12 GA HANGER WIRE, BY OTHERS, NOT BY HUNTER DOUGLAS SEE DETAIL A1.1 MAIN RUNNER SPLICE. SPECIFICATIONS (unless noted otherwise)
|
|
- Annabel Maxwell
- 5 years ago
- Views:
Transcription
1 12 GA HANGER WIRE, BY OTHERS, NOT BY HUNTER DOUGLAS SEE DETAIL A1.1 4' OPEN CELL RUNNER SEE DETAIL A1.7 FOR INFILL PANEL FIXTURE OPENING RECOMMENDATIONS CROSS RUNNER FIELD CUT AT PERIMETER TYPICAL SYSTEM SECTION SEE DETAIL A 1.5 2'x2' OPEN CELL PANEL, MODULE SHOWN SEE DETAIL A THIS SHEET MODULE SECTION DETAIL A OPEN CELL COMPONENT SECTION 1"x WALL ANGLE SEE DETAIL A1.2 1"x WALL ANGLE SEE DETAIL A1.2 MAIN RUNNER SPLICE SEE DETAIL A1.5 CROSS RUNNER FLOATING TRIM SEE DETAIL A1.3 TRIM NOT SHOWN FOR CLARITY MAIN RUNNER SPLICE 2 O.C. SPACING TYPICAL SUSPENSION LAYOUT PROJECT: OPEN CELL PRODUCT DRAWING NUMBER: OPEN-CELL-A1.0
2 INSTALLATION ORDER STEP 1: INSTALL 8' MAIN RUNNERS ON 48" CENTERS STEP 2: INSTALL 4' CROSS RUNNERS BETWEEN MAIN RUNNERS ON 2 CENTERS STEP 3: INSTALL 2' CROSS RUNNERS BETWEEN 4' CROSS RUNNERS ON 48" CENTERS CROSS RUNNER, FIELD CUT AT PERIMETER O.C.TYPICAL 12 GA HANGER WIRE 48" 12 GA HANGER WIRE, 48" O.C. MAX ALONG MAIN RUNNER, TYPICAL 1"x WALL ANGLE TRIM FINISHED 360 2'X 2'OPEN CELL PANEL, MODULE PANEL SHOWN 4'-0" CROSS RUNNER 4' OPEN CELL RUNNER CROSS RUNNER CROSS RUNNER 2 O.C. SPACING MODULE MAIN RUNNER SPLICE 2 O.C TYPICAL ASSEMBLY PROJECT: OPEN CELL PRODUCT DRAWING NUMBER: OPEN-CELL-A1.1
3 12 GA HANGER WIRE BEYOND, BY OTHERS, TYPICAL FINISH OPEN CELL RUNNER POP RIVET INSIDE OF OPEN CELL MEMBER, BY OTHERS, TYPICAL HANGER CLIP 0.25" HEM 2.00" FINISH CROSS/ MAIN RUNNER 1.00" 3 8 " FIELD CUT OPEN CELL PANEL EDGELINE LX-02 TRIM FINISH WALL/ BULKHEAD TERMINATIONS SCALE: 6" = 1'-0" 1" X OPEN CELL WALL ANGLE (FINISHED ON BOTH SIDES) FLOATING TRIM CONDITION #1 SCALE: 6" = 1'-0" CELL FLOATING PERIMETER BRACKET SEE ISOMETRIC VIEW BELOW X OPEN CELL RUNNER 12 GA HANGER WIRE, 48" O.C. MAXIMUM ALONG EDGELINE TRIM, BY OTHERS, TYPICAL EX-1 CLIP BEYOND EDGELINE LX02 TRIM MAIN/ CROSS RUNNER HANGER CLIP EDGELINE LX-02 TRIM FLOATING CONDITION #2 SCALE: 6" = 1'-0" OPEN CELL MAIN RUNNER CELL FLOATING PERIMETER BRACKET, FIELD DRILL AND POP RIVET TO RUNNER. FIELD APPLY TOUCH UP PAINT TO RIVET HEAD ISOMETRIC VIEW SCALE: NOT TO SCALE OPEN CELL SUSPENSION DETAILS PROJECT: OPEN CELL PRODUCT DRAWING NUMBER: OPEN-CELL-A1.2 SCALE: AS SHOWN
4 ALONG MAIN RUNNER 12 GA HANGER WIRE, 48" O.C. MAXIMUM ALONG LX TRIM, TYPICAL 12 GA HANGER WIRE, 48" O.C. MAXIMUM FIELD MITER CORNER, OUTSIDE CORNER BRACKET EX-1 CLIP AT ALL INTERSECTIONS 2'X 4' OPEN CELL PANEL, MODULE SHOWN LX02 EDGELINE TRIM EX-1 CLIP AT ALL INTERSECTIONS 2 O.C. SPACING * NO CROSS RUNNERS WITH 2'X4' PANELS MAIN RUNNER SPLICE 2 O.C. SPACING X 4'-0" OPEN CELL PROJECT: OPEN CELL PRODUCT DRAWING NUMBER: OPEN-CELL-A1.3
5 8'-0" MODULE OPEN CELL MAIN RUNNER 8'-0" 3' " " MODULE " OPEN CELL PROFILE OPEN CELL CROSS RUNNER 4'-0" 1' " " MODULE " NOT TO SCALE OPEN CELL CROSS RUNNER MODULE SPACING VARIES BY SPECIFICATION, CONTACT HUNTER DOUGLAS TYPICAL OPEN CELL RUNNERS PROJECT: OPEN CELL PRODUCT DRAWING NUMBER: OPEN-CELL-A1.4
6 12 GA HANGER WIRE, BY OTHERS, TYPICAL 18 GA (0.050") WIRE HANGER CLIP CUT VERTICAL LEGS INDIVIDUALLY WITH SNIPS NOTCHED TO RECEIVE SLIDING CLIP BEND CELL BACK & FORTH UNTIL IT BREAKS OFF SLOT TO RECEIVE CROSS RUNNER SLOTS TO RECEIVE SPLICE MAIN RUNNER CROSS RUNNER SPLICE, INSERT FROM TOP. TABS MUST SNAP INTO SLOTS. WIRE HANGER DETAIL SCALE: 1-1/ = 1'-0" FIELD CUT DETAIL SCALE: 1-1/ = 1'-0" SPLICE DETAIL SCALE: 1-1/ = 1'-0" DEPTH VARIES, SPECIFY DEPTH VARIES, SPECIFY OPENINGS VARY BY PROJECT, SPECIFY 4'-0" 3 8 " 3 8 " HOLE IS CENTERED IN BOTH DIRECTIONS OPENINGS VARY BY PROJECT, SPECIFY 3 8 " 1 2 " 2' X 4 OPEN CELL FIXTURE PANEL 2' X 4 OPEN CELL INFILL FIXTURE PANEL OPEN CELL INSTALLATION DETAILS PROJECT: OPEN CELL PRODUCT DRAWING NUMBER: OPEN-CELL-A1.5
7 CELL SQUARE x 3"x3" x 6"x6" 8"x8" 1x1 CELL RECTANGULAR 2x2 x6" x8" x1 3"x8" 3"x1 PATTERN CELL 3"/9" Pattern /8" Pattern 3"/6"/3" Pattern 8"/1/8" Pattern /16"/ Pattern PATTERNS PROJECT: OPEN CELL PRODUCT DRAWING NUMBER: OPEN-CELL-A1.6
8 1 2 " 1 2 " 1 4 " PANEL UPPER LENGTH VARIES PANEL LOWERS HAVE SUPPORT CLIP PANEL LOWER PANEL SUPPORT TAB LENGTH VARIES PANEL LOWERS PANEL UPPERS SECURED INTO PANEL LOWERS UNASSEMBLED OPEN CELL PANEL COMPONENTS ASSEMBLED OPEN CELL PANEL COMPONENTS FIXTURE PANELS & PANEL ASSEMBLY PROJECT: OPEN CELL PRODUCT DRAWING NUMBER: OPEN-CELL-A1.7
INTERIOR INSTALLATION
HOOK ON CROSS CONNECTOR CLAMP AT ALL INTERSECTIONS OF S 4-1 4" PANEL 1/2" x 1-1/2" 16 GA CR CHANNEL PRIMARY AT 48" O.C. MAX SPACING, TYPICAL. PANEL 1 1 2 " 12 GA HANGER WIRE, BY OTHERS, NOT BY HUNTER DOUGLAS.
More informationDETAIL 'A' INTERIOR INSTALLATION. OVERALL ISOMETRIC VIEW (unless noted otherwise) 300C CARRIER 12 GA HANGER WIRE, BY OTHERS, NOT BY HUNTER DOUGLAS
3 " NOM. 316 G, ER V RO N HA. TYP SEE DETAILS A1.7 THROUGH A1.10 FOR FIXTURE OPENING RECOMMENDATIONS IE ARR XC 12 GA HANGER WIRE, BY OTHERS, NOT BY HUNTER DOUGLAS SEE DETAIL A1.2 A "M 1'-0 300C PANEL SPLICE
More informationMIDDLE SECTION REPRESENTS "BLADE SIZE" (EXAMPLE: 24 = 24/32" [3/4"] 48 = 48/32" [1 1/2"]) REPRESENTS NUMBER OF BLADES PER 12" WIDE PANEL WG WB
HOW TO READ PRODUCT "SKU" : FIRST TWO LETTERS REPRESENT "PRODUCT TYPE" MIDDLE SECTION REPRESENTS "BLADE SIZE" (EXAMPLE: 24 = 24/32" [3/4"] 48 = 48/32" [1 1/2"]) REPRESENTS NUMBER OF BLADES PER 12" WIDE
More informationEAH153SY FITTING INSTRUCTIONS
EAH153SY FITTING INSTRUCTIONS REPLACES: 15.12.16 REVISED: 16.02.17 HOLDEN COLORADO 6/16on BIG TUBE WINCH PROTECTION BAR WITH FOG LIGHTS VEHICLE FRONTAL PROTECTION SYSTEM (VFPS) FOR AIR BAG & ADR COMPLIANT
More informationOV-1 STANDING SEAM OVERVIEW. Temple Architectural Products 638 Moore Rd Avon Lake, OH 44012
STANDING SEAM OVERVIEW SW-2 CB-2 CB-1 R-1 RK-1 V-1 SW-1 RK-1 H-1 VR-1 P-1 HW-1 PB-1 DE-2 DE-1 RK-3 DE-2 SP-1 OV-1 DRIP EDGE - 1 6" WIDE HIGH TEMP UNDERLAYMENT STRIP PRE-NOTCHED PANEL END STANDING SEAM
More informationCetra. Ceiling Power Entry Installation (AEC1, AEC14, or AEC16)
Figure A Power Pole Top Cap Trim Plate L Bracket (Long leg attached to top of panel) Ceiling Installation (AEC, AEC, or AEC) Recommended Tools Variable Speed Drill with Torque Option Pop Rivets Riveting
More information#GL18006-L2 Honda Gold Wing 1800 & F6B models - All Years Lower Cowl LED Driving Lights INSTALLATION INSTRUCTIONS
#GL18006-L2 Honda Gold Wing 1800 & F6B models - All Years Lower Cowl LED Driving Lights INSTALLATION INSTRUCTIONS 1. Lay out and familiarize yourself with the parts included in the set. Remove the left
More informationComponents & Methods of Attachment Series 99 Fixed & Moving Rail Tracks
Components & Methods of Attachment Series 99 Fixed & Moving Rail Tracks 9946 9943 9956 Internal Joining Fixed Track 9952 Ceiling Cover 78mm Diameter 9950 Swivel Hanger Attachment 9951P Two Screw Attachment
More informationWET WALL. EvApORATIvE COOLINg SySTEm. 10" x 8" Tee INSTALLATION INSTRUCTIONS
WET WALL EvApORATIvE COOLINg SySTEm 10" x 8" Tee INSTALLATION INSTRUCTIONS 800-779-3267 sales@schaeferfan.com www.schaeferfan.com 2012 Schaefer Ventilation Equipment 2-8-12 / M-WetWall SingleStack Table
More informationK.D. LOCKER ASSEMBLY INSTRUCTIONS
Instructions PN 860 K.D. LOCKER ASSEMBLY INSTRUCTIONS These Instructions Cover 3 Types of Lockers: VANGUARD, GUARDIAN AND INVINCIBLE II CONTENTS Single Tier Vanguard Locker (Single Row) GENERAL INSTRUCTIONS
More informationCOYOTE LCC (Low Count Closure)
PLP Feature Focus 2009 Preformed Line Products OCTOBER 2012 Film available at www.preformed.com COYOTE LCC (Low Count Closure) Be sure to read and completely understand this procedure before applying product.
More informationHard Bar Sport, M1/M2 Hard Core Hardtop, M2 Sport, and Xtreme Installation Instructions
HARDWARE KIT: Hard Bar Sport, M1/M2 Hard Core Shoulder Harness Guide Relocation Assemblies: 2-3/8" X 1" grade 8 bolts 4-3/8" flat washers 2-3/8" lock nuts 2 - brass bushings 2 - plastic trim caps 2-3/8"
More informationCOYOTE Dome Closure 9.5" x 28" with Transition Tray for High Density Splice Applications
OCTOBER 2017 COYOTE Dome Closure 9.5" x 28" with Transition Tray for High Density Splice Applications Be sure to read and completely understand this procedure before applying product. Be sure to select
More informationCOYOTE 9.5" x 19" (292 mm x 509 mm) Cross-Connect Dome Closure
AUGUST 2013 COYOTE 9.5" x 19" (292 mm x 509 mm) Cross-Connect Dome Closure Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED TM product
More informationUNPACK AND IDENTIFY THE FOLLOWING PARTS.
SUT-350-AIT ASSEMBLY REQUIREMENTS *Torque all T-bolt nuts to 35-40 foot pounds. *Check all lights before towing. *Tire pressure not to exceed recommendation on serial tag. *Re-torque wheel nuts after first
More informationunderfloor 49 UFC UFC 50 FAS P 50 UFCN 51 UC C DF 54 UFS 55 UFFS 56 UFS Cablofil cable management UNDER FLOOR SUPPORT CLAMP kit
underfloor 49 UFC 550 UNDER FLOOR SUPPORT CLAMP kit 49 UFC UNDER FLOOR SUPPORT CLAMP 50 FAS P FAS PROFILE 50 UFCN UNDER FLOOR CLAMP 51 UC 50 CABLE TRAY STANDOFF 51 C 50 UNDER FLOOR ATTACHMENT 52 fas l
More informationCOYOTE STP (Service Termination Point)
JANUARY 2017 COYOTE STP (Service Termination Point) Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application.
More informationUNPACK AND IDENTIFY THE FOLLOWING PARTS.
SUT-500-S ASSEMBLY REQUIREMENTS *Torque all T-bolt nuts to 35-40 foot pounds. *Check all lights before towing. *Tire pressure not to exceed recommendation on serial tag. *Re-torque wheel nuts after first
More informationCOYOTE STP (Service Termination Point)
March 2019 COYOTE STP (Service Termination Point) Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED TM product before application.
More informationZODIAC 601 XL. Trim the outboard corner of the front flange of the center spar 6W4-1. Corner should not touch the side of the cabin floor skin 6B10-1.
Trim the outboard corner of the front flange of the center spar 6W4-1. Corner should not touch the side of the cabin floor skin 6B10-1. Tape the side skins to the cabin floor skin (area in front of the
More informationINSTALLATION INSTRUCTIONS Toyota FJ Cruiser DEMELLO-OFFROAD.
INSTALLATION INSTRUCTIONS Item Description Vehicle 3 piece Rear Bumper 2007-2014 Toyota FJ Cruiser DEMELLO-OFFROAD www.demello-offroad.com 12785 magnolia ave Riverside ca 92503 Suite 1 phone: 1-951-735-4417
More informationCOLD AIR INTAKE INSTALLATION INSTRUCTIONS. # D Fits: F10 M5 # D Fits: F06/F12/F13 M6 PARTS LIST
COLD AIR INTAKE INSTALLATION INSTRUCTIONS # D760-0035 Fits: 2013-15 F10 M5 # D760-0037 Fits: 2012-15 F06/F12/F13 M6 PARTS LIST (1) Left Carbon Airbox Lid (1) Right Carbon Airbox Lid (1) Left Carbon Snorkel
More informationMustang Classic LightBar Instructions
1994-2004 Mustang Classic LightBar Instructions Note: Read installation instructions before starting. Component List: 1 LightBar 4 Poly Plugs 4 LightBar Bolts 4 LightBar Washers 2 LightBar Rivets 2 Light
More informationHi-Tech specially designed components allow for fast and easy assembly.
OPEN SHELVING MEDIUM, HEAVY AND EXTRA HEAVY-DUTY HI-TECH STEEL SHELVING Open Starter Units Include: Two beaded front posts, two angle back posts, one pair of back sway braces, two pair of side sway braces
More informationIMPORTANT: PLEASE KEEP THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE! TOOLS REQUIRED
IMPORTANT: PLEASE KEEP THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE! 2014-15 Toyota Tundra Mesh Grille Upper Insert - Fits ALL model Tundras with chrome or painted factory grille surround Black Mesh Part
More informationCOLD AIR INTAKE INSTALLATION INSTRUCTIONS
COLD AIR INTAKE INSTALLATION INSTRUCTIONS # D760-0033 Fits: 2013-15 F01 B7, 750i & xdrive (N63TU engine) 2013-15 F02 B7L, 750Li & xdrive (N63TU engine) PARTS LIST Left and right carbon fiber air box lids
More information3713 TRUCK MOUNT. Installation Instructions for Personal Plow. CAUTION Read this document before installing the snowplow.
November 1, 2003 Lit. No. 28047 3713 TRUCK MOUNT Installation Instructions for Personal Plow Jeep Liberty 2003 20 Read this document before installing the snowplow. See your sales outlet for application
More informationSection 75-ZA-3 Fin & Rudder Cable Fairing Installation
Section 75-ZA-3 Fin & Rudder Cable Fairing Installation This manual has been prepared for installation of the Fin and Fairings. This photo assembly manual is intended as a supplement to the drawings. If
More informationD'Shannon Aviation PANEL INSTALLATION INSTRUCTIONS
D'Shannon Aviation PANEL INSTALLATION INSTRUCTIONS Disconnect the battery posts 1. Windshield Removal NOTE: If the aircraft is equipped with a D'Shannon speed sloped windshield, you will not have to do
More informationSafeLite Installation Steps For a 2 x 2 Light Fixture
SafeLite Installation Steps For a 2 x 2 Light Fixture SafeLite Installation Instructions Fluorescent Fixtures (Refer to Diagrams) 1) For existing ceiling applications, remove ceiling tile from both sides
More information1. Front Fascia Removal 1.1 Remove the 6 plastic clips that secure the upper valance, then remove. 1.2 Remove 6 upper bolts that hold the grille and f
STRUT 2015 GMC Denali Collection Installation Manual " 1. Front Fascia Removal 1.1 Remove the 6 plastic clips that secure the upper valance, then remove. 1.2 Remove 6 upper bolts that hold the grille and
More informationMARCH COYOTE 9.5 x 19 (292 mm x 509 mm) Terminal Dome Closure Kits
MARCH 2012 COYOTE 9.5 x 19 (292 mm x 509 mm) Terminal Dome Closure Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before
More informationCOYOTE 28" GLC (Ground Level Closure) Complete Assembly Installation
NOVEMBER 2016 COYOTE 28" GLC (Ground Level Closure) Complete Assembly Installation Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED
More information(2) 12mm x 40mm Short Low Profile Bolt Plates. (2) Spacer Washers. (4) 12mm Plastic Retainers. Passenger/Right Front.
PARTS LIST: 1 Driver/Left Running Board with 1 Rubber Backing (use on SX & Limited models) 4 12mm Plastic Retainer 1 Passenger/Right Running Board with 1 Rubber 4 12mm Lock Washer Backing (use on SX &
More informationSUT-450-I ASSEMBLY REQUIREMENTS
SUT-450-I Torque wrench, carpenters square, wire cutters, Phillips screwdriver, 7/16, 9/16, and 3/4 combination wrenches, ratchet, 9/16,3/4,13/16, and 7/8 sockets. ASSEMBLY REQUIREMENTS *Torque all T-bolt
More informationPART A. INSTRUCTION SHEET FOR LOCK SERVICE PACK XW4Z CB, 5W4Z BB AND 4R3Z AA
KIT, 5W4Z-5421991-BB AND 4R3Z-6321990-AB Item # Part Number Description Used In Package Quantity A SK 5W4A-5421991-BB Instruction Sheet (48387) All 1 B1 324341 Tumbler # 1 All 4 B2 324342 Tumbler # 2 All
More information1) Page: REV 5: Changed depiction to show added hardware and T-01220
REVISION DESCRIPTION: 1) Page: 37-01 REV 5: Changed depiction to show added hardware and T-01220 Page: 37-02 REV 4: Added Figure 3 depicting Separating the T-01220 Doublers. Figure 4 was Figure 3. Added
More informationWindow Regulator: Service and Repair Front Door Trim. Armrests. With Power Windows. Front Door Arm Rest. Remove or Disconnect
1995 Oldsmobile Cutlass Ciera V6-3100 3.1L VIN M SFI Page 1 Window Regulator: Service and Repair Front Door Trim Armrests 1. Plugs from upper and lower armrest openings. 2. Screws from upper and lower
More informationCOIN CELL PC BATTERY HOLDERS
COIN CELL PC BATTERY HOLDERS 20mm to 30mm Sizes 12mm to 16mm & 1/3 N Sizes SINGLE CELL HOLDER (3-VOLT) DUAL CELL HOLDER (6-VOLT) Single and Dual Printed Circuit Cell Holders for Lithium Coin Cells. Designed
More informationJANUARY 2015 NOMENCLATURE. TOOLS REQUIRED 3/8" & 7/16" Can wrench or socket 1/4 Nut driver or screwdriver Snips Fiber optic cable opening tools
JANUARY 2015 COYOTE Dome Closure 6-1/2" x 17" Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED TM product before application. 1 2
More informationCOYOTE Dome Closure 6.5" x 22" Kits. COYOTE Dome Closure 6.5" x 22" for Buffer Tube Applications. Includes: (2) Grommets, (1) Buffer
JANUARY 2015 COYOTE Dome Closure 6.5" x 22" Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application. 1 2 3 6
More informationSECTION METAL LOCKERS. A. ADAAG Americans with Disabilities Act, Accessibility Guidelines.
SECTION 10 51 13 METAL LOCKERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Heavy Duty Welded Gear Lockers. B. Locker benches. 1.02 REFERENCES A. ADAAG Americans with Disabilities Act, Accessibility Guidelines.
More informationSkyline 4 Fascia Fabrication & Installation Instructions
Components Needed Page 2 Tools Needed Page 2 System Diagram Page 3 Instructions Step 1: Install Brackets Page 4 Step 2: Install Pre-assembled Shade Page 4 Step 3: Install Fascia Clip Page 4 Step 4: Cut
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Accessory Application Publications No. 3RD ROW AII 27366 ODYSSEY Issue Date P/N 08R12-SHJ-100 SEP 2004 PARTS LIST Left side rear sunshade Driver s Side 1. Remove the left speaker
More informationUNPACK AND IDENTIFY THE FOLLOWING PARTS.
SUT-250-M2 ASSEMBLY REQUIREMENTS *Torque all T-bolt nuts to 35-40 foot pounds. *Check all lights before towing. *Tire pressure not to exceed recommendation on serial tag. *Re-torque wheel nuts after first
More informationWORK STATION BRIDGE CRANES
FREE STANDING WORK STATION BRIDGE CRANES CAPACITIES: SPANS: ENCLOSED TRACKS: PRODUCTIVITY: Up to 4000 lbs Up to 30' Steel, Aluminum & Stainless Steel Average 28% Increase A Class Above... In Productivity.
More information3 DOOR SYSTEM ROOMFOLD DELUXE RANGE
ROOMFOLD DELUXE RANGE 3+0 Door Pattern 3 DOOR SYSTEM SYSTEM OVERVIEW Pivot Door Daily Access Door 282 HSS Drop bolt position on reverse of door 106 SSMF Guide TOOLS REQUIRED 24mm & 17mm Router Bit IMPORTANT
More information"CLARITY WALL" VIF " 1 1 8" SECTION 1 2 " 3 8 " "CLARITY" SLIDING DOOR with FIXED GLASS PANEL BLOCKING & SUPPORT AS NEEDED SCHEDULED CEILING
VIF BLOCKING & SUPPORT AS NEEDED 2 13 16" SCHEDULED CEILING FOAM GASKET 1/2" x 1/8" CORRIDOR SIDE 3 8 " OFFICE SIDE UPPER TRACK UPPER TRACK VALANCE DRY FIT CLEAR GASKET FIXED PANEL SLIDING DOOR 1 1 8"
More information2006 Saturn Ion ACCESSORIES & EQUIPMENT Doors - Ion
POWER DOOR LOCK SWITCH REPLACEMENT Removal Procedure Fig. 28: View Of Power Door Lock Switch 1. Using a flat-bladed tool, pry the switch from the door trim panel enough to expose the locking tabs. 2. Press
More informationINSTALLATION INSTRUCTION W Track Recessed 120V Flangeless
W Track Recessed 120V Flangeless WT4-RTL, WT8-RTL, WT12-RTL SAFETY INSTRUCTION Read all of these instructions before installing the track system. Turn off power at main switch before installing or modifying
More informationSection 13. Tail Rotor Drive. RotorWay International A600 TALON Construction Manual. Section 13. Page A
RotorWay International Page A Tail Rotor Drive Procedures covered in this section: Install driveshafts and gearboxes; install drive belt and tensioner; fabricate and install tail rotor pitch actuator arms;
More informationInstallation Instructions
Equipment Required: Installation Instructions Fastener Kit: F Wrenches: 8mm, 13mm, 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill, Reciprocating Saw, File WARNING: Under no circumstances do we recommend
More informationDearborn Overhead Crane
A Class Above... In Productivity. In Safety. In Ease of Positioning and Movement. In Ease of Installation. In Designs, Capacities, and Spans. It s no wonder more and more businesses like yours are choosing
More informationChicago Metallic 200 Snap Grid 15/16
Part of The ROCKWOOL Group Chicago Metallic 200 Snap Grid 15/16 coustical ceiling suspension system Ideal for: Retail, classrooms, general interiors. Performance Properties: -Intermediate and heavy duty
More informationCP-TK-2X4 POCKET TRIM KIT INSTRUCTION SHEET
CP-TK-2X4 POCKET TRIM KIT INSTRUCTION SHEET (COMPLETE TYPE CC-W KIT WITH CP-TK-2X4 TRIM KIT ILLUSTRATED) POCKET TRIM KIT POCKET TRIM KIT (CP-TK) SAVES ON INSTALLATION TIME, EASY TO INSTALL AND MAKES EASY
More informationChicago Metallic /16
Part of The ROCKWOOL Group Chicago Metallic 1200 15/16 coustical ceiling suspension system Ideal for: Retail, classrooms, general interiors. Performance Properties: -coustical grid system comes in intermediate
More informationHospital Grade Laminar Flow Common Plenum Ceiling System
MANUAL INSTALLATION Hospital Grade Laminar Flow Common Plenum Ceiling System HGPL Series v001 Issue Date: 11/15/17 2017 Price Industries Limited. All rights reserved. TABLE OF CONTENTS Product Overview
More informationGP Lam LVL. Grade Thickness Depth , , , , , 149, 169, 189, 249 (209and 229 by special order) 2.
GP Lam LVL Grade Thickness Depth 2.0E 1 3 49, 3 1 29 7 1 49, 9 1 49, 9 1 29, 11 1 49, 11 7 89, 149, 169, 189, 249 (209and 229 by special order) 1.5E 1 3 49 7 1 49, 9 1 49, 9 1 29, 11 1 49, 11 7 89, 149,
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Trans4mer Mounting System Part No. 30090 (black) Part No. 30091 (chrome) for Chev & GMC S-series trucks NOTE: GMC SLE only: This model has a plastic bumper cover which protrudes
More informationWAVETRAX USER MANUAL
WAVETRAX USER MANUAL 107719-2A0 WAVETRAX User Manual Document Number 107719-1A0 Copyright 2001, Telect, Inc., All Rights Reserved. Telect and Connecting the Future are registered trademarks of Telect,
More informationGP Lam LVL. Grade Thickness Depth , 9 1 4, 9 1 2, , , 14, 16, 18, 24 (20 and 22 by special order) 2.
GP Lam LVL GP Lam LVL Introduction.....................32 Bearing Details...................34 Handling and Installation..........35 Floor Beams.....................35 Window, Patio Door and Garage Door
More informationTri-Boro Shelving Features
6Steel Shelving Tri-Boro Shelving Features Tri-Boro Shelving is manufactured in the widest range of sizes available in the industry. When used in combination this array of sizes can meet the most demanding
More informationDuette & Applause EasyRise Honeycomb Shades Field Repair Manual
Duette & Applause EasyRise Honeycomb Shades Field Repair Manual Replace the Cord Loop Replace the Clutch Replace the Spool Assemblies (For EasyRise Lifting Systems prior to May 2009) Page 1 Table of Contents
More informationDeuce/Ace Installation Instructions
HARDWARE KIT: Upper Mounting Plate: 2-7/16" (11mm) X 3.5" bolts 2-7/16" flange nuts 2-2" spacers 2-7/16" trim cap mounting washers 2 - plastic trim caps TOOLS NEEDED: safety glasses wrenches 16mm or 5/8"
More information4 DOOR SYSTEM ROOMFOLD DELUXE RANGE
ROOMFOLD DELUXE RANGE 3+1 Pattern 4 DOOR SYSTEM SYSTEM OVERVIEW 818 Top 605 Hanger 125 EQUAL Slave Daily Access 282HSS EQUAL Flush bolt on reverse side of door 150 802 Bottom 106 SSMF Guide TOOLS REQUIRED
More informationLights TURN SIGNAL/PARKING LIGHT HIGH BEAM HEADLIGHT LOW BEAM HEADLIGHT. Maintenance
Check the operation of your car s exterior lights at least once a month. A burned out bulb can create an unsafe condition by reducing your car s visibility and the ability to signal your intentions to
More informationSide Dump Tarp System Driver or Passenger Stowing Non-Sealed applications
Roll Rite, LLC and its entire staff would like to not only Thank You but congratulate you on your purchase of one of what we feel to be the finest line of tarping systems in the industry. Side Dump Tarp
More informationINSTRUMENT PANEL WARPAGE REPAIR
PAGE 1 OF 15 AFFECTED VEHICLES: INSTRUMENT PANEL WARPAGE REPAIR ALL 1999-2000 MODEL YEAR CONTOUR AND MYSTIQUE OVERVIEW NOTE! Revisions to the technical instructions are indicated in RED text. This document
More informationInstallation instructions, accessories. Body kit
Installation instructions, accessories Instruction No 31265373 Version 1.1 5 Part. No. Body kit IMG-256263 Volvo Car Corporation Body kit - 31265373 - V1.1 Page 1 / 42 Equipment A0000162 A0000163 IMG-239664
More information*70200BAG1* 70200BAG FORD F150 GRILLE LIGHT MOUNT
927020000 *70200BAG1* 70200BAG1 2015-2018 FORD F150 GRILLE LIGHT MOUNT PRIOR TO INSTALLATION Make sure the kit is complete and you have read these instructions thoroughly before beginning installation.
More informationB5 A4 1.8t Front Mount Intercooler Install Instructions
B5 A4 1.8t Front Mount Intercooler Install Instructions Only work underneath your vehicle after properly supporting it with adequate jack stands on a flat surface. NEVER work under a vehicle only supported
More informationP-LED.com (325) INSTALLATION GUIDE
P-LED.com (325) 227.4577 INSTALLATION GUIDE GETTING STARTED CONTENTS Page 2 Mounting Bracket Layout Page 3 Installing Street Wrap into Mounting Brackets Page 4 How to Wire RGB Page 5 Custom Cut to Fit
More informationREAR STEEL BUMPER INSTALLATION INSTRUCTIONS Runner
REAR STEEL BUMPER INSTALLATION INSTRUCTIONS 2010+ 4Runner Version 2.1.0 - September 2016 Thank you for purchasing the Southern Style OffRoad Toyota 4Runner 5 th Gen Modular Rear Plate Steel Bumper. It
More informationMIRROR, GLASS AND PANEL TRIM
... MIRROR, GLASS AND PANEL TRIM RIGHT SHAPES RIGHT PRICE RIGHT NOW J CAP ALUMINUM CAP FOR 1/16" MATERIAL FR 0230, BC ALUMINUM CAP FOR 3/32" MATERIAL FR 0330, BC ALUMINUM CAP FOR 5/32" MATERIAL FR 0430,
More informationINSTALLATION INSTRUCTIONS JEEP 2011-UP JK SECURITY FULL CONSOLE #274
INSTALLATION INSTRUCTIONS JEEP 2011-UP JK SECURITY FULL CONSOLE #274 PARTS CHECKLIST Tuffy Console #9 Left Front Mounting Bracket #10 Right Front Mounting Bracket #11 Electronics mounting bracket #12 Divider
More informationHSpecialties Inc. TABLE OF CONTENTS
TABLE OF CONTENTS Introduction... Curtain Track Selection Guide...2 Ordering COMPLETE Tracks...3 00 Series Standard-Duty Straight Track...4 200 Series Black Medium-Duty Straight Track...8 300 Series Standard-Duty
More informationCorrect Track Suspension Alignment System
Correct Track Suspension Alignment System Table Of Contents Introduction........................................... 2 Parts List.............................................. 2 Preparation............................................
More informationLIGHT DUTY ROLL UP DOOR
1-800-225-6729 LIGHT DUTY ROLL UP DOOR CAUTION Use proper lifting equipment and correct lifting procedures to avoid damage or injury. MODEL 150C installation guide A rolling door is a large heavy object
More informationREVISION DESCRIPTION:
REVISION DESCRIPTION: 14401 Keil Road NE, Aurora, Oregon, USA 97002 PHONE 503-678-6545 FAX 503-678-6560 www.vansaircraft.com info@vansaircraft.com Service Letters and Bulletins: www.vansaircraft.com/public/service.htm
More informationToyota Tacoma Winch Mount Bumper Installation Instructions Tools Required: Transmission cooler relocation brackets Torque Wrench
2016-2017 Toyota Tacoma Winch Mount Bumper Installation Instructions Tools Required: Items Included: Small flat head screw driver Winch Mount Ratchet, 10mm, 12mm, 14mm, 17mm & Skid Plate 19mm sockets Transmission
More informationCOYOTE Dome Cross-Connect Closure 6-1/2" x 22"
FEBRUARY 2015 COYOTE Dome Cross-Connect Closure 6-1/2" x 22" Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application.
More informationITEM QTY CHECK PART NUMBER DESCRIPTION. NOTE: This package does not include any accessories for gauge installation
PART #90540A Gauge Pod Only Package, SLP, 2005-2013 Corvette PACKING LIST Before installation, use this check list to make sure all necessary parts have been included. ITEM QTY CHECK PART NUMBER DESCRIPTION
More informationSTOL CH 701. STOL CH701 cabin. Top view: Tunnel 7F11-4 between the Seats. STOL CH701 Seats
CH701 cabin Top view: Tunnel 7F11-4 between the Seats. CH701 Seats CHECK: If the Gusset 7F11-7 is supplied bent; hen it is best to install the Gusset before the Seat 7F16-1. Otherwise, install the Seat
More informationITEM QTY CHECK PART NUMBER DESCRIPTION
PART #90542A Boost Gauge Package, SLP, 2005-2013 Corvette PACKING LIST Before installation, use this check list to make sure all necessary parts have been included. ITEM QTY CHECK PART NUMBER DESCRIPTION
More informationDO NOT GRIND ANY WELDS
1 READ FIRST! PLEASE READ THROUGH ALL OF THE INSTRUCTIONS AND ENSURE THAT YOU UNDERSTAND THEM. BE SURE THAT YOU HAVE ALL THE REQUIRED GSI COMPONENTS, BASIC TOOLS, AND SKILLS. CUTTING THIS KIT REQUIRES
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS This document explains mounting for pendant, recessed, and wall PENDANT - STEP ONE INSTALL MOUNTING POINTS Non-power feed mounting points may be positioned 1 to 12 or 12 to 18
More informationCOYOTE 9.5" x 19" (292 mm x 509 mm) Dome Closure
AUGUST 2012 COYOTE 9.5" x 19" (292 mm x 509 mm) Dome Closure Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application.
More informationREVISION DESCRIPTION: REV 2: Steps re-written for clarity REV 2: Steps re-written for clarity.
REVISION DESCRIPTION: 14-04 REV 2: Steps re-written for clarity. 14-05 REV 2: Steps re-written for clarity. SECTION 14: W-1012-L OUTBOARD W-1012-R TRIMMED OUTBOARD S W-1012-L OUTBOARD W-1025B-R FLAP HINGE
More informationSECTION METAL LOCKERS. A. ADAAG - Americans with Disabilities Act, Accessibility Guidelines.
Section 10_51_13_MetalLockerPenco-ProTough_8-19-09 PART 1 GENERAL SECTION 10 51 13 METAL LOCKERS 1.01 SECTION INCLUDES A. Heavy Duty Welded Tubular Frame Lockers. B. Locker benches. 1.02 REFERENCES A.
More informationCHANGING REAR SHOCKS/REAR SHOCK MOUNTS on an E36/8 Z3 M Coupe
CHANGING REAR SHOCKS/REAR SHOCK MOUNTS on an E36/8 Z3 M Coupe Remove the rear luggage compartment floor trim. Remove the right (passenger side) rear compartment cover, and the M Mobility System. Remove
More informationAcoustical. Pages Watch for this icon for compatibility with new taller grid profile. Ph:
Watch for this icon for compatibility with new taller grid profile Pages 175-190 Sold by: http://www.twacomm.com Toll Free: (877) 892-2666 175 Lay In And Troffer Light Fixture Support Clips The original
More informationCURTAIN TRACK SELECTOR GUIDE
TABLE OF CONTENTS NOTE: For cross-reference purposes see our latest price sheet which lists all part numbers in numerical order with the corresponding catalog page numbers adjoining them. CURTAIN AND DRAPERY
More informationTHE SERIES-E POWR Slider
C.R. LAURENCE CO., INC. PATENT NO. 4,920,698 THE SERIES-E POWR Slider MODEL: EPC814S 2014+ CHEVY/GMC SILVERADO/SIERRA 1500 NAGS: DY90122PK5 ELECTRIC SLIDING REAR WINDOW 2014 + CHEVY/GMC SILVERADO/SIERRA
More information48" and 52" Hyflo TM Un-Assembled Fans Assembly Manual
48" and 52" Hyflo TM Un-Assembled Fans Assembly Manual The employees of Chore-Time Equipment would like to thank your for your recent Chore-Time purchase. If a problem should arise, your Chore-Time distributor
More informationROLL BAR FRAME 2 PLACES F-1231A-FL ROLL BAR FRAME F-1231C INBOARD F-1231B OUTBOARD ROLL BAR STRAP BAGGAGE BULKHEAD
SECTION 24iS/U: ROLLOVER F-1231A-FR ROLL BAR FRAME VAN'S AIRCRAFT, INC. F-1231A-AR ROLL BAR FRAME STRUCTURE F-1231E ROLL BAR SPLICE PLATE 2 PLACES F-1232A ROLL BAR BRACE F-01254-R-1 SUPPORT FRAME & F-01207
More informationPage: REV 3: Add drill and tap information to Figure 4 DRILL #3, TAP 1/4-28 BOTH ENDS.
REVISION DESCRIPTION: 1) Page: 32-03 MEMO: Step 4 should not be bold. Fix WD-1213 callout in Figure 3. Page: 32-04 REV 3: Add drill and tap information to Figure 4 DRILL #3, TAP 1/4-28 BOTH ENDS. Add make
More informationInstallation Manual TWM Performance Shift Boot 2006 and up Honda Civic Si
Page 1 Installation Manual TWM Performance Shift Boot 2006 and up Honda Civic Si Begin the installation by parking on a flat surface, as you may have to engage and disengage the hand brake and shift from
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS 2011 Dodge Charger Road Defender 5000 Series Push Bumper Part Number 5076 Do not attempt to install this product on any vehicle other than the one it is designed for and listed
More informationInstallation instructions for Pantera Rear Deck Lid Lift Support Kit
Installation instructions for Pantera Rear Deck Lid Lift Support Kit WARNING Modification of your vehicle with the parts identified above may alter its stock performance; the buyer hereby expressly assumes
More informationTimes-2 Speed Files INSTALLATION INSTRUCTIONS
Times-2 Speed Files INSTALLATION INSTRUCTIONS AURORA from RICHARDS-WILCOX, INC. 600 South Lake Street Aurora, Illinois 60506 Phone: 630-897-6951 Fax: 630-897-6994 Toll Free: 800-277-1699 TIMES-2 SPEED
More information