dr Ben Marner Approved by: Prof. Duncan Laxen 1 Calibration of DEFRA Background Maps 1.1 Background concentrations

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

Second Generation of Pollutant Emission Models for SUMO

Second Generation of Pollutant Emission Models for SUMO Second Generation of Pollutant for SUMO Daniel Krajzewicz, Stefan Hausberger, Mario Krumnow, Michael Behrisch; SUMO 2014 Conference Institut für Verkehrssystemtechnik www.dlr.de Folie 2 > Institut für

More information

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Recent Development of On- Board Vehicle Emissions Measurements in Hong Kong

Recent Development of On- Board Vehicle Emissions Measurements in Hong Kong Recent Development of On- Board Vehicle Emissions Measurements in Hong Kong Dr. Carol Wong Senior Environmental Protection Officer Environmental Protection Department Hong Kong 3 April 2014 Outline Background

More information

RTE. 1 at RTE. 637 & RTE. 639

RTE. 1 at RTE. 637 & RTE. 639 INTERSECTION SAFETY STUDY Prepared for: Virginia Department of Transportation Central Region Operations Traffic Engineering (UPC #81378, TO 12-092) DAVENPORT Project Number: 13-368 / /2014 RTE. 1 at RTE.

More information

Environmental Impact of Taxis Is there a Business Case for Hybrids. Dr James Tate, Institute for Transport Studies

Environmental Impact of Taxis Is there a Business Case for Hybrids. Dr James Tate, Institute for Transport Studies Environmental Impact of Taxis Is there a Business Case for Hybrids Dr James Tate, Institute for Transport Studies CONTENTS TAXI operations NETWORK impacts 2 Background THE LEEDS TAXI FLEET (Feb 2015) Vehicles

More information

REMOTE SENSING DEVICE HIGH EMITTER IDENTIFICATION WITH CONFIRMATORY ROADSIDE INSPECTION

REMOTE SENSING DEVICE HIGH EMITTER IDENTIFICATION WITH CONFIRMATORY ROADSIDE INSPECTION Final Report 2001-06 August 30, 2001 REMOTE SENSING DEVICE HIGH EMITTER IDENTIFICATION WITH CONFIRMATORY ROADSIDE INSPECTION Bureau of Automotive Repair Engineering and Research Branch INTRODUCTION Several

More information

Reducing Aircraft Ground Emissions

Reducing Aircraft Ground Emissions Reducing Aircraft Ground Emissions presented by Henry Fan Centre for Infrastructure Systems School of Civil and Environmental Engineering 26 May 2008 Presentation Outline Types of airport pollutants Sources

More information

Attachment C: Benefit-Cost Analysis Spreadsheet

Attachment C: Benefit-Cost Analysis Spreadsheet Attachment C: Benefit-Cost Analysis Spreadsheet TIGER VII Application Collier Blvd. Corridor Improvements June 5 th, 2015 Collier Blvd BCA Summary The Collier Boulevard Benefit Cost Analysis (BCA) has

More information

Appendix A.1 Calculations of Engine Exhaust Gas Composition...9

Appendix A.1 Calculations of Engine Exhaust Gas Composition...9 Foreword...xi Acknowledgments...xiii Introduction... xv Chapter 1 Engine Emissions...1 1.1 Characteristics of Engine Exhaust Gas...1 1.1.1 Major Components of Engine Exhaust Gas...1 1.1.2 Units Used for

More information

EMISSION FACTORS FROM EMISSION MEASUREMENTS. VERSIT+ methodology Norbert Ligterink

EMISSION FACTORS FROM EMISSION MEASUREMENTS. VERSIT+ methodology Norbert Ligterink EMISSION FACTORS FROM EMISSION MEASUREMENTS VERSIT+ methodology Norbert Ligterink Symposium Vehicle Emissions November 3, 2016 GETTING THE COMPLETE PICTURE fuels SCR DPF hybrid technology downsizing dynamometer

More information

REAL WORLD DRIVING. Fuel Efficiency & Emissions Testing. Prepared for the Australian Automobile Association

REAL WORLD DRIVING. Fuel Efficiency & Emissions Testing. Prepared for the Australian Automobile Association REAL WORLD DRIVING Fuel Efficiency & Emissions Testing Prepared for the Australian Automobile Association - 2016 2016 ABMARC Disclaimer By accepting this report from ABMARC you acknowledge and agree to

More information

VEPM 5.3. Vehicle Emission Prediction Model update: Technical report. Prepared for NZ Transport Agency. April 2017

VEPM 5.3. Vehicle Emission Prediction Model update: Technical report. Prepared for NZ Transport Agency. April 2017 VEPM 5.3 Vehicle Emission Prediction Model update: Prepared for NZ Transport Agency April 2017 Suite 1-6, D72 Building, 72 Dominion Rd Mt Eden, Auckland 1024 +64 9 629 1435 www.emissionimpossible.co.nz

More information

Micro Traffic Simulation Approach to the Evaluation of Vehicle Emissions on One way vs. Two way Streets: A Case Study in Houston Downtown

Micro Traffic Simulation Approach to the Evaluation of Vehicle Emissions on One way vs. Two way Streets: A Case Study in Houston Downtown Wang, Yu and Qiao 0 0 Micro Traffic Simulation Approach to the Evaluation of Vehicle Emissions on One way vs. Two way Streets: A Case Study in Houston Downtown By Jinghui Wang, Graduate Research Assistant

More information

Department of Civil Engineering The University of British Columbia. Nicolas Saunier

Department of Civil Engineering The University of British Columbia. Nicolas Saunier Department of Civil Engineering The University of British Columbia TRUCK SIGNAL PRIORITY Nicolas Saunier Wook Kang Why Truck Priority? Reduce Rd the Cost of Goods Transportation Reduce Red Light Running

More information

ONE YEAR ON: THE IMPACTS OF THE LONDON CONGESTION CHARGING SCHEME ON VEHICLE EMISSIONS

ONE YEAR ON: THE IMPACTS OF THE LONDON CONGESTION CHARGING SCHEME ON VEHICLE EMISSIONS ONE YEAR ON: THE IMPACTS OF THE LONDON CONGESTION CHARGING SCHEME ON VEHICLE EMISSIONS Sean D Beevers and David C Carslaw Environmental Research Group, King s College London, 4 th Floor, Franklin Wilkins

More information

APPENDIX G. Traffic Data

APPENDIX G. Traffic Data APPENDIX G Traffic Data HCM Signalized Intersection Capacity Analysis 2: Duanesburg Road & I-88 Ramps 10/7/2004 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl)

More information

City of Pacific Grove

City of Pacific Grove Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency

More information

RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic Impact Study

RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic Impact Study 19 May 2015 BY EMAIL: asaggarwal@gmail.com Manor Park Management 231 Brittany Drive, Suite D Ottawa, ON K1K 0R8 Attention: Mr. Anand Aggarwal RE: 3605 Paul Anka Drive Addendum #2 to the December 2012 Traffic

More information

French - IFSTTAR activities

French - IFSTTAR activities French - IFSTTAR activities ERMES Brussels, 26-27 September 2013 Yao LIU, Michel ANDRÉ Laboratoire Transports et Environnement 1 French activities (Ifsttar Lab. Transport & Environment) Emission factors

More information

Fleet Penetration of Automated Vehicles: A Microsimulation Analysis

Fleet Penetration of Automated Vehicles: A Microsimulation Analysis Fleet Penetration of Automated Vehicles: A Microsimulation Analysis Corresponding Author: Elliot Huang, P.E. Co-Authors: David Stanek, P.E. Allen Wang 2017 ITE Western District Annual Meeting San Diego,

More information

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS Proposed Gas Station 40 Arthur Street (Highway 26), Town of the Blue Mountains (Thornbury), County of Grey, Ontario AUGUST 2013 August 27, 2013 MR. REG RUSSWURM

More information

Institute for Transport Studies FACULTY OF ENVIRONMENT. Remote Sensing Vehicle Emissions

Institute for Transport Studies FACULTY OF ENVIRONMENT. Remote Sensing Vehicle Emissions Institute for Transport Studies FACULTY OF ENVIRONMENT Tuesday 27 th September 2011 ERMES Group, Brussels Dr James Tate j.e.tate@its.leeds.ac.uk Remote Sensing Vehicle Emissions METHOD A Remote Sensing

More information

Board Administration and Regulatory Coordination Unit. Division 3. Air Resources Board

Board Administration and Regulatory Coordination Unit. Division 3. Air Resources Board 2423. Exhaust Emission Standards and Test Procedures--Heavy-Duty Off-Road Diesel Cycle Engines. (a) This section shall be applicable to new heavy-duty off-road compression-ignition engines, produced on

More information

Some Comments on Air Quality Nitrogen Oxide

Some Comments on Air Quality Nitrogen Oxide Introduction Air quality Conclusions. Contribution to the workshop 14/1/25 Some Comments on Air Quality Nitrogen Oxide Udo Lambrecht Institute for Energy and Environmental Research Heidelberg udo.lambrecht@ifeu.de

More information

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM

TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM TRAFFIC AND TRANSPORTATION TECHNICAL MEMORANDUM for ENVIRONMENTAL ASSESSMENT US 460 Bypass Interchange and Southgate Drive Relocation State Project No.: 0460-150-204, P101, R201, C501, B601; UPC 99425

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

VALIDATION OF A VEHICLE EMISSION MODEL USING ON-ROAD EMISSION MEASUREMENTS

VALIDATION OF A VEHICLE EMISSION MODEL USING ON-ROAD EMISSION MEASUREMENTS VALIDATION OF A VEHICLE EMISSION MODEL USING ON-ROAD EMISSION MEASUREMENTS Jeff Bluett 1 and Gavin Fisher 2 1 NIWA, PO Box 109-695, Newmarket, Auckland, New Zealand 2 Endpoint, PO Box 37-656, Parnell,

More information

Pima Association of Governments Energy Programs Clean Cities

Pima Association of Governments Energy Programs Clean Cities 20,000,000 Oil Consumption per day 2009 (in billion gallons) Pima Association of Governments Energy Programs Clean Cities 16,000,000 12,000,000 8,000,000 4,000,000 Colleen Crowninshield, Program Manager

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

CR 510/85 Street from CR 512 to 58 Avenue

CR 510/85 Street from CR 512 to 58 Avenue Date: November 14, 2017 To: CR 510/ 85 Street PD& Project File From: Metric ngineering, Inc. Subject: FM No.: 405606-2-22-02 Air Quality Screening Test CR 510/85 Street from CR 512 to 58 Avenue Indian

More information

Provide an overview of the development proposal including projected site traffic volumes;

Provide an overview of the development proposal including projected site traffic volumes; December 19, 2013 File: 163600935 Attention: Troy Elliott Carl Elliott Limited 15-1831 Robertson Road PO Box 11117 Nepean, Ontario K1H 7T8 Dear Mr. Elliott, Reference: 2235 and 2265 Robertson Road Transportation

More information

AGENT-BASED MODELING, SIMULATION, AND CONTROL SOME APPLICATIONS IN TRANSPORTATION

AGENT-BASED MODELING, SIMULATION, AND CONTROL SOME APPLICATIONS IN TRANSPORTATION AGENT-BASED MODELING, SIMULATION, AND CONTROL SOME APPLICATIONS IN TRANSPORTATION Montasir Abbas, Virginia Tech (with contributions from past and present VT-SCORES students, including: Zain Adam, Sahar

More information

Past, Present-day and Future Ship Emissions

Past, Present-day and Future Ship Emissions Past, Present-day and Future Ship Emissions Veronika Eyring DLR-Institute of Atmospheric Physics How to make the sea green: What to do about air pollution and greenhouse gas emissions from maritime transport

More information

DOC design & sizing using GT-SUITE European GT Conference Gauthier QUENEY 09/10/2017

DOC design & sizing using GT-SUITE European GT Conference Gauthier QUENEY 09/10/2017 DOC design & sizing using GT-SUITE European GT Conference 2017 Gauthier QUENEY 09/10/2017 Background Simulation tool target Predict exhaust outlet emissions Thermal modeling Chemical modeling This presentation

More information

Proposed Pit Development

Proposed Pit Development July 5, 2017 via email: sam@greenwoodconst.ca CCTA File 114239 Sam Greenwood Greenwood Aggregates 205467 County Road 109 Amaranth, ON L9W 0V1 Re: Proposed Violet Hill Gravel Pit, Town of Mono Traffic Review

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

CHAPTER 7: EMISSION FACTORS/MOVES MODEL

CHAPTER 7: EMISSION FACTORS/MOVES MODEL CHAPTER 7: EMISSION FACTORS/MOVES MODEL 7.1 Overview This chapter discusses development of the regional motor vehicle emissions analysis for the North Central Texas nonattainment area, including all key

More information

Evaluating opportunities for soot-free, low-carbon bus fleets in Brazil: São Paulo case study

Evaluating opportunities for soot-free, low-carbon bus fleets in Brazil: São Paulo case study Evaluating opportunities for soot-free, low-carbon bus fleets in Brazil: São Paulo case study Tim Dallmann International seminar Electric mobility in public bus transport: Challenges, benefits, and opportunities

More information

Ontario s Drive Clean A mandatory, vehicle emissions-testing program

Ontario s Drive Clean A mandatory, vehicle emissions-testing program Drive Clean makes a difference Ontario s Drive Clean program is reducing smog-causing pollutants from both light-duty and heavy-duty vehicles. The program is helping us make smart choices about the way

More information

Approaches to control air pollution from ports and ships

Approaches to control air pollution from ports and ships Approaches to control air pollution from ports and ships Green Ports: New Front for China s War on Pollution and Climate Change Mitigation Dan Rutherford, Ph.D. Haifeng Wang, Ph.D. Xiaoli Mao 26 July 2016

More information

UTC Case Studies Turin, Rome

UTC Case Studies Turin, Rome UTC Case Studies Turin, Rome Quantifying the Effect of Intelligent Transport Systems on CO2 Emissions from Road Transportation Giorgio Magra, CNH-IVECO Giacomo Tuffanelli, RMA The process Data Collection

More information

AMBIENT AIR QUALITY MONTHLY REPORT

AMBIENT AIR QUALITY MONTHLY REPORT REPORT N O 171-00556-00 AMBIENT AIR QUALITY MONTHLY REPORT DECEMBER 2017 DECEMBER 2017 AMBIENT AIR QUALITY MONTHLY REPORT DECEMBER 2017 Lafarge Canada Inc. Project no: 171-00556-00 Date: December 2017

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

Evaluation of Coal-derived Diesel Fuels

Evaluation of Coal-derived Diesel Fuels Evaluation of Coal-derived Diesel Fuels Governor Tomblin s Energy Summit Joshua Israel Center for Alternative Fuels, Engines and Emissions West Virginia University October 6, 2016 Center for Alternative

More information

Heavy Vehicle Management: Signal Coordination

Heavy Vehicle Management: Signal Coordination Australasian Transport Research Forum 2016 Proceedings 16 18 November 2016, Melbourne, Australia Publication website: http://www.atrf.info Heavy Vehicle Management: Signal Coordination Mohammed Al Eisaei

More information

VEHICLE EMISSION ENFORCEMENT

VEHICLE EMISSION ENFORCEMENT VEHICLE EMISSION ENFORCEMENT BY GEORGE ACKOM (DIRECTOR, VEHICLE INSPECTION AND REGISTRATION) DRIVER AND VEHICLE LICENSING AUTHORITY (DVLA) DATE: 14 MARCH 2017 Outline 1. Background 2. Current Regulation

More information

Isolated Traffic Signal Optimization Considering Delay, Energy, and Environmental Impacts

Isolated Traffic Signal Optimization Considering Delay, Energy, and Environmental Impacts Isolated Traffic Signal Optimization Considering Delay, Energy, and Environmental Impacts Alvaro Jesus Calle Laguna Thesis submitted to the faculty of the Virginia Polytechnic Institute and State University

More information

Why is a towboat called a towboat when it pushes the barges?

Why is a towboat called a towboat when it pushes the barges? Why is a towboat called a towboat when it pushes the barges? The word "tow" comes from the canal age when a draft animal walking along the bank of the canal pulled a barge. As rivermen gained experience

More information

Traffic Micro-Simulation Assisted Tunnel Ventilation System Design

Traffic Micro-Simulation Assisted Tunnel Ventilation System Design Traffic Micro-Simulation Assisted Tunnel Ventilation System Design Blake Xu 1 1 Parsons Brinckerhoff Australia, Sydney 1 Introduction Road tunnels have recently been built in Sydney. One of key issues

More information

2014 Efficiency of Automated Collection and Performance of Compressed Natural Gas Vehicles CIF Project No

2014 Efficiency of Automated Collection and Performance of Compressed Natural Gas Vehicles CIF Project No 2014 Efficiency of Automated Collection and Performance of Compressed Natural Gas Vehicles CIF Project No. 548.11 Submitted by: City of Toronto Submitted to: Waste Diversion Ontario, Continuous Improvement

More information

A IR Q UALITY A PPENDIX

A IR Q UALITY A PPENDIX A P P E N D I X B A IR Q UALITY A PPENDIX... CO EWP Petaluma East Washington Place, Petaluma CARBON MONOXIDE ANALYSIS PM Peak Hour Assumes worst case of all intersections based on total volume, LOS and

More information

REPORT N O AMBIENT AIR QUALITY MONTHLY REPORT JUNE 2017

REPORT N O AMBIENT AIR QUALITY MONTHLY REPORT JUNE 2017 REPORT N O 171-00556-00 AMBIENT AIR QUALITY MONTHLY REPORT JUNE 2017 JUNE 2017 AMBIENT AIR QUALITY MONTHLY REPORT JUNE 2017 Lafarge Canada Inc. Project no: 171-00556-00 Date: June 2017 WSP Canada Inc.

More information

Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune

Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune 2016 TRB Managed Lanes Conference May 5th, Session 6 Presentation Background Outline Metro ExpressLanes

More information

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study Traffic Impact Study Proposed Commercial Development Ballwin, Missouri Technical Memorandum for Traffic Impact Study Crawford, Bunte, Brammeier May 1, 2009 MEMORANDUM Date: April 24, 2009 To: From: Subject:

More information

SAN PEDRO BAY PORTS YARD TRACTOR LOAD FACTOR STUDY Addendum

SAN PEDRO BAY PORTS YARD TRACTOR LOAD FACTOR STUDY Addendum SAN PEDRO BAY PORTS YARD TRACTOR LOAD FACTOR STUDY Addendum December 2008 Prepared by: Starcrest Consulting Group, LLC P.O. Box 434 Poulsbo, WA 98370 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY...2 1.1 Background...2

More information

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013 MnDOT Contract No. 998 Work Order No.47 213 Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/3/213 TASK #4:

More information

Traffic Impact Analysis Farmington Center Village

Traffic Impact Analysis Farmington Center Village Traffic Impact Analysis Farmington Center Village Route 4 (Farmington Avenue) Farmington, Connecticut Prepared for: The Town of Farmington, CT Prepared By: BL Companies Meriden, Connecticut December 2016

More information

LOST LAKE CORRIDOR REVIEW

LOST LAKE CORRIDOR REVIEW LOST LAKE CORRIDOR REVIEW Prepared for: Prepared by: Broadview Developments Inc. c/o Westbrook Consulting Watt Consulting Group Our File: 2064.B01 Date: October 31, 2016 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TECHNICAL MEMORANDUM DATE: September 10, 2014 PROJECT 5861.03 NO: PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis TO: Steve Holroyd - District

More information

Upgrading City Buses to Reduce NOx Emissions

Upgrading City Buses to Reduce NOx Emissions Upgrading City Buses to Reduce NOx Emissions Gavin Martin Environmental Assessment Manager City of Edinburgh Council Kathye Henderson Marketing Manager Eminox About Eminox Eminox was established in 1978

More information

LAQ and GHG Emissions Management

LAQ and GHG Emissions Management LAQ and GHG Emissions Management Emanuel Fleuti Head of Environmental Services Zurich Airport LAQ and GHG Emissions Management 1. Introduction to airport emission inventory 2. System definitions 3. Data

More information

CHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA

CHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA CHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA LSU Research Team Sherif Ishak Hak-Chul Shin Bharath K Sridhar OUTLINE BACKGROUND AND

More information

Air Quality Impacts of Advance Transit s Fixed Route Bus Service

Air Quality Impacts of Advance Transit s Fixed Route Bus Service Air Quality Impacts of Advance Transit s Fixed Route Bus Service Final Report Prepared by: Upper Valley Lake Sunapee Regional Planning Commission 10 Water Street, Suite 225 Lebanon, NH 03766 Prepared for:

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

OPEN HARDWARE, LOW COST, AIR QUALITY STATIONS FOR MONITORING OZONE IN COASTAL AREA

OPEN HARDWARE, LOW COST, AIR QUALITY STATIONS FOR MONITORING OZONE IN COASTAL AREA EGU 214 - Atmospheric and Meteorological Instrumentation 4/28/214 OPEN HARDWARE, LOW COST, AIR QUALIT STATIONS FOR MONITORING OZONE IN COASTAL AREA Marco Lima Co-authors: Davide Donzella, Fabio Pintus,

More information

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM

BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM BUCKLEY ANNEX REDEVELOPMENT PLAN TRANSPORTATION ANALYSIS ADDENDUM Prepared for: City and County of Denver Prepared by: Contact: Brian Bern, P.E., PTOE 303.572.0200 On Behalf of: Lowry Redevelopment Authority

More information

DIESEL EMISSIONS TECHNOLOGY SOLUTIONS

DIESEL EMISSIONS TECHNOLOGY SOLUTIONS International Emissions Technology DIESEL EMISSIONS TECHNOLOGY SOLUTIONS GET TOMORROW S PERFORMANCE WITH TODAY S TECHNOLOGY THE BRILLIANCE OF COMMON SENSE. W HY DIESEL TRUCKS AND BUSES ARE THE BEST THING

More information

Parking/Traffic Assessment Study

Parking/Traffic Assessment Study Brock Road Industrial Mall 985 Brock Road South City of Pickering Parking/Traffic Assessment Study Prepared by: Tranplan Associates, Toronto Toronto 416-670-2005 Sudbury 705-522-0272 Peterborough 705-874-3638

More information

REPORT N O AMBIENT AIR QUALITY MONTHLY REPORT MAY 2017

REPORT N O AMBIENT AIR QUALITY MONTHLY REPORT MAY 2017 REPORT N O 171-00556-00 AMBIENT AIR QUALITY MONTHLY REPORT MAY 2017 MAY 2017 AMBIENT AIR QUALITY MONTHLY REPORT MAY 2017 Lafarge Canada Inc. Project no: 171-00556-00 Date: May 2017 WSP Canada Inc. 150-12791

More information

HEAVY VEHICLE MANAGEMENT: SIGNAL COORDINATION VS. RESTRICTION STRATEGIES

HEAVY VEHICLE MANAGEMENT: SIGNAL COORDINATION VS. RESTRICTION STRATEGIES HEAVY VEHICLE MANAGEMENT: SIGNAL COORDINATION VS. RESTRICTION STRATEGIES A thesis submitted in fulfilment of the requirements for the degree of Master of Engineering Mohammed Al Eisaei Bachelor of Engineering

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Modeling Investigation of Energy Use and Air Emissions from Urban Transportation Sector

Modeling Investigation of Energy Use and Air Emissions from Urban Transportation Sector Modeling Investigation of Energy Use and Air Emissions from Urban Transportation Sector Prof. Kebin HE Tsinghua University Workshop of IGES/APN Mega-City Project January 23-24, 2002, Kitakyushu, Japan

More information

Appendix H: Construction Impacts H-2 Transportation

Appendix H: Construction Impacts H-2 Transportation Appendix H: Construction Impacts H-2 Transportation \ AECOM 71 W. 23 rd Street New York, NY 10010 www.aecom.com 212 366 6200 tel 212 366 6214 fax Memorandum To CC Subject Robert Conway Donald Tone Construction

More information

Airport Road Improvements

Airport Road Improvements Airport Road Improvements October 2015 ENVIRONMENTAL STUDY REPORT Airport Road from 1.0 km north of Mayfield to 0.6 km north of King Street Town of Caledon D TRAFFIC STUDY & ROUNDABOUT EVALUATIONS Airport

More information

IMAGE PROCESSING ANALYSIS OF MOTORCYCLE ORIENTED MIXED TRAFFIC FLOW IN VIETNAM

IMAGE PROCESSING ANALYSIS OF MOTORCYCLE ORIENTED MIXED TRAFFIC FLOW IN VIETNAM IMAGE PROCESSING ANALYSIS OF MOTORCYCLE ORIENTED MIXED TRAFFIC FLOW IN VIETNAM Nobuyuki MATSUHASHI Graduate Student Dept. of Info. Engineering and Logistics Tokyo University of Marine Science and Technology

More information

La Canada Flintridge Parents for Healthy Air November 1, 2018 Presented by Elizabeth Krider, Ph.D., Esther Kornfeld and Tamar Tujian

La Canada Flintridge Parents for Healthy Air November 1, 2018 Presented by Elizabeth Krider, Ph.D., Esther Kornfeld and Tamar Tujian Concerns regarding the Devil s Gate Sediment Removal Project 1. New science demands new assessment of health risks to 3,000 sensitive receptors nearby. a. Air pollution is the new tobacco health crisis,

More information

Is The Dulles Corridor Metrorail Project the answer?

Is The Dulles Corridor Metrorail Project the answer? Is The Dulles Corridor Metrorail Project the answer? Shigenori Hiraoka Contributed to by Bill Gouse & Claire Felbinger 10/27/2006 Japan International Transport Institute JITI Seminars are fully supported

More information

CENTRAL VIRGINIA LONG RANGE TRANSPORTATION PLAN. Appendix F

CENTRAL VIRGINIA LONG RANGE TRANSPORTATION PLAN. Appendix F Data Collection Traffic turning movement data were obtained from the Virginia Department of Transportation (VDOT) Southwestern Region Lynchburg District Traffic Engineering Section. However, 12-hour traffic

More information